Loading...
HomeMy WebLinkAbout04/10/2024 - Drainage Overview - - U! NOTES: 1. THE PROPOSED PROJECT IS LOCATED ENTIRELY WITHIN AN AREA OF EXISTING PAVEMENT,AS SUCH THERE WILL BE NO ) � INCREASE OF IMPERVIOUS COVER OR STORMWATER RUNOFF. 1 2. THERE ARE NO MAPPED WETLANDS LOCATED WITHIN 100 Headwall discharge r om existing OF THE PROPOSED WORK.CLOSEST WETLAND IS LOCATED APPROXIMATELY 350'TO THE WEST OF LIMIT OF PROPOSED WORK. drainage IIon of r S r I I / 3. ALL ELEVATIONS REFER TO THE NORTH AMERICAN VERTICAL hangars DATUM(NAVD 1988) SD 4. PROPERTY IS NOT LOCATED WITHIN A DESIGNATED FLOOD / HAZARD AREA. � 5. PORTIONS OF EXISTING CONDITIONS IS BASED ON BASEPLAN SD Jp SD _ RiM=i ae.os' g INFORMATION PROVIDED BY STANTECH,THE LAWRENCE Sp 5° Nv:-;.4; MUNICIPAL AIRPORT'S ENGINEER. isolated vegetated 6. EXISTING CONDITIONS SHOWN WAS COMPLETED BY AN ON THE GROUND INSTRUMENT SURVEY COMPLETED BY ANDOVER CONSULTANTS. LOCATION OF ANY UTILITY INFORMATION wetlandr stantech / SHOWN ON THIS PLAN IS BASED ON OBSERVABLE FIELD �g6 EVIDENCE AND RECORD PLANS. SOME UTILITIES SHOWN ON THIS PLAN RELIED ON GROUND MARKINGS PROVIDED BY A �¢ NV.,as.eoz°(s) F UTILITY LOCATION COMPANY. ADDITIONAL UTILITIES MAY O wv.ia.ae'(N) 6 mp EXIST THAT ARE NOT SHOWN HEREON. THE CONTRACTOR - c' � ate• Jp SHALL CONTACT"DIG—SAFE"PRIOR TO ANY ON SITE EXCAVATION. F rs Ir- 7. THESE DOCUMENTS HAVE BEEN PREPARED TO SATISFY ASCE 38.02 MINIMUM UTILITY QUALITY LEVEL C ONLY. N moo,. 38.02 MINIMUM QUALITY LEVEL C IS LIMITED TO THE COLLECTION AND REVIEW OF AVAILABLE RECORD UTILITY -- DOCUMENTS AND A SITE FEATURES SURVEY TO MEASURE So °,•' e THE LOCATION AND ELEVATION OF THE EXISTING SEWER a �Ile O S AND DRAIN SYSTEM. 15 CB 0�11p ,87(N 11 / ICJ S _ L_J / osA IrI II- ----------- isolated area extends further to �-�� GCB Headwall r I r \ South west and outlets at RIVM 15308 IN 14803(5)�MH JO '�- -hlv ia�9e J° ` j(Z1� 153..8299INv=aa' double catch '(NE)r Iproposed basin NV= (sw hangersr locations on airport to r lnage ditch MEWIL 50 RIM 160.32 �sa.6a sa (NE) J° =� ss ws INv.�6a 6a N' -61 le /so ti DRAINAGE OVERVIEW % V LAWRENCE MUNICIPAL AIRPORT y NORTH ANDOVER, MASS. PREPARED FOR: TANGO HOTEL, I I C DATE:APRIL 10, 2024 SCALE:1'=60' / - r � r ndove ,f o consultants _ N c. rz� East River Place 1 ace ✓ f j Methuen,Mass.01844 Dennis A.Griecci Telephone:978-687-3828 Reg. Prof.Engineer Kam, —— /-' 0 60 120 180 240 Ft. P: — \dwg\23-61 Sutton—site plan.dwg