Loading...
HomeMy WebLinkAboutFinal As-Built Plans - - 1210 Osgood Street NO TES T 1. THIS FINAL AS-BUILT PLAN WAS PREPARED IN ACCORDANCE WITH ITEM 87 OF THE DH(FD) � \ O N077CE OF DECISION-SITE PLAN REVIEW,MUL77 FAMILY HOUSING&REDUCTION/N PARKING-SPECIAL PERMIT PREPARED BY TOWN OF NORTH ANDOVER OFFICE OF IRE / / Dye PLANNING DEPARTMENT,DA7ED DECEMBER 6,2016,AS MODIFIED BY A DECISION OF THE / • DM-5�: Proposed oposed / O Rim=143 �` PLANNING BOARD DA IED✓ANUARY 23,2018. / x1�� � 744. / 2"in-139.4 2. THIS PLAN DEPICTS FINAL TOPOGRAPHY,BUILDING AND GARAGE STRUCTURES,CURBING, 25 COMM NAM,LLC / / • 12"in=139.z yr4¢6s Mixed Use PARKING SPACES,UT7LITlES,&DRAINAGE STRUCTURES(INCLUDING INVERT ELEVATIONS). DEED BOOK 13731,PAGE 276 / • �•,h 5"out=138.9 0.a INV. ALL AS-BUILT INFORMATION BASED ON AN ON-THE-GROUND SURVEY BY HANCOCK PLAN NUMBER 7334 / / \\� ASSOCIATES BETWEEN✓UIVE 2018 AND MAY 2020. CERTAIN SUBSURFACE ISEEPAGE STARTING POINT PLAN NUMBER 14092 INFRASTRUCTURE/NFORMATON/S PROV/OLD BY O/AZ CONSTRUCT/ON(SHOWN/N RED). (MAP 35,LOT 14) / Development 3 PARKING COUNT.PERM/T S17F PLAN DEPICTS 392 PARKING STALLS(EXCLUDING #25 COMMERCE WAY p N GARAGES AND LOADING AREAS).FINAL AS-BUILT PLAN DEPICTS 394 PARKING STALLS l �J PLUS 4 STALLS TO BE STRIPED AS A LOADING AREA FOR COMMERCIAL DEVELOPMENT / • 8" dpe;.........'. C_ LEGEND&ABBREVIA TIONS GRAPHIC SCALE: 1 INCH=20 FEET • O•/ / 144.33 0 10 20 40 80 • Route 125(Osgood Street AS-BUILT PARK/NG COUNT/N ACCORDANCE • III O BENCHMARK' C WITH PERMIT SITE PLAN nv out=l3o 1 / s BIRCH CUT SPIKE INV.=13. S-0 North Andover,Massachusetts 'Integrate w Wall EL_=135.07' 6' ,.L,T2,3,, PERMIT SI7F PLAN->AS-BUILT PLAN /5=0. (8'x16'apron) • S=0.01.,','' '" '' PARKING COUNT REVISION. • / • g �4¢>> PROPOSED\EMERGCY GENERAL R / Q PROP SMITH DMH- _ PREPARED FOR AB AS-BUILT EST ESI7MAIED �1��i p � / p RIM=144 Rim .1453.',''.'..',','.'.' CB CATCH BASIN FM FORCE MAIN P P CONTR L B•X h e,L-24' �j ° / • 6"INV IN=13 5 15"n-.I37'.9.',','.'..',','. 2 1 74 /44.22x CO CLEANOUT INV INVERT 5=02 INV15"CPP 6"INV OUT-13.90 5".Qu't,-�i,'8..',''.'. I DI DUC77LE IRON S SLOPE (WATER LINE) SMH SEWER MANHOLE 1I� PUMP C AMBER IM-141 5 0 4 30.2 2"GAS DMH DRAIN MANHOLE Al/ 6"INV IN-138 5 TINV15 • 15 e,L-7'S-0.05 • 15"INV-137.6 / The l R E DETAI) DMH-1 • R 139.95AB PROP SMH13 • Sa • 6 30.99AB O 2S'BUFFER RIM=144.4 �MH-37 out-136.0inn 0 CTrOUp O • R�" 5-n 41.0 •� 0�°° Rim-145.3 Pntegrate w Woll n / o �i/ Group ll NV IN=139.60 (\ =30. 6'INV =13905: 4"in=138.4 g'x�eOWri) v ° DMH- 5"In=141.46 • 22 Q m ��b°� r • 1 139.87A5 Rim=144.0 _ �o e/ 34.18 •' 15"out-1 o {UAINTENANCE. 24"(IR)=136.5 Sum 134.5 -1 139.67p a rr a ��LL El ININ WAt l \ • / O • CCNynETE BLOCK R _136P0 145 O•_�O • \ 02 I 4'hdpe, • H-1 2 ° • 1as.3, 13a.n 137.82AB o"MH i1 5309 Transportation Boulevard inv out-130.0 / 6 LIFT STATION 144,98 _. m DMH- 6"0 PVC L=3D'S O 01 q o 2° 4.15 ntegrate w Wall V Rim-142.7 \ R 142.00AB 144.91/ 4551 ,1 971 135.9"1 8 15 { 41._ Cleveland,OH 44125 fD inv.in- 3 144.80 .55 8 X16'apron) 138.29AB 144.4 45. lg5'456J^' W DMH-60 P ) 24"(IR)=136.5 g� N 74s��7 45.41 -1 2 • V 4"(IR)-136 \ Olb R5 1nrt. s 8"^INV=138 4 14 49 4 inv out 138 TKT �T$3 F� • / out-138 4"in=3 �, S= S �A�CO C11 1' 0"out=130.3 • Sump=13 5 qc 02 �� L6 4"INV-138 45 5'93 kh,1�y, asg4��. V O / ".i n=138.9 SS cx SS /\��^n n '{45.05 m x 14$ 44.79> 113o.34A6'6"INV=140 25 14a.51 �, 9s_ �- 144.01 137.49AB os EJP,4 ASSOCIATES DRAINAGE O'CPP V N596} P BASIN 1.4 sp w 2 s6 GLEANOU7 t32.^aew' dPe. 8"hdpe, n59; 33 42.0AB s- S dpe P 9 z 15"INV- 1.5 0.009� t 0 L=243 L=85' eS BASIN 1.213 A P 4, 45.7i 5=0.1 m o� 5-0-01 S-O 01 144.32AB x144.04 / os 'ems ° DMH-66 VALVE PIT 143.33 144.29'NSP.Pof44.80x S SQ O SPA PB2 SATE L 37.94AB 143.84 �� 166 Civil Engineers DMH-65 41.38AB x145.50� 145.73 S 9m 3b6T=138. 137.98AB m=145 4 Land Surveyors R 140.16AB (3)24"out(IRL�'gq.5 S-0.02 45 15'in=137 5 G 130.42AIB 1 kti 6 1 = I 24"ou IR-1 i45.0 4452 Sump=1345 er e Pa�oa I 144.26A6 5 Sa�7 0 =1492G.2 5 / O nti -t42.66 43.01AB ,ISOLA 0 0 144.10 E ^/ CB-3 ox V 3"PM V 607 144.v o2 0' �° f.t ump=1 5.5 Rim= 8 DMH-25 143 aa7a o Wetland Scientists S 55 IP \ g5.=137.5 DMH 45 s 2"out=142. 0 1 142.7t / DMH-79 Rim=142.2 1 142.38AB L 4 A3�Ni �537.57A6 �0 Mvi1vI ANCt45.32. o' V _ �O = �45 143. �� 15)in-144.6 (IR)-142.5 a 12"in-138.9 1 PORT (IR)=136.5 , 5"in-137.9 BASIN 1.2A a2.55 PJ�1 5 3 3 4.5 3 ass \ / o �� �Nti _ - Su p-]40 4.5 DMH-5 2 0 V Sump=1346 \� g"out=137.6 �ti 5 142.32 �, 0 _ �464 N Sump-] 315 ELM STREET,MARLBOROUGH,MA 01752 43 /OO°° / \�,� �5, 142.30 , in=143.7 p 6"hdpe, Rim=149- Z 144.28A6 6"in=146 VOICE 508 460-1111,FAX 508 460-1121 DMH- ID-14 �,� gal � 142.31 -27 �5 1z�n=143.9 L=ao' 1 1P ( ) ( ) 9 °� CORJIAIR 42.6 �k�6y F\ / _1426 "ti a� �" 143.E S-0.008 6"out-145.1 1 142.54AB WWW.HANCOCKASSOCIATES.COM Rim= DH( J ND vl �13 "� }��0 136.41AB o o t=1 .0°� 143.47AB / / 30"In=i3a.6 0 9 5 SD SD SD SD SD SD SD SD SD SD-1 S V ES TO 149.60- 150.40 151.11 0 51.54 DMI-59 7 Vrao / 24"out(IR)=136.5 CLO E �° 5�0 R 142.40AB=147.80 SD SO SD 1493 ` CCU 150.12 c "0.84 151., Rim=141.0 J A 12"p-13T5 PATIOS T / l 01 142.70A6 149.31 44.28AB Q Sum 134.5 142.38 yo k 138.WALL j� 12 -5 11 10"in=136.6 � P- e< Cr �� ��RET WALL 2�hd e, m 10"out=136. ?