Loading...
HomeMy WebLinkAbout09/10/2020 - Langan Memorandum - Addendum to Traffic Impact and Access Study - - AIVEiA /V 555 Long Wharf Drive New Haven,CT 06511 T:203.562.5771 F:203.789.6142 TO: Jean Enright/North Andover Planning Director FROM: Luke Mauro, PTOE John Plante, P.E. CC: Mac Utsey/Hillwood DATE: , 2020 RE: 1600 Osgood Street North Andover, Massachusetts Addendum to Traffic Impact and Access Study Langan Project No.: 140182701 Langan has prepared this memorandum to support revisions to the site plan resulting from the permit process with MassDOT, including those comments described in a certain letter issued to Mr. Mac Utsey, Hillwood Enterprises, LP, from Paul D. Stedman, District 4 Highway Director, MassDOT, dated July 30, 2020 (the_"MassDOT Mitigation Letter"). MassDOT is requesting certain off-site improvements and driveway management that requires revisions to the site plan. This memorandum describes the modifications to the site plan that impact vehicular access from Osgood Street, internal circulation and adjustment to the Traffic Impact and Access Study dated March 2020 by Langan. Previously Approved Improvements The approved development reconfigured the property into two separate lots, including Lot A and Lot B, with no vehicular access between the lots, except for the common driveway approved for the North (signalized) Access Road. In order to provide a comparison of the requested MassDOT revisions to the previously approved site plan, the following describes the traffic mitigation and access/egress originally approved: North Signalized Driveway The north signalized driveway was proposed to include the following improvements: Provide new signal equipment for full operation and coordinate timing with the development's southernmost driveway. Optimize the timings for these two coordinated signals at the development's driveways during both the weekday morning and evening peak period. {00170595;vll 1600 Osgood Street MEMOAddendum to Traffic Impact and Access Study Langan Project No.: 140182701 August 26September 10,2020- Page 2 of 8 North Unsignalized Driveway The unsignalized north central driveway serving existing building nos. 20 and 21 was proposed to be maintained in the existing condition. South Unsignalized Driveway The unsignalized south central driveway serving existing building nos. 20 and 21 was proposed to be maintained in the existing condition. South Signalized Driveway The south signalized driveway was proposed to include the following improvements: - Provide new signal equipment and construct an exclusive northbound left-turn lane with 350' of storage. - Restripe the southbound right-turn only lane to a shared through/right-turn lane, shift the southbound shared left-turn/through lane west, and provide a striped median to provide adequate room for re-alignment. Proposed Improvements MassDOT is requesting certain off-site improvements and driveway management that impact the site plan and access/egress as described in the MassDOT Mitigation Letter. Off-Site Improvements The following items have been incorporated into the mitigation program for the proposed development along the projects frontage: - Provide a MBTA standard bus bay and bus shelter on the west side of Osgood Street (Route 125) to service the Merrimack Valley Regional Transportation Authority (MVRTA). - Construct a 12-foot wide shared-use-path extending from the North Signalized Driveway to the South Signalized Driveway along the west side of Osgood Street (Route 125). - Mill and overlay of Osgood Street (Route 125) within the area of widening. North Signalized Driveway In addition to the previously approved improvements, the following are proposed at the north signalized driveway: {00170595;vll LAIVGA/V 1600 Osgood Street MEMO Addendum to Traffic Impact and Access Study Langan Project No.: 140182701 August 26September 10, 2020- Page 3 of 8 - Provide addition of northbound left-turn lane with 250 feet of storage. - Widen southbound approach to the intersection to provide a striped median to offset from northbound left-turn lane. - Provide crosswalk striping and signage to connect the proposed shared-use-path to a receiving ramp on the north side of the driveway. - Provide a sidewalk along the southern side of the driveway connecting to a sidewalk in the office parking lot for the portion of Lot A, servicing Building Nos. 20 and 21. North �Unsignalized Driveway The following are proposed at the unsignalized north central driveway on Lot A: nvert driveway to a - - turn out gDly. Install channelization island. Provide crosswalk striping and signage to maintain shared-use-path access through the driveway to a receiving ramp on the south side of the driveway. final confi rocess and_May_ The modifications above will be determi The without the connector drive and the noftherly South w Unsignalized Driveway The following are proposed at the unsignalized south central driveway on Lot A: Convert driveway to a right- in/right-turn out e only. Pa channelization island Crosswalk striping and signage to maintain shared-use-path access through the driveway. South Signalized Driveway In addition to the previously approved improvements, the following are proposed at the south signalized driveway: Provide a southbound