HomeMy WebLinkAbout04/06/2026 - Tim Willet (DPW) Comment - 44-46 Baldwin Street 4/6/26, 11:09 AM Town of North Andover Mail-ADU 44-46 Baldwin Street
0 "!
ril"I"A'' VER,
Jean Enright<jen rig ht@northandoverma.gov>
ADU 44-46 Baldwin Street
Tim Willett<twillett@northandoverma.gov> Mon,Apr 6, 2026 at 10:48 AM
To: Jean Enright<jen rig ht@northandoverma.gov>
Hi Jean,
Our minimum size for a water service is 1" copper, and it needs an outside shutoff, aka a curb stop.
Likewise, the minimum size for a sewer service is 6" PVC.
The design must be revised to show these changes.
[Quoted text hidden]
https://mail.google.com/mail/u/O/?ik=7c2eff6265&view=pt&search=all&permmsgid=msg-f:1861732978550105375&simpl=msg-f:1861732978550105375 1/1