�� 8"hd e ��ti,1 142.58 ° `145.84 , 2) 1 in 1 4. 0 p _ •RP P S A "S MAINTENANCE / L=63' o �� 42.00 a r = u=14 0" v D A 1 145.D7AB R 14O.13AB a7.sa 4809 47.s2 P 142.85AB c�V _ 2-18"hd Rb ti 143.67A6 ati SP. Ri 4 , NEED TO LOCATE OUTFALL? 136.53AB 0�� `LA SHUTOFF S 0 CONTRa1aN TDW136 0 1.71 142.43 G 1kti NN59 ;,6 147.49 CCB ORT 12" 4.5 NOT FIELD OBSERVED(5/20/20)l 'F/ �;' VALVES I'll S m 4.5 y 1 147.36 BASIN 2.2A MAIN �F SAY, ID 13 RESPONLE FOR N ^ 79 ry POR1 R 140.02AB ��V P�`D Ri=142fTiREN Cl�1# (J-IGH 1 136.22AE{ ^� �'�3-L'w w 147.10 -147.35 148.00 148.4 149.34x P =150.37 / �V "5/ Rim=14r. 151.00 -151.66- O 8'in outP4�4CONDU o \ .�Wxte`ti9Fti s BA�Nll - E �N35.60A6 F / / fQ ' 2 hdpe, - '� 12"out=1 3.5 \ 1P R 140.18AB �O oV 8"hdpe, FF CE N / /�P To ;� ` L=21' (STORM D AIIV) N o 142.3.AB SC 35.05A6 ff, , o 36.29AB s Z s a75s BASIN 22DCUTSPIKE SET 1' p a o2 ''w mp, c�% 10 4'136.8 ON CDNC POR ��.9ti ` "1 U s 5=0.01 1467� 18. 150.285=001 0 ELEIiAT/ON=133.48' `Ay , 1 142.83ABSC143 o v 147.50 E L=10' �I o � "� D-16 Rim=142.5 A p 1a2.sax s 2 .a3' ' 14 "^Q Q � 151.40143366� 3_ 47.38 147.66 CB-19 � ,o• �k F F�2)8'in=136.1 2"GAS �,� " '�2 ti o L�m a 1a3.s7 1145.45A6 'F �$'49but-136.0 p / 's��° S �T 5 IP CB Rim=139.8 13s.93 '2 k5 V��V �14x.31 ?�2 _ o o / S 0.029 H-52 NSP SO TOR OW(1 SC-7 DMH = Rin 12"out-135.3 2„GAS ^ 2 ��- ��T o'r' ;� _ -�L o 147.60' Ro '"" 149.25 144.02A6 150.37 150.75 - o, 7� x140.22 ��;� -MAINTENA CE 2) 1 `'o,",a\ �� 1 hd e, �& 147,7- 148.49 12" BASIN 1.1A �Ap�y PORT r P147.72 h8.98 150.0 150.55 3 DMH-68 =0. O' ✓ 149.29 e� s� a° 1 136.94AB to' N 4- e=6 =0 5x o c h -3JI51.aa o� 6"hd e L=9 142.86AB SIT 0 ti _ •E2 � �. s � 0.02 � P Rim=1 40-5 �A, m y 8"hd e, �/'` ��x �x A A' out'"'� hd e' � - 12"in=135.2 �� \ ' Y x^kti FM 3 h J r°s GARAGE=001 p GARAGE o =103' A > 42.60 out-,3 �� 0 145.15AB 24"out(IR)=135-0 ri �� o^,x ?A Lm32' m "hdpe L=22'5=0.01 ., m 2"out=136.6 32.4 m /"� or S=0.0 byc�� s �A?� 13�k001 143.53 6g m=140 4.4 M N 0 AT R R W SG 4 1 148.28A6 4 ' aF-� =5. N=5. 4� \ TCF 74T 34.98A6.> 79 1B2P \ 43.74 50.35 Sump -0 un�f for / h pe,L=4 e-o 22� 05 r434 DI �/) 14 5 145.72 146. 146.85 147.09 147.57 x148.65 149.16 \ O c\\ r BASIN 1.2A retains / -0.01 s0 '4� v RI=14. 1 140.47AB a7.63 1 j71 BASIN 2.2B 199 F h �` ? u E BASIN 2.2C •� �F 2 'x2 arya g �r2 'o 37, 40. N0.BY APP DATE ISSUE/REVISION DESCRIPTION o DMkj 33;27 \ , u' a IN OTH 14.90 150.53 '� FF, 34. 134.3 INSP > r,?> ,�b`L',�0, d17 �� \ '� \�V c. 2"GAS 144.06, x1.69 x146.07 146.07AB x147.87 146.7 151.87x O Rim=141.2 n Fp eU 20 9 ! Im r DIKt T10 S FROM DATE: 6 05 2020 DESIGNED BY: �7 2' P RT c RI=1426 ff / / - 1 145.30AB -- ��� 7 DH(FD) 2"in=1 .4'7 a 1az.3i; 8"'gyp ut-137.0 05 �^ R 143.62A8CSSIN DMH-5 5'� q, 1p SCALE: 1"=20'CHECKED BY: JP x131.8 C Vc� 141.24 .p 2 - 142.13 / 140.27AB Rim=143. 24"ou�IR)=1 .2f y 5ti Vd ° / 45.62AB 5Y.2 DRAWN BY: RD APPROVED BY: JP o 46.69A8 a 9 41.23 a� 149.45 51.83 52.36 4.3 P F �°` � 'O 1 ca 0.' 144.37 12"in 140 4 145 14.7 1.0 ut=136.6 a ' / 30" k R� 3 Cl 4. G�. 141.32 /\ 142.29x 5 6 P o, 1 Q MH-73 149.91 0 * x133.4 S p-13, 2" yo a°' � o �fl4i_4 0 R 143._OAB 30 in 8.3 im= N �h� 152.92 w 134.9x BASIN 1.16 3 3a.4 ti N E ad e 139.50AB �� 0 45.48AB 0" 136.9 � f 152.40IQ R 141.08AEi x 2,� 5=0.01 �. #191 I �P- .82, x x.°'hi.i" A _ ,o - 152.95 1 1 A' 2 00 • 2"in=1 si. 35.a s ff N a1.s3 ai:as 8"DI ° G4 m° * c 5 �oN $3� FINAL / 37.87AB 12"out=135.5 12 hd -- _ 50.99 15L72,152. -153.19�152.73 v1 52 In.=136.1 S-0.02 INSP.PG�. AS-BUILT 2 9 9 150.4D�v�- t'-31-EL 14551 152.63 a • P ) 5 CB x 135.3 x135.4 135. �`S 09 p MA TCH SHEET 156 S-0.02 Cx� O Rn AD RD a Tre) 134.6x • *Inte rate w ' �A w,r im 140.9 � Rim-y.8 •,°Y' G G r, RD H c � H ® _ ® ^�� / x135.4 x135.5 U Wlnv out a ron 673 °,s 0 05, xy o 3„FM %� out 4?J 3 c. o ^y 34� A o M MATCH SHEET 2 dp, N �) 37.2x - ,59, s o C� MATCH SHEET 3 14�T ti6 p�� �o o/0 1r'hdpe Ro'm=139.7 �� MA 2� =146 s=o 01 (1 OF 4) 135.8 7 e'L 0 6" ^ `� ' _ 15"h L-6o°s-o.o1 a � TCH SHEET 4 p� _ AA J Q 8"hd e, S=0.01 in ID-8 ID-10 a o / 133.7 •x134.7 0115 .=1 le PVC -O 6O �'O vi 4 GAS p ID-18 o / 135.6 �"136.3 15"inv= 5.5 136.8 / �C �'�' 30"out=139.2 L=235' BU�LD�NG B R 3 J7A �� �F�y 141 05 n oe �/ m �- R5 (3)8"in-146.3 Rim=149.6 Rim-149 6 12 S 37.5 o dp kti.qe�S V Q S=0.01 `�ti. 8 12"out-146.2 8"h L=44' , y �, 8"in=146.7 8"in=146.6 j o Ln.