Loading...
HomeMy WebLinkAbout31968.00 SWPPP Report Update - - 25 Beechwood Drive � I Climate-Controlled Self-Storage Beechwood Drive North Andover, MA Prepared on: September 20, 2021 Revised on. October 7, 2021 Prepared for. The Stubblebine Company 214 North Main Street Concord, NH 03301 TFM Project No. 31968.00 Prepsretl by: Civil Engineers Structural Engineers Traffic Engineers Land Surveyors " Landscape Architects Scientists 48 Constitution Drive, Bedford, NH 03110 Tel: (603) 472-4488 Fax: (603) 472-9747 www.tfmaran.com Illliliiiii Stormwater Pollution Prevention Plan (SWPPP) for Construction Activities at: Climate-Controlled Self-Storage Beechwood Drive North Andover, MA SWPPP Prepared For: THE STUBBLEBINE COMPANY 1 CRANBERRY HILL #103 LEXINGTON, MA 02421 P: 781-862-6168 SWPPP Prepared By: TFMORAN, INC. ROBERT DUVAL, P.E. 48 CONSTITUTION DRIVE BEDFORD, NH 03110 P: 603-472-4488 F: 603-472-9747 SWPPP Preparation Date: 9 /20/2021 Revised: 10/7/2021 Estimated Project Dates: Project Start Date: 10/13/2021 Project Completion Date: 12/1/2022 NPDES Tracking No: Stormwater Pollution Prevention Plan (SWPPP) Climate-Controlled Self-Storage- North Andover, MA Contents SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES ................................................................1 1.1 Operator(s) /Subcontractor(s)................................................................................................. 1 1.2 Stormwater Team ....................................................................................................................... 1 SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING...............................................................2 2.1 Project/Site Information .............................................................................................................2 2.2 Discharge Information ...............................................................................................................2 2.3 Nature of the Construction Activity..........................................................................................4 2.4 Sequence and Estimated Dates of Construction Activities................................................. 4 2.5 Allowable Non-Stormwater Discharges...................................................................................4 2.6 Site Maps .....................................................................................................................................4 SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS.....................5 3.1 Endangered Species Protection...............................................................................................5 3.2 Historic Preservation ...................................................................................................................6 3.3 Safe Drinking Water Act Underground Injection Control Requirements .............................7 SECTION 4: EROSION AND SEDIMENT CONTROLS...................................................................................8 4.1 Natural Buffers or Equivalent Sediment Controls....................................................................8 4.2 Perimeter Controls......................................................................................................................8 4.3 Sediment Track-Out.................................................................................................................. 11 4.4 Stockpiled Sediment or Soil..................................................................................................... 12 4.5 Dust Control............................................................................................................................... 12 4.6 Minimize the Disturbance of Steep Slopes............................................................................ 13 4.7 Topsoil......................................................................................................................................... 14 4.8 Soil Compaction....................................................................................................................... 15 4.9 Storm Drain Inlets...................................................................................................................... 15 4.10 Constructed Stormwater Conveyance Channels ............................................................... 16 4.11 Dewatering Practices .............................................................................................................. 17 4.12 Chemical Treatment................................................................................................................ 18 4.13 Other Stormwater Controls...................................................................................................... 18 4.14 Site Stabilization ........................................................................................................................ 19 SECTION 5: POLLUTION PREVENTION STANDARDS................................................................................21 5.1 Potential Sources of Pollution..................................................................................................21 5.2 Spill Prevention and Response................................................................................................22 5.3 Fueling and Maintenance of Equipment or Vehicles..........................................................23 5.4 Washing of Equipment and Vehicles.....................................................................................24 5.5 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes........24 5.6 Washing of Applicators and Containers used for Paint, Concrete or Other Materials ...28 5.7 Fertilizers.....................................................................................................................................29 5.8 Other Pollution Prevention Practices......................................................................................29 SECTION 6: INSPECTION AND CORRECTIVE ACTION............................................................................30 6.1 Inspection Personnel and Procedures...................................................................................30 6.2 Corrective Action.....................................................................................................................31 6.3 Delegation of Authority...........................................................................................................31 SECTION7:TRAINING.............................................................................................................................32 SECTION 8: CERTIFICATION AND NOTIFICATION..................................................................................33 SWPPPAPPENDICES................................................................................................................................34 ii Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES 1.1 Operator(s) /Subcontractor(s) Operator(s): Aho Construction Inc. 30 Tricnit Road New Ipswich, NH 03071 Contact: Abram Aho Phone: 603-878-3150 ext. 106 Fax: 603-878-1258 Email: ajaho@ahocon.com Subcontractor(s): Frank DeLucia &Son Inc. 119 Newton Road Plaistow, NH 03865 Contact: Rocci DeLucia Jr. Phone: 603-974-1580 Fax: 603-974-2553 Email: rocci@delucia-construction.com Emergency 24-Hour Contact: Aho Construction Inc. Contact: Abram Aho Phone: 603-878-3150 ext. 106 1.2 Stormwater Team Overall Site Responsibility and Stormwater BMPs Aho Construction Inc. 30 Tricnit Road New Ipswich, NH 03071 Contact: Abram Aho Phone: 603-878-3150 ext. 106 Fax: 603-878-1258 Email: ajaho@ahocon.com SWPPP Preparer TFMoran, Inc Contact: Robert Duval, PE Phone: 603-472-4488 Email: rduval@tfmoran.com 1 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING 2.1 Project/Site Information Project Name and Address Project/Site Name: Climate-Controlled Self-Storage-The Stubblebine Company Project Street/Location: Beechwood Drive City: North Andover State: MA ZIP Code: 01845 County or Similar Subdivision: Essex County Project Latitude/Longitude Latitude: Longitude: 420 43' 48.70" N (degrees, minutes, 710 6' 42.03" W (degrees, minutes, seconds) seconds) Method for determining latitude/longitude: Goode Earth Horizontal Reference Datum: ® NAD 83 or WGS 84 Additional Project Information Is the project/site located on Indian country lands, or located on a property of religious or cultural significance to an Indian tribe? ❑ Yes Z No Are you applying for permit coverage as a "federal operator" as defined in Appendix A of the 2017 CGP? ❑ Yes Z No 2.2 Discharge Information Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System (MS4)? E] Yes Z No Are there any surface waters within 50-feet of disturbance on this project Z Yes ❑ No wetlandAn unnamed idisturbance j t . 2 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Table 1 -Names of Receiving Waters Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4 (note: multiple rows provided where your site has more than one point of discharge that flows to different surface waters) 1. Unnamed Tributary discharging to the Merrimack River Table 2— Impaired Waters/TMDLs (Answer the following for each surface water listed in Table 1 above) If you answered yes, then answer the following: Is this surface What pollutant(s) Has a TMDL Pollutant(s) water listed as been for which "impaired"? are causing the completed? Title of the TMDL document there is a impairment? TMDL 1 ❑ YES NO ❑ YES ® NO Describe the method(s) you used to determine whether or not your project/site discharges to an impaired water: USEPA Waterbody Quality Assessment Report, 2012 & NHDES Table 3—Tier 2, 2.5, or 3 Waters Answer the following for each surface water listed in Table 1 above) Is this surface water designated If you answered yes, specify which as a Tier 2, Tier 2.5, or Tier 3 Tier (2, 2.5,or 3) the surface water is water? designated as? (see Appendix F) 1. [:] YES ® NO 3 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 2.3 Nature of the Construction Activity General Description of Project This project involves the construction of a 3 story, 90,000 GSF (30,000 SF footprint) building with first level overhead door access to storage units with associated site improvements. The project also consists of an 8-space public parking field for customers and 18 spaces in the interior for tenant access, an underground recharge area for infiltration of stormwater, and perimeter fencing with gated access to tenant storage units. The project will be serviced by municipal water and gas, on-site septic, and underground utilities. Size of Construction Project - SIZE OF PROPERTY: Approximately 2.86 acres TOTAL AREA OF CONSTRUCTION DISTURBANCES: 2.0± acres Construction Support Activities Equipment and material staging, and storage will be done on-site at locations to be determined at a later date. 2.4 Sequence and Estimated Dates of Construction Activities The exact sequence and schedule of construction has not been determined at this time. Estimated start date is October 13, 2021 Estimated completion date is December 1, 2022 2.5 Allowable Non-Stormwater Discharges List of Allowable Non-Stormwater Discharges Present at the Site Type of Allowable Non-Stormwater Discharge Likely to be Present at Your Site? Discharges from emergency fire-fighting activities ❑ YES ® NO Fire hydrant flushings ❑ YES ® NO Landscape irrigation ® YES ❑ NO Waters used to wash vehicles and equipment ® YES ❑ NO Water used to control dust ® YES ❑ NO Potable water including uncontaminated water line flushings ❑ YES ® NO Routine external building wash down ® YES ❑ NO Pavement wash waters ® YES ❑ NO Uncontaminated air conditioning or compressor condensate ❑ YES ® NO 4 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Uncontaminated, non-turbid discharges of ground water ors rin water [:] YES ENO Foundation or footing drains El YES ENO Construction dewatering water E YES E:1 NO 0 Landscaping irrigation stormwater discharges will occur throughout the site where irrigation has been installed for watering of landscaped areas. 0 Waters used to wash vehicles and equipment will be discharged at washing station locations. The contractor shall choose a location prior to construction commencing. 0 Waters used for dust control will be implemented throughout the site as necessary to control dust. 0 Routine external building wash down discharges will occur along the building when cleaning of the building exterior is necessary. 0 Pavement wash waters will discharge adjacent to the paved areas when cleaning of the paved areas is performed. 0 Construction dewatering locations will be designated by the contractor prior to construction commencing. Water should be pumped into a portable dewatering bag or a dewatering area. The dewatering area shall be located on a flat surface not within a runoff path. For non- vegetated dewatering areas, a layer of crushed stone with a minimum diameter of 2 inches should be installed. The dewatering area shall be encompassed with silt fence or sediment logs to allow infiltration of water into the ground. Dewatering shall be discharged within the limits of work as shown on the construction plans. 2.6 Site Maps Site Maps are located in Appendix A 5 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS 3.1 Endangered Species Protection Eligibility Criterion Under which criterion listed in Appendix D are you eligible for coverage under this permit? Fq A F-1 B El C F-1 D [:] E For reference purposes, the eligibility criteria listed in Appendix D are as follows: Criterion A. No federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's "action area" as defined in Appendix A of this permit. Criterion B. The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally-listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the "action area' . To certify your eligibility under this Criterion, there must be no lapse of NPDES permit coverage in the other operator's certification. By certifying eligibility under this Criterion, you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in your NOI form. Criterion C. Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site's "action area," and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification,you must include the following in your NOI: 1) any federally listed species and/or designated habitat located in your "action area and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with your NOI. Criterion D. Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat,and must have resulted in a written concurrence from the relevant Service(s) that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. Criterion E. Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat. The result of this consultation must be either: 6 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility i. a biological opinion that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or ii. written concurrence from the applicable Service(s) with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally- listed species or federally-designated habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. Criterion F. Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site's discharges and discharge-related activities on federally-listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. Supporting Documentation Provide documentation for the applicable eligibility criterion you select in Appendix D, as follows: For criterion A, indicate the basis for your determination that no federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's action area (as defined in Appendix A of the permit). Check the applicable source of information you relied upon: ❑ Specific communication with staff of the U.S. Fish & Wildlife Service or National Marine Fisheries Service. ❑ Publicly available species list. ® Other source: Estimated Habitat Map of State-Listed Wetland Wildlife published by the Natural Heritage of Endangered Species program (NHESP). 3.2 Historic Preservation Appendix E, Step 1 Do you plan on installing any of the following stormwater controls at your site? Check all that apply below, and proceed to Appendix E, Step 2. ❑ Dike ❑ Berm M Catch Basin ❑ Pond Z Stormwater Conveyance Channel (e.g., ditch, trench, perimeter drain, swale, etc.) Z Culvert ❑ Other type of ground-disturbing stormwater control: Appendix E,Step 2 If you answered yes in Step 1, have prior surveys or evaluations conducted on the site already determined that historic properties do not exist, or that prior disturbances at the site have precluded the existence of historic properties? ❑ YES Z NO Appendix E, Step 3 7 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility If you answered no in Step 2, have you determined that your installation of subsurface earth- disturbing stormwater controls will have no effect on historic properties? E YES ❑ NO Through consultation w/ Massachusetts Cultural Resource Information System (MACRIS) datacheck. Appendix E, Step 4 If you answered no in Step 3, did the State Historic Preservation Officer (SHPO), Tribal Historic Preservation Office (THPO),or other tribal representative (whichever applies) respond to you within 15 calendar days to indicate whether the subsurface earth disturbances caused by the installation of stormwater controls affect historic properties? ❑ YES ❑ NO If yes, describe the nature of their response: N/A 3.3 Safe Drinking Water Act Underground Injection Control Requirements Do you plan to install any of the following controls? F-1 Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system) F1 Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow F-1 Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system) The design of such structures has been reviewed and approved by the Town of North Andover and its engineering consultants. 8 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility SECTION 4: EROSION AND SEDIMENT CONTROLS Erosion and sediment controls used on the project may include, but are not limited to: Construction Sequencing • Silt Fence • Compost Filter Socks and/or Compost Filter Berms • Construction Entrances • Storm Drain Inlet Protection • Temporary Sediment Basins • Stormwater Detention Basins (underground chamber systems) • Geotextile Mats and Fabrics • Stone Check Dams • Hay Mulch with Tackifiers • Dust Suppression with Water Truck Soil Stabilizers 4.1 Natural Buffers or Equivalent Sediment Controls Buffer Compliance Alternatives Are there any surface waters within 50 feet of your project's earth disturbances? ❑ YES ® NO 4.2 Perimeter Controls General - Sediment controls will be installed along the perimeter areas of the site that will receive stormwater from earth disturbing activities. Specific Perimeter Controls Perimeter Control # 1 -Silt Fence BMP Description: Silt fence should be installed along the down gradient areas of the property as shown on the plan. Installation Schedule: The silt fence shall be installed before construction begins as indicated on the design plans. Inspections: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm: The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: The silt fence shall be inspected to ensure that it is intact and there are no gaps or tears along its length. If gaps or tears are found during the inspection, the fabric shall be repaired or replaced immediately. Accumulated sediment shall be removed from the base of the fence once it reaches one-third the height of the silt sock and disposed of in a legal manner. Before the silt fence is 9 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility removed from the site, any accumulated sediment shall be removed and disposed of in a legal manner. Responsible Staff: Aho Construction Inc., or their subcontractors. Alternate Perimeter Control and Sediment Barrier Perimeter Control # 2 - Erosion Control Mix Berm or Stump Grindings Berm BMP Description: Erosion Control Mix or Stump Grindings Berm should be installed in place of or in conjunction with silt fencing as shown on the Site Map. Installation Schedule: The Erosion Control Mix or Stump Grindings Berm shall be installed before construction begins as indicated on the design plans. Inspections: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm: The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: The Compost Filter Berm should be inspected to ensure that it is intact and there are no gaps along its length. If gaps are found during the inspection, the Compost Filter Berm shall be repaired immediately. Accumulated sediment shall be removed from the Compost Filter Berm once it reaches one-third the height of the silt fence and disposed of in a legal manner. Before the Compost Filter Berm is removed from the site, any accumulated sediment shall be removed and disposed of in a legal manner. Responsible Staff: Aho Construction Inc., or their subcontractors. Alternate Perimeter Control and Sediment Barrier Perimeter Control # 3-Erosion Control Mix or Compost Filter Sock BMP Description: Erosion Control Mix or Compost Filter Sock should be installed in place of, or in conjunction with silt fencing as shown on the Site Map. Installation Schedule: The Compost Filter Sock shall be installed before construction begins as indicated on the design plans. 