HomeMy WebLinkAboutTime Stamped Watershed Application - - 34 GLENORE CIRCLE PLANNING DEPARTMENT
Community & Economic Development Division
Special Permit — Watershed Permit Application
Please type or print clearly.
1. Petitioner: David + Marianne Sweetser
Petitioner's Address: 34 Glenore Circle North Andover, MA 01845
Telephone number&email: 978-258-6392 thesweetsers@comcast.net
2.Owners of the Land: David + Marianne Sweetser
Address: 34 Glenore Circle North Andover, MA 01845
Number of years of ownership: 20
3.Year lot was created: 1999
4. Is the lot currently on septic or sewer?
Yes
If on sewer, please provide date the sewer connection was
completed: 2002
5. Description of Proposed Project: Construction of an inground pool with an enclosure, patio,
demo deck, construct new deck, construct firepit within the"Non-discharge"watershed zone
but outside the 150 ft"Non-Disturbance"watershed zone. No trees to be cut.
6. Description of Premises: Existing Single Family House on 2.4 Acre lot
7.Address of Property Being Affected: 34 Glenore Circle
Zoning District: R1
Assessors Map: 37B Lot#: 74
Registry of Deeds: Book#: 6295 Page#: 180
8. Existing Lot:
Lot Area (Sq. Ft): 105,181 Building Height: 35 feet
Street Frontage: 175 ft Side Setbacks:
Front Setback: Rear Setback:
Floor Area Ratio: n/a Lot Coverage: n/a
9. Proposed Lot(if applicable): (n/a)
Lot Area(Sq. Ft): Building Height:
Street Frontage: Side Setbacks:
Page 1 of 2
120 Main Street, Planning Dept., North Andover, Massachusetts 01845
Phone 978,688.9535 Fax 978.688.9542 Web v�lww,igJ..hand0verma,ggy
Front Setback: Rear Setback:
Floor Area Ratio: _ Lot Coverage:_
10. Required Lot(as required by Zoning Bylaw): n/a
Lot Area (Sq. Ft): Building Height:_
Street Frontage: Side Setbacks:
Front Setback: Rear Setback:
Floor Area Ratio: Lot Coverage:
11. Existing Building(if applicable): n/a
Ground Floor(Sq. Ft.): #of Floors:_ _--
Total Sq. Ft.:—_-- Height:
Use: Type of Construction:
12. Proposed Building:
Ground Floor(Sq. Ft.): 608 #of Floors: 1
Total Sq. Ft. 608 Height:_< 9n feet
Use: Pool Enclosure Type of Construction: Wood Frame
13. Has there been a previous application for a Special Permit from the Planning Board on these
premises? No _If so,when and for what type of construction?
14. Section of Zoning Bylaw that Special Permit Is Being
Requested_
15. Petitioner and Landowner signature(s):
Every application for a Special Permit shall be made on this form, which is the official form of the
Planning Board. Every application shall be filed with the Town Clerk's office. It shall be the
responsibility of the petitioner to furnish all supporting documentation with this application, The
dated copy of this application received by the Town Clerk or Planning Office does not absolve the
applicant from this responsibility. The petitioner shall be responsible for all expenses for filing and
legal notification, Failure to comply with application requirements, as cited herein and in the
Planning Board Rules and Regulations may result in a dismissal by the Planning Board of this
application as incomplete.
1 7'�
Petitioner's Signature: �� " " ��� , �� ', ''��v` ' ��✓�C1,1�
Print or type name here: Da id Swe ser /_Marianne Sweetser
Owner's Signature: u � �/-11 r�r,-rat 1�k �.��I �e
Print or type name here: David Sweetser V4a.r anne Sweetser
16. Please list title of plans and documents you will be attaching to this application.
Written Supportive Narrative , Abutters List, Stormwater Report
-------P-4ot Rlara 34� --nc�re--Cir-Gle--dated Jan: 23-;--2023------ ---- - - -
--- Pa—fie z of ---
120 Main Street, Planning Dept., North Andover, Massachusetts 01845
Phone 978.688.9535 Fax 978.688,9542 Web www.northandoverma.gov
8. Assisting in the economical provisions of transportation, water, sewerage, schools, parks, and other public
facilities.
