HomeMy WebLinkAboutErosion & Sediment Control Plan - - 1210 Osgood Street LEGEND: NOTES. CONSTRUCTION SEQUENCING(cont)
TEMPORARY PER/METER 1. THE PURPOSE OF THIS PLAN IS TO GRAPHICALLY REPRESENT THE PRINCETON AT NORTH \ - -O - I Phase 4
ANDOIER APARTMENT HOMES TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ,F - Phase 4 is the period between base course being installed and A a/pavement and full stabilization of surrounding
STRAW WATTLE _ O ♦ -  - landscape areas.
2.THE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES INDICATED ON THIS PLAN r _ \ _ I. Instal/catch basins of low points throughout the site of Tina/rim grades leaving them Z-3 inches oboe
ARE CONSIDERED A GU/DE and SHOULD BE CONSIDERED THE MINIMAL EFFORT REQUIRED. base course elevations.
TEMPORARY MATERIAL STOCK ADDITIONAL or ALTERNATE MEASURES MAY BE REQUIRED,DEPENDING ON ACTUAL FIELD O ((( - 2. Install silt sacks in catch basins. Proposed
PILE or LA YDOWN AREA CON0I770NS F 3 Ring low point catch basins with/f"-1'stone a minimum of 12"wide and 3-4"high.
- _ 4. Periodically clean sediment and replace stone from around low point catch basins and remove and clean silt
AV
.3 EXIS77NG COND177ONS INFORMATION REPRESENTED ON THIS PLAN IS FROM THE PRO�CT socks p-prr/y
TEMPORARY SEDIMENT RA SIN SURVEY - Ir - - -- - - 5 6. Stabilize landscape areas as soon as possible as directed below.Catch basins an gradients shall have silt socks installed and sand tubes placed to bypass these catch basin Mixed Use
i� SPECIFIC EXISTING CONDI7/ON"SURY PLAN(,)PREPARED BY T77 ENWRONMENTAL,INC. / L - _ to law point catch basin
i
_ s.
4. THE PROPOSED GRADING,DRAINAGE and STORMWA7ER SYSTEMS REPRESENTED ON THIS i I `i i'' -' �G�� �_--- .-u _ = 7 Ring all loam stockpiles within paved areas with straw wattles. 1
TEMPORARY STABILIZED PLAN IS FROM PROWL SPEC/FIC DESIGN,AS INDICATED DN THE PERM/T PLANS, - \ �` t' 8. Sweep and clean parking lots regularly to limit sediment loading. Development
CONSTRUCTION ENTRANCE STORMWA TER REPORT and SWPPP. - Fr; r p
r,•,t`, �� BUFFER ZONE -- ---- FP,;
TEMPORARY SEDIMENT BASIN CALCULATIONS - L _,RESTORATIDN
-VOLUME REQUIRED IS BASED ON 3,630 OF PER ACRE a ! �tREp?
PHASE BASIN ID UPSTREAM WATERSHED AREA VOLUME REQUIRED VOLUME PROVIDED EXCESS i- 6 COMPZIS/OR BARK MULCH' = e OTSTLRe .
18"COMPOST OR BARK SOCK TO7E--=INSTALLED PRIOR �\ (� -_-- 'qIVC,
MULCH SOCK TO BE TO-CONSTRUCTION ! _ 0 F)
1-1 1.65 AC 6,000 OF 6,800 CF 800 OF INSTALLED AFTER / - - C6N
BUFFERI NE--- Route 125(Osgood Street)
1-2 7.54 AC 6,980 CF 8,750 OF 1,770 OF RESTORATION IS
2-1 2.87 AC 10,420 CF 10,483 CF 63 CF - COMLETE O/V ♦--�// -- l,, �m--_ -! ..:./-/i _ North Andover,Massachusetts
2-2 2,20 AC 8,000 CF 8,279 CF 279 CF
--
2-3 6.59 AC 23,910 CF 24,003 OF 93 CF : � W POINT r
CONSTRUCTION SEQUENCING AT HB SIN
BUFFER-ZONE RESTORATION - PREPARED FOR:
-=AREA 1 772ff
Phase 1 -��
Phase 1 of the construction sequencing is the area tributary to the"1"series wet/ands flogs at the southeast comer of the site in the area of the ,__ / r--•- -
proposed main entrance.This area will be worked prior to any other work performed on site outside of mobilization and the setting of construction traders. RETAIN TEMPO
G1 ALL -1. Clear and grub vegetation only in the area of the erosion control line,proposed temporary sediment basin 1-1 and the proposed retaining wall and \ - / 1 - - - f - SEDIMENT J3
sediment basin 1-2. - = TEMPORARY B IN 2-3 Princeton
8 -�_
2. Install erosion controls and construction entrance per plan,and begin buffer zone restoration. �.. eqs _- - DIVERS} WA LE \'
J. Construct sediment basin 1-1 and diversion swa/e Properties
4. Begin wall installation far two to three courses and construct sediment basin 1 2 behind wall as shown on detail in referenced plan. ? -
5. Begin fill operation for embankment down gradient of future Infiltration System to an elevation equal to the base of the system.
