SCOPE OF SERVICES
Woodard & Curran (WC) completed a peer review of the sewer system design presented on the Permit Site
Plans - North Andover, Massachusetts Proposed Redevelopment for Hillwood Enterprises, L.P. and 1600
Osgood Street, LLC Distribution Facility, 1600 Osgood Street.
FINDINGS
Findings of our review are summarized below.
1. The existing office building on Osgood Street(Lot A) is to remain and the existing buildings to the rear
of Lot A are to be demolished and replaced with the new distribution facility(Lot B).
2. There are two sewer pump stations for the proposed development; one for the existing office building
on Lot A labeled Ozzy Properties Pump Station and one for the proposed distribution facility labeled
New Tenant Pump Station. (Overall Utility Plan, Drawing CU 100 and Utility Plans I-V, Drawings CU 101-
CU105)
3. Both the Ozzy Properties Pump Station and the New Tenant Pump Station discharge to a proposed
valve vault at the rear of Lot B near the two existing force mains to GLSD, then from the vault to the
existing force main to GLSD. Both force mains are shown as 2"diameter which appears small for this
application. (Utility Plan V-Drawing CU105)
4. There are two existing parallel 8"force mains from the existing wastewater treatment building to GLSD.
The drawings do not indicate which force main the new force mains tie into.(Utility Plan V-Drawing
CU105)
5. The drawings do not include design details for the following:
• Ozzy Properties Pump Station
• New Tenant Pump Station
• Valve vault
• Tie-in to force main to GLSD
The pump design conditions were not included and, as a result,the force main diameters could not be
verified.
6. The location of the two existing 8"force mains from the existing wastewater treatment building is not
shown accurately and is difficult to see.(Utility Plan V-Drawing CU105)
7. The Ozzy Properties Pump Station is located in the middle of the paved parking lot either under a
parking space or in the travelled way, presumably with an access hatch. (Utility Plan III-Drawing
CU 103) It is recommended that the station be located in a non-paved area not accessible by vehicles.
The New Tenant Pump Station is not located in the roadway or parking lot. (Utility Plan II-Drawing
CU 102).
8. Force mains should avoid 90 degree bends.
9. Force mains should have air release valves at any high points and cleanouts at any low points.
uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuul� I�u uuu Ilmll Ilm uum I�um m um�uum m uuuum Imuuuuuuuumuuuuuuuuuu I m uuuuuuuuu� uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu
10. Should the Ozzy properties building wish to tie int the proposed Osgood Street gravity sewer,
approximately 900 feet of 8"sewer would be required from the manhole before the Ozzy Properties
Pump Station to Osgood Street via Subdivision Way, Lot D. The invert of manhole SMH-18 before the
Ozzy Properties Pump Station is at elevation 33.71. 900 feet of 8"sewer at a slope of 0.004 ft/ft would
result in an invert elevation of approximately 30.0 at a manhole in Osgood Street at the point of tie-in to
WOODARD the proposed municipal sewer. (Utility Plan III-Drawing CU 103) The road surface in Osgood Street
&CURRAN where the manhole would be located is at an approximate elevation of 46.5.This would require an
excavation of approximately 16.5 feet,which would be an acceptable depth for sewer construction at
this location to accommodate Ozzy properties by gravity. If this is desirable, the gravity sewer should be
installed at the time the proposed Distribution Facility is constructed and plugged at the manhole before
the pump station.
11. For the New Tenant Building to tie into Osgood Street approximately 1,300 feet of 8"sewer would be
required.The invert at manhole SMH-13 outside the New Tenant Pump Station is 24.2. 1,300 feet of 8"
sewer at a slope of 0.004 ft/ft would result in an invert elevation of approximately 19.0 at a manhole in
Osgood Street at the point of tie-in to the proposed municipal sewer. (Utility Plans III & IV-Drawings
CU103& 104)The road surface in Osgood Street where the manhole would be located is at an
approximate elevation of 46.5.This would require an excavation of approximately 27.5 feet,which
would not be an acceptable depth for sewer construction at this location. Therefore the New Tenant
building would need to tie into the proposed Osgood Street sewer by pumping.
12. Should the New Tenant wish to tie into the proposed gravity sewer in Osgood Street in the future, it is
recommended that a force main be constructed from the New Tenant Pump Station to Osgood Street
when the Distribution Facility is constructed. (Utility Plans III &IV-Drawings CU 103& 104)Valving and
discharge piping within the pump station or a valve vault could be configured to accomplish and the
corresponding valve closed.
13. Assuming the Ozzy Properties Building sewer line to the existing pumping station must remain in
service during demolition of the existing building(s)and construction of the proposed Distribution
Facility, several apparent conflicts appear on the drawings as follows:
• Utility Plan III-Drawing CU103—The existing 8"clay sewer is not shown from the existing SMH
near D-1 MH-6 200 feet southwest to an existing SMH faintly shown, then another 60 feet
where it connects to the existing 8"clay sewer. (This can be deduced from information on
Drawing VL105).As a result,there appear to be several conflicts as follows:
o The proposed 8"sewer from SMH-16 to SMH-17 is in the same location as the
existing 8"clay sewer from 30'to 90' north of SMH-16 as well as the existing
SMH. It also appears that the proposed 15" HDPE drain and D-1 CB-4 are in
the same location as both the existing and proposed sewers and the existing
SMH.
o It appears that the proposed 24"drain from D-1 EX YRD-1 to D-1 MH-6 is in
conflict with the existing 8"clay sewer just south of the existing SMH.
o The proposed UFW(fire protection line)crosses the existing sewer just north of
SMH-16 and is shown very close to the existing SMH.This should be checked
for conflicts.
• Utility Plan IV-Drawing CU104—The existing 8"clay sewer crosses both the proposed UFW
and electric lines east of the proposed Distribution Facility and should be checked for conflicts.
• Utility Plan IV-Drawing CU104 and Utility Plan V-Drawing CU105—The existing 8"clay sewer
continues through the proposed Distribution facility but should remain in service in order to
serve the existing Ozzy Properties Building unless other arrangements are in place.
• Utility Plan V-Drawing CU105-The existing 8"clay sewer crosses the proposed U FW, gas
and electric lines west of the proposed Distribution Facility and should be checked for conflicts.
• Utility Plan V-Drawing CU 105-The existing wastewater treatment facility and/or pump station
appears to be required to be demolished in order to construct the proposed Distribution Facility
uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuul� I�u uuu Ilmll Ilm uum I�um m um�uum m uuuum Imuuuuum uuuuuuuuuuum I m uuuuuuuuu3uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu
but should remain in service in order to serve the existing Ozzy Properties Building unless
other arrangements are in place.
• Utility Plan V-Drawing CU 105-The existing force main from the wastewater treatment facility
and/or pump station must remain in service in order to transfer flow from the existing Ozzy
Properties Building to GLSD unless other arrangements are in place.
WOODARD 14. The details for sewer and force main bedding on Utility Details I, Drawing CU501 reference
&CURRAN Wannacomet Water and Sewer.This appears to be incorrect.
We trust that the information herein is helpful as the project moves forward.
If you have any questions or wish to discuss our findings, please do not hesitate to contact me.
uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuul� I�u uuu Ilmll Ilm uum I�um m um�uum m uuuum Imuuuuum0uuuu uuuuuuuu of uuuuuuuuu3uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu