Re: Site Plan Review Special Permit for Assessor's Map 34, Portions of
Lots 15, 17, and 55 (Lot A)
1600 Osgood Street, North Andover, MA
Langan Project No.: 140182701
Dear Ms. Enright:
In accordance with the Planning Board Decisions issued for Lot A, or 1600 Osgood Street, the
following Site Plan Approval permit special conditions have been met: #76, #85, #107, #126,
#1271 #128, #130, #131, #134, #135, #136 and #140.
Special Condition #76
Per this condition, an Emergency Readiness Plan shall be developed for any circumstance in
which the station is inoperable for greater than 24 consecutive hours. A copy of the
Emergency Readiness Plan Prepared for Lot A is included as Attachment A.
Special Condition #85
Per this condition, evidence of maintenance of the stormwater management system shall be
provided to the Planning Department on an annual basis by a Registered Profession Civil
Engineer or other qualified professional post construction. Stormwater Compliance, LLC (SWC)
has been retained by Hillwood to perform quarterly inspections of the stormwater management
systems on site. Their most recent report from May 1, 2023 is included as Attachment B. The
next SWC reports will be submitted to the Town one (1) year from the date of this letter.
Special Condition #107
The current stormwater inspections services contract with SWC expires September 30, 2025
(based on a 3-yr term following their initial work that began October, 2022). 1600 Osgood
Street, LLC will assume responsibility for this requirement at the expiration of the current
contract. The new contract will continue with SWC or another qualified 3rd party as approved
by the Planning Department.
Special Condition #126
Per this condition, the engineer and architect must submit a letter stating that the project has
been installed in substantial compliance with the plans referenced in the Planning Board
Decision. This letter serves as confirmation on behalf of the site-civil engineer that the building,
100 Cambridge Street, Suite 13,10 Boston, MA 02114 T 1 . 24* 1 � 617.824.9101 www.Ia n gan.c orn
Jersey rk*Connecticut* adchuutt IPennsylvanja Washington, DC* I�� ��Ilu� r�* -N � I� M Arizona N�� 0 WashingtonCalifornia
0
� ,N itorn i
Athens 0 Calgary#Dubai 6 London a Panama
Site Plan Review Special Permit for Assessor's Map 34, Portions of Lots 15, 17, July 10, 2023
and 55(Lot A) Page 2 of 4
1600 Osgood Street, North Andover, MA
Langan Project No.: 140182701
landscaping, lighting, utilities, and site layout substantially comply with the plans approved by
the Planning Board.
See the draft as-built plans included as Attachment C.
Special Condition #127
Per this condition, a letter from the engineer must be submitted certifying that the new lighting
provided meets the requirements of the Signs and Lighting Regulations outlined in Article VI of
the Zoning Bylaw. This letter serves as certification on behalf of the engineer that the new
lighting provided meets the requirements of Article VI of the Zoning Bylaw. See the as-built
plans included as Attachment C.
Special Condition #128
Per this condition, a letter must be provided from a certified engineer that that associated
retaining walls have been constructed in accordance with the plans approved by the Planning
Board. The only retaining walls on Lot A are associated with the new loading dock. This letter
serves as confirmation on behalf of the engineer that the retaining walls have been constructed
in accordance with the plans issued. See the as-built plans included as Attachment C.
Special Condition #130
Per this condition, all drainage systems must be cleaned in accordance with the approved Post
Construction Operation and Maintenance Plan (0&M). Evidence of said cleaning must be
submitted to the Planning Department.
Stormwater Compliance, LLC inspected stormwater management features on Lot A for structural
condition, proper function, pollution accumulation, and good housekeeping practices. The
company's report, dated 10/24/22, recommended preventative maintenance and non-urgent
repairs. Podgurski Excavation and Utilities performed jetting and vacuum cleaning of the
stormwater structures over four separate site visits between 11/7/22 and 12/2/2022. DW White
Construction, Inc. addressed Stormwater Compliance, LLC's remaining recommendations not
addressed by Podgurski. Stormwater Compliance, LLC conducted a subsequent inspection in
May of, 2023, which confirms that all required repairs have been made and that only minor
maintenance is required. A copy of the most recent Stormwater Compliance, LLC report is
included as Attachment B.
Special Condition #131
Per this condition, all signage shall conform to signage regulations contained within the North
Andover Zoning Bylaw, Article 6 unless granted relief or variance from the Town. The signage
installed on site conforms to the North Andover Zoning Bylaw and/or the Sign Master Plan
Special Permit issued by the Planning Board April 26, 2022. Installation of the four (4)
monument signs on Osgood Street approved as part of the Sign Master Plan Special Permit is
in progress and expected to be completed by the end of July.
Site Plan Review Special Permit for Assessor's Map 34, Portions of Lots 15, 17, July 10, 2023
and 55(Lot A) Page 3 of 4
1600 Osgood Street, North Andover, MA
Langan Project No.: 140182701
Special Condition #134
Per this condition, the engineer and architect must submit a letter stating that the Solar Field
landscaping, utilities, and site layout substantially comply with the plans referenced in the
Planning Board Decision. This letter serves as confirmation on behalf the site-civil engineer and
landscape architect that the landscaping, utilities and site layout substantially comply with the
plans approved by the Planning Board.
Special Condition #135
Per this condition, a letter from the licensed surveyor confirming the heights of the Solar
Energy System improvements comply with height requirements under the zoning bylaw. This
letter serves as confirmation on behalf of the licensed surveyor that the heights meet zoning
requirements. Per the zoning by-law, the maximum allowed height of solar panels is 15'. The
maximum height of panels installed on site is 8.1'.
Special Condition #136
Per this condition, all drainage systems in the Solar Field must be cleaned in accordance with the
approved Post Construction Operation and Maintenance Plan (0&M). Evidence of said cleaning
must be submitted to the Planning Department.
A new drainage system was not installed in the solar field. Due to this, it is our belief that no
cleaning need be conducted in the Solar Field and this condition has been adequately met.
Special Condition #140
An as-built plan showing topography, the location of all new utilities, structures, curb cuts,
parking spaces and drainage facilities with inverts, is attached as Attachment C.
Site Plan Review Special Permit for Assessor's Map 34, Portions of Lots 15, 17, July 10, 2023
and 55(Lot A) Page 4 of 4
1600 Osgood Street, North Andover, MA
Langan Project No.: 140182701
Sincerely,
Langan Engineering and Environmental Services, Inc.
w
Frank Holmes, PE
Executive Associate
Michael Hunton, PLA, ASLA, WEDGE
Senior Project Manager
Ian Wisuri, PLS
Senior Survey Project Manager
cc: Hillwood, Epsilon Associates
VIangan.com\data\nhv\data7\140182701\project data\permitting\closeout\planning board letters\lot a\2023-07-10-planning board-lot a_d raft.docx
ATTACHMENT A
LA/V&A/V
Emergency Readiness Plan
For Sewer Pump Station
Ozzy Properties
1550-1650 Osgood Street, North Andover, MA
Primary Contact Information
Name: TBD
Cell Phone:
Email.
Secondary Contact Information
Name: TBD
Cell Phone:
Email.
Pertinent Information
1. The pump station is designed to avoid interruptions in service with the following
provisions:
• Redundant (duplex) pumps — pumps alternate with each pump cycle. In the
event of a pump failure, an alarm is triggered and building operation personnel
are notified so that the failed pump can be serviced, repaired or replaced. Until
the failed pump is serviced, repaired or replaced, the second pump will keep
the facility in service.
• Emergency generator— in the event of a power failure, the pump station will
remain operational, powered by the emergency generator.
2. Procedures if pump station is inoperable:
• In the event the pump station is inoperable (both pumps fail, a power
interruption and emergency generator failure, a failure in the sewer force main
on site, or any other issue preventing operation of the pump station), a high
water alarm is triggered and building operation personnel are notified through
the Building Management System. In the event that the duration of the pump
station being inoperable results in the storage volume of the pump station wet
well being exceeded, a 15,000 gallon overflow tank has been provided to allow
for the temporary storage of sanitary sewage. The 15,000 gallons of storage
represent approximately 24 hours of an average day's sanitary sewage
discharge from the existing facility serviced by the pump station.
• In a case where the high water alarm is triggered and the pump station is
determined to be inoperable, building maintenance personnel shall monitor the
level of sewage in the overflow tank. If the sewage level in the tank reaches
1/3 of the depth of the tank, the building maintenance personnel shall call a
septage hauler permitted by the town of North Andover Board of Health to
come to the property pump, out the tank and transport the sewage to a
disposal facility. The building maintenance personnel shall continue to monitor
the sewage level in the tank until such time as the pump station is operational,
calling a septage hauler each time that the sewage level in the tank reaches 1/3
of the depth of the tank.
• In the event that the overflow tank is utilized, and on the resumption of pump
station operation and after the overflow tank is pumped down, the interior of
the tank shall be cleaned by suitable means to remove residual waste.
ATTACHMENT C
LA/V&A/V
R M WAT'E,R
�'J t I ii r t at J:, e 0 41,C)6,
Mi�fi'flainirig IJOUI-ilIVElstu"nei'd Protf.',,dirtg�,)ur ei"tvir�xvi"i1c'nt"',
torrr at r lr pI e flo,on,S''u'',m m''a r y
Site Name: 1600 Osgood St Lot A- North Andover,MA Inspector: BM/SS
Weather Conditions: Rain
Date of Visit: 05/01/23 Last Precipitation: 4/30/23-0.75"
Inspected stormwater management features for structural condition,proper function,and pollutant accumulation. The
site was inspected for good stormwater housekeeping practices and condition of paved/landscaped surfaces.
Site Visit Incidental maintenance was performed during inspection where possible. Incidental maintenance includes removal of
Comments: minor trash,debris,and unwanted vegetation as well as obstruction removal if possible. Any issues requiring action are
summarized below. Recommendations not considered urgent should be addressed in a timely fashion as conditions
allow. Inspection Log and associated inspection photos are attached.
Urgent Action No immediate urgent action is recommended at this time.
Recommended
Catch Basins,Hoods,Trench No corrective action recommended at this time. Features appear to be in good condition and functioning
Drains,and Manholes as intended.
Separators(Stormceptor, No corrective action recommended at this time. Features appear to be in good condition and functioning
Vortech,Downstream as intended.
Defender,CDS,etc.)
Sub Surface
(Infiltration/Detention,Pipe No corrective action recommended at this time. Features appear to be in good condition and functioning
System,Stormtech,Isolators as intended.
Preventative Rows,etc.)
Maintenance
and Non-urgent Open Features(Ponds No corrective action recommended at this time. Features appear to be in good condition and functioning
repairs Swales,Inlets,Outlets, as intended.
Recommended Spillways,Outfalls,etc.)
Bioretention (Filterra,
StormTreat,Underdrain Mulch layer appears to be clean and in good condition. No areas of saturation observed.
Filters,Rain Gardens,Bio-
swales,etc.)
General Site Conditions
(Pavement,Curbing, General site conditions are good. Pavement is generally free of sediment,trash and debris. Landscaped
Landscaping,Good areas appear to be stabilized.
Housekeeping,etc.)
Other(Porous Pavement, Features not present.
Green Roof,etc.)
Notes
Comments
RMWAAYER
Buuuuuu
v%rv%vv�,/.S',L C)I W I L K2 C'.'c>r w 1111 c c>r w I
WOntain4ig Vc.'),ur ir"westry'lent-Pr'c.'A'c.'�'Chng II
sto
rm ater Structure Ihspection, Log
Site Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Date of Visit: 5/1/23 Weather Conditions: Rain
Last Precipitation: 4/30/23-0.75"
Structure Casting Surface Hood Condition Floatables Sediment Maintenance Maintenance Inspection/Maintenance Comments
Number Condition Condition (inches) Performed Required
1111111 iilmm mum ll�w
Al-EX M H-1 G G NH N 1 N N IN GRASS INSIDE AMAZON FENCE
Al-EXMH-2 G G NH N 2 N N
Al-MH-1 1 G G NH N 1 N N
Al-MH-12 G G NH N 1 N N
Al-MH-13 G G NH N I N N
Al-MH-21 G G NH N 3 N N
Al-MH-22 G G NH N 2 N N
Al-MH-26 G G NH N 1 N N
OCS A1.2 G G NH N 1 N N PIPES UNDER WATER/NORMAL BASED ON RECENT
PRECIPITATION.
OCS A1.3 G G NH N 1 N N
OCS A1.4 G G NH N 4 T N MINOR SEDIMENT ACCUMULATIONS AT INVERT
mim EMMA
Al-C135 G G G N 1 N N
Al-C136 G G G N 1 N N
Al-C137 G G G N 1 N N
Al-C138 G G G N 1 N N
Al-CB17 G G G N 1 N N
Al-CLC139 G G G N 1 N N
A1-CLCB14 G G NH N 1 N N
A1-CLCB15 G G G N 1 N N
Al-CLCB-16 G G G N 1 N N
Al-MH16 G G NH N 1 N N
Al-MH17 G G NH N 1 N N
Al-MH18 G G NH N 1 N N
Al-MH19 G G NH N 4 N N
Al-MH20 G G NH N 2 N N
Al-MH-23 G G NH N 1 N N
Al-MH23A G G NH N 1 N N
Al-MH24 G; G NH N 1 N N
mom
Al-C131 G G G N. 1 N N
Al-CB-2 G G G N 1 N N
Al-C133 G G G N 1 N N
Al-C134 G G G N I N N
Al-MI-12 G G NH N 2 N N
Al-MI-13 G G NH N I N N
Al-MI-14 G G NH N I N N
Al-MI-15 G G NH N SC N N UNDER SIDEWALK BRICKING PALLETS
Al-MI-15A G G NH N I N N
Al-MI-1513 G G NH N 1 N N
Al-MI-16 G G NH N 1 N N
Al-MI-17 G G NH N 3 N N
Al-MI-18 G G NH N 1 N N
Al-MI-19 G G NH N 4 N N
Al-MH10 G G NH N 0 N N
Al-I G G G N I N N ONE END FULL OF CIGARETTE BUTTS
Al-I G G NH N 3 N N
Al-I G G R N I N N
Al-I G G G N I N N
Al-I G G G N I N N
I I I I I I I I I
RMWAo4kY'E,R
Buuuuuu
W " tl tPA� v%rv%vv� S',L C.)Y,-,W I L�2 C'.'c>r w I 1, c r w I
Ontain4i,g irwery'en - fc.''e.,'Chng r,)LJF'
Stor'MMOte'' r'Structure Inspection Log''
Site Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Date of Visit: 5/1/23 Weather Conditions: Rain
Last Precipitation: 4/30/23-0.75"
Structure Casting Surface Hood Condition Floatables Sediment Maintenance Maintenance Inspection/Maintenance Comments
Number Condition Condition (inches) Performed Required
M! I ME I
Al-CB10 G G G N. 1 N "N
Al-CB18 G G G N 1 N N
A1-DCLCB11 G G G N I N N
A1-DCLCB12 G G G N I N N
A1-DCLCB13 G G G N I N N
Al-MH14 G G NH N I N N
Al-MH15 G G NH N 1 N N
Al-MH25 G G NH N 1 N N
�:MIEMMI Emil=
D1-CB1 G G NH N 3 N N
D1-CB2 G G NH N 4 N N
Dl-EX YD2 G G N H N 1 N N
OCS D-1.1 G G G N 2 N N
�11111 ME-
Dl-CB3 G G G N 1 N N
D1-CB4 G G G N 1 N N
D1-CLCB-1 G G G N 1 N N
D1-CLCB-2 G G G N 1 N N
Dl-CLCB-5 G G G N 1 N N
Dl-CLCB-6 G G G N 1 N N
Dl-EX YD 3 G G NH N 3 N N
D1-MH1 G G NH N 2 N N
D1-MH2 G G NH N 0 N N
D1-MH3 G G NH N 0 N N
D1-MH4 G G NH N 1 N N
Dl-MH5 G G NH N 1 N N
Dl-MH5A G G NH N 1 N N
Dl-MH6 G G NH N 2 N N
D1-MH7 G F NH N 3 N N
D1-MH8 G G NH N 1 N N
D1-MH9 G G NH N 1 N N
OCS D-1.2 G G NH N 2 N N
OCS D-1.3 G G NH N I N N
i
fi
IIVIIUUIIIIIIIIUmu 000ioum I IIIIIIIIIIIIIIIIIIII a poouuuuuu VUIIIUUIIIUUIIIVVIIIVDIII IIIIIIIUUnI idiom � ;� {" ��
StormWater Structure Inspection Log
Site Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Date of Visit: 5/1/23 Weather Conditions: Rain
Last Precipitation: 4/30/23-0.75"
Structure Casting Surface Sediment Maintenance Maintenance
Number Condition Condition Hood Condition Floatables (Inches) Performed Required Inspection/Maintenance Comments
Iffiffil
I ME=
D1-CB15 G G G N 2 N N
D1-CLCB 7 G G G N 1 N N
D1-CLCB8 G G G N 1 N N
D1-CLCB9 G G G N 1 N N
D1-CLCB10 G G G N 1 N N
D1-CLCB11 G G G N 1 N N
D1-CLCB12 G G G N 1 N N
D1-CLCB13 G G G N 1 N N
D1-CLCB14 G G G N 1 N N
D1-MH10(WQU G G NH N 3 N N
FD6HC)
D1-MH11 G G NH N 2 N N
D1-MH12 G G NH N 1 N N
D1-MH13 G G NH N 3 N N
D1-MH14 G G NH N 0 N N
��IIIIIVIIVUUummmm mooiouuuuNll oumU ICI UUUUIUUIII wo wu-u u
IIIUIVIUUIIV oi000000000 �_ r,":,x n�tl R li+'W:^i......,U h' h:.: ^ a'A ii.U,F.0 � . ff.::: d G 1,a W '"(I r Y II G I a .,:•�I,,;d'..
, ....F . 4•a r 4^"a°","a". h".:1' '7. rF"x:a h ,.'e G tl ti� "'::;D,,...
m�iuu`� mmul'No;w a N���rm:-DI` MiUn J� "oC� ,f�uuuu�Im�o1VId l'A","gym"If�iUIOiIU'd1"'Jp1�wa
Separator Starmwat r'Feature Lo''g'
Site Name: 1600 Osgood St Lot A- North Andover,MA Inspector: BM/SS
Weather Conditions: Rain
Date of Visit: 5/1/23 Last Precipitation: 4/30/23-0.75"
Stormwater Inspection Items Observations Inspection Comments
Feature ID _
Internal Components G Internal components appear to be in good condition and
functioning as intended.
Inlets/Outlets/Flow Controls G Inlets,Outlets and Flow Controls appear to be free from
obstructions and functioning as intended.
A1-MH1 (WQU Sediment Accumulation G 2 inches of sediment observed.
FD 8HC)
Trash/Debris/Pollutants G No evidence of significant trash/debris/pollutants observed.
Rodents/Insects G No evidence of significant rodent/insect activity observed.
Internal Components G Internal components appear to be in good condition and
functioning as intended.
Inlets/Outlets/Flow Controls G Inlets,Outlets and Flow Controls appear to be free from
obstructions and functioning as intended.
D1-MH10
(WQU FD 6HC) Sediment Accumulation G 3 inches of sediment observed.
Trash/Debris/Pollutants G No evidence of significant trash/debris/pollutants observed.
Rodents/Insects G No evidence of significant rodent/insect activity observed.
II
II
IIIIIIIIVIIIV�uuuuomoiuu�u Nioi�umm muuol ppp gioi Ism �
I
�I�IVIIIIOIIIIIOIIIIIIOIIIIIIIIIVIIII
2 U C)
MaI ltc'.9if'1 11 VC)Ur II"dve'stil�u'rit.. er"mf'(:m"iIIiT'N`lltlq"t
Subsurfate'''Sys'"temInspeCtion, Log-
Site
Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Weather Conditions: Rain
Date of Visit: 5/1/23 Last Precipitation: 4/30/23-0.75"
Stormwater Ins ection Items Observations Inspection Comments
Feature ID p
7777
Outlet/Outlet Control G No corrective action required. Feature appears to be in good condition and
Structure functioning as intended.
Surface Condition G Pavement above system appears normal.
Rodents/Insects G No evidence of significant rodent/insect activity observed.
RET A-1.3 Water Level G Water level appears to be normal based on current site conditions and recent
precipitation.
Sedimentation G No evidence of significant sediment accumulation observed.
Trash/Debris/Pollutants G No significant accumulation of trash or debris observed. No oil,gasoline or
other pollutants observed.
Other Components NA Other components not present.
OIIIIIIIIOIIII mmoiouuuu mum um i uuuuuum IIIII�I�VUI� NVIII umuo ,.,.,., ,,,. ...,,. .. ,.,.. ,.,, ,...
�I�IVIIIIOIIIIIOIIIIII0111111111VIIII7 7.2 7 U.....a g ' o-0
���lun'r���'i�"�ulwt�"w����,#r��"ar��.�"►:�'r'��ry�tmt D�ur��l����ull�.,����uG.�����.� �r�::�u�'�u��'Ii��°�
Subsu' rfa-ce''Sys'temImpe'dion'log
Site Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Weather Conditions: Rain
Date of Visit: 5/1/23 Last Precipitation: 4/30/23-0.75"
Stormwater Ins ection Items Observations Inspection Comments
Feature ID p
7 7
Outlet/Outlet Control G No corrective action required. Feature appears to be in good condition and
Structure functioning as intended.
Surface Condition G Pavement above system appears normal.
Rodents/Insects G No evidence of significant rodent/insect activity observed.
INF D-1.3 Water Level G Water level appears to be normal based on current site conditions and recent
precipitation.
Sedimentation G No evidence of significant sediment accumulation observed.
Trash/Debris/Pollutants G No significant accumulation of trash or debris observed. No oil,gasoline or
other pollutants observed.
Other Components NA Other components not present.
RMWATER
ffIpp�pIIIVIIIIIIIIIIIIlO 000iouuumuu uuu u. --
VU
�l��llllollllllolollllll 11 U m I' 11"1 a°r 2 VN V li /.'..n n %,"a tl C'. I Y.
y� � �� �uuuuu�ouuullul 11
�~��:���uatt��wmwN ��a.�r��a �...�tN�i��:N��. 0,4�r�;.�1...��.�.�u�t�.,nxr
Open StormlNater Feature Ihspecti0h Log
Site Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Date of Visit: 5 1 23 Weather Conditions: Rain
/ / Last 30 Precipitation: 4 23-0.75"
p / /
Stormwater
Inspection Items Observations Inspection/Maintenance Comments
Feature ID
1 1
Outlet Control/Outlet F Outlet pipe to OCS was observed to have fabric installed. Fabric may
Control Structure be partially cut to allow water flow (could not confirm).
Emergency G Spillway appears stable. No problem vegetation,trash or debris
Spillway/Overflow observed.
Inlets/Forebays G Inlets are unobstructed. Forebays appear to be functioning as
intended.Minor sediment accumulation observed.
Outfall G Outfall appears stable. No problem vegetation,trash or debris
observed.
Embankments G No significant signs of erosion,settling or saturation observed.
Vegetation is established and coverage is adequate. No unwanted
Vegetation G vegetation observed.
INF BASIN A-
1.2
Rodents/Insects G No evidence of significant rodent/insect activity observed.
Water Level G Water level appears normal in Pond based on recent precipitation.
Sedimentation G No evidence of significant sediment accumulation observed.
Trash/Debris/Pollutants F Minor accumulation of trash or debris observed. No oil,gasoline or
other pollutants observed.
Other Components NA No other components present.
RMWATER
ffIpp�pIIIVIIIIIIIIIIIIlO 000iouuumuu uuu u. --
VU
�l��llllollllllolollllll 11 U m I' 11"1 a°r 2 VN V li /.'..n o). T V"a tl C'. I Y.
y � �� �uuuuu�ouuullul 11
�~��:���uatt��wmwN ���a.jr ira �...�tN�i��:N��. 0,4�r�;.�1...��.�.�u�t�.,)G.vr
Open StormWater Feature' ' In'''sp'ectio'n Log
Site Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Weather Conditions: Rain
Date of Visit: 5/1/23 Last Precipitation: / /itation: 4 30 23-0.75"
Stormwater
Inspection Items Observations Inspection/Maintenance Comments
Feature ID
1 1
Outlet Control/Outlet G Outlet appears to be free from obstructions and functioning as
Control Structure intended.
Emergency G Spillway appears stable. No problem vegetation,trash or debris
Spillway/Overflow observed.
Inlets/Forebays F Inlets are unobstructed. Forebays appear to be functioning as
intended.Minor sediment accumulation observed.
Outfall G Outfall appears stable. No problem vegetation,trash or debris
observed.
Embankments G No significant signs of erosion,settling or saturation observed.
DET BASIN Vegetation is established and coverage is adequate. No unwanted
Vegetation G A-1.4 vegetation observed.
Rodents/Insects G No evidence of significant rodent/insect activity observed.
Water Level G Water level appears normal in Pond based on recent precipitation.
Sedimentation F Minor accumulation of sediment accumulation observed.
Trash/Debris/Pollutants F Minor accumulation of trash or debris observed. No oil,gasoline or
other pollutants observed.
Other Components NA No other components present.
RMWATER
ffIpp�pIIIVIIIIIIIIIIIIlO 000iouuumuu uuu u --
VU
�l��llllollllllolollllll 11 U m I' 11"1 a°r 2 VN V li /.'..n o). T V"a tl C'. I Y.
y � �� �uuuuu�ouuullul 11
�~��:���uatt��wmwN ���a.jr ira �...�tN�i��:N��. 0,4�r�;.�1...��.�.�u�t�.,)G.vr
Open StormWater Feature' ' Inspection Log
Site Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Weather Conditions: Rain
Date of Visit: 5/1/23 Last Precipitation: / /itation: 4 30 23-0.75"
Stormwater
Inspection Items Observations Inspection/Maintenance Comments
Feature ID III
Outlet Control/Outlet G Outlet appears to be free from obstructions and functioning as
Control Structure intended.
Emergency G Spillway appears stable. No problem vegetation,trash or debris
Spillway/Overflow observed.
Inlets/Forebays G Inlets are unobstructed. Forebays appear to be functioning as
intended.Minor sediment accumulation observed.
Outfall G Outfall appears stable. No problem vegetation,trash or debris
observed.
Embankments G No significant signs of erosion,settling or saturation observed.
DET BASIN Vegetation is established and coverage is adequate. No unwanted
D-1.1 Vegetation G vegetation observed.
Rodents/Insects G No evidence of significant rodent/insect activity observed.
Water Level G Water level appears normal in Pond based on recent precipitation.
Sedimentation G No evidence of significant sediment accumulation observed.
Trash/Debris/Pollutants G No significant accumulation of trash or debris observed. No oil,
gasoline or other pollutants observed.
Other Components NA No other components present.
RMWATER
ffIpp�pIIIVIIIIIIIIIIIIlO 000iouuumuu uuu u --
VU
�l��llllollllllolollllll 11 U m I' 11"1 a°r 2 VN V li /.'..n o). T V"a tl C'. I Y.
y � �� �uuuuu�ouuullul 11
�~��:���uatt��wmwN ���a.jr ira �...�tN�i��:N��. 0,4�r�;.�1...��.�.�u�t�.,)G.vr
Open StormWater Feature' ' In'''sp'ectio'n Log
Site Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Weather Conditions: Rain
Date of Visit: 5/1/23 Last Precipitation: / /itation: 4 30 23-0.75"
Stormwater
Inspection Items Observations Inspection/Maintenance Comments
Feature ID
1 1
Outlet Control/Outlet G Outlet appears to be free from obstructions and functioning as
Control Structure intended.
Emergency G Spillway appears stable. No problem vegetation,trash or debris
Spillway/Overflow observed.
Inlets/Forebays G Inlets are unobstructed. Forebays appear to be functioning as
intended.Minor sediment accumulation observed.
Outfall G Outfall appears stable. No problem vegetation,trash or debris
observed.
Embankments G No significant signs of erosion,settling or saturation observed.
INF BASIN Vegetation is established and coverage is adequate. No unwanted
D-1.2 Vegetation G vegetation observed.
Rodents/Insects G No evidence of significant rodent/insect activity observed.
Water Level G Water level appears normal in Pond based on recent precipitation.
Sedimentation G No evidence of significant sediment accumulation observed.
Trash/Debris/Pollutants G No significant accumulation of trash or debris observed. No oil,
gasoline or other pollutants observed.
Other Components NA No other components present.
RMWATER
ffIpp�pIIIV�IIIIIIIIIIIIlO 000iouuumuu uuu u --
VU
�l��llllollllll��olollllll 11 U m I' 11"1; a°r VN V ° /.'..n o g. "a tl C:. I Y U
y � �� �uuuuu�ouuullul
�~��:���uatt��w�iu�wN ���a.jr ira �...�tN�i��:N��. O'4°r�;.�1...��.�.�u�t�.,)G.vr
Open StormlWater Feature' ' In'''sp'ectio'n Log
Site Name: 1600 Osgood St Lot A - North Andover, MA Inspector: BM/SS
Date of Visit: 5 1 23 Weather Conditions: Rain
/ / Last Precipitation: / /itation: 4 30 23-0.75"
Stormwater
Inspection Items Observations Inspection/Maintenance Comments
Feature ID
1
Mulch/Filter Media G Mulch layer appears to be clean and in good condition. No areas of
saturation observed.
Embankments G No significant signs of erosion,settling or saturation observed.
Plantings G Plantings are establish and coverage is adequate. No unwanted
Rain Garden - vegetation onserved.
A-1 N
Inlets/Outlets/Overflow G Overflow structure appears to be functioning as intended.
Trash/Debris/Pollutants G No significant accumulation of trash or debris observed. No oil,
gasoline or other pollutatnts observed.
General Notes G Feature appears to be in good condition and functioning as
intended.
Mulch/Filter Media G Mulch layer appears to be clean and in good condition. No areas of
saturation observed.
Embankments G No significant signs of erosion,settling or saturation observed.
Plantings are establish and coverage is adequate. No unwanted
Plantings G vegetation onserved.
Rain Garden -
A-1 S
Inlets/Outlets/Overflow G Overflow structure appears to be functioning as intended.