10 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Inspections: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm: The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: The Compost Filter Sock should be inspected to ensure that it is intact and there are no gaps or tears along its length. If gaps or tears are found during the inspection, the Compost Filter Sock shall be repaired or replaced immediately. Accumulated sediment shall be removed from the Compost Filter Sock once it reaches one-third the height of the silt fence and disposed of in a legal manner. Before the Compost Filter Sock is removed from the site, any accumulated sediment shall be removed and disposed of in a legal manner. Responsible Staff: Aho Construction Inc., or their subcontractors. 11 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 4.3 Sediment Track-Out General -Stone construction entrance pads will be utilized to minimize the track-out of sediment onto off- site streets, other paved areas, and sidewalks from vehicles exiting your construction site 4.3.1 Establish Stabilized Construction Exits Track-Out Control # 1 - Stabilized Construction Entrance BMP Description: The stabilized construction entrances consisting of stone and filter fabric should be installed at the entrance/exit onto existing paved surfaces, as identified on the design plans, to prevent off-site transport of sediment by construction vehicles. The anti-tracking pad shall be at least seventy-five feet long, a minimum of 20 feet wide, flared at the intersection with parking areas, and shall consist of a twelve-inch layer of 3-6" stone. The stone shall be placed over a layer of geotextile fabric to reduce mitigation of sediment from the underlying soil. Installation Schedule: The stabilized construction entrance shall be installed before construction begins on site. The stone shall remain in place until the subgrade of pavement is installed on site. Inspections: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm: The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: The stabilized construction entrance shall be maintained in a condition that will prevent tracking or flowing of sediment onto any paved surface not within the active construction. Any sediment tracked, spilled, dropped, or washed onto these areas shall be immediately cleaned-up and disposed of in a legal manner. Sediment shall be removed from the entrance at least weekly, or more often if necessary. If sediment has clogged the entrance then additional crushed stone shall be added. Replacement of the entrance may become necessary when it becomes completely filled with sediment. The entrance shall be reshaped as indicated on the design plans for runoff control. The construction entrance shall be removed at the completion of the project. Responsible Staff: Aho Construction Inc., or their subcontractors. 4.4 Stockpiled Sediments or Soils General-The following apply to stockpiles of soils and sediment materials for the project: Stockpiles are to be located outside of any natural buffers established under Part 2.1.2.1 a and physically separated from other stormwater controls made in accordance with Part 2.1 of the CGP; • Protect from contact with stormwater (including run-on) using a temporary perimeter sediment barrier; 12 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility • Where practicable, provide cover or appropriate temporary stabilization to protect from precipitation and/or minimize sediment discharge; • Do not hose down or sweep accumulated soil or sediment on pavements into any stormwater conveyance (unless connected to a sediment basin, sediment trap, or similarly effective control), storm drain inlet or surface water; and, • Unless infeasible, contain and securely protect from wind. • The contractor shall maintain a chain of custody for all topsoil and organics to and from the site. Specific Stockpile Controls The perimeter controls outlined in Section 4.2 shall be utilized as a perimeter sediment barrier. Stockpile Locations Equipment and material staging, and storage will be done on-site at locations to be determined at a later date. 4.5 Dust Control General - The generation of dust will be minimized to the extent feasible through the appropriate application of water and/or other dust suppression techniques. Specific Dust Controls Dust Control # I - Watering BMP Description: Dust from the site should be controlled by using a mobile pressure-type distributor truck to apply potable water to disturbed areas. The mobile unit will apply water at a rate of 300 gallons per acre and minimized as necessary to prevent runoff and ponding. Installation Schedule: Dust controls will be implemented as needed upon the start of site grading, during windy conditions (forecasted or actual wind conditions of 20 mph or greater) and continue through grading operations. Potable water will be applied at a rate of 300 gallons per acre and be performed by a mobile pressure-type distributor truck no more than three times a day from May thru September and once per day from October thru April, or as required. Inspections: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: At least one mobile unit shall be available at all times to distribute potable water to control dust on the site. Each mobile unit shall be equipped with a positive shutoff valve to prevent over watering of the disturbed area. For vehicle and equipment maintenance practices, see Section 3, Part 3.4. Responsible Staff: Aho Construction Inc., or their subcontractors. 13 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 4.6 Minimize the Disturbance of Steep Slopes General ■ Steep slopes will be stabilized with stone or erosion control blankets. * There shall be at least 3 emergency rolls of erosion control blankets on-site prior to commencing any earth disturbing activities and shall be 100% biodegradable. ■ Slopes that will have a vegetative cover for final stabilization will be tracked (to the extent practicable) prior to application of slope mix seed. Specific Steep Slope Controls Steep Slope Control # I -Erosion Control Matting BMP Description: North American Green (or approved equal) BioNet blanket slope protection should be used to provide stabilization for the slopes as shown on the Active Construction Site Map. The blanket slope protection shall be installed in accordance with the manufacturer's recommendations and project requirement. See Detail Sheet in Appendix N. Installation Schedule: The blanket slope protection shall be installed once the slopes are final graded. Inspections: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: The blanket shall be inspected to determine if cracks, tears, or breaches have formed; if so, the blanket shall be repaired immediately. Contact with the soil must be maintained and erosion should not occur under the blanket. Any areas where the blanket is not in close contact with the ground shall be repaired or replaced. Responsible Staff: Aho Construction Inc., or their subcontractors. 4.7 Topsoil General - Topsoil will be preserved, stockpiled and reused on the site to the extent practicable. Specific Topsoil Controls Topsoil Control # I - Topsoil BMP Description:Topsoil stripped from the construction area Should be stockpiled as identified on the SWPPP Map. The stockpile area shall be in an area that will not interfere with the construction phases and at least 15 feet away from areas of concentrated flows or pavement. The slopes of the stockpile shall not exceed 2:1 to prevent erosion. A silt fence (or alternate perimeter control) shall be installed around the perimeter of the stockpile, in accordance with the specifications on the design plans and in Section 2.1.2.4. Of the CGP. The stockpile shall be temporarily stabilized with erosion controls as described in Section 2.1.2.4.c of the CGP if necessary. 14 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Installation Schedule: Topsoil stockpiles shall be established during grading activities. Temporary stabilization will be applied immediately after the slopes of the stockpile have been graded and construction equipment traverses the slopes. Inspections: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm: The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: Areas on or around the stockpile that have eroded shall be immediately stabilized with proper erosion controls. Maintenance and inspection procedures for silt fence are described in Section 4, Part 4.2. Responsible Staff: Aho Construction Inc., or their subcontractors. 15 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 4.8 Soil Compaction General - In an effort to minimize topsoil compaction, to the extent practicable after loam or humus is placed, vehicle and equipment traffic will be limited in the areas where final vegetative stabilization will occur. 4.9 Storm Drain Inlets General - The project will install inlet protection measures that remove sediment from discharge prior to entry into the storm drain inlet. Specific Storm Drain Inlet Controls #1 - Sedimentation Control at Catch Basin BMP Description: All existing catch basins within the paved areas should be protected from sediment by installing a filter fabric wrapped around the grate. See SWPPP Map. Installation Schedule: Sedimentation control at the catch basins shall be installed as the catch basin structures are constructed. Inspections: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance Clean, remove and/or replace, the protection measures as sediment accumulates, if the filter becomes clogged, and/or performance is otherwise compromised. Where there is evidence of sediment accumulation adjacent to the inlet protection measure, you must remove the deposited sediment by the end of the same work day in which it is found or by the end of the following work day if removal by the same work day is not feasible. Responsible Staff: Aho Construction Inc., or their subcontractors. 16 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Specific Storm Drain Inlet Controls #2 - Dandy Bag H (or approved equal) BMP Description: Existing catch basins should be protected from sediment by Dandy Bag II catch basin inserts. The inserts should be removed by the contractor once the construction site has been permanently stabilized. See Active Construction Site Map. Installation Schedule: Dandy Bag II shall be installed in the existing catch basin prior to any earth moving activity on site and within the new catch basins immediately after they are installed. Inspections: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm: The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: Clean, remove and/or replace, the protection measures as sediment accumulates, if the filter becomes clogged, and/or performance is otherwise compromised. Where there is evidence of sediment accumulation adjacent to the inlet protection measure, you must remove the deposited sediment by the end of the same work day in which it is found or by the end of the following work day if removal by the same work day is not feasible. Responsible Staff: Aho Construction Inc., or their subcontractors. 4.10 Constructed Stormwater Conveyance Channels General - If surfaceter are present on-site duringt r r conveyanceshall be implemented by the contractor as necessary to prevent erosion. channels shall be constructed withinits of work and removed prior to completion . Stormwater conveyance channels will be constructed at various locations for the project. These channels will be lined with non-woven geotextile fabric and stone, or approved erosion control matting prior to directing stormwater flows in order to minimize erosion in the channel. 4.11 Dewatering Practices General - Ground water and/or accumulated stormwater that is removed from excavations, trenches, foundations, vaults, or other similar points of accumulation, shall be effectively managed by appropriate controls prior to leaving the construction site.Dewatering water that is non-contaminated and non-turbid dewatering water may be able to be discharged without being routed to a control. 17 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Specific Dewatering Practices: Dewatering Practice # I - Excavation Dewatering BMP Description: Construction dewatering practices are intended to prevent sedimentation associated with managing water removed from excavations during construction. Activities must be conducted to remove sediments, prevent the discharged water from eroding soil on the site, and preserve down gradient wetlands and ditches. Water should be pumped into a portable dewatering bag or a dewatering area. The dewatering area shall be located on a flat surface not within a runoff path. For non-vegetated dewatering areas, a layer of crushed stone with a minimum diameter of 2 inches should be installed. The dewatering area shall be encompassed with silt fence or sediment logs to allow infiltration of water into the ground. Dewatering shall be discharged within the limits of work as shown on the construction plans. All requirements of state law and permit requirements of local, state and federal agencies must be met, including the Construction Dewatering General permit for projects that propose to discharge construction dewatering water to wetlands. Installation Schedule: The dewatering facility should be installed prior to starting dewatering activities. A minimum of two dirt bags shall be on-site prior to commencing of earth moving activities. Inspections: Weekly: The dewatering facility area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; Additionally, the dewatering facility should be inspected daily by the Contractor during the active dewatering process. During/Post-Storm: The environmental monitor shall also inspect the dewatering facility during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: Special attention should be paid to the buffer area of the dewatering facility for any signs of erosion or flow concentration that may damage the buffer's vegetation and/or the underlying soil. Dewatering discharge should be stopped immediately upon any sign of instability or erosion in the receiving area. If a portable dewatering bag is used for the dewatering facility, check the bag daily for rips and repair or replace as needed. If a gravel pad is used, check the surface area for erosion and install additional crushed stone if necessary. The silt fence or sediment log perimeter adjacent to the downstream side of the dewatering facility should be checked for gaps,tears or other deficiencies and repaired/replaced as needed. Dewatering should be avoided during periods of intense, heavy rain. Any repairs or replacements to the dewatering facilities use should be done by the end of the same work day in which it is found or by the end of the following work day if removal by the same work day is not feasible. The dewatering effluent should be visually monitored to assess whether additional treatment is required to protect downstream receiving waters. Care must be exercised to prevent contact of 18 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility dewatering effluent with oil, grease, other petroleum products, toxic and/or hazardous materials. Contaminated runoff must be contained, treated, and discharged or removed in accordance with the Project Plans and Specifications, as well as NHDES requirements. Turbid backwash water should either be hauled away for disposal or returned to the start of the treatment process. Replace or clean filter media for the dewatering devices when the pressure differential equals or exceeds the manufacturer's specifications. Responsible Staff: Aho Construction Inc., or their subcontractors. 4.12 Chemical Treatment Flocculation chemical treatment or other chemical treatment systems are not anticipated to be required for this project. 4.13 Other Stormwater Controls General - This document can be amended to include other stormwater controls if they become necessary. 19 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 4.14 Site Stabilization Site Stabilization Practice (only use this if you are not located in an arid, semi-arid, or drought-stricken area) ® Vegetative F-1 Non-Vegetative M Temporary F-1 Permanent Temporary Stabilization BMP Description: Earthwork temporarily ceasing on a portion or the entire site and not resuming within 3 days shall be stabilized. Proposed pavement areas are to be stabilized with compacted gravels; other areas that will not be permanently seeded within 14 days of disturbance with 6" loam and not less than 2.8 lbs. of Erosion Control Seed Mix per 1,000 sq. ft. Proposed vegetated areas not exhibiting a minimum of 85%vegetative cover growth by the end of growing season, or which are disturbed after the end of growing season, shall be stabilized by sowing Erosion Control Seed Mix and mulching with hay mulch, hydraulic mulch or other approved method. On slopes greater than 3:1,the area shall be seeded and protected with erosion control blankets or mulched using a minimum of 3.2 tons of mulch per acre that is secured with anchored netting, tackifiers, hydraulic mulch or bonded fiber matrix (BFM). The installation of erosion control blankets or mulch and netting shall not occur over accumulated snow or frozen ground and shall be completed prior to thawing or spring melt events. All ditches or swales not exhibiting a minimum of 85% vegetative growth by the end of growing season, or which are disturbed shall be stabilized temporarily with stone or composite turf reinforcement mat (North American Green SC 150). After November 15, parking surfaces,where work has stopped for the winter season,shall be protected with a minimum of 3 inches of crushed gravel. Installation Schedule: Inspect portions of the site where earthwork temporarily ceases and shall not resume within 30 days. Inspection: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: If washout, breakage, or erosion occurs, the surface will be repaired and new stabilization measures shall be added to the damaged areas. Responsible Staff: Aho Construction Inc., or their subcontractors. 20 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Site Stabilization Practice ® Vegetative ❑ Non-Vegetative [:] Temporary ® Permanent Permanent Seeding BMP Description: Permanent seeding should be applied immediately after the final design grades are achieved on portions of the site but not later than 72 hours after construction activities ceases. Permanent stabilization will be completed in accordance with final stabilization procedures in Section 7. All stabilization is to be performed in compliance with the MassDOT Standard Specifications. Installation Schedule: Permanent seeding shall be applied immediately after the final design grades are achieved on portions of the site but not later than 72 hours after construction activities ceases. Inspection: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and permanently stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: If washout, breakage, or erosion occurs, the surface will be repaired and new permanent stabilization measures shall be added to the damaged areas. Responsible Staff: Aho Construction Inc., or their subcontractors. 