� �y L-2' r I 6'INV OUT=146.10 0 136.5x 5. `�?S-0� � rU"o �" 0 8"out=146.6 8"in=146.1 o DWG:20731 Final AB.dwg 96' eti' o h / L=83',S-0.006 / 134.3x 2" __ 101 4• < �9 FT�^'�ti 45.26 SERVICE LATERAL CONNECT 8"out=146 0 U INV.31 0 �'�; "� , `^ ( ) DIVIDUAL GAS LAYOUT: AB7 13. 1.5"SERVICE h ti �I Q x 135.5 � ba,�L �a' 45 c., ay B�/lLQlnl�i Lj RVICES TO i ��"' � �l AB1 134.5 136.2 e, $0 14.75 6"DI CONTRACTOR (UNDER CONS7RUC770N)OSETS ON 8 hdpe, U-1 SHEET: 1 OF 4 I h '� R 141.01A6 m�^ mm RESPONSIBLE FOR Rim=149.6 ® n n. 6 140. ;0a ,„�.„�- w ID-12 PATIOS(TYP.) L-50' 1 5 q0 .9 0 114,11�0•BBAB a o/ R 145.76AE TRENCHING LIGHT _ �35 L-'_are, �,-� •c 'n n� - �. - U� / Rim=149.7 c�F 5oc pi oNc 5=0.01 8"IN=147.1 �, i 2073� I� PROJECT NO.: NO TES ` FPS FP�5 1. THIS FINAL AS-BUILT PLAN WAS PREPARED IN ACCORDANCE WITH ITEM 87 OF THE \ FP�4 N077CE OF DECISION SITE PLAN REVIEW,MUL77 FAMILY HOUSING&REDUCTION/N £��• \ FP9 PARKING-SPECIAL PERMIT PREPARED BY TOWN OF NORTH ANDOVER OFFICE OF THE • /NFSS \ Proposed PLANNING DEPAR7MENT,DA7ED DECEMBER 6,2016,AS MODIFIED BY A DECISION OF THE 2 PLANNING BOARD DATED✓ANUARY 23,2018. • ��S 2. THIS PLAN DEPICTS FINAL TOPOGRAPHY,BUILDING AND GARAGE STRUCTURES,CURBING, 0 T NO TRANSFORMER HERE \ FP I P�3 FP 16 PARKING SPACES,UTLITlES,&DRAINAGE STRUCTURES(INCLUDING INVERT ELEVATIONS). \ FP Mixed Use ALL AS-BUILT INFORMATION BASED ON AN ON-THE-GROUND SURVEY BY HANCOCK DMH-58: P12 ASSOCIATES BETWEEN✓UAIE 2018 AND MAY 2020. CERTAIN SUBSURFACE INFRASTRUCTURE INFORMA7ON/S PROV/OLD BY D/AZ CONSTRUCT/ON(SHOWN/N RED). Rim=14�_� 7 T o \ \ Development 2"In-139.4 \ FP77 3 PARKING COUNT.PERMIT S/7E PLAN DEPICTS 392 PARKING STALLS(EXCLUDING • 4¢s a / GARAGES AND LOADING AREAS).FINAL AS-BUILT PLAN DEPICTS 394 PARKING STALLS • 12"in-1392 o-`�NV.s CB-0 �3.s;'s / PLUS 4 STALLS TO BE STRIPED AS A LOADING AREA FOR COMMERCIAL DEVELOPMENT 15"out=138.9 a \� Ri=143.0 4352 �No^\ 1 out- 9.5 CS C� / F 139,9AR o LEGEND&ABBREVIA TIONS GRAPHIC SCALE: 1 INCH=20 FEET \ 4294 2"h pe, 444 o/ST��cT F Fiy \ 0 10 20 40 So �v �\ Fe0 CF Route 125(Osgood Street) 2� AS-BUILT PARK/NG COUNT/N ACCORDANCE : 8 dRe` / 0188A 3?� B S-O 011 7¢5 Z CpNCRf -e0Ok 86Rp0/�T North Andover,Massachusetts WTTH PERMIT SITE PLAN 1'S':,','. ,','.. eP 144.33� \2'?ou t=139.7 \ ,4386 ,y` '4¢82�v`�BLOck�eTaN7NC .qOe 1 CORUISS/O� \ PARKING COUNT REVISION. �r! PERMIT SIZE PLAN->AS-BUILT PLAN �' /, v 143.4 1 hdp� 143.14 42.96^ 2\ AB AS-BUILT EST ES77MATED eEacrMARK =11' e� ig3,86 \ - - PREPARED FOR CB CATCH BASIN FM FORCE MAIN 6 BIRCH,CUT SPIKE NV=13 5=0 00 k'S c a F �43, EL=135.07 6' 2,.:L, . /,�oA' 7 1qs 08 CO CLEANDUC77L I 5 INVERT S=0.o1 / 6"/ �IN �'I 1 .62A e x 61 i45 DI DUC77LE IRON S SLOPE w 1¢q, ^ 43.76 � ��43 \x \ The NRP :: �. > � >6 �445> (WATER LINE) SMH SEWER MANHOLE PROP SMH1 DMH- ',','.' '.. \„ / � 74q„l, DMH DRAIN MANHOLE RIM-144 Rim .:145:3.: .::','.'. 2 / 369 4a.zzx .20 6 NV IN=135 5"n 1.7:.9.::,'. : \ �g0 6 144.74 m � 745>3 Group NV/-11, .90 • 5".a'u'tr7'37,'8'.:,','.'.' ¢4 2"GAS w 9 748 \455 ss 157'S-0.05 • 15"INV=137.6 / Gy c A c 5� PROP SMH13 \ 4>5 RIM-144.4 36.0 q L �4j38 O•`BUFFER 9MH-37 nv out= / o� w D-15 \44s>, 2"GAS7gs52- "INV IN-139.60 Rim-145.3 ntegrate W Wa11 j o/ 8"in=143.1 Rae G 54? 6"INV 39.55 4"in=138.4 g'x Cer r a v m 12"in-143.1 7 0 g-0• �� \ c x�5Z"hdp� \ 15"in-141.46 22 Q �o w 12"out-143.0 \R c 45 74> Rim=144.0 • 39.87 15 f o s> L=315'x746 42 53�9 Transportation Boulevard \ • gAINT�'A CE':' 24"(IR)-136.5 5"out=1 c 34.18 145 S-0.008 �® / 4¢ x�4e3Z Cleveland,OH 44125 a � 139.677 a_ m ^ DMH-63 DMH-33 RDc ni.•� (FD) Sump J� f CONORETE BLOCK RE ININ WAL 5"CPP ti / Q �4H m \ p,o • 1 4"hdpe,L=8' ��, o.c / �,,.5 p //� 7 5 x 4> / •a 22. • 134.77 `b / R2'in�42.8 Rim- in¢143.4 RUu 03 x 4e6 � �•6 r 145.31 137.B2AB a 10"i1 x'4j o m LIFT STATION 144'96 i 6"1 PVC L=30'S=0.O1 - Qom 12"i'.4_15 STUB(OLD)12"out=142.7 2"out(IR)=1425 c i46 pg u ru R 142.00AB 144.91/ 745 1 135.91AB 141„12AB 2"out=143.5 CONNE B c l� HANCOCK \ 8/&D inv.in- 3 144.80 'S7 97 „g56 15" -�.Y41. 6 INV OUT=141.0 INDIVIDUAL GAS R� I / n \ 1 138.29A8 t44.4 ) 145 55 2 e Sump=140.5 �4j78 G 4>>4 ^ro m0 5e,44 S - N �4Sj>� 145.41 LL8666 1;S=0.01 SERVICES TO a / 14,o ASSOCIATES TES �44 y6 4 inv out=138. 4 1�-]1 SEWER SERVICE CLOSETS ON nv= 3 _102 5= �_S 8"INV=138.4 7¢S s �` 5. S-0.01 1 141.2 EST ) 0� q. 5 �4 J4S i___'� Rim-146.3 (EST)"m -�N 145.93 1e�:�5� 54 y. U PATIOS TYP \ p� =138.9 ® 4"INV=138.45 x f v s c � �,� 45.05 x�4S.> ��1�7,'=142.5 55 c� SS ��"'^ 144.79 8 �n 3F'�,,,'� o'-<u�tam 140.5 1136.34AB'6"INV=140.25 44.51 P- Fr c G s 144.01 1 137.49AB oS s.P l�L, SHUTOFF s ro oV5s-"U F BUILDING E o A Civil Engineers BASIN 1.4 =-T sp ti P/4669 �� VALVESA�FOC��NJ n�91 <I 142.96AB 15"INV- 1.5 5=0.009� �h e L-J 6 MAINTENA CE D-3 cOPNF Q)�A` uy m p I 142.61 AB �s- N Land Surveyors IP Q 145.71 S=0 7 � c � PORT �32 BASIN 1.28 144.32AB - 4 / Rim-147.0 Rim-148.0 � x144.D4 oS� ems."'" c VALVE PIT 43.33 $ Q A s.a' 14429NSP.PC144.80x Sp S� 8"in 143.8 137.94AB 143.84 DMH-65J a 46-6 p\c� 12"out-143.7 12"in-143.5 INV.