Loading...
HomeMy WebLinkAboutEmails - - 1429 OSGOOD STREET 4/23/2019 Town of North Andover Mail-1429 Osgood Street pi.................................... , NORT' a s Monica Gregoire <mgregoire@northandoverma.gov> " r 1429 Osgood Street 6 messages Chris Connelly <Chris@oliver-enterprises.com> Mon, Apr 22, 2019 at 10:09 AM To: Monica Gregoire <mgregoire@northandoverma.gov>, Benjamin Curell <bcurell@northandoverma.gov> Cc: Jeff Oliver<jeff@oliver-enterprises.com> Good morning Monica— As per our discussion this morning, I am providing you with a written account of the minor revisions to the site plan that we are seeking administrative approval for: • LOADING DOCK: We have replaced the doorway on the front right corner of the building with a loading dock door (at grade). This required the removal of a small section of the planting space to be replaced with asphalt. • RAIN GARDEN: We worked with our engineer to offset the additional asphalt required by the loading dock, and determined the best approach would be to eliminate a section of paving in the rear right corner by expanding the rain garden. This allowed us to maintain the same overall square footage of impervious surface that was used for the stormwater calculations and already approved by the town. • LINE STRIPING: The last minor change was we swapped the loading area with (4) parking spaces to align with the new door. No change in asphalt or parking quantities. Please confirm that these changes are acceptable and that we are OK to proceed. If you should have any questions at all please do not hesitate to contact me. Thank you, -chris Chris Connelly Landscape Designer OLIVER ENTERPRISES, INC. Street1429 Osgood North Andover, MA 01845 Direct: 781-404-5265 Office: 781-938-9213 Fax: 781-404-5270 Email: h rii I iii ....,ir...,,,,,,,,,n,t iirp rii c irn w Oliver.,.:..:..:..:..'in-teimpiriises,.Icoim Look us up on Facebook at Oliver Enterprises Incorporated! https://mail.google.com/mail/u/0?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 1/5 4/23/2019 Town of North Andover Mail-1429 Osgood Street 27 YEARS IN BUSINESS, SERVING YOUR NEEDS WITH THE HIGHEST QUALITY. Masonry . Design Services . Landscape Maintenance and Construction Benjamin Curell <bcurell@northandoverma.gov> Mon, Apr 22, 2019 at 12:07 PM To: Chris Connelly<Chris@oliver-enterprises.com> Cc: Jennifer Hughes <jhughes@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov> Hi Chris, Since you are proposing an alteration to a stormwater structure that is within 100' of wetlands (the rain garden), these changes will have to come before the Conservation Commission in the form of a Modification, which has a $200 filing fee and requires site plans and a formal description of the proposed alterations (see attached Conservation Commission meeting schedule). As for your question about Condition #62 in the OOC, that condition does not apply to your project since there are no new/existing catch basins on the property. Let me know if you have any other questions. Benjamin Curell Conservation Field Inspector [Quoted text hidden] 2019 Meeting Dates.doc 47K Chris Connelly <Chris@oliver-enterprises.com> Mon, Apr 22, 2019 at 3:09 PM To: Benjamin Curell <bcurell@northandoverma.gov> Cc: Jennifer Hughes <jhughes@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov>, Jeff Oliver <jeff@ol ive r-e nterp rises.com> Hi Ben/Jennifer— Thank you both for all your help today. I have a few additional questions: 0 Is there a form/application I need to submit for the Modification Approval.? 0 For the formal description, is the language I sent over this morning sufficient or is more detail needed? 0 Is the site plan that I previously provided to you sufficient.? 0 Is the submittal electronic, hard copies, or both—and if hard copies how many? 0 Thankyoul -chris https://mail.google.com/mail/u/O?