HomeMy WebLinkAbout07/07/2023 - Temporary Certificate of Occupancy - - 1450 Osgood Street AIVEiA /V Technical Excelllen�ce Practical Experience Client Responsiveness July 7, 2023 Jean Enright, Planning Director Town of North Andover 120 Main Street North Andover, MA 01845 Re: Request for Temporary Certificate of Occupancy 1450 Osgood Street (Lot B) North Andover, MA Langan Project No.: 140182705 Dear Jean: On behalf of Hillwood Enterprises, L.P., we respectfully submit this letter in support of a temporary certificate of occupancy for 1450 Osgood Street in North Andover for the office block. The office block will be used by Amazon construction management staff and vendors as construction in the interior of the building is continuing. The construction of the sitework on Lot B, including the parking areas, landscaping, lighting, utilities and stormwater management are all substantially complete. The site has been constructed in substantial compliance with the plans referenced in the Notice of Decision (Modification) with the following exceptions: 1. Planting of the wet pond at the south side of the site (A-2 wet pond) and seeding round the pond is ongoing and should be completed this month. 2. Pavement markings are being completed this month. Pavement markings for the 44 parking spaces in the southernmost parking lot will not be completed now pending a decision on whether that area will be utilized for a MVRTA bus stop. 3. Minor modifications to the north guardhouse are ongoing and should be completed this month. 4. Minor punchlist items related to pavement repairs, bollards and signage, drainage, utilities, planting and lighting are being addressed this month. 5. Installation of the four (4) monument signs on Osgood Street approved as part of the Sign Master Plan Special Permit is in progress and expected to be completed by the end of July. Additionally, and in accordance with Special Condition #49 of the Notice of Decision, attached is the emergency readiness plan for 1450 Osgood Street. 100 Cambridge Street, Suite 13,10 Boston, MA 02114 T 1 . 24* 1 � 617.824.9101 www.Ia n gan.c orn Jersey rk*Connecticut* adchuutt IPennsylvanja Washington, DC* I�� ��Ilu� r�* -N � I� M Arizona N�� 0 WashingtonCalifornia 0 � ,N itorn i Athens 0 Calgary#Dubai 6 London a Panama Request for Temporary Certificate of Occupancy July 7, 2023 1450 Osgood Street(Lot B) Page 2 of 2 North Andover, MA Langan Project No.: 140182705 Please let me know if you have any questions or if you require any additional information. Sincerely, Langan Engineering and Environmental Services, Inc. W Frank Holmes, PE Executive Associate cc : Mac Utsey, Hillwood \\Iangan.com\data\NHV\data7\140182701\Project Data\Correspon den ce\Lette rs\J ea n Enright-2023-07-07-Lot B TCO.docx LA/V&A/V Emergency Readiness Plan For Sewer Pump Station BOS3 Fulfillment Center c/o HIP Transaction Services, LLC 1450 Osgood Street, North Andover, MA Primary Contact Information Name: Mac Utsey Cell Phone: 843-276-6053 Email: mac.utsey@hillwood.com Secondary Contact Information Name: Adam Kedich Cell Phone: 313-732-5353 Email: adam.kedich@hillwood.com Pertinent Information 1. The pump station is designed to avoid interruptions in service with the following provisions: • Redundant (duplex) pumps — pumps alternate with each pump cycle. In the event of a pump failure, an alarm is triggered and building operation personnel are notified so that the failed pump can be serviced, repaired or replaced. Until the failed pump is serviced, repaired or replaced, the second pump will keep the facility in service. • Emergency generator— in the event of a power failure, the pump station will remain operational, powered by the emergency generator. 2. Procedures if pump station is inoperable: • In the event the pump station is inoperable (both pumps fail, a power interruption and emergency generator failure, a failure in the sewer force main on site, or any other issue preventing operation of the pump station), a high water alarm is triggered and building operation personnel are notified through the Building Management System. • In a case where the high water alarm is triggered and the pump station is determined to be inoperable, building maintenance personnel shall monitor the level of sewage in the pump station. If the sewage level in the pump station is above the inlet pipe, the building maintenance personnel shall call a septage hauler permitted by the town of North Andover Board of Health to come to the property, pump out the pump station and transport the sewage to a disposal facility. The building maintenance personnel shall continue to monitor the sewage level in the tank until such time as the pump station is operational, calling a septage hauler each time that the sewage level is higher than the elevation of the inlet pipe.