=145. 141.38AB 45.50�� 45.73 c m a �+...,,,,, 2"in=144.5 4 Wetland Scientists I 137.98AB m=145.4 2 �m �4 1 142.56AB 15"out-143.5 ati N43 5'in=137 5 74 M a �9Y IP x ao as = 24"ou IR-1 7 44.z6AB s 4 4j o'%,z 2' L���. 7 .�, R� 8"hdpe,e' 1 OSGOOD STREET AHF REALTY TRH 143.01 AB\/\ ,ISOLA ORG�O 144.10 E`E.�um 1 5.5 "' CB-32 l ya 142.52AB IP t436o7 �14a.27. p � Rim-1 � ias.o2 0 _ W � S=o.01 DEED BOOK 13288,PAGE 171 142.75AB 4 RD / PLAN#14266 315 ELM STREET,MARLBOROUGH,MA 01752 43,a5.=1375 DMH 1 0 145 g 2"out=142. o Qy U�,,. PLAN#14150 VOICE(508)460-1111,FAX(508)460-1121 142.38AB L 4 ti", v44in7i6 ANCe4s3 x '0 6.44� n 6 147.0 aa.15 / DNS 3�537.57AB 2 / o _ ,1a3n5�1a. � -- 15"in=144.6 PORT 3 1142.48AB o 1 1P;1 729 / 1143.54AB " (MAP 34,LOT 53) WWW.HAN000KASSOCIATES.COM 142.55 / �qc 3�u'I 142.3 3 u 3,Iq� 9s6 RD / NV.-145.2 BASIN 1.2A �� ��� 5 3 -- - 61 142.05AB \ #1284 OSGOOD STREET �8L•1$ Pi'_ 0 12"out=144.5 DMH-5 1g62L 2 3 -� C / i42.32 ��I Sump-140.8 Rim 149- 6 hdpe, 0C�� t423t -27 5 12°in=143.9 1144.28AB L=180 6"in=146.a 5=0008 6"out-145.1 142 54AB BASIN 1.3 �4>>6 x?>gsQ� 136.41AB 3.47AB 143.6 4� c-8 2\ y�ti. j o t=1 .0 Rim 147.8 0 47.22 n \ SD SD SD14980- SD 5D150405D SDSD 15111 c, SD SD-151.54 �4> „v 147.57 a SD SD _ sG 32 � �, 2"gut=144.0 R 142.4OAB,147.80 149.3 CC 150.12 `0.64 151.41 - / VV 15 o� 42.70AB 144.28A8 4 >4 z Zss \ o 5o kI 138.98AB 2 49.31 -5 o SO PORT la>4g 4.91AB x 49pg x�so� 2"GAS 7 RET WALL 2"hd e, im qx Y - 1 _ �"n 1 142.79AB�4> DMH�7j o\ "D1 e< `t M'A t �� 1 in 1 4. 0 p a >> 4B5 u� \ S m "5 MAINTENANC \ �480 142.00 0' -\kti >147.64 )4s.os IP 1142.85A6 ou=1 0" v D A > a u 'L 143.67AB ati 147.82 SP. RI 1 .4 145.OoAB 51.89 152.88 153.48 12"=142. 150 h. ��`✓ h 4k a1.6 x 147.49 CCBXI I 6"nd e,L=63' -O.Oa ' S m 4.5 ' 9> M en chmork: l o^� 5y ORT S m 4.5 152 fit B 153.34 g� p 13 12 Bo der,•Box CuE ' ✓, c 147.36 BASIN 2.2A MAINTENAN E\ P a 50 0 7g " PORT Log EL=74769 sa AG N^a FL " 147.10 x 147.35 148.00 146.4 vi p 33 t/ �`'� n Rim=145"J 149.34x 150.1 151.00 x151.66 INS.PORT x152,73 cC o \ ^H it �> y 12"out-1 3.5 2"hdpe, BASIN 2.1' = E S �N j a Dl-v y CONTRACTOR \ so J =21' - D B 2 (STORM D AINJ BASIN 2.2D P 144.56AB 6"inv 48.3 sq3 8x6 REDUCERS 9w u 6 0 47.56 P 111 42.35AB M RESPONSIBLE FOR Aso 5 's \ a S=0.01 148.70 Rim 1 8.' ISOLA OR ROW 9 8 3 V Na 46.s 16D.28 INV.148.0 M TRENCHING LIGHT 3 1149.10AB z6 ° rn 1475D> P 1142.83AE ( u=145. SC-7 0) 5p.72 ] POLE CONDUITS �o� J �•R�� H-77 ? z 15"3 M 51.40 EL.44.5 53.35 153.62•hope L-12 S-0.01 \F�15h »Rim=155.9 \ o 43.67 143.36AB 48.43 145.45AB p 52>, o �-3_ 147.38 147.fifi 17-'1� =5� CB_ mine drain Rim-154.5,inv.in-151.6(2),inv.out-148.2 �5? 153.66 4"In=152.7 S 0.029 H-52 NSP. SO TOR OW(1 SC-7 P = Rim 5l_8 � f PROP_HYDRANT&GATE(TYP.) �3 g 9 8"In=150.8 0 DMH 44.02AB �- RD RD RD RD 2 147.60 RD 147.7�' 148.49 149.25 150.37 150.75 = 12"o i=1 as S "' 18"out=150.7 4"GAS \ 1 hdpe, - f' - 152.16 �153.78 � `r¢ � 1 -1 n 48.98 150.0 150.55 - 152.1 1�33.57 M- A -1 2" _ S >.�, ' o 12J`J 10' N.= 4. h e=6 =0 t.t5x P 12 = 8"hdpe, \ i ,X�=0.02 in-1 .6 6"hd e L=9 142.86AB S m=14.8 - 151.48 53.19 )=146.5 ump=144. p Tn 55 =39' m nape LEA �ASLfi G E o °r out GARAGE=0.01 "hdpe'GARAGE `D P l���RAG uvoFncowsmua � N out-iYY �y10 0 45.15AB 51.69 =0.01 6"hd e{{ n 5=0.01 d e L-22'S-0.01 p L=22'5=0.�1 h ss NO.BY APP DATE ISSUE/REVISION DESCRIPTION P ;! 145.5 0 ATOR OW 7 C-40 EL 14 5 ueCB-24$ 0 AT R R W SC 4 48.28AB .0 - _ 8 DI Rim=157.1 DATE: 6 05 2020 DESIGNED BY: -- a F 14 5 145.72 146. •-�146.85 147.D9 147.57 148.65 149.16 150.35 Sump 15k81�--�155.07 x155.18 12'ouf-153.6 SCALE: 1"=20'CHECKED BY: JP `m 148.02 1.99 m 1146.46AB 1150.54AB 147.63 _ BASIN 2.28 S6.00 -14 1 140.47AB 7.71 _ 52.51 _ -- --� i \ DRAWN BY: RD APPROVED BY: JP 'o x 153.18 \MIT 11 a �40. VE BASIN 2.2C 53.70 s \ a o ^ nk� S 155.64 ,r u, 12"hdpe,OTH 14.90 150.53 'n "� �I 76 .a..06, x1.89 x14fi.07 146.O7AB x147.87 148.7 '� 15167x h 5154.61x 1 07 � _ -21 5'I.D.) w Di tRT10 S FROM 24 dp4 L=4' 0.1 NSP,PORT Him=53.9 e, 1153.64AB 15 2?•L 00.02 Rim-157.2 $ in <o - 145.3OAB o6 62AB3SSIN DMH-5 5'� * =148..1 M T = o _ m P - 1146.41AB IP 1 146.45AB ,, IP 1149.03AB BASIN 2.7 - A 212"in-153.5 2 TAB Rim=143. - _ p3 out=148.2 51.28AB �� FINAL_144.37 1 2"in 140 4 145 q."GAS 14 77 wy45.62AB 1 46.69AB 1 p 152.2 153.40 x153.66 "out IR-14615438 i 1 \' X gyp, 15'in=151.5MH-73 149.45 149.91 151.83 -y 152.36 () p u, " 155.33 56.98xJ, 18" ut=151.2 3.90AB 3in 83 Stiry 152.s2 BASIN 2.3 S p=1414.5 "3' A +1`4 rssa's\ s'��' AS-BUILT ° 3.50AB 0" 136A 1J im 145 5 R�1 145.48AB N 152.4D �� 4"GAS EASEMENT 00 c��s'2 \ 2"hdpe \ y 52.s5 STORM GRAIN) o l =13' 5 min 145.68AB �3� -G N 'n t� 155.41 G G 156.57 157. 