Loading...
HomeMy WebLinkAboutLot B - Notice of Decision - - Pa k 166135 Ps 193 -N 3 '" r� ► Office of the Planning D%,partment Town of North Andover Community Development and Services Divbian 120 Main Strom Now Andover,Massachusetts 01845fla .► ,. ".: -- . TILE OF DECISION nT PLAN RIEVIEW,PAR MG,, OMMO T DRYVEWAY, BU11DING; EIGEM,AND FLOOR Ar RATIO SPECUL PERMU Any appeal shall be filed hgm a from dew of decWM Within(20)days ate r the e of an aplaa- date of filing this notice in jr�-LFU the office of the Town Clerk. TOM Public Hearings: September 3,2019, September 17,2019,October 1,2019,October 15,2019(continued),November 5,2019, November 2 ,2019,Dw=ber 33,2019 (continued),December 17,2019,January 7, 2020,January 21,2020(continued),and February 4,2020(continued);February 25, 2010, h 10(continued),and March 24, 202-0(continued);April 7,2020(continued)-, .April 14,2020- May 5,"020,and,May O, 2020. Date of Decision:May2O,2020 Petition Op Hillwood Enterp ,L.P. 4507 North Front Str Suite 302 Harrisbuig,PA.1'7110 Premn' 1600 Osgood Str oM Andover.,MA 01845 Assessor's Map 34,Portions of Lots 15, 17,54,and 55, and depicted as Lot B c.onasisting of 110. 5 acres(4,806,699.st. Referring to the above petition for a Site flan Review,Parkin&Common Driveway,funding Height and Floor Area.Ratio Speoial Permits from the requ OFrnents of the North Andover Zoning Bylaw,(Article 8. Fart 3 [Site plan Review], Article� ,Fart 1, 1,954. . [Park- 2n,g Special Permits]; l+cl+e 2,§ 19 - .2. [Common Driveway Special Permit];A cle 7,§ 195-7.4.and 195 Attachtnent 3,Town of North Andover,Table 2:Sun-unary Of Di mensiona1 ulrrements,Footnote 1 [Building freight Special Permit]; Article 7,§ 1.95-7.6.and 195 Attachment 3,Town of North.Andover,';l"`abl+e 2:S=mart'Of Dimensional Requirements,Footnote 1 [Floor AreaRatio S P lt];and,Article 10, 195-103A gp�eciat p It-Genexnl],o►f Chapter 195- `o rth Andover onin,g ylaw an MIL eF 40A,,Sec 9,so as to allow for the construction of a proposed a-commercege,wamhouse and.distribution&tllity with accessory office and other uses,consisting of a. -stony building including approximately 3,835,5100 ,x squaw feet of ass floor area,with upgra&s to parkin&ae+cuss includin a common driveway.,uti1i es� m storm titer m gennent,lighting,landseVing and ether associated iimprovements to be located on fr Amu CAPY-1:dt . *1441A Bk 16635 Pg194 #3 42 V 1600 Osgood*Street,Map 4 Lots 15,17, 4,and 55(Lot ) Site plan Review,Parkm' &Building Height Floor Area Ratio,and Common Drivehy Speck Permits approximately 110.35 acres of land depicted as Lot B(the"Site"as deed below)on the"Pl e'as defined below. This Project is located within the 1-2 Zoning District. A&r a public hearing given on the above date,and upon a motion by L Simons and 2nd by A.Preston to APPROVE OVE the Site Pke R e ",P'ar in ,Common r-T Buil Heigh ,and Floor A do S;Mpec Permitsbased upon,and subject to the following conditions.Vote was 5—0 in favor of the applications. Of t ft g and Eitan Goldberg,Chahum P 3%ton :belly Cormier on Pteston John Simons The Plannm* g Board herein APPROVES the construction of a proposed e-cornmerce storage, warehouse,and distribution facility with accessory office and other uses,consisting of a 5-story building including approximately 3,835,500 square:feet of gross floor area,having a building footprint of approximately 817,212 square feet;along with access+ozy structures,with upgrades to parkin&access including a common driveway,utilities,stonrnwater management,lighting,l ping and other associated a ovements(the"P ojeot'`'as defted below)to be located on appmximately 110.35 acres of land depicted as Lot B(the"Site'as defined below)on the" ''lams,"as defined below.was Project is located within the 1-2 Zoning District, Prior to the construction of the i pro e, en nowd above, a number of tvities will be required to be conduct4 including:(i)the disconnwtion and relocadon of certain em"sting ground-mounted un solar modules and]Building 70 roof-mounted solar modules to proposed ►t A for re-' lladon d operation;(ii)the demolition of all a ist7ing buildings one Lot B;and,(iii)the cutting and capp kvmg of an existing utilities not being re-used,with the hu ation of new utilities as depicted on the utilities plan attwhed to Plans. The Site's a portion ofthe cunvntly known as 1600 Osgood Stut,or Osgood AV*"" and consists of 167.8 acres,andi"s currently depicW in the Town of North Andover"s Assessom Maps as four separate assessors p► r ls►,including:(1)Parcel 1,consisting of 118.95 a m(Assessors Map 34,Lot 17) where most of`the existing improvements at Osgood Lending are located-,(2)Parcel 2,consisting of 6.11 acres(Assessors;map 34,Lot 55)located along the so-called north entree to the 5i ("Nor Access Road"),with such lot recently merged into Lot 17,as depicted on a plan recorded the Essex North Registry ofDeeds as Plan No. 1 l; (3)Parcel 3,consisting of 11.29 acres(Assessors Map 3 4,Lot 15),a. rechmgular parcel bounded by Holt.Road and.Osgood Stred located along the southerly boundary ofthe site; and,(4)Parml 4,consisting of31.4+6 acres(Assessors Nfap 34,Lot 54)why the existing +gilds and parking are located,and representing the most northerly portion of the site(collectively,the` perty' . The Property is owned by 1600 Osgood gt ftt LLC. Them Speck P enmits were requested by Hffiwood Enterprises,LP,the Applicant. The applicafions were tiled with the Planning.Board on.August 9,2019,except with regard to the application for Common Driveway Speed permit which was filed on May 1,2020. The public on the above referenced appneaticons were opened on September 3,2019,and closed by the North Andover Planning Board on May 2020,except that the public hearing for the Common Driveway Special Pwnit was opened May 2% 2020. The Applicant submitted a.complete.set+ofapplications cmfamdug to the requirements of the North Andover Zoning Bylaw,which was notice and reviewed in accordance with(Article g,Part 3 [Site Plan Review]:- Article 8,l:'';art 1,§ 195-8. .[Parkin Special Permits];Article 2,§ 195-2.2.[Con=on Driveway 2 100 Osgood Street,Map 34 Lots 1 ,17,,54,and t B) Site Plan.Roview,Parking,Building Height Floor Area Ratio,and Common Driveway Special Permits Special Permit];Article 7,§ 1 5-7.4.and 195 Attachment 3,Town of North Andover,Table 2:Summmy Of Dimensional Footnote 1 Building Height ht Special Permit]- Article 7,§ 195-7.6.and 1.95 Attachment 3,Town of North Andover,Table 2;Summary Of`Dimensional Requirements,Footnote 19 [Floor Area Ratio Special Permit];and,Article 10, §1.95-1113A[Speeial Pwmit- enera�, of Chapter 195 -North Andover Zoning Bylaw), and MGL c.4W Sec 9. The Plan Board voted usmi o►usly(by a vote of 5 )to grant the She PLIm Review,Paricing, C ommron � �, e,Sleight and Floor Area Ratio 5► Permits. A sped it is b the g board,as special p pit tin g•au mority,requires a.vote of at lei four members of a five- member board. Planning Board members participating throughout the hearing process were:Eitan Goldberg, Chair,Peter o nton;Kelly Comer,Aaron Preston;and John Simons. Planning Board Member KAte R. Bar si used the hearings and did not participate in the votes described herein. The Applicant is hereby noted that should the Applicant disagree with this decision,the Applicant has the right under MGL Chapter 40A,Section 17,to appeal to Ws decision with twenty dam afbmthe daw this decision has been filed with the Town Clerk. FMINGS OF FACT I The Plannm* g Board makes the followm"g,findings under Article S.Part 3 [Site PlanReview]; Axticle g,Part 1, § 195-5. .(Park:mg Special P'e�ts)a Article 2, 19 -2.2. [Common Driveway Special Permit);Article 7, ' 1 �5-7.4.and 1. Attachment nt� ,Town of Andover,Table 2* Summary Of Dimensional Requirernents,Footnote 1 [Building Height Special Permit]; Article 7, 195-7.6.and 1.95 Attachment 3,Town of North Andover,Table 2:Summary of Dimensional P.equirernents,Footaote 19'[Floor Area Ratio"Special Permit];and,Article 10,§ 19 -10.'7 i. (Special Permits-General), of Chapter 195—North Andover Zo ' Bylaw. 2. The Plans have been submitted M' accordance with the regulations and procedures as outlined in Article 8,.Pant 3,and comply with§ 195- .15(review criteria and design guidelines),and § 19 - 103A(conditions for approval of Special Permit),as finther described below. 3. Site Plan Revever ern tier S l'" `t Farr . The specific Site is an appropnate locator for such a use,structure or condition. Since the Site is zoned for industrial use under the 1-2 Zoning District,I�ot B is an appropriate location for the proposed Project. The Site desIP * compliments the surrounding uses and provides for sufficient traffic,curb out and eircubWon hnprovements,as well as sufficient grater,suer,and other utilities. The proposed height and floor area ratio for the proposed building are appropriate for Lot D,as the highest p rt of the buildmg is located.932.3 feet from Osgood Street,the ground flog elevation(measured from the midpoint of the building)drops approximately 14 few from the Osgood Street elevation.,and most of the proposed building will be located west of`(and behind the existing)Building Nos.20 and 21 located on Lot A,all of which comrbine to enable the building to blend into the surrounding neighborhood. Parking Will also be adequate to serge the proposed uses. 4. The Project use as developed will not adversely affect the neighborhood character for the following reasons. The building entirely encloses the proposed use,and the building is complemented with appropriate landscaping and screenm' g. The proposed building'is set far back from Osgood Street and adjacent properties. The character of the architectural style ofthe proposed now building will complement the architectural style of the buildmng;s to remain at 1600 Osgood Street. The Site is zoned industrial and the proposed use as developed will result in a substantial improvement to Lot from an aesthetics and environmental.perspective. 'Me proposed build' height and mass" 9 will not adversely ly affect the neighborhood for all. sans described ►the ppli a t' Bk 16635 Pg196 #34286 1600 Osgood Street, Up 34 ts 15917,54,and 55(Lot B) Site Plan Review,Parkin&Building Height Floor Area Ratio,and Common Driveway Special Permits *6 .a aPP11caU014 and the lighM*Plan demonstrates that on-Site lighting will not adversely impact the neighborhood. Accordingly,the proposed uses are well suited for its proposed location. 5. There will be no nuisance or serious hazard to vehicles or pedestrians. Driveways accessing Osgood Street(including the south eftmee to the:dot,as well as the north en twice to the Lot which will include access from Osgood Street over a private,perpetual access easement as a common driveway over the North Access Road area on Lot A to be granted by the owner of Lot A for the benefit of Lot B)Will be located substantially in the same location as currently existing,and are located to provide for the best available sight distance along Osgood Strwt. The parking and * a ^fM i loading facilities have been.designed to minunize cordlic _ @ a auto ts and to AL" enicieney n layout A leading to the design of safe and effic Mgress ient to and egress from the Site for mobile,truck and pedestrian traffic. Traffic WVrovements have been designed to maximize on-Site and off-Site sab ty. For additional detail plem refer to the Traffic Report. 