Trash/Debris/Pollutants G No significant accumulation of trash or debris observed. No oil,
gasoline or other pollutatnts observed.
General Notes
G Feature appears to be in good condition and functioning as
intended.
S RMWATER
163 6
87 7 2 7'.L I.)(D S S, a,eau "V� c-'pr ?E'L(D r Fy�r'��) Fy
Mai n La i nVa ng jo i..j r i r�vest ri'i e n t- ti nq(,)tjr env i r(,)ra'ri1ent"
Stormwater In' s'pection Data Key
Stormwater Structures include collection and conveyance elements typical of stormwater management systems. Examples include Catch Basins
Structures: (CB),Manholes(MH),Trench Drains(TD),Yard Drains(YD),Outlet Control Structures(OCS),etc.
Open Open features include open air treatment and conveyance elements typical of stormwater management systems. Examples include
Features Ponds,Basins,Swales,Forebays,Outfalls,Bio-retention,Rain gardens,etc.
Separators are water quality devices meant to separate sediment and floatable pollutants from collected stormwater. These devices
Separators are know by several generic names such as Water Quality Unit(WQU),Oil/Grit Separators(OGS),etc. Common proprietary names
include Stormceptor,Vortechnics,Bay Saver,Downstream Defender,CDS unit,StormFilter,etc.
Filterra Filterra is a Proprietary Bio-retention/Filtration device. These units utilize engineered filter media and bio-uptake to improve water
quality. Also known as a Tree box filter.
StormTreat StormTreat is a Proprietary Bio-retention/Filtration device. These units utilize engineered filter media and bio-uptake to improve water
quality. Also known as a manufactured wetland.
Subsurface Subsurface systems are underground systems constructed with pipes,chambers,tanks,or other means. These systems are designed to
detain or infiltrate collected stormwater and function similarly to surface stormwater ponds. StormTech,Brentwood,StormTrap,
Systems StormChamber,etc.are common proprietary names.
Porous Porous pavement is a hard/durable surface designed to allow stormwater to pass directly through the surface. There are four general
types of porous pavements;poured in place concrete,poured in place asphalt,interlocking pavers and pre-cast modular porous
Pavement concrete(StormCrete).
ME
G Good Condition Condition and function of element is satisfactory. No maintenance recommended at this time.
F Fair Condition Condition and function of element is satisfactory but evidence of wear or minor deterioration is observed. Condition
should be monitored. Preventative maintenance or repairs may be recommended.
R Repairs Repairs or Maintenance required as conditions allow.
Recommended
U Urgent Action is required to prevent likely harm to persons,property,or environment.
NH No Hood No Hood observed in structure.
SC See Comments See comments in comment column.
Y Yes Yes
N No No
NA Not Applicable Element not present
N No maintenance performed/required.
C Cleanout of sediment accumulation
i Jetting by water pressure
Maintenance V Vegetation maintenance
Performed R Repair
Required T Trash/Debris Removal
S Skim floatable debris
OB Install or replace oil absorbents
SC See comments in comment column. Maintenance performed required.
.................... ENE=
00 Laa:InoAel gI$'I.Ie6,el:algejajAIS uel,".,asn uRL:a-i LZOZ/ZI/Z:alea oMa a,,-I'd
891 JO 99 hays H33
40 pa�oay0 1333 NI 3lVDS
O41 \ d
A8 UMDJQ OSl OOl OS 0 OSL
00 L JD OZOZ/<«L \
I.OLZ8t061
'ON BUIMDJQ 'ON loafOAd
/
Nbld 39VNI"(I \ \ \
6V33V3rMUS uvwmvaav o �eLMmaNVLL3M 1- `
L iaw mVNOIS
'8 N I a" \ \ \ o Nawflo Nn1SIO O ISE AMOLV5hEklV 0.D
a11l1 6u!MDJQ TV3Wl�VNM maneallneoNAs / �, `o k.
AW4Ms.L3snH3VS" 113AOONV H1110N ) \ \ANI a3a � V3VVM3ddneAOt \�/ 4,�
133211S a009SO 0091 \ 1 06Z
4 \
loafoJd \ (\ \ Sti p5 �� \JNOVASM AM
\
WOo-Ue6uel'MMM 9Zb9796.008:1
(1 \� L .
66tZ0 VW`uolsoe \ \
OtS allnS'laaJiS uolslAoB 999
,Dul'SaDIAJOS IelUOWUOA1nu3AlVgAIV7 I \ ( J
pue 6uuaaul6u3 ue6ue8 � 1\ I ( � � � � - - - -
( / �3NOZlnVI
811K'ON'O!1 VW 2J33NION3 1VNOISSIAO2Jd
31NVld NHOr I 1 v 1 32J allod13MZv
f11VN01S \` \\ j 1 \ o•L£ � N I �� � \ 4
✓ \ N
13Nozlnv�
w -\ � � lDvd NOI1neDllsla a3sodoad L�,
\ \\ MU11l3Vd llBHL OL SNOL 33NNOD dO DNIInG3H3S ONV S NOLLV30l 3Hl OL SV A3N3DV AMOLVInDM 3HL HUM ONLLVNION003
( SV 113M SV 03A31HDV 3NV SH1d311 13dONd 3UnSN3 Ol ONV
\\ I = U-MINIM 010AV Ol SV 113NNVW V i-DnS NI NOLLYIW.LSNl 31VNIaNOOD \ .
S N O I S In3�J I - IIVHS 3CU-WUN03`S3wlLLn ll3HLO IW 0NV'SNIVUG i00`d'371NaS SVD
I - - aNV W033131'IVJDLLD3l33DIAN3S M3LVM3LLS3W0O'SlVe31Vla3AA3S - \ VJJ--
oN uo!}duosa4 a1D4 / I ANVIINVS3anl3NIOLS37NVNLN3AU1LLnIWAOSNOLLV3OlWnLwMOd
/ SLWII cwvu3M n-_ C��/ SNOLLV31d173dS aNV SNVId WHfU:)3UFDWY QLM AN TIVHS'd013mN07 �
(z 3SVHd)00[N11311f18 Lz/zl/zo
/(l 3SVHd)V N11311118 I J M3ane -o - NIMNOLLVNLI IZ� \
00'b£ \ \
(( M3ddne m Af
\\ I mine ON As
\ yaw 3 -_�'_® '� NI5Y9 NOLLVNLI 1-3
\ .M3ddneAot s - ONfKr&n aNnz D a gar 0 0
eo 0 0 0
s
In3NIIAlLBdOMdS$ -
s
\ \\\ _ _
9 �s �,'° �a'° � sx � ��i_ �� � —wsve NouvxnaNl et-0
lsm NOLLVRLIMNl Z't-a
4
- NISVB NOLLN313a I� \
A310 a3aNW3 Y W V lol ,s6'Sa+-add 0 _
NIbYe NOLLHLLIHNI L't�V __ � _ _.-�
NIVW311 01 3sn 331dd0 AH01S-E DNLLSIX3
3NII ALN3dOMd
ti_— §o
NOLIN3L3
3 .3 .. AMaa30N31X3t•a t-a ZV3MVV10l
0 6 I6
'ONVS NV310 H1IM
030V1d321 38 IIVHS 11'NOI1VA313 30V2JOBf1S NISVB M0138 03AOW321 SI lIOS � E..... .................. _.. ........�_,,.�.......... .......... .......... ......... -` �....._.:-v_._ - -
_ �\
� dl'NOIlVaVd3ad 30V?JO8f15 ONI?Jf10 SNISV8 NOLLV?J1113NI NI SN011IONOD lIOS """""---
0' Wi11dN00 Ol i133NION3 IINO 3Hl d0 30N3S321d 3Hl NI SNISVB NOLLV21111dN1
N llV 30 W01108 3H1 1V Slld 1S31 NHOJ3 J3d IIVHS NO1DV2J1NOD'S1VIH31VW �\
p OINVO2J0 ONV 510021 ONIOf1lONl SNISVB NOIlV211lIdNl 11V d0 WO1108 'S3LLIlDVd M13H10L SNOLLD3NNM:10 DNnna3H3S aw
3Hl d0,b NIHIIM S213AV1-110S 3ALLMUS3N-nV 3AOW3H-nVHS 2101OVa NOO•S NOLLV3013H101 SV ADN3DV ANQLV1f1D3N 3HI HIM DNLLVNIOMOOD
\\
\OVOII 111 H SV n3M SV 03A31HJV 311V SHId3a M3dOMd 3NnSN3 01ONV \ \'1N3W3OVld 2131dV NVOS321d S131ldN0D OIOAV Ol SV 113NNVW V H3f1S Ni NOLLYINISNI3IVNIONOOD
80 S1N3A3 NIVN Noma Hl kliv8niVN 31113S 01 3?Jn1XIW ms Mo11V'b (11WH31210 IIVHS NO.I3VmNm,S3wlLLn 1131-110 llV ONV'SNIVNO d001i'33LAMS SVD ""��� �� \ � • \\
(INV W03313.L fV:)RU3313T31AM3S N31VMJLLS3W00'SIVN31Y1N3M3S
'SNISVB 3H1 d0 N313hl213d 3Hl o21V 03Sn 3B ANVIJNVS3anlJNICLLS33NVNLN3AlllllllllVdOSNOIIVDOIWLJV M
0N1 Od \
NVO 1N3WdIn03 AAVIH"SNISVB 3H1 NIHIIM ONIOV80 N3HM A1NO 1NINdIn03 SNOLLVDIAZIUS ONV SNVld 1VHn13311HDVV Ol 33d3H llVHS'd0L VNLNOJ
1HDI1 3sn(INV„8L-ZL d0 Sldll NI TOS 30V1d•SNISVB ONI111dNOV8 N3HM'S`
-XIW TOS H11M 031nIdX0VB ON13B
3HOd38 110S lvHn1VN 30„ZL 1SV31 1V 3Hni3VaJ38 Ol 0311I1 38]]VHS
S3NOZ O310VdNDO 3Hl'SNISVB NOLLVHillJNI NI an000 S300 NOIlOVdWOO Al'Z \ ✓_ O -
�J
1N3Wd1003 HDV211 301M 210`532111 3dAl 32101 HlIM 1N3Wd1003 \
1H011'S30H NOLLVAVOX3 d0 3sn 3H1 A8 318ISV3d 1N31X3 Wf1WIXVW 3H1
01 03ZIWININ 3e 11VHS 11IdNOVB 03a=32J ONV SV3iJV NISVB dO NOILOVdW00 'L \ I
NOIIVZIWINIW NOIlOVdW00
sown aNV113M O \\\ \
V
'SNISV8 W0HA 1N3WI03S 11V 3AOW32J'NOI1D02J1SNO0 ONiHno SNISVB
ONV SN302IVD NIVN Ol 1N31NI03S dO 302IVHOSIO 3H1 OIOAV Ol 2101DVa NOD'b mans OrUg3ONASS
'NOI1VZR8V1S 1VNId awns crime ON.05
Ol 210RJd SNISV8 ONV SN30HVD NIVH d0 WO11o8)J%VOS 01 NOiOVa NOD'£
•SW213e V'SNISV8'SN302IVD VRVN3ddne ADt - \
NIVH 30 S1N31X3 INM:U 1IOSd01 T'llld'SONIIIIW 11V 3AOW3?J Ol?J=VaNOD'Z
'SNOOld NISVB ONV N302IVO
NIVN NO 1N3WdinO3 AAV3H dO 3sn D8 NOLOVdW00 OIOAV of WiOVNi N00'L
I
Z S310N NISb9 N0Ilb211lIJNl
a
Zi 9 L 9 9 ti z l
1 2 3 4 5 6 7 8 Q
X'\
/ � 2
\
PROPERTY \
TYP)
SHEET LEGEND
CG101 I CG103 I CG106
A CG102 I CG104 I CG107
\ � s
CG105 � CG108 I �
Izz-
\ \ WETLAND LIMITS
\ \ \ 25'NO DISTURB
BUFFER
r
50'NO BUILD BUFFER
\ \ 100'BUFFER AREA Y;V
00
EXISTING GRADES TO BE \
�p MAINTAINED WITHIN PAVEMENT
�F p!F REMOVAL AREAS(TYP) �4
rL 9F \
C
S'SgQ� •\ p4'F�y9oF\
29 \ \
`♦ \• \ \ �\
♦ \ \ \ \\ \ / Date Description IN
♦ \ \ REVISIONS
\ ♦ \ \ \ I SIGNATURE
JOHN D \ �
\ \ \ I I PLANTE
ENGINEER
\ 21 PROFESSIONAL ENGINEER MA Lic.No.38118
HDPE
O
\ �, ♦ \ 100'BUFFER AREA, LANGAN
J=��/�O�" \♦ \ / I 50•NO BUILD BUFFER : I r"�T= Langan Engineering and
Environmental Services,Inc.
1 25'NO DISTURB BUFFER
888 Boylston Street,Suite 510
\ o= WETLAND LIMITS Boston,MA 02199
ti 1\p2, 9
T:800.952.6426 www.lan an.com
r F♦ 1 EXISTING 15 INCH CMP
s'S9oo\♦ \ TO REMA\
Project
\ �S 1600 OSGOOD STREET
E
APPROXIMATE \ \...
200 FT RIVERFRONT \ `�h�
♦ NORTH ANDOVER MASSACHUSETTS
\ I Drawing Title
PROPERTY LINE \
\ EXISTING 12
(TYP) \ TO REMAIN -.
\ GRADING &
`♦ \ EXISTING 18INCH RCP I DRAINAGE PLAN
\ \ \♦ \ TO REMAIN
\ \ \ EXISTING 15 INCH RCP CAP PIPE AND
\ TD REMAIN DEMOLISH UPSTREAM
NETWORK
Project No. Drawing No.
\ I 140182701
\ Date
MATCHLINE:CG101 \ \♦ e I 12/11/2020 CG 101
MATCHLINE•CC102 ��`' \ I Drawn By
F 40 a 10 25 40 TDO
Checked By
SCALE IN FEET FEH Sheet 56 of 155
Filename'.C\bms\langan-pw-D1\dms46D92\140182701-CG101-0101.DWG Date'.12/13/2020 Time:13:34 User:Iconlan Style Table:Langan.stb Layout.CG101
1 2 3 4 5 6 7 8 Z
MATCHLINE:CG101 Vx
MATCHLINE:CGIO2 \ \ J
C.
A \
\ \ EXISTING 15 INCH RCP
TO REMAIN
SHEET LEGEND
\ \ e I I CG101 I CG103 I CG106 I
\ \ ` \• I I CG102 I CG104 I CG107
CG105 CG108
TC42.96
\ \ \ TC42.5
BC42.15
\ \ ` II
\ I
\ I I BULLETIN 22(PHASE 1)/
\ g\ 05/19/22 BULLETIN 131 PHASE 2 4 oaz 00 B /11 12/21 BULLETIN 18(PHASE 1)/ 3
BULLETIN 124 PHASE 2
\ ®¢ �-- TC42.41 BULLETIN 13(PHASE 1)/
\ OE 1- Bc41.91 - 08/25/21 BULLETIN 116 PHASE 2 2
02/12/21 BULLETIN 4(PHASE 2
\ _ BULLETIN 100(PHASE 2) 1
Date Description No.
/ A-
\ PROPERTY LINE REVISIONS
\ AN
39.39
+ SIGNATURE
PROPERTY LINE �0,��S,S, =_
\ JOHN PLANTE
\ (TYP) 2F� PROFESSIONAL ENGINEER MA Lic.No.38118
APPROXIMATE Sy9O�pJ \38 0 6.36 LANGAN
\ 200 FT RIVERFRONT — 36.00 C-2
Langan Engineering and
36.1 Environmental Services,Inc.
888 Boylston Street,Suite 510
Boston,MA 02199
T:800.952.6426 www.langan.com
Project
\ 1600 OSGOOD STREET
E \
\ NORTH ANDOVER MASSACHUSETTS
Drawing Title
z_
GRADING &
\ DRAINAGE PLAN II
\ \ Project No. Drawing No.
140182701
Date
\ \., 12/11/2020 CG 1 02
\ Drawn By
F 40 a 10 25 40 TDO
Checked By
SCALE IN FEET FEH Sheet 59 of 158 -
Filename:C:\bms\langan-pw-01\dms460921140182701-CG101-0101.DWG Date:5/18/2022 Time:18:22 User'.akennedy Style Table:Langan.stb Layout:CG102
1 2 3 4 5 6 7 8 Q
2
Z
Z Z
7
100'BUFFER AREA
ANY WORK IN THE MASSDOT RIGHT OF WAY IS SHOWN FOR
GRAPHICAL PURPOSES.CONTRACTOR TO REFER TO
MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY
DIVISION-ROADWAY IMPROVEMENTS,ROUTE 125(OSGOOD
A STREET)AT OSGOOD LANDING,25%SUBMITTAL IN NORTH
ANDOVER,MASSACHUSETTS,DATED 10/08/2020.
SHEET LEGEND
# = SEE DRAWING SET"ROADWAY T T n
IMPROVEMENTS-ROUTE 125
= I (OSGOOD STREET)AT OSGOOD I CG101 I CG103 I CG106
RE LANDING -
`? -- CONTRACTOR INSPECT, I
REMOVE AND REPLACE
EXISTING STRUCTURE AS -
6.3 NECESSARY EXISTING DRAINAGE _
PIPES TO REMAIN I CG102 I CG104 I CG107
I PROPERTY I
LINE _. _ ;e _ #
-'_ _ __-_---- CG105 CG108
_ 2X45 BEND t - TC4968 TC52.26 D1-CB1 - -
BC49 18
D-1 EX.YRD-1 -.{ BC51.76 O _. # -- I Z
58 LF 12"HOPE @ 2.53% --{ ---
B -CS D-1.1 D1-CB2 - --- G
LN
--------
-+ 12X45'BEND - RESET EXIS IN - �---- ---- ---------- -_-
TC49.50 TC4 TC5D.98 MANHOLE.FRAME -
CLEANOUT TC48.96/ BC49.00 BC49.45BC49. AND COVER TC51.89 t
7 I
BC48.46� 8z8 TEE I� TC51.50 � -
AND STUB BC51.10D r-` PROPERTY
F
(TYP OF 2) j I I I TC4911 TC49.55 TC5012 F TC50.57 TC51.14 TC51.61 BC51.51 LINE(TYP) -
I l I BC48.61 BC49.05 BC49.62 BC50.07 BC50.64 BC51.11 f.
t C-2 C6,-7���.,.,. I I i 94
MAX BC51.44
I 21 LF 12"HDPE @ 1.18% 3:1
'. I II I I I:II TC52.09 TC52.11
I \ 30 LF 12"HDPE 0 0.85%EXTENDED DRY O2 O4 22 BULLETIN 19 PHASE 1)/
10
c-2 ce-a Bcs.sa Bcs1.s1 BULLETIN 127(PHASE
p DETENTION
C-2 MH B' I BASIN D-1.1 / /
BULLETIN 18(PHASE 1)/
' 45.2 I 11/12/21 BULLETIN 124 PHASE 2 9
CURTAIN DRAIN BULLETIN 17(PHASE 1)/
e 09/30/21 8
BULLETIN 121 PHASE 2
BULLETIN 13(PHASE 1)/
08/25/21 BULLETIN 116 PHASE 2 7
07/28/21 BULLETIN 11(PHASE 1)/ B
II
Nv IN S42.50 BULLETIN 114 PHASE 2
C TC46.23 i I D-1 FES-3
/ / BULLETIN 10(PHASE 1)/
05 25 21 BULLETIN 112 PHASE 2 5
TC46.23 ,BC45.73 INV.IN:42.50 TC48.80 TC49.26 / / BULLETIN 9 PHASE 1)
BC45.73 1 i BC48.00 -BC48.30 BC48.78 TC50.67 ( /
TC47.76 61 LF 24" TC49.83 TC50.29 BC50.37'TC51.53
OS 07 21 BULLETIN 109 PHASE 2 4
® 1 I BC47.26 HDPE @ 1.50% BC49.33 BC49.79 BC51.03 BULLETIN 7 PHASE 1
a 7 D-1 CLCB- ,D-1 CLCB-9 D-1 CLCB-11 D-1 CLCB-1 04/21/21 ( )/ 3
o \t TC48.22 = 41 LF 12" 41 LF 12"
BC47.72 41 LF 12" BULLETIN 105 PHASE 2
HDPE 0 1.00% HDPE @ 1.00% CHOPE 0 50.74 1.00% 03/18/21 BULLETIN 02(PHASEBULLETIN 6 PHASE)2 2
46: J o Tc51.94 BULLETIN 4(PHASE 1)/
.46.9 I I ® ® BC51.44 02/12/21 BULLETIN 100(PHASE 2) 1
XIF �' 47.7 4 D-1 MH-11 D-1 MH-12 D-1 MH-13 I I Date Description No.
�TC48.24. ao� 50.55 I.
BC47.74 = 71 LF 18" TC49.15 69 LF 15"HDPE @ 1.50% 78 LF 12" ) REVISIONS
CLEANOUT OCS D-1.2 °n HDPE @ 1.50%BC48.65 TC49.6 HDPE 0 2.63% _ _ _ _
I. TC45.08 -``-__j BC49.16 TC52.67
TC
BC45.58 [ TC48.63 BC52.17
.C-2 CB-3 TC47.76 BC48.13 BC49.69 TC51.24 -
2 41 LF 12" BC50.74 6"X6"WYE
C 2�MH��4 w BC47.26 -_ 41 LF 12" TC50.70 ;
I2 , =-_ HDPE @ 1.00% HDPE 0 1.00% BC50.20 _ 30 LF 6"HOPE @ 1.00%
CONNECTION
E s=m 6"X12"WYE 45'BEND(TYP.) 75 LF 6"HDPE @ 1.00%
C-2 _ D-1 CLCB-10 D-1 CLCB-12 41 LF 12" - - -" CONNECTION(TYP.)f A$ 0 __-_ D4 MH-8 45'BEND TYP.
D,1 CLCBs7 6 BC48.30= - TC49.83 HDPE®1.00% _ f D-1'MH-7 D-1 MH-8 ( ) _
I_ a :I I 13 LF 12" "�o BC49.33 D-1 CLC m- ? 207 LF 12"HDPE 0 0.91% 241 LF 12"HDPE @ 0.94%
HDPE @ 1.00% y
c f
TC48.23
J 1 BC47.73 TC49.26 TC50.29 TC50.86 TC52.06
D-1 MH 10(WQU FD-�6HC) ,�� , BC48.78 BC49.79 BC50.36 gC51.56 SIGNATURE
D � I I -II UNDERGROUND INFILTRATION AREA RAINS
15 LF 12" D-1 MH-14 BASIN D-1.3 D-1 CB-5 :53.6 '53.4- 81 LF 12" REFER TO MEP DR WINGS JOHN PLANTS
m HDPE 0 1.12% I I BOTTOM OF STONE=41.5' HDPE @ 1.00% (TYP) PROFESSIONAL ENGINEER MA Lic.No.38118
27 LF 12" '
HDPE 0 093% BOTTOM OF ARCH=42.0' a a
TOP OF STONE=45.0' a MAIN ENTRY 3"PVC LANGAI
_ - D-1 EX YRD-3 ROOF DRAIN LINE
D-1 DRY WELL I!I I 14 EXISTING YARD DRAINS AND 15 INCH
WITH APRON 3 RCP CONVEYANCE PIPES TO REMAIN EXISTING 3-STORY OFFICE USE TO REMAIN-±133,333 SF FOOTPRINT RAIN GARDENS TO BE g
a GR:41 6 TC49.40 SEE STRUCTURAL PLANS FFE=+45.95' INSTALLED IN LANDSCAPE Langan Engineering and
BOTTOM:37.6 BC48.90 FOR RETAINING WALL DESIGN 9 9 g
l I I 8"ROUND NYLOPLAST INLINE Q BW:43.56 ISLANDS,REFER TO LA •• -• Environmental Services,Inc.
_ I II 'IIII 10 A-1 TRENCH-1 A-1 RL-2 SERIES FOR LOCATIONS z
i TC50.43 DRAIN.CONNECT TO EXISTING 5 LF 10"HDPE @ 1.00% Z Z
-BC49.93 MANHOLE WITH 6"PIPE. 11 LF 8"HDPE @ 0.53% 5 LF 10"HDPE A-1 RL-1 RAIN GARDENS WITHIN 888 Boylston Street,Suite 510
6"PERFORATED: I AUL TO BE INSTALLED ]
_ SEE ENLARGEMENT DRAWING ON 18 LF 10" _ WITH IMPERMEABLE LINER r Boston,MA 02199
m =HDPE UNDERDRAIN INSPECTION PORTS PROPOSED 4 FT A-1 MH-4 A-1 RL-7
a ^ INV.:40.50' ° ° (TYP) TC51.00 TC51.47 TC52.04 TC52.50 77 CG510 LOADING DOCK TW:48.00 HDPE 0 1.00% '-- ��- (TYP 4.95
TC49.97 BC50.50 BC50.97 BC51.54 BC52.00 I CONNE T 0 AN M T EXIS NG FOUNDATION DRAIN. TC45.70 33 LF 6"HDPE @ 0.50%
CONNECT FOUNDATION DRAIN TO A-1 MH-4 AT INVERT 28 LF TC 10'HDP T:800.952.6426 www.langan.com
BC49.47 BC45.20 A-1 RL-8 A-1 RL-5 9
ELEVATION 42.38.VERIFY METHOD OF CONNECTION TO '
° EXISTING AND ROUTE OF RELOCATED FOUNTAIN DRAIN IN = BC44.34 44.41 CO
o - I TC48.93 FIELD WITH ENGINEER HDp 12 C - Project
= INFILTRATION BC48.43 - _ E®1Opq,: 0 1
- BASIN-' -- 3 LF 6'HDPE
t' I I I ° BC51.82 I I � ;,�,� TC45.50 84 LF 1•• o��
TC50.85 <` CO `:.,. BC45.00 - HDPE®D 2
TC49.83 TC52.27 --, APPROXIMATE LOCATION OF ACTIVITY I
DI 1.2 I I ° °° BC50.35 - 147 LF TC45.23 - - _-
BC49.33 TC51.89 BC51.77 AND USE LIMITATION LINE(TYP) �v TC45.97 _ HDPE @ 1.57%_BC44.7386�L- t-F.ea TC4570
1600 OSGOOD STREET
TC49.44 _ F
BC48.94 137 LF 6"HDPE-,,,,,. - 9_BC45.47 +AUL ZONE+ TC45.61 HDPE® o�.BC4520
- -- - 1.00y,, _
' 'N 26 LF 12"HDPE 0 0.94% TC48.88 "_TC50.29. Ttg BC4511 3_�
IIII III I IIII I III BC48.38 - BC49.79 TC51.32 FFE-f47.90' ®-a - TC45.1 CURB LEAKOFF WITH 1-FT -v C-2 MH-29 OZZY PROPERTIES-" BC50.82 --A-1 MH-6
re EXISTING YARD DRAINS AND 15 INCH BC44.69 _- ,.WI 2",91AMETER _- 18 LF 15" 4.
- 14 LF 12"HDPE 01.13% AP STATION- RCP CONVEYANCE PIPES TO REMAIN - -- __
E - � _ - SCREENED STONE(TYPE= - HDPE @ 1.00% A-1 WYE-2
8"CURTAIN 57 LF 12" TW: TC45.19 HDPE" @ 0.75%
DRAIN I HDPE @ 1.00% Tcas.ss 45 Bc44.69 _ YRD-1 116 LF 18 TC45.17
BC49.19 TC45.25 43.9 BC44.67 NORTH ANDOVER MASSACHUSETTS
M x _-TC48.70 TC49.14 25 LF 12 -
BC44.75 A-1 YRD-2
BC48.64 TC49.63 TW:47.85 - - _ Drawing Title
HDPE @ 1 00% TC45.40 TC45.79 - ON LF 1g A i
D-1 CLCB-2 BC44.90- gC45.2g - 11JSTALL6"X6"TEEi "y BC44.69
43.60
-' D-1 CLCB-1 _ CP 0
18 LF 24'RCP @ 2.00% OCS D-1.3 TC48.66 TC50.06 _ a3 LF 6"HDPE UNDERDRAIN, RING 6"PIPE TO 0509, 174 LF 1
' TC47.96 D RL TC45.75 - S DOME 24"~
-2 CB-10 I I I II BC48.16 d� - - GRA E N RCP
o B D-1 CB- BC45.25 _
CB-9 I D-1 CLCB-5 __ TC48.45 �,o TC49.39 ,N oo 18 LF-1HDPE1 -- TA 6"GRATE 1C O,SD9
C49.58 D A TALL
15 F 12"HDPE 0 1.00% -BC47.95 J^ BC48.89 ^^ TC50.87 D-1 EX.YRD-27\v •81 WITH S ER GRADING &
4
�T TC48.31 ®` ® C50.37 TC46.24 __ DRAINAGE I \ '\- D-1 M w I D-MH-3 BC45.74 A-1 MH-10 RAIN PLAN
STONE \D 1 MH-9 r R[°47.81 y.a W
CHECK DAM: I \. - 31 LF 30"HDPE 0 1 00% -_� o -`T'o a a __T__T_ 44.73 TC45.80
Y _ r• F D-1 MH-4 TC48.80 C _ BC45.30
- BC48.30 i -
I 6 D-1 MH-1 116 LF 24'HDPE 0 0.50% 69 LF 24"HDPE 0 0 50%-_< 57 LF 24" - TC45.80 6"HDPE 6"HOPE
�, TC48.22 T7H7 - HDPE @ 0.50% 9� ---- - T-- ----f _ BC45.30 UNDERDRAIN UNDERDRAIN TC45.80
o <F _ D-1 MH-SA
BC47.72 BC47.47 e,;,.__�; _a._Zq, -- ---- ---47.9 _
-«s _ �,  TC45.75 -1 CB-4 8"HDPE 0 Project No. Drawing No.