153.86AB =0.023 ' PLAN 147.51 - v1 149.79 -��� 5D.99 `151.72 152. --153.19 152.73 =153.66 •15.22 154.58 _ 157.15 NSP PC50.40 C-31)EL 45.5= 152.63 a 55.97 55.98 m dpe, CB-3 s� Rim 157.3 (2 OF 4) -- - - MAINTENANCE c RD RD RD-RD RD RD RD RD S=0.01 158 2"o t=153.8 RD M H RD H c c c H Ro ----�------------------® ' � � SD sD SD so ® � MATCH SHEET 2 2°In=140.17 5=0.01 1' RI- \ 9 0 �MATCH SHEET 4 L-22' (2)8"in=151.1 hdpe, m Rim=152.5 4 =0.01 t=51.4'D � 30"in=139.7 �8"hdpe S=0.01 inv.=146 0 30"in-145.6 �x o \\ DWC 20737 Final AB.dw U p a 12"out-151 0 Rim=155.1 L 4 \1 m 30"out-139.2 L=235' BUILDING B D-18 ID-8 D-10 o (2)24"out-145.6 BUILD(N G G ER N 3)8"in=151.0 z r LAYOUT: AB2 Q x (3) "in-146.3 ' EME 0.1 P AB12 - 5=0.01 () Rim=149.6 Rim=149.6 E� '"out=150.9 - -146.2 8"in=146.7 8"In-146.6 �� I, CONNECT INDIVI�AS W+DE SCW T \ j 1 Z DMH-61 _,", 20' n,a149 9 v2 SHEET: 1 OF 4 PROJECT NO.: 20731 L_ ? 1a?o� BASIN 1.1A ��'�9 /� PORT /ati.r2 m T:6 .1-1 r nape, -1 NOTES DMH-68 I/l =0 O' ✓ / �40.29 1136.94AB, 0TO in-1 .6 Rim-140.5 �F '� 8„hd e, 'nary ag xy �� 'tea' l�.y �s ;>'�,,=0.02 out/=r 1. THIS FINAL AS-BUILT PLAN WAS PREPARED IN ACCORDANCE WITH ITEM 87 OF THE 2"in-135.2 �� P /x teary "?s ?F 3"FM 3 h GARAG TO-1 .5 L=103' �A \ d > 42.60 out= . - N077CE OF DECISION-SITE PLAN REVIEW,MUL77 FAMILY HOUSING&REDUCTION/N 24"out(IR)=135.0 et m k��^\� c S=0.0 a5°�x 2xs �A 32 m=140. 32.4 '� 'o�, . 9 lq#0 01 143.53. Proposed PARKING-SPECIAL PERMIT PREPARED BY TOWN OF NORTH ANDOVER OFFICE OF THE 12"out=136.6 4" � Teti-a � 2�9 / +?�CP. s.68 V.-4.4� A7 134.98AB a 5, e 43.74 PLANN/NG DEPARTMENT,DATED DECEMBER 6,2016,AS MODIFIED BY A DECISION OF THE Sump=133.0 un�f for \/ h pe,L=4 V�x� �o `'1. �2 o s3 `� 14 5 PLANNING BOARD DATED✓ANUARY 23,2018. e / r BASIN 1.2A q LDI retains I / =0.01 \ .90 �,? � �A x 3a g I=144. I 140. 2. THIS PLAN DEPICTS'FINAL TOPOGRAPHY,BUILDING AND GARAGE STRUCTURES,CURBING, Fj 2�P�40. PARKING SPACES,UT7LITlES,&DRAINAGE STRUCTURES INCLUDING INVERT ELEVATIONS. c 2 2 a�� 2 3.7: N OFF E Mixed Use ( J DMk133.27 34. INSP Qi'�� a'U'L '�817 °� 144.06, xt.89 34.3 . , s� 9 2"GAS HE ITO S FROM ALL AS INFORMATION BASED ON AN ON-THE-GROUND SURVEY BY HANCOCK Rim-141.2 n FT ati' ° / l r vii T _ ASSOCIATES BETWEEN✓UIVE 2018 AND MAY 2020. CERTAIN SUBSURFACE ��� H") 12"in-13/j.4��'3 a 2° P RT c 1423j% 8"44utb 137.0 0 a� f SSSIN ) 5 ^ fff R 143.62AB DMH-5 5' De"elOy�Y11ey�+ INFRASTRUCTURE INFORMA770N IS PROVIDED BY DIAZ CONSTRUCTION SHOWN/N RED. S`` t3t.8 G Yc� t4t.24 fi 2 t42.t3 Development �1111 11L ( J 6 24"ou IR=1 -g w d1140.27A8 Rim=143. 3 PARKING COUNT.'PERM/T SITE PLAN DEPICTS 392 PARKING STALLS(EXCLUDING 12" ut-I35.0 4'3 rt �"1 J F 41.23 °1 aV° �30" to m�1 -144'37 12"in 1404 G' •. 142.29 x P a '� GARAGES AND LOADING AREASJ.FINAL AS-BUILT PLAN DEPICTS 394 PARKING STALLS x133.4 5 p=133 A z' F t41-32 � o v ox ^`°J�/`_ a R 143.90AB 30"in 8.3 34.9x BASIN 1.18 h P y:Jg3-4 PLUS 4 STALLS TO BE STRIPED AS A LOADING AREA FOR COMMERCIAL DEVELOPMENT / 134.a, ay' N T E� awe 139.50AB 0" 136,9 R 141.08AB s 2 S-0.01 419\ / 137.87AB 12»In=1"6. 35.4 TA 141.53 I 1 5 • �S N 141,16 6°D G�' -3144.14 qj a LEGEND&ABBREVIA TIONS ° •� =136.1 ro 2"out=135.5 2 ° 12" AS-BUILT PARK/NG COUNT/N ACCORDANCE / -135.3 x135.4 35.5 \s -69dP' F DMH-56 S=0.02 ary�� CB 44.38 9 p� Route 125(Osgood Street 20 W7TH PERMIT SITE PLAN x135.5 *v out-135. -s m=140A Rim- 8 • me rate w h A=0 �. o h Rn RD- NOTtIl Andover,NlaSS1C11USettS PARKING COUNT REVISION.' O / L W� '�a apron' Jq)7 �! v o 0 05 p„�o 3°'FM n0 _out i J.� M- • 134.6x x135.4 P )�,^f�FL�s� Q MATCHSHEETI, PERMIT SITE PLAN->AS-BUILT PLAN x DH(FD) ?s�133 t j c 41 ® o m I /' 6 2"in-140.17 137.2x 135.8 'I S �'T F �j a'L 0 6'> �� l � AB AS-BUILT EST ES77MATED H J ANDS LLC 15"h -60'S-0.01 I7Ss \o MATCHSHEET 3 ti O T\ i l a o' 12"hdpe, �` PREPARED FOFt ' / 1 131'in-139.7 CB CATCH BASIN FM FORCE MAIN •x134.7 15 .=1 TOP 14"PVC W o 60 "oQ 4"GAS CO CLEANOUT INV INVERT ZH�GAO Ll / A1356J7 4 x13s.3 15 Ind 5.5 � 3s.6 �40 141 oR 06COi � �� 30"out=139.2 DI DUC77LE IRON S SLOPE AN Y WU 12"14°' 37 5 Air 90 �dp aL'ok a5' Q' 45 ( ) DEED BOOK 13422,PAGE 15 s1.sD 'J L=2 �� R' 8 o a The NRP WATER LINE SMH SEWER MANHOLE 8n h L=44' & Ai v �.?p P DMH GRAIN MANHOLE (MAP 35,LOT 10) 1343x 136.5x 2, \4p06 10\ 14 JS-0 a1 3p� ry ��'I 5.26 #1250 OSGOOD STREET // INV.�1 t3. a/ a`� 1.5 SERVICE e h 14is� h�� Group \�I l i 135.5 0 14.75 '`a bLL .. c. h j I GRAPHIC SCALE: 1 INCH=20 FEET / 34.5 3s.2 A Pe' fao ,R 141.01AB m�( 6 0 10 40 13g e u0.99AB20 C 14..1 a?/ R 145.76AIE l / C „hdP_VDT 'o''v�2B 1a ti ati o 1 140.86AE �I '�27460 \-11 5 g m.��9,� �aa�0 1 ,moo./o�v ^o ( Inv.