6. Adequate and appropfiate facilities Vn*11 be provided for the proper operation of the proposed use. The Project is adequately and appropriately serviced by water,sewer and other utilities that adequately address the needs ofthe Project. Now stonnwater management facilities Will be constmded to provide adequate treatment of stormwater in accordance with applicable requirements. 7. In addition to the reasons described herein and as shown on the Site Plans and other information submitted as part of the Site Plan Review and Special Permits process,the use is in harmony with "0 A the general purpose and intent of this Zoning Bylaw for the following reasons. r ust,the location of the proposed Project is ideally suited to add additional industrial uses withi the 1-2 Zoning District to complement and build a critical mass which is important to the future redevelopment of the Route 125 corridor M" this area of North Andover. Second,the siting of a facility M the proposed location will have the effect of converdag a fimcdonally obsolete Site into an finportant and significant revenue-generating property for the Town. Third,the off-street parking provided is adequate to serve the uses of Lot B W* a safe and effective miner. Fourth,the Project,as proposed, is Projected to potentially provide 1,500 new full-time jobs to Lot B,in addition-to between 200 and 250 temporary construction jobs during the peak constmetion phase when all of major construction trades—sitework,concrete,steel,,roofin&mechanical,electrical,plumbing and fire protection-are on the Site at the same time,along with the multiplier effect arismug from the m* creased number of workers supporting other North Andover businesses,and potentially resulting in now busiesses opening along the Route 125 com'dor. Lastly,the Project,as shown on the Plans,complies with the Zoning By-Law,subject to the grant of the Special Permit relief requested. 8. The "Traffic Impact and Access Study for Proposed Redevelopment, 1600 Osgood orth Andover,Massachusetts,"'dated August 2019,as supplemented by a"Traffle Impact and Access Study for Proposed Redevelopment, 1600 Osgopd Stree�,North Andover,Masswhusetts,"dated March 2020,both of which were prepared for MIlwood Enterprises,L.P.by Laapn En&eermg& Environmental Services,as supplemented(collectively,the"Traffic Report")states: a.the location and number of curb cuts proposed is the same as the em*sting curb cuts,and has been reviewed and is appropriate for the proposed use.The driveways have been designed to provide sight lines that exceed m'u=ium requirements for intersection sight distances. Moreover,the proposed landscaping and Signs i the vicinity of the Site driveway Will have been located mfficiently back from Osgood Street so as not to impede thew sight distances,and turns into the Site driveways VA-11 operate at appropriate levels-of-service(LOS)during the peak-hours,and exiting movements from Lot B driveways will operate at an appropriate LOS 4 during the peak-hours.MassDOT has sole jurisdiction over any curb cuts and other 4 1600 Osgood Stree4 Map 34 Uts 15917 "4,and 55(Lot R) Site Plan �eview,Pa�rlcng�Building Height Floor Area Ratios and Common.Driveway special Permits M. improvements on Osgood Street which is a state highway,,so MassDOT will impose requirements it deems necessaxy to ensure safe and efficient circulation along Route 125 as a part of the MassD T permitting process; b. truck traffic to and from the fulfillment center Lot will enter from/egress from/egress to the north along Osgood Street as there is a.full interchange approximately two Mlles north that connects the Site to 1-495 via the Industrial Avenue(Route 1 5)connector; c. the proposed on-Site parking layout and Site access locations on Osgood Street will not cause detriment to the surrounding neighborhood through increased traffie volumes,Will not result increased vehicular congestion or gaeUM&should maintain or improve on-Site and off-Site c crrcu�lation patterns and anmunne conflicts between motor vehicles and pedestrians; d. the Pro,ect is expected to generate 1,868 new vehicle trips can an average weekday 934 entering and 934 exiting),with rQX ately 34 new vehicle trips 37 less entering and 71 esinexpected during the weekday morning roadway p hour,5 new vehicle trips(64 entering and 59 less exiting)during the weekday evening roadway peak hour, and 959 new vehicle trips(500 entering and 459 a ititW during the weekday mormng generator peak-hour and 1,027 new vehicle trips( 16 entering and 511 exiting)ding the weekday ev"�►ing generator hour; e. a tom of two curb-cuts with a fiffl access,driveway will be reconstructed in locations substantially identical to the existing southernmost wxess road,,or South Access Drive(across Osgood Street from the existing ps sMfion),as well as the northermnost access drive,or North Access Drive,which will connect with an upgraded private perpetual roadway access easement over Lot A,to be granted by the owner of Lot A.for the benefit of Lot B; f. the development requires the upgrade of the signal equipment at both intersections,to be approved by the Mass DOT; g. M order to improve overall operations at bath the South Access Drive and North Access Drive, the signal timings would be optimized;and, br. all proposed traffic improvements in Osgood Street are pending MassDOT approval. 9. According to the Traffic Impact and Access Study prepared by Langan En,gini g Environmental Service Inc.: a. The traffic impact studyidentifies potential impacts of`the proposed Project. b. There are approxhnately 5,170 parkingspaces servi+cmg the existing uses,which excludes the existing halt area occupied by the on-site solar facilities. c. Access to the Site is provided by two un-s" alized full-movement driveways and two Agnalized full-movement driveways on Osgood Sbvd. The northernmost si driveway currently operates m flash mode and functions as an,un-signalizeddriveway. d. The Project proposes to modify the ar ess driveways as follows Site Plan►.in Appendix A. i. The northern Lost so driveway,which will sbare both Uffllment center employee and truck access and egress and also for the relocated soar array,will be updated to now traffic sigrial operation. ii. The southernmost s driveway will be exclusively dedicated to bal illm+ent oenter employee ac=ss and egress. iii, The two ccuter un- lP"ZOd chiveways will be dedicated exclusively to Buildings 20 and 21 operations on proposed Lot A. e. To maintain acceptable or no-build and levels of',sem'ce the following of-site improvements are recommended Off-Site bnprovements Flan,dated July 19, 20199 : i. Construct a ogle nordf►bound left-ice lane at the sf so►ut bound driveway with "50"ofstorage and replace a si uaipment. 5 Bk 16635 Pg198 #34286 1600 Osgood Street,Ybp 34 Lots 15,17,54,and 55(Lot B) Site Plan Review,Parkm` &Building Height Floor Area Ratio,and Common Driveway Special Permits U. Res*e the s0uthbOund right-tUm only lane tD a shared throngb/fight-turn lane,shift the southbound shared left ter m/through Ime w4 and provide a striped median between to provide adequate room foT re-gignment. ill. Update the=isfing signal,at the northernmost driveway from flash mode to a coordinke timing scheme with the southernmost driveway. Optimize the fimings for these two coordhuod signals at the drivevvays. IV. 00mize signal timing at the intersection of Industrial Avenue&Shelley Road/Ward 11111 Avenue during the weekday morning peak pmiods. V. OPfimi=s4W turning at the k ten ecdon of Osgood Street&Gred Pond Road during both the weekday morning and weekday evening peak period. (All propcmd traffic huprovements are peading ManDOT approval.) 10 The Plans reflect extensive discussion and review with TEC,Inc.,the Town's traffic peer review consultant and the Project meets the requirements of the Town for Site plan Review as stated its Article 8,Paft 3[Site Plan Review)and other traffle-related on-tiftia of the Zoning Bylaw, (See lettm fmm TEC,Inc.,dated September 10,2019[Review#11,as supplemented by a final letter,dated,April I s 2020(Review and- "-- "a"Vs,response desaibed M" a Traffic Peer Review Comments Memorandum,prepared by Langan E nginew mOst and Enviro ►0 Services,Inc., r" dated October 3,201%March 25,2020 and April 89, 2020. 11 Ejuidug and,L. al dinsg bee P t wil EigdirM, The proposed Site l include a total of 1,803 j _.g:ML spaces where 1,796 parking spaces are required m" accordance with§ 195-8,4 and the"Table of Off- Street Parking,"and the breakdown of parking spaces is depicted on Plan CS 100 of the Plans. MoreoveT,the proposed Project includes a WW of approximately 226 leading spaces where 154 loading spaces am required under§ 195-9.5 E.and the"'Table of Off-Street Loading Regulations," and the breakdown of parking spaces is depicted on Plan CS 100 of the Plans. use it would be impractical to have all loading spaces designed to be located,on and attached to the proposed building the Applicant has requested a Special Permit for a modification of loading design standards M acwrdance with§ 195-8.8.D.2.to enable up to 161 of the 226 loading facilities to be located 4acent to the building as depicted on the Plans rather than attached to the building. While the 65 loading spaces attached to the building will meet the requirements of having an opening in a building th not less an 10 feet M' Width and niceM'e feet height,including a platform for loading and unloading goods,merchandise or other materials,the remainder of the loading areas will not be attached to the building but Will comply with all other design standards required for Ioadmig facilities,each of which will have min urndimensions of 12 feet vdde,25 feet in length, 14 feet Mi height clearance,and shall be located,arrang4 and of sufficient number to allow service by the type of vehicle customarily expected for the use while such vehicle is parked completely clear of any public way or sidewalk. 12. The Board further finds that the modification of loading facility design standards under 195-8.8.D.2 is appropriate and is consistent with the pwposes set forthim thi's Part I-,and has found that such relief does not cause detriment to the s=ounding neighborhood since the modification of design standards Vn*lI not result in increasers traffic congestion or queuing of vehicles,or any change kJ m traffic patterns and access to the Site,or result in any unsafe conflict of motor vehicle and pedestrian traJMc. 13. The Board also finds that since the Applicant's proposed modification of loading design standards meets the prerequisites for consideration of a Parma Special Permit,and since the P *ect meets r0i the Special Permit criteria under§ 195-10.7A of the Zoning Bylaw as described here' the grant of 6 IOU jaic 16635 1 #34286 1600 Osgood Street,Malt 34 Lots 1 t 17 42 and 55(Lot B) Site Plan Review,,Parldn&Building Height Floor Area Ratio,,and Common.Driveway Special Pertrit a Special Permit to allow for the modification of loading facility design,standards is appropriate under the circumstances. 1 . ail ei ecial unit P ind' . As to B uildiu►g Height,Article 195-7. .and 195 .Attachment 3,Town of North Andover,Table 2: Summary Of Dimensional Requirements, Footnote 18,provides that the PlannIng' turd.may t approval of an increase in the xnasixrcuM height described under Table 2,provided that such approval shall not permit a structure to exceed 105 feet'in building height,that the lot is at least 100 acres in size,and Ruther provided that such. approval is gumted by Planning Board.Special Permit after consideration.of the Special Permit criteria described under§ 195-1 0.?A,of the Zoning Bylaw. 15. The Board finds that the proposed building on Lot B(which is in excess of 100 acres in size),Will be no higher than 105 feet;as depicted on the Plans. Based upon elevation plans provided by the Applican. the proposed building height is,appropriate for the area since: a the Site is located Within the 1-2 Zoning District and is generally surrounded by industdal and commercial uses; the building'is set back approximately 932.3 feet from Osgood Street; c the'building'is partially obscured from Osgood Street due to the building's location west of,and behind,Bididings 20 and 21 on Lot A,such that only the northerly and soutimly►ends of the building will be visible from Osgood Sbmvt as one drives on Osgood' meta and the approximate 14-foot drop in elevation of the land between Osgood Street and the mid-location and the building, all factors,which the Planning Board have deemed appropriate for the proposed building height. 16. The Board also finds that sm" Co the Applicaat's proposed building meets the prerequisites for consideration of a Building Height Special Permit,and sm' 00 the Project meets the Special.Permit criteria under§ i195-1.o.7'A cif`the Zoning Bylaw a dmribed herein,the t of Building Height Special Permit s appropriate under the circumstances. 17. &qr `o ",ecieermit i to door�a Ratio,Article ', 195-7, ,and 195 Attuchmrent 3,Town of North Andover,'fable 2:Summary Of Requirements, Footnote 19,provides that the Plaanxng Board may grant approval of an increase in the maximum floor area ratio described.under'fable 2,provided that the floor area ratite shall not exceed 1:.0:I, that the lot is at least 100 acres in size,and that such approval is granted by P Board Special Permit a&r consideration of the pecial Permit criteria descfibed under§ 19 -1 .7A ofthe Zoning Bylaw. 1 . The Board finds that the Applicant is proposi6ng that the proposed maximum floor arrea ratio for the facility to be located on.Lot B(which is in excess of 100 s in size),is 0.80*-1 as depicted on the Flans,an which is much less than the 1:1 maximum permitted FA.l?t,by Special Permit. 19. 1 he Beard also finds that since the Applicant's proposed building meets the prerequisites for consideration of a Floor Area Ratio Special Permit,and since the Pro Aect meets the Special Permit criteria under§ 195-1.03A ofthe Zoning Bylaw as described herein,the gmnt of Floor Area Ratio Special Permit is appropriate under the circumstances. 20. r 1 o .r '' t i , Ih.+e Plan reflects extensive discussions with the Planning Board, Peer Review Consul:Wnts,the Planning Departnaend,other Town Departments,and the Applicant with respect to Site design and stormwater management. 21. The stomwatcr management is designed win accordance with the Town Bylaw requirements and best nanapment engineering practices,and the most recent verslort of the MA DEP Storruwater Handbook,and the Plan reflects extensive discussions and review by the To ►n.'s outside consulting 7 Bk 16635 Pg2OO #34286 1600 Osgood Street,Map 34:darts 15,179 54t and 55("t 8) Site Plan Review,Parking,Building Height J1% Floor Area Ratio,,and Common Driveway Special.Permits engines,Horsley&Witten.The proposed runoff ftorn the Project will be collected via curb leak off and ram" garden system,deep sump catch ba=4 or roof leader and convoyed In closed,off-Iwo underground pipe networks.Curb leak off to a grass swale also conveys run offto a closed pipe network.The pipe e networks discharge to infiltmfion basins,extended dry detention basins,or a wet pond,after passing through hydrodynamic separators or sediment fore bays.Having been treated and wtained the stomwater is discharged.,at a controlled rate through outlet control oueftres,to existing discharge locations on the Property via underground,closed pipe networks.There were extensive discussions between the Town's,outside consultant engineer and the Project Engineer related to the overall design and long term Stour water Operations&Maintenance Plan (See correspoodence from Horsley Witten Group,dated September 10,2019(Review#1), October 10,2019(Review#2),and Engffieenng response comments on October 3,2019). *.a 22. The Plans reflect extensive discussion and review with TEC,Inc.,the Town's civil peer review consultant and meets the requirements of the Town for Site Plan Review as stated in Article 8,Part 3 [site plan review]of the Zoning Bylaw. letters from TEC,Inc.,dated September 12,2019[Review#1),November 27.2019[Review #21,and Langan's response described in a Civil Engineering Peer Review Comments Memorandum,prepared by .� igmeenng and Enviromnental Services,Inc.,dated November V"x 8,92019). 23. The Landscape Plan reflects extensive discussions M' regards to the integration,of landsc, and RPM9 lighting elements designed to integrate into the varieties and types of landscapin and screen* M9 Ing:) and plantings have also been reviewed and approved by the Conservation CommiggiOn. 24. The Project Will provide for water.,sewer and utilities on-Site to adequately address the needs of the Project.A sewer design and capacity analysis has be=conducted by Woodard and Curran which has made several Project recommendations. A water infrastruchm design review has been conducted by Weston&Sampson Engineers,Inc.which has made several Project recommendations. (See Woodard&Cunran Memorandum to Jim Stanford,.director,Department of]Public Works, Town of North Andover,from Ken Carlso�, Senior Project Manager,Woodard&Curran,dated November 11,2019;as supplemented by Memorandum,dated March 16,2020,and by ail correspondence dated May 4,2020; and,Weston&Sampson Engineers,Inc.letter from Tam E. 90 McManus,P.E.,Team Leader,Weston&Sampson Engineers,Inc,,to Timothy 1.Wi'llM Operations , JVXMNP.,Department of Public Works,Town of North Andover,dated December 10, 2019,as supplemented by a letter,dated Marcb 31,2020,and by email correspondence dated May In 10 V a 1,2020- and, s responses described in 30 a Memorandum to Timothy J.Willet�DPW Operations Manager,Water and Sewer Department,North Andover Departmen of Public Works, a a preparect by Langan Engineering and Environmental Services,Inc.,dated January 24,2020,as supplemented by a Memorandum,dated April 21,2020,and Langan's responses described'in a "Oftv% Memorandum to Mr.AM Stafford,Director,Department of Public Works, prepared by ZKKA X .9 WK V ---4-wp- Engmee=* g and Environmental Services,Inc.,dated January 24,2020,as supplemented by a Memotandum,dated March 16,2020,and by a Memorandum,dated April 8,2020). 25. The Board fords t1W a viable sewer lie to support Lot B must be established for the proposed e- commerce building,and that sufficient sewer capacity in the,existing sewer lore aumntly servi 10mg 1600 Osgood Street runs from the rear of the Property,and extends southerly past the Wheelabrator site,across Holt Road and runs along the exisfing raUroad line to the Greater Lawrence Sanitary 8 TIU 16635 :fig 201 #34286 1600 Osgood Street,Map 34 Lots 15,17,54,and 55(Lot B) Site Plan Review,Parking,Building Height Floor Area Rio,and Common Driveway Special Permits District(GLSD)(the"Existing Sewer"),and is an adequate solution to which the Owner of Lot B can tie into,subject to a sewer use agmment approval granted by the GLSD(the"'GLSD Agreement'). 26. The Board also undentands that the Applicant desires to tie into a new public sewer line proposed to be constructed in Osgood Street which would extend from the frontage of 1600 Osgood Street southerly to Sutton Street beyond the intersection of Osgood Street and Sutton Street(the"New Sewee). The New Sewer proposal has been awarded a Mass oar, Grant with additional funding committed by both the Town and the Applicant. Lot B Building is profecW to be constructed and operational by Q3,2022,as may be adi*usted based upon potent 1.construction delays and other factors("Building B Operations Start Date"). 27. The Board further understaids that ff the New Sewer is fully operational by the Bul"Idm' g Operations Sty Date,and that ift the Applicant secures all applicable permits to tie into the New Sewer by the Building B Operations Start Date,then the Applicant intends to tie into the New Sewer and discontinue its use of the Existing Sewer. Otherwise,the Board finds it acceptable for the Applicant to tie into the EXisting Sewer if the New Sewer is not fully operational by the Building OpeTations Start Date. Once the New Sewer is operational and the Building Operations Start Date has occuind,however,we understand the Applicant shall tie into the New Sewer* accordance with the tems and conditions of GLSD Agreement and other applicable approvals. 29. The Town E ngineer has reviewed the Pro ect,and has also reviewed the comments identified by TEC,the Town of North Andover's taffie peer review consultant,in their comment letter dated April 1,2020,regarding the Traffic Study prepared by Langan,for the Ammn Fulfillment Center, to be located at 1600 Osgood Street,and by letom,dated April 13,2020,has recommended that the Applicant to continue to coordinate with the Town throughout the Mass DOT punnitting process and keep the Town apprised of any potential mitigation measures within the Project area and/or at certain intersections identified M* the April 1,2020 TEC letter. Otherwise,the To Engineer and has confumed that all engineering department comments have been adequaely addressed. (See letter from John J.Borgesi,RE.,,Town Engm* eer,North Andover DPW,to Monica Gregoire.,Staff Planner,dated April 13,2020) 29. The Nortb Andover Fire Department has reviewed the Plans and determined that the fmal design addresses all of the concerns the Fire Department,subject to conditions described M' Ws decision. (See email from Lt.Belkne,North Andover Fire Dept.,dated August 13,2019,October 30,2019, November 25,2019 and May 112 2020). 30, A Notice of Intent(NOI)has been filed with the Conservation Comm*ss* i ion concernmg the Project, and on February 5,2020,the Conservation Commission voted to issue an Order of Conditions for the Project. A wetlands Order of Conditions approvWg the proposed Project work under the State Wetlands Prowtion Act and the Town of North Andover Wetlands Protection Bylaw(Chapter 190) (MADEP File No.242-1766),,was issued on February 22,,2020,as am' ended("Wetlands Order of Conditions!). 