21 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility SECTION 5: POLLUTION PREVENTION STANDARDS 5.1 Potential Sources of Pollution Potential sources of sediment to stormwater runoff: • Topsoil stripping and stockpiling (if necessary) • Vehicle tracking • Grading and excavation activities • Stockpiles of building debris Potential pollutants and sources, other than sediment, to stormwater runoff: • Material Storage Area-topsoil stockpile (if necessary) • Construction Activity- paving, concrete barrier installation, concrete pouring/mortar Construction Site Pollutants Trade Name Material Chemical/Physical Storm Water Pollutants Description Asphalt Black solid Oil, petroleum distillates Concrete White solid Limestone, sand Glue, adhesives White or yellow liquid Polymers, epoxies Hydraulic Brown oily petroleum Mineraly it h hydrocarbon o Colorless, pale brown or Benzene, ethylbenzene, Gasoline pink petroleum toluene, x l n MTBE hydrocarbon y e e, blue-green t II w Petroleum distillate, oil and Diesel Fuel Clear, o yellow grease, naphthalene, liquid g p ' xylenes Ethylene glycol, propylene Antifreeze/coolant Clear green/yellow liquid glycol, heavy metals (copper, lead, zinc Erosion Solid Particles Soil, Sediment Construction Debris/ Sod Particles rti I Trash/Debris/Organic p Munici al Waste a c es Material Sanitary toilets Various colored liquids Bacteria, parasites, and viruses 22 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 5.2 Spill Prevention and Response Spill Prevention and Control Procedures BM P Description: A Spill Prevention and Response Plan shall be prepared and identify ways in which to reduce the chance of spills, stop the source of spills, contain and clean up spills, dispose of material containment by spills and train personnel responsible for spill prevention and response. i. Employee Training:All employees will be trained via bi-weekly training sessions, as detailed in Section 7. ii. Vehicle Maintenance:All vehicles and equipment including subcontractor vehicles will be checked for leaking oil and fluids. Vehicles leaking fluids will not be allowed on-site. Drip pans will be placed under all vehicles and equipment that are parked overnight. iii. Hazardous Material Storage: Hazardous materials will be stored in accordance with Section 5, Part 5 and in accordance with all federal, state and local regulations. iv. Spill Kits: Spill kits will be within the materials storage area. v. Spills: All spills will be cleaned up immediately upon discovery. Spent absorbent materials and rags will be hauled off-site immediately after the spill is cleaned up for in a legal manner. Spills large enough to discharge into surface waters shall be reported to the National Response Center at (800) 424-8802. vi. Material safety data sheets, a material inventory, and emergency contact information will be maintained at the on-site project trailer. Installation Schedule: The spill prevention and control procedures will be implemented once construction begins on-site. Inspection: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: All personnel shall be instructed during training sessions, regarding the correct procedures for spill prevention and control. Notices that state these practices will be posted in the office trailer, and the individual who manages day-to-day site operations will be responsible for seeing that these procedures are followed. Responsible Staff: Aho Construction Inc., or their subcontractors. 23 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 5.3 Fueling and Maintenance of Equipment or Vehicles General-The following apply to the fueling and maintenance of equipment and vehicles at the site ■ Adequate clean up supplies are to be available at all times to handle spills and leaks. Clean up spills or contaminated surfaces immediately, using dry clean up measures where possible and eliminate the source of the spill to prevent a discharge, or a furtherance of an ongoing discharge; ■ Use drip pans and absorbents under or around leaky vehicles; ■ Dispose of used clean up supplies, oil and oily wastes in accordance with other federal, state, tribal, or local requirements; and ■ Do not clean surfaces by hosing the spill area. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 - Equipment/Vehicle Fueling and Maintenance BMP Description: When possible, equipment/vehicle fueling and maintenance shall be done at an offsite facility. All major equipment/ vehicle maintenance will be performed off-site. If equipment/vehicle fueling or maintenance needs to be done on site, employees and subcontractor shall be trained in proper fueling and maintenance procedures. Several types of vehicles and equipment will be used on-site throughout the project. Fuel tanks shall be kept on- site in the materials storage area. Fueling activities shall occur in the designated materials storage area. All equipment fluids generated from maintenance activities will be disposed of into designated storage in accordance with Section 5 Part 5. Absorbent, spill-cleanup materials and spill kits will be available at the staging and materials storage area. Drip pans will be placed under all equipment receiving maintenance and vehicles and equipment parked overnight. Installation Schedule: BMPs implemented for equipment and vehicle maintenance and fueling activities will begin at the start of the project. Inspection: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: Vehicles and equipment will be inspected on each day of use. Leaks will be repaired immediately, or the problem vehicles(s) or equipment will be removed from the project site. Keep ample supply of spill-cleanup materials on-site and immediately clean up spills and dispose of materials in accordance with local and state regulations. Recycle fluids whenever possible. Responsible Staff: Aho Construction Inc., or their subcontractors. 5.4 Washing of Equipment and Vehicles General - Equipment/Vehicle Washing activities are not expected to occur at the project site. If washing does need to occur on site, the SWPPP will be revised to address the need for appropriate BMPs. 24 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 5.5 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes 5.5.1 Building Products Specific Pollution Prevention Practices Pollution Prevention Practice #1 -Materials Storage Area BMP Description: Equipment and materials that are on site will be kept near the materials storage areas. A watertight container will be used to store hand tools, small parts, and other construction materials. Non-hazardous building materials such as packaging material (wood, plastic, and glass), and construction scrap material (brick, wood, steel, metal scraps, and pipe cuttings) will be stored in a separate covered storage facility adjacent to the container. All hazardous waste materials such as oil filters, petroleum products, paint, and equipment maintenance fluids will be stored in structurally sound and sealed containers under cover within the hazardous materials storage area. Very large items will be stored in the open in the materials storage area and elevated on wood blocks to minimize contact with runoff. Installation Schedule: The materials storage area will be established prior to any infrastructure constructed on site. Inspection: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: The storage area will be kept clean,well organized, and equipped with ample cleanup supplies as appropriate for the materials being stored. Perimeter controls, containment structures, covers, and liners will be repaired or replaced as needed to maintain proper function. Responsible Staff: Aho Construction Inc., or their subcontractors. 5.5.2 Pesticides, Herbicides, Insecticides, Fertilizers, and Landscape Materials General - These Items are not expected to be stored at the construction site. 5.5.3 Diesel Fuel, Oil, Hydraulic Fluids, Other Petroleum Products, and Other Chemicals Hazardous Waste Materials BMP Description: All hazardous waste materials such as oil filters, petroleum products, paint, and equipment maintenance fluids will be stored in structurally sound and sealed shipping containers, within the designated hazardous materials storage area. Hazardous waste materials will be stored in appropriate and clearly marked containers and segregated from other non-waste materials. Secondary containment will be provided for all waste materials in the hazardous materials storage area and will consist of commercially available spill pallets. Additionally, all hazardous waste materials will be disposed of in accordance with all federal, state, and local regulations. Hazardous waste materials will not be disposed of into the on-site dumpsters. All personnel will be 25 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility instructed, during training sessions, regarding proper procedures for hazardous waste disposal. Notices that state these practices will be posted in the office trailer and the individual whom manages day-to-day site operations will be responsible for seeing these practices are followed. Installation Schedule: Containers used to store hazardous waste materials will be installed once the site materials storage area has been installed. Inspection: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: The storage areas will be kept clean, well organized, and equipped with ample clean-up supplies as appropriate for the materials being stored. Material safety data sheets, material inventory, and emergency contact numbers to be maintained in the office trailer. Responsible Staff: Aho Construction Inc., or their subcontractors. 26 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 5.5.4 Hazardous or Toxic Waste General - Please see Section 5.5.3 above 5.5.5 Construction and Domestic Waste General - Waste containers of adequate size will be provided on the construction site. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 - Waste Materials BMP Description: All waste materials will be collected and disposed of into trash dumpsters in the material storage area as indicated on the Active Construction Site Map in Appendix B. Dumpsters shall have a secure watertight lid, be placed away from storm water conveyances and drains, and meet all federal, state, and local regulations. Only trash and construction debris from the site will be deposited in the dumpster. No construction materials shall be buried on-site. All personnel will be instructed, during training sessions, regarding the correct disposal of trash and construction debris. Notices that state these practices will be posted in the office trailer and the individual whom manages day-to-day site operations will be responsible for seeing these practices are followed. Installation Schedule: Trash dumpsters will be installed once the materials storage area has been established. Inspection: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: Dumpsters shall be emptied on a regular basis or if trash and construction debris are exceeding the dumpster's capacity on an as-needed basis and disposed of in a legal manner. Responsible Staff: Aho Construction Inc., or their subcontractors. 27 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 5.5.6 Sanitary Waste General - Temporary portable sanitary facilities will be provided at the construction site. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 -Sanitary Waste BMP Description: Temporary sanitary facilities (portable toilets) will be provided at the site throughout the construction phase. The toilets shall be located within the materials storage area. The portable toilets will be located away from a concentrated flow paths and traffic flow and will have collection pans underneath as secondary containment. Installation Schedule: The portable toilets will be brought to the site once the staging area has been established Inspection: Weekly: The area shall be inspected by an environmental monitor at least once every seven (7) days from the start of terrain alteration until the site is completed and stabilized; During/Post-Storm The environmental monitor shall also inspect the site during any rain event in which 0.25 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. Maintenance: All sanitary waste shall be collected from the portable facilities on a regular basis and disposed of in accordance with local and state regulations. Wastewater from toilets shall not be discharged or buried on site. Toilets shall be inspected for leaking holding tanks. Toilets with leaking holding tanks will be removed from the site and replaced with new portable toilets. Position portable toilets so that they are secure and will not be tipped or knocked over. Responsible Staff: Aho Construction Inc., or their subcontractors. 5.6 Washing of Applicators and Containers used for Paint.. Concrete or Other Materials General - Designated vehicle and equipment washout areas will be provided on-site. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 - Concrete Washout Area 28 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility BMP Description: A designated temporary, above-ground concrete washout area will be constructed as detailed on the site map. The temporary concrete washout area shall be at minimum 10-ft in length and 10-ft in width and with sufficient quantity and volume to contain all liquid and concrete waste generated by washout operations. Straw bales shall be installed around the entire perimeter of the washout area. The washout area shall be lined with plastic sheeting at least 10 mils thick and free of any holes or tears. The plastic sheeting shall be stapled into the straw bales (two staples per bale). Signs will be posted marking the location of the washout area to ensure that concrete equipment operators use the proper facility. See Detail Sheet on SWPPP plan sheets. Concrete pours will not be conducted during or before an anticipated storm event. Concrete mixer trucks and chutes will be washed in the designated area or concrete wastes will be properly disposed of off-site. When the temporary washout area is no longer needed for the construction project, the hardened concrete and materials used to construct the area will be removed and disposed of according to the maintenance section below, and the area will be stabilized. Installation Schedule: The washout area will be constructed before concrete pours occur at the site. Inspection: The washout areas will be inspected daily to ensure that all concrete washing is being discharged is being discharged into the washout area, no leaks or tears are present, and to identify when concrete wastes need to be removed. Maintenance: The washout areas will be cleaned out once the area is filled to 75 percent of the holding capacity. Once the area's holding capacity has been reached, the concrete wastes will be allowed to harden;the concrete will be broken up, removed,and disposed of in accordance with local and state regulations. The plastic sheeting will be replaced if tears occur during removal of concrete wastes from the washout area. Responsible Staff: Aho Construction Inc., or their subcontractors. 29 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 5.7 Fertilizers General - Fertilizers will be stored off-site, handled and applied by a contractor that is competent in their storage and use. 5.8 Other Pollution Prevention Practices Specific Pollution Prevention Practices Pollution Prevention Practice # 1 - Water Used to Control Dust BMP Description: Dust control will be implemented as needed once site grading has begun and during windy conditions (forecasted or actual wind conditions of 20 mph or greater) while site grading is occurring. Spraying of potable water at a rate of 300 gallons per acre or less will be performed by a mobile pressure-type distributor truck no more than three times a day during the months of May-September and once per day during the months of October-April or whenever the dryness of the soil warrants it. Responsible Staff: Aho Construction Inc., or their subcontractors. 30 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility SECTION 6: INSPECTION AND CORRECTIVE ACTION 6.1 Inspection Personnel and Procedures Personnel Responsible for Inspections - THIRD PARTY ENGINEER PROVIDED BY NORTH ANDOVER Inspection Frequency Weekly Inspection: The USEPA Construction General Permit indicates for this project Section 4.1.2.1 applies; at least once every 7 calendar days; or Once every 14 calendar days and within 24 hours of the occurrence of a storm event of 0.5 inches or greater. To determine if a storm event of 0.5 inches or greater has occurred on your site, you must either keep a properly maintained rain gauge on your site, or obtain the storm event information from a weather station that is representative of your location. For any day of rainfall during normal business hours that measures 0.5 inches or greater, you must record the total rainfall measured for that day in accordance with Part 4.1.7.1d. Post-Storm Inspection: Additionally, the environmental monitor shall also inspect the site within 24- hrs any rain event in which 0.5 inches of precipitation or more falls within a 24 hour period. If the environmental monitor is unable to be present during such a storm, an inspection shall be performed within 24 hours of the event. "Within 24 hours of the occurrence of a storm event" means that you are required to conduct an inspection within 24 hours once a storm event has produced 0.5 inches, even if the storm event is still continuing.Thus,if there is a storm event at your site that continues for multiple days, and each day of the storm produces 0.5 inches or more of rain, you are required to conduct an inspection within 24 hours of the first day of the storm and within 24 hours after the end of the storm. All erosion and sediment controls will be inspected in accordance with the applicable requirements in Part 4.1, and document your findings in accordance with Part 4.1.7. If you find a problem (e.g., erosion and sediment controls need to be replaced, repaired, or maintained), you must make the necessary repairs or modifications in accordance with the following schedule: If the necessity for corrective actions is identified during the inspection,the inspector shall notify and submit a copy of the inspection report to the site supervisor. The site supervisor shall initiate the corrective action within the guidelines listed above. Corrective actions shall be recorded in the Corrective Action Log in Appendix F. For any corrective actions requiring a SWPPP amendment, the SWPPP Amendment Log in Appendix G shall be filled out appropriately and the SWPPP report and Active Construction Site Map revised as necessary. Rain Gauge Location The rain gauge used will be the South Lawrence Station, KMANORTH377 weather station available through Weather Underground. Inspection Report Forms A COPY OF THE SWPPP INSPECTION FORM IS LOCATED IN APPENDIX D. 31 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility 6.2 Corrective Action From Section 5.2 of the CGP: For any of the following conditions on site, you must install a new or modified control and make it operational, or complete the repair, by no later than 7 calendar days from the time of discovery. If it is infeasible to complete the installation or repair within 7 calendar days, you must document in your records why it is infeasible to complete the installation or repair within the 7 calendar day timeframe and document your schedule for installing the stormwater control(s) and making it operational as soon as practicable after the 7-day timeframe. 5.2.1.1 A required stormwater control was never installed, was installed incorrectly, or not in accordance with the requirements in Parts 2 and/or 3; or 5.2.1.2 You become aware that the stormwater controls you have installed and are maintaining are not effective enough for the discharge to meet applicable water quality standards or applicable requirements in Part 3.1. In this case, you must notify your EPA Regional Office by the end of the next work day. You are required to submit your notification through EPA's electronic NOI system, or "eNOI", at www.epa.gov/npdes/cgpenoi; or 5.2.1.3 One of the prohibited discharges in Part 2.3.1 of the CGP is occurring or has occurred. 