-14.6 M SERVt 2'ObuR7 X1 rn 141.17 lay.a��R 140.84AB aQ C• z 8"D DMH-34 1�1 x133.a• a6°tN_T9, 45s1 137.71AB ts(M) Q rc J r)h� 10 RR 135.9 L \\CV ATV R 145.97AEi S=0.013(P) o �' J o fin-140.8 .85 135.E mo 'r \ BENCHMARK.' > a • o 1142 02AB =w ur a1.9 5309 Transportation Boulevard / CLUBHOUSE 45 1"� HYD,'FRONT/LEFTBOMO px134.8sEE P2uMeIN� 4 h J " Cleveland,OH 44125 / M p c PVCRi 46.2 5=0.13 c S EL 0 30"o=1 0. PLAN FOR POOL nt rah- r TOP 4"cPP 8'�ooSFU m= 5 a re In II 135.5 13B6 LOCA ION OF S �_ NE7 out=I42.3 r CD EQUIPMCx13�1 [Dw(EX) 9� 135.s DOWNSPOUTS TYP.)SEE ARCH IN B H 3==FM G ,� I <y12"out-i 7 F D ° ' v PLANS FOR E ACT LOCA 0 0 1`DIRECTI141., o 0 o X 6" �RVO I�,,/ �• IN_= s Q o_ ME 1ZE GASO��>4,.05 c e7 e"TEE HANCO CK Q\5 0( r9e,DD �p 6 cRosslNG 6,,.�pl w w w \ 21 SLOPE 34.5 5= NV.148.1 0"hdpe w •° �9 47 f T ASSOCIATES SEE DETAI a 0 � 0 $ C nn� \5 ALIx5o0 g• co / 4'GAS �s L 39 ��� W \r 0 STABILIZATION 134.7x 2"GAS SsS 0.01E v�62y. �P, \ \dli / 133.8x �6'� ��S�P1�h/IH9 � av^. Q 7 m-_ -+•F8 G 5 `, g M=1 �, B Rim=1 48.77 14 3ry %� 147.62 8„i =1466 6 t36.8 OF R-s0.81 a !' o -1 6.97 Civil Engineers ° \�. IJ,qy"INv o,o. G E 19 - 1 P�OV.IH1 01 g • 736.s tib qg T=1Lg-5�70 V' )MI-18,d - E M£NT 1 / 134.3x w21' E 0 ha n P (ACCESS, ARKING&U ITYJ3 / 136.2x x,38.s p w R 146.1 CAB `� -22 148,7 x1 6.ss Land Surveyors 134.6x •. R 149.34AB e „a�':� F e 142.77AB o 5=0.02 m1 to 6 44.77 / 3Q.62AB 5 o_a R 146.43AB ao -1 VdpUL 5\ o CB-9 8.4 135.4 �• 138.4 s O TR Po � qg8 r Rw. ��. •o�-PQ 47.5 j o ' 0 149 2°out- EVE Wetland Scientists 6„hdpe /` rn 4°°GAS 26 1. m 1142.35A '�147.1\52. 148.40 x\51\ t39.9x 146.3x147s02 DIRE'u� FRO t -45'S=0.03 136.2 \5� 147.7 � \ () °Y x 136.5 T 49 5=0. M j CRO ING - / x13s.2 a7.zx \ 21 G 51. EE s=D.D,')o 1 139.1 150.5 150' �.°49. \ C cn °� `J EASEMENT 13s.sx 1s' \ ;fit �\y��s'\ 4. 2' 14a.7a n 3„FM A ^oA. _1 G ^d G Note-, x137.0 150.7 o 00 \o c'Ov�,.-\49• ''�y 1 o x148. h P 1k 6 1 147.36 148.63 1 ° (DRAIN) q x 139.3 o E _ 139• 147.2x '� 2c�g51 ^� o c (-0.0•�15M 12� F _44.8 315 ELM STREET,MARLBOROUGH,MA 01752 / • \3e7 xso w 4s.27 s.6P o°°p 144.77AB ss 5` HEA�G JALL 145.9x s%o\ n1' _ Vc VOICE 508 460-1111,FAX 508 460-1121 •• 140.7 \x t 15 \go39 \6CD- o 31 q %o-G > - - - WWW HANCOCKASSOCIATES.COM z 141.1x p\ 146.2x \Z , „ y a tiao ^ ��,147.31 x 140.7 x 150' • /.(\1 142.2� \5\•9\ ,���j* 1 CP _24"CP_P S=0.013(M) 147.85� ^a ETC E L- PM5'dla I W �a'` - 7 7. .N 9, 5=0.01 P ) ETG N u �1 E WATER 64 A CB-6 B ED cn x146.3 \� S �. \4 _ () L �R� N 1-1 I Q , N 's '�l x\5 BASIN 25 �p It3� � �s=v(M) Rim=148.0 STUB FOR�P2H��K`-1� O w aV AS SD♦- 522 OGP o /=i () o /�S B FOR PHA 43 • D_ \ 4 \5 OA2P P PpE 12"out=1444� E ro 5°06 i�=1 146.37AB Z 8"HDPE SD.�.;_5�,4 \5\6 P5N G j6 I J� �O� I - •146 fl 1 9 145.7 �\ 9 `fix 150' R 149.31 AB ���\ /E �"� S=D.D1B "CP � D( N6�FORE PHA ETT�R1�4420 6"PVC Q ou y42.1x h %B 3 3 1$152.3 OS� \5\" 15 Q -O 12"CPP P-- I apron) 6 xa�. x \�' x\51' 6' p6 7 PROp / \ &"DI R 147.75AB E�� 1 o min Kati' \/\52' Sti' 62 p3 A S 2 \5019 �� 46.44AB Q� / a =146.0 a jc 44.08AB (M) z' O W • it x\5� Y 'Ss \5`L \\\ h O'er \ � E N S=DB01(P) a ver 3.3'+ GT c \53' \5ti' hdpe, ory 10 P P S H 4 e» E I 2"RD INV=146.3 •O •° a x \55°15 S 5\�3/. L=15'S= �o 00 -149.6 () °� () sETt �- o \5ti Q ti\ / 12"C o C S=0.009M 5=0.032M g"INV-144.57 m �` 2 S=0.020 M `'3"INV IN- 5.5(\DROP) 5=001(P) 12 PP s=o.D1(P) er cu 0 5 ° N 11 _47 0 - �L- INV IN=14.70 �H-15 9ov< INV IN=14`4.31 W 3 Y x x`hJ o B .=144 Rim=148.6 FF=753.0' ~ • •�nVB o J "� E 8"INV OUT=1 4%LB-� BUILDING PAD � �( ' 2"in=143.9 fn W w m a �� y'� �o� 6�M / '4�n=143.2 5O.2OAB F[.�52D' �` 1� I x5 ^ O WAFTER --STUB WATERUN E 24"our-43 1 ••� -•• r� FOR PHASF 'a N Z TO ��,� CL- / \�� o l�o U y SS-d _ 1-150.6 dpe / NV 144.22AB ° ° L=33 ` I o h o o N ® '5=0.04 Q Q 6" o • Q� 7 58'5=0.01 4xc y V INV.-150.2±(STUB o 2 S$r (PUB FOR PHASE 2) INV_=4/.O5 of oCMI FOR PHASE 2) o 1 ., M U I J ^a 1 } o 0 I a� C • EXIS77NG JO'WIDE DRAIN EASEMENT Y / I I "� EASEMENT�4A BOOK 954,PAGE 71 F, NO.BY APP DATE ISSUE/REVISION REVISION DESCRIPTION 3 PLAN//4446 EL c / I ^ 8"DI VA LT FF=151.5' (SEWER) -- o ^ C� E BUILDING PAD DATE: 6 05 2020 IDESIGNED BY: o` ° Ids 1. � I F / PROP BMCbK75' SCALE: 1"=20'CHECKED BY: JP 6"INV IN- DRAWN BY: RD APPROVED BY: JP �o CONC PAD n clip ZN F -148AO o Y 4n w \ ® ® Q WI7R AS B ITT LOCATION S H1A 8" LDI I E *(Inside Drop) CL SS 52 8"INV IN=143.87 48.23AB PROP.RIM=156.2 m 12"PVC EVE A o MJ F THINGS(typ.) OFT IN 8"INV OUT=143.84 �I��� 2 8"INV IN=141.92 DIRECTIONS T "in"'0UT=1 1.89 M e m AREA F POWER CROSSING F D Ln (DEED�OOK LINE N3792, h \ 6�,L=10',S=0.02 / `�I,�, S 007p(M N V-148 3t o o�1 AS SMH c PAGE 3s�- 6}2 1142.61AB STUB / = I��1 (pj I� 143.36AB N I cp y\- SLEEVE FOR PHASE 2, P PLAN ,2.5 _ ITT 5 E s`o2co � o .68 --✓ _ s=o.aos(M) a"Pvc DIRECTIONS FROM �° E ° .58 BPVO -5=0.006(P)- 86 L=140' CROSSING E E�E��g1�y�PROP HYDRANT&GATE TYP T Ia ^ _ r 0 BE o,�o / I� C A\ rn SMH DOGHOUSE - __ e - S A2LEpE� EHCNA F / Iii o o� (17 Or�FJ - -- 1141A6AB ADDED SMH 0004i 8=.0058A8 - - "D 2=132', =n nn E�E�Erc 1; o )ap jf 141.36AB c� -- 8"P D S=o.Do4pM- E E > .o r S� 141.77A8 _ ( DIAZ IN -ETC I-SM r \ ��00,,��ppgg pp-_. S StiUC4(K E� E ETC-ETC-ETc ET S F -E E E E o 141.0 132.61' 3 _�- -- - E � 4 pvc s ,DUD ��_e Ems'E 1143.33AB DWG:20731 Final AB.dwg ETC E -- -------------- EA SEMEN T148 �PROPOSED - 251.13'S21'00'29"W L ETC -- ® AB3 LAYOUT: AB3 / SHEET: 3 OF 4 -------°y�`--(SEWER) 8"CLDI WATER MAIN I Fxicrinlr T ,., _ .