HomeMy WebLinkAboutConstruction Schedule - - 75 COACHMANS LANE F6mmmmmmmwmm�«
SINCE1978
WHAT TO EXPECT DURING YOUR POOL IN5TA LA4_TION
WEEK 1 a. POOL EXCAVATION (GENERALLY 1-3 DAYS) 5/30/25
b. POOL STRUCTURE INSTALLED
c. CONCRETE SUPPORT COLLAR POURED AROUND BASE OF WALLS
WEEK 2 a. ELECTRICIAN BONDS STRUCTURE 6/2/25
b. BONDING GETS INSPECTED BY CITY/TOWN OFFICIAL
c. POOL PLUMBING GETS INSTALLED AND STUBBED TO APPROX FILTER LOCATION
WEEK 3 a. POOL GETS BACKFILLED 6/9/25
b. IT IS TIME FOR PATIO COMPANY TO INSTALL PATIO (TIME FRAME DEPENDS ON THE SIZE OF
PATIO/WALLS/MATERIALS CHOSEN (GENERALLY 1-2 WEEKS)
Week 6-8 AFTER PATIO COMPLETION 7/7/25 - 7/21/25
a. POOL BASE AND LINER GET INSTALLED.FILTER EQUIPMENT INSTALLED
b. POOL IS FILLED AND STARTED/POOL CHEMICALS GET BALANCED
c. CUSTOMER GETS TO SWIM II!
d.APPOINTMENT IS MADE TO GIVE CUSTOMER INSTRUCTION ON MAINTAINING POOL
*KEEP IN MIND THIS TIMETABLE IS APPROXIMATE AND GIVEN SO CUSTOMER HAS A GENERAL IDEA OF THE PROGRESSION OF
INSTALLATION.IT IS ONLY MEANT TO BE A GUIDE AND SCHEDULE MAY VARY DEPENDING ON BUT NOT LIMITED TO:
WEATHER,CONTRACTOR AVAILABILITY,PRODUCT AVAILABILITY,CONDITION OF YARD,ACCESS,ECT "CUSTOMER RESPONSIBLE
FOR CONTACTING AND SIGNING WITH PATIO/FENCE AND ELECTRICIAN
CONTACTS
EXCAVATION : KEN SKEIRIK CELL:978-265-9220
INSTALLATION/SCHEDULING: ANDRE PLATON CELL:978-835-2159
ELECTRICAL: (If chosen) RICH HAMEL CELL: 978-420-7067
SALESMAN: PAUL NOEL CELL:978-409-8081
TRIAD: (if chosen) SALESMAN OFFICE:978-373-4223
70 South llroad x ay _. L awrrel-i....... .. . ..
ce, MA 01843 - Tel: (978) 68 -8307 - Fax: (978) 688-1.949