HomeMy WebLinkAbout2026-03-30 Select Board Minutes NORTH ANDOVER SELECT BOARD MINUTES MARCH 30, 2026
Call To Order: Chair Janice Phillips called the open meeting to order at 7:01 PM in the Community Room at
the Senior Center located at 481 Sutton Street.
Select Board in Attendance: Chair Janice Phillips, Rosemary Connelly Smedile, Clerk Brian Roache, Laura
Bates, and David Kres were present
Non-Board Members in Attendance: Town Manager Melissa Murphy-Rodrigues, Assistant Town Manager
Laurie Burzlaff and Assistant Town Manager Andrew Shapiro
JOINT MEETING between Select Board, Finance Committee, School Committee, and Kittredge
School Building Committee
NEW BUSINESS
Presentation from Kittredge School Building Committee
Ms. Bates discussed a few housekeeping items. Ms. Bates discussed the presentation agenda. Ms. Bates
discussed the partnership with the MSBA. Ms. Lathrop stated the main building being over 70 years old has
surpassed its useful life and the modular addition is not a permanent solution to the 21 st century school
building. Ms. Lathrop discussed some of the challenges they faced with the existing facilities. Ms. Lathrop
discussed the education priorities that will be provided through the new Kittredge elementary school. Phil
Palumbo, director of Collier and owner project manager, discussed the project schedule. Mr. Palumbo
discussed where the project has been, where they currently are, and where they are going if the project is
approved at Town Meeting. Mr. Palumbo stated if approved at Town Meeting, they will move into MSBA
module six detailed design, which will be about another 12 months of getting the drawings and specs to bid
ready. Mr. Palumbo stated they would hit the construction phase around September of 2027, which will take
about 24 months. Mr. Palumbo stated to save some time and money during the construction phase, they
plan to do an early bid package for the abatement and demo of the existing building. Jeffrey Burchard,
president of Machado Silvetti and architect for the project, discussed the building and site design. Mr.
Burchard stated elementary schools are not the same from one district to another, and they take into account
the specific needs and demands of the community. Mr. Burchard discussed the things that need to be taken
into account. Mr. Burchard stated this school is purpose designed for this site, for this community, and for the
education mission of the North Andover School District. Mr. Burchard discussed the site plan. Mr. Burchard
discussed the location of the parking lot. Mr. Burchard discussed the pick up and drop off circulation. Mr.
Burchard stated the passenger pick up and drop off is separate from the bus pick up and drop off. Mr.
Burchard discussed the floor plans. Mr. Burchard stated the stage will sit directly between the cafeteria and
the gymnasium so it can function in both directions. Mr. Burchard stated due to the site being sloped, they
ended up with a lower level instead of a second level. Mr. Burchard stated both levels actually open directly
to the exterior. Mr. Burchard stated there are 15 classrooms overall. Mr. Burchard displayed an aerial view of
the new Kittredge School building. Mr. Burchard discussed what they had done with the massing of the
building, the size, and its appearance. Mr. Burchard displayed the main entrance and the main level corridor
of the new building. Mr. Burchard displayed the lower level corridor. Mr. Palumbo discussed the project costs.
Mr. Palumbo stated the local share is approximately 63.4% of total money spent and the remaining would be
the MSBA share of 36.6%. Mr. Palumbo discussed a new construction costs chart that the MSBA has
created. Ms. Murphy-Rodrigues discussed the funding for this project. Ms. Murphy-Rodrigues stated this
project was part of Facilities Master Plan 2. Ms. Murphy-Rodrigues stated they do anticipate they will need
debt, but they will not need a debt exclusion. Ms. Murphy-Rodrigues stated they do have levy capacity
available that would fund this project due to the personal property taxes of Amazon. Ms. Murphy-Rodrigues
stated this would be a 30 year bond with an approximate interest rate of 4%. Ms. Murphy-Rodrigues stated
based on this analysis, this will not impact the average taxpayer.
NORTH ANDOVER SELECT BOARD MINUTES MARCH 30, 2026
Public input/questions regal proposed Kittredge School
Mr. Chaney, from the Finance Committee, asked if the MSBA money is capped at$29 million or is it a
percentage of the total cost. Mr. Palumbo stated it is capped at$29 million. Mr. Chaney asked if in the event
that they are over budget, do they have something in place or have they had that conversation yet. Mr.