. �..TC49.04 TC49.00 ITC
„ NDP 47.44 TC47.0 �29 LF 12
-.. 34 LF 36"HDPE 0 0.50% -_BC48.54 BC49.60 TC50.37 ��F HDPE 0 1 35% BC45.25 177 LF 12"HDPE @_0.60% g
28 LF 18"HDPE 0 1.11% BC46.50 '�-
A 177 LF 1
o D-1 FES-1 BC48.50 BC49.87 TC49.95 ®QSoy TC45.40 29 LF 12"HDPE 0 3.00% 140182701
x I 20'(TYP) l TC49.73 - _ _ 1
1 BIOD DABLE EROSION CONTROL TC49.35 BC49.23 TC50.37 BC49.45  BC44.90
- -. TC47.80 232 LF 15"RCP 0 0.50%- _ A-1 CB-3 Date
PREFORMED BLANKET BE INSTALLED ON ALL BC48.85 _ .BC49.87 _,_ D-1 MH-5 BC47.30,. TC47.44 CG 103
SCOUR PAD -- - -
J CLEANOUT(TYP) (TYP) y'SLOPES :1 TO 3:1(TYP) "- "-- _�-�
BC46.94 I�-- D 1 CB-4 TCHLINE:CC703 12/11/2020
Drawn By
.. .. .-. T(`.45 47 MAT L NE: 104
F 40 0 25 4o TDO
Checked By
SCALE IN FEET FEH Sheet 59 of 158
Filename:C\bms\langan-pw-01\dms460921140162701-CG101-0101.DWG Date:2/42022 Time:09:54 User:akennedy Style Table:Langan.stb Layout:CG103
2 3 4 5 6 1 7 8
(TYP) .77 .:CG703
:45.69 46.52 TC45.98 TC46.49� Tc C-1 TC45.42 .78 %ml am MATCHUNE:001134 TC44.
45.6
EIC4672
.28 3C46.02 BC45.48 TC45.66
I BC45. imIPF749 35 BQ44.2
TC45.41 BC44,93 38 LF 15"HDPE 0 0 �43.99
TC45.43
2 MH 3 45.66 E3:1 TC45.66
44.5 44.6 BC45.16
I R C-1 YRD- 95 V ISV7 1 YRD-15
TC46.15 - TC45.65
BC45.65 TC45.29 CONCRETE YARD
44.77 IC44.80 7 15"HOPE @ 1.00% BC44,79 BC44.79 144 LF 24"V-B-Y48"H CONC. I RAIN To BC45.15
LF 12"RCP 0 1.00% 38 LF 15"HDPE 0 1.00% ACCOMMODATE @ ELLIPTICAL PIPE
0
3B LF 15"HOPE 0 1.00% BOX a 0 TC45.94
A ".Vol BC45.44
"1]4'1VLEF48"HDPE 0 0.39% 135 LF 42"HOPE @ 0,38% 135 LF 35 TC45,2 L_--FTC-4-4.4--21
C-1 4H 1
C 1 H-1 -14 RCP @ 0.38% �C-1 MH-16 BC44.7ui _JT45.95 IBC43.92 TC45.77
STONE .12 1 MH FTC45.63 I BC45.27
3 1 IBC45.45
HECK M _FW UNDERDRAIN -_FC4-5.-9-11 TC TC45.9
DA BC45.13 C-1 MH-15 63 APPROXIMATE LOCATI IBC45.41
ON OF SHEET LEGEND
n67 _JTG46.08]
IBC45.58 P LAiDu/rLoK HAND
TC45.91 LIMITATION LINE(TYP) i��
TC45.92 r
-_Fr46.1� PARKING ENLARGEMENT
5"PERFORATED42 IBC45.63
BC45.41 TC-45-.-911 C,
HOPE ---FTC--.921 \_FTC-45-.9--01 -F B044.92TC4 O
UNDERDRAIN �A 113C45.42 IBC45.40 a IBC45.41 TC45. BC45.5 CG101 CG103 CG106
INFILTRATION B TC46.25 [Tc� BC45. TC46.33
jf?�4-6�.22 TO .25 BC45 P 6.34
INV.:38-00' 97
BC45.72 45.75
MAX 3:1 t6. UNDERDRAIN(TYP)
BC45.81'
FCF46.3, CG102 CG104 CG107
TC46.23 C46.23
C-1 YIRDI�V BC45 BC45.73 TC46.
C-1 DRY WELL 'C46 64
TC46.21 A
L ik
WITH APRON C46.14 TC46.1 a 'C4 BC45.71 TC46.15
JBC45.53
GR:39.10 &�-20 BOTTOM:35.'- -30 FC-2
C- HW28 5.79 CG105 CG1 08
HDPE @ 0.4171\\IV,
LF
TC4 A-2 MH-16
CURB LEAKOFF NTH 1-FT WIDE, C-1 YRD TC45.82 C-1 -13 3-0- 6-4 LF 3-0 -1
TC44.95 DIAMETER SCREENED STONE(TYP) BC45.30 BC45.32 05 45.44 HDPE @ 0.50% HDPE @ 0.50% _J z
C-1 YRD-5 V1 a VA Ilk IK
BC44. 80 TC46.
B kgii] BC45.55
44.4
C44.23 TC45,87 BC45.35 WYE-35 6 LF 4" 1
44.55 45.21 C-1 YRD IBC45,39 BC45.37 C-2 - 74 LF 12" 11-= - 0
1 2 1:44. TC46.50 M 3.22% HDPE 0 0 60% 20 LF 8" od
U- 0 C44.71 67 LF 315' 49 LF 3 2 MH-18 C-2 R- C-2 RL-48 HOPE 01.84%
;hm C-2 M 66 7F 36" 89 LF 36"
ESP0 4-6.1-0-1 HDPE 0 0.60% HOPE @ 0. % HOPE @ 0.48% HDPE •0 0.52% 32 LF 24' - A-Z AD-8
-18 LF 12" o _FT
HDPE 0 52 LF 30" HOPE 0 1.937 7 LF 4" 7 LF 8"
1.08%- '22 LF 1�"HDPE 0 0.93% 44.1 IBC45.60 -----JT-C-46-7-91_ TC46.66 HOPE 0 0 50% C-2 WYE-32 HDPE @ 1�52%- TC4.6 BC46- HDPE
TC44.13 IBC46. 13 11 LF 12"
IBC45.75 TC46.14 HDPE @ 3.8 5 LF 12" -2
A.63 ��Llb LF 10" - 0%
2 HIJI'L 9 U%-- BC45.64 C-2 RL-45 HOPE @ 184%
C nTC43.4 HDPE 0 0.94% HDPE @ 1.90% 13 LF 81,
C-2 FE 7 C-2 RL-46 A-2 RL-2
20 LF 3"HOPE 0 1.00% 32 LF 24" A-2 AD-4-J
nBC42.92 C-2 FE 4
HOPE @ 0.50%
0 BC41�85 --5b 27 LF B"HOPE 36 LF 18 46.2 OP- --L46=".71 47.01] LF 8"HDPE @ 1.00% 12 LF 12"
CID
HOPE 0 1.66%
PE @ 0.5 ->MM-2z co \111fl-2 MH-13
FIE /-
TC \ I
TC45.44 TC46.26 �6,71
tJL;40./b \\--C-2 RL-39 \\-C-L22'Rl-G-Q RL-41-/ C-2 RL-43
-2 RL-
- C-2 RL-42
40.3 TC40.85 C-2 RL-37 TC46.6 - RAIN GARDENS TO BE INSTdLLED IN 54 LF 10"HDPE 2.41%
TC40.66 3.917 REFER To LA SEI ES 55 LF 24" BC40.35 0 angi
HOPE 0 EIC40.16 39.8 LANDSCAPEISLANDS, FOR
11 LOCATIONS.RAIN GARDENS WITHIN AI-11[TO BE
C-2 MH-1 TC40.45 47 LF 42"HDPE 0 0.62% BULLETIN 22(PHASE 1)/
BC39.95 C-2 YR 1 INSTALLED WITH IMPERMEABLE LINER(TYP) 05/19/22 7
C-2 FES-2- TC45.41 BULLETIN 131(PHASE 2)
R Co ,-C-2 RL-36 BULLETIN 17(PHASE 1)/
TC40 2'9�PUF 128."..% BC44.91
09 30 21 6
PROPERTY 35 LF 18" TC40.50 FTc-4 5.19 72 LF 8" BULLETIN 121(PHASE 2)
BC40.00 BC Q -HDPE..@ 4 271� L-35
C HDPE @ 2.00% W96
LINE co C46-96 013/25/21 BULLETIN 13(PHASE 1)/
C
C-2 M-7 2 -26 75 LF 4 DC4646 CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS FOR ACTUAL LOCATIONS BULLETIN 116(PHASE 2) 5
TC46.24 HOPE 0 4.47. I OF ALL UTILITY ENTRANCES TO INCLUDE SANITARY SEWER LATERALS,DOMESTIC WATER SERVICE, BULLETIN 10(PHASE 1)/
BC4 4 .99 ELECTRICAL,TIELECOM AND GAS SERVICE,ROOF DRAINS,AND ALL OTHER UTILITIES.CONTRACTOR 4
6"PERFORATED BC40.23 TC4 ITC46.96 SHALL COORDINATE INSTALLATION IN SUCH A MANNER AS TO AVOID CONFLICTS AND TO ENSURE BULLETIN 112(PHASE 2)
HDPE TC 94 BC45. IBC46.46 PROPER DEPTHS ARE ACHIEVED AS WELL AS COORDINATING WITH THE REGULATORY AGENCY AS TO
UNDERDRAIN 466 46.94 THE LOCATION AND SCHEDULING OF CONNECTIONS TO TH DR FACILITIES. 05/07/21 BULLETIN 9(PHASE 1)/ 3
119 LF 18" BULLETIN 109(PHASE 2)
IN 33.00' STONE RCP @ 1.05% -70 LF 8"HDPE 0 4.35% BULLETIN 7(PHASE 1)/
Ln TC41-- CHECK rc40.66 T040.76 -C-2 AD-2 04/21/21 BULLETIN 105(PHASE 2) 2
.501 3C40.16 BC40.26
BC44688 BULLETIN 4(PHASE 1)/
.00 -- 7o LF DE @ 4.35 02/12/21 1
1 1
TC40.50 BULLETIN 100(PHASE 2)
TC4 BC40.00 Br'A Ir A TC46.931\\-C-2 RL-50 PROPOSED DISTRIBUTION FACILITY Date Description No.
BC46.43k +817,212 SF FOOTPRINT
BC Ll 3
'C40.32 ±3,835,500 GSF
CUBG C39.82 6 LF 8"HOPE 0 6.72%
TC40.45 -C-2 RL:ar Ca.-8�15 FFE±47JW REVISIONS
io-e
7L J3C39.95 C-2 D-2
V LL �J 7 LF 8"HDPE @ 21.67%
IC40.32 BC4&99 C-2 WYE-33
I EIC39.52 TC40,48 '--25 LF 42"HOPE 0 0h627
I INFILTRATION 7 BC39.98 C45.89 -C-2 RL-33
BASIN TC40.73 TC46.30 0-17 LF 101,HDPE 0 20.69%
2 BC40,23 �-,C-2 WYE 25
T 2 "C40,67 BC45.80
IC40.17 tJU4b.UtJ C-2 RL-32
46.55 SIGNATURE
TC4.50
D BC41.00
MC-4 F-66-U
40.94 18 LF 8"HOPE 0 22.30%
42 LF 24"HDPE @ 0,51% C40.44 TC40. C-2 WYE-24 JOHN PLANTE
73 PROFESSIONAL ENGINEER MA Lic.No.38118
BC40.23
TC46.27
7ES-5 EIC45.77 -------------------------
C-2 ES-10 TC40.87
BC40.37 AUL ZONE N2 -30 - N -52 LF 42"HOPE 0 O�627 LANGA
It Mil W M m�MMMMMMMMMMWMM\ Z7 Langan Engineering and
i 1-�� 3 224 LF 48" TC46.103 ---'-�-2 RL-31
47 F 24" TC40.44 TC40.31 DPE 0.50%EIC45.53 Environmental Services,Inc.
RC @ 1.98% BQ39.81 40.2 ��7 LF 12"HOPE @ 1.32% 888 Boylston Street,MA Suite 510
C
31 LF 15" TC40.79 -2 MH-10 Boston,
-2.00% 935 BC40.29 .5
C-2 MH- C-2 FES-9 .0
-STO'NE -2 M-9 BC45 52 T:800.952.6426 www.langan.com
CHECK 58 LF 24"HOPE @ 1.75%
DAM
TC41 16 -C-2 1 RL-30 Project
TC.32
BC40.6 TC415.25 -17 LF 8"HOPE 0 28.96%
Q 9.82 BC45.75 -c-z.WYE-23
TC41.14 29 LF 24"HDPE @ 1.74%
z z-
BC40,64 BC46.08 C-2 RL-29 D-CCE) t
�17 LF 10"HOPE 0 24.21% IN
C-2 CB-5�4 E)A---- L -0 AE)CH RA 1600 OSGOOD STREET
-I TC41,94 45.8 HA
A. 52 L 18" 40.93 BC41.44 C-21 WYE-22
vt- HOPE 0 2.00% -27 LF 24"HOPE 0 1.74%
-C-21 RL-28
T-41 81 J C A ALL UT-U--y Et----R N C E
E 1 C-2 CB
17 LF 6"HOPE 0 23.42%
EIC42.68 /-Ko NORTH ANDOVER MASSACHILISET'rS
120 LF 12" TC43.18 -C-21 WYE-21 S-1 -S/A tK v-%�
RCP-z\
@ 2.00% SEWER LATERALS, DOML- E EL-
TC43.35 45.86 42 LF 24"HDPE @ Drawing Title
g - - \ t%-JD- A- L 0---HER UMITI
TC42.61 t....-F DKAINS N
BC42.11 GAS SERMICE, R )0
11A�11N 2 CD- TC46. -c-21 RL-27 - A
-E)F%--
V
z C TIC -16 LF 8"HDPE 0 2.66% ALLf-V 4��
LINE - U AT- --3- M A GRADING &
-Pfio-ERTY TU41.ii 4, -C-2 MH-14 -0
:3 (TYPE BC40.3 BQ4.' TIC45.45
BQ45.96 -ff C D C D CH Ru�-Mu THSAIR"
TC40.86 BC43.61 -41 LF 8"HDPE 0 6,13% A DRAINAGE PLAN IV
EIC410.36 0 TC43.50 A -U A
ZC FIRI-26 M�--Ckl
BC43�00 U W- REGULA Uu LA
X C Project NO. Drawing No.
llb`-�-2 IN-M41QONN LF 8"HDPE @-1.02% �4 U 3(� U N a-2 RL-25 • A E D U L E C
52-�IN i!tt-
BIODEGRADABLE EROSION CONTROL BLANKET TO BE 140182701
MATCHUNE*CGI04
D-1'
YARD
'.DATE
'AL PIPE
44.42
8 4 2
C4 C-1
INSTALLED ON ALL SLOPES 2:1 TO 3:1(TYP) Date
MAX 3:1 TC4 50 BOTTOM OF STAIRS 43.33
C-WYE-19
BC4 nn 22 LF 8"HDPE @ 2.24% MATCHLINE:00104 12111/2020 CG1 04
-- -2 RL-z IMATCHUNE:03105 Drawn By
A �, 113 I FC4"Hr)PF 0-3.37%
F 40 0 10 25 40 TDO
Checked By
SCALE IN FEET FEH Sheet 60 of 158
Filename:C\bnis\langan-pw-01\dn)s460921140182701-CG101-010l.DWG Dat,5/1812022 Time:1832 Us,rak,nn,dy Style Table:Langaii.stb Laput:CG104
2 3 4 5 6 7 8
I t11+ou
2 L 8"HOPE @ 2�24% MATCHUNE:03104
BC4 0
MATCHLINE:001105
16 LF 4"HDPE @-3.37% CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS FOR ACTUAL LOCATIONS G-2 RL 5
H-16 OF ALL UTILITY ENTRANCES TO INCLUDE SANITARY SEWER LATERALS,DOMESTIC WATER SERVICE,
75 LF.60" TC43.25 _�I TC43.50 ELECTRICAL,TELECOM AND GAS SERVICE,ROOF DRAINS,AND ALL OTHER UTILITIES.CONTRACTOR C 2 RL 6
RCP @ 18"RCP 0 1.81% QQ4.TQQ1 SHALL COORDINATE INSTALLATION IN SUCH A MANNER AS TO AVOID CONFLICTS AND TO ENSURE
SCO
S-8 MAX PROPER DEPTHS ARE ACHIEVED AS WELL AS COORDINATING WITH THE REGULATORY AGENCY AS TO APPROXIMATE LOCATIW --47.0 C-2 RL-3
3:1 - .00 BIODEGRADABLE EROSION CONTROL THE LOCATION AND SCHEDULING OF CONNECTIONS TO THEIR FACILITIES. DOOR ENTRANCE ON OF ACTIVITY A --:54- ,
PROPOSED DMIKIBUTION FACILITY ISLAND LOADING DOCK LIMITATION ME VP-"--:54 - -2 RL
BC42,45 --BLANKET TO BE INSTALLED ON ALL 36 C-2 RL-2
P) z� ±817,212SFFOOTPIUNT 43.50±3,835,SW CSF C-2 AD-3--,
DOOR ENTRANCE ON -DOCK FFE BOTTOM OF bIAIKb Al
CZDOOR ENTRAN K DOCK DOORS ISLAND AT LOADING ".7 LOADING DOCK OC 0
4 /47 00 IBC43.00
�2*'88(T
FIFE Q7 (TYP)
±42.W (TYP) TYP
43.81
A -2 RL-17 C-2 RL-15� C� RL-13 _2 RL-11 C 2 RL-8 41 LF 6"
CICS C_ C-2 RL-23-i-2 FI -2 RL-20 -18 C-2 RL-16 C-2 RL 14 1 C-2 RL 9 HOPE @ 2.00% TIC.50
1N,1 -1 F-1 F-1 F-1 :�F-1 F-1 F-I\ C_� 'A F-1 F-A F-1 EPRV BC 00
RL_12
F 14 A 1 --]\
V-
2 LF 3"HOPE @ 1.00% xki�d y y- -y- y y- C�
@ 1 COC CO Co co W'CO co CD__ co COco 79 Off" co - CO SHEET LEGEND
4 LF 3"HOPE @ -2 6 Co. HOPE 0 2;M 0
C-2 C0-01 1.71 1.1 �5 34 LF 6"
LU-i
- W I �'i 2 Z .C'� C,
c;
35 LF 3"1 D @
I'D P`E TC41.86r� 0 1.48%
4 LF 3"HDPE @ 1.00%
68 2 W 6 tea= ateCG101 I CG103 I CG106
o
69 LF 3"HOPE @ 1.15% 0"P, 42.4 C-2 Iv C-2 WYE-12
C EXA _1 k 61 LF 24"
M� Aun #jn Nd -RCP @ 0.40%-.
IH-4,K TC41.04
BQ40.54 C-2 MH-25 52 LF 48" -T-46 LF 42" 75 LF 42"RCP 00.36 53 LF C-2 MH-22 43 LF 24 CG1
- RC-RCP @ C).36%-/-FW-RCP!0.36% UP -�w RCP_t 0.36% J RCP 0 D�40
_REMAIN C-2 MH-23 22 LF 36"RCP 0 0.36%
28 LF 48" 6% C-2WY&A S C-2 WYE-7 C-2 WYE-6 -1 -4
BASIN C-2 11 LF 36"RCP @ 0.36% ft
INFILTRATION EXISTING 48 TO INCH RCP J�Vf 02 CG104 CG107
RCP-0 0.3 RC 17 LF 24 RCP @.40%--
C:2 WYE 11 LF 42 F�@ 0.36% WYE-11 C-2 VYE4 'W -2 WYE-5
C
C-2 WYE-14 -9 C 35 LF 36"RCP @ 0.367 tc-IP44-111
22 LF 48"RCP @ 0.36% LF 36
_I 37 LF 42"RCP 0 O�36. RCP @ 0,36 23 LF 24"RCP @ 0.40%
-34 LF 48 RCP WE CG105 CG108
- C-2 Mtti 27 C-2 WYF_-4 10 LF 24;�
-1/CB-8 C-2 WYE-13 �RCP a D.40%
W4 -W�W)24 60 B 0 1 . .
- - 33 LF 42"RCP 0 0.36% z 22 LF 24"RCP @ 0.40% C__2 WTKI-Z-14�Sk 34 A D 138% 35 LF 36"RCP 0 0. % V J _J
NV DUT�2 a 5 3 170 LF 24"RCP z
B SIM 7- 203 LF 36"RCP 0 0.26:1 cP 0 0,26% - 203 LF 36"RCP @ 0.26%
E 4
-1 MH-11
7
61 LF 18"RCP @ 0.26% 1 8 1 11 R M:
_V�
V,0-T 19 8 EN COMPENSATORY Old
Shp;11 P'%1:39.62
RM ZO-1-3 -11:29.88 64 LF 18"HOP 0 D-63% 64 LF 18"HOPE 0 078%
\",/' STORAGE
64 LF 18"HDPE 0 O�79%
B-1 Cr--7--
IN V=GUT?5 E, TC39.
BC38.7 B-1 CB-6 ELEVATION(FEET) CUBIC FEET
TG3 31:3kl \�.TC39j.83 6.1 TC38.81 22-23 14
TC 3
C
51 ";""L B-1 CB-5
37.81 _BC37.8 1B 37.81 13391.81 BI 23-24 56
RM -69_/
S�0_09 BC S_ I.T23.3
S)-3--,44 ................................ --- 24-25 90
_Vr �0.. 25-26 185
.40.00 TWI 39.40 26-27 2315
BW:28.57
27-28 7,735 8 986 B-1('.R
28-29 280
\ 29-30 29,604
30-31 1 14:1�1_4
TOTAL FLOOD PLAIN 54.414
VOLUME INCREASE
MAX 3:1
\ - ONE
C -Z
ZONE X(SHADED) 06/17/22 BULLETIN 133(PHASE 2) 5
MAX 3:1 ENSURE NO WETLANDS BULLETIN 18(PHASE 1)/
DISTURBANCE DURING PIPE 11/12/21 4
REMOVAL BULLETIN 124(PHASE 2)
A 09/30/21 BULLETIN 17(PHASE 1)/ 3
BULLETIN 121(PHASE 2\ \ / /
04/21/21 BULLETIN 7(PHASE 1)/ 2
EXISTING 12 INCH CMP BULLETIN 105(PHASE 2)
TO REMAIN 02/12/21 BULLETIN 4(PHASE 1)/ 1
BULLETIN 100(PHASE 2)
z z
\ ` COMPENSATORY Date Description No.
PROPERTY ST AGE AREA
LINE(TYP) REVISIONS
\ 9.9 / / / I _ _
1A
\ / � � � l 1%4A-
100'BUFFER AREA FE
D AP SIGNATURE
50'NO BUILD BUFFER JOHN PLANTE
25'NO DISTURB BUFFER PROFESSIONAL ENGINEER MA Lic.No.38118
WETLAND LIMITS LANGAN
\ _ _
/ \ \ Langan Engineering and
Environmental Services,Inc.
\ / \ 888 Boylston Street,Suite 510
APPROXIMATEBoston,VIA 02199
y 200 FT RIVERFRONT
APPROXIMATE T:800.952.6426 www.langan.com
EDGE OF RIVER EXISTING GRADES TO BE Project
MAINTAINED WITHIN PAVEMENT
DEMOLITION AREAS(TYP)
1600 OSGOOD STREET
E
\ 30 / \ 77 NORTH ANDOVER MASSACHUSETTS
\ / \ \ / / Drawing Title
\ / GRADING &
\ / �� DRAINAGE PLAN V
\ \ I I \ 2 -_ Project No. Drawing No.
140182701
Date 12111/2020
\ \� .- / CG1 05
Drawn By
F 40 0 10 25 40 TDO
Checked By
SCALE IN FEET FEH Sheet 61 of 158
Filename:C\b.s\1.119.11-pl,-Ol\dms460921140182701-OG101-010l.DWG Date:6/1512022 Time:14 33 User:ak,nn,dy Style Table:Langan.7 Layout:CG105
1 2 3 4 5 6 7 8 Q
2
4
J
�Z
A
SHEET LEGEND
r--T--T---1
ANY WORK IN THE MASSDOT RIGHT OF WAY IS SHOWN FOR I CG101 I CG103 CG106
GRAPHICAL PURPOSES.CONTRACTOR TO REFER -
MASSACHUSETTS DEPARTMENT OF TRANSPORTATIO10 N HIGHWAY
DIVISION-ROADWAY IMPROVEMENTS,ROUTE 125(OSGOOD
STREET)AT OSGOOD LANDING,25%SUBMITTAL IN NORTH I CG102 I CG104 I
ANDOVER,MASSACHUSETTS,DATED 10/08/2020.
CG107
--- --- -- - CG105 CG1 08
- -
GB W
�sr_ - - _- -- --- - _
PROPERTY ------ - - _
-�
F. -
LINE - EXISTING 15 INCH RCP
66.91 TO REMAIN
m
TC60.76
-' csoz3 �� _ 05/19/22 BULLETIN 22(PHASE 1)/ 10
T
�t BULLETIN 131 PHASE 2
PROPERTY TC59.61 BC59.73 :y ` BULLETIN 19(PHASE 1)/
LINE(TYP) rc60.29
02/04/22 BULLETIN 127 PHASE 2 9
`_` Bcssas
Tcso.z7 ♦♦ BULLETIN 18(PHASE 1)/
I _ ' 11/12/21 BU
Bcs 0.27 LLETIN 124 PHASE 2 8
ecss a2
I r- 09/30/21 BULLETIN 17(PHASE 1)/ 7
r`1 TC59.47 TC50.12 - _ J
_ acsa.s7 BC59.62 rc59.41 = BULLETIN 121 PHASE 2
e - 6 BC58.91
TC59.7 _
BULLETIN 13(PHASE 1)/
OB/25/
21 BULLETIN 116 PHASE 2 6
BC59.26 TC59.50
O �- BC59.00 -=- 100'BUFFER AREA BULLETIN 11(PHASE 1)/
TC58.99 z TC59.55 TC59.60 =� 07 14 21 5
BC58.49-_ BC59.05 BC59.10 TC59.79 _ -{-- 50'NO BUILD BUFFER / / BULLETIN 114 PHASE 2
TC59.91 BC58.79
-- - I •,' BC59.41 TC59.77 TC59.12 ___ BULLETIN 10(PHASE 1)/
-21- BC59.27 BC56.62 25'NO DISTURB BUFFER 05/25/21 BULLETIN 112 PHASE 2 4
i 1 6'HOPE TC58.84 TC58.28 - MAX 3:1 BULLETIN 7(PHASE 1)/
- UNDERDRAIN BC58.34 - 4'WIDE LEAKOFF(TYP) WETLAND LIMITS 04/21/21 3
A-1 EX.MH-2 I TC59.15 Bcs7.7a BULLETIN 105 PHASE 2
t- - BC58.65 -_ GRASS SWALE BULLETIN 6(PHASE 1)/
t.ice EXISTING 15" 03/18/21 2
/ • RCP TO REMAIN TC58.05 = BULLETIN 102 PHASE 2
/ Bcs7.ss __ BULLETIN 4(PHASE 1)/
T 02/12/21 BULLETIN 100(PHASE 2) 1
--'� 67 T05769 CONVERT TO _ / Date Description No.
MANHOLE ADJUST RIM BC57.19 - MANHOLE
� r TC58.12 p9�� ELV:57.40 ADJUST RIM TC59.91 REVISIONS
A-1 CLCB-9 TC57.75
- BC57.62 BC57.25 BC56.84
45 LF 12° TC57.85 _
45°BEND(TYP.) 100 LF 6"HDPE DRAINAGE LINE FOR _ _ - �$ HDPE 0 0.50% TC57.38 BC57.35
1.00% FUTURE AREAWAYS - -- --LF BC56.88
AREA DRAINS �BC15561591
7 21 LF 12"HDPE®0.0% TC56.48 TC57:19REFER TO MEP DRAWINGS A-1 MH-22 � A-1 MH-21 BC55.98 8CS6.fi
(TYP) 180 LF 12"HDPE 0 0.58% TC57.11 / TC55.80 TC578-_
TC 7.07 - �/ BC55.30 C57.00 BC57 30 -
BC56.61 EXISTING 42"RCP _
BC 8.57 1 MH-" A-1 C BC56.50
T PIPE TO REMAIN 9 LF 24" 6"HDPE TC58 57
A-1 CB-7 RCP�0.57% UNDERDRAIN TC56.66
- CORE OPENINGS CORE OPENING BC56.18 B-8 07-_
D 98 FOR UNDERDRAIN BC55.7a UNDERDRAIN _ SIGNATURE
TC56.36 \ r JOHN PLANTE
I _-
RAIN GARDENS TO BE INSTALLED IN LANDSCAPE ISLANDS, 48 83 LF 12" 25 LF 10" BC55.86 --- .� PROFESSIONAL ENGINEER MA Lic.No.38118
REFER TO LA SERIES FOR LOCATIONS.RAIN GARDENS WITHIN A- HDPE®0.50% HDPE®0.62% A-1 M-24 TC57.26
57.6 TC55.72 40 LF 8" 20 LF 10"
AUL TO BE INSTALLED WITH IMPERMEABLE LINER TYP BC56.78 -- ---_`, \FIFE 5.95' BC55.22 --_ - -
„ 34 _
33 LF 6 HDPE HDPE�0.50% 56•p A-1 MH-18 A 1 MH-23A 60 LF 12" HDPE®0.50% _
MAIN ENTRY A-1 MH-25 --44 LF 18"RCP®0.70%% HDPE C 0.45% A-1 CB-17 C55.66 -57.54 '
o g EXISTING 3-STORY OFFICE USE TO REMAIN"±133,333 SF FOOTPRINT A 1 L;tjXy
3"PVC 17 LF 18"RCP®0.50% _
V O 84 LF 12"HDPE 0 8.35% - _ 6"PERFORATED '
VLANGAI
ROOF DRAIN >L ,H* -- -=L 3 A-1 CB-6 0.00 _ Langan Engineering and
ui ui LINE APPROXIMATE LOCATION OF ACTIVITY A-1.4 EXTENDED DRY DETENTION 0.86 i 56.31 -- -56 HDPE UNDERDRAIN g g g
Z Z - - _` BASIN WITH IMPERMEABLE LINER - 56.40 INV.:49.0' Environmental Services,Inc.
