HomeMy WebLinkAbout201214 Traffic and Parking Memo - - 25 Beechwood Drive Civil Engineelt
SIMCtUral Engineers
Ti-affic Engineers
Land Survoyor's
Architiacts
TMAF F I kj";` &0", PRK`"INS
M E Mul`R A N D U M
Date,-. December 14, 2020
i Town of North Andover Planning Department
120 Main Street
North Andover, MA 01845
From' Roberi E. Duval, P.E.
Proposed Beec rive Self-Storage - North Andover, MA
Tax map 34 Lot 50
T'FM Project No. 31968-00
PROPOSAL
The Stubblebinn Company is proposing, to construct a self storage facility on Beechwoold Drive
in North Andover. The proposed use will include a 3-story 90,000 sf bui'lding (30,1000 sf
footprint). the facility will provide, heated storage units with access from either thile exterior
drives or interior corridors., The facility will be open 7am� to 9pm, with 1 or 2 employees present
during normal business hours.,
DESCRIPTION OF SITE
The site is located at the southwest corner of Beechwood Drive and Osgood Street (M,A1 25).
Beechwood Drive is a private dead-end roadway with rising grade heading east. Osgood Street
(MA1 25) is a, north-south arterial roadway with two, lanes of travel in each, direction. The
property is mostly wooded with a wetl�and area in the southwest portion of the lot. Surrounding
properfies, are cieveio,ped with a variety ofr commercial and industrial developments., With
approximately 10' of grade change along the Bee,chwood Drive property frontage, the proposed
building will have two access drives; one on each side of the building. The two driveways allow
for at grade access to storage units and the butilding interior on both sides of the building.
TRIP GENERATION
Using standard trip, generation rates published by the IT E (10t-hEdition), Land' Use Code (LUC)
151 —Mini-Warehou storage
was used to calculate vehicle trips for the proposed self
facilityi. Table 1: shows,the trip genieration used on the proposed building area.,
Table 1 —Proposed TrI Generation
In Out Total
Weekd,ayAM Peak Hour of Adjlacen Street 5 4 9
Weekday PM Peak,Hour oif Aojacent Street 7 8 15
Weekend SA,T' Peak Hour of the Generator 17 11 281
1"Moraii, hic. MSG a d''I'VIS1011 Of"''n, 0
48, Cor)stihition Drive, f3edfor,(iJil M-1 0.3110 170 Way 102, Portsi [NII-I 038,01
472-4488 F(603)472-9747 T(6,03)431-2222 F-(6,013),4311-0,91,10 WW'W-111sceingli'leel
—.-.........
n December 4,2020
Proposed Beechwood Drive Self Storage Page 2 of
0 Beechwood Drive,, north Andover MA
PARKING GENERATION
Using the ITE Parking Generation manual 3rd Edition), the parking requirements for L C 151
Mini-Warehouse is as follows below.
Peak Period Total Parking Parking
Demand* Provided"
Weekdays: 10a -1 2prn
Weekends: pm- pm 5 23
' Average Parking Demand based on ITE Parking Generation Manual for LUC 151 Mini-
Warehouse, 3rd edition.
Parking supply includes 8 sp intended for employees and new customers accessing
office, and 15 spaces inside fence for secure unit access.
The project proposes a total parking supply of 23 parking spaces} with 8 spaces outside the
fence including two accessible spaces for employees and new tenants} and 15 spaces inside
the fence for existing tenants.
At the lower grade level, 12 exterior storage units are proposed. It is assumed that tenants of
these spaces will park in the area directly in front of their unit when accessing their storage.
Likewise, on the upper grade level, 18 exterior storage units are proposed. The upper drive aisle
is proposed at 26 feet wide to allow for access along the drive with a parked vehicle in front of a
storage unit,
CONCLUSION
Trip generation and parking demand presented herein are typical for self-storage facilities.
These facilities are generally open to tenants 24 hours per day, and therefore do not reflect
typical peak hour patterns of adjacent roadway use.
In summary, we find that the traffic associated with this proposal is on the order of day-to-day
variations in street traffic, and can be easily accommodated by Beechwood Drive and Osgood
Street without need for improvements. We also find the provided parking supply both inside and
outside the security fence to be adequate to serge the facility.
Respectfully submitted,
TFI IOI AN, INC.
Robert Duval, PE
Chief Engineer
Trip Generafion Summary
Alternative: Self-Storage Facility
Phase: Open Date: 1 114199
Project: 31968.99 Stubblebina Analysis Cate: 1 /14l 9 9
Weekday AIM Peak Hour of Weekday day I I Peak Hour of Saturday Peak Hour of Generator
Adjacent Street Traffic Adjacent Street Traffic
ITE land Use Enter Exit Total Enter Exit Total Enter Exit Total
151 MWAI EH USE 1 5 4 9 7 8 15 17 11 28
99.3 1999 S q. Ft. G FA
Unadjusted Volume 5 4 9 7 8 15 17 11 28
Internal Capture Trips 9 0 0 9 9 9 0 9
Pass-By Trips 9 9 9 9 9 9 9 9 9
Volume Added to Adjacent Streets 5 4 9 7 8 15 17 11 28
Total Weekday AM Peals Hour of Adjacent Street Traffic Internal Capture=9 Peroant
Total Weekday day i"'M Peak Hour of Adjacent Street Traffic Internal Capture=9 Percent
Total Saturday Pear Hour of Generator Internal Capture=0 Percent
-Custom rate used for selected time period.
Source: Institute f Transportation Engineers, Trip Generation Manual 10th Edition
TRIP GENERATION 10, TRAFFICWARE, LLC P. 1
. .......... .............................................................. . . ............ . . .. .