Loading...
HomeMy WebLinkAbout05/05/2025- Vin Helfrich (Helfrich Brothers Boiler Works) Comments - - 5/5/25, 10:559 AM Town of North Andover Mail-F : NO R fl,''AN"DOVER Jean Enri but<jenright@northandoverma.gov lM!YY v4y Q'� , „ 4 FWm 0 1 message Vin Helfrlch <VHelfrieh hhlbrwinc.eem> Mena May 5, 2025 at 101:2 AM To: "jenright@n ortha ndov rm .gov" jenright n rth n o erma.gov Cc: "dgriecci and av roc nsullt nts. r " <d r ecci@and verconsu tants.c rn , "MARK SC A T REP"A,I RS@LWM FALCON!. OM " <REPAlRS@l mfal nn. orn , Con or Helfrich <chelfrich@hlbbwinc.com Hi Jeanne Please see attached ,sketch prepared by Andover Consultants showing proposed limit of earth disturbing work of 4,1,500 sq feet., I have attached Dennis to this email if there are any questioins 'hanks Vin i n, Helfr*lch H'elfrl'chl, Brothersil r Works, Inc. From: Dennis A. Griecci < g riecci@andoverconsu Ita r .com> Sent. Monday, May 5, 2025 20 AM To,:Vin Helfrich<VHelfrich @ 11 B BWl N C. , 'MAR II SCOT"T" <RE PAI R,S @LW'M FALCO N.,COM>; Co:nor Helfrich < . 1 fri @HBBW1 .d Subject. RE: ***This e-mail is from an external source. Hsi Vin, As discussed attached is the sl<etch showing the work per your highlighted rnarl<up sketch. Please call or email with any comments or questions. Th a n,l<you, Dennis https://r il. o gl . om/ra it/u/O/?i c2 ff 2 5&vi pt se r h ll r t id thread-:18 29120,2 608 5&s pl=msg-f:1 '12 12 ,:2 08 0 5, 1/ 5/5/25, 10:59 AM Town,of North Andover Mail-FW: Good:, morning, Dennis, please see attached. 'Total area leased land: 59,000 sq ft Total building coverage.: 24,1690 sq ft Total disturbed land including over dig: 29,206 sq ft Total land between buildings.: 9,528 sq ft(not disturbed land, but included), Total construction area: 38,734 Sq ft Item 31 of the Special permit calls out that any stockpiling of construction materials must be shown on the site plan. No provisions have been made for stockpiling on this project; therefore, all material is trucked off site daily.The layclown area for the metal buildings is in a hangar on the North ramp. Given that the total construction area including over dig and all the land between the buildings is less than 43,560 sq ft, are we required to have a SWPPP plan? Please advise Thank You Vin Vin Helfflich 0: 9178-6183-7244 1 C: 978-360-5466 Helfrich Brothers Boller Works, Inc. From,:Vin Helfrich<Vl-.-�ielfri @lmIBBW'INC,,COM> Sent: Monday, May 5, 2025 8:11 AM To:Vin Helfrich <V11e1,frich@HBBW1NC.COM> Subject: Get Outlook for iOS httpis://mail.google.com/mail/u/O/?ik=7c2eff6265&view=pt&search=all&permthidi=thread-f:l 831291'1202860,886045&simpil msg-f:1 831'291202860886045 3/4 P:\23\23— 1\dwg\23-61 Sutton—site plan.d'wg law no= sm Imm mm r q A LJ 60@ amw C) PROPOSED HANGAR 7,360,SF SLA11=1 52*1 00 80 lb In= amm AN= mm mm mm mm mm Em no C14 0- PROPOSED 0 HANGAR 3,600 SF 0 CL A SLAB=151.4 ------ 'PROPOSED 60' HANGAR 72' 6,380 SF SLAB=15�3.75 F r-I 58' 82' so= own mom ME= is= mom, so= mom no= now BE= mm PROPOSEDI PROPOSED LIMIT OF H 7$ANGER 350 SF EARTH DISTURBING SLAB 1 . 'WORK ±41,500 SF = 536 PROPOSED LEASE AREA 50' mm mm m i 0 sm mm r� A ,c) SKETCH SHOWING PROP01SE IA OF CONSTRUCTION I TUJ A C LAWRENCE MUNICIPAL AIRPORT NORTH ANDOVER, MASS, PREPARED FOR: TANGO HOTEL, LLC DATE.-,MAY 5, 2025 SCALE:1"=20' 0 30 40 60 80 Ft.