5.2.2. Where your corrective actions result in changes to any of the stormwater controls or procedures documented in your SWPPP, you must modify your SWPPP accordingly within 7 calendar days of completing corrective action work. Personnel Responsible for Corrective Actions Aho Construction Inc., or their subcontractors. Corrective Action Forms A COPY OF THE CORRECTIVE ACTION FORM IS LOCATED IN APPENDIX E 6.3 Delegation of Authority The Delegation of Authority identifies the individual or position where the construction site operator has delegated authority for the purposes of signing inspection reports, certifications, or other information. See Appendix J for Delegation of Authority Duly Authorized Representative(s) or Position(s): Insert Company or Organization Name: Insert Name: Insert Position: Insert Address: Insert City, State, Zip Code: Insert Telephone Number: Insert Fax/Email: 32 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility SECTION 7:TRAINING Individual(s) Responsible for Training: Aho Construction Inc., and/or their Subcontractor(s) General stormwater and BMP awareness training for staff and subcontractors: Informal training provided for all staff, including subcontractors, on the site. The training will be conducted primarily via training sessions and focus on avoiding damage to storm water BMPs and preventing illicit discharges. The training sessions will address the following topics: Erosion Control BMPs, Sediment Control BMPs, Non-stormwater BMPs, Waste Management and Materials Storage BMPs, and Emergency Procedures specific to the construction site. See Appendix I-SWPPP Training Log. 33 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility SECTION 8: CERTIFICATION AND NOTIFICATION Instructions (CGP Appendix I.. Part I.11.b): — The following certification statement must be signed and dated by a person who meets the requirements of Appendix I, Part 1.1 l.b. — This certification must be re-signed in the event of a SWPPP Modification. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: Title: Signature: Date: [Repeat as needed for multiple construction operators at the site.] 34 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility SWPPP APPENDICES Attach the following documentation to the SWPPP: Appendix A-Site Maps Appendix B-Copy of 2017 CGP Appendix C-NOI and EPA Authorization Email Appendix D-Inspection Form Appendix E-Corrective Action Form Appendix F-SWPPP Amendment Log Appendix G-Subcontractor Certifications/Agreements Appendix H-Grading and Stabilization Activities Log Appendix I-Training Log Appendix J-Delegation of Authority Appendix K-Endangered Species Documentation Appendix L-Massachusetts Historical Commission Project Notification Form Appendix M- Project Permits Appendix N-NRCS Soils Maps Appendix O-Completed SWPPP Inspections 35 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix A-Site Maps SNVId 311S 00-996L2 3_1IA0V0[�3 NOZZ 70 21 K9 A-7s 'OUI'UDJON*j SDUJOqj -lnSNO0�13dl 10 J83!110 PBZ!Joq4nD AInp D Xq poubis ssalun 8A!jD8Jj8 IOU 9!UDId siqj 00.,296 1 ON HIP M31A3N ONii z/qi,/cO L A HP HP M31A3d ONINNVIdl dad Lz/gz/co z 0 9 1. oc JaAaOS104M UUJOJ,CUD Ul pampoicaj asimjaqlo Jo palDo!ldoj'PQIDD!Idnp Woo-UDIOWJI.Mmm sls!lual.s HP HP M31A3d'NINO3 NOILVAd3SNO0 d3d WtVvo 2 107 —A DUI'UDAON'A SDUUOLj 40 uo!ss!wjad ue;Iijm joijd eqj Inoqji 02 -IVOS_lViNDZINOH 'NINO3 'pa!doa aq IOU ADLU SIDUajDUU SUDId 2S24i'P@M@SW Slqb!J IV sloa jq�v PLO LtL6-ZLt(209)MAI I adoospuol HIP HIP M31A3N NOILVA83SNO3 83d LZILzlto t, n Uo' HIP HIP NOISI030 AD 33ILDN 83cl LZOZ/L/9 g 01,1,£O WN'PIOJP-8'.A!IC]uo!lnl!l.u.o et, 132"-ZLi,(��09)-U-Hd S p 0 F �OUI'UDJON'j SDUU04j@ LZOZ lqbi Adoo .1 ulbu3 31".Ji HP H.1 NOIS30 3ILc3S 31vocin zoz/2/g 9 j DLL£O HN'PJOIPaG .1...6u3 imnlonils 9A!JO uo!lnl!lsuoD qt, S188u!bu3 I!A!o LZ09 U Auvnue3:j OCEA 13-IVDS ANVdWOO M183199niSMI p HO:J 0]HVd]8d dlHSH3NlHVd(331INII 0GV3V8lV Ag Cz]N/V\0 VW'H3A0GNV HIHON"HO(300ARH3338 ONIN3iVM3(3 NOilondiSNOD NOA SOVe(iNICI)0NId3iVM3O/M, NOIAH3S3d 3NOiS 03Hsndo . .................... 210vaoils--InEls C191noRLRoa_aLvmlID V3NV 30Vd01S CdAi)SV3dV(13ednisio-nv (133S�R NVO-1 -lVId3iVN SS33X3 NVId LN3W3[)VNVW U3.LVMWUO.LS V C 09 iM dVA XVi 0 SNV'ld LN3WdO'13A3(1 311S Z n 9L SNOuvy03d 31ViS ONV NMOi HiIM 30NVOH000V -m3d 0301/\Odd 3e NI SISVe Nv V NO AD 03SOcSIO/O3NIViNIVN ONV NoiiondiSNOO DNidna �('dAl)NODS -n IM -113VJ -311S NO -nVHS -nViSNI S31il 31SVM),dViINVS 13llOi 318Vid0d (]31an8 38 31SVM,NOiionHiSNOZ) iSOcNO3 0 'SISVe A-1>133M V NO 311S 3Hi NONJ O3AON3N ONV 3dnsolQN3 G3ADdccV NO S63iSd 0 N Nn -IVI?J3iVV4 SIH830 NOu5ndiSNOJ 11V P 3dnD3S NI(33dOiS ONV(=031100 38 llVHS S 31SVM ONV '30NVedn1s10 ONV1 03ZI-IIBViS 03NDIS 3e_nVHS iN3N3iViS 30NVI�cll/400 30dVH0SIIJ iI0I_nI NV'21 'SNOHdV ANV 01 NOINd iNVDI]ddV 3Hi AB dVH did AB 'd0133cSNI 3H1 JO),iIdOrVN 3H1 313ldV400 SI NOiionNiSNOO N3HM'31ViS ivNniVN Sil NI ONV 03H0nOiNn 'SN31SAS H03iMdOiS OMi 01 NIVdo-nIM 311S 3e HiOe 111M 311S NO S13iinO 3cIcl Offii 3Hi NIVN3N_nIM 311S 3NOV L6'2 3Hi AD S3NOV TL61 A13iVI/4IXONccV'N31SAS 30VNIVNG(13SO�o 03unvnD 3H1 Ae 030N3114114003N SV NVId 3H1 01 0300V ONV 031N3N3lcI/4I 38 llVHS NDliVDIJIOOIN NISV8 H3iV3 ONV 3cIcl V Ae 031331103 3e TIM SV3dV C]3dOl3A3(l NOJ 39VNIVNG d31VM NdOis 'NVId NO]ONVN3_LNIVh SIHi HilM ILIS]Hi iV 111A NO idl>l le 01:INV SidOA]d SNOlioldSNI 'd31V3ND -0 sNnOH NO,g AD INNOiS V d31JV VZ NIHiIM ONV SAVO(L)N3A3S XN3A3 SNOI103cSNI -lnSNO3 V 3AVH NO SNOLL03cSNI Nd0,d3d TIVHS dOiZ)VdiNOZ)3Hi'27 iN3N30VNVIN H31VM NdOiS'L NdOAH3cl H33NION3 9Nii 3IVMS 3H1 AD NOISON3 iN3A3dcl(INV SMOIJ d31VM NdOiS(13iVdiN30NO3 AD kilOO-13A 3H1 UA 311SNO 03iVILINI 3NV S3dnSV3N NOILVZI-II8ViS N3HM S31VG(INV -lVMS SSVdO(13SOcOdd ONV SNILSIX3 NI(131IViSNI 38-nm-SINVO>133HO 3NOiS 7_ '31lS 3H1 AD NOILHOd V NO(]=IcNOO SI ANOM N3HM S3_LVO'31lS 3H1 AD NOIiNOcl V NO(13SV30 3onI33H 01 S3 .k-11HVHOdIN3i 3AVH S3111AIL3V NOLLondiSNOD N3HM S31V0'S31LIAIi3V ONlovdo dOrVN AD S31V0 *03(]V\OHd 3e ONiomONI'S3LLV\IiDV NOLLonaSNO3 AD SGHO03d NIViNIVN 01 3I81SNOcIS3d SI dOi3Vd1NO3 3H1'1,1, _nVHS clVld3AO AD J,AID nnNININ V'03dinb3d 3NV 13>INV-18 AD ScIHiS 3H0N NO Z 3d3HM'MO1,1 9HAG '311SN0 d3-1IVdi 301JJO 3H1 NI ONV V3dV 30VH01S d31VM NdOiS AD NOL103NIO 3H1 NI 13ANVle 3H1]]ON'ONI]dViS H31AV HON3d1 i3VdNO3 ONV -nlJ>IDVB'HON3di -10 -10 W1831VIN 3H1 NI(13-LSOd 30 TIM I3NNOSd3cl_nIcS 3181SNOcIS38 AD S3hVN 3H1 dnNV3I0 c330.9 V NI 13ANV 3Hi ONIdOHONV AB 13>INV 3H1 AD c01 3H1 dOHoNV NV NOl1N3A3dd AD 3SVHcl Hv-lnolidVd V NOJ 3-181SNOdS3d 31140038 HOV3]ILM sivnoV\IONI '31lS ND H3d331S NO S3cO-lS L:Z-nV NO 0311V1SNI 38 TlVHS-NDIi33iOdcl 3clDIS 13ANV_1B \('dAl)30N3J iTS 3S3H1"ONINIV8i cnNV3_10(INV NOIiN3A3dcl_nIcS 3AI303d HOV3_nIM OHM 13NNOS83d 311s kHVHOdV43i llViSNI H31diD 33dH1 iSV3-1 iV 31VN9IS3O-nIM A31di'd01VNIOd003 dnNV3-13 ONV NOLLN3A3dcl-nIds ONV V3dV ONINNVd 3Hi NIHiIM 0NnD_J SNISVB 3H1 3e-nim'SNOI1VH3c0 311S AV(]-Oi-),V(l 3H1 HOJ 3181SNOcIS3H iN3(IN3iNIH3dnS 311S 3H1- H31V3 3H1 iV(13-nViSNI 38_nIM NOLL03iOdcl 0INEIVJ 831]IJ/3NOiS ONV AVM I3AVd1 3H1 NI _nViSNI _nIM'03amONI 031VOOI 3HV iVHi SNISV8 HOiVO AD S31VN0 3H1 CINnoNv(13 39 018eVA 831TA'V3HV NDLondiSNOO 3H1 NIHiIM SNISV8 HOiVO-nV iV(13]]ViSNI 30 111M,-NDL031D8d NISVB HoiVo 38 OSW TIM S3dnSV3IN dnNV3]0 3Hi ONV'il 03snvo iVHM'llIcS 3Hi-AD NOLLdIdDS30 V'3N0 83HiONV SI 3H3H1 All IlIcS 3Hi do NV310 01 MOH ONV 0Niddn00O3d N08A_nIcS G AD 3clAi SIHi i N3A3dd 01 S3dnSV31N 3anlONI 01(]31snr(]V 38-nIM NVId NOIiN3A3acl-nIdS 3Hi- *SdvqnS NISV8 H0iV3 HNO\,0 ('AlAi)SV3dV(1398nisici-nv -3Z S 'AON30V 1N3NNd3AO0 W001 3H1 V40HJ SiN3NI(13S]IV 3AON3d 01 sisve ivnNNV NV NO(13NV310 30_nIM-SNISVe HOiVO (133S 32 NVOI I AD SS31(18VO38 snoOdVZVH dO 3IXOi AID SllIdS- 'NinnVANVi V HiIM(JINIA03 le IIVM ONINIVild NO 31ViS 31VIddOdddV 3Hi 01 03idOd3d 38 11M lVId3iVN OP \X, IONVisens snoodVZVH V HiIM i3ViNO3 NONA AdnrNI iNlAldcl 01 ONIHiOlD 3AIL33iOddl Al, 31VIdc0ddcV dV3M 11M 13NNOSd3d ONV 031VILLN3A 113M id3>1 38-nIM V3dV-nIcl -nVHS 311S 3Hi INO�U NO/GNV 01_lVId3iVN 0NnnVH sNandi'31lS 3HI NONA!(13>10VHi ON138 NONA =d3NOO _131VIO3NNI _nIcS_nV dvincion 5 3Hi 6 d31,1V A din 03NV3�0 3e 71M S iNIO ONV Onn SS30X3 3AON3d 01 SISVO A1>133M V NO id3MS 38 1 VHS 311S 3Hi 01 iN3Dvr(iv 3SOcHncl SIHi NOJ),TlV3IJI03cS Sd3NIV1N00 HSVdi lV13l/4 ONV DILSVlcl (IN 133d1S 03AVd 3Hi'(13ZI]IOViS Aiin,l N338 SVH RIS Noiiz)naSNDZ)3Hi AD d30NIVN3d 3Hi '3iISNO 03AVd 3Hi 01 33NVdiN3 3Hi iV 3dVIJ CINV 3GIM-,OZ 38 111M 33NVdiN3 03ZI-11BViS 3Hi 311S ONV'isnamvs VS'?J311l-1),iil>l'S3-10000'S3AOIC)'SC)Vd'SdOV4'SNVdl isno'smode -IIiNn 03NIViNIVIN 38]]VHS 30NVd1N3 03ZIlIeViS 3H1'3NOiS JO,ZI,AD Hic30 V 3AVH ONV OVON 01 03111NIl 3e iON ine 3 nl3NI 11M SIVIN3 VN ONV 1N3114c=3 V3NV 30VdOiS -IVI?J3-LVV4 3H1 NI 1c3N 38 i-lim dnNV310 TlIcS NOJ AdVSS303N iN3v4cinO3 ONV S-lVld31VN- 'S31�ciclnS clnNV3�3 ONV 3Hi JJO S1N3NIO3S AD OND10"i 310IH3A 3on(l3d dl3H 01 3115 NOiiondiSNOO 3Hi 01 30NV?JiN3 ondiSNOO 03ZI_IIeViS_nIM 3Hi iV TV13O 3Hi HiIM 30NV0dO30V NI 031IV1SNI 38 -33NVd1N3 NOLL NOIiVNdOJNI 3H1 AD NOLLVOOI 3H1 ONV S3dnO30Odcl 3H1 AD 3NVMV 3(IVV4 38 111M-13NNOSH3d 0NId31VM3O NOiiondiSNO'0 NOJ IiIS ONV O]iSDd A-18VI-13 19-nIM dnNV:310-nIcS 80A SOOHi:3N 0:30 N:]N V403:1N s,z_-Gdri.LovAnNVIN- 'V3NV NOLLond1SNO0 3H1 NIHiIM iN31NI03S SOVS(idIO)0NId]iVM7I0/M :dnNV310 ONV NOIiN3A3dcl 3H1 ONINIV13d 3-11HM 0IN8VJ d31-11J 3H1 NI S0NIN3c0 3H1 Honadidi MO-1,1-nm JAONnd'3ov-j8ns NOIAN3S3d 3NO1S(13HsnHci -nIcS dOJ C13MO-nOJ 38-nIM S301LOVdd ONMO-nOJ 3Hi'NVId SIHi AD SNOIiZ)3S snoIA38d ONn0d0 3H1 NV3N ONINNOA V40NA SAVO 1N3A3Nd 01 30VJNns GNn0d9 3Hi MO130 Oldne oiHev_j 3H1 NI 03ssnos10 S30ILOVdcl 1N3N39VNVN_lVId3iVN(INV DNld33>13snOH(1000 3H1 01 NOIWOOV NI 3H1 AD,2 iSV3-1 iV HiIM SiSOcl N33AU38 0IN8VJ d31lIJ 030NOJINIGH DNIHOi3as AB 0311V1SNI :S33IiZ)Vdcl_lOHiNOJ IlIcS CdAi)S, -nv iv -nIM ION73,1 i-11S]Hi'NOLLondiSN00 CIIISOAONAI:]Hi NOA NNOM AD SiINIFI]Hi liVINI-110 V iV NOLL03iONd 13W 80_PV iV Bo' 19 lTnW�SNII *N31VM HSVM v4ndo HOA V3NV _nIM(INV SV3dV C]3eHnisl(l 3H1 AO d313h1d3d 3H1 JNnoNv 0310nd1SNO0 3e_nM-33N3j iIIS NV HiM dOi3Vd1NO3 ONicninlB 30AOdcl ONV 31VNIOd000 01 KiO"iNOO 311S'(]Vd ONI(fline *V3HV NOiiondiSNO3 3Hi _j 3H1 NOA 313HONOD HilM O3iVI3OSSV d31VM HSVM NnNy_nV AD WAON3d NOJ 3I13ISNOcIS3H NIHiIM iN3NIO3S 3Hi ONINIVi3d 3THM AOOS iTS 3Hi NI S9NIN3dO 3Hi HonDdHi MD_u_nm AJONnd Si H013Vd1NO3 ONio-lino'S301LOVdd 1N3N30VNVN 1538 ONisn AD 03SOcSI0 38-nVHS '30VANns ONnodD 3Hi NV3N SAVO DNINNOJ NONA NODS ilIS 3Hi iN3A38d 01 33vjHnS ONnodo 831VM HSVM'd010Vd1NO0 311S 3H1 Ae 031VN9IS3O SV3dV NI 03sn 38_nVHS 313d0NO3 SS30X3 3Hi MO�31]a31dne iSOcl 3Hi JO,g iSV31 iV HiIM(13sn 38]]VHS SiSOd'S83H10),e(13-nViSNI :sNom:l 313d3NOD 3e_nM MOOS iTS 3H1'NOLLonHiSNOO(13SOcOdd 3H1 NOJ NNOM AD SiIhI_1 3H1 31V3NI_130 'SNOiivin93H-1VOO-1 ONV 31ViS NO SNOiiondiSNI S,d3dni3vjnNVN 01 ONIOND33V _niM ONV SV3NV 03edn1sIO 3H1 JO H313NId3cl 3H1 ONnodv(131ondiSNOO 38_nIM—AOOS iIIS -nim ine -nIM iNIVdl AD 03SOcSIO),183dOHd 38 83M3S 1480iS 3Hi 01 a308VHoSIO 38 iON 108iNOO NOIiViN3hIKI3S(INV NOISON3 80A S301LOVdd wdniomis 9 SS30X3'3sn Hoj C]3dinO3H iON N3HM(13HOiS(INV 03W3S AUH01i 38_nIM Sd3NIV1NO3_nV :SiNIVd -,�HVSS303N 383HM 30VId NI(13NOHONV 38 01 HDlnN'HoInvq AVH AD 3NOV H3cl SNOi 9*1,HiIM 03HOim 38 TIVHS V3NV HOV3'ONI(133S d31JV'C13IlcAV 38-nVHS H3ZIRLH3A ('d),i)30NVdiN3 'SlTcS OIOAV 01 NIB OliSVld 318VIV3S V 01 03dd3JSNVd1 38 111M d3ZIlIid3_J AID S0VB OZ-OZ-01,All 3NOV aid SGl 009(INV 3NOiS31141�jv8n11n01dov AD 3NOV 83d SNOi Z AD NnNINIIN V NOiiond1SN00 03sn k-nVLLHVd ANV AD S1N31NO3 3H1 03HS a3d�00 V NI 38_nIM 30VH01S'831VM V180is '0N1033S 01 NOINA!'110,13di iOOJS(]al8 AS OOO'L/Sel OZ'O(INV'3noS3J 038 0NIA3380 AS OOO'VSm Di 3HnsodX3 ill/W 01 TOS 3H1 OiNI(13ANOM 30_nIM d3ZIlIid3J'031�dlc!V 30N0'd3HrdovjnNVr4 OZ*O'3noS3J IlVi AS 000'L/S81 gt,'O JO 1SISNO3 3SIMd3H10 AVN 8D S310N NVId 3cV3SaNVl (*dAi)SV3NV 03BdniSl'O'\llV 3H1 AG(130N31NINOD3d SiNnonv NnNININ 3H1 NI AINO 031�cic!V 30_nIM(13sn S83ZIQid3j :SdJZI]Ii?j3j 3Hi Ae 031,1133clS SV 38 IIVHS XIN(133S 1N3NVNN3J 3Hi'XilAliDV NOiiondiSNOD iSVI 3Hi _CI33S v Nvol a0am" d31JV SAVO��NVHi d31Vl ON 033S iN3NVNH3cl HiIM(13ZIlleViS 38-nVHS S3SV33),]iN3NVINH3d 'SNOIiVON3ININO03d _nlM 53111ALL3V NOiiondiSN03 3d3HM 311S 3H1 AD SNOIidOcl(138NniSIG-NOliVZI-11BViS 1N3NVNd3d S,d3dniovjnNVN 3Hi 01 ONIGNOOOV(131lddV 3e 311SND 035n S30Nv1sens i]VHdSV ANV'(13-13OVI AINV310 3dV HOIHM SN3NIV1NO3(131V3S)JUHDIL -03033N All-10diNOO isna NOJ 035n 38 llVHS 301HD-IHD nnio-lvD'031-iddV -30V>IV3]NI(13NOiS 3e jim sionGONAI vqn3lOdi3dl JO 3Z)NVHZ)3H1 36603N 01 3Z)NVN3iNIVIN 3e NVD iN3lN3AVd snONINniie ILLNn 3Sve—enS 3NO1S V ONV S31I1X31O39 ONIAIdlc!V AB(13ZI-ileVis 3AIiViN3A3dcl dvim3d 3AI303d ONV SAV31 NOJ 03NOiINON 38 111M S319IH3A 311SNO_nV '),HVSS3D3N 3H3HM 30V_Icl NI isfon(]Oddl An310d13d ATNVdO.IN3i 30 ITM 03AVcl 38 111M iVHi 311S 3Hi JO SV3dV 0_1 IN _nVH(13HOHONV 3e 01 HOim*Holm AVH AD 3NOV N3cl SNOi 9'L HiIM(13H n 3e S V3dV HOV3 '0NI033S *(131-lddV _nVHS -OZ-01 -I :3-LIS NO 03MO-nOJ 38 TIIM S301i3VNd 3IJI33cS ionOOdcl 9NIMO-nOJ 3H1 d3_LJV 3e d3ZIlLLd3J OZ AD 3NOV d3cl Se�009 ONV 3NOiS3NI dVW N011V301 -lvda-inoi8ov JO 3NOV aid SNOT Z AD NnNININ V'3N1033S 01 dOldd'JS DOD'I.H3cl S8-1"L AD ;SJZ)IiZ)Vdd JIJIJ3cS iz)n(]O?Jd 31VN 3H1 iV(131-lddV 3AN-lvnNNV 3e_nVHS 033S AN"Odl/43i 3H1'30NVednlSIO iSVl 3H1 d31JV AVO Hiii.3H1 AB(13ZI-11OViS 38 isnN 3N0N NO SAVO iL dOJ 03BHFUSI03d 38 iDN_nM iVHi Y, '(13MO-nOA 3e_nM lVSOcSIO d3clONd NOJ SOOHi3V4(130N31NNOD3H - _IIeViS kdVdOcN3i u OGG L 311S NOiion 31ViS(INV�VOO�NO S,d3dniovjnNVN'JO(13SOdSICI 3e isnN ion(IONd smcHns ji— NiSNOO 3H1 AD SV3dV(13odnisia ONV S31IA>I3OiS TOScOi NOIiVZI !NOIiVV4dOJNI ionOOdd LLI _lIeViS'9:SlOaNOO NOILViN3NIO3S ONV NOISON3 NOJ S30LLDVHd NOILVZI Diazti iNVidOcNI NIV1NO3 k3H1!03NIVi3d 3e-nim VIVO),L3JVS WId3iVN ONV S13eV1 wNIOINO- !3-18V-1V3S3d iON 3dV),3Hi SS3-lNn Sd3NIV1NO3-lVNI0IdO NI id3A 38 iiim sionOOdd- :V3dV OV T VI, 30VANns sn01Ad3chl zz� :s-lviH3ivvq sno(]HVZVH HiIM 03iVI0OSSV SASIN 3H1 3on(l3d 01 03sn 3dV S30Ii3Vdcl 3S3H1 L9'0=0 :1N3101JA300 JJONnd NoiionaSNOD-iSOd cr; !sionaoAd snoUHVZVH 'NOIiVNdOJNI 3cOlS ONV'HiON3-1 3cIcl'id�Nl Wvs WIN HOA NVId 30VNIVNG V ONRIVNE)33S'NVId 3H1 NO NMOHS SI/GiSAS 39VNIVNG H31VM NdOiS'-V �_A '311SN0 SlVI831VN (INVS ANVO�80SONIM 009Z H3dOdcl 3NnSN3 01 KlIVO 133ASNI-nIM iN3ON3iNId3jnS 3115 3H1-AID lVSOcSIO ONV 3sn 'SNIVH(I ONV S30NVk3AN00 831VMNN01S V408A AVMV ONUS ANVO1 HOSONIM 009Z -nVHS 033Vlcl 38 ONV(111 1H9I1d31VM 3dn33S V 3AVH 80 0313NSVO 38 Sd31SdNnO HSV8i- 'S301AN3S lios—vasn),e NOliVA83SNOD (138Vd38d !03mo-nOJ 3e 111M WSOASIO ONV 3sn H3cOdcl HOJ SNOILWIN31/41/40038 S83HrLLovAnNVN- 'idVc!N831SV3'Vh'AiNnoo X3SS3 JO A3AHns WS 3H1 V408A 38V NMOHS S110S T do 03sn 38 iim ioncio8d v AD-nv'312ISSOd N3A3N3w-!83NIViNOO 3Hi AD 0NISOcSIG 380,13a A % !d38n_LovAnNVN -07:30NVe8nisio AD V38V lViOi OV T 3H1 AB(130N31NV4003H SS3lNn H3HiONV 3NO HiIM 03XIN 38 iON 111M S33NV1sens— ov T-97 :V3dV 31lS lViDi*Z !138VI 0 GIN N-_ S,838n10vjnNVN WNIONO 3H1 HiIM Sd3NIV1NO0 IVNIONO H1314i NI 1c3N 38 iiim s10n008d- 'S1N3h3AOdcNI 3115 031VI00SSV '3l81SSOcl All'ONV S83NIV1N00 31Vl8d0HddV HiIM),il]IOVJ 30VdOiS-,1l3S 03110d1N00-31VNI10 v ionNiSNOO 01(13SOdOHd 9N130 SI il -1. H !3dnsO�ON3 d3Hi0 dO JOON V d3(1Nn d13H1 NI d3NNVN)JlN30NO'1V3N V NI(13dOiS 38 11M 311SNO(13NOiS SWIH31VN 11V- Ll d 3 A 0- IN 'BOP 3H1 OCI 01 03dinO3d ionGONd H9nON3 AINO 3N01S 01 30VN 38 ITM iH0JJ3 NV- '133PONd NOiiondiSNOD 8310N p, 3H1 ONiNnO 311SN0 03MOIIOJ 38 11M S30liOVNd ONIcI33>13snOH 0009 9NIMO_nOJ 3H1 j iV I N0103N Vd3 SJINVION3 M3N AD 3NIVMS),eeV iC)ViNOD It, Z_ '30NV1SISSV d3Hidnj NOJ'NOliVV4NOJNI IVNOIiICIGV NOJ�13iVMv4NOiS/S3(]dN/ADE)'Vd3'MMM iV HD 91,96-1,99-ZOZ iV iN3h39VNVN d31VM3iSVM AD 301AJO Vc3sn i3ViND0 3SV3�cl'o13'S3NI�3(lino '3AOeV(EiSl�NOIiVAdOJNI 3H1 3(inIONI 01 NVId NOIiN3A3dcl NOiinIlOd 3H1)JIOON- v '3SV313N d3HiONV iN3A3Hdl 33NVN31NIVN 1N3NdinO3'S-10diNOO NOI1V1N3NI03S ONV NOISOd3 AD NOIiViN3N3-1dNI'(S,JddMS) 01 N3>lVi 3e 01 Sc31S 3H1(INV 3SV=d 3H1 AD S30NViSvqnoNia ONV 31V0 3H1 9NIOIAOdcl 331JJD-IVNDID38 Vd3 3Hi Di 3SV3-13d 3Hi AD NOIicId3S3O N311ldM v imens'SAVO$,[NIHim- SNVIcl NOIiN3A3dcl NOLLmiod N31VM HdOiS'01 031lllfln iON ino'EmanlDNI'SNOi1v1nD3H N31VM ,gLqz-9zv(zoz)-nvo INNOiS(S3CIcN)N3_LSkS NOIUVNINI�3 30NVHOSIO Noiin-nOd IVNOIiVN 3H1 AD SiN3r0dm3d 3H1 HiM A-1dNO0 01 d010VaNO0 ONV d:]NMO:]Hi 0NLLVONVN SNOISIAONcl AD i]S V S]NrunD J03]Hi 7 "TO'NOi0NIHSVM NI!ZO99-VZV(299)iV k_131VIO3NNI N31N30 3SNOcS3N 1VNOILVN 3H1 AjIiON- _N' v- :Sc3iS 9NIMO-nOJ 3Hi 3AVi TVHS Vd3 3H1 A8 03NIJ30 '09tOZ 30'NDiE)NIHSVM'MN'3AV SV AiliNvnD 3IeV1d0c3d 0N10333X3 NO 01 Ivn03 SiNnoNV NI IlIcS ANV'N3Nn10vjnNVh 3H1 ONV VINVA-1),SNN3d OOZI,'Vd3sn'(N2OZV)1N31NI AD 30ILON d31VM mNOiS 01 0311llNenS 38 isnN ION x- SNOiivIm3d 31V1S AO(131,1103clS SV d3NNVN W03I V NI AD 03SOcSIO aNV ch a3NV3-io 3e_nVHs ll� 31IS No REV am AD S3d),i 3S3Hi AD_nIcS ANV'NOiin-nOd NO NOILVNINViNO0 AD S30dnos-lVliN3iOd NdOiS V'c03 3H1 AD idVd SV'(Vd3)AON30V NOIi33iOHcl-lViN3NNOdIAN3 S30NViSens 3Hi*NOiiondiSNO3 ONION31/41NOO 01 NOINd SAVO L iSV3�iV Vd3 3Hi 01 0311lhenS 38 isnh(ION) iN3A3dcl 01 03sn SNOiinv33dcl ONV'V3HV 3NnO3S V NI(13NOiS 38_nVHS NoilondiSNOD oNiHncl iN3iNI AD 30ILON d31VM oisn S-lVId]iVN 83H10 CINv slonoodd Nnilodiij'S-lV0IN]H0-nV':IiISNO NVId SIHi HiIM adOold 3Hi V40HA(S3d3V 3AIJ NVHi SS3_1 ine 3NOV 3NO NVHi d31V3ND)S31WAILOV NOiionaSNOD NO id3>1 3e_nVHS 103PONd SIHi NO 03sn sioncioNd d3H10 ONV SI/Gil NoiionaSNOO AD iSn V'01, -nvNs NO(S3HOV 3N0N NO 3AIJ)S311IAILOV NOiionNiSNOO 30NVI 80A(c03)ilhd3d wd3N39 NOLLond1SN03 V NIV180 isnN'(SN01Vd3c0)N013Vd1NO0 3H1 HiIM NOLLOWN03 NI'd3NMO 3H1 '3NI-1 831VM ONILSIX3 DiNI ScVi 80 N01133NIO S30NVH3 3NI-831VM 383HM 0301AOdc 38-nVHS ADD a isnHHi'6 .LlWU3d WUM30 NouonmiSNOO _ EROSION CONTROL NOTES CONSTRUCTION SEQUENCE NOTES DEWATERING NOTES BACKFILL AND COMPACT DURING CONSTRUCTION AND THEREAFTER,EROSION CONTROL MEASURES ARE TO BE IMPLEMENTED AS NOTED: PART 1-GENERAL TRENCH AFTER INSTALLATION 4 OVERLAP 1.INSTALL STABILIZED CONSTRUCTION ENTRANCE. 1.INSTALLATION OF SILTATION FENCES AND OTHER EROSION CDNTRDL MEASURES SHALL BE COMPLETED PRIOR TO 1.1 DESCRIPTION: C) (MIN.) THE START OF SITE WORK IN ANY GIVEN AREA.PREFABRICATED SILTATION FENCES SHALL BE INSTALLED ACCORDING 2.CUT AND CLEAR TREES WITHIN AREA OF DISTURBANCE UNLESS OTHERWISE NOTED. THIS SECTION SPECIFIES PERFORMANCE OF DEWATERING REQUIRED TO LOWER AND CONTROL GROUND WATER TABLE LEVELS AND HYDROSTATIC PRESSURES TO TO THE MANUFACTURER'S RECOMMENDATIONS. PERMIT EXCAVATION,BACKFILL,AND CONSTRUCTION TO BE PERFORMED IN THE DRY.CONTROL OF SURFACE WATER SHALL BE CONSIDERED AS PART OF THE WORK 3.CONSTRUCT TEMPORARY AND PERMANENT EROSION CONTROL FACILITIES PRIOR TO ANY EARTH MOVING OPERATION. 2.SILTATION FENCES AND OTHER EROSION CONTROL MEASURES SHALL BE KEPT CLEAN DURING CONSTRUCTION AND UNDER THIS SPECIFICATION. STAPLE 12" REMOVED WHEN ALL SLOPES HAVE A VEGETATIVE COVER OF GREATER THAN 85%.EROSION CONTROL MEASURES 4.ROUGH GRADE SITE OR PHASED WORK AREA.ALL SLOPES SHALL BE STABILIZED IMMEDIATELY AFTER GRADING. 1.2 SUMMARY: ON CENTER SHALL BE INSPECTED ON A WEEKLY BASIS AND AFTER EVERY RAINFALL. ALL DISTURBED AREAS SHALL BE STABILIZED NO LATER THAN 72 HOURS AFTER CONSTRUCTION ACTIVITY CEASES. IF EARTHWORK TEMPORARILY CEASES ON A PORTION OF OR THE ENTIRE SITE,AND WILL NOT RESUME WITHIN 21 A. WORK TO BE COMPLETED BY THE CONTRACTOR INCLUDES,BUT IS NOT NECESSARILY LIMITED TO THE FOLLOWING: 3.EXISTING VEGETATION IS TO REMAIN UNDISTURBED WHEREVER POSSIBLE. DAYS,THE AREA SHALL BE STABILIZED. 1.IMPLEMENTATION OF THE EROSION AND SEDIMENTATION CONTROL PLAN. 4.THE AREA OF LAND EXPOSED AND THE TIME OF EXPOSURE SHALL BE MINIMIZED.ALL DISTURBED AREAS SHALL BE AN AREA SHALL BE CONSIDERED STABILIZED IF: 2.DEWATER EXCAVATIONS,INCLUDING SEEPAGE AND PRECIPITATION. STAPLE 12" STABILIZED WITHIN 72 HOURS AFTER FINAL GRADING. A)BASE COURSE GRAVELS HAVE BEEN INSTALLED IN AREAS TO BE PAVED; ------ B)A MINIMUM OF 85%VEGETATED GROWTH HAS BEEN ESTABLISHED; B.