HomeMy WebLinkAboutEmergency Readiness Plan - - 1450 Osgood Street i
Em.ergency Readiness Plan
For sewer Pump Station
BOS3 Fulfillment Center
c/o HIP Transaction Services LLC
1450 Os ood Street- North Andover IUiA
Primary Contact Information
Name: Mac Utsey
Cell Phone.-
Email:
Secondary Contact Information
Name: Adam Kedich
Cell Phone:
Email:
Pertinent Information
1. The pump station is designed to avoid interruptions in service with the following
provisions:
Redundant (duplex) pumps —pumps alternate with each pump cycle. In the
event of a pump failure, an alarm is triggered and building operation personnel
are notified so that the failed pump can be serviced, repaired or replaced. Until
the failed pump is serviced, repaired or replaced, the second pump will keep
the facility in service.
Emergency generator— in the event of a power failure, the pump station will
remain operational, powered by the emergency generator.
2. Procedures if pump station is inoperable:
® In the event the pump station is inoperable (both pumps fail, a power
interruption and emergency generator failure, a failure in the sewer force main
on site, or apy other issue preventing operation of the pump station), a high
water alarm is triggered and building operation personnel are notified through
the Building Management System.
In a case where the high water alarm is triggered and the pump station is
determined to be inoperable, building maintenance personnel shall monitor the
level of sewage in the pump station. If the sewage level in the pump station is
above the inlet pipe, the building maintenance personnel shall call a septage
hauler permitted by the town of North Andover Board of Health to come to the
property, pump out the pump station and transport the sewage to a disposal
facility. The building maintenance personnel shall continue to monitor the
sewage level in the tank until such time as the pump station is operational,
calling a septage hauler each time that the sewage level is higher than the
elevation of the inlet pipe.