31. The Project will require a National Pollutant Discharge Elimination System(NPDESK Construction Gene nd Permit(COP)to be filed with and obtained from the United States Enviroranental Protection A, ency. 32. The Massachusetts Department of Transportations OviassDOT)highway Division i's granted authority to'issue State Highway Access Permits and Non-vehicular Access Permits by M.G.L. 9 1600 Osgood Street,Map 34 Lots 1 ,17,54oand 55(lot B) Site Plan Review,Parldng,Building Height .t Floor Area Ratio,and Common n"veway' pecW Permits Chapter 8 1,Sec.21 and 720 CNR 13.00 for any work related to State Route 125 Osgood Street) which is a state Jurisdictional highway. 33. As stated above,the Project will require permits from Massl OT for the anticipated c improvements at and around the site driveways. As part of the MassDOT permit application proms,,the Applicant will need to certify that the Project does not meet or exceed any review thmholds under 302 CUR 11.00 b PA Regulations(see MassDOT correspondence dated January 3117 2020 from Paul D.Stedman,D M hway Director). 34. Accordigly,the Applicant requested advisory opinion as to whether a UEPA review is reed. The NfflPA Office,determined ftiat MEPA Review is not required for the Project, iucluding the Proj ect proposed on Lot B. (See letter,dated May 8,p 200202 to David Llewett,Epsilon Associates,from`Pori T.Kira,AssisUmt Secrvtary,1 EPA Office). 35. Once both Lot A,and Lot B am created Via the endorsement of an Approval Not Required (Al) Plan,thecommon driveway to be created in accordance with the common driveway provisions described under Article 2, § 1 5-2, .,will service both.Lot B and the Solar Project via access from Osgood Street,and will be regulated by a recorded maintenance agreement. The common driveway serves to mmi "me curb cuts off Osgood hut;facilitates traffic circulation,enhances safety for motorists entetbg and exiting the Propel,and meets all of the,genet special permit criteria. under§ 195-10.7A.for the reasons as described above. 36, The Project was reviewed pursuant to Airspace Review by sDOT''s Aeronautics DI sion,and Hazards to Navigation review by the FAA,bused upon its location and elevation,and was determined to create no hazards to navigation.Copies of FAA HazardsNavigation Determinations,including: 2019-- - 07 - E,dated December 10,201 for proposed Lot B building),2019-ANE-6076-0E,dated December 10,2019for temporary construction crane),and determinations,dated January 17,2020 including 2019,-AN&70 4- E,2019-ANE-7 5-O , 2019- -7 66 ► ,20I - NFI-7067-0E,and.2019-ANE-7068-OE,,+dated January 17,2020 (extending over the proposed Lot solar army),dated Jan 17,202 (ailconfrmm* gproposed imp►; ►vernen do not exceed obstruction standards and would not be hamd to air navigation)are on file in the Plan Yng Department. Accordingly,y,the Planning Board finds that this Project generally complies with the Town ofl' orth Andover Zoning Bylaw requirements,including:Article g,Part 3 (Site Plan Review); Article 8,Part 1, § 195-8. . (Parking Special Permits);Article 2,§ 195-2, .(Common Driveway Special Permit);Article 7,§ 15-7.4. and. 195 Attachment 3. Town of`North Andover, Table 2: Summary f` Dimensional tonal .� qui* men , Footnote 1 (Building Height Special Permit)- Article 7,§ 195-7.6 and 195 Attachment 3,Town of North Andover,Table 2:Summary Of D enssion Requirements,Footnote 19 Floor Area Ratio Special Permit),- and,Article l O, § 195-10-7A.(Special Permit---General), of Chapter 195; and,M L c. 40A, Sec 9, but requ'nw conditions in order to be fully in compliance. The Planning Board hereby grants an approval to the Applicant of a requested Special Permits above,provi . ded the following conditions am met: PERMIT D FINMO , 37. The"Locus"or" "or"Lot "refers to a l 10.35-acre parcel of land front*on0sgqodSt=tas shown on a portion of Assessors Map 34,Lots 15, 17, 54,and 55, and also known as aWa) 1600 Osgood Street,North Andover, Massachusets, and as more specifically depicted as Lot B on the Plans. 10 Bk 16635 Pg203 #34286 1600 Osgood Street,Map 34 Lots 15.)170 547 and 55(Lot B) Site Plan Review,Parking Building Height Floor Area Ratio,and Common Driveway Special Permits 3 8. The "Pla&'refer to the portions of the plans related to Lot B prepired by an even Engine efing& Environmental Servim,Inc. dated July 25,, 2019 and revised to May 11) 2020, consisting of 146 sheets, entitled "Termit Site Plans, North Andover Massachusetts, Proposed Redevelopment for Hill wood Enterprises,L.P.and 1600 Osgood Street,LLC,Distribution Facility, 1600 Osgood Street, Town of North Andover,,Esser County,Massachusetts." A list of plans is attached as Exhibit A to this decision. 39. The'&TrcjecVI,refers to the construction of a proposed e-commerce storage,warehouse and distribution facility with accessory office and other uses,consisting of a 5-story building includ' 9 approximately 3,835,500 square feet of gross floor area,having a building footpint of approximately 817,212 square feet,along with accessory structures,with upgrades to parking, access Including a common driveway,utilities,stonnwater management, a r" Mg landscap* and other associated improvements to be located on the Site as depicted on the Pla"An"s.Prior to the construction of the bw*ldin&the Project includes a number of activities M' cluding-, (i)the disconnection and relocation of the existing ground-mounted solar modules and Building 70 roof- mounted solar modules to proposed Lot A for re-installation and operation,along with certain Solar Energy System"improvements associated with the solar relocation on Lot A tDbe approved as a part of the Large-Scale Gro=d-Mounted Solar Energy System described under separate application; (ii) the demolition of all existing buildings on Lot B-and,(iii)the c-utdng and capping of all emsting utilities not being re-used,with the installation of now utilities as depicted on the utilities plan eIng attached to Plans. This Project is* located within the 1-2 Zo District. 40. The"Applicant"'refers,to Elwood Enterpriws,,L.P.,4507 North Front Street Suite 302, Harrisburg,PA 17110 c/o Mae Utsey,VP-Development,the Applicant for the Special Permits,its suamsors and assigns. 41. The"'Project Owner"or"Ownce'rc&rs to the person or entity holding the fee interest to the tide to the Locus from time to time,which can M* clude but is not limited to the Applicant., developer,and owner. SPECLAL CONIDMONS 42. Recognizing the necessity of the Applicant's need to commence:(a)abatement(b)related demolition regarding existing buildings and structures being demolished on the Site;(c)the establishment of replacement utilities to support demolition and segregation of building systems Including selective e&ernal trenching and site work associated with now btilities support demolition and segregation activities noted above-,(d)all work associated with the disco ion, movernent,and installation of existing solar panels and related tructure improvements from existing ground-mounted and rooftop locations to Lot A-"and,(e)work associated with instal1mg new utilities and cutting and capping old utilities in support of the work above,the,Applicant is not prohibited by this decision to commence and complete necessary abatemend demolition,relocation and such other activities necessary to enable the demolition of such buildings and structures notwidistanding the conditions described below,provided that.(i)the Applicant notifies the Building Inspector and P DeprOLLUMMI M advance of such work,(ii)such work is performed In accordance with all applicable approvals;and,(iii)a demolition permit is obtained from the Building In ' I Spector to demolish such buildings and other structures(collectively,the"Allowed Prelim miary Work'). 43. Once the New Sewer is operational,the Applicant shall apply to the Town s Department of Public Works" Water&Sewer Department for permission to connect into such sewer systcm�and subject to any other applicable approvals,thereaft connect to the connect to the New Sewer in accordance Bk 16635 Pg204 #34286 1600 Osgood Street,Map 34 Lots 15,179 54,and 55 QW U) Site Plan Review,Parkin&Building Height Floor Area Ratio,and Common Driveway Special Permits 9 with.the requirements of the Department of Public Works' Water&Sewer Division.Until the later of either the New Sewer is operational or the Building B Operations Start Date,the Applicant shall tie the Lot B building sewer line into the Fxisting Sewer,subject to a sewer use agreernent approval granted by the GLSD(the"GLSD Agreement`%and the Applicant shall provide evidence ofthe approval by the Greater Lawrence Sanitary District of rights to connect to the Existing Sewer. 44. The Applicant must meet all Massachusetts Department Of Transportdion(M ass DOT)regulations concerning traffic sigrWizafion and roadway finprovements to Route 125, 45. Any information required and submitted to any agency of the Commonwealth,shall be filed with the Planning Department. 46. A copy of all local,state and federal permits required for the Project must be submitted to the Planning Depament. 47. The Applicant shall supply a copy of approved MassDOT permits necessary for access and cons ruction of the Project to the Planning Department. In the event Mass DOT reqw*res a material change as deemed by the Planning Director)M* the accesslegress or other details depicted on the Plans and/or Conceptual Off-Site Improvement Plan dated July 19,2019(including,but not limited to details listed in F" Of Fact—Renovation Project#8 and#9 M' this decision),the Applicant shall submit revised Plans to be reviewed M' accordance with the process described M* Section 195- 8.17(Revisions to Approved site plan). 48. The Applicant shall provide faW plans to the P Departrent when Route 125 roadway 0 2* I V geometry aril s are coordinated with Mass DOT. 49. The private sewer pump station depicted as the Lot B Pump Station on the Plans shall remam' the property of the Applicant and/or Owner m" perpetuity.- An Emergency Readmess Plan shall be developed for any circumstance in which the station is inoperable for greater than 24 consecutive hours- A copy of said Emergency Readiness Plan shall be submitted to the PlannM* g Department prior to the commencement of operations of the Lot B Pump Station. 50. The Applicant shall implement a post-opening traffic study to evaluate the operations of the site driveways to compare the anticipated tip generation and operating conditions of the proposed facility to actual post-opening trip generation and operating conditions at the four site driveways to verify that the anticipated t-affic volumes and operating conditions outlined within the traffic study are in line,with actual post-opening conditions,and the tirnefiame for conducting this evaluation at these site driveways shall be approximately twelve months from the time that Amazon opens for full facility opemtions. To the extent that the MassDOTftnposes its own post-opening ftffic study of these site driveways m* a manner which 'I's similar to that proposed herein,as contemplated under Condition No. 116 herein,then the MassDOT post-operating study shall be substituted for the requirements herein The results of any and all post-opening traffic studies shall be presented to the Planning Board within three months of the conclusion of the study. 