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL MATERIALS,EQUIPMENT,LABOR,AND SERVICES NECESSARY FOR CARE OF WATER AND EROSION S"OVERLAP ON CENTER 5.ALL DISTURBED AREAS SHALL HAVE A MINIMUM OF 4"OF LOAM.ACCEPTABLE SEED MIXES ARE AS FOLLOWS: C)A MINIMUM OF 3-OF NDN-EROSIVE MATERIAL SUCH STONE OR RIPRAP HAS BEEN INSTALLED,OR CONTROL.EXCAVATION WORK SHALL NOT BEGIN BEFORE THE EROSION AND SEDIMENTATION CONTROL PLAN IS IN PLACE. PARK SEED MIX MIN.135 LBS/ACRE, D)EROSION CONTROL BLANKETS HAVE BEEN PROPERLY INSTALLED. 1.3 REQUIREMENT: 33%CREEPING RED FESCUE (MIN,45 UBS/ACRE) 5.CONSTRUCT CULVERTS,RIP-RAP AND OTHER DRAINAGE FACILITIES ACCORDING TO PLAN.THE CONTRACTOR SHALL A.PREVENT LOSS OF FINES,SEEPAGE,BOILS,QUICK CONDITIONS OR SOFTENING OF FOUNDATION STRATA. 42%PERENNIAL RYEGRASS (MIN,55 LBS/ACRE) STABILIZE ALL DITCHES,SWALES,AND PONDS/BASINS PRIOR TO DIRECTING FLOW TO THEM. B.MAINTAIN STABILITY OF SIDES AND BOTTOM OF EXCAVATION. 21%KENTUCKY BLUEGRASS (MIN.30 LBS/ACRE) TYPICAL STAPLE 4%REDTOP (MIN-5 UBS/ACRE) 6.INSTALL ALL UNDERGROUND UTILITIES. C.CONSTRUCTIDN OPERATIONS ARE PERFORMED IN THE DRY. NO.11 GAUGE WIRE 4"LOAM&SEE STPLE 12" TEMPORARY LAWN MIX:(MIN.47 LBS/ACRE) 7 8.CONSTRUCT PARKING AND FINISH GRADE SITE ACCORDING TO PLAN.ALL SLOPES SHALL BE STABILIZED.CONSTRUCT BUILDING, D.CONTROL OF SURFACE AND SUBSURFACE WATER IS PART OF DEWATERING REQUIREMENTS.MAINTAIN ADEQUATE CONTROL SO THAT: "CENTER o XNA 100%ANNUAL RYE 1.THE STABILITY OF EXCAVATED AND CONSTRUCTED SLOPES ARE NOT ADVERSELY AFFECTED BY SATURATED SOIL,INCLUDING WATER ENTERING PREPARED SUBBASE _ SLOPE SEED(WF)MIX 31 OR GREATER SLOPES(MIN.105 UBS/ACRE), C) IMMEDIATELY AFTER GRADING. AND SUBGRADES WHERE UNDERLYING MATERIALS ARE NOT FREE DRAINING OR ARE SUBJECT TO SWELLING OR FREEZE-THAW ACTION. 38%CREEPING RED FESCUE (MIN,40 UBS/ACRE) 2.ERDSION IS CONTROLLED. 9.INSPECT AND MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL MEASURES PERIODICALLY AND IMMEDIATELY 1.5" 32%PERENNIAL RYEGRASS (MIN.35 UBS/ACRE) AFTER STORM EVENTS. 3.FLOODING OF EXCAVATIONS OR DAMAGE TO STRUCTURES DOES NOT OCCUR. 5%REDTOP (MIN.5 UBS/ACRE) 5%ALSIKE CLOVER (MIN.5 LBS/ACRE) 10.COMPLETE PERMANENT SEEDING AND LANDSCAPING. 4.SURFACE WATER DRAINS AWAY FROM EXCAVATIONS. NOTES 5%BIRDSFOOT TREFOIL (MIN.5 LBS/ACRE) 5.EXCAVATIONS ARE PROTECTED FROM BECOMING WET FROM SURFACE WATER,OR INSURE EXCAVATIONS ARE DRY BEFORE ADDITIONAL WORK IS UNDERTAKEN. 3%LANCE-LEAF COREOPSIS (MIN.3 UBS/ACRE) 11.REMOVE TEMPORARY EROSION CONTROL MEASURES ONCE ALL AREAS ARE STABILIZED WITH A SUITABLE STAND OF 1.BEGIN AT THE TOP OF BLANKET INSTALLATION AREA BY ANCHORING BLANKET 3%OXEYE DAISY (MIN.3 UBS/ACRE) GRASS,PAVEMENT OR COMPACTED GRAVELS. E.PERMITTING REQUIREMENTS:THE CONTRACTOR SHALL COMPLY WITH AND OBTAIN THE REQUIRED STATE AND COUNTY PERMITS WHERE THE WORK IS PERFORMED. IN A 6"DEEP TRENCH.BACKFILL AND COMPACT TRENCH AFTER STAPLING. 3%BUTTERFLY WEED (MIN.3 LOS/ACRE) -REFER TO THE STORM WATER MANAGEMENT PLAN FOR EROSION CONTROL MEASURES AND SPECIFIC INFORMATION. 1.4 SUBMITTALS: 2.ROLL THE BLANKET DOWN THE SWALE IN THE DIRECTION OF THE WATER FLOW. 3%BLACKEYED SUSAN (MIN.3 LBS/ACRE) 3%WILD LUPINE (MIN.3 LBS/ACRE) A.SUBMIT SHOP DRAWINGS. 3.THE EDGES OF BLANKETS MUST BE STAPLED WITH APPROX.4 INCH OVERLAP WHERE 2 OR MORE STRIP WIDTHS ARE REQUIRED. SLOPE SEED MIX 3:1 OR GREATER SLOPES(MIN.90 LBSACRE)� B.DRAWINGS AND DESIGN DATA: 4.WHEN BLANKETS MUST BE SPLICED DOWN THE SWALE,PLACE BLANKET END OVER 44%CREEPING RED FESCUE (MIN.40 UBS/ACRE) 1.SUBMIT DRAWINGS AND DATA SHOWING THE METHOD TO BE EMPLOYED IN DEWATERING EXCAVATED AREAS 30 DAYS BEFORE COMMENCEMENT OF EXCAVATION. END WITH 6 INCH(MIN.)OVERLAP AND ANCHOR DOWN SLOPE BLANKET IN A 6 38%PERENNIAL RYEGRASS (MIN.35 UBS/ACRE) GENERAL NOTES 2.INCLUDE A WRITTEN REPORT OUTLINING CONTROL PROCEDURES TO BE ADOPTED IF DEWATERING PROBLEM ARISES. INCH DEEP TRENCH. 6%REDTOP (MIN.5 LBS/ACRE) 5.BLANKET SHALL BE NORTH AMERICAN GREEN SC-150 OR APPROVED EQUAL. 6%ALSIKE CLOVER (MIN.5 LBS/ACRE) 1.ALL IN PAVEMENT MANHOLES SHALL HAVE RIMS SET TO FINISH GRADE REGARDLESS OF ANY ELEVATIONS OTHERWISE 3.DETAILED DESCRIPTION OF DEWATERING PROCEDURE AND MAINTENANCE METHOD. 6%BIRDSFOOT TREFOIL (MIN.5 LBS/ACRE) SHOWN. PART 2-EXECUTION A. PLACING LOAM ON SITE 2.WHERE DEPTH OF COVER IS LESS THAN 3 FEET CLASS V REINFORCED CONCRETE PIPE SHALL BE USED. 2.1 INSTALLATION: BLANKET SLOPE PROTECTION a- ALL SUBGRADE ELEVATIONS SHOULD BE UNIFORMLY GRADED TO RECEIVE LOAM AND SHALL BE A.INSTALL A DEWATERING SYSTEM TO LOWER AND CONTROL GROUND SURFACE WATER IN ORDER TO PERMIT EXCAVATION,CONSTRUCTION OF STRUCTURE,AND INSPECTED AND APPROVED BY THE GENERAL CONTRACTOR PRIOR TO PLACEMENT OF LOAM. 3.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES OWNING UTILITIES,EITHER OVERHEAD DR UNDERGROUND, PLACEMENT OF BACKFILL MATERIALS TO BE PERFORMED UNDER DRY CONDITIONS.MAKE THE DEWATERING SYSTEM ADEQUATE TO PRE-DRAIN THE WATER-BEARING FOR EROSION CONTROL NOT TO SCALE D. PLACE LOAM TO FORM A MINIMUM DEPTH OF 4"WHEN ROLLED,UNLESS OTHERWISE INDICATED. WITHIN THE CONSTRUCTION AREA AND SHALL COORDINATE AS NECESSARY WITH THE UTILITY COMPANIES OF SAID c. ALL DEPRESSIONS EXPOSED DURING THE ROLLING SHALL BE FILLED WITH ADDITIONAL LOAM. UTILITIES.THE PROTECTION OR RELOCATION OF UTILITIES IS ULTIMATELY THE RESPONSIBILITY OF THE CONTRACTOR. STRATA ABOVE AND BELOW THE BOTTOM OF STRUCTURE FOUNDATIONS,UTILITIES AND OTHER EXCAVATIONS. B. SEED BED PREPARATION 4.THE CONTRACTOR SHALL MAINTAIN EMERGENCY ACCESS TO ALL AREAS AFFECTED BY HIS WORK AT ALL TIMES- 2.2 OPERATION: AFTER FINISH GRADING AND JUST BEFORE SEEDING,THE AREAS TO BE SEEDED SHALL BE LOOSENED A.PRIDR TO ANY EXCAVATION BELOW THE GROUND WATER TABLE,PLACE SYSTEM INTO OPERATION TO LOWER WATER TABLE As REQUIRED AND OPERATE IT TO PROVIDE A ROUGH,FIRM BUT FINELY PULVERIZED SEEDBED.THE INTENT IS A TEXTURE CAPABLE 5.ALL EXCAVATIONS SHALL BE THOROUGHLY SECURED ON A DAILY BASIS BY THE CONTRACTOR AT THE CONTINUOUSLY 24 HOURS A DAY,7 DAYS A WEEK UNTIL UTILITIES AND STRUCTURES HAVE BEEN SATISFACTORILY CONSTRUCTED,WHICH INCLUDES THE PLACEMENT OF RETAINING WATER,SEED AND FERTILIZER WHILE REMAINING STABLE AND ALLOWING SEED TIME TO COMPLETION OF CONSTRUCTION OPERATIONS IN THE IMMEDIATE AREA. GERMINATE.SEED SHALL BE APPLIED TO THE CONDITIONED SEEDBED NOT MORE THAN 48 HOURS OF BACKFILL MATERIALS AND DEWATERING IS NO LONGER REQUIRED. 50'MIN. EXISTING AFTER THE SEEDBED HAS BEEN PREPARED. 6.EROSION CONTROL SYSTEMS SHALL BE INSTALLED AND MAINTAINED FOR THE DURATION OF THE PROJECT IN B.PLACE AN ADEQUATE WEIGHT OF BACKFILL MATERIAL TO PREVENT BUOYANCY PRIOR TO DISCONTINUING OPERATION OF THE SYSTEM. OR 4 TIMES THE CIRCUMFERENCE OF THE LARGEST PAVEMENT ACCORDANCE WITH APPLICABLE NHDES STANDARDS.THESE DETAILS SERVE AS A GUIDE ONLY. CONSTRUCTION VEHICLE TIRE,WHICHEVER IS GREATER 6.LIME AND FERTILIZER SHALL BE INCORPORATED INTO THE SOIL PRIOR TO OR AT THE TIME OF AT THE TIME OF 2.3 WATER DISPOSAL: SEEDING.A MINIMUM OF 2 TONS PER ACRE OF AGRICULTURAL LIMESTONE AND 500 LES.PER ACRE OF 10-20-20 7.REFER TO THE TOWN STANDARD DETAILS,LATEST REVISION,FOR ADDITIONAL INFORMATION AND CRITERIA. A.DISPOSE OF WATER REMOVED FROM THE EXCAVATIONS IN SUCH A MANNER AS: FERTILIZER SHALL BE APPLIED.SEEDING PRACTICES SHALL COMPLY WITH LOCAL USDA SOIL CONSERVATION EXISTING GROUND 3"-6"STONE 12"MIN. SERVICES RECOMMENDATIONS. B.THE CONTRACTOR SHALL STABILIZE ALL DITCHES,SWALES,AND PONDS PRIOR TO DIRECTING FLOW TO THEM. 1.WILL NOT ENDANGER PORTIONS OF WORK UNDER CONSTRUCTION OR COMPLETED. 7.HAY MULCH OR JUTE MATTING SHALL BE USED WHERE INDICATED ON THE PLANS.A MINIMUM OF 1.5 TONS OF 9.THE SMALLEST PRACTICAL AREA SHALL BE DISTURBED DURING CONSTRUCTION,BUT IN NO CASE SHALL EXCEED 5 2.WILL CAUSE NO INCONVENIENCE TO GOVERNMENT OR TO OTHERS WORKING NEAR SITE. MOUNTABLE BERM MULCH PER ACRE SHALL BE APPLIED.MULCH SHALL BE ANCHORED IN PLACE WHERE NECESSARY.JUTE MATTING ACRES AT ANY ONE TIME BEFORE DISTURBED AREAS ARE STABILIZED. 3.WILL COMPLY WITH THE STIPULATIONS OF REQUIRED PERMITS FOR DISPOSAL OF WATER. FILTER CLOTH (OPTIONAL) SHALL BE LAID IN THE DIRECTION OF RUNOFF FLOW AND APPLIED IN ACCORDANCE WITH MANUFACTURER'S (SPUN BOUND 1135 MIRAFI PROFILE INSTRUCTIONS. 4.WILL CONTROL RUNOFF:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTROL OF RUNOFF IN ALL WORK AREAS INCLUDING BUT NOT LIMITED TO: 60OX OR EQUIVALENT) pC 8.PERMANENT OR TEMPORARY COVER MUST BE IN PLACE BEFORE THE GROWING SEASON ENDS.WHEN SEEDED COMPOST FILLED SILT SOCK EXCAVATIONS,ACCESS ROADS,PARKING AREAS,LAYDOWN,AND STAGING AREAS.THE CONTRACTOR SHALL PROVIDE,OPERATE,AND MAINTAIN ALL DITCHES, (12"-18"TYP.) BASINS,SUMPS,CULVERTS,SITE GRADING,AND PUMPING FACILITIES TO DIVERT,COLLECT,AND REMOVE ALL WATER FROM THE WORK AREAS.ALL WATER SHALL LU AREAS ARE MULCHED,PLANTINGS MAY BE MADE FROM EARLY SPRING TO EARLY OCTDBER.WHEN SEEDED AREAS 3"-4" ARE NOT MULCHED,PLANTINGS SHOULD BE MADE FROM EARLY SPRING TO MAY 20 OR FROM AUGUST 15 TO 2"x 2"WOOD STAKE BE REMOVED FROM THE IMMEDIATE WORK AREAS AND SHALL BE DISPOSED OF IN ACCORDANCE WITH APPLICABLE PERMITS. -M SEPTEMBER 15.NO DISTURBED AREA SHALL BE LEFT EXPOSED DURING WINTER MONTHS. PLACED 10'O.C. - Z B.EXCAVATION DEWATERING: LJ 9.WATER SHALL BE USED FOR DUST CONTROL IN APPROPRIATE AREAS. 1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL FACILITIES REQUIRED TO DIVERT,COLLECT,CONTROL,AND REMOVE WATER FROM ALL 10'MIN. - M FLOW <0 EXISTING CONSTRUCTION WORK AREAS AND EXCAVATIONS. GROUND Z3"-6"STONE- OVERWINTER STABILIZATION 2.DRAINAGE FEATURES SHALL HAVE SUFFICIENT CAPACITY TO AVOID FLOODING OF WORK AREAS. Z 3.DRAINAGE FEATURES SHALL BE SO ARRANGED AND ALTERED AS REQUIRED TO AVOID DEGRADATION OF THE FINAL EXCAVATED SURFACE(S). x 1. PERMANENT STABILIZATION CONSISTS OF AT LEAST 85%VEGETATION,PAVEMENT/GRAVEL BASE OR RIPRAP. WORK 2.DO NOT EXPOSE SLOPES OR LEAVE SLOPES EXPOSED OVER THE WINTER OR FOR ANY OTHER EXTENDED DEGRADATION OF THE NATURAL WATER QUALITY. z PLAN VIEW TIME OF WORK SUSPENSION UNLESS FULLY PROTECTED WITH MULCH. C.DEWATERING EQUIPMENT SHALL BE PROVIDED TO REMOVE AND DISPOSE OF ALL SURFACE AND GROUND WATER ENTERING EXCAVATIONS,TRENCHES,OR OTHER AR EA 4.THE CONTRACTOR SHALL UTILIZE ALL NECESSARY EROSION AND SEDIMENT CONTROL MEASURES AS DESCRIBED HEREIN TO AVOID CONSTRUCTION RELATED C�EO3.APPLY HAY MULCH AT TWICE THE STANDARD RATE(150 LES.PER 1,000 SF).THE MULCH MUST BE PROTE PARTS OF THE WORK DURING CONSTRUCTION,EACH EXCAVATION SHALL BE KEPT DRY DURING SUBGRADE PREPARATION AND CONTINUALLY THEREAFTER UNTIL THE THICK ENOUGH SUCH THAT THE GROUND SURFACE WILL NOT BE VISIBLE AND MUST BE ANCHORED. REA STRUCTURE TO BE BUILT,OR THE PIPE TO BE INSTALLED THEREIN,IS COMPLETED TO THE EXTENT THAT NO DAMAGE FROM HYDROSTATIC PRESSURE,FLOTATION, NOTES 4.USE MULCH AND MULCH NETTING OR AN EROSION CONTROL MULCH BLANKET OR MIX FOR ALL SLOPES TOP OF GROUND OR OTHER CAUSE WILL RESULT. 1,FILTER CLOTH WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE SURFACE. GREATER THAN 8%OR OTHER AREAS EXPOSED TO DIRECT WIND. 2.4 CORRECTIVE ACTION: 2.WATER-ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS 5.INSTALL AN EROSION CONTROL BLANKET IN ALL DRAINAGE WAYS(BOTTOM AND SIDES)WITH A SLOPE IF DEWATERING REQUIREMENTS ARE NOT SATISFIED DUE TO INADEQUACY OR FAILURE OF THE DEWATERING SYSTEM(LOOSENING OF THE FOUNDATION STRATA,OR THE ENTRANCE. IF PIPING 15 IMPRACTICAL,A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. GREATER THAN 3%. iiNOTES INSTABILITY OF SLOPES,OR DAMAGE TO FOUNDATIONS OR STRUCTURES),PERFORM WORK NECESSARY FOR REINSTATEMENT OF FOUNDATION SOIL AND DAMAGED 3.MAINTENANCE-THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING 6.SEE THE VEGETATION MEASURES FOR MORE INFORMATION ON SEEDING DATES AND TYPES. 1.SILT SOCK SHALL BE FILTREXX.SILTSOXXTN OR APPROVED EQUIVALENT. OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY.THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS STRUCTURE OR DAMAGES TO WORK IN PLACE RESULTING FROM SUCH INADEQUACY OR FAILURE BY CONTRACTOR,AT NO ADDITIONAL COST TO GOVERNMENT. CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.ALL SEDIMENT 2.SEE SPECIFICATIONS FOR SOCK SIZE AND COMPOST FILL 2.5 DAMAGES: SPILLED,DROPPED,WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY. REQUIREMENTS. IMMEDIATELY REPAIR DAMAGES TO ADJACENT FACILITIES CAUSED BY DEWATERING OPERATIONS. 4.WASHING-WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY. WINTER CONSTRUCTION 3.SILT SOCK SHALL BE INSPECTED PERIODICALLY AND AFTER ALL STORM 2.6 REMOVAL: WHEN WASHING IS REQUIRED,IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN EVENTS,AND REPAIR OR REPLACEMENT SHALL BE PERFORMED AS INSURE COMPLIANCE WITH ALL CONDITIONS OF REGULATING PERMITS AND PROVIDE SUCH INFORMATION TO THE RESIDENT ENGINEER.OErrAIN WRITTEN APPROVAL FROM APPROVED SEDIMENT TRAPPING DEVICE. IN ADDITION TO THE OTHER NOTES CONTAINED ON THIS PLAN,THE FOLLOWING MUST BE IMPLEMENTED: NEEDED. RESIDENT ENGINEER BEFORE DISCONTINUING OPERATION OF DENATERING SYSTEM. 5.PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN STORM EVENT. 1. WINTER EXCAVATION AND EARTHWORK SHALL BE COMPLETED AS SUCH THAT NO MORE THAN 1 ACRE OF 4.COMPOST MATERIAL SHALL BE DISPERSED ON SITE,AS DETERMINED BY THE SITE IS WITHOUT STABILIZATION AT ANY ONE TIME. USDA - C THE ENGINEER. S STABILIZED 2.AN AREA WITHIN 100 FEET OF A PROTECTED NATURAL RESOURCE MUST BE PROTECTED WITH A DOUBLE SILT SOCK C S ONSTRUCTION ENTRANCE ROW OF SEDIMENT BARRIER. FLAP FOLDS OVER NOT TO SCALE oc NOT TO SCALE 3.TEMPORARY MULCH MUST BE APPLIED WITHIN 7 DAYS OF SOIL EXPOSURE DR PRIOR TO ANY STORM TO ENCLOSE GRATE EVENT,BUT AFTER EVERY WORKDAY IN AREAS WITHIN 100 FEET FROM A PROTECTED NATURAL RESOURCE. 1-3/4"x1-3/4"x4'MINIMUM 4.AREAS THAT HAVE BEEN BROUGHT TO FINAL GRADE MUST BE PERMANENTLY MULCHED THE SAME DAY. GRATE WOOD STAKE OR APPROVED EQUAL 5.IN THE EVENT OF A SNOWFALL GREATER THAN 1 INCH(FRESH OR CUMULATIVE),THE SNOW SHALL BE SILT FENCE MIRAFI 10OX REMOVED FROM THE AREAS DUE TO BE SEEDED AND MULCHED. r 6 VELCRO CLOSURE OR APPROVED EQUAL 6.LOAM SHALL BE FREE OF FROZEN CLUMPS BEFORE IT IS APPLIED. 36"MINIMUM WIDTH 7.A DITCH THAT WILL BE CONSTRUCTED DURING THE WINTER MUST BE STABILIZED WITH RIPRAP. A N A WORK SITE DEVELOPMENT PLANS , AREA LIFTING STRAPS TAX MAP 34 LOT 50 USE 1 1/2 STONE 2 ALLOW EASY DANDY BAG N MOVEMENT PATENTED U DETAIL S \\ HEET UNIT WITH GRATE FLOW GRATE PERSPECTIVE VIEW -C -STORAGE DANDY BAG TM CLIMATE-CONTROLLED SELF BEECHWOOD DR.,NORTH ANDOVER,MA DOWNHILL TOP OF 11 SIDE OWNED BY L THE DISTANCE SUCH THAT POINTS GROUN ALBACADO LIMITED PARTNERSHIP A AND B ARE OF EQUAL ELEVATION SECTION A-A 8"EMBEDMENT PREPARED FOR INSTALLATION (MIN.) Z. THE STUBBLEBINE COMPANY STAND GRATE ON END. PLACE DANDY BAG OVER GRATE AND ROLL GRATE -FENCE POST STONE CHECK DAM M OVER SO THAT OPEN END IS UP. PULL UP SACK.TUCK FLAP IN,PRESS Z VELCRO STRIPS TOGETHER. BE SURE END OF GRATE IS COMPLETELY II m NOT TO SCALE COVERED BY FLAP OR DANDY BAG WILL NOT WORK PROPERLY. HOLDING PLACE 4"OF FABRIC SILT FENCE- SCALE.AS SHOWN FEBRUARY 10,20211 HANDLES,CAREFULLY PLACE DANDY BAG WITH GRATE INSERTED INTO CATCH ALONG TRENCH AWAY - c, UNDISTURBED BASIN FRAME. FROM PROTECTED AREA FLOW GROUND BACKFILL AND TAMP GROUND MAINTENANCE Civil Engineers 48 Constitution Drive Structural Engineers 0311 Copyright 2021©Thomas F.Moran,Inc. WITH A STIFF BRISTLE BROOM OR SQUARE POINT SHOVEL REMOVE SILT& \N� Bedford,NH 0 OTHER DEBRIS OFF SURFACE AFTER EACH EVENT. REMOVE FINE Traffic Engineers Phone(603)472-4488 48 Constitution Drive,Bedford,N.H.03110 MATERIAL FROM INSIDE ENVELOPE AS NEEDED. FILTER CLOTH Land Surveyors All rights reserved.These plans and materials may not be copied, (CONTACT DANDY PRODUCTS INC.1-80D-591-2284) 8"EMBEDMENT 4 04/27/21 PER CONSERVATION COMM.REVIEW JH JH MM Landscape Architects Fax(603)472-9747 duplicated,replicated or otherwise reproduced in any form whatsoever SECTION 3 04/14/21 PER CONSERVATION COMM.REVIEW JH JH Scientists www.tfmoran.com without the prior written permission of Thomas F.Moran,Inc. 12 6/21 1 PER PLANNING REVIEW F This plan is not effective unless signed by a duly authorized officer of 8 1 1 DR I PWH I FB DANDY BAG DETAIL SILT FENCE 1 N3�/W/2 PER CONSULTING REVIEW J H�RD 1 1968,00 C-9 L Thomas F.Moran,Inc. CATCH BASIN EROSION PROTECTION NOT TO SCALE NOT TO SCALE REV I DA 7F DISCRIP 77ON 9"?C/( CKI RED CADFILEJ 31968-00 DETAILS Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix B-Copy of 2017 CGP 2017 Construction General Permit (CGP) (as modified) National Pollutant Discharge Elimination System General Permit for Discharges from Construction Activities (as modified) In compliance with the provisions of the Clean Water Act, 33 U.S.C. §1251 et. seq., (hereafter CWA), as amended by the Water Quality Act of 1987, P.L. 100-4, "operators" of construction activities (defined in Appendix A) that meet the requirements of Part 1.1 of this National Pollutant Discharge Elimination System (NPDES) general permit, are authorized to discharge pollutants in accordance with the effluent limitations and conditions set forth herein. Permit coverage is required from the "commencement of construction activities" (see Appendix A) until one of the conditions for terminating CGP coverage has been met (see Part 8.2). This permit becomes effective on June 27, 2019. This permit and the authorization to discharge expire at 1 1:59pm, February 16,2022. Signed and issued this 14th day of May 2019 Signed and issued this 14th day of May 2019 Deborah Szaro, Charles W.Maguire, Acting Regional Administrator, EPA Region 1. Director, Water Division, EPA Region 6. Signed and issued this 14th day of May 2019 Signed and issued this 14th day of May 2019 Jeff Gratz, Jeffery Robichaud, Deputy Director, Water Division, EPA Region 2. Director, Water Division, EPA Region 7. Signed and issued this 14th day of May 2019 Signed and issued this 14th day of May 2019 Jose C. Font, Darcy O'Connor, Acting Director, Caribbean Environmental Director, Water Division, EPA Region 8. Protection Division, EPA Region 2. Signed and issued this 14th day of May 2019 Signed and issued this 14th day of May 2019 Catharine McManus, Tomas Torres, Deputy Director, Water Division, EPA Region 3. Director, Water Division, EPA Region 9. Signed and issued this 14th day of May 2019 Signed and issued this 14th day of May 2019 Jeaneanne M. Gettle, Daniel D. Opalski, Director, Water Division, EPA Region 4. Director, Water Division, EPA Region 10. Signed and issued this 14th day of May 2019 Joan M.Tanaka, Acting Director, Water Division, EPA Region 5. 2017 Construction General Permit (CGP) (as modified) CONTENTS 1 How to Obtain Coverage Under the Construction General Permit(CGP)..................................1 1.1 Eligibility Conditions....................................................................................................................... 1 1.2 Types of Discharges Authorized..................................................................................................2 1.3 Prohibited Discharges...................................................................................................................4 1.4 Submitting your Notice of Intent (NOI) ......................................................................................4 1.5 Requirement to Post a Notice of Your Permit Coverage........................................................6 2 Technology-Based Effluent Limitations...........................................................................................b 2.1 General Stormwater Control Design, Installation, and Maintenance Requirements.........7 2.2 Erosion and Sediment Control Requirements...........................................................................8 2.3 Pollution Prevention Requirements........................................................................................... 14 2.4 Construction Dewatering Requirements................................................................................. 18 3 Water Quality-Based Effluent Limitations......................................................................................18 3.1 General Effluent Limitation to Meet Applicable Water Quality Standards........................ 18 3.2 Discharge Limitations for Sltes Discharging to Sensitive Waters........................................... 