HomeMy WebLinkAbout04/08/2020 - Langan Response to Woodard & Curran Peer Review - - 1450 Osgood Street N
LA /VGA, /V
888 Boylston Stet,Sum 510 Boston,MA 02199 T.*617-82 910
T : M . dingy Stanford, Director
Department of Public Work,
Town of North Andover
From, Tim O'Neill, P.E.
Nate Kirschner
r
C PIEDO Mac Utsey/Hill'wood Enterprises, L.P.
John S calla k/Smolak&Vaugh an LLP
Cater, April 80 22
Response to Woodard &Curran Sewer System peer review comments
North Andover Fulfillment Center
16 Osgood Street, North Andover, Massachusetts
Langan Pr j"eat No..: 14 82701
Enclosed, please find our responses to review comments raised by Woodard & Curran in their
peer review comment memo dated March 16 2020. WC noted in the review comment memo
that their only comments are in relation to the original comment#13, which is copied below for
reference. Each comment is foll'lowed by our response in bold.
13. Assuming, the Ozzy Properties Building sewer line to the existing purnpling station must
remain in service during demolition of the existing building(s) and c nstruction of the
proposed Distribution Facility, several apparent conflicts appear on the drawings as
follow
Utility Plan III-Drawing C '1 03—The existing 8to clay sewer its not shoran from
the existing S H near 1 1 IVIH 6 200 feet southwest to an existing SMH faintly
shown,, then another 60 feet where it connects to the existing " clay sewer.
(This can be deduced from information on Drawing VL1 5)w As a result, there
appear to be several conflicts as follows:
1
Comment es s Previously addressed.
The proposed "sewer from SMH-16 to SMIH-1 ' is in the same location
as the existing 8" clay serer from 3 ' to 900 north of SMH-16 as well as
the existing S H. It also appears that the proposed 15" HD PE drain and
D-1 C -4 are in the same location as both the existing and proposed
sewers,and the existing SOH.
Comment Response,,- Previously +ddressed.,
Mangan Project No. 140182701
_mEMO April 8, 2020- Page 2 of 3
0 It appears that the proposed 24" drain from D-1 Ex YI D-1 to D-1 MHWS is
in conflict with the existing 8" clay sewer just south of the existing SMH.
Comment Response: Previously addressed.
o The proposed UFW(fire protection line) crosses the existing sewer just
north of SMH--16 and is shown very close to the existing SMH. This
should be checked for conflicts.
Comment Response:Previously addressed.
In the final proposed condition, existing sanitary service lines and
equipment servicing buildings 20 and 21 will be removed. During
construction the sanitary sewer service will remain in operation as it exists
today for as long as possible. Before the existing sanitary conveyance
system servicing existing buildings 20 and 21 are taken off line,a new
sanitary conveyance system will be constructed. The discharge locations
from the existing building will be disconnected from the existing sanitary
service and reconnected to the new service route,limiting down time.
Depending on the exact timing of certain demolition and site work it is
possible that the existing sanitary main will need to be demolished in
advance of the new sanitary system being able to go into operation.
Should this temporary condition arise, temporary holding tanks would be
used to store sanitary waste. These tanks would be Installed,operated and
emptied in accordance with all with any local or state requirements and
would be removed as soon as the permanent sanitary connect can be
made.
Utility Plan IV-Drawing CU104--The existing 8" clay sewer crosses both the
proposed UFW and electric lines east of the proposed Distribution Facility and
should be checked for conflicts.
Comment Response: The existing sanitary service lines and equipment
will be removed in the final condition. Existing sanitary service will remain
active as it is in its existing condition as long as possible. !Please refer to
the above options for the continuous sanitary service approach for
buildings 20 and 21.
• Utility Plan IV Drawing CU104 and Utility Plan V--Drawing CU105-The existing
8" clay sewer continues through the proposed Distribution facility but should
remain in service in order to serve the existing Ozzy Properties Building unless
other arrangements are in place.
Comment Response: The existing sanitary service lines and equipment will
be removed in the Bnal condition, Existing sanitary service will remain
LANGAN
Langan Project No. 140182701
RRWAM E M 0 April 8, 2020-Page 3 of 3
active as it is in its existing condition as long as possible. Please refer to
the above options for the continuous sanitary service approach for
buildings 20 and 21.
• Utility Plan V-Drawing CU105--The existing 8" clay sewer crosses the proposed
UFW, gas and electric lines west of the proposed Distribution Facility and should
be checked for conflicts.
Comment Response. The existing sanitary service Fines and equipment will
be removed in the final condition. Existing sanitary service will remain
active as it is in its existing condition as long as possible. Please refer to
the above options for the continuous sanitary service approach for
buildings 20 and 21.
• Utility Plan V�-Drawing CU105-The existing wastewater treatment facility and/or
pump station appears to be required to be demolished in order to construct the
proposed Distribution Facility but should remain in service in order to serve the
existing Ozzy Properties Building unless other arrangements are in place,
Comment Response: The existing sanitary service lines and equipment will
be removed in the final condition. Existing sanitary service will remain
active as it is in its existing condition as longs as possible. Please refer to
the above options for the continuous sanitary service approach for
buildings 20 and.21.
• Utility Plan V-Drawing CU 105-The existing force main from the wastewater
treatment facility and/or pump station must remain in service in order to transfer
flow from the existing Ozzy Properties Building to CLSD unless other
arrangements are in place.
Comment Response: The existing sanitary service lines and equipment will
be removed in the final condition. Existing sanitary service will remain
active as it is in its existing condition as long as possible. Please refer to
the above options for the continuous sanitary service approach for
buildings 20 and 21.
We trust these responses and the enclosed revised material adequately address your
comments and concerns. Should you have any additional comments or concerns: please
do not hesitate to contact us directly on 617-824-9100 or nkirschner@langan.com, or
toneill@langan.com.