Loading...
HomeMy WebLinkAbout04/06/2026 - Tim Willet (DPW) Comment - 44-46 Baldwin Street 4/6/26, 11:09 AM Town of North Andover Mail-ADU 44-46 Baldwin Street 0 "! ril"I"A'' VER, Jean Enright<jen rig ht@northandoverma.gov> ADU 44-46 Baldwin Street Tim Willett<twillett@northandoverma.gov> Mon,Apr 6, 2026 at 10:48 AM To: Jean Enright<jen rig ht@northandoverma.gov> Hi Jean, Our minimum size for a water service is 1" copper, and it needs an outside shutoff, aka a curb stop. Likewise, the minimum size for a sewer service is 6" PVC. The design must be revised to show these changes. [Quoted text hidden] https://mail.google.com/mail/u/O/?ik=7c2eff6265&view=pt&search=all&permmsgid=msg-f:1861732978550105375&simpl=msg-f:1861732978550105375 1/1