Loading...
HomeMy WebLinkAboutEmergency Readiness Plan - - 1450 Osgood Street i Em.ergency Readiness Plan For sewer Pump Station BOS3 Fulfillment Center c/o HIP Transaction Services LLC 1450 Os ood Street- North Andover IUiA Primary Contact Information Name: Mac Utsey Cell Phone.- Email: Secondary Contact Information Name: Adam Kedich Cell Phone: Email: Pertinent Information 1. The pump station is designed to avoid interruptions in service with the following provisions: Redundant (duplex) pumps —pumps alternate with each pump cycle. In the event of a pump failure, an alarm is triggered and building operation personnel are notified so that the failed pump can be serviced, repaired or replaced. Until the failed pump is serviced, repaired or replaced, the second pump will keep the facility in service. Emergency generator— in the event of a power failure, the pump station will remain operational, powered by the emergency generator. 2. Procedures if pump station is inoperable: ® In the event the pump station is inoperable (both pumps fail, a power interruption and emergency generator failure, a failure in the sewer force main on site, or apy other issue preventing operation of the pump station), a high water alarm is triggered and building operation personnel are notified through the Building Management System. In a case where the high water alarm is triggered and the pump station is determined to be inoperable, building maintenance personnel shall monitor the level of sewage in the pump station. If the sewage level in the pump station is above the inlet pipe, the building maintenance personnel shall call a septage hauler permitted by the town of North Andover Board of Health to come to the property, pump out the pump station and transport the sewage to a disposal facility. The building maintenance personnel shall continue to monitor the sewage level in the tank until such time as the pump station is operational, calling a septage hauler each time that the sewage level is higher than the elevation of the inlet pipe.