HomeMy WebLinkAboutEmails - - 1429 OSGOOD STREET 4/23/2019 Town of North Andover Mail-1429 Osgood Street
pi....................................
,
NORT'
a s Monica Gregoire <mgregoire@northandoverma.gov>
" r
1429 Osgood Street
6 messages
Chris Connelly <Chris@oliver-enterprises.com> Mon, Apr 22, 2019 at 10:09 AM
To: Monica Gregoire <mgregoire@northandoverma.gov>, Benjamin Curell <bcurell@northandoverma.gov>
Cc: Jeff Oliver<jeff@oliver-enterprises.com>
Good morning Monica—
As per our discussion this morning, I am providing you with a written account of the minor revisions to the site plan that
we are seeking administrative approval for:
• LOADING DOCK: We have replaced the doorway on the front right corner of the building with a loading dock door
(at grade). This required the removal of a small section of the planting space to be replaced with asphalt.
• RAIN GARDEN: We worked with our engineer to offset the additional asphalt required by the loading dock, and
determined the best approach would be to eliminate a section of paving in the rear right corner by expanding the rain
garden. This allowed us to maintain the same overall square footage of impervious surface that was used for the
stormwater calculations and already approved by the town.
• LINE STRIPING: The last minor change was we swapped the loading area with (4) parking spaces to align with the
new door. No change in asphalt or parking quantities.
Please confirm that these changes are acceptable and that we are OK to proceed. If you should have any questions at
all please do not hesitate to contact me.
Thank you,
-chris
Chris Connelly
Landscape Designer
OLIVER ENTERPRISES, INC.
Street1429 Osgood
North Andover, MA 01845
Direct: 781-404-5265
Office: 781-938-9213
Fax: 781-404-5270
Email: h rii I iii ....,ir...,,,,,,,,,n,t iirp rii c irn
w Oliver.,.:..:..:..:..'in-teimpiriises,.Icoim
Look us up on Facebook at Oliver Enterprises Incorporated!
https://mail.google.com/mail/u/0?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 1/5
4/23/2019 Town of North Andover Mail-1429 Osgood Street
27 YEARS IN BUSINESS, SERVING YOUR NEEDS WITH THE HIGHEST QUALITY.
Masonry . Design Services . Landscape Maintenance and Construction
Benjamin Curell <bcurell@northandoverma.gov> Mon, Apr 22, 2019 at 12:07 PM
To: Chris Connelly<Chris@oliver-enterprises.com>
Cc: Jennifer Hughes <jhughes@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov>
Hi Chris,
Since you are proposing an alteration to a stormwater structure that is within 100' of wetlands (the rain garden), these
changes will have to come before the Conservation Commission in the form of a Modification, which has a $200 filing fee
and requires site plans and a formal description of the proposed alterations (see attached Conservation Commission
meeting schedule). As for your question about Condition #62 in the OOC, that condition does not apply to your project
since there are no new/existing catch basins on the property. Let me know if you have any other questions.
Benjamin Curell
Conservation Field Inspector
[Quoted text hidden]
2019 Meeting Dates.doc
47K
Chris Connelly <Chris@oliver-enterprises.com> Mon, Apr 22, 2019 at 3:09 PM
To: Benjamin Curell <bcurell@northandoverma.gov>
Cc: Jennifer Hughes <jhughes@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov>, Jeff Oliver
<jeff@ol ive r-e nterp rises.com>
Hi Ben/Jennifer—
Thank you both for all your help today. I have a few additional questions:
0 Is there a form/application I need to submit for the Modification Approval.?
0 For the formal description, is the language I sent over this morning sufficient or is more detail needed?
0 Is the site plan that I previously provided to you sufficient.?
0 Is the submittal electronic, hard copies, or both—and if hard copies how many?
0
Thankyoul
-chris
https://mail.google.com/mail/u/O?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 2/5
4/23/2019 Town of North Andover Mail-1429 Osgood Street
Chris Connelly
Landscape Designer
OLIVER ENTERPRISES, INC.
1429 Osgood Street
North Andover, MA 01845
Direct: 781-404-5265
Office: 781-938-9213
Fax: 781-404-5270
® Chris@Oliver :A-terprises com
www Oliver �l�:..:..:..:..'in-teiripiriises,.Icoim
Look us up on Facebook at Oliver Enterprises Incorporated!