11 5 L All Plans shall comply with applicable Americans with Disabilities Act(ADA)and Amhitectural Actiess Board(AAD)requv' ements. 52. This decision shall be 'included M' the general contractor's construction con d specifications dealing with the work proposed and shall superseded any confliefing contract requirernents. 77he Applicant shall assure that all contructors,subcontmdors,and other personnel performing the permitting work are fully aware of the decision terms and conditions* 12 1016. 16635 Pg205 #34286 1600 Osgood Street,hbp 34 Lots 15,179 54,and 55(Lot B) Site Plan Review,Puking,Buildm" g Height Floor Area Ratio,and Con=on Driveway Special Permits 53. All new gas,telephone,cable,electric and other utilities,except for temporary utilities,and the interconnection to National Grid, shaU be installed underground as specified by the respective utility companies unless otherwise depiewd on the Plm,or except for so called""green utility boxes"or other aboveground poles or structures as may be required by the utility companie%and except as may otherwise be temporarily required to effect the movement and operation of the Solar EnergY System to the Site. If final locations of appurtenant equipment to these utilities(e.g. transformer pads)not shown on the Plans materially hnpact the design, the Applicant and/or Project Owner shall provide such details of such modification to the Phmning Director for review. 54. Deeply rooted trees and shrubs shall not be planted over subsurface infiltration systems and landscape areas designated as snow storage locations shall be planted accordingly,to account for the snow storage. 55. Snow shall be plowed to areas desi oated.on the Plans only. When snow on Site impairs vehicle movement and parking,snow shall be removed from the Site and disposed of M' accordance with 0 a applicable local,state and federal requirements.Dexcing chemicals shall be applied in accordance with standard practices m' a responsible ma Liner and only as required. 56. Upon request by the Planning Departmen4 the Applicant and/or Project Owner shall provide copies of stormwater structure midatenance reports(BW Checklist)as identified M" the Operations and Maintenance Plan referenced "in this decision). 57. All sfor mwater best management practices shall be maintained as specified M* the Pollution Prevention and Operation and Maintenance Plan(O&M). Evidence of maintenance of the stonnwater management system shill be provided to the Planning Department on an annual basis by a Registered Professional Civil Engineer or other qualified professional post construefion. The first report shall be submitted one year after the fust stormwater strums=goes on-]"Me. 58. All pennanent dumpsters shall be screened with fencm' g and plantings as shown on the Plans. 59. The Owner and/or its tenants shall not place banners or other like signs on any structure or erect structures to hold such advartism* g devices unless otherwise approved by a To Board or Building Inspector. 60. Any revisions to the approved Plans shall be submitted to the Planning Director for review. If these revisions are deemed sub the Avolicants must submit revised plans to the Planning Board A A for approval,all of which is in acc*rdance wiffi Section 195-8.17(Revis-ion to Approved Site Plan'' . PIUOR TO THE COMMENCEMENT OF SITE DISTURBANCE Except for the Allowed Prelimuixy Work desoribed above, the followmg conditions must be satisfied as preconditims; to the commencement of Site disturbance'(i.e., prior to grading, dl'gg*mg and earth movement): 61. Two(2)copies of the recorded decision must be delivered to the Planning Department. 62. Applicant shall submit draft documentation concerning a declamflon of cross-easern ents, restrictions and covenants,or equivalent,among the Pro W ect Owner of Lot A and Lot B which shall 9 identify post-construction obligations for maintenance, ent and other requa"ements for 13 Bk 16635 Pg206 #34286 1600 Osgood Street,Map 34 Lroto 15,17t 54,and 55(Wt B) Site Plan Review,Parking,Building Height Floor Area Ratio,and Common Driveway Special Permits access/egress driveways including the common driveway,the sewer pump station,stormwater management system,sidewalks including the sidewalk along Osgood Street common area maintenance areas,utilities,and landscaping as applimble to the Planning Departnent,DPW and Town Counsel for review and comment. The document shiffl be recorded with the Norlhern Essex Registxy of Deeds,and the Applicant shall provide the Pha n Department with two c;opies of the recorded documents. 63. The `lava shall incorporate heavy duty pavement for up to 25 feet of the Site entnmces extending from the State Highway layout into the Site., "including the Now Access Road(if applicable),or as otherwise may be required by MassDOT. 64. The Applicant shall address the following requirements to satisfaction of the Fire Department prior to the commencement of any Site work unless otherwise provided below: a. Applicant shall file asite saf6ty plan meeting therequirem' ents of 527 CMR Ch. 16 and NFPA. 241 with the Fire Department before any demo or construction can commence;and, b. Plans must meet requirements of MGL 148,527 CM 780 CMR;and, 0. Confinuation that an elevator which is large enough to accommodate an EMS stretcher is be installed in accordance with 780 CMIZ;and, d. A SWEPT path analysis be performed ofthe Site and parking areas us' NAFD L I template to Ing ensure FD apparatus has Duarte access to the buildings M accordance with 527 CMR Ch IS and, e. A Hydrant plan sal be submitted depicting any and all new fire hydrants proposed to be installed at the Property,and such plan shall show the hydrants to be located,supplied and distributed so as to be in amordance with applicable codes and standards,includ* but not Ing limited to 780 CMF.1 527 CM Pt,NFPA 14,and be subject to final Fire Department approval prior to M" Stallation. A plan for the new hydrant locations and related Fire Department specifications for the hydrants and related systems shall be subject to final Fire Department approval prior to fimmllation.Evidence of said approval shall be provided to the Plannmeg Board;and, f. Fire protection systems plans shall be in accordance with MOL 148,NFPA 13,and 780 CMR or any variance to 780 CWR approved through the established appeals process. (See August 13,2019,October 30,2019 and November 25,2019 email from Lt.Mchael Beftne, No.Andover Fire Department) 65. The Applicant shall IMP- lement the following requirements of the Police Department: a. Sight lies should remain unobstructed;and, b. Dumpster pickup shall be limited to during daythne,hours,but in no event earlier than 7:00 am. (See August 24,2019 email from U.Dan Lanen,No.Andover Police Department). 66. The Applicant shall implement the following recommendations of the Board's peer review stormwater ni ugement consultant Horsley Witten Group: a. The Applicant shall provide seasonal high groundwater elevation and infiltration rates in.the proposed location of the inftration systems(Horsley Whitten Oct. 10,2019 memo#2.e)-and, b. The Owner shall sip the Long Term Operation and Maintenance Plan;-and, P c. 7he Owner shall provide a signed illicit discharge compliance statement prior to any on-Site earth disturbance. (See correspondence fi-om Horsley Witten Group,dated September 10,2019(Review#1),October 10,2019(Review#2),and Lange ngineering response comments on October 3,2019). 14 Bk 16635 PgZ07 #34286 1600 Osgood Street,Map 34 Lots 15,17�54,and 55(Lot B) Site Plan Review,Parkin&Building Height Floor Area Ratio,and Common Driveway Special Pamits 67. The Applicant shall implement the following recon=endafions of the Board's civil engineering peer mview consultant TEC,Inc,,.A a. The Applicant will coot-dimte with the Town of North Andover Fire Department and Police Department to confirm that the fire and emergency access L's acceptable;and, b. The Applicant will coordinate proposed fire hydrant locations with the Town of No Andover Fire Department. (S ee letters from TEC,Inc.,dated September 12,2019[Review#11,November 27,2019[Review a Engineering 0 #21,and Langan"s response described m' a Civu* zngmeenng Peer Review Comments Memorandum,prepared by peering and Environmental Services,Inc.,dated November 812019). 68, The Applicant shall comply with the Long Tenn Pollution Prevention Operation and Maintenance Plans(O&M Plan),as the same may be amended by the Wetlands Order of Conditions for the Project. 69. Sewer Design and Capacity Analysis. The Applicant shall address comment numbers 3,4,5, 10, 11,and 13 in the November 11,2019 Woodard&Curran Memorandum,which are related to Lot B, to the satisfaction of the Director of the Department of Public WDrks. (See Woodard&Curran Memorandum to Jim Stanford,Director,Department of Public Works, Town of North Andover,from Ken Carlson, Senior Project Manager,Woodard&Curran,dated November 11,2019,as supplemented by Memorandum,dated March 16,2020,and by ernwd correspondence dated May 4,2020;and rVft 's response described in a Memomdum to a 5 In Memorandum to Mr.Jim Stanford,Director,Department of Public Works,prepared by Langan EngineerIng and Environmental Services,Inc.,daW January 24,2020,and as supplemented by a Memorandum,dated April 8,2020). 70. Water Design and Capacity Analysis. The Applicant dWI address comment nwnbers 3,4,5P 6P 8 and 10 in the December 10,2019 Weston&Sampson Engineers,Inc.letter and reeornmendations below,which are related to Lot 13,to the satisfaefion of the Director of the Department of Public Works. 71. With regard to the water tank,domestic water lines and the fire Im" es/water tank shall include no interconnection such that the fire lines and water tank shall be completely'isolated from the domestic lines for potable water quality purposes. (See Weston&Sampson Engineers,Inc. letter f rom Tara E.McManus,P.E.,Team Leader,Weston &Sampson Engineers,Inc.,to Timothy J.Willett,Operations Manager,Department ofPubfic Works, Town of North Andover, dated December I Ov 2019, as supplemented by a letter,dated March 31, 2020, and by emai'l correspondence dated May 1, 2020; and, Langan's response described in a Memorandum to Timothy J.Willet,DPW Operations NfanW,Water and Sewer Department,North Andover Department of Public Works,prepared by Egan Engineering and Environmental Services, Eac.,dated January 24,2020,as supplemented by a memorandum, dated April 21,2020). 