-F T o [PROJECT NO.: 20731 x 14tl.06 i4y.1a 1 i Sum 14S_5 154.81 155.0/ x155.18 \ 14 s 145.72 146. 14fi.85 147.09 147.s7 146.02 1.99 p= 1 146.46AB 150.54AB -144 1 140.47AB 147.63 BASIN 22B �ss.o0 V E 1 7.71 = 152.51 x 153.18 = - e.� ri� 0. BASIN 2.2C 153.70 F5 \ `s\ 1N OTH 14.90 150.53 'o n�11{76 S 155.64 !✓ p, 12"hdpe, 146.07AB xlssaz I \MITProposed 144.D6, x1.89 x146.07 x1 7.87 146.7 151.87x h 53.98 -21(5'M) DiKt T10 S FROM 24 dpe�,L=4' 0.1 NSP.PORT Kim=539 154.61x 1.07 e, 1 153.64AB 15 Z��L-002 Kim AD DSSIN DMH-5 5' v - 45.30AB '°6 n=148.�- _ � m - IP 1 146.41AB IF 1146.45AB 'n IP 1149.03AB M i. BASIN 2.7 h � 212"in=153.5\ AS Rim=143 n out=148.2 =.0 144.37 1 145.62AB 1146.69AB 152.2 = x153.8s j„ 1.,1.28AB O. --� 12»In 140 4 145 4"GAS 1.7 1.0 153.40 154.36 // 1 X X t� 15"in=151.5 Mixed Use C MH-73 �149.45 try 91 151.83 -y 152.36 out(IIR(=146 P Uti7 155.33 156.31 156.98 / s� �I 18" ut=151.2 Mlxe v se .90AB 30"in 8.3 m= / 5tiry 52.s2 BASIN 2.3 S»p-1444.5 Ti 3 iS�6Bis 1� \i 50AB 0' 136.9 15 4� 45.48AB 152.40 1� 4"GAS EASEMENT o 00 �s 2 ' 12"hdpe \ "=1455 15295 S TORM DRAIN) o =13' Development c - 5 °� - 145.68AB G c I 153.86AB =0.023 14.7 147.51 m 149.79-- � � _� � 50.99 151.72 152. -153.19,152.73 =153.66 154.22 154.58 G -G N -sue 155.41 G G 156.57 157.,,, / 1.9 - 157.15 15040 Ju -C-31 EL.45.5f 152.fi3 "1 � 0 155.97 155.98 1"hdpe, TEI:-153,8 01157,3 \ INSP.PG, �` \ MAINTENANCE c - S-0.01 _ M4TCHSHEET2 1 Ro Ro Ro Ro MA7-CHSHEET2 ise R m T SD so So So ® \ \� - - ---- M d � RI_ sew ti 12"m=140.17 i L=2� S=o.01 Rim=152.5 4 s Route 125(Osgood Street) MATCH SHEET 4 MATCH SHEET 4 12)o-15101 ha 30"In=139.7 =146. 30"in=145.6 / Rim=155.1 p \x m \ North Andover,Massachusetts o i 8"hdpe, D-18 5=0.01 0 0 2"out=151 0 -4 30"out=139.2 L=235' BUILDING D-8 D-10 0 2)24"out=145.6 3)8"in=151.0 I L x oo� 8"in-146.3 Rim-149.6 Rim-149.6 BUILDING N G G / SEMENT," �' 5 U.1 ;y. `m P S=GD1 ER EA oui=150.9 12"out=146.2 8"in-146.7 8"in=146.6 m DMH-61 CONNECT INDIVIDeA GAS � 20 W,DE SEW49 Z N v 6"INV OUT-146.10 / SERV ICE�CLOSETS ON Ex1S71NG 4 2 8"out=146.6 8"in=146.1 o Rim=1522 pCPN RE`ucA7Eo) PREPARED FOR L=83',S=0-006 / PATIOS TYP 70 BE / S 02\ or \ CONNECT 8"out=146.0 � 8"in=145.8 ( ( � `� y (SERVICE LATERAL) DIVIDUAL GAS F AS PI ANS D BUILDING 24"m=145.5 BUIL NG�C i D-2 159 < Do \ CONTRACTOR (UNDER CONSTRUCTION RVICES TO 8,.hd e, ID10 1 12"out(NO-145.5 (UNDER CONS7RUC770N) / Rim-Ib4.9 \ A z�OSE(T ON P 6"INV 0U=,4D 4 = The NRP m� RESPONSIBLE FOR Rim=149.6 ® 18'out=146.5 8"in=151.9 -- 43 \ ID-12 PATIOS(TYP.) L-50 CONTRACTOR L=77 S- 1 159., 8"DI O W TRENCHING LIGHT Rim=149-7 5=0.01 8'IN=147.1 Sump-143.5 �� 8"oui=151.8 �15949� m �W SEE GAS PLANS a RESPONSIBLE FOR Inv-14 6 POLE CONDUITS TRENCHING HT ( � -5 / 60 6'In=148.2 8"out=147.0 � Inv.=153.2 SE LATERALID Inv=148.6 8'out=148.2 m POL �6N 1 S o 0 1 8�CLDI Group 2"PVC SLEEVE m Rim=154.9 Ut o 10FT IN BOTH o m E .,,cn DMH-41 6 in=1528 m DMH-34 6"hd e, 0-7 0 6"hd e, / CLASS 52 p DIRECTIONS FROM o Rim=153.9 p 8'out=152.8 K m `' 1 145.85 =50' Rim=149.7 a o L=57' SEWER SERVICE m MJ TTING� CROSSING m D-6 0 5"in=148.5 5=0.007 49.E EST 8"X 6"TEE m- =141.9 S 8 8"in=147.8 Rim=149. 8"in=146.2 ( } m y / SEWER SERVICE i ro HUTOFF o 0 0"a 1�0. 1147.7{EST} / 4.7 TO F8;In=147. 30"in-]45.2in- q p A VE o �s qq V 8 c qq t8„hdpe,L=12 ----L--T----I--------------- --- ---- RD Rb -- RD --,r e„oI D- 530 and B ab 6b 4 ® \ q F 9 Transportation Boulevard C F TEE 8"X 6"TEE 8"X 6"TEE 8„D1 G I46.15AB STUB 149.53AB ( 7 -154. X �P Cleveland,OH 44125 w w w w w w w W w w e, w w w w w w w r Q?oZ 149.38 E E E150.45 s 150.51 _1 .1.88 .05 WATER LINE IN ER DIAZ(TYP) 158.91 159.24 16.12 52.1 �, 'so 151.57 1.98 153.71 =3 U ETc F E E E E E a CB-1 S �Q SMH7 5 4 - 0 OSE 6"inv N1 5 I oy sF GAS E Ft ETC QpIYP a� 6"PGPC P 8 CLDI V MAINT. 4 6� f DMH-2� yc� HANCO�� N V 7 ca5c �12"h PORT o_ s Ple 2"a 49 l� = L_ G 3 G G G G 12"in-15 G G G G G G G 8 CRJ'in = � � G G b5 D BAS LOCA ION t \ � in=159.8 2 Rim=1 48.77 149.02 ) 0.12� 150.30 151.49 151.76 , 152.78 153.35 ro�=00154.57 hdpe=160 156.42 156.8 158.53 160.0 160�1 12 hh 2 hdpe, 8" IN=1 -xi F-9 P H i DMH-10 pR p HYDRANT 2"In=1554 ASSOCIATES _kfG' Ef t5'B1 2"GAS STUB(OLD) ' 2' BASIN 2.6 e -0 5'I D. h 2 �h b ��a 15"out=155.1 `NT / 146.97AB 147.80AB _ - RI 7 0 i BENC MAR 0ti im=3.3 h rn 6" i1 'ING&U ITY)2 7 �� DMH-35 a-0.008 h --C�153.zs DMH-410 149.89AB AREA=404,926±S.F.