Loading...
HomeMy WebLinkAbout164 Bridges Lane - NACC# 369 Small Project Approval - Permits #NACC #369 - 164 BRIDGES LANE 6/10/2026 CONSERVATION DEPARTMENT Community & Economic Development Division Paul DeLuca June 15, 2026 164 Bridges Lane North Andover, MA 01845 164 Bridges Lane, North Andover Small Project Permit In-Kind Deck Replacement Conservation Conditions of Approval, NACC #369 Pursuant to section 4.4.2 (B) of the North Andover Wetlands Protection Regulations,Paul DeLuca, property owner, filed for a Small Project Permit for work proposed at 164 Bridges Lane, North Andover. Work involves the in-bind replacement of old boards, railings,posts and footings of an existing deck. The existing 4"x4"posts and 8" concrete footings shall be removed and replaced with 6"x6" posts and 12" diameter sonotube footings at 48" depth. The footing of the post closest to the Bordering Vegetated Wetland shall be replaced with a diamond pier footing to reduce ground disturbance, as it is 48" from BVW. All work shall be located within an existing gravel area enclosed by pressure treated timbers. Work shall be done by hand, and no dumpster shall be necessary. All work shall take place within the 100-foot Buffer Zone,with the closest point of work consisting of previously mentioned diamond pier footing, at —48' from BVW,with all other work outside of the 50-foot No Build Zone. During the June 10, 2026 public meeting the North Andover Conservation Commission voted to approve this as a Small Plj2 ec� t Categoiy `B"In kitad lalacemerat ol'La)),,rlly ea�decks, ieXgr Iles o[si� The project is approved only as it relates to the Conservation Commission and any a� nd (if applicable) all other approvals should be obtained by the applicant/homeowner. The applicant is responsible for determining properor boundaries.All work shall conform to the following: RECORD DOCUMENTS: Small Project Filing Including: Application Checklist & Project Narrative, Aerial GIS Map showing Measurements to wetland The following conditions are hereby mandated: CONDITIONS: Paul DeLuca Small Project Approval at 164 Bridges Lane,NACC#369 June 15,2026 Page 1 of 2 1. A pre-work site inspection shall be scheduled with the Conservation Department and the contractor to review project scope. 2. A post-work site inspection shall be scheduled with the Conservation Department to verify compliance. 3. This permit shall expire one year from the date of issuance. **The applicant, homeowner and their contractors are advised that NO other work on the property is allowed under this permit. The NACC has jurisdiction over all of the wetlands and associated 100-Foot buffer cones and 200 Riverfront Area to the Shawsheen River on site and any work that involves ground disturbance or changing the current conditions in these areas Nvill require permitting with the NACC.This includes,but are not limited to,house additions pools, patios,decks, sheds, fences,garden beds,landscaping and bridge installation,tree or vegetation cutting;/pruning.These activities shall be held to the current standards under the Bylaw and W13A.** Should you have any questions, or need additional information please do not hesitate to contact the Conservation Department through emailing mA?x4cr@no;thandoverma..gov or alangevin a northa doves goy or by phone at (978)-688-9530. Respectfully, NORTH ANDOVER CONSERVATION DEPARTMENT (41- '` Alexyss Langevin Conservation Field Inspector& Planner Paul DeLuca Small Project Approval at 164 Bridges Lane,NACC#369 June 15,2026 Page 2 of 2