HomeMy WebLinkAbout03/06/2025 - Tim McGuire (NAFD) Comment - - 430 OSGOOD STREET 3/8/25,8:48 AM Town of North Andover Mail-NAHS Fields Renovation Project
1
j
0
"!
VER,
Jean Enright<jen rig ht@northandoverma.gov>
�
NAHS Fields Renovation Project
Tim McGuire <tmcguire@northandoverma.gov> Thu, Mar 6, 2025 at 4:42 PM
To: Jean Enright<jen rig ht@northandoverma.gov>
Hi Jean,
A swept path analysis is not necessary and I am fine with the gate for the access road. The only suggestion that I have is
if there could be an area where we could turn around. Right now, there is room where the ambulance can do a three point
turn behind the baseball backstop, where the shed is on the plan.As long as that is staying in place, could they widen the
gravel road where the gravel path meets the existing gate for the football field (behind the backstop)? I circled the area by
the shed and attached it to this email. This would be prefered.Another option would be to add gravel to behind the stands
in order for an ambulance to back into and then drive out. I also circled this area.
Thanks,
Lt. Timothy McGuire
Fire Prevention
North Andover Fire Department
795 Chickering
Andover,North MA 01845
(978) 688-9590 ext. 2
r
A�
uA
W
[Quoted text hidden]
»grey
Fields Project with Revision.pdf
757 K
https://mail.google.com/mail/u/O/?ik=7c2eff6265&view=pt&search=all&permmsgid=msg-f:1825882627275577026&simpl=msg-f:1825882627275577026 1/1