Loading...
HomeMy WebLinkAboutO&M Standalone_For client - - 34 GLENORE CIRCLE Sullivan Engineering Group, LLC 0 rIJEngrneers 8 Land Derelopment Consultants Date: March 14, 2023 Stormwater Operation & Maintenance 34 Glenore Circle North Andover, MA 01845 Beginning with the construction of the drainage system, and continuing in perpetuity thereafter, the owner(s) of the site shall maintain in accordance with the following schedule: a. Pavement and walkways shall be swept in the early spring immediately after snow melt b. Roof drain inlets,downspouts, and roof drain pipes - All components of the roof drain collection system shall be inspected at least 2 times per years Sediments and debris shall be removed and disposed of in accordance with all applicable federal, state, and local laws. Any components that become damaged shall be repaired or replacd immediately upon discovery to assure proper conveyance of stormwater runoff into the drywell systems. c. Infiltration Chambers —The level of water in the infiltration chambers shall be monitored during and after heavy rain storms at least 2 times per year during the ftrst year of operati<;m and at least twice annually thereafter for evidence of clogging or other problems. If water does not leave the chambers within 72 hours after the storm, or if water breaks out on the surface above the system,or ifthe roof collection system begins to overflow frequently (for the 10 year storm intensity or less intense storms), the infiltration bed is likely clogged. The infiltration bed shall be cleaned and repaired or replaced as needed to maintain proper functioning. d. Vegetation shall be maintained in healthy condition to prevent erosion and sedimentation in the drainage system and wetland resource areas. e. Existing Catchbasin—The existing catchbasin shall be inspected twice a year. Any accumulated sediment, branches, or leaves shall be removed from the grate area to allow free flow of water. Additionally, the inside of the catchbasin should be inspected to see if any accumulated sand or sediment needs to be removed from the basin. f. Permeable Bluestone paver—Twice a year the pavers shall be inspected after a 1"rain storm to see how water infiltrates thru the gaps in the pavers into the underlying base. The owner shall avoid placing sand on the pavers during winter conditions. Attached is a simple sketch plan which provides an illustration of the stormwater BMP's referenced above with each site item referenced with the corresponding letter above (Le "a", "b", etc....) P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153gcomcast.net — ' = 1 ' SKET CH PLAN TO ACCOMPANY O &M PLAN . .0* DRAINAGE EASEMENT cb I f &L 12'ROP Fkwod End im-18MOr Lo AREA 105.181 V/2.41 - ---------- *0614 Am PrqL FbWft zE Am wIPaUs Ek to be O&M Item "f O&M Ism "d" Stop prop. `Am Am O&M tm "b" Oe patlo "c" Am Provwa own" O&M I m at dow t Ae O&M Ite d- ro FiL Dock stow a com lancamimh M=Am st-ft PWF.DRADIAM alo I * WLMA71ON FM Am GLENORE • (7.r x O&M Item "e" Prop.4rF SWd4pk m A of Work Am v to craftumn o ows"' 06 I N78W22*E , ri '22"W WATER EASEMENT S7 A CIRCLE 6ce O&M Item "a"