AND USE LIMITAT+ON LAVE '- 56 LF 18"RCP®3.00% _ STONE -
A.1 RL-6 - 6 TC 5.87
_ 2 TOP OF BASIN:46.00 A-1 FES-6 ❑„� TC55.73 `:a`• g 5.37 43 LF 24" 888 Boylston Street,Suite 510
48 LF 12"HDPE®0.50% BOTTOM OF BASIN:41.00 BC55.23 - RCP®0.357 DAM
6 LF 6"HDPE A-1 R1�3 A-1 FES-2 "P °�
A-1 RL-10 A-1 RL-4 rrH A `, A-1 MH-19 Boston,MA 02199
A-1 MH-5B 33 LF i0'-HDPE TC.36 �/ELL, 5
D7 15 LF 8'HDPE®1.OD% 5 LF 10'HDPE BC gg TC54.48 + 54.57 C56 0.00 _•�
.00
- BO 6.49 T:800.952.6426 www.langan.com
_ O A-1 FES-1 3:1 j� EXISTING 60 INCH RCP
LJ Co45.74 _ 39 LF 12 55.50 BC56.60 PIPE TO REMAIN
.70 HOPE
0 3 0% 18 LF 3 RCP®0.5 DRY WELL as = J t
`❑ =%BC45_:70- _ - - -. TC55.80 TC55.a0 TC55.95 O J
t SS Project
TC44.72 - _®C.50% __ .86 BC54.19 BC55.30 WITH APRON
y LL p1E TC45.98 TC54.28 BC55.30 BC55.45 4% GR:48.3D
05 LF 12 HD BC45.48 ,STONE CHECK DAM 1C 33 LF 12"HDPE 0.00%BC53.76 CLCB-14 71 LF 24" BOTTOM:44.30 MAX 3:1
-1-- - - - - - A-1 DO -11 HDPE®0.42% INFILTRATION _'
TG45.99 1600 OSGOOD STREET
• �� _ +AU L ZONE+ BC45 49 TC56.83 BASIN A-1.2)
62 LF 18"HDPE®0.50% _ A-1 MH-1 {';•`- A-1 MH-16 UNDERDRAIN BC56.3 y 12 LF 24"HDPE®0.64% TC57.00
44.9 TC45.69 0 =�, TC53.71 UNDERDRAIN BC56.50 ,
s ��8% A_1 _3 CURB LEAKOFF WITH 1-FT WIDE,2" TC45.72 - i TC55.73 TC57.11
BC45.19 51\5 050° DIAMETER SCREENED STONE(TYP) BC45. TC§;3b2
C45.32 i - - -
E q - 0P� --- 37 LF 18"HDPE 0 0.50% 44.27 - _ TC 6.7 _, X 3:1
43.6 MAX 3:1 52.44 BC56.69 �M1
TC45.17 _YRD_3 A-1 rizD-a I. BC52.26 BC55.28 B 6.2
BC44.67 19 LF 15" TC45.70 51.94 1 55.37 69 LF 18'• TC56.56 TC56.57
57 LF 15"HDPE®3.00% BC54.87 BC56.06 BC56.0 NORTH ANDOVER MASSACHUSETTS
HDPE®1.00% INSTALL 6"X6"TEE ON BC45.20 RCP @ 0.43%
-1 •25 UNDERDRAIN,BRING 6"PIP4MTO� 6"PERFORATED I A-1 MH-15 TC52.50 RCP(e LF 12"
% TC56.46 BIODEGRADABLE TO EROSION ED CONTROL
ROLL Drawing Title
TC45.19 BC52.00 A-1 MH-17 -
30 LF 12" \
BC44.69 A-1 H-5 �F..2ppq GRADE AND INSTALL<6< MH4- HDPE UNDERDRAIN IA-1 CB-18 A-1 dQUBLE CLCB 12 UNDERDRAIN -.A-1 CLCB-15 7C5g 44 BC55.96
TC56.31 B 55.9• SLOPES 2:1 TO 3.1(TYP)
A-1.3 UNDER.01}gl0 _ A HDPE e�3.00%
® TC46.34 IN V-:39.5'
pE RE{5NTWI= BC45.84 �_ -`
67 LF 24" vp_�"'° P.
A-1.3 ` BC55.94 BC55.81
-a4 TWO(2)WATER TIGRi ItU RAIN 22 LF 12"HDPE®3.00% 47 LF 12" TC55.24 -
HDPE H.2 = - "-- TC55.63 - GRADING &
�_ � 41.0 - 54 LF 12"HDPE®3.00% '1 RCP®0.43% BC54.74 9°
=T25 LF 48" e 190 LF 60'RCP SEE SHEET CG503 FOR "Trm.BC55.13 166 LF 12"HDPE�5.52%
A- H-2 HDPE®0 50% -3 TWO(2)WATER TIGH CROSS SECTION TC51.65 0:S A-1.2 TC
6Q� 6et •__T az 9 315 LF 60 IIIN
LF 48"HDPE®0.00 \CH H 25 BC46.z5 OCS A-1.4 _-BC50.61
___ BC49.7 129 LF 24"HDPE®0.45% TC56.07 TC56.50 DRAINAGE PLAN V
�0 9 % BCC• A-1 MH-13
TC45.95 45.58 TC.46 TC4 3 --- � BC55.57 BC56.0
RCP HDPE 45.96 BC47. --- 88 LF 12"HDPE 6'0.75% TC55.96
A-1 MH-12 A-DOUBLE CLCB-13 51 LF 36" A-1 CLCB-16 BC TC56.20
55.46
HDPE 00.50% BC55.70 -_-
A-1 MH-11 UNDERDRAIN rC56.16 TC56.20
A-1 MH-1 WOU�F0-8HC pp_rrB_2 RCP E TC46.16 BC47.40 TC48.92 21 LF 30" CUT AND REMOVE
BC55.66 BC55.70 Project No. Drawing NO.
-MH-8 21 LF 15"HDPE®1.00%, 124 LF 10"HDPE®"1.�0% BC45.66 BC48.42 BC49.47 BC49.97 HDPE®0.00% EXISTING 42 INCH
1 H-9 12 LF 12"HDPE®1.00% 6"HDPEr - 39 LF 8"HDPE®0.44% TC50.41 TC55 4 f RCP PIPE TO DOG TC55.38 _ _ 140182701
_ BC49.9 BC49.91 BC55 HOUSE A-1 MH-11 BC5488 TC56.26 Date
53 LF 12"RCP®0.82% A�1 UN AIN WATER TIGHT RCP ,' BC53.10 -2 HW-3 CG 106
TO HDPE COUPLINGS I - =t Bic
BW54.20 12111n020
--�-- - -- -- -- -- -- -- TC5z.7s Drawn B
' BC52.25 ., Y
MA'.. LINES 1 a - ,
F 40 a 10 25 40 TDO
Checked By
SCALE IN FEET FEH Sheet 62 of 158 -
Filename:C:\bms\langan-pw-01\dms460921140182701-CG101-0101.DWG Date:5/19/2022 Time:13:07 User:akennedy Style Table:Langan.stb Layout:CG106
2 1 3 4 5 6 7 8
IIJ HUHE UUUHU BC52.60 1
---------- --- ----------
Tr.59 7-9;
TC44.64 TC45.97
Bic
TC46.16 '82 YRD--ti TC54.36
42 8 4.66 BC53.86
R�E TC45.0 54.40 C52.77
.-NCI 53.90
C52.2 TC52.17
KC DRAIN TC54.39
AC M..EA_
MOME
C�L
,LLI IIUAL 1-11- A-2 YRD-4 0 53.8 TC52.55 IEEE—
FFC-4 z
LELC4 BC44,8 TC45,12 TIC 5.2 BC52..5 BC51:67
TC44.64 4 C44.62 BC44.74 22 1 Ut14.22
3.72
BC44.14 LF 19 APPROXIMATE LOCATION A YRD-2
A 44.07 TC45.40 TC54.53 A-2 MH-15
T044.64 -a Vc 44.6 BC44.90 TC45.35 OF ACTIVITY AND USE UNDE DRAIN(TYP) BC54.03
• LIMITATION LINE(TYP) A-2 CLCB-4
TIC 5.64 A-2 MH-4
TC52.02
BC45.14 TC45.50 RAIN GARDENS TO BE INS 54,48 T 51.
TC45.69 LANDSCAPE NOS,REFER TO LA SE BC51.19
BC45.1 9 BQ45.00 LOCATIONS.RAIN GARDENS WITHIN A PIPE MA RIAL MUST
lk 2o,
TC45.48 [TC4-5.82 J nqV LF SHEET LEGEND
CP 2- INSTALLED WITH IMPERMEABLE HAVE A.1NNING'S Nx IC54.18 EXISTING 60
BC44.98 IBC45.3 24� - TC50.36 OF 0.1 OR LESS TC54.6 INCH RCP PIPE-
TC45.27 TC45.90 Q 40:-. FU450.7-0 TC50.19 BC54.18 TO REMAIN
BC44.77 =BC45.40 TC45.63 I—— .�_q r n
DEMOLISH SECTION OF
6.01 85 0 A-2 MH 3 INC-4.5 INCH RCP
L51 45.35 TC49.44 0 __4
C 2::25_' TC 59 1 BC48.94 I XPET r051.50 CG101 CG103 CG106
7 ' BC 54 _r::� fTC49.34L
TC. BC45.58 IBC48.841
BC46.32 BC45-.1 31 1 TC45.66
CURB LEAKOF WITH 1-FT WIDE,2" TC46.01 C53.33B*.52.86yl
DIAMETERS REENED STONE(T BC45.51 413.43 TC53.81 T_:V A-2 MH-14
i.83912g__ 1 8 A�__i N=RF/
>M31 A-2 CLCB-2 CG102 CG104 CG107
_F��592 2 CB 3
IBC45.42
A MH 28 A-2 MH TC5: TC50.51 L
BC5: BC50.01 (VERSION SWALE
-TFA-2�H� TC45.64 TC47-1 5
BC45,14
A-2 WYE-3 TYP CG105 CG1 08
ITW..6
FTC---59-L 45.63 DEM ISH INLET ES TO BE \IDERDRAIN(TYP)
co CW._511 IBC45.09 3C45.1 YRD 1 E 51110 OVED,BRIG ID MORTAR 'E2:0:�\ L _J _J 2 R 4 J A-2 WYE-4 A- 2�
_14C-3 I _ BC45,25 BC45.26 HAVE A 4-ANINI S
PIPE MATERM, z
B 91= 5.72 OF 0. S N TC49.01
2 YRD-5 TC45.99 A-2 MH-7 A-2 H-5 C TRA�70(-ON FIRM 0
7 BC45.49 A:_�J BC48.51
TC46.56 V CONDITION OF E ISTING Ind
61 • �45,.891 BC4 A-1 M MANIH[QLE�FOR RUSE WIT
2 Mn BC415.015 1-13 TC49.86
2 AD-7 ITC47.154 A NH-2 -CIVIL;NGINEER;1 45.39 TC46..8 A-2 -5 45,3 TC46.29 BC47 ANEW' TC49.26
Rmv MANHOLE AND ONNII TO BC48.76
46.8 TC47.19 LA1311INU UU ILL IF IN DOR 27
BC11 CONDITION.
TC46�::R
BIC _6 _Q!j7
TIC it 81 7_._
TC46 74 -2 MH- .34 BC46.15 V4:2 TC47
-2 RL-5-" BC47.76 BC47.
A ,r, K 1
BC46 32 P.45j- RrA61 A TWI.I.I.
46.56 -1 EX.MH-1
A-2 RL-6 C46.06 46.91 A
co-; TC45 67 TC4 TC47.96
0 Co__Co BC4 BC BC4
47.00 TW.55.67 06/17/22 BULLETIN 133(PHASE 2) 10
CONNECT TO PERFORATED
A-2 RL- TC RETAINING WALL DRAIN PIPE. 06/01/22 BULLETIN 132(PHASE 2) 9
46.99 A-2 RL 8 A-2 RL-9 A-2 RL-10 A-2 RL-11 A-2 RL-12-/ N BC44.01 I L;44 Ud SCO .17 SEE RETAINING WALL
_R M 44 05 DETAILS FOR CONTINUATION. 05/19/22 BULLETIN 22(PHASE 1)/ 8
A-2 RL-13 _V� -(--_ -6 BULLETIN 131(PHASE 2)
BC42,73 NJ,J v- aO,76 -
7 VFW BULLETIN 19(PHASE 1)/
1 02/04/221 7
5 A- MH-1 1� BULLETIN 127(PHASE 2)
A-2 RL-14 .95 BC44.75 TC45,56 Q 3,9
A-2 RL-15 TC45.7 Rr.47 17
18 A- E -A-2 FES-4 11/1 BULLETIN 18(PHASE 1)/
Rum-\ 0 2/21 BULLETIN 124(PHASE 2) 6
C 46.9 -,-SEDIMENT FOREBAY A-2.2 09/30/21 BULLETIN 17(PHASE 1)/
CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS FOR ACTUAL LOCAI BOTTOM OF STAIRS A-2 ECIAL MH-2 PM-A337 A-2 FES-3 BULLETIN 121(PHASE 2)
OF ALL UTILITY ENTRANaS TO INCLUDE SANITARY SEWER LATERALS,DOMESTIC WATER SERVII 44.10 �1313F_ 1
ELECTRICAL,TELECOM AND GAS SERVICE,ROOF DRAINS,AND ALL OTHER UTILITIES.CONTRACTOR A-:�MH-20 �___I -V`O-T 3640 BULLETIN 13(PHASE 1
013/25/21 4
SHALL COORDINATE INSTALLATION IN SUCH A MANNER AS TO AVOID CONFLICTS AND TO ENSURE MAX 3:1380 \-MAX 3-1 BULLETIN 116(PHASE 2)
PROPER DEPTHS ARE ACHIEVED AS WELL AS COORDINATING WITH THE REGULATORY AGENCY AS TO TC43.74 r2_1
THE LOCATION AND SCHEDULING OF CONNECTIONS TO THEIR FACILITIES. BC42.74 CONC.BOX
05/07/21 BULLETIN 9(PHASE 1)/
47.0 43.86 TC43.75 BIODEGRADABLE EROSION CONTROL BULLETIN 109(PHASE 2)
111-2 L-16 BC42.75 A-2 L MH ---BLANKET TO BE INSTALLED ON ALL BULLETIN 1709 1)/
1 28 LF 24"V X 45"H SLOPES 2:1 TO 3:1(TYP) 04/21/21 2
7. TC43.70 CONC.BOX @ 0.50% BULLETIN 105(PHASE 2)
Emy/ TC43.9 A-2 HW-1 WETLAND LIMITS 02/12/21 BULLETIN 4(PHASE 1)/ 1
A-2 RL-1 BC42 89
co MAINTENANCE ACCESS 25 FT NO DISTURB BULLETIN 100(PHASE 2)
TC44.0 A-2 MH-25
PROPOSED D STRIBUTION FACILITY B
±817,21!SF FOOTPRINT C43.0 BUFFER Date Description No.
±3,835,500 GSF 50 FT NO BUILD
FIFE±47.W BUFFER REVISIONS
A-2 WYE-15 1/ 100 FT BUFFER
A-2 RL-18 7.00 CO SEDIMENT F?REBAY-2.1-" AREA.\
40.30 �EXISTING 72 INCH RCP
PIPE TO REMAIN
co 1
'38 IF=
A-2 R 19_� MH-02
E __ / -
A-2 MH-11
� FNM,42 9 LEA OF TYP)
V� (�e SE):35 0 1
D M�t A-2 WYE- _V�0-T,3-,96 JOHN PLANTE
EXISTING 6FTX3FT BOX 38.0 PROFESSIONAL ENGINEER MA Lic.No.38118
C A-2 RL-20 E>7 O CULVERT TO REMAIN
C\1
46 FT WIDE RIP NRAP SPILL WAY--- LANGA
•A-2 WYE-9
BOTTOM OF STAIRS AT WET POND A-2 Langan Engineering and
LOADING DOCK ON ISLAND Environmental Services,Inc.
43.88(TYP) A-2 MH-9:�� A 2 F56/-1- 888 Boylston Street,Suite 510
A-2 RL-22 Boston,VIA 02199
A E- co \ \
T:800.952.6426 vvww.langan.com
E
Project
0 37.0
E co A-2 WYE-10 i 38.0 MAX 4:1 TEMPORARY POND
Z z
A-2 RL-23
cc,
F�N
BOTTOM OF STAIRS AT A-2 RL-24:f��O A-7 W L_111/
LOADING DOCK SEE SHEET
E 42.88(TYP) CG5O03S&,FOR
CR
E> A-2 WYE12- SECTION
NORTH ANDOVER MASSACHILISET'IS
A-2 RL-25-4- Drawing Title
co 2)�O"OUTLET
E> R:M PIPES 0 1 OCS A-2
�Z�f4 7A�4 EX.M 1---_
N&OUT�3��
A-2 RL-26 E- A-2 Mf10 E�q
GRADING &
DRAINAGE PLAN VII
A-2 RL-27 co 13770-01
E-
---------------------------------------
A 2 RL-28 1 1D0 BUFFER A FA
Project No. Drawing No.
37.00 APPROXIMATE 2?000FT T 140182701
A- RL-29- __J A= RIVERFR Date
MATCHUNIE:00107 co /-EMERGENCY SPILLWAY MAI NC�E"
ACCESS 12111/2020 CG1 07
Drawn By
A-2 RL-31-1 n-X
MATCHUNE:03,108 _7717-1 I 1�
F 40 a 10 zs 4o TDO
Checked By
SCALE IN FEET FEH Sheet 63 of 158
Filename:C:\bms\langan-pw-01\dms460921140182701-CG101-0101.DWG Date:6/1712022 Time:09 39 User:ak,nn,dy Style Table:Langan.stio Layout:CG107
1 2 3 4 5 6 7 8 Q
MATCHUNE:CC707 CO `258 LF 10" `` ''-� ACCESS ,
16 LF 4 HDPE 0 2.15%, A-2.MH-1 - _ HDPE O 0.80%1-`- 1a - '
MATCHUNE:010708 A-2 RL-31 - = - 35 FT WIDE RIP RAP Q
CONTRACTOR SHALL REFER TOARCHITECfURAL PLANS AND SPECIFICATIONS FOR ACTUAL LOCATIONS A-2 32 5 LF 4 . __= EMERGENCY SPILLWAY \ \ J
OF ALL UTILITY ENTRANCES TO INCLUDE SANITARY SEWER LATERALS,DOMESTIC WATER SERVE, HOPE 0 7.19% - 43.7 _ �� I
ELECTRICAL,TELECOM AND GAS SERVICE,ROOF DRAINSMANNER,AND ALL OTHER UTILITIES.boNTRACTOR m
PROPER DSHALL
CE�PTHDS INATE ARE ACHIEVED AS WELL AS INSTALLATIONIN �COORDINATING WITHTHAS TO IE REGULATORY AGENCY AS TO HOPE 20114%  --6- 43.1 STOAITS OF-LF 1S RCP 00.45% A iH-2g
THE LOCATION AND SCHEDULING OF CONNECTIONS TO THEIR FACILITIES.
A-2 MH-23 _= CO 43.8 292 / '� I /•
__ 43.2 ( �_, EXISTINGTO 15 IN RCP\ /.•'
-__ `-
FFE AT LOADING PROPOSED DISTRIBUTION FACILITY 37 LF 18 RCP 0 0 52%
DOCK DOORS ±817,212 SF FOOTPRINT . A 1> 50011I /
47.00(TYP) i:3,835,500 GSF LF 6 HDPE 0100%
FFE=t47.00' DOOR ENTRANCE ON - 7
BOTTOM OF STAIRS AT ISLAND AT LOADING DOCK 30 - 1 '
LOADING DOCK 43.Du Ca RL-30 /.
A �B-1 RL-6 42.88(TYP) - -2 ISLAND
OP.STAIRS OEt 43.8 7 LF 4" _
ISLAND AT LOADING DOCK- HDPE 0 1.42% - 4�
C-2 RL-1 B 1 RL 5 B-1 RL-4 B-1 RL-3 B-1 RL-1 43.88 - - I NO wFn AN /k®.0
42.4 TC42.91- E DISTURBANCE DURING
BC41.91 BOT OM OF PIPE REMOVAL
CO CO C0; CO 0 CO CO CO - 42.31 A-2 -22438.3 = I r MAINTENANCE ACCESS SHEET LEGEND
43 LF 18"RCP 0 0.45%
m o o °� `V^1I 11 00 -n _-2 RL=33= TC43 07 �33 LF 18°HDPE__®0 489 /
IJ �a ®+ 10 LF 8"
w w w
a n a w n I, a w HDPE 0 130%__ 18 LF 18"HDPE 0 0.48%
a a co a �o ao co a m ao ..'
0 0 0 = o = Q7 2 *#MT m_t` BC42.14 -_ - -_ I I CG101 I CG103 I CG106 I
\28 LF 12'HDPE 0 0.23% ___=- - I III
-2 MH 21 I - A-2 WYE4= - _ _ =m I I I Ln/--
C 1
43 LF 24" 43 LF 24' -,- 37 24' _ J 41 71 _ -__ _ I
HDPE 0 1.047 HDPE 0 1.04% H 0 1.03%Akin - a
LF 24" n _ HDPE 0 1 27% I CG102 I CG104 I CG107 I
'`W OF y 71 �W 19 LF 8"HDPE 0 0.48%� Upw --w EXISTING GRADES TO BE
r• B-1 MH-14 �F -A-2 WYE-7 - I MAINTAINED WITHIN PAVEMENT
REMOVAL AREAS(TYP) - L J
4 B- B`-1 MH-1 °'OF 5 LF 8
t24p% B-1 WYE-3 _E1"1-MH-2. -
33 LF 24" 16 LF 24" ®i7 HDPE®0 60% 1 SPECIAL 1 I
HDPE 0 1.05%= HDPE 0 1.06% 6y e I CG105 ' CG108 i
204 LF 42" B-1 WYE-1 119 LF 42 `� B-1 MH- 50
RCP 0 0.26% RCP 0 0.26% 182 LF 42"RCP 0 0.26% 145 LF 42"RCP 0 0.26% �.' _ I I L J i J O
B I I I Ai 45
.M 4069 W
r ao I 40 O
x �
64 LF 15"HDPE 0 0.79% _SPECIAL MH-2 > I
64 LF 18"HDPE 0 0.79% 49 L1.15" n m I- B-1 QOUBLE FC-I
HDPE 0 1.02% I I Tr�B-1 CB-1 56 F p 1
90% 10 LF 36"V 8" 3`9 \
RCP® CONC.BOX 0.21%
TC39.83 TC38.81 TC39.83 - TC38.81 TC37.79 \ \
BC38.83 - 1-CB-3 BC37.81 BC38.83 BC37.81 B-1 CB-2 BC36.79 14 LF 24 HDPE 0 0.22% �8
B-1 MH-5 WQU FD-8HC B-1 MH-6 DIVERSION MH
TW:39.71 .39.65 19 LF 24 HDPE 0 0.31% I. I�02 t3j
CO C BOX X 43"% 4-
4,
BW:29.00 \S�y2F BW:29.00 I ...-...-...__...-...-...-... ..-...-_...-...-...-...-...-... F 1 \d
N 0 1° � \ \
o9V-�- OCS B-1 f � \ a2 y�sy9o\
179 LF 24"RCP 0 0.45%F k� B-1 FES-3 \ \ \oJ
B-1 FES-2 \
®0.45q- ...-...-...-... ..-....-.-... ...-... .... ... -
1 FES 4 1 1 \ \\ \ \
. �� �7-.• 06/17/22 BULLETIN 133(PHASE 2) 7
1tGP MAX 3:1...
177`F 24r \ L J � � BULLETIN 18(PHASE 1)/
33.75 \ \ 10/12/21 BULLETIN 124 PHASE 2 6
33 FT WIDE RIP RAP
EMERGENCY SPILLWAY BIODEGRADABLE EROSION \\ \ \ / O9/3O/21 BULLETIN 17(PHASE 1)/ 5
\ Y.
COMPENSATORY r. \ \ \ BULLETIN 121 PHASE 2
EXTENDED DRY STORAGE AREA 2 STONE CHECK DAM CONTROL BLANKET TO BE
DETENTION BASIN B-1 INSTALLED 1 ALL SLOPES k= f\ \ \ \ BULLETIN 7(PHASE 2
zs.00 2:1�3:1(TYP) \ \ -/ \ � / 05/07/21 BULLETIN 105 BULLETIN 7(PHASE(PHASE
)/ 4
PREFORMED SCOUR PAD I 1 1 \ ` ` \ / 04/21/21\ \�
BULLETIN 105 PHASE 2 3
~ \ \ \ 03/18/21 BULLETIN 6(PHASE 1)/
SIZED FOR 32 PIPE 2
8 BULLETIN 102(PHASE 2)
�i(15, 02/12/21 BULLETIN 4(PHASE 1)/ 1
AE \ BULLETIN 100(PHASE 2)
_ EXISTING GRADES TO BE Date Description No.
v~, \\�-MAINTEMAINED
I NT SOOLITON AREASA(TYP)
DHADFD) /
/ REVISIONS
100'BUFFER AREA
50'NO BUILD BUFFER
I 25'NO DISTURB BUFFER
D I WETLAND LIMITS ( \ \ \ \ SIGNATURE
PLANTE
ENGINEER
\ \ PROFESSIONAL ENGINEER MA Lic.No.38118
NO 100'BUFFER AREA \ \ Ii / /
I
J LANGAN
50'NO BUILD BUFFER� I APPROXIMATE / Langan Engineering and
200 FT RIVERFRONT 25'NO DISTURB BUFFER
WETLAND LIMITS l\ Environmental Services,Inc.
888 Boylston Street,Suite 510
\ \\ Boston,MA 02199
/
� / T:800.952.6426 www.langan.com COMPENSATORY
STORAGE AREA 3 \
Project
1600 OSGOOD STREET
\ MAX 3:1 \ \
NORTH ANDOVER MASSACHUSETTS
I I /J Drawing Title\ /�,(_/ i GRADING &
ZONE PE ' - `
DRAINAGE PLAN
Vill
Project No. Drawing No.
140182701
� �� Date
12/11/2020 CG 1 08
Drawn By
F 40 a 10 25 40 TDO
Checked By
SCALE IN FEET FEH Sheet 64 of 158 -
Filename:C:\bms\langan-pw-01\dms400921140182701-CG101-0101.DWG Date:6/17/2022 Time:09:32 User:akennedy Style Table:Langan.stb Layout:CG108
1 2 3 4 5 6 7 8 Q
A-1 OUTFACE NETWORK A-1.3 INFLOW NETWORK A-1.3 INFLOW NETWORK BASIN/POND REFERENCE TABLEQ
NAME TYPE TOP ELEV. BOTTOM SEDIMENT SED.FOREBAY J
STRUCTURE TABLE STRUCTURE TABLE STRUCTURE TABLE ELEV. FOREBAY DEPTH
STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: A-1.2 INFILTRATION 54.20 50.00 YES 1.00
BASIN
RIM=49.04 A-1 CB-1 RIM=43.75 12"HDPE(E)=40.13 A-1 RL-6 NV IN=40.04 3"HDPE(N)=40.04 6"HDPE(W)=40.04
A-1 EX.MH-1 INV IN-36.00 48"HDPE(NE)6.0.00 72"RCP(W)=36.00 INV OUT=40.13 INV OUT=40.04 A 1.4 BASINDETEN EXTENDED
46.00 41.00 YES 1.00
NV IN=36.00 60"RCP(E)=36.00 BASIN
INV OUT=36.00 A-1 CB-2 RIM-44.83 10"HDPE(N)=41.25 A-1 RL-7 INV OUT=41.22 10"HDPE(W)=41.22 IMPERMEABLE
A A-1 CB-3 INV OUT=41.25 12" LINER
RIM=57.55 A-1 RL-8 INV OUT-40.85 8"HDPE(W)=40.85
INV IN=46.47 18"RCP(SE)=46.47 RIM-43.75 HDPE(E)=40.01 A-2 WET POND 41.00 37.00 YES 1.00
NV IN=44.82 48"RCP(NE)=44.82 INV OUT=40.01
A-1 EX.MH-2 48"HDPE(SW)=44.82 A-1 RL-9 NV OUT=39.35 8°HDPE(W)=39.35
INV IN=46.97 18"HDPE(NW)=46.97 B-1 EXTENDED DRY 34.75 31.00 YES 1.00
INV IN=49.32 12"HDPE(N)=49.32 A-1 CB-4 RIM=44.05 12"HDPE(S)=40.19 DETENTION
INV OUT=44.82 INV OUT=40.19 D-1 RL-1 NV OUT=44.80 6"HDPE(W)=44.80 BASIN
RIM=54.51
RIM=44.99 C-1 INFILTRATION 44.50 39.00 YES 2.00
INV IN=39.18 12°HDPE(SE)=39.18 INV IN=38.25 48"HDPE(NE)=38.25 BASIN
A-1 MH-11 INV IN=39.70 48"HDPE(NE)=39,70 48"HDPE(SW)=38.00 A-1 MH-1(WQU FD-8HC) INV IN=38.25 18"HDPE(N)=38.25 48"HDPE(S)=38.25 A-1.4 INFLOW NETWORK C-2 INFILTRATION 39.70 34.00 YES 2.00
INV IN=38.00 36"HDPE(N)=3800 MANNING'S N=0011 INV IN=39.06 15"HDPE(W)=39.06 BASIN
. .