27 YEARS IN BUSINESS, SERVING YOUR NEEDS WITH THE HIGHEST QUALITY.
Masonry . Design Services . Landscape Maintenance and Construction
[Quoted text hidden]
All email messages and attached content sent from and to this email account are public records unless qualified as an
exemption under the Massachusetts Public Records Law.
Visit us online at www.northandoverma.gov.
Jennifer Hughes <jhughes@northandoverma.gov> Mon, Apr 22, 2019 at 3:22 PM
To: Chris Connelly<Chris@oliver-enterprises.com>
Cc: Benjamin Curell <bcurell@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov>, Jeff Oliver
<jeff@ol ive r-e nterp rises.com>
Chris,
We can use the plan and write-up you sent us. There is no formal form although you may want to formalize the request
with a letter. The fee is $200 and we should receive that before 5/1. Thanks.
Jennifer A. Hughes
Conservation Administrator
Town of North Andover
120 Main Street
North Andover, MA 0 1845
Phone 978.688.9530
Fax 978.688.9542
Email jhughes@northandoverma.gov
Web www.northandoverma.gov
dd:image002Jpg@01 CD02A1.85A49B40
[Quoted text hidden]
image002Jpg
4K
https://mail.google.com/mail/u/O?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 3/5
4/23/2019 Town of North Andover Mail-1429 Osgood Street
J ,
Chris Connelly <Chris@oliver-enterprises.com> Mon, Apr 22, 2019 at 3:25 PM
To: Jennifer Hughes <jhughes@northandoverma.gov>
Cc: Benjamin Curell <bcurell@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov>, Jeff Oliver
<jeff@oliver-enterp rises.com>
Hi Jennifer®
StreetSounds good—I will type up a formal letter and submit it with the fee.
I would like to tentatively schedule a pre-construction meeting for 1130 on Thursday(4/25), pending availability of
our engineers. Would that time work for all of you?
Thank you,
Chris Connelly
Landscape Designer
OLIVER ENTERPRISES, INC.
1429 Osgood
North Andover, MA 01845
Direct: 781-404-5265
Office: 781-938-9213
Fax: 781-404-5270
Emailm. Chiris@Oliveir,,,,, Aterprises c m
www Oliver,,,,,:..:..:..:.,'in-teir�piriises,.Icoim
Look us up on Facebook at Oliver Enterprises Incorporated!
27 YEARS IN BUSINESS, SERVING YOUR NEEDS WITH THE HIGHEST QUALITY.
Masonry . Design Services . Landscape Maintenance and Construction
[Quoted text hidden]
https://mail.google.com/mail/u/0?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 4/5
4/23/2019 Town of North Andover Mail-1429 Osgood Street
Monica Gregoire <mgregoire@northandoverma.gov> Tue, Apr 23, 2019 at 9:01 AM
To: Chris Connelly<Chris@oliver-enterprises.com>
Cc: Benjamin Curell <bcurell@northandoverma.gov>, Jeff Oliver<jeff@oliver-enterprises.com>, Jean Enright
<jen rig ht@northandoverma.gov>
Hi Chris,
Thank you for providing this information. Can you provide us with a letter from your engineering explaining how the
change in the rain garden offsets the removal and paving of the planting area? A formal letter describing the extent of the
project and any changes to the calculations is needed (I attached an Engineer's letter from another project to give you an
idea of what Planning is looking for). Please let me know if you have any questions.
Best wishes,
Monica
On Mon, Apr 22, 2019 at 10:09 AM Chris Connelly< ri i r® i >wrote:
[Quoted text hidden]
Monica Gregoire
Staff Planner
Planning Department
Town of North Andover
120 Main Street
Northr, MA 01845
Phone
Fax
Email t
Web www.northandoverma.gov
Hours of Operation: Monday, Wednesday, Thursday 8 AM -4:30 PM
Tuesday 8 AM -6 PM, Friday 8 AM -12 PM
Insig Change Ur(1).pdf
175K
https://mail.google.com/mail/u/0?ik=dadd 1 872e7&view=pt&search=all&permthid=thread-f%3A1 631523605401487716&simpl=msg-f%3A1 6315236054... 5/5