Loading...
HomeMy WebLinkAbout06/20/2025 - Plan Change Memorandum - - 430 OSGOOD STREET Gale Associates, Inc. 00 III e J 'µw c)i���'X III ace I Sdt'' 0 0 I ck4mi, III A 02 �'L,E d01,111111j4 LiGA III 781.335.6465 III 781.335.6467 www.gainc.com mv KK June 20, 2025 Ms. Amy Maxner, Conservation Administrator North Andover Conservation Commission Town of North Andover 120 Main Street North Andover, MA 01854 Re: 100%Construction Drawings DEP#242-1906—430 Osgood St Order of Conditions (OOC) Gale JN #719560 Ms.Amy Maxner, As requested in Special Condition 41a of the above referenced Order of Conditions, please refer to the separately provided 100% construction drawings (719560—NAHS Construction Set-2025 0606), presented as they have been issued to the awarded contractor, Heimlich Landscaping & Construction Corp., for use in construction. Please see below for a list of construction plan set revisions relative to the approved Permit Plan Set, dated April 15, 2025: 1. Athletic lighting The athletic lighting scope proposed for Walsh Stadium (LED retrofit and two (2) new poles) and the new multipurpose baseball/softball field (new system with ten (10) poles) has been removed from the construction scope. All items related to these lights (foundations,wiring, conduit, etc.) have also been removed. 2. Bid Alternates not selected The following items were bid as alternates and have subsequently not been selected for award. Items therefore removed from the project include the following: - Walkway lighting around the perimeter of the multipurpose baseball/softball field. - The football goal post proposed on the west side of the multipurpose baseball/softball field and associated run of ball netting. - Portable bleachers (6 total) with concrete pads proposed for the multipurpose baseball/softball field. - The scoreboard proposed for the multipurpose baseball/softball field. 3. Wetland Restoration Scope Per direction from the Town of North Andover,the wetland restoration scope included on sheet 1-101 of the approved permit plan set will be performed independently of the overall athletic improvements construction contract. As such, all references to erosion control, earthwork, and landscaping related to the culvert replacement and wetland restoration adjacent to the tennis courts have been removed from these construction documents. North Andover Conservation Commission 100%Construction Drawings CAL,E' D E P#242-1906 da June 20, 2025 The wetland restoration scope is still anticipated to be performed and completed concurrently with the overall athletic improvements project, however,the Town will procure this scope via a separate construction contract and may also self-perform certain scope items.The Town is aware of the OOC Conditions applicable to the wetland restoration scope (59, 62, 63, & 64), and will contract directly with a third-party environmental consultant, LEC Environmental Consultants, Inc.,to perform the required oversight. As detailed above, the changes to the approved plans are limited strictly to reductions in scope on account of budgetary restriction and a phased approach to construction. Excluding minor adjustments required to progress the plans to a construction ready design, the project scope has not been expanded to include any additional resource area disturbance, earthwork, or proposed conditions relative to the approved permit level design. We hope you find this memorandum and plan set satisfactory. Please do not hesitate to call our office at (781) 335-6465 or reach out via email to Kyle Rowan at kfr@gainc.com should you have any comments or questions, or if you require additional information. Best Regards GALE ASSOCIATES, INC. Kyl,e/F. '/Ro-waw *IZyaw D. «-C;(/Y Kyle F. Rowan Ryan D.Thackeray Project Manager Project Designer KFR/RDT Referenced Documentation: 1. 719560_NAHS Construction Set_2025 0606.pdf G:\719560\04 Construction\permit requests\Con Comm OOC\719560 Plan Changes Memorandum 0620 2025.docx