72. The Project will be subject to the US EPA NPDES Construction General Permit(CGP) requirements and require a Stozm Water Pollution Prevention Plan(SWPPP). A copy of the CGP and SWPPP shall be submitted to the Pl ninar Department. %W 73. In consultation with the Director of Plannin& the Applicant shaJI designate an Independent Construe on Monitor. The Construction Monitor shall read, sign, and return to the f'laraa4 15 .......... Bk 16635 Pg208 #34286 1600 Osgood Street9 N(ap 34 Lots 15,17,54,and 55(Loot B) Site Plan Review,Parkin&Building Height lews Floor Area Ratio,and Common Driveway Special Permits Director the Letter of Agmment for Independent Monitors. The Construction Monitor must be a ilable upon four(4)hours' notice to inspect the Site with the Planning Board designated official. val The Construction Monitor shall makc weekly inspections of the Project provide monthly reports to the Planning Department throughout the duration of the Project, and detail any areas of non- compliance and corrective actions.Additionaly,the Construction Monitor shall assist Town Staff M, overseeing lementationandupdat' of the SVVPPP throughout the development process. The w MP updating ly 0 eek mspe0 ions and monthly reports provided to the Planning Department shall include-, site clearing,erosion control,drainage and detention structures,on-site water and sewer utilities,parking 0 spaces and related pavement,curb cuts,retaining walls,site screening,lands and shvet trees, site reswration,fnW site cleanup. evIng 74. In consultation with the Director of PImming, the Applicant shall designate an Independent Enviranmexitd Monitor. ne Environmental Monitor shall read, sign, and return to the Planning Director the Letter of Agreement for Independent Monitors. The Envirommental Monitor must be available upon four(4)hours'notice to inspect the Site with the Planning Board designated official. The Environmental Monitor shall make weekly inspections of the Project,provide monthly reports to the Planning Department throughout the duration of the Project, and detail any areas of non- compliance and correedve actions.The Enviromnental Monitor will also provide reports following heavy rain events. 75. Prior to any work cornmencig on-site, the Applicant shall meet with the Site contractor, the Independent Construction Monitor, Independent Environmental Monitor, and the Project engineer/wetland scientist to discuss a Construction Sequencw?hasing Plan.In addition to up lug the Stortawater Pollution Prevention Plan and Construction Sequencing Plan, the Applicant shall address when the underground stormwater management systmn BMPs go on-I"mt reMve to the installation of pavement and building foundations, catch basins and related pip` - ' A detailed and ing dated sequence of construction, including the m* stallation of sedimentation/erosion control devices, construction of temporary sedimentation basins and swales, retain* wall construction, drainage Mg installation, building constructioj4 and all other work planned through ilization. Any changes to the sequencing plan shall be approved by the Planning Board or its designated agent. 76. At least 30 days prior to the start of land disturbing activities, the Applicant shall provide to the Plwmm* g Department for review and comment a copy of its Stonnwater Pollution Prevention Plan (SWPPP)prepared in consultation with the Applicants' site contractor(s)and Project engicers. The SW PPP shall be prepared m' accordance with the US Environmental Protection Agency's Stormwater Construction General Permit (USEM 2017), as amended, and related guidance document entitled "Developing Your Stormwater Pollution Prevention Plaw, A Guide for Consiruction Operators." The SWPPP shall build upon the Draft Stormwater Pollution Prevention Plan and Construction Sequenemg Plan referenced herein' and the approved sequence of construation referenced in Condition#75 above. 77. In consultation with the Director of Pia in the Applicant may designate a single,person or fum to complete the duties of both the Construction Monitor and Environmental Monitor for the Property if the single person is certified as a wetland scientist,and either has a Cons on Supervisor License and/or is a Massachusetts Registered Civil Engineer. 78. A bond in the amount of eighty thousand dollars(Sgo,000.00)shall,be posted for the purpose of insuring,that the Site is constructed in accordance with the approved plan and that a dal as-budt M9 I plan is provided,showing the location of all on-Site structures(Site utilities including water and sewer utilities,structums,,awb cuts,parking spaces and drainage facilitie,%. M' cluding invert elevations of all stonnwater structures). This bond shall be in a form acceptable by statute. In 16 ............. ........................... Bk 16635 Pg209 #34286 1600 Osgood Street,Map 34 14ts 152 179 54,and 55(1.,,ot B) Site Plan Review,Parking,Building Height Floor Area Ratio,and Common Driveway Special Permits consultation with the Director of Planning,a single bond may be posted for the Property and may be partially released on a lot by lot basis. In addition,the Applicant shall require the general contractor to name the Town ofNorth Andover as an'additional ffinavd"on the general contractor's*insurance certificate,to the extent reasonable possible. 79. The retain' wallsidentffied on the Plans shall be designed and stamped by a structural Ing engineer registered 'in the Commonwealth of Massachusetts,as required by Buddm' g Code. Stamped plans and calculations shall be submitted to the P1 - Department and 13 'Iding inspector -or to "Ming Ul pri construction of the retaining walls. The submittal of the plans'i's for informational purposes only. The Applicant must apply for and receive a building permit to be issued for the applicable rebdning walls on the Site. 80. The Long Term Stormwater Operations&Maintenance Plan Compliance and Certification Statement,as approved under the Wetlands Order of Conditions,shall be signed by the owners of Lot A and Lot B,and a copy shall be submitted to the Planning Department. 8 1. The Applicant and/or Owner shdl secure and maintain a long term third party contract or other qualified equivalent with an industry specific trained and licensed professional capable of operatin&'inspecting and maintaining the stormwater management system.A copy of the executed 9h third party contract or equivalent arrangement sM1 be provided to the Plannm* g Department. 82. Any and all such contractual arrangements shall be added to the final Stormwater Maiiagctnent Operations and Maintenance Plan,as an addendum with continual updatm business registrations, certifications and proper m* suranees,as applicable. 83. All,permanent dumpster locations,if any,shall be shown on the Plans and the durnpsters shall either be located to the rear(or west)of the buildin&or screened witti fencing and plantings.The final details shall be reviewed with the Planning Director. 84. All stomwater management best practices shall be maintained as specified'in the approved Storinwater Operations and Maktenance Plan,as the same may be amended by the Wetlands Order of Conditions. 85. The hauling route for the im ort and/or eVort of earth materials and demolition debris shall be =P approved by the hispector of Buildings and the Operations Division Commander(North Andover Police Department). All public,ways are to be kept clean arid free of any dirt or debris associated w ith hauling activities. i PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR LOT 8 BUILDING Except for the Allowed Prelim"nary Work described above�the following conditions must be satisfied as W m9ft preconditions,to the issuance of a building permit for the Lot B b Hdi a 86, The Applicant shall submit to the Planning Board for its approval a Forin A application for Approval Not Required(ANR),along with an ANR plan(ANR Plan)which proposes to create Lot B as depicted on the Plans�and upon endorsement,the Applicant shall reewd an approved ANR Plan for Lot B. 87,,,,, The Applicturt shall submit final Water Storage Tank design drawings with the application for building permit. 17 Bk 16635 Pg210 #34286 1600 Osgood Street,Map 34 Lots 15,17,54,and 55(Lot R) Site Plan Review,Parking,Building Height Floor Area Ratio,and Common Driveway Special Pervaits 88, The Applicant must apply for and zweive a building permit to be issued for the applicable retaining walls on the Site. 89. A copy of those applicable local,state and federal permits necessary to permit the construction of the Lot B bua-lding must be submitted to the Planning Department. 90. The plans filed with the buildm' g permit aoulication for the Lot B building,shall address the A_JL followIng requ imments to the satisfaction of the F'ire Depsent: a. Plans for a bi-directional amplifier/emergency responder communications system shall be submitted,and then insWled M' accordance with 790 CMR 916 as a part of building construction; b. Project must meet requirements of MGL 148,527 CM& 780 CMR,-and, c. Plans for fire protection ems shall be in accordance with 790 CMR,MGL 148 and NFPA 13-and, d. Plans shall be provided which demonstrate that the system is monitored M' accordance with CMS.903.4.1 and, e. A third-party review of Project by a registered Fire Protection Engineer at the Applicant's expense shall be complaW. DURING CONSTRUCTION 9 1. Dust mitigation must be wormed weekly,or more frequently as dkeoted by the Planning Director, throughout the constriuction process. The Site must be kW clean and swept regularly. 92. Any wvas,for stockpiling of materials(dirt wood,construction maWK etc.)must be aged M' accordance widi the Wetlands Order of Conditions. 93. Twenty four hour emergency contact information and Owner"s information shall be posted In a common am on a permanent Sign. This informadon simfl also be provided to the PJann3n&Police, Fire and Building departments. 94. Construction traffic associated with the Project shall be regulated by the Jnspector of Buildings. All 01 construction traffic shall access the Site via the Ward 14ill connector and egress the Site traveling towards the Ward Hill connector-Any deviation from the,approved route and/or scheduling once established shall require proper notification and approval fi-om the Inspector of Buildings. Constructiontaffic shall be defined as large trucks hauling earth moving equipment,dump trucks, trucks hauling building matwk1s,cement trucks,and contractor's vehicles larger than panel trucks. It shall be the developer's responsibility to inform all contractors,sub contraotors,vendors,and workmen of the restriction. 95. It shall be the responsibility of the Owner to assure that no erosion t^rom.the construction Site shall occur which Will cause deposffion of soil or sediment upon adjacent--- except as may be Mcidental to work on Lot A,or public ways,except as normal ancillary to off-Site construction, Except as permitted above,off-Site erosion ww"'be a basis for the Planning Board making a finding that the Project is not in compliance with&e Plans.provided,however,dmt the Planning Board sMI give ve the Owner written notice of any such finding and four days to cure said condition. 