6. Stabilize a//areas down gradient of the wall and/a-and seed embankment
7 Proceed with clearing and grubbing of remaining oreo within Phase 1. -
8. Maintain and modify as necessary the diversion swa/es and sediment basins as rill and wall operations proceed
-i - BUILDING PAD E
Phase 2
Phase 2 includes the balance of the site as this area is a//tributary to the 2"and'3"series wet/ands. / �"(��-PN FILL 8 FEET ,
1. Clear
and grub vegetation only in the area of the proposed erosion control line,retaining wo//e and temporary sediment basin 2-1,2-2 and 2-3
2 Install erosion controls per plan. ----_- O C I ! r c�
3 Begin wall installation for two to three courses and construct sediment basins and diversion swales behind walls as shown orr detail in referenced plan. -® _ 1 1 5 weStlOYd Street,4t17 F'IOOY
4. Begin fill operation and advance walls higher / O - __-- - _- - / 1 1� p
5 Stabilize all areas down gradient of the wall with loam and seed Lowell,MaS53C11uSettS�t051
S. Proceed with clearing and grubbing of remaining oreo within Phase 2. \O / ------ _ AUT� _ / I
7 Maintain and modify as,necessary the diversion swa/es and sediment basins as All and wall operations proceed O
8. P otect areas designated for future infiltration systems from sediment or over compaction.7hese areas should be roped off to prevent excessive
vehicular traffic after All CB - __ J
Phase 3 / BUILDING PAD D -- - - T COCK
Phase 3 begins when pad sites ore brought to grade and underground stormwater systems and systems piping has been instol/ed but prior to a base couse / - __ _ _ -- - ���I�O K
of pomment being installed / FILL 10 FEET ---- 1 r 1'
1. Install temporary shallow sediment basins as required between retaining wall perimeter and system areas to handle contributing area at a volume of -
3,600 cubic feet per acre.
2 As catch basins and oreo drain inlets ore installed protect with silt sacks or other acceptable means to keep all sediment from omterus.Do not use _- ___ _ ���O�T�T��
underground systems to directly receive stormwcter during this phase. LOW POINT _- - W N7 _ _ - 1 1
J. Protect oreo over systems until ti/the specified compacted bockfi//depths have been achieved. CATCHBASIN _- D_ C HBASIN - - \ -/ --
SEQUENCING CONTINUES(TOP RIGHT) // - Q ®O -
TEM ORA8Y --- ® /
f DIVE NPFAITI ( Civil Engineers
Land Surveyors
1 \
\\
1 ,,;,,,,,,,,,, -- — C B ,,,,,,,,,,,,,,,,,,,,, ,,,
LIMIT OF WORK / '' __ _ Q�_- - - --` --- I ® \ _
ll
2 COURSES 9 V'�4 4n _,` �'CA Wetland Scientists
S/LT FENCE -_-_ -\ lj
SEDIMENT BASIN
11 rn 9 t j 9 \
STRAW
315 ELM STREET,MARLBOROUGH,MA 01752
I U �� u \ VOICE(508)460-1111,FAX(508)460-1121
WWW.H AN CO CK ASSO CI ATES.COM
/ T DIWENT PDRARY 1 SEE GEOTECH REPORT FOR REMOVAL OF UNSUITABLE �\
3'FROM FACE OF wA[[ ASIN 1-2- -- EXCAVATED MATERIAL UNDER BUIDLING SOILS UNDER FOUNDATIONS AND SLABS ON
j SLABS TO BE RE-USED AS ONSITE FILL.
__ BUILDING PAD C
EROSION BARRIER
_ ®C ®I
CROSS SECTION o - ---- BUILDING PAD B FILL 8 FEET
\r;
NOT TO SCALE / F $UILDINGI PAD FILL 4 FEET D D 1�/ -COMPOST OR BARK I _- - _ ---
r`-- MULCH SOCK TO BE !I -
/ INSTALLED AFTER _ --- _
BUFFER ZON - OINT
I.STORATI IS - SIN- - -
-- --.1 -- __ - --
25 DI FUTURE INFILTRAT ON
TURB SANCE
PROPOSED PROPERTY LINE, I
i� ----(No - _-- - - - - ARMty
-01 BUFFER
-71
I _' CB_ C
(No coNSTR1 _ COMMERCIAL AREA -
TEMPORARY _-
( `�
II� _ (� SEDIMENT _- \.
f -TE'.RARY 1Aa - /-CBS - CONSTRUCTION BASIN 2 1 - _ TEMPORARY - - -\ - -` NO.BY APP DATE ISSUE/REVISION DESCRIPTION
SEOTMENr - - _ _ - . _
Q Q DIVERSION SWALE eA�IN 1,-1 - PARKING AND MATERIAL 152__ \ =DATE: 4 20 18 DRAWN BY: ETC
\ r c= SCALE: AS NOTED CHECK BY: JP
J J TEMPORARY TEMPORARY LAYDOW 1 or \ APPROVED BY: JP
Q STORAGE AREA DIVERSION SWALE MATERIAL STOCKPILE(TYP.) C
1A EM Z 1-
4 1A6 TF;8RARY ,� ° Z �
DIV jjRSI`6N SW�rLE J � W o00 `
I---_ /0/---- l% ct Li U)ll I ` ----- -- �- -� , - -_
j 100"WETLAiVD
0
Jill o EROSION AND
�UFFEF2` ° SEDIMENT
I _
o - CONTROL
--------
�� --_ � PLAN
— —-- --------- --- -------- --- - —_ � — - _—__— E�25 --
r-
— ---- -------- -- --- — -- TROUT _ _
— r — orn �---- — _ _—
——=  —
WIDTHA �
_ --- --- - --__ D BRAR I E TION'�N DWG:19770SP-ESC-col wy
TEMPORARY S ILIZED - -_ --- _ _-- _ - - ---
CONSTRUCT] NTRANCE(TYP.) - - = - ---
`(I�6I NIGNWgY - \ - LAYOUT: ESC
- _
GRAPHIC SCALE: 1 INCH=40 FEET SHEET:27 OF 29
--- -- 0 20 40 80 160
x -_ PROJECT No.: 9770