HomeMy WebLinkAboutConstruction Schedule - - 0 GREAT POND ROAD North Lake Cochichewick Boat Launch 1D Task Name Duration Start Finish August September October November 7113 7/20 7I27 8/3 8/10 8/17 = W4 8/31 9f7 9/14 91 10126 �21 9/28 10/5 10112 J 101119 1112 111gTla6 11123 North Lake Cochichewick Boat Launch 75 days Wed 8/15/25 Tue 11/18/25 Mobilization 2 days Wed 8/6/25 Thu 8/7/25 Mobill za�lon Install Construction Entrance and Signage 1 day Fri 8/8/25 Fri 8/8/25 Install Construction Entrarmce and Signage 4 Tree Felling and Removal 1 day Mon 8/11/25 Mon 8/11/25 Tree Felling and Removal 5 Erosion Controls No.1,2,3 Installation 1 day Tue 8/12/25 Tue 8/12/25 Erosion Controls No.11,2,3 Installation 6 Turbidity Curtain Installation 1 day Wed 8/13/25 Wed 8/13/25 A Turbidity Curtain Installation 7 Stumping and Grubbing 2 days Thu 8/14/25 Fri 8/15/25 Stumping and GrUbWtng Portadam Installation 6 days Mon 8/18/25 Mon 8/25/25 —-------------- Portadarn Installation 9 Sumps and Dewatering Installation 2 days Tue 8/26/25 Wed 8/27/25 Sumps and Dewateong Installation 10 Site Demolition,Demo of Boat Launch 3 days Thu 8/28/25 Mon 9/1/25 Site Demolition,Demo of Boat Launch 11 Prep and Install New Boat Launch 5 days Tue 9/2/25 Mon 9/8/25 Prep and Install New Boat Launch 12 Demo Existing Retaining Wall 3 days Tue 9/9/25 Thu 9/11/25 Demo Existing Retaining Wall 13 Install New Retaining Wall-Stockpile/Sample Sediment 12 days Fri 9/12/25 Mon 9/29/25 ­R Install N"Retaining Wall-Stockplle/Sa mple Sediment 14 Characterize,Profile,Load Out Impacted Sediment 30 days Fri 9/12/25 Thu 10/23/25 Characterize,Profile,11 Load Out Impacted Sediment 15 Bank Stabilization Work 2 days Tue 9/30/25 Wed 10/1/25 Bank Stabilizalion Work 16 5 days Thu 10/2/25 Wed 10/8/25 Remove Dewatering System and Portaclarn Remove Dewatering System'and Portadarn 17 Erosion Control No.4 Installation 1 day Thu 10/9/25 Thu 10/9/25 T­ Erosion Control No.4 Installation is Electrical Conduit and Guy Wire Work I day Thu 10/9/25 Thu 10/9/25 Electrical Conduit and Guy Wire Work 19 Shape and Grade Infiltration Basins-Install Drainage 2 days Fri 10/10/25 Mon 10/13/25 Shape and Grade Infiltration$#sirts-Install Drainage 20 Subgrade Prep for Upland Permeable Pavers 3 days Tue 10/14/25 Thu 10/16/25 I Subgrade Prep for Upland Permeable Pavers 21 Install Geotextile,Subbase Stone and Sand 3 days Fri 10/17/25 Tue 10/21/25 Install Geotextile,Subbase!Stone and Sand 22 Install Permeable Pavers 8 days Wed 10/22/25 Fri 10/31/25 Install Permeable Pam 23 Fill Permeable Pavers with Loam or Stone 3 days Mon 11/3/25 Wed 11/5/25 Fill Permeable Pavers with Loam or Stone 24 Install Railing,Guardrail and Rope Fence 3 days Thu 11/6/25 Mon 11/10/25 Install Rail!n9j,Guardrail and Rope Fence 25 Install Signage and Boat Racks 1 day Thu 11/6/25 Thu 11/6/25 Install Signage and Boat Racks 26 Trees Installation 2 days Fri 11/7/25 Mon 11/10/25 Trees Ins tall ition 27 foaming and Seeding 2 days Tue 11/11/25 Wed 11/12/25 Loaming and'Seeding 28 Final Cleanup 2 days Thu 11/13/25 Fri 11/14/25 up Final Clean 29 Demobilization 2 days Mon 11/17/25 Tue 11/18/25 Demobilization Task Summary Inactive Milestone Duration-only AIUIM_�—­W—H Start-cnly C External Milestone Manual Progress Project:North Lake Cochichewi Date:Mon 7/28/25 Split Project Summary Inactive Summary Manual Summary Rollup m-w­� Finish-only Deadline Milestone Inactive Task Manual Task Manual Summary 1 111 External Tasks Progress Page 1