96. In an effort to reduce noise levels,the Applicant and/or contractor shall keep M- optimum working "der,,through regular ce,any and all equipment at shall emanate sounds form the structures or Site. IOU 1 00 Osgood ShW4 Map 34 Lots 1 St17,54,and (Lost B) Site Plano Review,Parking Building Height Floor Area Ratio,and Common Driveway Sped Permits 97. Associated pavement and roadways shall be swept at least weeldy or as dhwW by ffie Envfiwmental o l Monitor,the j er,or P for as long as the Site remai osed and un '' If �is tracked beyond the constructionentmoe onto the adjacent roadway,It will be sW up daily, 8. .'lbw ng construction the mnitary suer service oonnwtedt0GLSD will rems' Inopaafim as It exists today fbr as long as possiNe.Before the eAsanhary sewer 6ng system,sa.+cnag existing buildings 20 and 21 are taken off linei a new sankw sewer system will be conwacted reoomeeft buildings 20 and 21 to GLSD,The discharge locations ns + h building will be diswm from the 'sting s r w sanitary sere and to the new service route, [111 11.�g down lime. Depending on the end dMing of mtak demolitica and sfte work ft is possible 11W the 'stagditiLtly MRM` n to be dmolished in advance of the new s em b - able to go into op ' ; "Should this condition holding tanks would be constucted.on the PropetV and used to stare saniWy wa&e.Thm fttdm would be installed,operated and emptied in accordance with any and all local or state requirements,would be removed as soon as the pertnarient sardtary canneet can be e,and the protocol for temporazy holding tanks shall be set forth in the decImmdon off"cross- easemen#s,restricdow and cove between the Owner of Lot A.and the owner of Lot B as provided m Special Condition No.62 above.In the proposed cord on,existing s&aitwy se . lines and equipment servi ' bull. ' 2 and 1 w be removed and with,a now sewer service connected to GLSD(unlea the New Sewer wiU be available for cow+ don sooner). (See Memorandum to Jim Stanford,Dir ,r,Departaxat ofPubllc Work,%filom Tim OW4 PX-1 dated April 8,2020 PRIOR TO A CERTIFICATE ATE OF OCCUPANCY Except for the Allowed Prelinifitary Work described above,the following conditions rain t be satisfied cd as preconftons to the iss► oe of a Catificate of Occupancy for the Lot B building as a.part of the Project: 99. The Applicant shall supply a copy of the approved MuMOT permits necessiry for access to,and construeflon of the Project to the Pimming Department In the event MswDOTIs aWovats reqwze a. maWW change(as deemed by the Planning Dire in the access/egms or other details depicted on Lot B shown on the Plans and/or Conceptual Off-Site Improvement Plan dated July 19,201 including,but not limited tDdetails 11 In Findings of Fact—Renovation Project# 'and# lu tl�+decision),the Applicant shall submit revised phins to be reviewed inaccordanee wig the prooess described in§ 1 5-8.1'7. (Revisions to Approved Site Plan). 100. The Applicant shall implement the following recommendations of the Board' l n ' egg peer review consultant;TEC,1w,as refs in the April 13,2020 Memorandum from Luke +e Mauro,PTOE,and John Plwxte,PS.,to Samuel Gregmio,P.E.,P OE,RSP, 'TIC,and.Monica Gregoire,Town of North Andover,wbich consist of coordirmting with the Mas DOT as a part of the MassDOT permitting process: a. The Applicant should further coordinate with MassDOT on the ce of a Permit to Access Stato Highway(Comment o. 1); b. The Appli t should.coordinate with MassDOT on the potential 11'roj ect impacts at the intemetion of Osgood od /Barker which is currently uader reconstruction as part of off-site ti `o►n.for a separate project.As this intersection's naw traffic signal is to be part of a larger coordinafion strcam,it is ' p+ortant that the Pro ected tr c volumes from.the 1600 Osgood Street site are utilized in additional miti "on in coordination with DOT (Comment No.3 ; 1 X2U zlic 16635 Pg212 #34286 1600 Osgood Stree4 Map 34 Lots 15,179,54t and 55(fitR) Site Plan Review,Parkin&Building Height Floor Area Ratio,,and Common Driveway Special Permits c. The Applicant shall coordinate with the Merrimack Valley Regional Transit Authority (MVRTA)for bus service(i.e.,additional bus routes,,expanded bus route hours)as may deemed necessary by the MVRTA based upon any increased demand a rising brom the Project (Comment No. 10).In addition,consideration for expansion of existing bus routes to provide public transit to MeGovem Transportation Center,Merrimack Street,Lawrence,MA.Shall be considered; d. The Applicant shall coordinate signalization improvements with the MassDOT(Comment No. 14); 14".VA. e. The Applicant shall coordinate with MassDOT to .09,1LA"Ar"W the optimiwd signal tim' scheme M9 related to the intersection of Osgood Street barest Pond Road/Casa Blanca(Comment No. 17)- f The Applicant shall work with the Mass DOT to evaluate the Holt Street approach toOsgood Street as a part of the MassDOT permit process(Condition No. 19); 9. The Applicant shall coordinate with the MassDOT to determine the potential need to address Project tmff ic finpacts mi the following MassDOT-jun'sdictTonal approaches: Mass Jurisdiction(with Town side-street approaches): • Route 133 Osgood Street/Colgate Drive • Route 125 Bradford Street • Route 125 Farrwood Drive(Haverhill] Route 125 1 Boston Road I Cross Road[Haverhill) (See letters from'SEC,Inc.,dated September 10,2019(Review#1],April 1,2020(Review#2],and Langan"s response described M* a Traffic Peer Review Comments Memorandum,prepared by Langan Engineerig and Envu'l0nmental Services,Inc,,,dated October 10,2019,dated March 25, 2020,,and dated April 13,2020). 101.In an effort to reduce the overall number of automobile trips M' the area and to integrate the Project into the available trans ortation resources,the Applicant I implement the foIl P will Ow'Ing Transportation Demand Management(TDM measures: a. The Applicant,its employees,successors or assigns,shall be obligated to become a participating member of the Merrfinack Valley Transportation Management Association (1' VT A ,subject to payment of all dues and other obligations of membership. The Applicant,its employew,successors or assigns,shall remain a member for no less than ten(10) years and shall be required to file a declaration stating such membership is current on or before January 15 annually. The Applicant its employees,successors or assigns shall submit a copy of this declaration to the Planning Department b. Information regarding public transportation services,maps,schedules and fare information shall be posted M" a central location. c. An informational packet shall be provided to new hires of the Projec�promoting alternative modes of Mnsportation.This shall MiClude information relative to potential caTpool operations available tbrough Ride Share or MVTMA, d. A weather protected b* le rack area shall be Provided in a secure area. e. Car-share spaces shall be considered on-site. 102.The Applicant must submit a letter from the architect and eagm' eer of the Pro]ect stating that the CaPM& +;V% building,lands Site layout substantially comply with the plans referenced at ft end of this decision as approved by the Plarming Board and that the stomwater nagement structures are functioning as designed. Alternatively,the Applicant as Owner may provide a bond,determined bythePlann' Board,to cover the full amount of the 01 M9 rate als and iratallation if weather conditions do not permit the completion of the landscapm* g prior to the issuance of a Final Certificate of Occupancy. In consultation with the Director of Planning,a single bond may be posted for Lot 20 Bk 16635 Pg213 #34286 1600 Osgood Street,AUp 34 Lots 15,17,549 and 55(Lot B) Site Plan Review,Parking,Building Height Floor Area Ratio,and Common Driveway Special Permits A and Lot 13,and may be partially released on a lot by lot basis by majority vote ofthe Planning Board. 103- The Applicant shall submit a certified letter from a licensed surveyor confirming the final avmp grades and building height(as defined in the Zoning Bylaw). 104. The Applicant must submit a letter from the engineer mff*g fliat the ligh ' 0 12 Is prcmdect meets 1he requirements of Article V1(Signs and Lighting Regulations)ofthe =9 W" 105. Tte Appliewt will provide a letter from a certified engineer stating that associated retaining wants have been constructed in accordance with approved plans and this decision. sion. 106. All story water structures shall be cleaned.,M in accordance with the approved Stormwater Operation &Maintenance Plan,as the same may be amended by the WetJands Order of Conditions. Evidence of said cleanw* &(i.e.invoices/bills of lading)shall be submitted to the P * 9 Department. 107.Per NAFD,a secured key access bDx[es]will need to be M* st&Ued M" accordance with North Andover By-Law 69.8.1.(5),, The number and location of box[es]to be determined by the North Andover Fie Department. 108. All signage shall conform to the signage regulations contained within the North Andover Zoning Bylaw,Article 6,unless a Variance i's issued by the Now Andover Board of Appals,or other relief is gmnted m* accordance with the North Andover Zoning Bylaw. PRIOR TO THE FINAL RELEASE OF ALL SECURITY AND ESCROWED FUNDS 109. The planning Staff shall review the Site. Any screening as may be reasonably required by the Mo Planning Staff will be added at the Project Owner's expense., Additionally,all pedestrian waming signage will be reviewed and any additionid signage deemed necessazy at non-controlled locations such as mid-block crossings and at the roundabout shall be added at the Project Owner's expense. low a 110.A final as-built plan showing nna I I topography,the location of all new on-Site utilities,structures, I Va curb cuts,parking spaces and drainage facilities,inoludmg invert elevations of all stormwater structures,must be submitted to the Planning Department.Any variance to the Plan shall be specified in memo format.The as-built must be provided M' paper form as well as in SDP(Standard Digital File)format. (See Memomndum from Engineering&Environmental Services,Inc.to Timothy J.Willm, DWP Operations Manager,Water&Sewer Depatt=4 dated April 21,2020.) 111. The Planning Board must by a majority vote make a finding that the Site is in conformance with the approved Plans. GENERAL CONDITIONS 112.The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 113.Any plants,trees,shrubs,or fencing that have been m' corporated into the Landscape Plan approved in this decision that die or fall into disrepair must be replaced by the Project Owner with like-kind materials and varieties of landscaping to ensure the landscape plan, as approved, is adequately mamtained and preserved. 