left-turn lane with 125' of storage. {00170595;vll A 1VG 1600 Osgood Street MEMO Addendum to Traffic Impact and Access Study Langan Project No.: 140182701 August 26September 10, 2020- Page 4 of 8 Provide crosswalk striping and signage along the west side of Osgood Street (Route 125) for the shared-use-path and a crosswalk on the south side of the Osgood Street (Route 125) & South Driveway intersection to provide pedestrian access to the east side of Osgood Street (Route 125). On-Site Revisions The MassDOT requested access/egress management necessitates revisions to the site circulation. - Provide a driveway connection between the southern signalized driveway (currently serving Lot B only) and the driveway serving existing Building Nos. 20 and 21, allowing vehicles in the southern side of the parking lot serving existing Building Nos. 20 and 21 on Lot A to access a signal controlled intersection. The proposed driveway connection has been located outside the limit of the peak hour eastbound queue length. The Lot A parking lot connector driveway will be stop sign controlled, and will include- "Do Not Block The Box" pavement marking and signage to prevent vehicles from obstructing movements in and out of the connector driveway. - Provide a driveway connection between the North signalized) (currently Lot B only) and the parking lot serving existing Building Nos. 20 and 21 on Lot A, allowing vehicles in the northern side of the parking lot serving existing Building Nos. 20 and 21 to access a signal controlled intersection. The proposed driveway connection has been located outside the limit of the peak hour eastbound queue length. The Lot A parking lot connector driveway will be stop sign controlled, and will include both "Do Not Block The Box" pavement marking and signage to prevent vehicles from obstructing movements in and out of the connector driveway. - Provide adjustments to some curb radii to facilitate truck and emergency vehicle circulation within the parking lots serving existing Building Nos. 20 and 21 on Lot A. - Rearrange parking spaces on Lot A to accommodate the geometric adjustments. The total number of parking and loading spaces remains the same. Supporting Analysis The signalized driveways have been evaluated to verify that the rerouting of vehicles via the proposed office connections provide acceptable traffic signal operation. Figures 1 through 6 show the existing, no-build, and build peak-hour traffic volumes for the roadway peak and generator peak periods. These figures were used as a basis for the following analyses. North Access Driveway/Lot A Driveway Connection {00170595;vll LAIVGA/V 1600 Osgood Street MEMO Addendum to Traffic Impact and Access Study Langan Project No.: 140182701 August 26September 10, 2020- Page 5 of 8 Langan evaluated the traffic impact on the north signalized driveway resulting from the connecting driveway. As discussed above, the north central unsignalized driveway 4'6--RA9W- pf-ep�)6LM be restricted to 4 ®® right- - movement only. All left-tu; exiting * the north central unsignalized driveway were re-routed to enter and exit ®r at the north signalized driveway® ® tilize the north connection to Lot A. To accommodate these movements, a northbound left-turn lane was added to Osgood Street ra Inalized drivgWay. Tables 1 through 4 below compare the previously submitted analysis results with the revised capacity analysis. As shown in the tables, acceptable or previously submitted levels-of-service were maintained with the connection between the parking lot serving existing Building Nos. 20 and 21 on Lot A and the north signalized driveway (See the attached capacity analysis reports). In addition to verifying that the proposed operation of the intersection of Osgood Street and the north signalized driveway was acceptable, Langan also verified that the exiting queues would not overlap with the proposed on-site office connection intersection. The proposed on-site office connection is located approximately 295 feet behind the eastbound approach stop bar. Tables 1 through 4 indicates that the maximum exiting queue length with the office connection is approximately 145 feet. A "Do Not Block The Box" pavement marking and signage are proposed. Langan also evaluated the intersection sight distance (ISD) for the north connection intersection to determine if the available intersection sight distances meet the minimum requirements established by the American Association of State Highway and Transportation Officials (AASHTO) as outlined in A Policy on Geometric Design of Highways and Streets, 6th Edition (also known as the AASHTO Green Book). As shown in Table 5, the north connection intersection ISDs provided at the site driveways meet AASHTO's minimum requirements. Note, if necessary, revisions to the previously approved landscaping plan will be made to provide the sight triangles. South Access Driveway/Lot A Driveway Connection Langan evaluated the traffic impact on the south signalized driveway resulting from the connecting driveway from Lot A. As discussed above, the south central driveway as it meets Osgood Street is now proposed to limit vehicles to right-in/right-out movements only. The left- turning exiting vehicles from the south central unsignalized driveway were re-routed to exit the development at the south signalized driveway. 