INV OUT=3&00 INV OUT=38.25 STRUCTURE TABLE D-1.1 EXTENDED DRY 46.50 42.50 YES 1.00
DETENTION
RIM=49.74 RIM=45.06 BASIN
A-1 MH-12 INV IN=38.83 8"HDPE(N)=38.83 24"HDPE(S)=38.83 NV IN-38.38 24"RCP(N)=38.38 STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: D-1.2 INFILTRATION 46.50 41.50 YES 2.00
INV OUT=38.83 A-1 MH-2 NV IN=38.38 24"HDPE(SE)=38.38 48"HDPE(SW)=38.38 RIM=53.35 BASIN
NV IN=38.38 24"HDPE(E)=38.38 A-1 CB-10 INV OUT=47.99 12"HDPE(SW)=47.99 D-1.3 INFILTRATION 45.00 41.50 WQU N/A C
RIM=55.04 INV OUT=38.38 BASIN N
A-1 MH-13 INV IN=39.84 12"HDPE(S)=39.84 12"HDPE(NW)=39.84 RIM-49.94 °D
INV OUT=39.84 RIM=43.78 A-1 CB-18 INV OUT=45.04 12"HDPE(E)=45.04
INV IN=39.25 18"RCP(N)=39.25
RIM=58.00 A-1 MH-3 INV IN=39.25 15"HDPE(NE)=39.25 24"RCP(S)=39.25 RIM=53.00
A-1 MH-21 INV IN=47.90 12"HDPE(N)=47.90 18"HDPE(SE)=47.90 INV OUT=39.25 A-1 DOUBLE CLCB-11 INV OUT=47.81 12"HDPE(NW)=47.81 d
INV OUT=47.90 Z
B RIM=47.69 RIM=50.90
A-1 MH-22 RIM=61.88 12"HDPE(S)=48.95 A-1 MH-4 INV IN=42.58 8"HDPE(N)=42.58 8"HDPE(S)=42.38 A-1 DOUBLE CLCB-12 INV OUT=45.28 12"HDPE(N)=45.28 G
INV OUT=48.95 INV OUT=42.38
RIM=51.12 RIM=44.23 A-1 DOUBLE CLCB-13 INVI .58 OUT 49 45.98 12"HDPE(NE)=45.98 d
A-1 MH-26 INV IN=36.35 48"HDPE(NE)=36.35 48"HDPE(SW)=36.35 INV IN=38.88 18"HDPE(N)=38.88
INV OUT=36.35 MANNING'S N=0.011 A-1 MH-5 INV IN=38.88 18"HDPE(SE)=38.88 24"HDPE(W)=38.88 q-1 FES-2 RIM-42.75 18"RCP(S)=41.00
INV IN=40.35 12"HDPE(NE)=40.35 INV IN=41.00
RIM=52.70 INV OUT=38.58
OCS A-1.2 INV IN(4"PERF S):49.00 12"HDPE(N)=49.00 RIM=44.37 A-1 FES-6 RIM=42.10 12"HDPE(E)=41.00
INV OUT=49.00 INV IN=39.38 12"HDPE(SE)=39.38
A-1 MH-SA 18"HDPE(NW)=39.38 INV IN=41.00
IN
RIM=53.64. V IN=39.38 10"HDPE(E)=39.38 RIM=52.49
TOP OF WEIR FROM WEST INLET:41.00 INV OUT=39.38 INV IN=42.67 15"HDPE(W)=42.67
OCS A-1.3 12"ORIFICE:38.25 24"HDPE(N)=38.25 36"HDPE(S)=38.25 A-1 MH-14 INV IN=46.82 12"HDPE(SE)=46.82 18"RCP(N)=42.67
RIM=45
INV IN=38.25 30"HDPE(W)=38.25 .68 INV IN=46.82 12"HDPE(NE)=46.82
INV IN=38.25 A-1 MH-513 INV IN=40.14 6"HDPE(N)=40.14 12"HDPE(SW)=41.20 =4 6 Q
INV OUT=38.25 INV IN=40.01 6"HDPE(E)=40.01
INV OUT=41.20 RIM=50.79
RIM=44.75 INV IN=44.37 12"HDPE(SW)=44.37
4"ORIFICE:4 RIM=44.28 A-1 MH-15 INV IN=44.37 12"HDPE(S)=44.37 15"HDPE(E)=44.37
1.D0
OCS A-1.4 N 1. 39.50 8"HDPE(S)=39.00 A-1 MH-6 NV IN=40.51 12"HDPE(N)=40.61 18"HDPE(S)=40.61 INV IN=44.37 12"HDPE(W)=44.37
INV IN(4"PER
NV OUT F E): NV IN=40.61 10"HDPE(NE)=40.61 INV OUT=44.37
NV OUT=40.61 09/30/21 BULLETIN 17(PHASE 1)/ 6
RIM=55.7 BULLETIN 121(PHASE 2)
C RIM INV IN=-3943.7901 12"HDPE SE NV IN-52.63 6"HDPE(E)=52.63
. . A-1 MH-25 12"HDPE(W)=48.00 BULLETIN 13(PHASE 1 2)
A-1 MH-7 ( ) 3901 24"HDPE(NW)=39.01 INV IN=48.00 6"HDPE(N)=48.00 08/25/21 BULLETIN 116(PHASE 2) 5
INV IN=39.01 15"HDPE(E)=39.01 INV OUT=48.00 BULLETIN 11(PHASE 1)/
A-1.2 INFLOW NETWORK INV OUT=39.01 07/28/21 BULLETIN 114(PHASE) 4
RIM=44.56 BULLETIN 10(PHASE 1)/
STRUCTURE TABLE A-1 MH-8 INV IN=39.27 12"RCP(S)=39.27 15"HDPE(E)=39.27 C-1 NETWORK 05/25/21 BULLETIN 112(PHASE 2) 3
NV OUT=39.27 BULLETIN 6(PHASE 1)/
STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: RIM=43.87 STRUCTURE TABLE 03/18/21 BULLETIN 102(PHASE 2) 2
RIM=56.00 NV IN PHASE 1)
A-1 CB-5 INV OUT=50.94 10"HDPE(NW)=50.94 A-1 MH-9 NV IN=40.01 10"HDPE(S)=40.01 12"RCP(N)=39.70 STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: 02/12/21 BULLETIN 100(PHASE) 1
INV OUT=39.70
A-1 CB-6 RIM=54.25 18"RCP(E)=50.67 RIM=44.12 C-1 FES-3 RIM=42.25 48"HDPE(S)=38.00 Date Description No.
NV OUT=50.67 INV IN=38.00
A-1 MH-10 NV IN=39.13 12"HDPE(N)=39.13 18"HDPE(S)=39.13 REVISIONS
A-1 CB-7 RIM=55.94 12"HDPE(SW)=50.91 INV IN=39.13 12"HDPE(W)=39.13 RIM=45.09
NV OUT=50.91 INV OUT=39.13 INV IN=38.17 48"HDPE(S)=38.17
C-1 MH-13 INV IN=40.63 12"RCP(E)=40.63 48"HDPE(N)=38.17
A-1 CB-8 RIM=55.50 8"HDPE(SE)=51.42 A-1 RL-2 RIM-45.81 10"HDPE(W)=41.74 INV IN=38.21 12"HDPE(W)=38.21
NV OUT=51.42 INV OUT=41.74 INV OUT=38.17
A-1 CB-17 RIM=55.05 10"HDPE(NE)=50.88 A-1 TRENCH-1 RIM-43.56 8"HDPE(S)=42.64 RIM=45.10
INV OUT=50.88 NV OUT=42.64
INV IN=38.72 42 HDPE S =38.72
RIM=56.38 RIM=46.15
C-1 MH-14 INV IN=38.93 12"HDPE(W)=38.93 48"HDPE(N)=38.72
D A-1 CLCB-9 INV OUT=51.45 12"HDPE(S)=51.45 INV IN=41.03 12"HDPE(N)=41.03 INV IN=38.87 15"HDPE(SE)=38.87 SIGNATURE
A-1 WYE-1 12"HDPE(S)=41.03 NV OUT=38.72
INV IN=41.03 10"HDPE(E)=41.03
L
PROFESSIONAL
A-1 CLCB-14 RIM-55.00 24"HDPE(S)=50.73 INV OUT=41.03 RIM=45.10 J HN ENGINEER MA Lic.No.38118
INV OUT=50.73 INV IN=39.24 36"RCP(S)=39.24
RIM=44.49 C-1 MH-15 INV IN=39.60 12"HDPE(W)=39.60 42"HDPE(N)=39.24 LANGAI
RIM=54.55 NV IN=39.75 18"HDPE(N)=39.75
A-1 CLCB-15 INV OUT=51.07 12"RCP(S)=51.07 A-1 WYE-2 NV IN=40.35 8"HDPE(E)=40.35 18"HDPE(S)=39.75 NV IN=39.60 15"HDPE(SE)=39.60
INV OUT=39.75 INV OUT=39.24
RIM-54.23 Langan Engineering and
A-1 CLCB-16 12"RCP(E)=51.10 RIM=45.11
INV OUT=51.10 RIM=44.00 24"V X 48"H CONC. Environmental Services,Inc.
INV IN=39.06 18"HDPE SE NV IN=39.75 ()=39 75 888 Boylston Street,Suite 510
RIM-53.08 A-1 WYE-3 ( )=39.06 18"HDPE(NW)=39.07 C-1 MH-16 INV IN-40.28 BOX S 36"RCP(N)=39.75
A-1 FES-1 INV IN=50.20 30"RCP(N)=50.20 INV IN=39.06 8"HDPE(E)=39.06 INV IN=40.28 15"HDPE(W)=40.28 Boston,MA02199
INV OUT=39.07 INV OUT=39.75 15"HDPE(SE)=40.28
RIM=55.31 RIM=42.54 T:800.952.6426 www.langan.com
NV IN=50.60 18"RCP(W)=50.60 RIM=45.10 ()=41.18
A-1 MH-16 24"HDPE(E)-50.60 INV IN-39.90 12"HDPE(SE)=39.90 15"RCP W
INV IN=50.65 24'HDPE(N)=50.65 A-1 WYE 4 NV IN=39.90 8"HDPE(E)=39.90 12 HDPE(NW)=39.90 NV IN=41.18 19"V 3D"H CONC. 24"V X 48"H CONC. Project
INV OUT=50.60 C-1 MH-17 INV IN=40.40
INV OUT=39.90 INV IN=40.40 ELLIPTICAL(SE)=40.40 BOX(N)=40.40
RIM=54.64 INV OUT=40.40 15"HDPE(SE)=40.40
INV IN=51.00 12"RCP(N)=51.00 A-1 YRD-1 RIM=43.32 15"HDPE(SW)=39.43
A-1 MH-17 INV IN=50.90 12"RCP(W)=5D.90 18"RCP(E)=50.90 NV OUT=39.43 1600 OSGOOD STREET
INV OUT=50.90 RIM=43.62 C-1 YRD-5 INV OUT 4 439.83
12°HDPE(E)=39.83
RIM=55.36 A-1 YRD-2 INV IN=40.07 8"HDPE(N)=40.07 18"RCP(S)=40.D7 RIM=44.41
E INV IN=50.81 12"HDPE(NE)=5D.81 INV OUT=41.00 INV OUT=40.07 C-1 YRD-6 12"RCP(W)=41.00
A-1 MH-18 NV IN=50.81 12"HDPE(N)=50.81 18"RCP(S)=50.81 RIM=43.32
23
INV OUT=50.81 A-1 YRD-3 INV OUT=39.20 15"HDPE(W)=39.20 C-1 YRD-7 RIM==40
INV OUT= .55 12"HDPE(E)=40.55
NORTH ANDOVER MASSACHUSETTS
RIM=55.08 A-1 YRD-4 INV OUT 43 39.58 12"HDPE(NW)=39.58 C-1 YRD-8 RIM=44.41 15"HDPE(NW)=39.25 Drawing TitIDRAINAGE
A-1 MH-19 NV IN=50.30 24"RCP(E)=50.30 30"RCP(S)=50.30 INV OUT=39.25
INV IN=50.30 24"HDPE(W)=50.30 RIM=44.88
NV OUT=50.30 C-1 YRD-9 INV OUT=41.22 12"HDPE(E)=41.22 STRUCTURE
RIM=56.27 A-1.3 INFLOW NETWORK
A-1 MH-20 NV IN=51.22 8"HDPE(NW)=51.22 12"HDPE(S)=51.22 RIM-44.41
NV IN=51.22 12"HDPE(N)=51.22 C-1 YRD-10 15"HDPE(NW)=39.98
INV OUT=51.22 STRUCTURE TABLE NV OUT=39.98 REFERENCE SHEET
RIM=54.76 STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: C-1 YRD-11 RIM=44.89 15"HDPE(E)=41.09
A-1 MH-23 INV IN=50.51 12"HDPE(S)=5D.51 24"RCP W=50.45 NV OUT=41.09
INV IN=50.45 24"RCP(N)=50.45 () A-1 RL-1 NV OUT=40.95 10"HDPE(W)=40.95 RIM-44.41
C-1 YRD-12 15"HDPE(NW)=40.66 Project No. Drawing No.
INV OUT=50.45 INV OUT=40.66
A-1 RL-2 INV OUT=41.74 10"HDPE(W)=41.74 140182701
RIM=54.70 RIM=45.23
A-1 MH-23A 24°
NV IN=50.50 18"RCP(N)=50.50 RCP(S)=50.50 A-1 RL-3 INV OUT=39.54 10"HDPE(W)=39.54 NV OUT=41.99 C-1 YRD-13 15"RCP(E)=41.99 Date
A
INV IN=50.59 18"RCP(W)=50.59 Drawn 12/11/2020L) _I
INV OUT=50.50 A-1 RL-4 INV OUT=41.18 10"HDPE(W)=41.18 C-1 YRD-14 RIM=44.41 15"HDPE(NW)=40.59 D B
IN OUT-40.59 y CG0 I
RIM=55.36 INV IN=40.38
F A-1 MH-24 NV IN=50.78 10"HDPE(SW)=50.78 12"HDPE(N)=50.78 A-1 RL-5 INV OUT=40.38 3"HDPE(S)=40.38 6"HDPE(W)=40.38 C-1 YRD-15 RIM=43.51 19"V 30"H CONC. CLR
NV IN=50.78 10"HDPE(SE)=50.78 INV OUT=41.18 ELLIPTICAL(NW)=41.18 Checked By
INV OUT=50.78
FEH Sheet 65 of 158
Filename'.C'.\bms\langan-b-01\d-46092\140182701-CG201-0101.DWG Date'.10/1/2021 Tl-12:47 User:akonnody Style Table:Langa n.stb Layout.CG201
1 2 3 4 5 6 7 8 Q
A-2 NETWORK A-2 NETWORK(CONT.) A-2 NETWORK(CONT.) A-2 NETWORK(CONT.) v
STRUCTURE TABLE STRUCTURE TABLE STRUCTURE TABLE STRUCTURE TABLE
STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: A. STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT:
A-2 AD-1 RIM-42.84 6"HDPE(SW)=40.33 RIM-50.85 A-2 RL-19 RIM-42.95 10"HDPE(S)=38.75 RIM-4D.3D
INV OUT=40.33 INV IN=46.10 30"RCP(E)=46.10 INV OUT=38.75 A-2 WYE-14 INV IN=39.19 8"HDPE(N)=39.19 12"HDPE(S)=39.10
A-2 MH-15 INV IN=47.00 12"HDPE(S)=47.00 30"RCP(W)=46.10 INV IN=39.10 8"HDPE(NE)=39.10
RIM=46.47 INV IN=47.00 8"HDPE(N)=47.00 A-2 RL-20 RIM=42.94 8"HDPE(S)=39.33 INV OUT=39.10
A A-2 AD-3 INV IN=42.11 8"HDPE(S)=42.11 8"HDPE(N)=42.11 INV OUT=415AD NV OUT=39.33
INV OUT=42.11 RIM=39.8D
RIM=46.36 A-2 RL-21 RIM=42.95 12"HDPE(S)=39.00 A-2 WYE-15 INV IN-38.70 12'HDPE(E)=38.70 8 HDPE(NE)=38.91
RIM=46.47 INV IN=41.40 4"HDPE(W)=41.40 INV OUT=39.00 INV OUT=38.91 12"HDPE(W)=38.70
A-2 AD-4 INV IN=42.36 8"HDPE(S)=42.36 8"HDPE(N)=42.36 A-2 MH-16 NV IN=41.40 12"HDPE(SW)=41.40 18"HDPE(S)=41.40 NV OUT=38.70
NV OUT=42.36 INV OUT=41.40 A-2 RL-22 RIM==39 8"HDPE(S)=39.33
INV OUT=39-33 RIM=42.93
RIM=46.48 RIM=45.96 INV IN=41.59 8"HDPE(NW)=41.59
A-2 AD-5 INV IN-42.85 8"HDPE(S)=42.85 8"HDPE(N)=42.85 INV IN=4D.35 24"HDPE(N)=40.35 A-2 RL-23 RIM=42.95 10"HDPE(S)=39.00 A-2 WYE-17 INV IN=41.18 18"HDPE(N)=41.18 18"HDPE(S)=41.18
INV OUT=42.85 A-2 MH-17 INV IN=40.36 12"HDPE(W)=40.36 36"HDPE(S)=40.36 INV OUT=39.00 INV OUT=41.18
RIM=46.48 INV OUT=40.36 RIM=42.94
15
A-2 AD-6 INV IN=43.58 8"HDPE(S)=43.58 8"HDPE(N)=43.58 A-2 RL-24 INV OUT=39.33 8"HDPE(S)=39.33 A-2 YRD-1 RIM==41 15"HDPE(W)=41.80
RIM=46.75 INV OUT=41.80
INV OUT=43.58 A-2 MH-18 INV IN=41.75 10"HDPE(W)=41.75 12"HDPE(E)=41.75 RIM=42.94
RIM=46.47 INV IN=43.70 4"HDPE(N)=43.70 A-2 RL-25 INV OUT=39.50 6"HDPE(S)=39.50 A-2 YRD-2 RIM=48.94 18"RCP(W)=44.00
INV OUT=43.83
A-2 AD-7 8"HDPE(N)=43.83 INV OUT=41.75 INV OUT=44.00
RIM=42.95
RIM=42.71 A-2 RL-26 INV OUT=39.33 8"HDPE(S)=39.33 A-2 YRD-3 RIM=44.77 15"RCP(E)=41.00 C
RIM=46.45 INV IN=38.70 6"HDPE(NW)=38.70 INV OUT=41.00
A-2 AD-8 INV IN=41.98 8"HDPE(S)=41.98 8"HDPE(E)=41.98 A-2 MH-19 INV IN=38.61 8"HDPE(W)=38.61 12"HDPE(S)=38.70 RIM=42.94 °D
INV OUT=41.98 - -27 8 A2 RL "HDPE(SE)=39.33 RIM=44.45 19"V 30"H CONC.
NV IN=38.70 8°HDPE(N)=38.70 INV OUT=39.33 A-2 YRD-4 O
A-2 CB-1 RIM=47.32 12"RCP(SE)=43.30
NV OUT=3&70 RIM=43.63 INV OUT=40.95 ELLIPTICAL(S)=40.67 �
INV OUT=43.30 RIM=42.29 A-2 RL-28 INV OUT=39.33 8"HDPE(SW)=39.33 A-2 YRD-5 RIM=44.81 15"RCP(SE)=41.40 d
A-2 MH-20 INV IN=38.7D 8"HDPE(NW)=38.70 8"HDPE(E)=38.70 INV OUT=41.40 Z
A-2 CB-3 RIM=48.79 12"HDPE(S)=45.29 INV OUT=38.70 RIM=43.76
B INV OUT=45.29 RIM=43.49 A-2 RL-29 INV OUT=39 INV OUT=.50 4"HDPE(S)=39.50 A-2 YRD-6 RIM==40.95 18"RCP(SW)=40.95 G
A-2 CB-5 RIM=50.36 8"HDPE(S)=47.36 NV IN=39,15 8"HDPE(NE)=39.15 RIM=43.96 CMG
INV OUT=47-36 A-2 MH-21 INV IN=39.15 4"HDPE(N)=39.15 10"HDPE(S)=39.15 A-2 RL-30 INV OUT=39.50 4"HDPE(W)=39.50 A-2 YRD-7 RIM==41 30"CONC.(S)-41.43 d
RIM=44.12 INV OUT=39.15
INV OUT=41.43
A-2 CB-6 12"RCP(S)=40.99 RIM=43.89
NV OUT=40.99 A-2 RL-31 4"HDPE(W)=39.50 RIM==46 ELLIPTICAL
30"H CONIC.
RIM=43.82 INV OUT=39.50 A-2 YRD-8 INV OUT=46.OD ELLIPTICAL(S)=41.43
A-2 CLCB-2 RIM-49.15 12"HDPE(N)=45.15 A-2 MH-22 INV IN=38.41 18"HDPE(N)=38.41 18"RCP(SE)=38.41
INV OUT=45.15 NV IN=39.4D 4"HDPE(E)=39.40 A-2 RL-32 RIM==39 6"HDPE(W)=39.50 RIM=53.37
INV OUT=38.41 NV OUT=39.50 A-2 YRD-9 18"RCP(W)=48.00
INV OUT=48.00
RIM=50.72
A-2 CLCB-4 12"HDPE(N)=47.50 A-2 RL-33 8"HDPE(W)=39.33 RIM=38.50
INV OUT=47.50 RIM=43.74 RIM=42.93
NV IN=38.65 18"RCP(NW)=38.65 NV OUT=39.33
A-2 MH-23 18"HDPE(S)=38.65 W/GATE SHUT OFF VALVE 30"HDPE N-32.30
RIM=41.00 NV IN=39.20 6"HDPE(E)=39.20 RIM=42.95 OCS A-2 TWO(2)6"RECT.ORIFICE:37.00 ()
INV IN=32.22 30"HDPE(S)=32.22 INV OUT=38.65 A-2 RL-34 8"HDPE(W)=39.33 INV OUT=32.30 30"HDPE(N)=32.30
A-2 EX.MH-1 INV IN=31.97 72"CONIC.(E)=31.97 72"CONC.(W)=31.97 INV OUT=39.33
INV IN=32.22 30"HDPE(S)=32.22 RIM=42.31 INV OUT=32.30
INV OUT=31.97 A-2 MH-25 INV IN=38.90 6"HDPE(N)=38.90 12"HDPE(W)=38.90 A-2 RL-35 RIM=42.93 8"HDPE(W)=39.33
INV OUT=38.90 INV OUT=39.33
RIM-39.29
A-2 FES-1 24"RCP(N)=37.00 RIM=42.12
INV IN=37.00 RIM=41.00 INV IN=37.70 24"V X 48"H CONIC.
NV IN=37.10 10"HDPE(N)=37.10 BOX(NE)=37.70 24"V X 48"H CONC.
RIM=40.88 A-2 MH-26 INV IN=37.10 18"RCP(NW)=37.10 18"RCP(E)=37.10 A-2 SPECIAL MH-1 INV IN=37.14 24"V X 48"H CONIC. BOX(SW)=37.14
A-2 FES-2 30"RCP(E)=38.D0 INV IN=36.84
NV IN=38.00 NV OUT=37.10 INV OUT=37.14 BOX(N)=37.14
C 8"RCP E BULLETIN 17(PHASE 1)/
RIM=39.17 RIM=46.30 ()=36.84 09/30/21 BULLETIN 121(PHASE 2) 5
A-2 FES-3 INV IN=38.00 12"RCP(N)=38.00 INV IN=4D.9D 18"HDPE(N)=40.90 RIM-42.56 24"V X 36"H CONIC. 24"V X 48"H CONC.
A-2 MH-27 24"HDPE(S)=40.90 NV IN=37.69 BULLETIN 13(PHASE 1)/
NV U=41..9 12"HDPE(W)=41.16 A-2 SPECIAL MH-2 INV IN=38.10 BOX(NE)=37.69 BOX(SW)=37.25 08/25/21 4
A-2 FES-4 RIM=39.61 6"HDPE(E)=39.00 NV OUT=40.90 BULLETIN 116(PHASE 2)
INV IN=39-00 INV OUT=37.25 12"HDPE(NE)=38.10 BULLETIN 9(PHASE 1)/
RIM=45.16 06/01/22 BULLETIN 132(PHASE 2) 8 05/07/21 BULLETIN 109(PHASE 2) 3
RIM=38.83 NV IN=40.15 36"HDPE(N)=40.15 RIM=46.98
I
A-2 FES-5 INV IN=37.00 18"RCP(W)=37.D0 A-2 MH-28 NV IN=41.09 15"RCP(NW)=41.09 36"HDPE(S)=40.15 A-2 SPECIAL MH-3 NV IN=40.77 24"RCP(E)=40.77 24"V X 48"H CONC. 05/19/22 BULLETIN 22(PHASE 1)/ 7 04/21/21 BULLETIN 7(PHASE 1)/ 2
INV OUT=40.15 INV N=38.34 42"HDPE(N)=38.34 BOX(SW)=38.50 BULLETIN 131(PHASE 2) BULLETIN 105(PHASE 2)
A-2 HW-1 RIM=39.62 48"CONIC.(NE)=37.00 INV OUT=38.34 02/04/22 BULLETIN 19(PHASE 1)/ 6 02/12/21 BULLETIN 4(PHASE 1)/ 1
INV IN=37.00 RIM=46.68 BULLETIN 127(PHASE 2) BULLETIN 100(PHASE 2)
NV IN=39.46 36"HDPE(N)=39.46 RIM=43.43
A-2 HW-3 RIM=53.78 30"RCP(W)=50.90 A-2 MH-29 INV IN=39.47 18"RCP(E)=39.47 36"HDPE(S)=39.46 A-2 SPECIAL MH-4 INV IN=38.15 36"HDPE(N)=38.15 24"TWIN RCP(S) Date Description No. Date Description No.
INV OUT=50.90 INV OUT=39.46 INV IN=40.82 4"HDPE(N)=40.82 =38.15
RIM=46.48 INV OUT=38.15 REVISIONS
RIM=42.66
INV IN=40.00 15"HDPE(E)=40.00 RIM=42.28
A-2 MH-2 42"HDPE(S)=38.88 INV IN=38.84 18"RCP(NW)=38.84
NV IN=38.88 36"HDPE(N)=36.88 A-2 MH-30 INV IN=40.D4 6"HDPE(N)=40.04 18"RCP(SE)=38.84 A-2 WYE-2 NV IN=40.62 24"HDPE(N)=40.62 24"HDPE(S)=40.62
INV OUT=38.88 INV OUT=38.84 INV N=40.87 12"HDPE(NW)=40.87
RIM=46.09 15"RCP(W)=40.00 RIM=46.41. INV OUT-40.62
41
INV IN=40.00 24"TWIN RCP(N) A-2 RL-1 INV OUT= 50 4"HDPE(E)=41.50 RIM=43.23
A-2 MH-3 INV IN=39.84 =39.84 36"HDPE(S)=39.84 A-2 WYE-3 NV IN=39.98 36"HDPE(N)=39.98 36"HDPE(S)=39.98
INV IN=40.00 18"RCP(NE)=40.0D RIM=46.85 INV IN=41.06 10"HDPE(NW)=41.06
D INV OUT=39.84 A-2 RL-2 INV OUT=41.50 12"HDPE(NE)=41.50 INV OUT=39.98 SIGNATURE
RIM=45.17 19"V 30"H CONIC. 24"TWIN RCP(S) A-2 RL-3 RIM=46.92 12"HDPE(E)=41.50 RIM=43.09 JOHN PLANTE
A-2 MH-4 NV IN=40.67 ELLIPTICAL(N)=40.67 =40 INV OUT=41.50 NV IN=39.84 36"HDPE(N)=39.84 PROFESSIONAL ENGINEER MA Lic.No.38118
67
INV IN=40.67 18"RCP(NE)=40.67 A-2 WYE-4 INV IN=41.00 8"HDPE(NW)=41.00 36"HDPE(S)=39.84
INV OUT=40.67 A-2 RL-4 RIM=46.41 12"HDPE(E)=41.50 NV OUT=39.84 LANGAI
NV OUT=41.50
RIM=49.85 RIM=42.87
INV IN=46.00 18"RCP(E)=46.00 RIM=47.00 I
NV N=39.62 36"HDPE(N)=39.62
A-2 MH-5 INV IN=45.26 18"RCP(SE)=45.26 24"RCP(W)=45.26 A-2 RL-5 INV OUT=41.50 6"HDPE(SE)=41.50 A-2 WYE-5 INV N=40.78 8"HDPE(NW)=40.78 36"HDPE(S)=39.62 Langan Engineering and
INV OUT=45.26 INV OUT=39.62 Environmental Services,Inc.
