HomeMy WebLinkAboutConstruction Schedule - - 0 GREAT POND ROAD North Lake Cochichewick Boat Launch
1D Task Name Duration Start Finish August September
October November
7113 7/20 7I27 8/3 8/10 8/17 = W4 8/31 9f7 9/14 91 10126
�21 9/28 10/5 10112 J 101119 1112 111gTla6 11123
North Lake Cochichewick Boat Launch 75 days Wed 8/15/25 Tue 11/18/25
Mobilization 2 days Wed 8/6/25 Thu 8/7/25
Mobill
za�lon
Install Construction Entrance and Signage 1 day Fri 8/8/25 Fri 8/8/25
Install Construction Entrarmce and Signage
4 Tree Felling and Removal 1 day Mon 8/11/25 Mon 8/11/25
Tree Felling and Removal
5 Erosion Controls No.1,2,3 Installation 1 day Tue 8/12/25 Tue 8/12/25
Erosion Controls No.11,2,3 Installation
6 Turbidity Curtain Installation 1 day Wed 8/13/25 Wed 8/13/25
A
Turbidity Curtain Installation
7 Stumping and Grubbing 2 days Thu 8/14/25 Fri 8/15/25
Stumping and GrUbWtng
Portadam Installation 6 days Mon 8/18/25 Mon 8/25/25 —--------------
Portadarn Installation
9 Sumps and Dewatering Installation 2 days Tue 8/26/25 Wed 8/27/25
Sumps and Dewateong Installation
10 Site Demolition,Demo of Boat Launch 3 days Thu 8/28/25 Mon 9/1/25
Site Demolition,Demo of Boat Launch
11 Prep and Install New Boat Launch 5 days Tue 9/2/25 Mon 9/8/25
Prep and Install New Boat Launch
12 Demo Existing Retaining Wall 3 days Tue 9/9/25 Thu 9/11/25
Demo Existing Retaining Wall
13 Install New Retaining Wall-Stockpile/Sample Sediment 12 days Fri 9/12/25 Mon 9/29/25
R
Install N"Retaining Wall-Stockplle/Sa mple Sediment
14 Characterize,Profile,Load Out Impacted Sediment 30 days Fri 9/12/25 Thu 10/23/25
Characterize,Profile,11 Load Out Impacted Sediment
15 Bank Stabilization Work 2 days Tue 9/30/25 Wed 10/1/25
Bank Stabilizalion Work
16 5 days Thu 10/2/25 Wed 10/8/25
Remove Dewatering System and Portaclarn
Remove Dewatering System'and Portadarn
17 Erosion Control No.4 Installation 1 day Thu 10/9/25 Thu 10/9/25
T
Erosion Control No.4 Installation
is Electrical Conduit and Guy Wire Work I day Thu 10/9/25 Thu 10/9/25
Electrical Conduit and Guy Wire Work
19 Shape and Grade Infiltration Basins-Install Drainage 2 days Fri 10/10/25 Mon 10/13/25
Shape and Grade Infiltration$#sirts-Install Drainage
20 Subgrade Prep for Upland Permeable Pavers 3 days Tue 10/14/25 Thu 10/16/25
I
Subgrade Prep for Upland Permeable Pavers
21 Install Geotextile,Subbase Stone and Sand 3 days Fri 10/17/25 Tue 10/21/25
Install Geotextile,Subbase!Stone and Sand 22
Install Permeable Pavers
8 days Wed 10/22/25 Fri 10/31/25
Install Permeable Pam
23
Fill Permeable Pavers with Loam or Stone 3 days Mon 11/3/25 Wed 11/5/25
Fill Permeable Pavers with Loam or Stone
24 Install Railing,Guardrail and Rope Fence 3 days Thu 11/6/25 Mon 11/10/25
Install Rail!n9j,Guardrail and Rope Fence
25 Install Signage and Boat Racks 1 day Thu 11/6/25 Thu 11/6/25
Install Signage and Boat Racks
26
Trees Installation 2 days Fri 11/7/25 Mon 11/10/25
Trees Ins tall ition
27 foaming and Seeding 2 days Tue 11/11/25 Wed 11/12/25
Loaming and'Seeding
28 Final Cleanup 2 days Thu 11/13/25 Fri 11/14/25
up
Final Clean
29 Demobilization 2 days Mon 11/17/25 Tue 11/18/25
Demobilization
Task Summary Inactive Milestone Duration-only AIUIM_�—W—H Start-cnly C External Milestone Manual Progress
Project:North Lake Cochichewi
Date:Mon 7/28/25 Split Project Summary Inactive Summary Manual Summary Rollup m-w� Finish-only Deadline
Milestone Inactive Task Manual Task Manual Summary 1 111 External Tasks Progress