21 101P. 16635 Pg214 #34286 1600 09900d Street,Map 34 Lots 159 179 54t and 55(Lot B) Site Plan Review,Parking.Building Height Floor Area Ratio,and Common Driveway Special Permits 114.Recogni mig that the Prooect located within an i U I's ndustrial areas the hours of construction sba be limited to between 6:00 a.m.and 6:00 p.m.Monday through Saturday.The construction hours may be expanded during these days when a particular construction phase or activity(i.e.,concrete pouring and curi ng)requies the expansion of such hours beyond the hours noted above, m whf ch case,the Applicant sball notify the Building Inspector,Planning Director and Police Department M* advance of the expansion of said hours,and such writing shall include'.(a)the type of work M* Volved;(b)the expected duration of such work requh-ing such hours;and,(c)the name and contact information for the Applicant's point of contact which can be contacted on a 24-hour basis should the be the need for such point of contact to be consulted. I J 5.All tractor trailer trucks exiting Lot B shall turn left(north)from Lot B onto Osgood Street to the north toward Bradford, and similarly, ftiler trucks being routed to the facility on Lot B shall be required to enter from the north of the Site from Route 125 (Boston Road W* Haverhill to Osgood Sueet M' North Andover)to the Lot B entrances on Osgood Street. Such routing requirmnents shall be communicated by the Applicant to vendors usm* g trailer trucks to access Lot B. MW required by the MassDOT district office,the Applicant shall conduct a ftaffic monitoring program post-development,the specifies of which shall be in the form required,and as directed,by MassDOT.The Applicant must also submit this report to the PI nin Department. fa 117.No open burning shall be done, except as is permitted during burning seas under the Fire Department regulations. His on I 18. The Owner shall apply to the Board of Health for the appropriate dumpster it. 119. The provisions of this conditional approval shall apply to and be binding upon the Applicant, its employees and all successors and assigns in.interest or control. 120.Any action by a Town Board, Commission, or Department,which reqU changes In the Plan or am design of the building,as presented to the Planning Board,may be subject to modification by the Planning Board, 12 1. A s required by the Fire Department,the Project must meet requirements of MGL 14 8,5:27 CW and 780 CMIL 122. Any revisions to the approved Plans shall be submitted to the PlarmM` Dff" ector for 9 review pursuant to§ 195-8.17. (Revisions to Approved Site Plans). If Plamling Director determm' es,based upon consultation with the Planning Board Chair,that the recisions sions are determined to be substantial and materially different from the approved Plans,the developer must submit revised plans to the Planning Board for approval ' the process outlined in§ 195-8-17 vision Plan)of the Zon* Bylaw. U-SM9 ion to Approved Site Ing 123.Pursuant to the North Andover Zonmg Bylaw§ 195-10.7.A(3), the Special Permits gmted by this decision shall be deemed to have lapsed after May20,2022,(two years from the date the permit lis granted),unless substantial use or construction has cortunenced.If the Applicant can show good cause why substantial use or construction has not commenced widiin lie two-yew period,tile special permit granting authority,at its discretion,may extend the Special Permit for an additional one-year period.Included within the two-year period swed above'i's the time required to pursue or await the detennffiadon of an appeal from the provisions of the bylaw. 22 on"ho 16635 Pg215 #34286 1600 Osgood ftreet,Map 34 Lots 15,17,54,and 55(1,ot.B) Site Plan Review,Parking,Building Height Floor Area Ratio.,and Common Driveway Special permits 124. When this decision becomes final o ,the terms and conditions'in this decision shall supersede the M terms and conditions set forth b the Board's"Notice of Decision—Site Plan Review Special Permit Petition of Ozzy Properties,Inc.."dated July 22,2005,and"Notice of Dec- i n -Site plan Islo Review,Petition of New England Tractor Trailer School of Mass,Inc.",dated September 20,2016. Moreover,to the extent that any other Planning Board decision has been-issued for the Property PrIoir tO 2019(the"Prior Decisions"),and which Covers all or a portion of the real property comprising the Site,this decision shall be deemed to supersede the Prior Decisions by the terms and conditions in this decision when this decis' becomes final.Notwithstanding the foregoing,and ion when this decision becomes final,the terms and conditions M' this decision shall amend the tenns n is VI and conditions set forth"I the Board's"Notice Of Dec' ion—Site Plan Re 'ew,Petition of Osgood Solar,LLCP"dated July 5,2016. 125. The f olloWing Anf oMafion I span be deezued a part of the record for this decision,, PL2n titled; Permit Site Plans, North Andover Musachusetts, Proposed Redevelopment for Hillwood Ent rises,L.P.and 1600 Osgood Sheet LLC,Distribution Facility,,1600 Osgood Stree,4 Town of North Andover,Essex County,Massachusetts, Prepared for: 11illwood Enterprises,LY, 4507 North Front Stye., Suite 302 Harrisbur&PA 17110 1600 Osgood Street LLC 1600 Osgood SUvet North Andover,Massachusetts 01845 Prepared by: Langan Engineering&Environmental Serviom Inc. 361 Newbury Str*et ]Boston,,Nkssachusetts 02115 She I" 40f Date: July 25,2019 and IaA May 11 revised 2020 Sheets: I tbrough 146 Phm titled: ConcephW Off-Site Irnprovernents 6 & Prepared by: Langan Engmewmg&Environmental mices,Inc. 361 Newbury Street Boston,Massachusetts 02115 Dated: July 1%2019 Stormwater melat Report Prepared by: Engineezing&Envirownental SerAces,Inc. Dated: 2019 and last rep+ ed October 3,2019 Corm rater Operations and Maintenam Plaw."Long Term Pollution Prevention Operation and Maintmance Plane'.(Appendm' 'IV"M* the Stormwater Managment Report) Prepared by: Langan Engimeermiig&Envimmental Services,Inc. OPemfiolms and?"Utenance Program for Ground Mounted Solar Array: Located at 1600 Osgood Su=4 North Andover,Massachusetts 01845 Date: OctDber 22,2019 Applicmt. Osgood Solar,LLC,1600 Osgood Streets North Andover,MA 01845 23 160+0 Osgood Street,Map 34 Lots 1 ,17,54,and 55(Lot B Site Plan.Review,Parkin&Building Height Floor Area Ratio,and Common Driveway Special permits Archftectund:Renderings Prepared by: Macgregor AssocWts Arobitects Dated.- June 5,2019,reprised as otherwise shown. Traffic Impact and Access,Study—Pmpesed Redevelopment 1600 Osgood et 'earth Andover,Massachusetts Prepared by. &Enviro=ental Services,Inc. Date: August 2019,as supplemented by Tmffic Impact and Access Study(March 2020 ,: Applicant Abutter Tow Clerk Owner 4 Bk 16635 Pg217 #34286 1600 Osgood Street,Map 34 is 15,17,54,and 55(Lot B) Site Plan Review,Parking,Build* Height M9 Floor Area Ratio,and Common Driveway Special Pennits A TO NOTICE OF DECISION SIB PLAN REVIEW9 PARIONG,BUILDING HEIGHT,AND FLOOR AREA RATIO SPECL4L PERMITS P 1. CS001 COVER SBEET 2. CS002 MASTER LEGIEND&NOTES 3. VL101 AL TA/NSPS LAND TITLE SURVEY 4. VL102 ALTA/NSPS LAND TITLE SURVEY 5. VL103 ALTA/NSPS LAND TInE SURVEY 6. VL104 ALTA/NSPS LAND TITLE SURVEY 7. VL105 ALTA/NSPS LAND TITLE SURVEY S. VL106 ALTA/NSPS LAND nTLE SURVEY 9. VL107 ALTA/NSPS LAND TITLE SURVEY 10,VL108 ALTAJNSPS LAND TITLE SURVEY I I-VL109 ALTAINSPIS LAND TITLE SURVEY 12.VL1 10 ALTA/NSPS LAND TrME SURVEY 13. VL1 I I ALTA/NSPS LAND TITLE SURVEY 14.VL1 12 ALTAJNSPS LAND TITLE SURVEY 15.VL1 13 ALTA/NSPS LAND TITLE SURVEY 16.CS100 SITE PLAN-OVERALL 17.CS101 SITE PLAN 1 18.CS102 SITE PLAN 11 19. CS103 SITE PLAN III 20.CS104 SITE PLAN IV 21. CS105 SrM PLAN V 22. CS 106 SITE PLAN VI 23.CS107 SITE PLAN 'II 24.CS 108 SITE PLAN VIA 25.CS200 RECLAIMED CONCRETE AND ASPHALT PLACENIENT PLAN 26. CS501 SrM DETAILS 1 27.CS502 SITE DETAILS 11 28.CS503 SITE DETAILS III 29.CS504 SITE DETAILS IV 30. CS505 SITE DETAILS V 31, CP101 SIGNAGE&STRIPING PLAN I 32,CP102 SIGNAGE&STRIPING PLAN 11 33. CP103 SIGNAGE&STRIPING PLAN III 34. CP104 SIGNAGE&STRIPING PLAN VI 35.CP105 SIGMA GE&STRIPING PLAN V 36.CP106 SIGMA GE&STRIPING PLAN VI 37. CP107 SIG AGE&STRIPING PLAN VII 38.CP108 SIGNAL GE&STRIPING PLAN VIII 39. CP501 SIGNAGE&STRIPING DETAILS I 40.CP502 SIGNAGE&STRIPING DETAILS 11 41.CP503 SIGNAGE&STRIPING DETAILS III 25 1600 Osgood ! �Street, t Map 4 Lots. �17t 54,and 55(Lot B) te Plan }Parking, Floor Area Building Height Rati< « � � � Special Permits E.L4&2LQQN1Xffu-X22 -TM101 TRUCK MOVEMENTS - TMI02 TRUCK . \ « TRUCK 45. CGIOO GRADING&DRAINAGE PLAN -OVERALL , GRADING DRAINAGE 51. CG106 GRADING&DRAINAGE PLAN VI , CG201 DRAINAGE STRUCTURE REFERENCE SHEET 1 . 55. CO202 DRAINAGE STRUCTURE REFERENCE SHEET H 56. CO203 DRAINAGE STRUCTURE REFERENCE SHEET III 59. CG503 GRADING&DRAINAGE DETAILS III » .` N2ENSATORY STORAGE PLAN I a COMPENSATORY . , UTILITY PLAN I 67. CU103 UTILITY PLAN III 68. CU104 UTILITY PLAN IV , UTILITY TLT . , UTILITY PLAN V1 , CU107 UTILITY PLAN VII « ALTERNATE SANITARY coNNEcnoN PLAN « CU501 UTILITY DETAILS 1 , CE101 SOIL EROSION& / ` CONTROL 77.CE102 SOIL EROSION& SEDR%4ENT CONTROL PLAN(PHASE 1)H , SOIL EROSION CE201 SOEL EROSION& � 4 - , , CONTROL PLAN(PHASE 2)1 80. CE202 SOIL,EROSION&SEDIMENT CONTROL PLAN(PHASE 2)H , SOIL EROSION ^ E` . CONTROL.PLAN. (PHASE . , \ (PHASE 3)1 Bk 16635 Pg219 #34286 1600 Osgood Street,Map 34 Lots 15,17,54,and 55 oLot 19) Site Plan Review,Parkin&Building Height Floor Am Ratio,and Common Driveway Special Pemits E"M MOW 86. CES02 SOIL EROSION EDMENT CONTROL DETAILS 11 87,LP100 OVERALL PLANTING PLAN 88.LP101 PLANTING PLAN I 89.LP102 PLANTING PLAN II 90. LP103 PLANTING PLAN III 91.LP104 PLANTING PLAN IV 92.LP105 PLANTING PLAN V 93.LP106 PLANTING PLAN V1 94.LP107 PLANTING PLAN V11 95.LP108 PLANTING PLAN V1111 96, LP501 PLANTING DETAILS I 97.LP502 PLANTING DIETAILS II 98.LL 100 OVERALL LIGHTING PLAN 99.LL101 LIGHTING PLAN I 100. LL102 LIGHTING PLAN 11 101. LL103 LIGHTING PLAN III 102. LL104 LIGHTING PLAN IV 103. LL105 LIGHTINGPLANV 104. LL106 LIGHTING PLAN V1 105. LL107 LIGHTING PLAN VII 106. LL108 LIGHTING PLAN VM 107. LL501 LIGHTING DETAILS I 108. G-100 ARC HTrECTURAL SITE PLAN 109. G-101 OVERALL GROUND FLOOR 110. G-102 OVERALL NEZZ. FLOOR M. G-103 OVERALL RSP LEVEL 2 112. G-104 OVERALL:RSA'LEVEL 3 113. G-105 OVERALL:ASP"LEVEL 4 114. G-106 OVERALL RSP LEVEL 5 115. G-107 OVERALL ROOF PLAN 116. G-108 BUILDING SECTIONS 117. G-108a SECTIONS 118. 0-109 13UILDING ELEVATIONS 119. G-109a BUILDING ELEVATIONS 120. G-1 10 ENLARGED PLANS 121. 0-201 GROUND FLOOR RESTROOM LOCATIONS 122. 0-202 MIEZZANM LEVEL 123. G-203 RESTROOM LOCATIONS 124. A-001 COVER SHEET 125. A-002 ARCE[ITECTURAL SrM PLAN 126. A-003 EGRESS PLANS-LEVEL I &2 127. A-004 EGRESS PLANS-LEVEL 3 128. A-011 DEMO M ELEVAnON 129. A-100 FLOOR PLANS BUILDING 20&21 130. A-110 PARTIAL FLOOR PLAN-BUILDING 20&21 -A 27 1600 gir d Street,Map 34 Lots 15,17,54,and 55(fit$) Site Plan Review,Pa rkm' g,Building Height ,floor,,area,.Rafio,and Common Driveway Special Permits P—LAN.S 131. A-111 PARTIAL FLOOR PLANBUILDING 20 &21 - 13 , -1 12 PARTIAL FLOOR.PLAN-BUILDING 20&21 133. A. 113 PARTIAL FLOOR PLANBUILDING 20 iM",We 21 - 135. A 3 01 ELEVATIONS 136. -400 WALL SECTION 137. .-4+ 1 WALL SECTION.,./ 139, A-501 MASONRY DETAIL 140, A-502 MASONRY DETAIL 142. A-504 METAL PANEL DETAILS 143. A 5+ 5 DETAILS 144. A-601 INTERIOR WALL TYPES AND DETAILS 145, A-70 DOOR.DETAILS AND HARDWARE 146. A►.-7 1. STORM NT DETAILS 8 a