HomeMy WebLinkAbout01/24/2020 - Langan Response to TEC's Peer Review - - 1450 Osgood Street SMOLAK & VAUGHAN LLP
Eitan Goldber&Chair
lair Board
February 18,2020
3, Memorandum,dated January 24,2020,from rBm O'NeAl and Nate Kirschner of
Langan Engineering tO TEC,Inc.to Monica Gregoire,Town of North Andover(Response
W TRUS-Definitive Subdi i ion Reijew Comments,daltd. mber 15,2
(n n I A On'IA i.vnl
A/VfiA/V
: :m and:
o.m..
888 Bo on StrM Suite 510 Boston,MA 02199 T:617-SMIOO
To: Monica Gregoire Town of North Andover
From: Tim "l eill, P.E.
Nathan Kirschner
Copied: Peter F. Elll e TEC
Mac l tsey H111 ood
John Srn to Smolak &Vaughn
Michael Rosen RIW
Date: January 24,, 2020
e; Response to TECIS Derinifive Subdivision Review Comments
North Andover Amazon Fulfillment Center
1600 Osgood Street, North Andover,Massachusetts
Langan Project No.; 140182701
Please find our responses to your comment memo related to the Application for Definitive
Subdivision Approval memo from Peter Ellison of T C dated November 15,2019. Each comment
is followed by our response in bold.
Section .2.A—The Waiver Requests should be added to the Definitive Subdivision
Pleas.
Comment Response; The waiver requests have been included to the DeflnItIve
Subdivision Plan in sheet CS 03*
. Section -5. ;F.( ( )ft) Sh et V8201 s hould include the Contiguous b iidable aree
total frontage, and let width for each newly created lot, Lots net meeting these
requirements should be designated as a non-building )et". This comment is clerical in
nature because future lot line adjustments will result in all lots being buildable.
5
Comment Response:- Contiguous building area, total frontage, and lot width for
each newly created lot have lasers added to Sheet VB201.
}
TC understands that the intent of the Definitive Plans is to create legal frontage for Lot
(solar array). The remaining area outside of Lot C will be further consolidated/divided
y an A1F plan: {
r
Comment Response:Noted
If
J
i
I
i
L
r
s .
f
F
e
a
i
MEMOResponse to Mass DOT District 4 Trip Generation Follow Up Comments
October 2 , 21 —Page 2 of
In addition to the responses above, we are requesting the following:
Waiver r request supplemental to memorandum or r dum from Smolak & Vaughn for "List of Requested
Waiver" dated 1 o 1 1 , wh1ch we s filed with the d finit ve subdivision appilcation
§255-5.7 Performance Guarantee
As a supplement to the waiver list f iled with the Planning Board as a partodefinitive f the
subdivision application, we are requesting an additional waver as described below.
Section 2 5- . ' (Performance Guarantee) of the subdivision regulations provides that pursuant
to MG c.41, 81 U, before endorsement of the Board's approval of a Form C plan, the apry licant
haII secure the construction of ways and installation of mun1cipaI services in a n amount s ff i lent
to cover the cost of all or a ny agreed-upon portion of such construction and installation and of the
subdivision improvements specified in Article vi of these regulations or as may ho n on the
Form C plan.
The applicant requests a waiver from strict compliance w h this requirement, allowing instead
that the Planning Board condition issuance of the final certificate of occupancy for the Lot
Project upon completion of the subdivision road, as approved by the Planning Board, which will
act as the Applicant's performance guarantee.
We trust these responses and revised materials adequately address your comments and
concerns. Please feel free to contact us a ( 17) - 1 o0 or it chner@Lan an.eom
toniell@Langan.corn with any questions or should you require additional information,
anpn.00 a-W\NH data7 14018 701Trojeot DatMarre po ence\Comment Hosponse L tter 1 f -1 1 0 TEC Respome to
Definitive S ubd€vislori Comments\T07 ES.1 DOnitive SLjWslon Review I A x
{