Loading...
HomeMy WebLinkAboutConstruction Schedule - - 75 COACHMANS LANE F6mmmmmmmwmm�« SINCE1978 WHAT TO EXPECT DURING YOUR POOL IN5TA LA4_TION WEEK 1 a. POOL EXCAVATION (GENERALLY 1-3 DAYS) 5/30/25 b. POOL STRUCTURE INSTALLED c. CONCRETE SUPPORT COLLAR POURED AROUND BASE OF WALLS WEEK 2 a. ELECTRICIAN BONDS STRUCTURE 6/2/25 b. BONDING GETS INSPECTED BY CITY/TOWN OFFICIAL c. POOL PLUMBING GETS INSTALLED AND STUBBED TO APPROX FILTER LOCATION WEEK 3 a. POOL GETS BACKFILLED 6/9/25 b. IT IS TIME FOR PATIO COMPANY TO INSTALL PATIO (TIME FRAME DEPENDS ON THE SIZE OF PATIO/WALLS/MATERIALS CHOSEN (GENERALLY 1-2 WEEKS) Week 6-8 AFTER PATIO COMPLETION 7/7/25 - 7/21/25 a. POOL BASE AND LINER GET INSTALLED.FILTER EQUIPMENT INSTALLED b. POOL IS FILLED AND STARTED/POOL CHEMICALS GET BALANCED c. CUSTOMER GETS TO SWIM II! d.APPOINTMENT IS MADE TO GIVE CUSTOMER INSTRUCTION ON MAINTAINING POOL *KEEP IN MIND THIS TIMETABLE IS APPROXIMATE AND GIVEN SO CUSTOMER HAS A GENERAL IDEA OF THE PROGRESSION OF INSTALLATION.IT IS ONLY MEANT TO BE A GUIDE AND SCHEDULE MAY VARY DEPENDING ON BUT NOT LIMITED TO: WEATHER,CONTRACTOR AVAILABILITY,PRODUCT AVAILABILITY,CONDITION OF YARD,ACCESS,ECT "CUSTOMER RESPONSIBLE FOR CONTACTING AND SIGNING WITH PATIO/FENCE AND ELECTRICIAN CONTACTS EXCAVATION : KEN SKEIRIK CELL:978-265-9220 INSTALLATION/SCHEDULING: ANDRE PLATON CELL:978-835-2159 ELECTRICAL: (If chosen) RICH HAMEL CELL: 978-420-7067 SALESMAN: PAUL NOEL CELL:978-409-8081 TRIAD: (if chosen) SALESMAN OFFICE:978-373-4223 70 South llroad x ay _. L awrrel-i....... .. . .. ce, MA 01843 - Tel: (978) 68 -8307 - Fax: (978) 688-1.949