A-2 RL-6 RIM=46.73 4"HDPE(S)=45.89 888 Boylston Street,Suite 510
RIM=45.67 INV OUT=45.89 RIM=42.63 Boston,MA02199
NV IN=39.09 36'HDPE(N)=39.09 INV IN=39.37 36"HDPE(N)-39.37
A-2 MH-7 INV IN=42.50 6"HDPE(W)=42.50 36 HDPE(S)=39.09 A-2 RL-7 RIM=46.96 10"HDPE(E)=43.00 A-2 WYE-6 INV IN=40.54 8"HDPE(NW)=40.54 36"HDPE(S)=39.37
INV OUT=39.09 INV OUT=43.00 INV OUT=39.37 T:800.952.6426 www.langan.com
RIM=46.60 A-2 RL-8 RIM=47.00 10"HDPE(E)=43.00 RIM=40.00 Project
A-2 MH-8 INV IN=40.65 6"HDPE(NW)=40.65 12"HDPE(E)=40.65 INV OUT=43.00 A-2 WYE-7 INV IN=39.28 8"HDPE(NE)=39.28 8"HDPE(S)=39.28
NV IN=41.65 12"HDPE(W)=41.65 INV OUT=39.28
INV OUT=40.65 A-2 RL-9 RIM=47.00 8"HDPE(E)=43.33
NV OUT=43.33 RIM=39.83 1600 OSGOOD STREET
RIM=42.31 INV IN=38.50 8"HDPE(NE)=38.50
INV IN-37.83 15"RCP(W)=37.83 RIM=47.00 A-2 WYE-8 18"RCP(W)=38.08
A-2 RL-10 INV OUT=43.33 8"HDPE(E)=43.33 INV IN=38.08 18"RCP(E)=38.08
A-2 MH-9 INV IN-38.05 8"HDPE(N)=38.05 24"RCP(S)=37.83 INV OUT=38.08
E INV IN-37.83 18"RCP(E)=37.83 RIM=47.00
NV OUT=37.83 A-2 RL-11 8"HDPE(E)=43.33 RIM=39.70
INV OUT=43.33 INV IN=37.95 18"RCP(E)=37.95
RIM=42.31 A-2 WYE-9 INV IN=38.22 12"HDPE N 38.22 18°RCP(W)=37.95 NORTH ANDOVER MASSACHUSETTS
A-2 MH-10
NV IN=38 12"
-55 8"HDPE(NW)=38.55 RCP(E)=38.53 INV OUT=A-2 RL-12 RIM==43.50 6"HDPE(E)=43.50 INV OUT=37 Drawing Title
.95 ()
INV IN=38.55 8"HDPE(N)=38.55
NV OUT=38.53 RIM==43 RIM=39.58DRAINAGE
A-2 RL-13 INV OUT=43.50 4"HDPE(S)=43.50 A-2 WYE-10 INV IN=38.8.32 10"HDPE(NW)=38.32 15°RCP(E)=38.12
RIM=42.31 INV IN=38.12 15"RCP(W)=38.12
A-2 MH-11 NV IN=38.40 10"HDPE(N)=38.40 18"RCP(W)=38.38 RIM=47.00 INV OUT=38.12
INV IN=38.62 12"HDPE(E)=38.62 A-2 RL-14 INV OUT=41.33 8"HDPE(5)=41.33 INV OUT 38.38
RIM=39.63 STRUCTURE
=
A-2 RL-15 RIM=47.00 6"HDPE(SE)=41.33 A-2 WYE-11 NV IN=38.17 15"RCP(W)=38.17 15"RCP(E)=38.17
RIM=42.83 INV OUT=41,33 INV IN=38.46 8"HDPE(NW)=38.46 REFERENCE SHEET II
INV IN=39.04 12"HDPE(N)=39.04 INV OUT=38.17
A-2 MH-12 18"RCP(SE)=39.03
NV IN=39.20 8"HDPE(E)=39.20 RIM=43.85
INV OUT=39.03 A-2 RL-16 INV OUT=39.33 8°HDPE(SE)=39.33 RIM=39.84
RIM=47.56 RIM=42.95 A-2 WYE-12 INV ININV IN=38.38 62 HDPE(NW)3.38 15"RCP(E)=38.38 Project No. Drawing No.
INV IN=41.37 30"HDPE(E)=41.37 A-2 RL-17 INV OUT=39.50 6"HDPE(S)=39.50 INV OUT=38.38 140182701
A-2 MH-13 INV IN=43.21 12"RCP(NW)=43.21 30"RCP(W)=41.37 Date
INV IN=46.56 6"HDPE(N)=46.56 RIM=42.39 RIM=39.67 ^^0^
NV OUT=41.37 A-2 RL-18 NV OUT=34 8"HDPE(S)=39.33 NV IN=38.56 18"HDPE(N)=38.56 12/11/2020 (`.J•1 1
A-2 WYE-13 INV IN=39.15 4"HDPE(E)=39.15 18°HDPE(S)=38.56
Drawn By
RIM=49.29 INV OUT=38.56
INV IN=44.12 30"RCP(E)=44.12 CLR F
A-2 MH-14 INV IN=45.02 12"HDPE(S)=45.02 30"HDPE(W)=44.12 Checked By
FEH Sheet 66 of 158
Fil-ame:C:\bms\langan-pw-01\dms460921140182701-CG201-0101.DWG Date:5/27/2022 Time:09:39 User'.akennedy Style Table:Langan.stb Layout:CG202
1 2 3 4 5 6 7 8 Q
B-1 NETWORK B-1 NETWORK(CONT.) C-2 ENTRANCE DRIVE NETWORK D-1.3 NETWORK Q
STRUCTURE TABLE STRUCTURE TABLE STRUCTURE TABLE STRUCTURE TABLE v
STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT:
B-1 CB-1 RIM=36.11 15"HDPE(S)=33.00 B-1 RL-6 RIM=42.93 12"HDPE(W)=39.00 C-2 CB-1 RIM=43.11 12"HDPE(N)=40.00 RIM-48.17
INV OUT=33.00 INV OUT=39.00 INV OUT=40.00 INV IN=43.41 18"HDPE(S)=43.41
D-1 MH-11 INV IN=43.52 12"HDPE(E)=43.52 24"HDPE(NW)=43.41
B-1 CB-2 RIM-36.83 15"HDPE(E)=33.50 RIM-37.26 36"V X 48"H CONC. C-2 CB-2 RIM=43.11 12" D = 00 Q INV IN=43.53 12"HDPE(SW)=43.53
INV OUT=33.50 B-1 SPECIAL MH-1 NV IN=31.29 42"RCP(N)=31.29 BOX(W)=31.29 = INV OUT=43.41
A INV OUT=31.29
B-1 CB-3 RIM-37.81 18"HDPE(E)=34.50 C-2 CB-3 RIM=45.20 12"HDPE(NW)=41.20 RIM-49.23
INV OUT=34.50 RIM=36.84 INV OUT=41.20 INV IN=44.47 15"HDPE(S)=44.47
36"V X 48"H CONC.
INV IN=31A1 BOX E D-1 MH-12 INV IN=44.56 12"HDPE(E)=44.56 18"HDPE(N)=44.47
B-1 CB-4 RIM=37.81 18"HDPE(E)=34.50 B-1 SPECIAL MH-2 INV IN=31.30 ()=31.11 36'V X 48'H CONC. C-2 CB-4 RIM=45.21 12"HDPE(S)-41.20 INV IN=44.56 12"HDPE SW
INV OUT=34.50 INV IN=32.50
24"RCP(SE)=31.30 BOX(W)=31.11 INV OUT=41.20 ( )=44.56
15"HDPE(N)=32.50 INV OUT=44.47
RIM-37.81 INV OUT=31.11 RIM-39.67
B-1 CB-5 18"HDPE(E)=34.50 C-2 CB-5 12"HDPE(NE)=36.31 RIM=50.26
INV OUT=34.50 RIM=37.89 INV OUT=36.31 INV IN=45.59 12"HDPE(SW)=45.59
NV IN=36.23 24"HDPE(N)=36.23 D-1 MH-13 INV IN=45.59 12"HDPE(E)=45.59 15"HDPE(N)=45.50
B-1 CB-6 RIM=37.81 1B"HDPE(E)=34.50 B-1 WYE-1 INV IN=36.73 10"HDPE(E)=36.73 24"HDPE(S)=36.23 C-2 CB-6 RIM=39.67 15"RCP(E)=36.36 Q INV IN=45.5D 12"HDPE S
INV OUT=34.50 INV OUT=36.23 T- 3 ()=45.50
INV OUT=45.50
RIM=37.81 RIM=44.91
B-1 CB-7 INV OUT=34.75 18"RCP(E)=34.75 RIM=38.27 C-2 CB-7 12"HDPE(S)=40.91 RIM=47.59
1B"RCP(E)=34.75 NV IN=36.60 24"HDPE(N)=36.60 INV OUT=40.91 NV IN=42.00 12"HDPE(N)=42.00
INV OUT=34.75 B-1 WYE-2 24"HDPE(S)=36.60
INV IN=37.10 8"HDPE(E)=37.10 RIM=44.91 D-1 MH-14 INV OUT=42.00 30"RCP(E)=42.00 12"HDPE(S)=42.00
B-1 CB-8 24"
RIM=39.85 RCP(S)=36.20 INV OUT=36.6D C-2 CB-8 INV OUT=40.91 12"HDPE(N)=40.91 INV OUT=42.00 12"HDPE(W)=42.00
NV OUT=36.20 42.00
RIM=39.07 NV OUT=
INV IN=37.40 24"HDPE(N)-37.40 4
RIM=35. C-2 CB-9 RIM=44. 12"HDPE(S)=40.91
31 .9
INV OUT= .80
B-1 DOUBLE CB-9 24"RCP(NW)=31.80 B-1 WYE-3 INV IN=370 8"HDPE(E)_37.90 24"HDPE(S)=37.40 NV OUT=40.91
NV OUT=37.40 RIM=44.91
RIM=29.00 C-2 CB-10 INV OUT=40.91 12"HDPE(NW)=40.91
B-1 FES-1 INV IN=26.00 24"RCP(SE)=26.00 RIM=32.25 24"RCP(NW)=26.80 Z
OCS B-1 INV OUT=26.80 24"RCP(NW)=26.80 =24
4" DP N =34.00
B B-1 FES-2 RIM-29.00 24"RCP(SE)=26.00 INV OUT=26.80
.02
INV IN=26.00 G
RIM=33.25 "HDPE(NW)B-1 FES-3 INV IN=3100 24"HDPE(E)=31.00 D-1.2 NETWORK B-1 FES-4 RIM=34.62 36"V X 48"H CONC. STRUCTURE TABLE 18"HDPE(E)=34.40 24"HDPE(S)=34.27
INV IN=31.00 BOX(E)=31.DO INV OUT=34.27
RIM=42.09 STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: RIM=43.39
NV IN=36.05 24"HDPE(N)=36.05 NV IN=34.58 15"HDPE(E)=34.58
B-1 MH-1 N NV OUT=V IN=38.60 8"HDPE(E)=38.60 24"HDPE(S)=35.56 D-1 CB-3 RIM==4629 12"HDPE(W)=46.29 C-2 MH-2 NV IN=39.80 12"HDPE(S)=39.80 18"HDPE(W)=34.58
INV OUT=35.56 . INV IN=39.80 12"HDPE(N)=39.80
RIM-46.27 INV OUT=34.58
RIM=42.10 D-1 CB-4 INV IN-43.00 12"HDPE(NE)=43.00 15"RCP(N)=43.00
B-1 MH-2
NV IN=36.95 24"HDPE(N)=36.95 HDPE(S)=3695 INV OUT=4300 RIM=45.89 Q
INV IN=38.30 12"HDPE(E)=38.30 24° . . C-2 MH-3 INV IN=36.60 15"HDPE(E)=36.60 15"HDPE(W)=36.60
INV OUT=36.95 RIM=48.28 O = s
D-1 CLCB-1 INV OUT=44.28 12"HDPE(W)=44.28
RIM=40.38 RIM=45.49
B-1 MH-4 INV IN=32.14 42"RCP(N)=32.14 42"RCP(S)-32.14 D-1 CLCB-2 RIM-48.97 12"HDPE(W)=44.97 INV IN=41.03 12"HDPE(SE)=41.03
INV IN=34.26 24"HDPE(N)=34.26 INV OUT=44.97 C-2 MH-4 INV IN=40.95 12"HDPE(N)=40.95 15"HDPE(W)=39.20
INV OUT=32.14 INV IN=39.20 12"HDPE(E)=39.20
D-1 CLCB-5 RIM=46.90 12"HDPE(S)=41.79 V U =39 0
RIM=36.03 INV OUT=41.79
C B-1 MH-5 WQU FD-8HC INV IN=31.06 24"HDPE(SE)=31.D6 24"HDPE(W)=31.06 RIM=40.00 BULLETIN 13(PHASE 1)/
INV OUT=31.06 RIM-47.59 NV IN=35.85 12"HDPE(SW)=35.85 08/25/21 BULLETIN 116(PHASE 2) 5
D-1 CLCB-6 12"HDPE(NW)=42.20 C-2 MH-5 24"RCP(E)=32.92
INV OUT=42.20 INV IN=35.85 15"RCP(W)=35.85 a BULLETIN 11(PHASE 1)/
RIM=36.98 36"V X 48"H CONC. = 07/28/21 4
B-1 MH-6 DIVERSION MH BOX(W)=3109
NV IN=31.09 36"V X 48"H CONC. RIM-51.54 BULLETIN 114(PHASE 2)
.
INV OUT=31.09 BOX(E)=31.09 D-1 EX YRD-3 INV IN=44.00 12"HDPE(E)=44.00 15"HDPE(W)=44.00 RIM=45.16 BULLETIN 9(PHASE 1)/
INV OUT=31.09 24"HDPE(NW)=31.09 INV OUT=44.00 NV IN-40.66 12"HDPE(N)-40.66 05/07/21 BULLETIN 109(PHASE 2) 3
NV I N 40.66 12"
C-2 MH-28 HDPE(S)=40.66 12"HDPE(W)=40.66 BULLETIN 6(PHASE 1)/
I =
RIM=39.98 RIM=47.74 INV OUT=40.66 03/18/21 BULLETIN 102(PHASE 2) 2
INV IN=34.59 18"RCP(W)=34.59 D-1 EX.YRD-2 INV IN=42.15 15"HDPE(E)=42.15 18"HDPE(W)=42.15
B-1 MH-7 INV IN=34.70 24"RCP(N)=34.70 36"RCP(S)=34.59 INV OUT=42.15 RIM=45.19 BULLETIN 4(PHASE 1)/
INV IN=34.59 18"RCP(W)=34.59 INV IN=37.49 15"HDPE(E)=37.49 02/12/21 BULLETIN 100(PHASE 2) 1
INV OUT=34.59 D-1 FES-1 RIM=43.25 36"HDPE SE =40.00 C-2 MH-29 INV IN=40.75 12"HDPE(SE)=40.75 15"HDPE(W)=37.49
INV IN=40.00 ( ) INV IN=40.66 12"HDPE(N)=40.66 Date Description No.
RIM=38.67 INV OUT=37.49
B-1 MH-8 INV IN=31.67 42"RCP(N)=31.67 42"RCP(S)=31.67 RI IN 4 4432 30"HDPE(E)=41.32 REVISIONS
INV IN=33.00 15"HDPE(W)=33.00 D-1 MH-1 36"HDPE(NW)=4D.17 RIM=40.17
INV OUT=31.67 INV IN=40.17 24"HDPE(S)=40.17 C-2 MH-30 INV IN=31.99 24"RCP(W)=31.99 24"HDPE(SE)=31.99
INV OUT=40.17 INV OUT=31.99
RIM=39.98
NV IN=32.47 42"RCP(N)=32.47 RIM=48.59
B-1 MH-9 INV IN=34.00 18"HDPE(W)=34.00 42"RCP(S)=32.45 INV IN=40.75 24"HDPE(S)=40.75
INV OUT=32.45 D-1 MH-2 INV IN=43.87 12"HDPE(E)=43.87 24 HDPE(N)=40.75 D-1.3 NETWORK
INV OUT=40.75
RIM=39.98 STRUCTURE TABLE
D B-1 MH-10 INV IN=33.00 36"RCP(N)=33.00 42"RCP(S)=33.00 NV IN 4 10 941 24"HDPE(S) SIGNATURE
NV IN=34.00 18"HDPE(W)=34.00 D-1 MH-3 ()=41.10 24"HDPE(N)=41.10 STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: JOHN PLANTE
INV OUT=33.00 INV IN=44.56 12"HDPE(E)=44.56
INV OUT=41.10 PROFESSIONAL ENGINEER MA Lic.No.38118
RIM=39.98 D-1 CB-15 RIM=51.56 12"HDPE(N)=47.56
INV IN=33.00 18"RCP(N)=334.0 RIM= 41. NV OUT=47.56 LANGAI
B-1 MH-11 INV IN=34.00 18"HDPE(W)=34.00 36"RCP(S)=33.53 RI IN=.90 24"HDPE(S)=41.38
INV OUT=33.53 D-1 MH-4 INV IN=46.04 12"HDPE(E)=46.04 24 HDPE(N)=41.38 D-1 CLCB-7 RIM==42 12"HDPE(S)=42.90
INV OUT=41.38 NV OUT=42.90 Langan Engineering and
RIM=39.98 RIM=46.90 Environmental Services,Inc.
INV IN=34.06 36"RCP(N)=34.06 RIM-49.01 D-1 CLCB-8 D-1 MH-5 () 24" 15°HDPE(SW)=42.90
B-1 MH-12 HDPE(W)=34.10 36"RCP(S)=34.06 INV IN=41.84 18"HDPE E =41.84 HDPE(N)=41.84 NV OUT=42.90
INV IN=34.10 18" 888 Boylston Street,Suite 510
INV OUT=34.06 INV IN=41.84 15"RCP(S)=41.84 RIM=47.93 Boston,MA02199
INV OUT=41.84 D-1 CLCB-9 INV OUT=43.93 12"HDPE(W)=43.93
RIM=42.10
B-1 MH-14 INV IN=38.60 12"HDPE(E)=38.6D 24"HDPE(S)=37.85 RIM=46.60 RIM=47.94 T:800.952.6426 www.langan.com
INV OUT=37.85 D-1 MH-5A INV IN=43.39 6"HDPE(E)=43.39 12"HDPE(SW)=43.39 D-1 CLCB-10 INV OUT=43.94 12"HDPE(NE)=43.94
INV IN=43.50 6"HDPE(N)=43.50 Project
B-1 RL-1 RIM=42.94 8"HDPE(W)=39.33 INV OUT=43.39 D-1 CLCB-11 RIM=48.97 12"HDPE(W)=44.97
INV OUT=39.33 INV OUT=44.97
RIM=54.711600 OSGOOD STREET
B-1 RL-2 RIM=42.93 10"HDPE(W)=39.00 D-1 MH-6 INV IN=44.4.51 12"HDPE(S)=44.81 12"HDPE(W)=44.81 D-1 CLCB-12 RIM=48.97 12"HDPE(NE)=44.97
INV OUT=39.00 INV OUT=44.81 INV OUT=44.97
B-1 RL-3 RIM=42.94 8"HDPE(W)=39.33 RIM=59.10 D-1 CLCB-13 RIM=50.00 12"HDPE(W)=46.00
=46.70 12"HDPE(S)=46.70 12"HDPE(N)=46.7D INV OUT=46.00
INV OUT=46.70
RIM=42.93 RIM=50.00
B-1 RL-4 INV OUT=39.00 RIM-4294 12"HDPE(W)=39.00 RIM=62.36 D-1 CLCB-14 INV OUT=46.00 12"HDPE(NE)=46.00 NORTH ANDOVER MASSACHUSETTS
D-1 MH-8 INV OUT=48.95 12"HDPE(N)=48.95
.
B-1 RL-5 8"HDPE(W)=39.33 RIM=47.09 yawing Title
INV OUT=39.33 RIM=47.12 INV IN=42.50 24"HDPE(SE)=42.50 DRAINAGE
INV IN=41.63 24"RCP(E)=41.63 D-1 MH-10(WQU FD-6HC) INV IN=42.77 12"HDPE(N)=42.77 30"RCP(W)=42.35
D-1 MH-9 INV IN=41.63 12"HDPE(SE)=41.63 30"HDPE(W)=41.63 INV IN=42.50 15"HDPE(NE)=42.50
INV IN=41.63 12"HDPE(N)=41.63 INV OUT=42.35
INV OUT=41.63 STRUCTURE
D-1 RL-1 RIM=47.55 6"HDPE(W)=44.8D
INV OUT=44.80 REFERENCE SHEET III
RIM=46.85.
6"ORIFICE:42.75' 24"HDPE(E)=42.75
OCS D-1.2 6'WIDE WEIR:44.90 Project No. Drawing No.
INV OUT=42.75 24"HDPE(E)=42.75
INV OUT=42.75 ��182701
Date
RIM=47.16
TOP OF WEIR TO WEST OUTLET:44.10 12/11/2020 C 203
6"ORIFICE:43.00 12"HDPE(S)=42.00 Drawn By
OCS D-1.3 INV IN=42.00 12"HDPE(E)=42.00 24"RCP(W)=42.00
F INV IN=42.00 12"HDPE(N)=42.00 CLR
INV IN=42.00 Checked By
INV OUT=42.00
FEH Sheet 67 of 158
Filename:C:\bms\langan-pw-01\dms400921140182701-CG201-0101.DWG Date:8/24/2021 Time:11:22 User:akennedy Style Table:Langan.stb Layout:CG203
1 2 3 4 5 6 7 8 Q
C-2 NETWORK C-2 NETWORK(CONT.) C-2 NETWORK(CONT.) v
STRUCTURE TABLE STRUCTURE TABLE STRUCTURE TABLE
P STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT:
C-2 AD-1 RIM-42.07 6"HDPE(N)=39.56 RIM-42.68 C-2 RL-18 RIM-42.94 8"HDPE(W)=39.33
INV OUT=39.56 C-2 MH-16 INV IN=39.00 8"HDPE(E)=39.00 18"RCP(NW)=39.00 INV OUT=39.33
NV IN=40.05 4"HDPE(S)=40.05
= INV OUT=39.00 C-2 RL-19 RIM-42.94 8"HDPE(W)=39.33
A C-2 AD-2 INV IN=42.93 8"HDPE(SW)=42.93 8"HDPE(N)=42.92 INV OUT=39.33
INV OUT=42.92 RIM=46.17
C-2 MH-17 INV IN=39A1 36"HDPE(S)=39-11 36"HDPE(N)=39.11 C-2 RL-20 RIM=42-93 8"HDPE(W)=39.33
C-2 AD-3 RIM-42.78 6"HDPE(W)=40.50 Q INV IN=42.44 10"HDPE(W)=42.44 INV OUT=39.33
INV OUT-4050 s INV OUT=39A1
C-2 RL-21 RIM= 8"HDPE(W)=39.33
RIM=46-50 RIM=45 =39-63 INV OUT=39.33
C-2 AD-4 INV IN=43.43 8"HDPE(S)=43.43 8"HDPE(N)=43.43 C-2 MH-18 INV IN=39.63 30"HDPE(S)=39.83 30"HDPE(W)=39.83
INV OUT=43.43 Qs C-2 RL-22 RIM=42.94 8"HDPE(W)=39.33
NV OUT=39.33
RIM=46.50 RIM=46.22
C-2 AD-5 INV OUT=43.83 8"HDPE(N)=43.83 INV IN=40.44 24"HDPE S 40.44 RIM==30
()= C-2 RL-23 INV OUT=39.50 6"HDPE(NW)=39.50
RIM=46.98 C-2 MH-19 INV IN=41.00 8"HDPE(W)=41.00 30"HDPE(N)=40.44
C-2 AD-6 NV IN=43.38 8"HDPE(S)=43.38 8"HDPE(E)=43.38 INV IN=43.18 8"HDPE(W)=43.18 RIM=43.46 4"HDPE(N)=39.50
NV OUT=43.38 INV OUT=40.44 C-2 RL-24 INV OUT=39.50
= C-2 MH-20 INV IN=41.46 4"HDPE(W)=41.46 24"HDPE(N)=41.46 C-2 RL-25 RIM=43.52 8"HDPE(N)=39.33 p
C-2 CO-01 INV IN=37.69 3"HDPE(E)=37.69 3"HDPE(SW)=37.69 INV OUT=41.46 INV OUT=39.33 n
NV OUT=37.69 N
RIM=44.36 °D
RIM-42.09 C-2 RL-26 8"HDPE(N)=41.33
RIM=41.84 NV OUT=41.33 C
C-2 CO-02 INV IN=37.29 3"HDPE(N)=37.29 3"HDPE(SE)=37.29 C-2 MH-21 INV U=38.71 7.9 8°HDPE(E)=38.71 24"RCP(N)=37.90
12
INV OUT=37.29 NV OUT=37.90 C-2 RL-27 RIM==43 8"HDPE(N)=43.33 d
RIM-42.10 INV OUT=43.33 Z
RIM=40.97 INV IN=37A4 24"RCP(S)=37.14 RIM=46.92
B C-2 EX.MH-1 INV IN=15.41 48"HDPE(E)=15.41 48"HDPE(NW)=15.21 C-2 MH-22 INV IN=39.00 8"HDPE(E)=39.00 36"RCP(N)=36.80 C-2 RL-28 NV OUT=43.33 6"HDPE(N)=43.33 G
INV OUT=15-21 INV IN=38.09 6"HDPE(SE)=38.09
RIM=35-75 INV OUT=36.80 C-2 RL-29 RIM=46-92 10"HDPE(N)=43.00 a
C-2 FES-2 NV IN=34.00 18"HDPE(S)=34.00 INV OUT=43.00
RIM=42-11
RIM=36.17 C-2 MH-23 NV IN=36.18 36"RCP(S)=36.18 42"RCP(N)=36.18 C-2 RL-30 RIM=46.92 8"HDPE(N)=43.33
C-2 FES-4 INV IN=34.00 24"HDPE(E)=34.00 INV IN=39.OD B"HDPE(E)=39.00 INV OUT=43.33
INV OUT=36.18
C-2 FES-5 RIM=34.00 C-2 RL-31 RIM=46.92 12"HDPE(N)=43.00
RIM=42.11 INV OUT=43.00
C-2 FES-6 RIM=39.58 60"RCP(S)=34.DO C-2 MH-24 NV IN=35.43 42"RCP(S)=35.43 48"RCP(N)=35.43 RIM=46.77
NV IN=34.00 NV IN 8"HDPE(N)=43.33
INV OUT=35.43 INV OUT=43.33
C-2 FES-7 RIM-36.17 24"HDPE(E)=34.00
INV IN=34.00 RIM=41.99 C-2 RL-33 RIM==43 10"HDPE(N)=43.00
C-2 MH-25 INV IN=34.94 48"RCP(S)=34.94 48"HDPE(NE)=34.94 NV OUT=43.00
C-2 FES-8 RIM=36.85 3"HDPE(NW)=36.50 INV OUT=34.94 RIM=46.92
NV IN=36.50 RIM=42.50 INV OUT=43.33 C-2 RL-34 8"HDPE(N)=43.33
RIM=35.75 NV IN=34.74 48"HDPE(SW)=34.74
C-2 FES-9 INV IN=34.00 18"HDPE(S)=34.00 C-2 MH-26 INV IN=39.00 6"HDPE(SE)=39.00 48"HDPE(NE)=34.74 C-2 RL-35 RIM=46.92 4"HDPE(N)=43.5D
INV IN=39.44 6"HDPE(S)=39.44
NV OUT=43.50
RIM=42.17 INV OUT=34.74
C-2 HW-1 24"HDPE(W)=40.00 RIM=46.89
INV OUT=40.00 C-2 RL-36 INV OUT=4333 8"HDPE(N)=43.33
RIM-42.95 . BULLETIN 17(PHASE 1)/
C RIM=39.25 36"HDPE(SW)=36.00 C-2 RL-1 INV OUT=39.33 8"HDPE(W)=39.33 RIM=46.92 09/30/21 BULLETIN 121(PHASE 2) 5
C-2 HW-2 INV OUT=36.00 36"HDPE(SW)=36.00 C-2 RL-37 NV OUT=43.50 4"HDPE(N)=43.50
INV OUT=36.00 RIM=42.93 ( BULLETIN 10 PHASE 1
)-
C-2 RL-2 NV OUT=39.OD 12"HDPE W=39.00 05/25/21 ( )
36 HDPE(NE)=36.00 C-2 RL-38 6"HDPE(E)=43.50 BULLETIN 9(PHASE 1)/ 4
RIM=39.25 RIM=46-92 2 BULLETIN 112 PHASE"
C-2 HW-3 NV IN=36.00 RIM=42.93 NV OUT=43.50 05/07/21 3
INV IN=36.00 36"HDPE(NE)=36.00 C-2 RL-3 INV OUT=39.00 4"HDPE(W)=39.00 BULLETIN 109(PHASE C-2 RL-39 8"
RIM=46.92 BULLETIN 7(PHASE 1)//
HDPE(E)=43.33
RIM=42.17 RIM=43.76 INV OUT=43.33 04/21/21 BULLETIN 105(PHASE 2) 2
C-2 HW-4 INV OUT=40.00 24"HDPE(W)=40.00 C-2 RL-4 INV OUT=39.50 6"HDPE(W)=39.50 BULLETIN 4(PHASE 1
RIM=46.91 )/
C-2 RL-40 INV OUT=43.33 8"HDPE(E)=43.33 02/12/21 BULLETIN 100(PHASE 2) 1
RIM=40.00 C-2 RL-5 RIM=42.95 4"HDPE(W)=39.00
C-2 MH-7 INV IN=35.41 18"RCP(SE)=35.41 18"HDPE(N)=34.71 INV OUT=39.00 RIM=46.94 Date Description No.
INV IN=34.75 18"RCP(SW)=34.75 C-2 RL-41 8"HDPE(E)=43.33
INV OUT=34.71 C-2 RL-6 RIM=43.67 6"HDPE(W)=39.50 INV OUT=43.33 REVISIONS
NV OUT=39.50 RIM=46.93
RIM=40.02 C-2 RL-42 10"HDPE(E)=43.00
INV IN=35.48 15"RCP(E)=35.48 RIM-42.97 INV OUT=43.00
C-2 MH-9 NV IN=36.09 12"RCP(SW)=36.09 18"HDPE(N)=35.03 C-2 RL-7 INV OUT=39.00 12"HDPE(W)=39.00 RIM=46.95
INV OUT=35.03 C-2 RL-8 RIM=42.94 8"HDPE(W)=39.33 C-2 RL-43 INV OUT=43.00 10"HDPE(E)=43.00
RIM=46.08 INV OUT=39.33 RIM=46.88
INV IN=35.25 24"HDPE(W)=35.25 C-2 RL-44 12"HDPE(E)=41.50
RIM=42.93 INV OUT=41.50
C-2 MH-10 INV IN=42.77 12"HDPE(S)=42.77 48"HDPE(N)=35.11 C-2 RL-9 INV OUT=39.00 12"HDPE(W)=39.00
NV IN=35.38 42"HDPE(E)=35.38 RIM=46.
D 41
INV OUT=35.11 C-2 RL-45 INV OUT=41.50 8"HDPE(E)=41.50 SIGNATURE
C-2 RL-10 RIM=42.95 8"HDPE(W)=39.33 JOHN PLANTE
RIM=45.16 INV OUT=39.33 PROFESSIONAL ENGINEER MA Lic.No.38118
NV IN-37-04 36"HDPE(SE)=37.04
C-2 MH-11 NV IN-40.50 4"HDPE(S)=40.50 42 HDPE(W)=37.04 C-2 RL-11 RIM==39 12"HDPE(W)=39.00 LANGAI
INV OUT=37.04 INV OUT=39.OD
RIM=45.79 C-2 RL-12 RIM==39 8"HDPE(W)=39.33
INV IN=37.96 36"HDPE(5)=37.96 INV OUT=39.33 Langan Engineering and
C-2 MH-12 NV IN=37.96 6"HDPE(( =37.9 36"HDPE(NW)=37.96 RIM=42.93 Environmental Services,Inc.