Palumbo stated no, they are entering into a project scope and budget agreement with the MSBA, and this is
the deal with any MSBA project.
Ms. Nadeau, from the Finance Committee, asked what escalation formula they have used moving forward
based on the chart they displayed. Mr. Palumbo stated with the construction budget right now, they are
carrying right around $4 million in escalation. Ms. Nadeau asked if new schools have to meet certain energy
efficiencies. Mr. Palumbo stated yes, they have to meet the updated energy code.
Ms. Watson, from the Finance Committee, asked what will the capacity of the new school bring the Town
elementary capacity and how does that compare to the projected enrollment. Ms. Lathrop stated it increases
what they have had currently in terms of enrollment. Ms. Lathrop stated it does give them more capacity
within the schools. Mr. Palumbo stated the 335 student enrollment is the number that is linked to the project Is
agreement with the MSBA.
Ms. Allen, from the Finance Committee, asked what is the enrollment or capacity in the other four schools.
Ms. Lathrop stated she does not have those numbers in front of her. Ms. Allen asked which one of the other
elementary schools would be closest in size to this new school. Ms. Lathrop stated Atkinson or Thompson.
Ms. Kean, from the Finance Committee, asked if it is a full size gymnasium. Ms. Lathrop stated yes.
Mr. Roache asked what the maximum height of the retaining wall would be. Mr. Burchard stated about 12ft.
Mr. Roache asked about the height of the buildings. Mr. Burchard stated it is about 25ft tall on the south side
where the gym would be. Mr. Burchard stated the building on the north side becomes two stories. Mr.
Burchard stated no one will see the roof from the road or the houses. Mr. Roache asked if the bus drop off
lane is going to be restricted to buses only. Mr. Burchard stated yes.
Ms. Cormier, from the School Committee, asked what is the planned lifespan of this building. Mr. Palumbo
stated as part of the MSBA agreement, it needs to last 50 years plus.
Ms. Smedile asked if the MSBA still held to the artistic flare in school buildings. Mr. Palumbo stated the
MSBA is not going to have much to say about the exterior aesthetics. Mr. Burchard stated there is a lot of
room to go in the design process.
Mr. Brown asked if part of the selection of the orientation of the building was taking into account better
lighting. Mr. Burchard stated yes. Mr. Burchard discussed the number of skylights within the building.
Ms. Irwin, from the Finance Committee, asked about the main entrance way being a flat top. Mr. Burchard
stated it would be sloped. Ms. Irwin asked if the top would be translucent. Mr. Burchard stated they are
unsure of what it will be made of. Ms. Irwin asked if the $964 per square feet is specifically for elementary
schools. Mr. Palumbo stated the bigger the building the lower the cost per square foot due to the economy of
scale. Ms. Irwin asked if they were plotted on the displayed chart around high schools or elementary schools.
Mr. Palumbo stated they are right around elementary schools.
NORTH ANDOVER SELECT BOARD MINUTES MARCH 30, 2026
Mr. Chaney asked during deconstruction, do they have a waste management plan in place where they are
taking advantage of recycling. Mr. Palumbo stated they will.
Ms. Nadeau asked where the costs were for outfitting the school. Mr. Palumbo stated within the $79.8
million.
Ms. Phillips asked with this increased capacity, does that open the door to some redistricting around Town.
Ms. Lathrop stated potentially.
Ms. Irwin asked if the start times for the schools are staggered so they are not coming in at the same time as
the middle school. Ms. Lathrop stated the hope is this traffic pattern will bring traffic in and out opposed to
jamming up Main Street.
Ms. Cormier asked if there will be a stop sign or blinking light for the traffic pattern where parents are exiting.
Mr. Burchard stated it will be a stop sign, and they will be conducting a traffic study at the intersection.
Ms. Kean asked if the bus entrance is a new cut. Mr. Burchard stated it is a reconfiguration of that cut.
Ms. Irwin asked if there has been soil testing. Mr. Burchard stated yes.
Gail Henny of 134 Rosemont Drive asked if there will be a dedicated walkway in the parking lot where traffic
is and will they need to have personnel there or a crossing guard. Ms. Lathrop stated that would be teacher
duty. Mr. Burchard stated there is not a designated walkway in this diagram, but they can look at the striping
pattern. Ms. Henny asked about the discrepancy regarding the budget for the building being $79.8 million
within the April newsletter and the maximum reimbursement for the MSBA being $28.7 million yet they are
looking for a bond for the full cost of construction. Mr. Palumbo stated the MSBA requires the total project
budget number to be on the Town Meeting article, but MSBA will reimburse in real time through the course of
the project.