19 4 Site Inspection Requirements........................................................................................................20 4.1 Person(s) Responsible for Inspecting Site.................................................................................20 4.2 Frequency of Inspections...........................................................................................................20 4.3 Increase in Inspection Frequency for Sites Discharging to Sensitive Waters......................21 4.4 Reductions in Inspection Frequency........................................................................................21 4.5 Areas that MUST Be Inspected..................................................................................................22 4.6 Requirements for Inspections....................................................................................................22 4.7 Inspection Report........................................................................................................................23 4.8 Inspections By EPA.......................................................................................................................23 5 Corrective Actions.........................................................................................................................24 5.1 Conditions Triggering Corrective Action.................................................................................24 5.2 Corrective Action Deadlines.....................................................................................................24 5.3 Corrective Action Required by EPA.........................................................................................25 5.4 Corrective Action Report...........................................................................................................25 6 Staff Training Requirements...........................................................................................................25 7 Stormwater Pollution Prevention Plan (SWPPP) ............................................................................26 7.1 General Requirements...............................................................................................................26 7.2 SWPPP Contents..........................................................................................................................26 7.3 On-Site Availability of Your SWPPP............................................................................................32 7.4 SWPPP Modifications ..................................................................................................................32 Page 2017 Construction General Permit (CGP) (as modified) 8 How to Terminate Coverage.........................................................................................................33 8.1 Minimum Information Required in NOT....................................................................................33 8.2 Conditions for Terminating CGP Coverage............................................................................34 8.3 How to Submit Your NOT............................................................................................................34 8.4 Deadline for Submitting the NOT..............................................................................................34 8.5 Effective Date of Termination of Coverage............................................................................34 9 Permit Conditions Applicable to Specific States, Indian Country Lands, or Territories.............35 Appendix A: Definitions and Acronyms...........................................................................................A-1 Appendix B: Permit Areas Eligible for Coverage and EPA Regional Addresses........................... B-1 Appendix C: Small Construction Waivers and Instructions............................................................C-1 Appendix D: Eligibility Procedures Relating to Threatened & Endangered Species Protection. D-1 Appendix E: Historic Property Screening Process ............................................................................E-1 Appendix F: List of Tier 3, Tier 2, and Tier 2.5 Waters.........................................................................F-1 Appendix G: Buffer Requirements................................................................................................... G-1 Appendix H: 2-Year, 24-Hour Storm Frequencies...........................................................................H-1 Appendix I: Standard Permit Conditions........................................................................................... 1-1 Appendix J: Notice of Intent(NOI) Form and Instructions...............................................................J-1 Appendix K: Notice of Termination (NOT) Form and Instructions ..................................................K-1 Appendix L: Suggested Format for Request for Chemical Treatment............................................L-1 Page ii 2017 Construction General Permit (CGP) (as modified) 1 HOW TO OBTAIN COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT(CGP) To be covered under this permit, you must meet the eligibility conditions and follow the requirements for obtaining permit coverage in this Part. 1.1 ELIGIBILITY CONDITIONS 1.1.1 You are an "operator" of a construction site for which discharges will be covered under this permit. For the purposes of this permit and in the context of stormwater discharges associated with construction activity, an "operator" is any party associated with a construction project that meets either of the following two criteria: a.. The party has operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications; or b. The party has day-to-day operational control of those activities at a project that are necessary to ensure compliance with the permit conditions. Where there are multiple operators associated with the same project, all operators must obtain permit coverage.' Subcontractors generally are not considered operators for the purposes of this permit. 1.1.2 Your site's construction activities: a.. Will disturb one or more acres of land, or will disturb less than one acre of land but are part of a common plan of development or sale that will ultimately disturb one or more acres of land; or b. Have been designated by EPA as needing permit coverage under 40 CFR 122.26(a)(1)(v) or 40 CFR 122.26(b)(15)(ii); 1.1.3 Your site is located in an area where EPA is the permitting authority (see Appendix B); 1.1.4 Discharges from your site are not: a. Already covered by a different NPDES permit for the same discharge; or b. In the process of having coverage under a different NPDES permit for the same discharge denied, terminated, or revoked.2, 3 1.1.5 You are able to demonstrate that you meet one of the criteria listed in Appendix D with respect to the protection of species that are federally listed as endangered or threatened under the Endangered Species Act (ESA) and federally designated critical habitat; 1.1.6 You have completed the screening process in Appendix E relating to the protection of historic properties; and 1 If the operator of a "construction support activity" (see Part 1.2.1 c) is different than the operator of the main site, that operator must also obtain permit coverage.See Part 7.1 for clarification on the sharing of permit-related functions between and among operators on the same site and for conditions that apply to developing a SWPPP for multiple operators associated with the same site. 2 Parts 1.1.4a and 1.1.4b do not include sites currently covered under the 2012 CGP that are in the process of obtaining coverage under this permit, nor sites covered under this permit that are transferring coverage to a different operator. 3 Notwithstanding a site being made ineligible for coverage under this permit because it falls under the description of Parts 1.1.4a or 1.1.4b, above, EPA may waive the applicable eligibility requirement after specific review if it determines that coverage under this permit is appropriate. Page 1 2017 Construction General Permit (CGP) (as modified) 1.1.7 You have complied with all requirements in Part 9 imposed by the applicable state, Indian tribe, or territory in which your construction activities and/or discharge will occur. 1.1.8 For "new sources" (as defined in Appendix A) only: a.. EPA has not, prior to authorization under this permit, determined that discharges from your site will cause, have the reasonable potential to cause, or contribute to an excursion above any applicable water quality standard. Where such a determination is made prior to authorization, EPA may notify you that an individual permit application is necessary. However, EPA may authorize your coverage under this permit after you have included appropriate controls and implementation procedures designed to bring your discharge into compliance with this permit, specifically the requirement to meet water quality standards. In the absence of information demonstrating otherwise, EPA expects that compliance with the requirements of this permit, including the requirements applicable to such discharges in Part 3, will result in discharges that will not cause, have the reasonable potential to cause, or contribute to an excursion above any applicable water quality standard. b. Discharges from your site to a Tier 2, Tier 2.5, or Tier 3 water4 will not lower the water quality of the applicable water. In the absence of information demonstrating otherwise, EPA expects that compliance with the requirements of this permit, including the requirements applicable to such discharges in Part 3.2, will result in discharges that will not lower the water quality of such waters. 1.1.9 If you plan to add "cationic treatment chemicals" (as defined in Appendix A) to stormwater and/or authorized non-stormwater prior to discharge,you may not submit your Notice of Intent (NOI) unless and until you notify your applicable EPA Regional Office (see Appendix L) in advance and the EPA Regional Office authorizes coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to discharges that cause an exceedance of water quality standards. 1.2 TYPES OF DISCHARGES AUTHORIZED5 1.2.1 The following stormwater discharges are authorized under this permit provided that appropriate stormwater controls are designed, installed, and maintained (see Parts 2 and 3): a.. Stormwater discharges, including stormwater runoff, snowmelt runoff, and surface runoff and drainage, associated with construction activity under 40 CFR 122.26(b)(14) or 122.26(b)(15)(i); b. Stormwater discharges designated by EPA as needing a permit under 40 CFR 122.26(a)(1)(v) or 122.26(b)(15)(ii); 4 Note:Your site will be considered to discharge to a Tier 2,Tier 2.5, or Tier 3 water if the first water to which you discharge is identified by a state, tribe,or EPA as a Tier 2,Tier 2.5, or Tier 3 water. For discharges that enter a storm sewer system prior to discharge, the first water of the U.S. to which you discharge is the waterbody that receives the stormwater discharge from the storm sewer system.See list of Tier 2,Tier 2.5, and Tier 3 waters in Appendix F. 5 See "Discharge" as defined in Appendix A. Note:Any discharges not expressly authorized in this permit cannot become authorized or shielded from liability under CWA section 402(k) by disclosure to EPA,state, or local authorities after issuance of this permit via any means,including the Notice of Intent (NOI) to be covered by the permit, the SWPPP, or during an inspection. Page 2 2017 Construction General Permit (CGP) (as modified) c. Stormwater discharges from construction support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) provided that: i. The support activity is directly related to the construction site required to have permit coverage for stormwater discharges; ii. The support activity is not a commercial operation, nor does it serve multiple unrelated construction sites; iii. The support activity does not continue to operate beyond the completion of the construction activity at the site it supports; and iv. Stormwater controls are implemented in accordance with Part 2 and Part 3 for discharges from the support activity areas. d. Stormwater discharges from earth-disturbing activities associated with the construction of staging areas and the construction of access roads conducted prior to active mining. 1.2.2 The following non-stormwater discharges associated with your construction activity are authorized under this permit provided that, with the exception of water used to control dust and to irrigate vegetation in stabilized areas, these discharges are not routed to areas of exposed soil on your site and you comply with any applicable requirements for these discharges in Parts 2 and 3: a. Discharges from emergency fire-fighting activities; b. Fire hydrant flushings; c. Landscape irrigation; d. Water used to wash vehicles and equipment, provided that there is no discharge of soaps, solvents, or detergents used for such purposes; e. Water used to control dust; f. Potable water including uncontaminated water line flushings; g. External building washdown, provided soaps, solvents, and detergents are not used, and external surfaces do not contain hazardous substances (as defined in Appendix A) (e.g., paint or caulk containing polychlorinated biphenyls (PCBs)); h. Pavement wash waters, provided spills or leaks of toxic or hazardous substances have not occurred (unless all spill material has been removed) and where soaps, solvents, and detergents are not used. You are prohibited from directing pavement wash waters directly into any water of the U.S., storm drain inlet, or stormwater conveyance, unless the conveyance is connected to a sediment basin, sediment trap, or similarly effective control; i. Uncontaminated air conditioning or compressor condensate; j. Uncontaminated, non-turbid discharges of ground water or spring water; k. Foundation or footing drains where flows are not contaminated with process materials such as solvents or contaminated ground water; and I. Construction dewatering water discharged in accordance with Part 2.4. 1.2.3 Also authorized under this permit are discharges of stormwater listed above in Part 1.2.1, or authorized non-stormwater discharges listed above in Part 1.2.2, commingled with a Page 3 2017 Construction General Permit (CGP) (as modified) discharge authorized by a different NPDES permit and/or a discharge that does not require N PDES permit authorization. 1.3 PROHIBITED DISCHARGES6 1.3.1 Wastewater from washout of concrete, unless managed by an appropriate control as described in Part 2.3.4; 1.3.2 Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; 1.3.3 Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 1.3.4 Soaps, solvents, or detergents used in vehicle and equipment washing or external building washdown; and 1.3.5 Toxic or hazardous substances from a spill or other release. To prevent the above-listed prohibited non-stormwater discharges, operators must comply with the applicable pollution prevention requirements in Part 2.3. 1.4 SUBMITTING YOUR NOTICE OF INTENT(NOI) All "operators" (as defined in Appendix A) associated with your construction site, who meet the Part 1.1 eligibility requirements, and who seek coverage under this permit, must submit to EPA a complete and accurate NOI in accordance with the deadlines in Table 1 prior to commencing construction activities. Exception: If you are conducting construction activities in response to a public emergency (e.g., mud slides, earthquake, extreme flooding conditions, widespread disruption in essential public services), and the related work requires immediate authorization to avoid imminent endangerment to human health, public safety, or the environment, or to reestablish essential public services, you may discharge on the condition that a complete and accurate NOI is submitted within 30 calendar days after commencing construction activities (see Table 1) establishing that you are eligible for coverage under this permit. You must also provide documentation in your Stormwater Pollution Prevention Plan (SWPPP) to substantiate the occurrence of the public emergency. 1.4.1 Prerequisite for Submitting Your NOI You must develop a SWPPP consistent with Part 7 before submitting your NOI for coverage under this permit. 1.4.2 How to Submit Your NOI You must use EPA's NPDES eReporting Tool (NeT) to electronically prepare and submit your NOI for coverage under the 2017 CGP, unless you received a waiver from your EPA Regional Office. To access NeT, go to,. ..:.r.i-- s: . . n s st iri ir..... iscl r s,..... ............... .cons:tru c-11::Ji...............! ..::::.:............... ..Ji.............li..Ji.................. ...............J�............... irtiin . Waivers from electronic reporting may be granted based on one of the following conditions: 6 EPA includes these prohibited non-stormwater discharges here as a reminder to the operator that the only non-stormwater discharges authorized by this permit are at Part 1.2.2.Any unauthorized non-stormwater discharges must be covered under an individual permit or alternative general permit. Page 4 2017 Construction General Permit (CGP) (as modified) a. If your operational headquarters is physically located in a geographic area (i.e., ZIP code or census tract) that is identified as under-served for broadband Internet access in the most recent report from the Federal Communications Commission; or b. If you have limitations regarding available computer access or computer capability. If the EPA Regional Office grants you approval to use a paper NOI, and you elect to use it, you must complete the form in Appendix J. 1.4.3 Deadlines for Submitting Your NOI and Your Official Date of Permit Coverage Table 1 provides the deadlines for submitting your NOI and the official start date of your permit coverage,which differ depending on when you commence construction activities. Table 1 NOI Submittal Deadlines and Official Start Date for Permit Coverage. Type of Operator NOI Submittal Deadline' Permit Authorization Date$ Operator of a new site (i.e., a site At least 14 calendar days before 14 calendar days after EPA where construction activities commencing construction notifies you that it has commence on or after February 16, activities. received a complete NOI, 2017) unless EPA notifies you that your authorization is delayed Operator of an existing site (i.e., a site No later than May 17,2017. or denied. with 2012 CGP coverage where construction activities commenced prior to February 16, 2017 New operator of a permitted site (i.e., At least 14 calendar days before an operator that through transfer of the date the transfer to the new ownership and/or operation replaces operator will take place. the operator of an already permitted construction site that is either a "new site"or an "existing site" Operator of an "emergency-related No later than 30 calendar days You are considered project" (i.e., a project initiated in after commencing construction provisionally covered under response to a public emergency activities. the terms and conditions of (e.g., mud slides, earthquake, this permit immediately, and extreme flooding conditions, fully covered 14 calendar disruption in essential public services), days after EPA notifies you for which the related work requires that it has received a immediate authorization to avoid complete NOI, unless EPA imminent endangerment to human notifies you that your health or the environment, or to authorization is delayed or reestablish essential public services) denied. 1.4.4 Modifying your NOI 7 If you miss the deadline to submit your NOI, any and all discharges from your construction activities will continue to be unauthorized under the CWA until they are covered by this or a different NPDES permit. EPA may take enforcement action for any unpermitted discharges that occur between the commencement of construction activities and discharge authorization. 