Loading...
HomeMy WebLinkAbout50 Sutton Hill Road - NACC #374 Small Project Approval - Permits #NACC #374 - 50 SUTTON HILL ROAD 6/24/2026 CONSERVATION DEPARTMENT Community & Economic Development Division Earl Zimmerman 50 Sutton Hill Road North Andover, IVIA 01845 June 26, 2026 50 Sutton Hill Road, North Andover Fence Installation Conservation Conditions of Approval, NACC #374 Pursuant to section 4.4.2 of the North Andover Wetlands Protection Regulations, the applicant/homeowner Earl Zimmerman, filed for a Small Project Permit application under Category "H", for work proposed at 50 Sutton Hill Road,North Andover. The work involves: replacement and installation of 8'wood stockade fencing at the northerly and easterly property line outside buffer zone. Installation of a 6' chain link fence at the edge of the rear lawn which will be 78 feet from the wetland at its closest point. Work to be accomplished by hand and excess soil from post holes will be disposed of outside the buffer zone. During the June 26, 2026 the North Andover Conservation Comm mission (NACC) found this project to qualify as a Small Project Permit and voted unanimously to approve this project as proposed under i Cale o'g 0 1-1"for fence installation, subject to compliance with the conditions listed below. The project is approved only as it relates to the Conservation Commission and any and all other approvals should be obtained by the applicant/homeowner. All work shall conform to the following: RECORD DOCUMENTS: Small Project Filing Including: ® Application Checklist with supporting narrative and attachments, stamped received May 20, 2026; ® Proposed Fence Project Aerial Map with wetland measurements. The following conditions are hereby mandated: 1. A pre-construction site inspection shall be scheduled with the Conservation Department and the contractor to review project scope. 2. A post construction site inspection shall be scheduled with the Conservation Department to verify compliance. 3. This permit is valid for one (1) year from the date of issuance. The appli , homeowner and their contractors are advised that NO other work on the property is allowed under this permit. The NACC has-jurisdiction over all of the wetlands and associated I 00-Foot buffer zones and 200 Riverfront Area to the Shawsheen River on site and any work that involves ground disturbance or changing the current conditions in these areas will require permitting with the NACC. This includes, but are not limited to, house additions, pools, patios, decks, sheds, fences, garden beds,landscaping and bridge installation, tree or vegetation cutting/pruning. These activities shall be held to the current standards under the Bylaw and WPA.** 50 Sutton Hill Road—Small Project Permit Approval Category H Page 1 of 2 Should you have any question or conunents regarding the contents of this letter,please do not hesitate to contact the undersigned at 978.688.9530. Thank you for your anticipated cooperation with this matter. Respectfully, NORT"ANDOVERj CONSERVATION DEPARTMENT Amy R. axner Conservation Administrator 50 Sutton Hill Road—Small Project Permit Approval Category H Page 2 of 2