Loading...
HomeMy WebLinkAboutEmail - WSP SC#16 & SC#17 - - 0 GREAT POND ROAD 9/4/25, 12:18 PM Town of North Andover Mail-N.Lake Cochichewick Boat Launch-WSP SC#16 and SC#17—Follow-Up 0 "! R' ril"I"A'' VER, Jean Enright<jen rig ht@northandoverma.gov> � N. Lake Cochichewick Boat Launch - WSP SC#16 and SC#17 — Follow-Up Jamie Veillette <Jamie.Veillette@apexcos.com> Thu, Sep 4, 2025 at 12:04 PM To: Jean Enright<jen rig ht@northandoverma.gov> Cc: Ryan Paul <Ryan.Paul@apexcos.com>, Jamie Keel <Jamie.Keel @apexcos.com> Hi Jean, Closing the loop on this. The stage storage HydroCAD worksheet tables (as requested per SC#16) are attached and were also included in our response letter dated October 8, 2024. No changes were made to the storage volumes following the issuance of the WSP. The only modification to the stormwater design was the revision of the bioretention basins to infiltration basins, based on the observed Estimated Seasonal High Groundwater (ESHGW) elevation. Regarding SC#17, the test pits were conducted on November 6, 2024, prior to the issuance of the OOC. The test pit observation report is attached and also included in the appendices of the project specifications. Please reach out with any questions! Thank you, Jamie J iiii� liii e liii IIIII IIIII °°fie IIIII°� IIIII.......... Project Manager Illl�llll�l�l��i Apex Companies, LLC Office:18 Commerce Way, Ste 2000, Woburn, MA 01801 -657-0960 Mobile: 203-560-7817 https://mail.google.com/mail/u/O/?ik=7c2eff6265&view=pt&search=all&permmsgid=msg-f:1842350015391667596&simpl=msg-f:1842350015391667596 1/2 9/4/25, 12:18 PM Town of North Andover Mail-N.Lake Cochichewick Boat Launch-WSP SC#16 and SC#17—Follow-Up 3 attachments "'°' N. Lake Cochichewick_Test Pits Observation Report_November2024.pdf 8855K "'°' HydroCAD StoreTable_Bio.Ret.Areallo.2.pdf 51 K "'°' HydroCAD StoreTable_Bio.Ret.Areallo.1.pdf 52 K https://mail.google.com/mail/u/O/?ik=7c2eff6265&view=pt&search=all&permmsgid=msg-f:1842350015391667596&simpl=msg-f:1842350015391667596 2/2