8 Discharges are not authorized if your NOI is incomplete or inaccurate or if you are not eligible for permit coverage. Page 5 2017 Construction General Permit (CGP) (as modified) If after submitting your NOI you need to correct or update any fields, you may do so by submitting a "Change NOI" form using NeT. Waivers from electronic reporting may be granted as specified in Part 1.4.1. If the EPA Regional Office has granted you approval to submit a paper NOI modification,you may indicate any NOI changes on the same NOI form in Appendix J. When there is a change to the site's operator, the new operator must submit a new NOI, and the previous operator must submit a Notice of Termination (NOT) form as specified in Part 8.3. 1.4.5 Your Official End Date of Permit Coverage Once covered under this permit, your coverage will last until the date that: a. You terminate permit coverage consistent with Part 8; or b. You receive permit coverage under a different NPDES permit or a reissued or replacement version of this permit after expiring on February 16, 2022; or C. You fail to submit an NOI for coverage under a revised or replacement version of this permit before the deadline for existing construction sites where construction activities continue after this permit has expired. 1.5 REQUIREMENT TO POST A NOTICE OF YOUR PERMIT COVERAGE You must post a sign or other notice of your permit coverage at a safe, publicly accessible location in close proximity to the construction site. The notice must be located so that it is visible from the public road that is nearest to the active part of the construction site, and it must use a font large enough to be readily viewed from a public right-of-way.9 At a minimum, the notice must include: a. The NPDES ID (i.e., permit tracking number assigned to your NOI); b. A contact name and phone number for obtaining additional construction site information; C. The Uniform Resource Locator (URL) for the SWPPP (if available), or the following statement: "If you would like to obtain a copy of the Stormwater Pollution Prevention Plan (SWPPP) for this site, contact the EPA Regional Office at [include the appropriate CGP Regional Office contact information found at sRwww. 0 . v/)Q con t ct-u -s,t rm t r= re i n ];" and d. The following statement "If you observe indicators of stormwater pollutants in the discharge or in the receiving waterbody, contact the EPA through the following website: -t-t s: . of irc m n it irt,..... n lilt nm in-tal viola-tioins.,, 2 TECHNOLOGY-BASED EFFLUENT LIMITATIONS You must comply with the following technology-based effluent limitations in this Part for all authorized discharges.10 9 If the active part of the construction site is not visible from a public road, then place the notice of permit coverage in a position that is visible from the nearest public road and as close as possible to the construction site. 10 For each of the effluent limits in Part 2, as applicable to your site,you must include in your SWPPP (1) a description of the specific control(s) to be implemented to meet the effluent limit; (2) any applicable design specifications; (3) routine maintenance specifications;and (4) the projected schedule for its (their) Page 6 2017 Construction General Permit (CGP) (as modified) 2.1 GENERAL STORMWATER CONTROL DESIGN, INSTALLATION.. AND MAINTENANCE REQUIREMENTS You must design, install, and maintain stormwater controls required in Parts 2.2 and 2.3 to minimize the discharge of pollutants in stormwater from construction activities. To meet this requirement, you must: 2.1.1 Account for the following factors in designing your stormwater controls: a.. The expected amount, frequency, intensity, and duration of precipitation; b. The nature of stormwater runoff and run-on at the site, including factors such as expected flow from impervious surfaces, slopes, and site drainage features. You must design stormwater controls to control stormwater volume, velocity, and peak flow rates to minimize discharges of pollutants in stormwater and to minimize channel and streambank erosion and scour in the immediate vicinity of discharge points; and c. The soil type and range of soil particle sizes expected to be present on the site. 2.1.2 Design and install all stormwater controls in accordance with good engineering practices, including applicable design specifications.I' 2.1.3 Complete installation of stormwater controls by the time each phase of construction activities has begun. a. By the time construction activity in any given portion of the site begins, install and make operational any downgradient sediment controls (e.g., buffers, perimeter controls, exit point controls, storm drain inlet protection) that control discharges from the initial site clearing, grading, excavating, and other earth-disturbing activities.12 b. Following the installation of these initial controls, install and make operational all stormwater controls needed to control discharges prior to subsequent earth- disturbing activities. 2.1.4 Ensure that all stormwater controls are maintained and remain in effective operating condition during permit coverage and are protected from activities that would reduce their effectiveness. a.. Comply with any specific maintenance requirements for the stormwater controls listed in this permit, as well as any recommended by the manufacturer.13 b. If at any time you find that a stormwater control needs routine maintenance,you must immediately initiate the needed maintenance work, and complete such work by the close of the next business day. installation/implementation.See Part 7.2.6. 11 Design specifications may be found in manufacturer specifications and/or in applicable erosion and sediment control manuals or ordinances.Any departures from such specifications must reflect good engineering practices and must be explained in your SWPPP.You must also comply with any additional design and installation requirements specified for the effluent limits in Parts 2.2 and 2.3. 12 Note that the requirement to install stormwater controls prior to each phase of construction activities for the site does not apply to the earth disturbance associated with the actual installation of these controls. Operators should take all reasonable actions to minimize the discharges of pollutants during the installation of stormwater controls. 13 Any departures from such maintenance recommendations made by the manufacturer must reflect good engineering practices and must be explained in your SWPPP. Page 7 2017 Construction General Permit (CGP) (as modified) c. If at any time you find that a stormwater control needs repair or replacement,you must comply with the corrective action requirements in Part 5. 2.2 EROSION AND SEDIMENT CONTROL REQUIREMENTS You must implement erosion and sediment controls in accordance with the following requirements to minimize the discharge of pollutants in stormwater from construction activities. 2.2.1 Provide and maintain natural buffers and/or equivalent erosion and sediment controls when a water of the U.S. is located within 50 feet of the site's earth disturbances. a.. Compliance Alternatives. For any discharges to waters of the U.S. located within 50 feet of your site's earth disturbances, you must comply with one of the following alternatives: i. Provide and maintain a 50-foot undisturbed natural buffer; or ii. Provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by erosion and sediment controls that achieve, in combination, the sediment load reduction equivalent to a 50-foot undisturbed natural buffer; or iii. If infeasible to provide and maintain an undisturbed natural buffer of any size, implement erosion and sediment controls to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer. See Appendix G, Part G.2 for additional conditions applicable to each compliance alternative. b. Exceptions. See Appendix G, Part G.2 for exceptions to the compliance alternatives. 2.2.2 Direct stormwater to vegetated areas and maximize stormwater infiltration and filtering to reduce pollutant discharges, unless infeasible. 2.2.3 Install sediment controls along any perimeter areas of the site that will receive pollutant discharges.14 a.. Remove sediment before it has accumulated to one-half of the above-ground height of any perimeter control. b. Exception. For areas at "linear construction sites" (as defined in Appendix A) where perimeter controls are infeasible (e.g., due to a limited or restricted right-of-way), implement other practices as necessary to minimize pollutant discharges to perimeter areas of the site. 2.2.4 Minimize sediment track-out. a. Restrict vehicle use to properly designated exit points; b. Use appropriate stabilization techniques15 at all points that exit onto paved roads. 14 Examples of perimeter controls include filter berms,silt fences,vegetative strips,and temporary diversion dikes. 15 Examples of appropriate stabilization techniques include the use of aggregate stone with an underlying geotextile or non-woven filter fabric, and turf mats. Page 8 2017 Construction General Permit (CGP) (as modified) i. Exception: Stabilization is not required for exit points at linear utility construction sites that are used only episodically and for very short durations over the life of the project, provided other exit point controls16 are implemented to minimize sediment track-out; c. Implement additional track-out controls» as necessary to ensure that sediment removal occurs prior to vehicle exit; and d. Where sediment has been tracked-out from your site onto paved roads, sidewalks, or other paved areas outside of your site, remove the deposited sediment by the end of the same business day in which the track-out occurs or by the end of the next business day if track-out occurs on a non-business day. Remove the track-out by sweeping, shoveling, or vacuuming these surfaces, or by using other similarly effective means of sediment removal. You are prohibited from hosing or sweeping tracked-out sediment into any stormwater conveyance, storm drain inlet, or water of the U.S.18 2.2.5 Manage stockpiles or land clearing debris piles composed, in whole or in part, of sediment and/or soil: a.. Locate the piles outside of any natural buffers established under Part 2.2.1 and away from any stormwater conveyances, drain inlets, and areas where stormwater flow is concentrated; b. Install a sediment barrier along all downgradient perimeter areas;19 c. For piles that will be unused for 14 or more days, provide cover20 or appropriate temporary stabilization (consistent with Part 2.2.14); d. You are prohibited from hosing down or sweeping soil or sediment accumulated on pavement or other impervious surfaces into any stormwater conveyance, storm drain inlet, or water of the U.S. 2.2.6 Minimize dust. On areas of exposed soil, minimize dust through the appropriate application of water or other dust suppression techniques to control the generation of pollutants that could be discharged in stormwater from the site. 2.2.7 Minimize steep slope disturbances. Minimize the disturbance of "steep slopes" (as defined in Appendix A). 16 Examples of other exit point controls include preventing the use of exit points during wet periods; minimizing exit point use by keeping vehicles on site to the extent possible;limiting exit point size to the width needed for vehicle and equipment usage; using scarifying and compaction techniques on the soil; and avoiding establishing exit points in environmentally sensitive areas (e.g., karst areas;steep slopes). 17 Examples of additional track-out controls include the use of wheel washing, rumble strips, and rattle plates. 18 Fine grains that remain visible (i.e., staining) on the surfaces of off-site streets, other paved areas, and sidewalks after you have implemented sediment removal practices are not a violation of Part 2.2.4. 19 Examples of sediment barriers include berms, dikes,fiber rolls, silt fences,sandbags,gravel bags, or straw bale. 20 Examples of cover include tarps, blown straw and hydroseeding. Page 9 2017 Construction General Permit (CGP) (as modified) 2.2.8 Preserve native topsoil, unless infeasible.21 2.2.9 Minimize soil compaction.22 In areas of your site where final vegetative stabilization will occur or where infiltration practices will be installed: a.. Restrict vehicle and equipment use in these locations to avoid soil compaction; and b. Before seeding or planting areas of exposed soil that have been compacted, use techniques that rehabilitate and condition the soils as necessary to support vegetative growth. 2.2.10 Protect storm drain inlets. a.. Install inlet protection measures that remove sediment from discharges prior to entry into any storm drain inlet that carries stormwater flow from your site to a water of the U.S., provided you have authority to access the storm drain inlet;23 and b. Clean, or remove and replace, the protection measures as sediment accumulates, the filter becomes clogged, and/or performance is compromised. Where there is evidence of sediment accumulation adjacent to the inlet protection measure, remove the deposited sediment by the end of the same business day in which it is found or by the end of the following business day if removal by the same business day is not feasible. 2.2.11 Control stormwater discharges, including both peak flowrates and total stormwater volume,to minimize channel and streambank erosion and scour in the immediate vicinity of discharge points. 24. 2.2.12 If you install a sediment basin or similar impoundment: a.. Situate the basin or impoundment outside of any water of the U.S. and any natural buffers established under Part 2.2.1; b. Design the basin or impoundment to avoid collecting water from wetlands; c. Design the basin or impoundment to provide storage for either: i. The calculated volume of runoff from a 2-year, 24-hour storm (see Appendix H); or ii. 3,600 cubic feet per acre drained. 21 Stockpiling topsoil at off-site locations, or transferring topsoil to other locations,is an example of a practice that is consistent with the requirements in Part 2.2.8. Preserving native topsoil is not required where the intended function of a specific area of the site dictates that the topsoil be disturbed or removed. For example,some sites may be designed to be highly impervious after construction, and therefore little or no vegetation is intended to remain,or may not have space to stockpile native topsoil on site for later use, in which case,it may not be feasible to preserve topsoil. 22 Minimizing soil compaction is not required where the intended function of a specific area of the site dictates that it be compacted. 23 Inlet protection measures can be removed in the event of flood conditions or to prevent erosion. 24 Examples of control measures that can be used to comply with this requirement include the use of erosion controls and/or velocity dissipation devices (e.g., check dams,sediment traps),within and along the length of a stormwater conveyance and at the outfall to slow down runoff. Page 10 2017 Construction General Permit (CGP) (as modified) d. Utilize outlet structures that withdraw water from the surface of the sediment basin or similar impoundment, unless infeasible;25 e. Use erosion controls and velocity dissipation devices to prevent erosion at inlets and outlets; and f. Remove accumulated sediment to maintain at least one-half of the design capacity and conduct all other appropriate maintenance to ensure the basin or impoundment remains in effective operating condition. 2.2.13 If using treatment chemicals (e.g., polymers, flocculants, coagulants): a.. Use conventional erosion and sediment controls before and after the application of treatment chemicals. Chemicals may only be applied where treated stormwater is directed to a sediment control (e.g., sediment basin, perimeter control) before discharge. b. Select appropriate treatment chemicals. Chemicals must be appropriately suited to the types of soils likely to be exposed during construction and present in the discharges being treated (i.e., the expected turbidity, pH, and flow rate of stormwater flowing into the chemical treatment system or area). c. Minimize discharge risk from stored chemicals. Store all treatment chemicals in leak- proof containers that are kept under storm-resistant cover and surrounded by secondary containment structures (e.g., spill berms, decks, spill containment pallets), or provide equivalent measures designed and maintained to minimize the potential discharge of treatment chemicals in stormwater or by any other means (e.g., storing chemicals in a covered area, having a spill kit available on site and ensuring personnel are available to respond expeditiously in the event of a leak or spill). d. Comply with state/local requirements. Comply with applicable state and local requirements regarding the use of treatment chemicals. e. Use chemicals in accordance with good engineering practices and specifications of the chemical provider/supplier. Use treatment chemicals and chemical treatment systems in accordance with good engineering practices, and with dosing specifications and sediment removal design specifications provided by the provider/supplier of the applicable chemicals, or document in your SWPPP specific departures from these specifications and how they reflect good engineering practice. f. Ensure proper training. Ensure that all persons who handle and use treatment chemicals at the construction site are provided with appropriate, product-specific training. Among other things, the training must cover proper dosing requirements. g. Perform additional measures specified by the EPA Regional Office for the authorized use of cationic chemicals. If you have been authorized to use cationic chemicals at your site pursuant to Part 1.1.9, you must perform all additional measures as conditioned by your authorization to ensure that the use of such chemicals will not cause an exceedance of water quality standards. 25 The circumstances in which it is infeasible to design outlet structures in this manner are rare. Exceptions may include areas with extended cold weather,where using surface outlets may not be feasible during certain time periods (although they must be used during other periods). If you determine that it is infeasible to meet this requirement,you must provide documentation in your SWPPP to support your determination, including the specific conditions or time periods when this exception will apply. Page 1 1 2017 Construction General Permit (CGP) (as modified) 2.2.14 Stabilize exposed portions of the site. Implement and maintain stabilization measures (e.g., seeding protected by erosion controls until vegetation is established, sodding, mulching, erosion control blankets, hydromulch, gravel) that minimize erosion from exposed portions of the site in accordance with Parts 2.2.14a and 2.2.14b. a.. Stabilization Deadlines:26 Total Amount of Land Disturbance Deadline Occurring At Any One Time27 i. Five acres or less(55.0) Initiate the installation of stabilization measures immediately28 in any areas of exposed soil where Note:this includes sites disturbing more construction activities have permanently ceased or will than five acres(>5.0)total over the be temporarily inactive for 14 or more calendar days;29 course of a project, but that limit and disturbance at any one time (i.e., phase Complete the installation of stabilization measures as the disturbance) to five acres or less soon as practicable, but no later than 14 calendar days (:55.0) after stabilization has been initiated.30 26 EPA may determine, based on an inspection carried out under Part 4.8 and corrective actions required under Part 5.3, that the level of sediment discharge on the site makes it necessary to require a faster schedule for completing stabilization. For instance,if sediment discharges from an area of exposed soil that is required to be stabilized are compromising the performance of existing stormwater controls, EPA may require stabilization to correct this problem. 