Loading...
HomeMy WebLinkAbout05/11/2018 - TEC Peer Review - - 1429 OSGOOD STREET 69999 146 Doasc,(.')rd,)I'Zoad 1,69 Ocea n'B I vd,Ukn it'I 01, Aridiover,MA 0 1 81 0 �PO Box 249 I r'riptr la Dri'NI-i 03842 978.,7 94,1,7,92 6 f 3 60 1-8-154 Engineenrig Corp Ms. Jean Enright May 11, 2018 Planning Director Town of North Andover 120 Main Street North Andover, MA 01845 Re: Application for Special Permit: 1429 Osgood Street General Civil Peer Review Dear Ms. Enright: On behalf of the Town of North Andover, TEC, Inc. reviewed documents as part of the civil engineering peer review for the proposed project located at 1429 Osgood Street. Oliver Enterprises, Inc., ("Applicant"�, submitted the following documents, which TEC reviewed for conformance with the Town of North Andover Zoning Bylaws and general industry standards: • Site Development Plans, prepared by Allen & Major Associates, Inc., dated April 12, 2018; • Drainage Report, prepared by Allen & Major Associates, Inc., dated April 12, 2018; Upon review of the submitted documents, TEC has compiled the following general civil comments: 1. The Applicant should coordinate with the Planning Department to determine if a Traffic Impact Study, Fiscal Impact Study, and Community Impact study will be required as part of the project submission and review. 2. The project proposes 85.3% of lot coverage. The maximum allowable lot coverage for Corridor Development District 3 (CDD3) is 70%. 3. The project proposes 14.7% of open space. The minimum usable open space requirement is 30%. 4. The Off-Street Parking Summary Table indicates that the total square footage equals 21,300 SF; however, the plans show that Tenant A building area totals 12,320 SF and Tenant B building area equals 8,950 SF, totaling 21,270 SF. The Applicant should update the plan to show a consistent building square footage. 5. The Off-Street Parking Summary Table indicates that a minimum of two ADA parking stalls are required; however, only one ADA parking stall is shown on the Layout and Materials Plan. 6. The ADA parking signs shall be placed at the center edge of the ADA parking stall. 7. The Site Plan does not call for any loading areas to the building. The Applicant should clarify how package deliveries to the building will be handled and provide a striped area for loading purposes (12'x25' required per Zoning Bylaw). Plan I Permit I Design I Construct T:\T0652\TO652.13\Docs\Letters\TO652.13-1429 Osgood St TEC Peer Review 5-11-18.docx 1429 Osgood Street Civil Peer Review Page 2of3 8. The Applicant should provide further detail for the proposed lighting onsite including a detail and specification for the parking lot lighting. 9. The Applicant shall clarify what type of materials will be stored outdoors. Applicant shall also provide a detail of the storage bins. 10. A wall is considered a structure according to the definition of"Astructure' (Section 2.68). Therefore, in Zone CDD3 (Section 16.13.3) the minimum setback for a wall (structure) shall be 20- feet from the side yard and 30- feet from rear lot lines. 11. The modular block retaining wall detail indicates a 4"diameter wall drain. The Applicant should clarify where the wall drain connects to and the material of the 4"wall drain. It should be noted that the proposed walls will require a final design, stamped by a structural engineer, to be reviewed and approved by the Town of North Andover Building Department. 12. Section 16.7.3 — Applicant shall provide 10-feet of landscaped area from rear yard lot line and 5- feet from side yard lot line. 13. Section 16.7.5—Applicant shall provide a minimum of 3-feet wide landscaped strip around building foundation. 14. The Applicant indicates the existing retaining wall along the northern property line is to be retained; however, the existing wall is not shown on the Grading and Drainage Plan. 15. The Applicant should clarify if the existing water line and telephone line are to be retained. 16. The Applicant should indicate where the water line connects into the existing building. 17. The Applicant should clarify if the existing monitoring wells in the pavement are to be retained. 18. The Applicant should coordinate with the Town of North Andover Fire Department and provide truck turning templates based on the required access routes. The Fire Department should also review plans for adequate fire protection water supply. 19. The Applicant should coordinate with the Town of North Andover Health department for all requirements for construction of the septic system. 20. The Applicant shall provide details of the septic tank, pump chamber, and soil absorption system (SAS) with actual invert elevations and sewage flow design criteria according to MassDEP Title 5. 21. The existing electrical line feed from the transformer runs through the SAS. The Applicant should clarify if the existing electrical line will be removed and provide a new location. 22. The Applicant should provide minimum setback distance of 10-feet from water line to proposed SAS, septic tank, and pump chamber. T:\T0652\TO652.13\Docs\Letters\TO652.13_1429 Osgood St TEC Peer Review 5-11-18.docxT" EU 1429 Osgood Street Civil Peer Review Page 3of3 23. The Applicant should clarify if the two existing SAS systems on site are to be retained. 24. There appears to be five leaching trench lines shown on the Utilities Plan, located east of Osgood Street and west of the existing building. It appears to be located within the proposed rain garden. The Applicant should clarify what these dashed lines indicate. 25. A dumpster location has not been identified on the site plans. If proposed, the Applicant should provide a detail of the dumpster pad and enclosure. If no dumpster is proposed, the Applicant should clarify how waste will be managed by the building. 26. The Applicant should provide truck turning templates for delivery trucks, trash removal trucks, and any other type of truck that will need to access the facility. If you have any questions regarding the peer review, please do not hesitate to contact us at (978) 794-1792. Thank you for your consideration. Sincerely, TEC, Inc. "TheEngineeringCorp,com" Peter F. Ellison, PE Senior Civil Engineer T:\T0652\TO652.13\Docs\Letters\TO652.13_1429 Osgood St TEC Peer Review 5-11-18.docxT" EU