Loading...
HomeMy WebLinkAbout09/24/2019 - Amy Maxner (Conservation) Comments - - 1210 Osgood Street 9/24/2019 Town of North Andover Mail-1210 Osgood-Various Site Issues To Be Addressed R, VER, 0 AN, t�assacnus �x Monica Gregoire<mgregoire@northandoverma.gov> ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. 1210 Osgood - Various Site Issues To Be Addressed 1 message ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Amy Maxner<amaxner@northandoverma.gov> Tue, Sep 24, 2019 at 3:51 PM To: bmyers@nrpgroup.com, Brenden Gilmore<bGilmore@nrpgroup.com>, Dan Brenner<dBrenner@nrpgroup.com>, Dick Bleakley<dbleakley@princeton properties.com>, Donald Rivait<DRivait@nrpgroup.com>, Greg Hochmuth <ghochmuth@wsengineers.com>, "Holden, Jeffrey" <jholden@geiconsultants.com>, Joe Peznola <jpeznola@hancockassociates.com>, Michael Sabulis<msabulis@geiconsultants.com>, Paul McManus <pmcmanus@ecotecinc.com>, "plockwood@Irt-Ilc.net" <plockwood@Irt-Ilc.net>, Thor Akerley<takerley@wsengineers.com>, "vkokosa@san born head.com" <vkokosa@san born head.com>, Wes Gemba <WGemba@nrpgroup.com> Cc: Benjamin Curell <bcurell@northandoverma.gov> Bcc: mgregoire@northandoverma.gov Hello Brendan, All, In consultation with the Commission's peer review consultant team GEI, the following provides responses and recommendations to various items raised in that last several days for 1210 Osgood Street: • Don with NRP contacted me today requesting my/the Commission's blessing to decommission the well point system as the interceptor trench is apparently complete and functional. It is GEI's and my opinion that decommissioning the wells is not in compliance with the Monitoring Plan and cannot occur at this point in time. Per Sanborn Head's August 7,, 2019 Revised Monitoring Plan,, (second paragraph under Modification to Dewatering System): "" The interceptor trench will supplement the existing well point network as a,proactive measure and provide a more expansive groundwater collection system that will be capable of handling changes in the existing flow patterns which may occur as the project development proceeds As such, the interceptor trench serves to address GEIs request for a "contingency measure"that can be implemented in the unlikely event that the well point system fails, or if other discharge points are identified. " We recommend a review of the Sanborn Head's August 7th letter to refresh everyone's memory as to what has been agreed upon for the course of action moving forward. • In conversation with the Building Inspector, he mentioned that the project proponent is getting ready to (or in the midst of installing) landscape irrigation system which is to be fed by irrigation wells on site (wells to be drilled). The https://mail.google.com/mail/u/0?ik=dadd 1872e7&view=pt&search=all&permthid=thread-f%3A1645587648295551526&simpl=msg-f%3A16455876482... 1/2 9/24/2019 Town of North Andover Mail-1210 Osgood-Various Site Issues To Be Addressed concept of drawing groundwater that is potentially impacted with calcite and high pH for surface uses seems counterintuitive at the very least. In consultation with GEI, this proposal cannot be implemented until more information is provided that demonstrates groundwater can safely be used for irrigation purposes and will not cause any harm to human health or the environment. • GEI has reviewed the pH monitoring summary tables and plotted these data points vs. time and precipitation events. This exercise indicated a spike and subsequent rebound in pH levels in July and August 2019,, respectively. Based on the recent data provided, we understand that pH levels are trending downward again. We also agree that the well point system has been continuing to capture impacted groundwater. The spike was attributed to a singular heavy rain event; however, additional spikes were not observed despite the occurrence of similar rain events. Based on Vern*s response, this spike and other future pH variations are to be expected based on rain events or other site activities. GEI is recommending, and the Commission will surely agree, that moving forward the project proponents need to begin tracking site activities on a daily basis so as to provide a reference for understanding how activities impact groundwater conditions. • The "Interim Pavement Maintenance Plan" dated September 4,, 2019 prepared by Hancock Associates only addresses short term/immediate maintenance of paved surfaces during construction/as the site is base-coat paved. Pursuant to GEI's June 11, 2019 letter, it was recommended that "An inspection., monitoring and repair program to maintain pavement integrity" be prepared. This pavement maintenance plan/program is meant to address long-term maintenance of paved areas (e.g. means/methods for repair so the pavement is kept intact) to address the potential for surface infiltration through pavement cracks/failures and subsequent saturation of the crushed concrete fill. While the Interim Plan is useful in the short term, the Commission will expect a revised plan for long term O&M to maintain the integrity of the final paved surfaces. Thank you for your time and attention to the above. The Conservation Commission has scheduled discussion on this project for its October 9, 2019 meeting. NAmy Amy R.Miner Conservation Administrator Town of North Andover 120 Main Street North Andover,MA o1845 Phone: 978-688-9530 Fax: 978-688-9542 Email: amaxner@northandoverma.gov Web:www.northandoverma.gov https://mail.google.com/mail/u/0?ik=dadd 1872e7&view=pt&search=all&permthid=thread-f%3A1645587648295551526&simpl=msg-f%3A16455876482... 2/2