Lucius Michel of 93 Pleasant Street asked if they could talk a bit more about what a design contingency is
and how it works. Mr. Palumbo stated they have completed what is called schematic design. Mr. Palumbo
stated it is phase one of a three phase design process. Mr. Palumbo stated there are a lot of design
elements that are not on the plans or in the specs that the cost estimators are creating a cost estimate off of.
Mr. Palumbo stated due to that, they carry a design contingency at the different earlier points in design to
ensure they are capturing dollar-wise unknowns. Mr. Palumbo stated as they advance in design, that design
contingency gets less. Mr. Michel asked if the design contingency is there to cushion against price overruns.
Mr. Palumbo stated no, they have a separate line item for that. Mr. Michel asked if prices do increase, is
there a point where they make decisions about what to include or exclude from the original plan. Mr.
Palumbo stated yes. Mr. Michel asked if that is the case, does the group come back to talk about the
decisions being made and what might be being cut. Mr. Palumbo stated yes.
Stanley Limpert of 43 Stonecleave Road asked if the building committee gave any thought to the reuse of
the existing gymnasium. Ms. Murphy-Rodrigues stated yes, part of the capital improvement plan includes
moving that gymnasium to the DPW site to be used for cold storage for the Fire Department and DPW. Mr.
Limpert asked if they will have the budget to be able to provide teachers for this new school. Ms.
Murphy-Rodrigues stated Facilities Master Plan 2 did include funding for enhanced staff, and they will have
to look at what the schools decide to have as part of their strategic plan as they move forward. Ms. Lathrop
stated they are a proponent of asking for an override for FY28 in order to provide extra staffing for this
school.
NORTH ANDOVER SELECT BOARD MINUTES MARCH 30, 2026
Michael Lenihan of 58 Osgood Street expressed an idea that was generated from the Historic District
meeting regarding a bell from the Merrimack school at the DPW and integrating that into the Kittredge
design.
Kim Ramos of 40 Court Street asked what the entry way would be for children that walk to school. Mr.
Burchard explained how the walkers would enter the parking lot on both sides. Mr. Burchard stated there will
be a new crosswalk near the entrance way where the flashing light is now. Ms. Ramos asked if that will need
to be redone or will they use the existing one. Mr. Burchard stated that it will be reconfigured with this project.
Ms. Ramos asked how the staff would be able to drive in and avoid the line of parents. Ms. Lathrop stated
staff are required to come to work a half hour before the students. Ms. Ramos asked if this will be called the
Kittredge School or is there something else on the table. Ms. Lathrop stated her expectation would be that it
is called the Kittredge School.
Stanley Limpert of 43 Stonecleave Road asked if the buses come from Chickering Road and do not go out
on Chickering Road. Mr. Burchard stated yes.
Gerald Brecher of 488 Pleasant Street expressed his support for the new Kittredge School and emphasized
giving children a sense of what quality design and beauty can look like when they approach their school.
Diane Huster of 279 Winter Street asked where the elevator will be in the school. Mr. Burchard stated it will
be right near the entrance door.
Bradford Wakeman of 140 Academy Road stated that he hopes they continue to consider the ancillary
structures.
ADJOURNMENT- Finance Committee
MOTION:Mr. O'Connell made a MOTION, seconded by Ms. Nadeau to adjourn the Finance Committee
meeting at 8:04PM. Motion approved 9-0.
ADJOURNMENT-School Committee
MOTION: Mr. Brown made a MOTION, seconded by Ms. Koenig to adjourn the School Committee meeting
at 8:04PM. Motion approved 3-0.
ADJOURNMENT- Kittredge School Building Committee
MOTION:Mr. O'Connell made a MOTION, seconded by Mr. Brown to adjourn the Kittredge School Building
Committee meeting at 8:04PM. Motion approved 6-0.
ADJOURNMENT
MOTION: Mr. Roache made a MOTION, seconded by Ms. Smedile to adjourn the Select Board meeting at
8:04PM. Motion approved 5-0.
NORTH ANDOVER SELECT BOARD MINUTES MARCH 30, 2026
Respectfully submitted,
Nicole Civitarese
Executive Assistant
Brian Roache, Clerk of the Board
Documents used at meeting
Presentation