�95 B±AC.)IP 154.O6AB H D, ONEE BOM24"in=147.8 _ �a��3.17 x1.96 x149.66 < < 150.28x 15100 DMH-35 x151.73 152.49 1=146.7'(DIAZ) `n x154.26 155.9x x1 1J.ai _ ( x159.67 ELEVATION=�63.4�INV 155.35AB 151.49 152.91x INV 160.11 AB B 44 77 Rim=151.,' 2"In=149.0 lro MIN. x1 8.93 ^�A \ 724. 7g QQ P 148.74AB 6 qA - 149.94AB _ �! _ =0.012(M S-0.02 g Civil Engineers S^a^ a� 12"PVC SLEEVE G 12 hd e 153.4 o% DMH-1D 160.74 �-2 CPP ,M D _EVE N1641'p0"E7.6 xti p =1 .25 h 10 In=149.3 BASIN 24 h 62 c =0.02(P 2146.40 149.22T IN B TH 150.458�'out=147.1 151.25 _ 151.98 152.91 153.44-13 154.05 1 -,154;98 1 5.89 157 5 58.22 159.69 _ ) Q L-1 5=0.02 6 PRO OSED ASIN L CATON ® 2� �-1 6174 ry�\� Land Surveyors bN FRO ECTI NS F OM \ 1� -4 EASEMENT Rim=1 3. 0 147.8 � S Q 11 147.69AB $ 2"ou=1 9. 7483 est JG ROS ING \ Rim=1 (ACCESS,PARKING&UTILITY)M INT. 10"hdpe, 1a e \ 45.62AB 5=0.1 0 G G G G G G A PM � °"PUN f"i49 5 ee-17 Wetland Scientists N V 2 -C' S S S WATER "7' 6 �148.63 149.41 150.81 15144 S 152.12 �152.92 S rn�153.86 154.04 1.11 'pV 5=0.0 M 156.20 157.04 157.10 158.48 159.63 �_\ �} Y \"' Rim=163.6 s8 S S=0.009N) _ B 4 6"S=0.20 NV.=151.45 STUS=0.01(P)PH ) 57.08 INV.=154.78 vl// 12"out=16 ss ss &TO 8 S-0.009 8 Pv 5=0.009(P) C 16___ ss g;PVC_ 5=0.0o3(M) D - n 148.51AB -1477 =14 NSest CB-16 - _ s=o.006(P1 C ETc Tc x -449 MT 2"RIGID INSU ATI N E S '\63 Ou*160.1 E NV.=155.0 PM AS REQUIRED) m 2"PVC SLEEVE 6"INV OUT=154.2 STUB Tq pTER 2"h oLE,SET 10FT IN BOTH FOR PHASE 2 c 315 ELM STREET,MARLBOROUGH,MA 01752 n T� WATER V 1 147.62AB L=10',S-0.02 2"hd e 0 \ L=12'^ Erc STUB FOR PHASE DI CHOPS FROM 1146.73AB p, ( ) ( ) =145.15es SERVICE LATERAL STUB N6 z VOICE 508 460-1111,FAX 508 460-1121 q E If GT top 148_65 max CROSSING C 24"hdpe L=182'5=0.008 L=44' n 0 S-0.02 m � FOR PHASE FF=162.5' ® �s �, www.HANcocKAssoclATEs.coM -I 146.37AB 18"tap to outlet nv 6"INV-154.3 S-0.027 0 IT J n outlet Inv=147.15 max I,,pp��V- 9.5 I-15ZD hF--161'D� BUILDING PAD 6'PVC m SET TO 145.5 PROP SMH6(5 0Z STUB WATERLINE STUB WATEYCLIN / L=10',5=0 02 BUILDING PAD EL.161.5, �6� x N In 4 e 1a5.65 RIM=150.6 FOR PHASE 2 FOR PHASE 2 (SERVICEfFA7TEIr59.9'UB EL 160.0' CB-15 =146o Z 6"INV IN-145.60 FOR PHA a er 33'+ GT tow 14a.es m w ��LD?acPAO R1m=160.7 A s"t p to inlet pv 6"INV IN-148.1 -146.55 EL.158.0' inlet v 147.4 max 15"out=157.2 ,60 °' \ 8"INV IN=145.65 o SET TO 145.75 m GT to 47.0 FF=1 D'INV OUT=145.57 grade 1 0± �1 BUILDING P 6„INV OUT-148.6 FF=NO156.PAD' h £L.154.0 BUILDING PAD L lu L=12',S=0.02 EL.J55.0" n> W W (SERVICE LATERAL �''f w �171 \ yslue FOR PHASE 2) w CONNECT To V NV.=148.3f MAIN VF \ EXISTING GAS h h w EASEMENT I3 - �' (ACCESS&UTILITY) 1 173.56 3 }\ O I 4 /� O DMH 13 1 Rim=156.1 CB-1 / / / ° ® / 5 In=149.75 NO.BY APP DATE ISSUE/REVISION DESCRIPTION •3 ® E j Rim=159.1 / 12 In=154.2 Out-155.6 -' DATE: 6 05=20'DESIGNED Y: -- a 4 Ezc � 12 In=152.5 ______ �� SCALE: 1"=20'CHECKED BY: JP /0 "CPP 5=0.012M / DRAWN BY: RD APPROVED BY: JP �o 24' out=149.25 s=D--oicM _ 01 V G 2,/ D B ---- 12:,hdpe, _ 44 `o -1544 a_ LOT 1 S=l _ FINAL FG E'�15 out-] Q 012(M') 5-0.133(M)_ I AI�195,726±S.F.(4.4 S-0' S^cPir 12"hdpe, s=o.oz(P)�6.1 __ �p Ell � /E 1 J p 01 U�e L-1 i J L-5 12-OUt=1 -- GRAPHIC SCALE: 1 INCH=20 FEET AS-BUILT S=0.02 0 10 20 40 BO ^�+ �+v y s=o.o2 _ -- LEGEND &ABBREVIATIONS NOTES PLAN IN ET E� _ -- - 1. THIS FINAL AS-BUILT PLAN WAS PREPARED IN ACCORDANCE WITH ITEM 87 OF THE -E- -- -- ® 2� AS-BUIL T PARKING COUNT IN ACCORDANCE NOTICE OF DECISION-SITE PLAN REVIEW.MULTI TI FAMIL Y HOUSING&REDUCTION/N (4 OF 4) w 4,P WITH PERMIT SITE PLAN PARKING-SPECIAL PERMIT.PREPARED BY TOWN OF NORTH ANDOVER OFFICE OF THE 7, p=23�'�� _-- PLANNING DEPARTMENT,DATED DECEMBER 6,2016,AS MODIFIED BY A DECISION OF THE o ® ® Ls813'4f R=1�'00' -------- 17 1 PARKING COUNT REWSION• PLANNING BOARD DATED✓ANUARY 25,,2018. PERMIT SITE PLAN->AS-BUILT PLAN 2. THIS PLAN DEPICTS FINAL TOPOGRAPHY,BUILDING AND GARAGE STRUCTURES,CURBING, o PARKING SPACES,UTILl77ES,&DRAINAGE STRUCTURES(INCLUDING INVERT ELEVA770NS). " AS AS-BUILT EST ESTIMATED DWG:20731 Final AB.dwg ALL AS-BUILT INFORMA170N BASED ON AN ON-THE-GROUND SURVEY BY HANCOCK CB CATCH BASIN FM FORCE MAIN ASSOCIATES BETWEEN✓UNE 2018 AND MAY 2020 CERTAIN SUBSURFACE LAYOUT: A34 ----- CO CLEANOUT INV INVERT INFRA S77RUC7URE INFORMA77ON IS PROVIDED BY DIAZ CONSTRUCTION(SHOWN/N RED). Q ------ DI DUCTILE IRON S SLOPE 3. PARKING COUNT PERMIT SITE PLAN DEPICTS 392 PARKING STALLS(EXCLUDING (WATER L/NE) SMH SAB4 EWER MANHOLE SHEET: 4 OF 4 ------- � GARAGES AND LOADING AREAS).FINAL AS-BUILT PLAN DEPICTS 394 PARKING STALL DMH DRAIN MANHOLE PLUS 4 STALLS TO BE STRIPED AS A LOADING AREA FOR COMMERCIAL DEVELOPMENT. PROJECT NO.: 20731