INV OUT=37.96 C-2 RL-13 INV OUT=39.00 12"HDPE(W)=39.00 888 Boylston Street,Suite 510
RIM=46.04 RIM=42.95 Boston,MA02199
C-2 MH-13 INV IN=41.69 10"HDPE(W)=41.69 36"HDPE(N)=39.57 C-2 RL-14 INV OUT=39.33 8"HDPE(W)=39.33
INV IN=39.57 30"HDPE(E)=39.57 T:800.952.6426 www.langan.com
INV OUT=39.57 C-2 RL-15 RIM=42.93 12"HDPE(W)=38.50
INV OUT=38.50 Project
RIM=45.93
C-2 MH-14 INV IN=42.90 8"HDPE(S)=42.90 24°HDPE(E)=37.97 C-2 RL-16 RIM=42.94 8"HDPE(W)=39.33
NV IN=37.97 8"HDPE(W)=37.97 INV OUT=39.33
INV OUT=37.97 1600 OSGOOD STREET
C-2 RL-17 RIM=42.93 10"HDPE(W)=39.00
RIM=43.03 INV OUT=39.00
C-2 MH-15 NV IN=34.28 48"HDPE(SW)=34.28 60"RCP(N)=34.28
E INV IN=38.50 18"RCP(SE)=38.50
NV OUT=34.28
NORTH ANDOVER MASSACHUSETTS
Drawing Title
DRAINAGE
STRUCTURE
EFERENCE SHEET I
Project No. Drawing No.
140182701
Date
12/11/2020 CG 2 04
Drawn By
F CLR
Checked By
FEH Sheet 68 of 158
Filename:C:\bms\langan-pw-01\drris4bO92\140182701-CG201-0101.DWG Date:10/11/2021 Time:18:49 User'.akennedy Style Table:Langan.stb Layout:CG204
1 2 3 4 5 6 7 8 Q
C-2 NETWORK(CONT.) C-2 NETWORK(CONT.) D-1.1 NETWORK v
STRUCTURE TABLE STRUCTURE TABLE STRUCTURE TABLE
STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT: STRUCTURE NAME: DETAILS: PIPES IN: PIPES OUT:
C-2 RL-40 RIM=46.91 8"HDPE(E)=43.33 RIM=39.56 D-1 CB-1 RIM=48.81 15"RCP(N)=44.87
INV OUT=43.33 C-2 WYE-15 INV IN=35.60 42"RCP(S)=35.60 42"RCP(N)=35.60 INV OUT=44.87
NV IN=37.01 8"HDPE(SE)=37.01
C-2 RL-41 RIM-46.94 8"HDPE(E)=43.33 INV OUT=35.60 RIM=48.33
A INV OUT=43.33 D-1 CB-2 INV IN=44.00 15"RCP(S)=44.00 15"RCP(N)=44.00
RIM-39.85 INV OUT=44.00
RIM-46.93 INV IN=35.35 48"RCP(S)=35.35
C-2 RL-42 INV OUT=43.00 10°HDPE(E)=43.00 C-2 WYE-16 INV IN=37.02 8"HDPE(E)=37.02 48"RCP(N)=35.35
RIM=46.64
RIM=45.79 NV OUT=35.35 INV IIN=40.33 15"RCPE(S)=40.33 0.04
C-2 RL-43 INV OUT=43.00 10"HDPE(E)=43.00 RIM=39.67 D-1 EX.YRD-1 INV IN=40.33 15"RCP(SE)=40.33 24"RCP(N)=40.04
RIM=45.73 C-2 WYE-17 INV IN-35.16 48"RCP(5)=35.16 48"RCP(N)=35.16 INV IN=40.33 18"RCP(E)=40.33
C-2 RL-44 NV OUT=41.50 12"HDPE(E)=41.50 INV IN=36.83 8"HDPE(SE)=36.83 NV OUT=40.04
NV OUT=35.16
RIM=45.94 RIM-45.50.
C-2 RL-45 B"HDPE(E)=41.50 RIM-39.54 OCS D-1.1 10"ORIFICE:42.50' 12"HDPE(SE)=41.50
INV OUT=41.50 INV IN=35.04 48"RCP(S)=35.04 INV OUT=41.50
RIM=46.11 C-2 WYE-18 INV IN=36.71 8"HDPE(SE)=36.71 48"RCP(N)=35.04
C-2 RL-46 INV OUT=41.50 12"HDPE(E)=41.50 INV OUT=35.04
RIM=46.22 RIM=40.75
C-2 RL-47 INV OUT=41.50 12"HDPE(E)=41.50 C-2 WYE-19 INV IN=39.50 8"HDPE(S)=39.50 8"HDPE(W)=39.50 p
INV OUT=39.50
C-2 RL-48 RIM=46.28 4"HDPE(E)=41.50 RIM=41.21
INV OUT=41.50 C
C-2 WYE-20 INV IN=40.50 8"HDPE(S)=40.50 8"HDPE(E)=40.50
RIM=41.74 P _ A. OUT=40.50
d
RIM-39.78 Z
=44.08 INV IN=37.24 24"HDPE(W)-37.24 1-
C-2 RL-50 INV OUT=43.33 8"HDPE(NE)=43.33 C-2 WYE-21 INV IN=39.24 6"HDPE(S)=39.24 24"HDPE(E)=37.24 w
INV OUT=37.24
- eG
NV IN=37.73 24"RCP(S)=37.73 RIM=37.88 d
C-2 WYE-1 NV IN=38.23 12"HDPE(E)=38.23 24"RCP(N)=37.73 INV IN-36.77 24"HDPE(W)=36.77
INV OUT=37.73 C-2 WYE-22 INV IN=38.77 10"HDPE(S)=38.77 24 HDPE(E)=36.77
INV OUT=36.77
RIM=39.96
INV IN=37.67 24"RCP(S)=37.67 RIM=37.38
C-2 WYE-2 24"RCP(N)=37.67 INV IN=36.28 24"HDPE(W)=36.28
NV IN=38.50 4"HDPE(SE)=38.50 C-2 WYE-23 (S)=38 28 24"HDPE(E)=36.28
INV OUT=37.67 INV IN=38.28 8"HDPE
INV OUT=36.28
RIM=39.92
INV IN=37.63 24"RCP(S)=37.63 RIM=38.46
C-2 WYE-3 INV IN=38.38 6"HDPE(E)=38.38 24"RCP(N)=37.63 INV IN=39.20 8"HDPE(S)=39.20
INV OUT=37.63 C-2 WYE-24 INV IN=35.71 42"HDPE(E)=35.71 42"HDPE(W)=35.71
INV OUT=35.71
RIM=39.83
INV IN=37.54 24"RCP(S)=37.54 RIM=38.64
C-2 WYE-4 INV IN=38.37 4"HDPE(SE)=38.37 24"RCP(N)=37.54 INV IN=39.39 10"HDPE(S)-39.39
INV OUT=37.54 C-2 WYE-25 INV IN=35.89 42"HDPE(E)=35.89 42"HDPE(W)=35.89
INV OUT=35.89
RIM=39.74
NV IN-37.45 24"RCP(S)=37.45 RIM=39.42
C C-2 NYE-5 NV IN=38.20 6"HDPE(SE)=38.20 24"RCP(N)=37.45 INV IN=36.67 42"HDPE(E)=36.67
INV OUT=37.45 C-2 WYE-26 INV IN=40A6 4"HDPE(S)=40.16 42"HDPE(W)=36.66
INV OUT=36.66
RIM=39.67
INV IN=37.38 24"RCP(S)=37.38 RIM=39.50 BULLETIN 10(PHASE 1)/
C-2 WYE-6 24"RCP(N)=37.38
INV IN=37.88 12"HDPE(E)=37.88 INV IN=36.75 42"HDPE(E)=36.75
INV OUT=37.38 C-2 WYE-27 NV IN=40.25 8"HDPE(S)=40.25 42"HDPE(W)=36.75 OS/25/21 BULLETIN 112(PHASE 2) 3
INV OUT=36.75
RIM=40.14 BULLETIN 7(PHASE 1)/
INV IN=36.72 36"RCP(S)=36.72 RIM=42.08 04/21/21 BULLETIN 105(PHASE 2) 2
C-2 WYE-7 36"RCP(N)=36.72
INV IN=36.72 12"HDPE(SE)=36.72 INV IN=38.36 36"HDPE(S)=38.36 BULLETIN 4(PHASE 1)/
INV OUT=36.72 C-2 WYE-28 INV IN=41.36 8"HDPE(W)=41.36 36"HDPE(N)=38.36 02/12/21 BULLETIN 100(PHASE 2) 1
NV OUT=38.36
RIM=40.01 Date Description No.
INV IN=36.59 36"RCP(S)=36.59 RIM=41.43
C-2 WYE-8 INV IN=37.76 8"HDPE(E)=37.76 36"RCP(N)=36.60 INV IN=38.68 36"HDPE(S)=38.68 REVISIONS
INV OUT=36.60 C-2 WYE-29 INV IN=41.68 8"HDPE(W)=41.68 36"HDPE(N)=38.68
INV OUT=38.68
RIM=39.89
C-2 WYE-9 INV IN=36.47 36"RCP(S)=36.47 36°RCP(N)=3647 RIM=43.13
.
INV IN=37.47 12"HDPE(SE)=37.47 C-2 WYE-30 NV IN-40.11 30"HDPE(S)=40.11 30"HDPE(N)=40.11
INV OUT=36.47 INV IN=41.12 12"HDPE(SW)=41.12
INV OUT=40.11
RIM=39.83
C-2 WYE-10 INV IN=36.41 36"RCP(S)=36.41 36"RCP(N)=36.41 RIM=42.86
INV IN=40.69 24"HDPE(S)=40.69 24"HDPE(N)=40.69 SIGNATURE
INV OUT=36.41 INV IN=41.19 12"HDPE(SW)=41.19
INV OUT=40.69 JOHN PLANTE
RIM=39.63 PROFESSIONAL ENGINEER MA Lic.No.38118
C-2 WYE-11 NV IN=36.22 36"RCP(S)=36.22 36"RCP(N)=36.22 RIM=43.02
INV IN=37.22 12"HDPE(SE)=37.22 INV IN=40.85 24"HDPE(S)=40.85
INV OUT=36.22 C-2 WYE-32 INV IN=41.35 12"HDPE(SW)=41.35 24 HDPE(N)=40.85 LANGAI
INV OUT=40.85
RIM=39.87 Langan Engineering and
NV IN=35.91 42"RCP(5)=35.91 RIM=42.69
C-2 WYE-12 42"RCP(N)=35.91 INV IN=39.00 36"HDPE S =39.00 Environmental Services,Inc.
NV IN=335.9 12"HDPE(SE)=37.16 C-2 WYE-35 () 36"HDPE(N)=39.00 888 Boylston Street,Suite 510
INV OUT=35.91 INV IN=42.00 8"HDPE(SW)=42.00 y
INV OUT=39.00 Boston,MA02199
RIM=39.75
INV IN=35.79 42"RCP(S)=35.79 RIM=4D.57
C-2 WYE-13 NV IN=37.20 8"HDPE(E)=37.20 42 RCP(N)=35.79 C-2 WYE-36 INV IN=39.86 8"HDPE(S)=39.86 42"HDPE(W)=36.36 T:800.952.6426 www.langan.com
INV OUT=35.79 INV IN=36.36 42"HDPE(E)=36.36
INV OUT=36.36 Project
RIM=39.61
C-2 WYE-14 NV IN=35.65 42"RCP(S)=35.65 42"RCP(N)-35.66 C-2 YRD-1 RIM-39.09 18"RCP(NW)=36.00
NV IN=36.99 10"HDPE(SE)=36.99 INV OUT=36.00
INV OUT=35.66 I _ 1600 OSGOOD STREET
C-2 YRD-2 INV OUT 3936.00 18"RCP(NE)=36.00
E C-2 YRD-3 NV OUT 3936.10 15"RCP(W)=36.10
C-2 YRD-4 INV OUT 41.6338.50 12"RCP(NE)=38.50 NORTH ANDOVER MASSACHUSETTS
Drawing Title
RIM=36.80. DRAINAGE
OCS C-2 INV IN(4"PERF E):33.00 48"HDPE(W)=18.50
INV OUT=18.50
STRUCTURE
REFERENCE SHEET V
Project No. Drawing No.
140182701
Date
12/11/2020 C G 2 0 5
Drawn By
F CLR
Checked By
FEH Sheet 69 of 158
Filename:C:\bms\langan-pvtA1\d ms46092\140182701-CG201-0101.DWG Date:5/2112 0 2 1 Time:14:31 User:ak-n,dy Style Table:Langan.stb Layout:CG205
05-01 -2023 - HiII ood Lot A - I sp
iv�
-------------------------
Al CB..(1) Al CB..(2) Al CB-1(1) Al CB-1(2)
f II
II
'Mr,
ANSI,
Al CB-1(3) Al CB-2(1) Al CB-2(2) Al CB-2(3)
IIIIIII
In
IIII
I II
IIII
Al CB-3(1) Al CB-3(2) Al CB-3(3) Al CB4(1) ryryryryryryryryryry
ryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryry
ryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryryry
uo
win IN
Ar,
Al CB4(2) Al CB4(3) Al CB-5(1) Al CB-5(2)
KIM:;
Al CB-5(3) Al CB-6(1) Al CB-6(2) Al CB-6(3)
IIr
of
I.
II If
III
110,
I:
WIN I
Al CB-7(1) Al CB-7(2) Al CB-7(3) Al CB-8(1)
Storm,"Water Compliance, LLC
05-01 -2023 - Hillwood Lot A - Insp
r
r
r
I.
1
r
I III°� RIi; I
r ,rf
r
Al B-8(2) Al B-8 ) Al B-10(1) Al B-10(2)
TEEM=
9, ;:� iian
a r N
N
,
err ,
"Arm
r P
Al B-10 ) Al B-17(1) Al B-17(2) Al B-17 )
fl
_r.
it iu
p'I
,I I,
f
}
1
'u f"Ia 1! I
d
R.
I
I
-� II
rJ�I,I III i�
�I
u Y IPm� III IIIIIII
v�
y;
i yup )ry
s I ,
Al B-18(1) Al B-18(2) Al B-18 ) Al L B-9(1)
,
IIIII
Ilu'u i'
f
�!I I
r!
U„ •, €
Al L B-9(2) Al L B-9 ) Al L B-14(1) Al L B-14(2)
PI
o,
f
N
,o I
I
y P
l l
i
Ir7ll
r
I
i
I u uuuuuuu
f ��, , V
f
d
r � y
u
I Y
/fri i
p r j1� Orr JPro�;` /'➢'
r %
u
! VW�G' �iYi i yll+U911 I I1mfl iR
; J U
I
Al L B-16(1) Al L B-16(2) Al L B-16 ) Al D L B-11(1)
Ston "Water Compliance, Li
05-01 -2023 - Hillwood Lot A - Insp
II
1
II '
,,T dwrrl� rJ ,r<�l i, � l�G/YY/((pv.: ,�,✓lfi,�;wil� »rm,
I�'I all ll l l / 4
I
r
Feu
Al D L B-1 1(2) Al D L B-11 ) Al D L B-12(1) Al D L B-12(2)
r,
r r
/
y
I i al I-
u I
4
I,
I
r � II I
uul
v
�l
r
f f f
Al D L B-12 ) Al D L B-13(1) Al D L B-13(2) Al D L B-13 )
/rr/IIII'
u
w
/rr,III
/
r' 411
i I III I
w,r
r
Al EX M H-1(1) Al EX M H-1(2) Al EX M H-1 ) Al EX M H-2(1)
,%
I
V, I s, I
�UIVp)Ilt i' yyllmu III,:
Y uI
} ,I ul liulli ,I
R I<f d uu
r
I
i
r
4,
, III
Al EX MH-2(2) Al FES_2(1) Al FES_2(2) Al FES_2 )
H
r
„
r P�I I III li ; III I � uw I
I
SDI'i u W r
r
I I,
�- 11 w n
I�I
� I Y'I IIIIIIII "yt,
f arl
VU I I'
r
1/0 0 I I 2 A �Ur � IIII
tl w
c
r I yurTlvl r� I
r
r
Al FES_2(4) Al FES_2(5) Al FES_2(6) Al FES-6(1)
r u /
I �r
,%9rr;
„�r�%f rr/�����"��}��J�r fir.✓" r ,.{V ml� m„
w`
l Iv ,
1^ ,
JJ ',',�r. i>r �1�gx ,U; ,.r,, im4✓-Ji.. ,J ;.. ��.`,. -tll�µ hm, ,.I� �� �� lbw'",�'
�,.,� ,, /.,/H,,,.,� ,,r�rr.,,v r,y�..,r ,.,✓ ;. � IaNI, f ��'% �.,, ',, ,: �,n.: ,.,,:,,� I�,."'Gmn'.�i',;�Id?✓
r
� � /��9/1'�/I � ✓ % 1/NI I G' ,;,cry ,,,.. r, am,
%!//.- �1 � '%6�/pi J5�. �r,S o�// >✓.y'II ;. ''a"..{I '.,;,, "iiwwT%„ /r G r
IIII Y�'
Al FES-6(2) Al FES-6 ) Al FES-6(4) Al FES-6(5)
Stogy Water Compliance, LL C
05-01 -2023 - Hillwood Lot A - Insp
w,
r i�ry yiF l
"AM i? uuu
r
0
i
Al FES-6(6) Al MH-`i QU FD-8H )(1) Al MH-`i QU FD-8H )(2) Al MH-`i QU FD-8H ) )
,II
/
/
,III I I
ri
/l
III III a IIII'Vi uu i it I:::i //i „ �f /
{N
,, II(IIIIIII� i�l�
Ir
r f f
Al MH-2(1) Al MH-2(2) Al MH-2 ) Al MH-3(1)
,r
y ,
Al M H-3(2) Al M H-3 ) Al M H4(1) Al M H4(2)
+I
di I I ii
, a
IIIIIIIIII WIIti�I�
F
11I h r
Y
Al M H4 ) Al M H4(4) Al M H-5(1) Al M H-5(2)
II ��
u i
1
y�
Ij
lii l
/
%�1f /
r l
Al MH-H(1) Al MH-B(2) Al MH-B ) Al MH-6(1)
�j
I 111 iluu°°i i III,;:: ➢Ilrl rrKy O:,,�
I 4
i.lr
r
J
I
�., i�i d,F➢J NJJ
�'lii 1 rIi�Je� �^wy road 1
Al M H-6(2) Al M H-6 ) Al M H-7(1) Al M H-7(2)
Storm"Water Compliance, LL C
05-01 -2023 - HiII ood Lot A - I sp
Ow,
l f/1
f WOO,
aY
Al MH-7(3) Al MH-8(1) Al MH-8(2) Al MH-8(3)
Al,
WWI
Al MH-9(1) Al MH-9(2) Al MH-9(3) Al MH-9(4)
r.
Ip
tr
I.
-77
r.
Al MH-9(5) Al MH-10(1) Al MH-10(4) Al MH-10(5)
r.
Al MH-12(1) Al MH-12(2) Al MH-12(3) Al MH-13(1)
nl
Al MH-13(2) Al MH-13(3) Al M H-1 4(1) Al M H-1 4(2)
MINIMUM
ih ..........
Al M H-1 4(3) Al MH-15(1) Al MH-15(2) Al MH-15(3)
Storm,"Water Compliance, LLC
05-01 -2023 - Hillwood Lot A - Insp
I
I �
i�rigr��%/II�'/'�Ila uulu uum puumpV mV I -
ME-
wl/
/
!
II�
i
/r
r
Y
1
Al M H-16(1) Al M H-16(2) Al M H-16 ) Al M H-17(1)
fl
f
//
//
III I
r
'QI I I u �uuuuuuuuuuuyuuuuuuuuuuuuuuuuuuuuuuuu„ ill I
f
%1 I r", IIII IIIIII 'I� 11
I I°
Y
r ( f
Al M H-17(2) Al M H-17 ) Al M H-18(1) Al M H-18(2)
I
/I
II�111��11`r'rlV 1 tl!I II'p� 11 r,:1:.;;I
'///' � � � I�lI��V�I I�I�ill'��ilill I V�I• �..4 q YYY I IIIIIIIIIIIIIII qW�w� ',.
l�.� I. ��Vbu'IIII,. II IIIIII II I p
i
Al M H-'18 ) Al M H-18(4) Al M H-19(1) Al M H-19(2)
Now
a
IIIIII
ul l' II
Al M H-'19 ) Al M H-20(1) Al M H-20(2) Al M H-20 )
AN
r,
of V4
r� (I
qti I
1
1 l/ I
l /
P Irlr ouuulili�m
/
I
Al M H-21(1) Al M H-21(2) Al M H-22(1) Al M H-22(2)
/ I
r1,
r ,I �,I
I n,
Ir°'
I
II ,
I
it {II
lii I q;I
It p Ir I .IIIII V..
I
/ /1
o, r ,1�JF,J V t IIIII
I I ,
rb afi
r IIII.I 'm
I
I I
t I I I�r/1 I I
I VI I III
a 1��d����� �!%���r;��✓�%lei �f�� /i/ I`l�� /In 11�
1114��1 ��„fr Cr rld��{IVI f
I Il Al M H-22 ) Al M H-23(1) Al M H-23(2) Al M H-23 )
Ston Water Compliance, LL C
05-01 -2023 - Hillwood Lot A - Insp
Jill,
I,F
II
I
I ;I:
II I
I.
I
/
/ e
/ II u VVVVVVVVVVVVV a°�
Y
uuul^IV
II umuu. II�
f
I YIIIIIII
I Illlli " I' "
/ IIV I ��I
1 /
/ I
/ V IIIIII I
I..
IV uuu ,
i r r„ ✓, „,.. /� / of � J,/// �%���i III
„
`
I IIP
r
W
II
I I �1 r rr I- f
Al M H-23A(1) Al M H-23A(2) Al M H-23A ) Al M H-24(1)
191 I i y�
I
f �� IIII IIII IIII
YII IIVI iiiiilll IIIIII VuVVuVllllll I'�'�I Y���,Ilil°IIIV Il�r�q.Y I ri���4M,
V PIYI�Yu 1 e
� rl
r,
r
IIII
Al M H-24(2) Al M H-24 ) Al M H-25(1) Al M H-25(2)
MIM
r
f
r
f �y
Y r
I
I r,
Al M H-25 ) Al M H-26 Al RL-9(1) Al RL-9(2)
i
4:
o I
J:
.I: ,�Illll��i IIII
/
r
/
,I
f
/r fs
� r
/
/
/
/
I�/ f/
/ �/,,,/of ,� iaaaaaaaaaaaaaaaai/ r
0
r /
u
I
I
II
I
I 1
I�
II I�Lr
/
/
_ f r f / /
/F/ r I
/
r L /
.'. 1� ?7��wM• �w"^. �/V/�/1j ,. ,,. ,.��,fr�'r/m/y�w'.f r f/ .�,,,, f
I/J�i j71 4ND 1
rNimP miiF / I
Al RL-9 ) Al Trench-1(1) Al Trench-1(2) Al Trench-1 )
f%
I,
`'
r
I 1 II Il I Il III I
/
f
Al Trench-1(4) Al Trench-1(5) Al Trench-1(6) Al YRD..(1)
I�r ffff��
r�„rrrri /uuuuuuuuuuul II I ,i
I'ICIPV��� /// / IIIIIIIIIIIIIIIII IIIIII IIIIIIII „„�/��i I
I I I p
DUU lul d IIVI �,, f
1
yr
III,
,„„ "' »r, e' I, M,,:d,'°�'�*,ti, ,. i.. r ,,i I�^ f%� ,'�;� f✓ �. �rii l 7 I" �I I I !/ Imw�"rk,ur
`r I
J .:�I:IIIIIIIIIIIIIII IIIIIIIIIIIII I I@,IY��uV
'/ rU���� �wlll,l ill IIIIIIIIII GV��V���IY�IY
uuuumill II
1� � II u0 i' I ul I IIIIIIIIIIIIIIIII III
I
T '
,r
f
Al YRD..(2) Al YRD.. ) Al YRD..(4) Al YRD..(5)
05-01 -2023 - HiII ood Lot A - I s�� /� %/ //rrr„
Al YRD..(6) Al YRD..(7) Al YRD..(8) Al YRD-1(1)
X",
Al YRD-1(2) Al YRD-1(3) Al YRD-2(1) Al YRD-2(2)
ul
rr
IM
Al YRD-2(3) Al YRD-2(4) Al YRD-3(1) Al YRD-3(2)
I.
II w
11
II I
11
OWN
Al YRD-3(3) Al YRD4(1) Al YRD4(2) Al YRD4(3)
SHOT
11017M,
CLCB-1(1) CLCB-1(2) CLCB-1(3) D1 CB-3(1)
wq7F
9.
D1 CB-3(2) D1 CB-3(3) DI CB-4(1) DI CB-4(2)
Storin,"Water Compliance, LLC
05-01 -2023 - Hillwood Lot A - Insp
MONSOON,
. ..
I
'p'....",",
u
i
mm a B
n
�� II
r i
If
-
'
S
r
D I CB4 ) DI B-13(1) DI B-13(2) DI B-13 )
I' rrr f ors� '' IIIIII I
r
„ y
G
iJr7, I
I
r
,; v'• ,,:4� pill
u
r
/ r
r r �
r /
r ( f
DI B-15(1) DI B-15(2) DI B-15 ) DI L B-1(1)
f.
ik-
,
I II
.I.
I
I {
I
r rlll
yy
/
u!
rr
I i.
l
6
l
r�i/ � a r. �/f�/ IVViI q Il�llll�Vllll��llililuu / ��r ,
� I
rr .I I
I
f
IIIII i �
ill
I;
(
I
II ,
G � // � 1
r,
ct
;
DI L B-1(2) DI L B-1 ) DI L B-2(2) DI L B-2 )
Aw
r
r rf,
I v o u 7�r1 v,y
/ y VIYe I, IIIII I I( i�
V
I
/ 1rr✓,r
/ / r
yu
i
(I IIJff�„.., I.: IIIIIIIIII
I
// , 1 � � uul I IIIIIIIIIIIIIIII �/,' �
1 �I Ijl� 11
I I'll IIII'' 7% I I
,
ul�ii�fi�Pd hrffior / � {r '
/r
i
DI L B-2(4) DI L B-5(1) DI L B-5(2) DI L B-5 )
' I
P l��unil I IUI"I' G
v /
r
I
I �I
l
DI L B-6(1) DI L B-6(2) DI L B-6 ) DI L B-7(1)
611
I II 4
I 1.r1
/
/
V I /
I /
II°d(111111111111111111 III
r riol�,�q�kp
/
P, f ua n
DI L B-7(2) DI L B-7 ) DI L B-8(1) DI L B-8(2)
Ston Water Compliance, LL C
05-01 -2023 - Hillwood Lot A - Insp
ki,
81,
1501
1 1 III i} 'iiii
I.
d
rr I
IVV
I A
y,
1 I
I
ri
I
I
f/� s
DI L B-8 ) DI L B-9(1) DI L B-9(2) DI L B-9 )
�1"ry'' !II iiaflllllll'I{DUI u'
�fJ ^9 ,
I ,
/
f f
DI L B-10(1) DI L B-10(2) DI L B-10 ) DI L B-11(1)
I
I
/
,
/
1
/
/ J
/
r /
,
Ili iiiu I I 'I I
I
�r I�
it lull
VVI i I I.