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 2/5 4/23/2019 Town of North Andover Mail-1429 Osgood Street Chris Connelly Landscape Designer OLIVER ENTERPRISES, INC. 1429 Osgood Street North Andover, MA 01845 Direct: 781-404-5265 Office: 781-938-9213 Fax: 781-404-5270 ® Chris@Oliver :A-terprises com www Oliver �l�:..:..:..:..'in-teiripiriises,.Icoim Look us up on Facebook at Oliver Enterprises Incorporated! 27 YEARS IN BUSINESS, SERVING YOUR NEEDS WITH THE HIGHEST QUALITY. Masonry . Design Services . Landscape Maintenance and Construction [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Jennifer Hughes <jhughes@northandoverma.gov> Mon, Apr 22, 2019 at 3:22 PM To: Chris Connelly<Chris@oliver-enterprises.com> Cc: Benjamin Curell <bcurell@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov>, Jeff Oliver <jeff@ol ive r-e nterp rises.com> Chris, We can use the plan and write-up you sent us. There is no formal form although you may want to formalize the request with a letter. The fee is $200 and we should receive that before 5/1. Thanks. Jennifer A. Hughes Conservation Administrator Town of North Andover 120 Main Street North Andover, MA 0 1845 Phone 978.688.9530 Fax 978.688.9542 Email jhughes@northandoverma.gov Web www.northandoverma.gov dd:image002Jpg@01 CD02A1.85A49B40 [Quoted text hidden] image002Jpg 4K https://mail.google.com/mail/u/O?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 3/5 4/23/2019 Town of North Andover Mail-1429 Osgood Street J , Chris Connelly <Chris@oliver-enterprises.com> Mon, Apr 22, 2019 at 3:25 PM To: Jennifer Hughes <jhughes@northandoverma.gov> Cc: Benjamin Curell <bcurell@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov>, Jeff Oliver <jeff@oliver-enterp rises.com> Hi Jennifer® StreetSounds good—I will type up a formal letter and submit it with the fee. I would like to tentatively schedule a pre-construction meeting for 1130 on Thursday(4/25), pending availability of our engineers. Would that time work for all of you? Thank you, Chris Connelly Landscape Designer OLIVER ENTERPRISES, INC. 1429 Osgood North Andover, MA 01845 Direct: 781-404-5265 Office: 781-938-9213 Fax: 781-404-5270 Emailm. Chiris@Oliveir,,,,, Aterprises c m www Oliver,,,,,:..:..:..:.,'in-teir�piriises,.Icoim Look us up on Facebook at Oliver Enterprises Incorporated! 27 YEARS IN BUSINESS, SERVING YOUR NEEDS WITH THE HIGHEST QUALITY. Masonry . Design Services . Landscape Maintenance and Construction [Quoted text hidden] https://mail.google.com/mail/u/0?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 4/5 4/23/2019 Town of North Andover Mail-1429 Osgood Street Monica Gregoire <mgregoire@northandoverma.gov> Tue, Apr 23, 2019 at 9:01 AM To: Chris Connelly<Chris@oliver-enterprises.com> Cc: Benjamin Curell <bcurell@northandoverma.gov>, Jeff Oliver<jeff@oliver-enterprises.com>, Jean Enright <jen rig ht@northandoverma.gov> Hi Chris, Thank you for providing this information. Can you provide us with a letter from your engineering explaining how the change in the rain garden offsets the removal and paving of the planting area? A formal letter describing the extent of the project and any changes to the calculations is needed (I attached an Engineer's letter from another project to give you an idea of what Planning is looking for). Please let me know if you have any questions. Best wishes, Monica On Mon, Apr 22, 2019 at 10:09 AM Chris Connelly< ri i r® i >wrote: [Quoted text hidden] Monica Gregoire Staff Planner Planning Department Town of North Andover 120 Main Street Northr, MA 01845 Phone Fax Email t Web www.northandoverma.gov Hours of Operation: Monday, Wednesday, Thursday 8 AM -4:30 PM Tuesday 8 AM -6 PM, Friday 8 AM -12 PM Insig Change Ur(1).pdf 175K https://mail.google.com/mail/u/0?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 5/5