HomeMy WebLinkAbout04/10/2024 - Dennis Griecci (Andover Consultants) Comment - - 5/5/2,5,9:25 AM Town of North Andover Mail-Draft decision-Tango Hotel,,LLC
NORT',':H ND VER
t
Jean Enri ht<jenri ht@nor handoverma ca r
Draft deci
Dennis A. Grieccl <dgriocci@andovorconsultants.com> Wed,Apr 10, 2024 at 9:38,AM
To: ,Joan Enright<jen rig ht@northandoverma.go >,, lion Borenstein on jbll l w. r °
Cc:Andrew Lechner<androw@jbllclaw.com>
Hi Jean,
No comments on the revised draft.
In response to your email regarding the disturbance area, the buildings will require excavation for footings and minor
grading around the building sis required to ensure pitch away from,the hanger doors so runoff does not flow into the
buildings. As a result the project will disturb greater than I acre and the contractor will need to file for a Nl DES CG
prior to earth disturbance.
,John did leave a me a voicema l late last night and I just called him back and loft a vo cemail. Hope to connect with him
this morning to address his comment.
Thank you,.
Dennis
Dennis . Griecci, .
*Licensed in MA/NH
Andover Consultants, Inc.
Civil Engineers I Land Surveyors I Land Planners
1 East River Place
Meti'lUen, MA 01844
Phone: ( 7 687-3 2
d riccci undo rcons:ul nts cotes
an verc r s l n ,co
This communication and any attachments to this are confidential and intended only for the ocipion ).Any other use,
dissemination, copying,or disclosure of this communication is strictly prohibited. If you have received this communication in error,
please notify us and destroy it immediately.Andover Consultants is not responsible for any undetectable alteration,virus,
transmission error, conversion, media degradation, software error, or interference with this transmission or attachments to this
transmission.
[Quoted text hidden],
https:Hmail.google.com/mall/u/O/?,i'k=7c2 ft 2 5 view pits arch all permm, id rn -f:17 595514? ,8 ?340 impel= -f.17'95 5514?9 73 1/1