D`1 L B-11(2) D`1 L B-11 ) DI L B-12(1) DI L B-12(2)
lzi
f°Ir i l Jl y r i 1 I
IIIIff
louul u
� uuu�" uuuuuuuuuuuuuuuuuuuu
/
Flu
r I
II
I�
� I
'iiii Il uu uummu u
I
I
i
IIIIIIIIIIIII
I
I "
I
I
�p
V
DI L B-12 ) DI L B-13(1) DI L B-13(2) DI L B-13 )
i111� . �L,II
II I
ulslr
f it
,
v
/ , I Illlulil�llll�� /
Ia
I'IuruuNVlllllluulluulliuo�uuu�lrsrrurl�,-,,'
Y I
I,u
DI EX YRD-`i(1) D'I EX YRD-`i(2) D`i EX YRD-`i ) DI EX YRD-2(1)
,{ I
�I
I , r/
r/
Ir 4 iu
l , r
I1 I
r '
/
i
f
f q
r
D`i EX YRD-2(2) D'I EX YRD-2 ) D`i EX YRD-3(1) DI EX YRD-3(2)
Ston Water Compliance, LL C
05-01 -2023 - Hillwood Lot A - Insp
r
/
�j
v a
1
I
i
p ,rG N I�
x
.,I
u
u ,6 t IIIII
II i. II IIIIIIIIII
",,� ,,I�;r" �„ �,� � I ✓ r,, 1 �� .'w�„ �" ���II III II
i
w
i
y,
,.ry✓, I', 1. !f c f:,l�p b x,..' � � V �� �%fr f�� '
i r
d
t
DI EX YRD-3 ) DI FE"(1) DI FE"(2) DI MH-1(1)
i re,
r
rm,�
r
5 a
1
r f f
DI MH-1(2) DI MH-1 ) DI MH1(5) DI MH1(6)
HIM I
I ,
14f
f
//,
ii ri„
r /
rl
1;,, s,:.;• „,�,w,rro;, �/ � III( ��,� /�
^
✓✓�� i lu I�Y I
II !c0.114 2 2
DI MH1(7) DI MH1.4(8) DI MH1.4(9) DI MH1.4(10)
//,,, .rfr/i� �'�,/'/%i j✓j" � �;,�I I lam' � i
(
iu
DI MH1.4(11) DI MH-2(1) DI MH-2(2) DI MH-2 )
r
I,
O � M
"iluuuuuuuuuuuumiiiiliiiuumiiiii
�I
i
I ,
I uum
V
f
i
DI MH-3(1) DI MH-3(2) DI MH-3 ) DI MH4(1)
IN
Ifi l l l
a /r
� � I
r
II uu III
VuV mm
�u 4
r/
Im
1
i
DI MH4(2) DI MH4 ) DI MH-5(1) DI MH-5(2)
Ston "Water Compliance, LL C
05-01 -2023 - Hillwood Lot A - Insp
J
rr
f%
pr
,
i
D1 MH-6 ) D1 MH-5(4) DI MH-M(1) DI MH-M(2)
Wi
�II I VI VIA i 4.i
� Y
�b
r ( f
DI MH-M ) D1 MH-6(1) D1 MH-6(2) D1 MH-6 )
r/
w,
i
+r
tlti 6i�iVCi�ii
dr,6
i
D1 MH-7(1) D1 MH-7(2) D1 MH-7 ) D1 MH-8(1)
ire /iia� j �Ih g i
r r,
I 1/
I
D1 MH-8(2) D1 MH-8 ) D1 MH-9(1) D1 MH-9(2)
„e
r �
u
I '�iG�r"aryl it
i �11 i
D1 MH-9 ) DI MH-'10 QU FD-6H )(1) DI MH-10 QU FD-6H )(2) DI MH-10 QU FD-6H ) )
Ir
i
D1 MH-11(1) D1 MH-11(2) D1 MH-11 ) D1 MH-12(1)
Stogy Water Compliance, LL C
05-01 -2023 - Hillwood Lot A - Insp
M 7/j 11
,yr
It,
Dill MH-12(2) Dill MH-12(3) Dill MH-13(1) Dill MH-13(2)
Dill MH-13(3) Dill MH-14(1) Dill MH-14(2) Dill MH-14(3)
MINOR !I
�Acllilscl,111(.:�
DI-MH-11(1) DI-MH-11(2) DI-MH-11(3) Gen Sites(1)
Gen Sites(2) Gen Sites(3) Gen Sites(4) Gen Sites(5)
lmim��Iil 11 1 111 1 1::::Offivia
I
IN
44/40%. KENN,
IN
I I'M
Gen Sites(6) Gen Sites(7) Gen Sites(B) Gen Sites(D)
I ligm, IMMUM: ggigl:ili i;1
ON.
w"Mor
P
.............
liffliMMI-Mi
Gen Sites(10) Gen Sites(11) Gen Sites(12) Gen Sites(13)
Storm,"Water Compliance, Li
05-01 -2023 - Hillwood Lot A - Insp
rIloilo'
.r
ARM.
o
r
r
l
Gen Sites(14) Gen Sites(15) Gen Sites(16) Gen Sites(17)
1100
ail //
�a
o
On
r,l , /v<I
rl, ,
1�
I I
r rl I
,
r t
I Y Iii�V"V14�V"�y
I
�r V
f t
I
�y,nnl
�iiiwi� IIV
I„
r ( f
Gen Sites(18) Gen Sites(19) Gen Sites(20) Gen Sites(21)
f
i
rrrr
/
/ /f ,r
1
r
/
r /r /
rrr,
/
/ f /
/
t o of
/
r r
rrrr ,
r
t _ ,r
./ r,r /
/ r r ,
J
r ,
/
t
Itr
/ I
//
r
r
/
1 t ,
r / t 1/ � t r
r/ f
/r
f
i,
/
OPINION
Gen Sites(22) Gen Sites(23) Gen Sites(24) Gen Sites(25)
I
Poll,
iY 1111 1 Iltlil, �\�1,
fl' II.
11
v, 1/
t
t l //t /f�11 r
wilil!III
1
Gen Sites(26) Gen Sites(27) Gen Sites(28) Gen Sites(29)
f /
I /I /
I /
I / /
/
/ r
t / /
/
/
/
/ r
/
t t /
� r
r / r
,r
/
rrr /
t /
r �
/
r,
/
/
J r/
r ,
/ r r
r /
/
/
/t
/
/
rrr
Gen Sites 0) Gen Sites 1) Gen Sites 2) Gen Sites 3)
I N
a �
ar �'
°rrr;
t
J a
r
Gen Sites 4) Gen Sites 5) Gen Sites 6) Gen Sites 7)
Stor "Water Compliance, LL C
05-01 -2023 - HiII ood Lot A - I siaaaaa
-Mr/
f r,
,,////// � 1, � � �
r r , � rr
, , /rr r
Gen Sites(38) Gen Sites(39) Gen Sites(40) Gen Sites(41)
lig—m— INNER! lul mmi 111
II
/ / r o
rrrrr
� / is / � � ,
o
J /// /%�% /r � I I �� V�, �;lillllllll�l�Y //
Gen Sites(42) Gen Sites(43) INFIL BASIN OCS DI(1) INFIL BASIN OCS DI(2)
023j"O 56,�01.1 14 2 5,4 10 5,�0.2 14 2 5,'48
INFIL BASIN OCS DI(3) INFIL BASIN OCS DI(4) INFIL BASIN OCS DI(5) OCS(1)
' �!'° j i�%%� / „� /rrrr/
/ lull II 111
I yell
II
"All
OCS(2) OCS A 1(1) OCS A 1(2) OCS A 1(3)
III
nrU
roe
OCS Al(1) OCS A-1(1) OCS Al(2) OCS A-1(2)
N i
OCS Al FES-1(5) OCS Al FES-1(6) OCS Al FES-1(7) OCS Al FES-1(8)
StonnWater Compliance, LLC
05-01 -2023 - Hillwood Lot A - Insp
rr
J u;
Yu'
rill, r r�ii „ i`� IIVII
/
I
t
"
r ! '
O S Al FES-1(9) O S Al FES-1(10) O S Al FES-1(11) O S Al FES-1(12)
i
I
;I I Il
.I� I
r^,111 i� I
I
I
11� Ili
r f f
O S Al Stone Cheep Dam(4) O S Al Stone Cheep Dam(5) O S A1.2 ) O S A1.2(4)
i
lip
J u
O SAl.2(5) O SAl.2(6) O SAl.3(6) O SAl.3(7)
I
I
,
z„
I "o Gy lak
r
i
,
n
r I v
r I
I
r
14 d,':1.^ 0 .1 1.4"OBI 17 d� 05,~"01 14"O'g,y:� I��,�°���°6���
lim III
O S Al.3 ) O S Al.3(9) O S Al.3(10) 0 CS Al.3(11)
I:
r
,r r
f/p,� ✓� ,,, i l IUllr�d �`, h)rfl(Ol�%%%GL^///%ru, :, ✓ �,, yir r.,
N r
a,
I
I
r
ul
I.
r o
4 1,
w
O S Al.3(1 2) O S Al.3(1 3) O S Al.3(1 4) O S Al.3(1 5)
MEMMEM
u
1 l
11 uiii„
r,.
av, I 1
r a,
0
:.�tl 1111�I Ibrl::.
/
r
O S A-1.4 ) O S A-1.4(4) O S A-1.4(5) O S A-1.4(6)
Storm"W t ` Compliance, LL C
05-01 -2023 - Hillwood Lot A - Insp
a �
RIF
---------------
�J 1 Jar f(r„y/l! u v ,, iiiiimlu I IIII IIIIIIII r r�..,, /.
�mrl�fJ/,/,,,/R�/. rr!/ �u uuuuBullu u�uu a uu a // ° / � ) ,1; 1 ✓
/Jr✓1 b�//,I 9�rl ri/ ,i,,„ I I I IIIII I IIIIIIIIIII III uYm IIIIIIIII I I IIIII IIIII I III <./„ I
/ I /II
I u
/
tl
/r/nf s
1
d
�r
`r r
e
O S A-1.4(7) O S D-1.1(9) O S D-1.1(10) O S D-1.1(11)
I fi�p 1,
,Jff
��r In li
r
I
u
13�II�„ ii
U
1i' III
v l�
,
O S D-1.1(12) O S D-1.1(13) O S D-1.1(14) O S D-1.1(15)
,,/, rr,;Y»,W ,, ,,,,,. ,. t,a,:,.,� ,r�,.'r�,,.W a«✓,', il,. «11.,, "%/O//%%,,.,o/ � : / ,, ";,,; r' i
II; / Ir, ✓r /,ri,,,, ;/
i
r
r,
II
+� f
dwr
4
MINIM
I
v '
O S D-1.2(1 2) O S D-1.2(1 3) O S D-1.2(1 4) O S D-1.2(1 5)
777777/77777-7
am w
Illy 14
g
>>,II
I
I II I
r I I'41 I I.Ir I I mV 1 11111
yII f
IuU��
i w111 n 11
l / a
11 /r
/ /
r�
� r
nir
r
O S D-1.2(16) O S D1.3(2) O S D1.3 ) O S D1.3(5)
i
/ �, 'i'"°°°Illi I VVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV I 1
r ar/iil«�d141:11 1111��I;, 1 Il�i�l�",
rrr
Illlllllllllllllllllllllllllhr
w w
w
w w.
w
0 w w
w.
w.
,x
Y r�
CC YY IV�
�I ����� �I�����I 1111111111111111111111111111111111111111111111 II,, //AI Nlbl l dlll:ll IIII Y I i �/;
I`
L
f' V
r IJr,
OCS D1.3(6) O S D1.3(8) O S D1.3(10) O S D1.3(12)
1
I IIIII
/
I
I / r Ilf /I
r/
1
J
/ r
1 /
f
\ n
rr ,�
/
u
1 ) /
h�drllYll�dllVldl / ,71ll�lllldi�IdIIIVlllllilul: �, r
r
0
1f
1
O S D1.3(13) O S D-1.3(20) Open Feature(1) Open Feature(2)
Ston Water Compliance, LLC
05-01 -2023 - Hillwood Lot A - Insp
r
li 'II
p
I,r
I
„ fur
� r;u
, v
Outfall...(1) Outfall...(2) Outfall... ) Outfall...(4)
IYP9Nd�v II 'r%i�l�"err 'a,/4ll(Imlllll „,, J
r,
,IIIII�I I l r I�/ ii
�j
r y
!,
r f f
Outfall...(5) Outfall...(6) RETENTION PIPE-Al MHI(1) RETENTION PIPE-Al MHI(2)
r�
,
ru,
V I m u uu"u VV
i
„e
RETENTION PIPE-Al MHI ) RETENTION PIPE-Al MHI(4) RETENTION PIPE-Al MHI(5) RETENTION PIPE-Al MHI(6)
RETENTION PIPE Al MHI(7)
Ston "Water Compliance, LL C
ATTACHMENT C
LA/V&A/V
1 2 3 4 5 6 7 8
2
v
A
PROJECT LOCATION MAP
\\ SCALE: NOT TO SCALE
/J
<QURCF.
1.4APQUEST
O
N
/
/ O
V'
Z
B -7 ' --- G
W
i O
a
f f
1
I
/
G T i I',
I a
I I
-I I, u o ❑
V_ f T T
II
II
III II
❑a
Q -I
� p
11
Date Description
No.
UJ REVISIONS
W
t `N OF MASS�`yG
o� IAN s
C. N
SHEET AB102 SHEET AB103 CISURI
No.47403 a�
_ C/STERE�JP�4, N�/�y,f//�/� ItJ�tI//�0nkl LAND t"f 1 o 12f.,
D IAN C.WISURI DATE SIGNED
l i PROFESSIONAL LAND SURVEYOR
MASS STATE LIC.No.47403
LANGAN
Langan MA,Inc.
100 Cambridge Street,Suite 1310
Boston,MA 02114
---
T:617.824.9100 F:617.824.9101 www.langan.com
Project
HILLWOOD
MAP 32 LOTS 15,17,54,&55
E TOWN OF NORTH ANDOVER
ESSEX COUNTY
t COMMONWEALTH OF MASSACHUSETTS
Drawing Title
t
LOT A
AS-BUILT
SURVEY
Project No. Drawing No.
140182701
Date
OCTOBER 10,2022 A B 1 00
Drawn By
150 0 75 150 AGBAL
F
SCALE IN FEET Checked By
ICW Sheet 1 of 4
Filename-Uangan-c idatah"Hl/ICata7ll4Ol827ei?FrgreCt Oata Otsrva6nelS,rirevICAQ AS$v+1:1a0i&'7t71-V-AHOZG1Aw'g!late lallcP22 Time 13'01 User blamben Sryte Table'tanyansth t1WUt AB160 9
1 2 3 4 5 6 7 8 Q
4Z
J
+_
/
I I
� I
\ t
Pohl / \ I 1
.tl/E + col I I ;'/+
+
/ 1 p
).5,
L;).5
5 z + � APPROXIYAIE \� f /
/ �o, Z
+ / /
_ � W
m y A�T
— / APflMpMA]E
r—AiAl
x l �
C
_' • I SOLAR ARRAY I mT E E E 1 i / TA 57 H I HT 08 RUFI] /
8.
Awaowale _ / - 1' / I x r
uwrscP I / II � � Date Description No.
41
fx �� REVISIONS
/ ——
_ I
ms s�� I 1x
�� I
D / + m E E E E E / I I IAN C.WISURI DATE SIGNED
APPrOtlMAE ,movAE ' ————————______ 1 1x PROFESSIONAL LAND SURVEYOR
r ———————————— — II MASS STATE LIC.No.47403
LANGAN
5•
_ ' I
of
/ SOLAR ARRAYS _ / 1 1 x Langan MA,Inc.
ALL LESS THAN 1'HIGH 1
1 I I 100 Cambridge Street,Suite 1310
—
/ Boston,MA 02114
T:617.824.9100 F:617.824.9101 www.langan.com
APR40.tlYA1E APP•40.tlNA1E _ A4MJAlE I I ` ,
Project
h�Po � ---------' erT ( I s, AHEwwr• I I
—-� ———————— — cram. Awxaxuus sG '�. )
HILLWOOD
7.6'
j HIT X MAP 32 LOTS 15,17,54,&55
Cj -AY
'IIE,6E`f —___-----EG--- ' ------- ---- —_� _I�
TOWN OF NORTH AND OVER
ESSEX COUNTY
COMMONWEALTH OFMASSACHUS ETTS
s
40-
_ -- --------------- Drawing Title
p _ — UNK UNK UNK '�'b_—+!ffiL�x�Kx x.IfNK UfW UNK UNx�NK UNK
40— ElZL-b!3
i
-- --- x -x LOTH
c c c c ems T' c Tc c c c Tcp c G
it n�z s.axrcr O—613J
w r, w w W w M1 W -. W WW W w I: W w AS-BUILT
✓Y _. �Y �: —mow �: W 3 /IJW gW W W W -W W W 4N W �,y
'z:"roc �`�� ��:. ' SURVEY
a r aro ®-�m�e ss c,awbzoc m-szeo I' mos °Z 1
Mll{y-J15J ���1P-HOPE �(L.J1.69 `Y
Ml7 J-J).19
eEu-bt.aJ ..
Project No. Drawing No.
MATCHLINE 1 (SEE SHEET AB102) 140182701
Date
40 0 10 25 40 OCTOBER 10,2022 A B 101
Drawn By
F SCALE:1 INCH=40 FEET fIGBAL
Checked By
ICW Sheet 2 of 4
F,lename II/angan.c IoatalNHl'Ildalay1140189]011Projecl Mal_Dl,plinel5urveylCADWs-Bm1fl14018a101-V-ABOl01-Uwg Date-1011112022 Tme'13'O1 Use,blambert SVe Tble-Langan-stb Layol1'AH101
COLHv X0,f97 WsueOue7 8I491014,1 L&qwelq-n 6LOalll01
-V JO 2 1aal-ls Ak)l
1333 0i,=HQNl I:]-IVDS
lvwff
A8 umc)JO oil sz 00 or
zz0z'0 L 11380m ....... -———————
zo lov CD-- 3--————————
0
94DO lz r*=w JD -S
aid.01
J4d.01
WLURWL 96w= N1 -6
\,/gg 9f N11 gi:AAA:
NI 09Vt-lPN 8
ssvw f4l
9. Nt dOd.91 )it Z,
0
fo my f-'. e I, f9'0=I A# ml EM N
'ON BU!MDJC] ON 109fOAd 91 dam zil 9*=Nld88E4 m
K
I N1
f f 'daH.zi m 1/9 09 3dGP-.9IWa zi
W
gpw=nlN (ZA 3 3daq.pZ
------o.,A—
P amoo .08.91
d0
A3AWIS O-A-d 9 .9
6r"
09" jk�77S 69'6*=m
-sv 66'6P=MAY 3
iiina ;,11.
3dGH Z1 3d6H,Zl wl .11--4 2 X N
Z 99 wl
P11- wl
10 Iz Z* 6
zrp=m&,
-mly
Z* PW
0
ONIG7ins
V 101 21— x;
z
@14!j bulmli ON1151X3 \01
o
1 7 isz)-my
sLi3snHDVSSVW JO H1lV3MN0WW0D —
AlNina)x3ss3OAd ps
96
3
13AOCINV HISON dO NAN01 1/9
�96 jig
Ss,ylFs,LL'StS.L0lzEdvw 9f
1/8 Its -q
1/9 f 'XOldd:!7R 00 A 10
17 1/8 0,
00
Imilm.9
F 119
GOOM111H ofo*- Z6'9o-- 17
09
Ow
09 (dkL)
ma
Al 0'P*=T71S X7vm?N0J 11 )/7 ONOO J] UM 0N00 X7VM 00
OLIP
WOO-UEBUEPAMM WWtZ8-L�9:=I DOWtZTL�9:i >W�z
ZZW,�N
N1 N1 Nd.9 • J / -- OOo o�
t7 L,E0 VA UOJSOS 00 .19j"111-1 olp
6 Ni
.-L ".�,�Nl
N1 g0Z#
Uel elps'leeilS el)p!jqweo 00l
C) -md.9 W
-oul'vvy U25ue-j
uj 9NIG71no
DANG7ins 11*1--
DmaglX3
9NUSX3 11 loll ERIZ.
rn
6z 9*=W
AlVgAIV7 q 2
CO-VLV*ON'01-1 IiViS SSVN 119
NOA3AHns GNV-1-lVNOlSS3JONd
03NDIS 31V0 Ninsim'o Nvi T—
Ileair 0
3dUH.9 _7
3d6n 9 ------------
Z
6 A T
3 q `- , - I'MiS.— — -m
Uzo-3 gg=M
69=mly -----------------7— 9" 9f
f6w*=6v
`7 3dGH Zl ogzk=w
3dUH _�A
SNOISIA:]�J
.ON uo!jduosaO GJDO _a 110,r7 ldll 11 96
9.w*). w o)� 3daq
1/9 9z -a 116"r
N1 ('du) A,
PS 01,09 AG
>nvm j J� )nV.M ONO',
N,
f All
'IVNOISS33OHd 3Hi
YOH el
90,6p=md
-IVA iON Sl),]ANns SlHi JO nV]S GIANI NO OISS09N3:]Hi inOHilM(11
—T.-
'SNOliVO01
0n313 NOJ(INV 3d)d),iniin JO NOl1V3131d3A NOJ C]313ViNOD 30 isinn
S31ON39V Ainan N3dONd 3H1'NOiionNiSN03 NO NOIS30 ANV 01 NOINd
JAY A.k3 Nns
SlHi AO iNVd SV GIIANOAN]d INIM NVO"SNUVNi]N�ld ONn0N9
NO SNOliVAV3X3'Sild 1S31 ON'013'SVUiS),S Ol1d3S'SANVi'S-nVM lie 1/8
SNOli3]rONcJ'SONIiOOA'SNOliV(]NnoA'siNnionas(]NnoNDN3ONn a, ll-4
3 N
N JO NOUV O�NO 30 31SIX3'33N3SEIV 3Hi 01 SV S331NVNvn9 tip
3V
Lei
NO SNOUVNINNIi](1 ON S]AVM NO),]ANns 3H1'n3A3n GNnoN9
iv 03NnsV3N(INV 031VOOn 3N3M S3Nn10nas CINV SONicnine-nv
*3NI NOiionNiSNOO IiIHM MCI kG CIINVd�]Nd'ZZOZ
V
'g isnonv aava',ov=,j iivos',,sii3snHOVSSVN'N3AOCINV HiNON 01 17/
'iiajis wooso oogL'ininq f 6,1
3
I fW1
dVVq NO 03SVO SNOLV301 OlNi=3(INV SVO'N31VM(1NnoHDH30Nn
sv Ainan N3AO(INV HiNON,,03�iLN3
19t
140-
741
ND3H3H
(]3iv3l(]Nl NOiivNno13N00 80 NOUV301 iOVX 3NV NON
'3sn HO-d 3lev11ns NO(13NOONVOV'301AN3S NI N3H1l3 3HV Slinan
3 3Hi NI
ONnoN0N30Nn NMOHS 3H1 iVHi S331NvNvno ON S3>IVN NO),3ANns
x,�
3H1*S3111li1n(]NnoHoH3(]Nn 3H1 31VOOn ATV01SAHd 01 031VAVOX3
=LLD
iON SVH NO),3ANnS 3Hi'NO3N3H(1310N AlIVOIJ103dS SS3nNn 6r'lk=(I�Wl
of=mly I :
6v 'I a I -
-�Z),
96 Nl buy.91 lie
SONIMVNO ONUSIX3 V4ONJ NO/ONV
.T"=PI)IN
O 's3Nn10nN1s ONliSIX3'(SN3HiO,,8)SONIANVn 30VJNins(131VDOn 10n31J
m NONJ NMOHS Sl ViVG CX3 OlNiO313'SVO'N31VM))aniin WNDLIOCIV 8
--IP-AV 71
V,'-,710—
sainionNis 031VQOl 3Hi N33M138 iHDIVNiS 9 A
i,-V
z
0 Sl NnN 3dld 3Hi ivHi NO'3NnionNiS HOV3 iV(13AN3S8O 3SOHi an —IV,
SV�IAVS]Hi�INV NnN�icjicj]]Hi inOHE)noNHi AZIS:]cJlcj NO/ONV
WN]liVV4 3dld iVHi iNVNNVM iON S30G(INV'iONNVO NO,.]ANns �5V(41
]Hi'�INVD AO ONVONViS ciiNinnN]Hi DNlilln lildSl(l
Sl VIVO INIIHM SNOUVOOn(INV NIHM S]Hli]Hi iV(138]iNnOON] clzr- Ni
3SOHi NOHJ AHVA NVO SNOWCINOO'(313'SNISVO HOiVO/S3�10HNVN)
(,Zls siNnionas aavom miu iv aiNnsvivi(INV(1:1ANIS90 SVM
3dld(INV'WNIHV�N 3dld'iN3ANI 3dld ONianlONI)NOliVhNO-JNl
H3M3S),HViINVS CINV NNOiS'NO3N3H C1310N AIIVOU133dS SS3-lNn 9
*((13(]VHSNn)X 3NOZ CINV 3V 3NOZ NI Sl V3HV 103rDdd t
]Hi,Z10Z'���,-lnr]iVG:]Ali0:]-JJ:]'J9ZZ006009Z Nievm dVh'009
JD 9ZZ TINVd(SNOiioiasiNnr-nv)siiisnH0VSSVVl'AiNnDO X�ISS],,
CllniliNl dVN NNU hVNOONd IONVNnSNI OOOIJ IVNOIiVN]Hi aid SV
'ZZOZ 839N31d3S
JO HiNON 3H1 DNiNna 03i3-ldnO0 NNOM 0-131J-S301AN35 9NIH33N19N3
(INV WiN:]hNONlAN:]NVONVn),G S.,3ANns ONnoNs VIONA O�]NlViI910
N330 SVH NO3N3H NMOHS NOl1VnNO3N1 0lHdVNSOd01(INV DIN13NINVId
SSNO AG(13NINNH3(l SV(8ZL(11030)(99CIAVN)9961 JO nniva
WDLN3A NVOIH3NV HiNON 01 033N3N333H 3HV NMOHS SNOliVA3-13 '2 V
'(SHOO)SNOliViS
IONINIAIN Cl]iVNIdO),-lSnonNliNO3 i]NiNVV4S NOXH,19 10�101AONd W4
SV(SSN9)SN31SAS 31l-n3iVS NOliVSlAVN W8019 A8(13NlkNH3i3G
SVM NOWSOd'(LOO6 H3Od3)22 OVN n31SAS 31VNIGH003 3NV-ld 31ViS
3dll
A',
S113snHOVSSVA 01 G33N3H333N Sl),3Aans SlHi JO NVIGIN3h 3H1 7
*NOliVnHO-JNI 0330(INV 31lS 103renS 3H1
iV ONnOJ SNOLIONOO nVOIS),Hd ONIUSIX3 NOdn(13SVE]Sl),3ANns SlHi I
SUCIN
Zi 8 L 9 9 ti 2 z
MRV SIWe7 W-10-7 aIqll-4,1 lJ-Q-lq-f?apt-I 6606/ff/o6.1'a
-V jo V 1aaLls AVI
40 pa�oaqo
1333 Ot,=HONI L:31VOS
Eo Lev Ao UMC)AC] I I I
01 s, OL 0 M7
zzoz,o t Issom
Ir- Al NY
9 Ni
Z9'0P=7738
zzrk=w� Z6
'ON BUIMDJC] 'ON 109fO-d
7-- Al ---------------—--------- 3
OO 99 Al
q 0 ozzf NY
A) Z1-
_I A
zyw ZZ'"=do
-? f
—J-3
11 N11.11—J7 I � I 6#-T730 f.19' NY .9.9 CV
ra
A3AArIS b D9T9=HAy JIG 90 ogvf- NY (Y)
(Ga6a-7y As) Y', -jj Zy (G"3a AB) G*
0 zr Z_� 'IW -0-m 0 m 0 0-m-
N
19 o*-o MY R
I Ag (,-03Y AS)
Z6W=(i)4Nf
�Z)a-- 7-1-- , f 7T-
-N(1,
kJ11-4 4,4,1d--� I
9.993f n
r n
a-sv
V 101 �d
SFV6V SsVAY9
lilt INI Ffi NY
6617 1 NY
6y NI I NY
6 99 Ff
Ire NI
961-
JO
JJ
sLi3snHDVSSVW JO H11V3MNOWWOD %
@14!j buIMIDA(] "o
Nw
AINno:)x3ss3 Xd. z
- NY
-ozzg=w W=Tso 95�zr- NI 9
N '*9=W 0 Aft oo\.q
INY JIG .1 3
113AOCINV HISON dO NAN01 09W=Nal
m
90
Ss,y ItsL L st S.Lol ZE dyw fzog=m/y
G00MIIIH I _u I "[J— I 16�,I ad —11 H J� d
Of'f*=W A 1/9
% m
rzf*=& 90,6f N 99m=,NY N� E
-11 a
-40 99MIPM11 90
Tg
0
Joaroic] IV 99 o-ffld
69'eP 9.0� '09=7738
-4L,NY
1/9 #9=80 01 WOO-UEBUEPAMM WWt7Z8-L[9:=I 00Wt7Z8-L[9:i
ssvw
t7 L Eo VA UOjSOS
I— CdU)
6�0�
Ucl alps,joeilS el)p!jqweo ool
LLRT
-oul'VVY U25ue-j f
/V� Z9 A'
T X7VM OAW
-----------
INIIIIIIII
ONUSIX3 C)
a F91Z 9019=-In NZ
AIV.qIVV7 ------- 9999=M-
99.9-7739 -S,
99 alo qNia7ing
j DNILSIX3 ONIMIng
'01-1 IiViS SSVN 101,-Ir VNU5X3
HOA3AHns CINV-I_IVNOISS3JO2Jd W I I H I
ssvw
03NDIS 3ivcl Rjnsim'o Nvi lie 0
19\ _ /' !,1�1131d-GH.11 s�
--- *� -- DNI0711118
079 13 1-
ZJ :g, t. I NY VNILSLY3
3daH.01 1 -(r�
17
AR) 99=M6,
-wo fill 1
IP iIrIVII, 3dGH rdU) P09--mly
99 W*j�goF
-09V9=Mly NY
9.It�738 NY -777—,
9 lfwg=
\ - 9 3dGH.9
\ \ ro
Z�3dOH I ---------
si 3dGH.9
�Im I I jAI
1.1 DAW 'N
SNOISIA:]�J 0 0 IM — z
ON GID(] Ile
(9) ogzg=&
yo
ONIddVkN ONIUSIX3 a 3dGH
noH-d(13110ld-(0310N SV 99= G z
A4z
das'.
Id.),i)INI�wriiin 13N]2JIJIN Iz zg=m
rz�
fo*- NI
F9Vft= NY �ov Zg=nly 3NII ino ANVA 2JHVM
NY
3NI�ino ANVVI N3M3S.,NViINVS NY
91 9�=Mly 1
2 79-1-
99 rq-
Si
3NI�ino mvn svo — —o-
3NI-I ino N2JVI`q NOUVDINnnnoz) — lo lie
,V
3NI�ino mvm 01�J10313
3NI-1 ino AHWN 30VNIV�JG
Ire
NIVA 302J03),HViINVS —
4
INI-1 2jnO1NO3 — rvd \ `�q N— -g—,
IINI3 kVM-J0-iH0IN —
———— \� ———,\ - d 4 _\ F
99' Z
IINI3)dN3dONd — -A'
INII A3HISV3 — SA a
3NIM CIV3H�J3AO —
33NI3>INIINIVHO —
A
imi a�jvno aoom —
3d12i1s mo-m),:i�snoci — G
qNno I1INV210
-N
ONIN2JVM I�gViO:Ii]C] mu VS7
VS7
�3AVNO JO 30G3 03
d3 1N3A3AVd JO 30a3
-nVm Jo noi-Loo
O V3HV MdVOSONVI V57
GVd 3132JONOO do
:Ii]2JONOO omoo
z snONinniig 118
0 NOLVATI]iOdS f x
]AIVA N]iVM
NIEN Nlivm
IdId(INViS
O NMJ0 JOON
3-10d H3MOd a
(03�38V1 SV 3dkL)3-10HNVVI @@0@@@@00@0
:]�Od iHOI� A
3Nim Ano
3A�VA SVO
N3EVI svo F--1
X08 NOUVOINnnnoo 12
NOIL33S GN3 03dVl3
iNWJ(1),H 36J
H3EV4 DlHiD= R-31
X09 31�jio]171 FT
inONY]ID — 9�p
NISV9 H01V3 — [M am@ ME V
33Ni —
NOIS —
N000 — V
A
iINn ONINOUI0N00 2JIV 117V/V ON
1IT/3S Ci N100HS iON)(IN3Dal
Zi 8 1 z 1 9 9 ti 2 z