100% of previously submitted entering and exiting left-turns have been re-routed to enter/exit as left-turns via the south signalized driveway. {00170595;vll LAIVGA/V 1600 Osgood Street MEMO Addendum to Traffic Impact and Access Study Langan Project No.: 140182701 August 26September 10, 2020- Page 6 of 8 Inbound vehicles turning left into the south central driveway were rerouted to turn left into the south signalized driveway. In addition to the connection, a south left-turn lane was added to Osgood Street and was incorporated into the revised analysis. Minor signal timing optimization was required to balance the proposed traffic volumes. Tables 1 through 4 below compare the previously submitted analysis results with the revised capacity analysis. As shown in the tables, acceptable or previously submitted levels-of-service were maintained with the connection between the office parking lot and the south signalized driveway (See the attached capacity analysis reports). In addition to verifying that the proposed operation of the intersection of Osgood Street and the south signalized driveway was acceptable, Langan also verified that the exiting queues would not overlap with the proposed on-site Lot A connection intersection with the South Signalized Access Drive. The proposed on-site connection is located approximately 325 feet behind the eastbound approach stop bar. Tables 1 through 4 indicates that the maximum exiting queue length with this connection is approximately 46 feet. A "Do Not Block The Box" pavement marking and signage are proposed. Langan also evaluated the intersection sight distance (ISD) for the south connection intersection to determine if the available intersection sight distances meet the minimum requirements established by the American Association of State Highway and Transportation Officials (AASHTO) as outlined in A Policy on Geometric Design of Highways and Streets, 6th Edition (also known as the AASHTO Green Book). As shown in Table 5, the south office connection intersection ISDs provided at the site driveways meet AASHTO's minimum requirements. Note, if necessary, revisions to the previously approved landscaping plan will be made to provide the sight triangles, which is limited to the relocation of street trees outside the proposed sight triangles. Revised landscape plans will be provided under separate cover. Conclusion Based on the analysis, the proposed connections between the north and south signalized intersections and the parking lot serving existing Building Nos. 20 and 21 on Lot A will operate adequately and not have a negative impact on the traffic operating conditions. In addition to these connections, the following items have been included in the proposed improvements following ongoing coordination with MassDOT: - North Signalized Driveway o Provide addition of northbound left-turn lane with 250' of storage. o Widen southbound approach to the intersection to provide a striped median to offset from northbound left-turn lane. {00170595;vll LAIVGA/V MEMO 1SOODogood8�ee Addendum to Traffic Impact and Access Study Langan Project No.: 14O1827U1 of o Provide crosswalk striping and oignege to connect the proposed shared-use-path to a receiving ramp on the north side of the driveway. o Provide e oidevve|h along the southern side of the driveway connecting to e sidewalk in the office parking lot. - North Gep#a4LInsignalized4 [)rivavvey o nvert driveway only.in/right-_turn out o Install channo|izotion io|and� o o Provide crosswalk striping and signege to maintain shared-use-path access through the driveway. - South Gen#a44Unsignalized4 [)hvevvey o Convert driveway toa right-turn in/right-turn utaccess only. o ohenno|izetion island o Provide or000vve|h striping and oignage to maintain shared-use-path eooeoo through the driveway. - South Signalized Driveway o Provide addition ofoouthbound left-turn lane with 125' of storage. ~ Provide cnOSSVV8|k Striping and Sign8g8 along the VV8St side Of Osgood Street (Route 125) for the shared-use-path and e crosswalk on the south side of the Osgood Street (Route 125) & South [)[iV8w8V intersection to provide-pedestrian 8CCeQS to the east side of Osgood Street (Route 125). - Off-Site Improvements o Provide o M8TA standard bus boy and bus shelter on the vvoot side of Osgood Street (Route 125\ to service the Merrimack Valley Regional Transportation Authority (MVRTA). o Construct a 12-foot wide shared-use-path extending from the North (Signalized) Driveway to the South (Signalized) Driveway along the west side of Osgood Street (Route 125). o yWi|| and overlay of Osgood Street (Route 125)within the area of widening. - On-Site Improvements o Provide adjustments to some curb radii to facilitate truck and emergency vehicle circulation within the office perking lots. o Rearrange perking spaces on Lot Ato accommodate the geometric adjustments. The total number of parking spaces remains the same. mongon.commota\NHV\dots7\14o1oo7o1\pnojectootaLoiaoip|ine\Tnamc\RepnrtaxOff-SiuoImprovements Summary Memo L �� ��'�OO17O�8�'v1� �-�1VGA��� 1600 Osgood Street MEMO Revisions to Conceptual Off-site Improvements Langan Project No.: 140182701 August 26September 10, 2020- Page 8 of 8 {001 70595,AJ