Loading...
HomeMy WebLinkAbout04/21/2020 - Langan Response to Weston & Sampson Peer Review - - 1450 Osgood Street AIVEiA /V Me orandum ---------------------------------------------------------------------------------------------------...................................................................... 888 Boylston Street Suite 510 Boston,MA 02199 T:617-824-9100 To: Timothy J. Willett, DPW operations Manager, Water & Sewer Department Town of North Andover From: Tim O'Neill, P.E. Nate Kirschner COPIED: Mac Utsey 1 Hillwood, Enterprises, LP John Smolak 1 Smolak &1laugh an, LLP Michael Rosen 1 RlW Date: April 21, 2020 Re: Response to Weston & Sampson Water System peer review comments North Andover Fulfillment Center 1600 Osgood Street, North Andover, Massachusetts Langan Project No.: 140182701 Enclosed please find our responses to review comments raised by Weston & Sampson in their peer review memo dated December 10, 2019. Weston & Sampson noted in their review comment memo their comments are further clarifications of previous comments, which are copied below for reference. Below please find each comment followed by our response in bold. Water Infrastructure Review 11. The North Andover Fire Department shall review the proposed fire lines and hydrant location slspacing for conformance with their standards and policies. LANGAN RESPONSE: NOTED. Ill!&S Response: Based on this comments response, it is our understanding that Langan is reaching out directly to NAFD for approval of the revised plans. Langan Response: Langan will coordinate directly with NAFD for approval of fire limes and hydrant locations. 14. The developer shall provide additional information on the purpose and materials of construction for the proposed "Water Tower" located on Plan Drawing No. CU105. LANGAN RESPONSE: THE WATER TANK FOUND ON SHEET CU105 WILL BE USED FOR FIRE SUPPRESSION PURPOSES ONLY. CONSISTENT WITH SIMILAR PROJECTS OF THIS NATURE THE TANK WILL LIKELY BE A ±270 000 GALLON SUCTION TANK WHICH MEASURES ±39.5 FEET IN DIAMETER WITH A HEIGHT OF ±32 FT. THE TANK IS ATTACHED TO A PUMP HOUSE CONTAINING A DIESEL GENERATOR AND A PUMP WHICH WILL SUPPLY WATER TO THE FIRE SUPPRESSION SYSTEM IN CASE OF AN MEMO Langan Project No. 140182701 April 8, 2020 --- Page 2 of 2 EMERGENCY. THE TANK WILL BEAWELDED METAL TANK DESIGNED IN LINE WITH HARRINGTON GROUP SPECIFICATIONS. AS A CONDITION OF APPROVAL FOR LOT B A PROFESSIONAL TANK MANUFACTURER WILL PROVIDE DETAIL DRAWINGS AND SPECIFICATIONS TO BE SUBMITTED FOR THE HARRINGTON GROUP AND LOCAL AUTHORITIES REVIEW AND APPROVAL. W&S Response: our preliminary review of the plans did not find any interconnections between the domestic water lines and the fire lines/water tank. However, we are requesting confirmation from Langan that no interconnection exists. The fire lines and water tank shall be completely isolated from the domestic water lines for potable water quality purposes, Langan Response: Confirmed, the water tank/fire lines are isolated from the domestic water lines and will not be connected to ensure water quality. 15. The developer shall provide as-built record drawings of all new and existing water infrastructure to the NAWD at the completion of construction. LANGAN REPONSE: A NOTE HAS BEEN ADDED TO SHEET CS002 UNDER THE UTILITY NOTES SECTION TO REQUIRE THIS. W&S Response As-Builts shall be provided to NAWD electronically both in PDF and AutoCAD (Release 2014 or later) format. Langan Response: Digital versions of the as-builts will be provided upon project completion We trust these responses and the enclosed revised material adequately address your comments and concerns. Should you have any additional comments or concerns, please do not hesitate to contact us directly on 617-824-9100 or nkirschner@langan.com, or toneill@langan,com. lMangan.comldata\NMdata71140182701Troject Data\Correspondence\Comment Response Letters\2020-03-31 Weston&Sampson-Water Comments\Comment Response Letter-Water Peer Review-Willett-3-31-20.doex LAIVGA/V