This project will not impact the above noted public facilities and/or utilities. There ivill not be a
negative impact to the economics of any public utility.
9. Controlling the use of bodies of water, including watercourses:
This project does not directly abut the Lake and will not have a negative impact on present uses of the
Lake or tributaries thereto.
10. Reducing the probability of losses resulting from floods:
This property is not located within a designated Flood Plain as shoiam as the latest FIRM maps. The
proposed construction will utilize drainage mitigation to collect & recharge stormwater runoff back to
the groundivater table. There will be no increase of stormwater runoff from this site. There will be no
increase in flooding probability due to the development of the property.
11. Reserving and increasing the amenities of the Town
This project will increase the amenities of the Town through an improvement to the property and
additional tax revenue due to the new construction assessment.
The Planning Board, in reviewing this application, will note that all threshold requirements for granting the
Special Permit are met and/or exceeded.
Further written documentation is provided below(responses to required items are in italics)
1. Written certification by a Registered Professional Engineer, or other scientist educated in and possessing
extensive experience in the science of hydrology and hydrogeology, stating that there will not be any
significant degradation of the quality or quantity or water in or entering Lake Cochichewick.
1) No pesticides,fungicides, chemicals, or non-organic fertilizers 1vill be used in lawn care or
maintenance. Presently, there are no limitations on the type or quantity offertilizers.
2) Siltation controls are proposed at the limit of Work during construction and until the site is final
stabilized by landscaped means to protect the lake and surrounding properties from any potential
runoff impacts.
3) Stormwater mitigation has been provided to account for increases in impervious areas. A proposed
drainage infiltration field consisting of cultec units has been provided to capture runoff from the pool
enclosure roof area. The drainage infiltration field is sized to handle the 100 year rain event(8.6"
per Town of North Andover StormlVater° bylaw)
4) The existing dwelling IS connected to the municipal sewer system; therefore there ivill be no potential
increase in nitrogen levels over the existing background levels at the property.
5) This site does not directly abut the lake. Additionally, natural ivooded buffers will be retained. No
trees are to be cut/removed as part of this project.
6) Carefully planning went into the pool/patio location to limit site grading changes and to match the
existing topography. By limiting the grading changes onsite, existing drainage watercourses will
continue to function as in the undeveloped state.
2. Proof that there is no reasonable alternative location outside the Non-Disturbance and/or Non-Discharge
Buffer Zones, whichever is applicable, for any discharge, structure, or activity, associated with the proposed
use to occur.
The majority of the developed lot is within the "Non-discharge zone". All proposed ivork is outside of
the "Non-disturbance"zone. The pool must be located in the rear yard per zoning.
3. Evidence of approval by Mass DEP of any industrial waste water treatment or disposal system or any waste
water treatment of system 15,000 GPD capacity.
This item does not apply to this site.
PO Box 2004 Woburn, MA 01888 781-854-8644 e-mail:jacksu1153@comcast.net
4. Evidence that all on-site operations including,but not limited to, construction,water water disposal,
fertilizer applications, and septic systems will not create concentrations of Nitrogen in groundwater, greater
than the federal limit at the downgradient property boundary.
The existing dwelling IS connected to the municipal sewer system and the deed restriction only
allowing organic or slow-release nitrogen,phosphorus free produce for fertilizer use will insure that
background nitrogen levels in the groundwater table will not be increased.
5. Projections of downgradient concentrations of nitrogen,phosphorus, and other relevant chemicals at
property boundaries and other locations deemed pertinent by the SPGA.
There will be no downgradient concentration of the above referenced chemicals as outlined in the
response to Item 4 above.
If you should have any questions or require additional information please feel free to contact me.
Very, Yo
f�• .Yt�'V r 4
eV
SULL'IVAI'
ack an, P.E. s:� 1
Attachments (as noted)
Cc: David +Marianne Sweetser
PO Box 2004 Woburn, MA 01888 781-854-8644 e-mail:jacksu1153@comcast.net