27 Limiting disturbances to five (5) acres or less at any one time means that at no time during the project do the cumulative earth disturbances exceed five (5) acres.The following examples would qualify as limiting disturbances at any one time to five (5) acres or less: 1. The total area of disturbance for a project is five (5) acres or less. 2. The total area of disturbance for a project will exceed five (5) acres, but the operator ensures that no more than five (5) acres will be disturbed at any one time through implementation of stabilization measures. In this way,site stabilization can be used to "free up" land that can be disturbed without exceeding the five (5)-acre cap to qualify for the 14-day stabilization deadline. For instance, if an operator completes stabilization of two (2) acres of land on a five (5)-acre disturbance,then two (2) additional acres could be disturbed while still qualifying for the longer 14-day stabilization deadline. 28 The following are examples of activities that would constitute the immediate initiation of stabilization: 1. Prepping the soil for vegetative or non-vegetative stabilization as long as seeding, planting, and/or installation of non-vegetative stabilization products takes place as soon as practicable, but no later than one (1) calendar day of completing soil preparation; 2. Applying mulch or other non-vegetative product to the exposed area; 3. Seeding or planting the exposed area; 4. Starting any of the activities in # 1 -3 on a portion of the entire area that will be stabilized; and 5. Finalizing arrangements to have stabilization product fully installed in compliance with the deadlines for completing stabilization. 29 The requirement to initiate stabilization immediately is triggered as soon as you know that construction work on a portion of the site is temporarily ceased and will not resume for 14 or more days, or as soon as you know that construction work is permanently ceased.In the context of this provision, "immediately" means as soon as practicable, but no later than the end of the next business day,following the day when the construction activities have temporarily or permanently ceased. 30 If vegetative stabilization measures are being implemented,stabilization is considered "installed" when all activities necessary to seed or plant the area are completed. If non-vegetative stabilization measures are being implemented,stabilization is considered "installed" when all such measures are implemented or applied. Page 12 2017 Construction General Permit (CGP) (as modified) ii. More than five acres(>5.0) Initiate the installation of stabilization measures immediately3l in any areas of exposed soil where construction activities have permanently ceased or will be temporarily inactive for 14 or more calendar days;32 and • Complete the installation of stabilization measures as soon as practicable, but no later than seven (7) calendar days after stabilization has been initiated.33 iii. Exceptions: (a) Arid, semi-arid, and drought-stricken areas (as defined in Appendix A). If it is the seasonally dry period or a period in which drought is occurring, and vegetative stabilization measures are being used: (i) Immediately initiate and, within 14 calendar days of a temporary or permanent cessation of work in any portion of your site, complete the installation of temporary non-vegetative stabilization measures to the extent necessary to prevent erosion; (ii) As soon as practicable, given conditions or circumstances on the site, complete all activities necessary to seed or plant the area to be stabilized; and (iii) If construction is occurring during the seasonally dry period, indicate in your SWPPP the beginning and ending dates of the seasonally dry period and your site conditions. Also include the schedule you will follow for initiating and completing vegetative stabilization. (b) Operators that are affected by unforeseen circumstances34 that delay the initiation and/or completion of vegetative stabilization: (i) Immediately initiate and, within 14 calendar days, complete the installation of temporary non-vegetative stabilization measures to prevent erosion; (ii) Complete all soil conditioning, seeding,watering or irrigation installation, mulching, and other required activities related to the planting and initial establishment of vegetation as soon as conditions or circumstances allow it on your site; and (iii) Document in the SWPPP the circumstances that prevent you from meeting the deadlines in Part 2.2.14a and the schedule you will follow for initiating and completing stabilization. (c) Discharges to a sediment- or nutrient-impaired water or to a water that is identified by your state,tribe, or EPA as Tier 2, Tier 2.5, or Tier 3 for antidegradation purposes. Complete stabilization as soon as 31 See footnote 27 32 See footnote 28 33 See footnote 29 34 Examples include problems with the supply of seed stock or with the availability of specialized equipment and unsuitability of soil conditions due to excessive precipitation and/or flooding. Page 13 2017 Construction General Permit (CGP) (as modified) practicable, but no later than seven (7) calendar days after stabilization has been initiated. b. Final Stabilization Criteria (for any areas not covered by permanent structures): i. Establish uniform, perennial vegetation (i.e., evenly distributed, without large bare areas) that provides 70 percent or more of the cover that is provided by vegetation native to local undisturbed areas; and/or ii. Implement permanent non-vegetative stabilization measures35 to provide effective cover. iii. Exceptions: (a) Arid, semi-arid, and drought-stricken areas (as defined in Appendix A). Final stabilization is met if the area has been seeded or planted to establish vegetation that provides 70 percent or more of the cover that is provided by vegetation native to local undisturbed areas within three (3) years and, to the extent necessary to prevent erosion on the seeded or planted area, non-vegetative erosion controls have been applied that provide cover for at least three years without active maintenance. (b) Disturbed areas on agricultural land that are restored to their preconstruction agricultural use. The Part 2.2.14b final stabilization criteria does not apply. (c) Areas that need to remain disturbed. In limited circumstances, stabilization may not be required if the intended function of a specific area of the site necessitates that it remain disturbed, and only the minimum area needed remains disturbed (e.g., dirt access roads, utility pole pads, areas being used for storage of vehicles, equipment, materials). 2.3 POLLUTION PREVENTION REQUIREMENTS36 You must implement pollution prevention controls in accordance with the following requirements to minimize the discharge of pollutants in stormwater and to prevent the discharge of pollutants from spilled or leaked materials from construction activities. 2.3.1 For equipment and vehicle fueling and maintenance: a. Provide an effective means of eliminating the discharge of spilled or leaked chemicals, including fuels and oils, from these activities;37 35 Examples of permanent non-vegetative stabilization measures include riprap, gravel,gabions, and geotextiles. 36 Under this permit,you are not required to minimize exposure for any products or materials where the exposure to precipitation and to stormwater will not result in a discharge of pollutants,or where exposure of a specific material or product poses little risk of stormwater contamination (such as final products and materials intended for outdoor use). 37 Examples of effective means include: • Locating activities away from waters of the U.S. and stormwater inlets or conveyances so that stormwater coming into contact with these activities cannot reach waters of the U.S.; • Providing secondary containment (e.g., spill berms, decks, spill containment pallets) and cover where appropriate; and • Having a spill kit available on site and ensuring personnel are available to respond expeditiously in the event of a leak or spill. Page 14 2017 Construction General Permit (CGP) (as modified) b. If applicable, comply with the Spill Prevention Control and Countermeasures (SPCC) requirements in 40 CFR part 1 12 and Section 311 of the CWA; c. Ensure adequate supplies are available at all times to handle spills, leaks, and disposal of used liquids; d. Use drip pans and absorbents under or around leaky vehicles; e. Dispose of or recycle oil and oily wastes in accordance with other federal, state, tribal, or local requirements; and f. Clean up spills or contaminated surfaces immediately, using dry clean up measures (do not clean contaminated surfaces by hosing the area down), and eliminate the source of the spill to prevent a discharge or a continuation of an ongoing discharge. 2.3.2 For equipment and vehicle washing: a. Provide an effective means of minimizing the discharge of pollutants from equipment and vehicle washing,wheel wash water, and other types of wash waters;38 b. Ensure there is no discharge of soaps, solvents, or detergents in equipment and vehicle wash water; and c. For storage of soaps, detergents, or solvents, provide either (1) cover(e.g., plastic sheeting, temporary roofs) to minimize the exposure of these detergents to precipitation and to stormwater, or (2) a similarly effective means designed to minimize the discharge of pollutants from these areas. 2.3.3 For storage, handling, and disposal of building products, materials, and wastes: a.. For building materials and building products39, provide either (1) cover (e.g., plastic sheeting, temporary roofs) to minimize the exposure of these products to precipitation and to stormwater, or (2) a similarly effective means designed to minimize the discharge of pollutants from these areas. Minimization of exposure is not required in cases where the exposure to precipitation and to stormwater will not result in a discharge of pollutants, or where exposure of a specific material or product poses little risk of stormwater contamination (such as final products and materials intended for outdoor use). b. For pesticides, herbicides, insecticides, fertilizers, and landscape materials: i. In storage areas, provide either (1) cover (e.g., plastic sheeting, temporary roofs) to minimize the exposure of these chemicals to precipitation and to stormwater, or (2) a similarly effective means designed to minimize the discharge of pollutants from these areas; and ii. Comply with all application and disposal requirements included on the registered pesticide, herbicide, insecticide, and fertilizer label (see also Part 2.3.5). c. For diesel fuel, oil, hydraulic fluids, other petroleum products, and other chemicals: 38 Examples of effective means include locating activities away from waters of the U.S.and stormwater inlets or conveyances and directing wash waters to a sediment basin or sediment trap, using filtration devices,such as filter bags or sand filters, or using other similarly effective controls. 39 Examples of building materials and building products typically present at construction sites include asphalt sealants, copper flashing, roofing materials, adhesives,concrete admixtures, and gravel and mulch stockpiles. Page 15 2017 Construction General Permit (CGP) (as modified) i. Store chemicals in water-tight containers, and provide either (1) cover(e.g., plastic sheeting, temporary roofs) to minimize the exposure of these containers to precipitation and to stormwater, or (2) a similarly effective means designed to minimize the discharge of pollutants from these areas (e.g., having a spill kit available on site and ensuring personnel are available to respond expeditiously in the event of a leak or spill), or provide secondary containment (e.g., spill berms, decks, spill containment pallets); and ii. Clean up spills immediately, using dry clean-up methods where possible, and dispose of used materials properly. You are prohibited from hosing the area down to clean surfaces or spills. Eliminate the source of the spill to prevent a discharge or a furtherance of an ongoing discharge. d. For hazardous or toxic wastes:40 i. Separate hazardous or toxic waste from construction and domestic waste; ii. Store waste in sealed containers,which are constructed of suitable materials to prevent leakage and corrosion, and which are labeled in accordance with applicable Resource Conservation and Recovery Act (RCRA) requirements and all other applicable federal, state, tribal, or local requirements; iii. Store all outside containers within appropriately-sized secondary containment (e.g., spill berms, decks, spill containment pallets) to prevent spills from being discharged, or provide a similarly effective means designed to prevent the discharge of pollutants from these areas (e.g., storing chemicals in a covered area, having a spill kit available on site); iv. Dispose of hazardous or toxic waste in accordance with the manufacturer's recommended method of disposal and in compliance with federal, state, tribal, and local requirements; v. Clean up spills immediately, using dry clean-up methods, and dispose of used materials properly. You are prohibited from hosing the area down to clean surfaces or spills. Eliminate the source of the spill to prevent a discharge or a furtherance of an ongoing discharge; and vi. Follow all other federal, state, tribal, and local requirements regarding hazardous or toxic waste. e. For construction and domestic wastes:41 i. Provide waste containers (e.g., dumpster, trash receptacle) of sufficient size and number to contain construction and domestic wastes; ii. Keep waste container lids closed when not in use and close lids at the end of the business day for those containers that are actively used throughout the day. For waste containers that do not have lids, provide either (1) cover (e.g., a tarp, plastic sheeting, temporary roof) to minimize exposure of wastes to precipitation, 40 Examples of hazardous or toxic waste that may be present at construction sites include paints, caulks, sealants,fluorescent light ballasts,solvents, petroleum-based products,wood preservatives,additives, curing compounds, and acids. 41 Examples of construction and domestic waste include packaging materials,scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics,styrofoam, concrete, demolition debris; and other trash or building materials. Page 16 2017 Construction General Permit (CGP) (as modified) or (2) a similarly effective means designed to minimize the discharge of pollutants (e.g., secondary containment); iii. On business days, clean up and dispose of waste in designated waste containers; and iv. Clean up immediately if containers overflow. f. For sanitary waste, position portable toilets so that they are secure and will not be tipped or knocked over, and located away from waters of the U.S. and stormwater inlets or conveyances. 2.3.4 For washing applicators and containers used for stucco, paint, concrete,form release oils, curing compounds, or other materials: a.. Direct wash water into a leak-proof container or leak-proof and lined pit designed so that no overflows can occur due to inadequate sizing or precipitation; b. Handle washout or cleanout wastes as follows: i. Do not dump liquid wastes in storm sewers or waters of the U.S.; ii. Dispose of liquid wastes in accordance with applicable requirements in Part 2.3.3; and iii. Remove and dispose of hardened concrete waste consistent with your handling of other construction wastes in Part 2.3.3; and c. Locate any washout or cleanout activities as far away as possible from waters of the U.S. and stormwater inlets or conveyances, and, to the extent feasible, designate areas to be used for these activities and conduct such activities only in these areas. 2.3.5 For the application of fertilizers: a.. Apply at a rate and in amounts consistent with manufacturer's specifications, or document in the SWPPP departures from the manufacturer specifications where appropriate in accordance with Part 7.2.6.b.ix; b. Apply at the appropriate time of year for your location, and preferably timed to coincide as closely as possible to the period of maximum vegetation uptake and growth; c. Avoid applying before heavy rains that could cause excess nutrients to be discharged; d. Never apply to frozen ground; e. Never apply to stormwater conveyance channels; and f. Follow all other federal, state, tribal, and local requirements regarding fertilizer application. 2.3.6 Emergency Spill Notification Requirements Discharges of toxic or hazardous substances from a spill or other release are prohibited, consistent with Part 1.3.5. Where a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR 1 10, 40 CFR 117, or 40 CFR 302 occurs during a 24-hour period,you must notify the National Response Center (NRC) at (800) 424-8802 or, in the Washington, DC metropolitan area, call (202) 267-2675 in accordance with the requirements of 40 CFR 1 10, 40 CFR 117, and 40 CFR 302 as soon as you have knowledge of the release. You must also,within seven (7) calendar days of knowledge of the release, provide a Page 17 2017 Construction General Permit (CGP) (as modified) description of the release, the circumstances leading to the release, and the date of the release. State, tribal, or local requirements may necessitate additional reporting of spills or discharges to local emergency response, public health, or drinking water supply agencies. 2.4 CONSTRUCTION DEWATERING REQUIREMENTS Comply with the following requirements to minimize the discharge of pollutants in ground water or accumulated stormwater that is removed from excavations, trenches, foundations, vaults, or other similar points of accumulation, in accordance with Part 1.2.2.42 2.4.1 Treat dewatering discharges with controls to minimize discharges of pollutants;43 2.4.2 Do not discharge visible floating solids or foam; 2.4.3 Use an oil-water separator or suitable filtration device (such as a cartridge filter) that is designed to remove oil, grease, or other products if dewatering water is found to contain these materials; 2.4.4 To the extent feasible, use vegetated, upland areas of the site to infiltrate dewatering water before discharge. You are prohibited from using waters of the U.S. as part of the treatment area; 2.4.5 At all points where dewatering water is discharged, comply with the velocity dissipation requirements of Part 2.2.1 1; 2.4.6 With backwash water, either haul it away for disposal or return it to the beginning of the treatment process; and 2.4.7 Replace and clean the filter media used in dewatering devices when the pressure differential equals or exceeds the manufacturer's specifications. 3 WATER QUALITY-BASED EFFLUENT LIMITATIONS 3.1 GENERAL EFFLUENT LIMITATION TO MEET APPLICABLE WATER QUALITY STANDARDS Discharges must be controlled as necessary to meet applicable water quality standards. Discharges must also comply with any additional state or tribal requirements that are in Part 9. In the absence of information demonstrating otherwise, EPA expects that compliance with the conditions in this permit will result in stormwater discharges being controlled as necessary to meet applicable water quality standards. If at any time you become aware, or EPA determines, that discharges are not being controlled as necessary to meet applicable water quality standards, you must take corrective action as required in Parts 5.1 and 5.2, and document the corrective actions as required in Part 5.4. 42 Uncontaminated, clear (non-turbid) dewatering water can be discharged without being routed to a control. 43 Appropriate controls include sediment basins or sediment traps,sediment socks, dewatering tanks, tube settlers,weir tanks, filtration systems (e.g., bag or sand filters), and passive treatment systems that are designed to remove sediment.Appropriate controls to use downstream of dewatering controls to minimize erosion include vegetated buffers, check dams, riprap, and grouted riprap at outlets. Page 18 2017 Construction General Permit (CGP) (as modified) EPA may insist that you install additional controls (to meet the narrative water quality- based effluent limit above) on a site-specific basis, or require you to obtain coverage under an individual permit, if information in your NOI or from other sources indicates that your discharges are not controlled as necessary to meet applicable water quality standards.This includes situations where additional controls are necessary to comply with a wasteload allocation in an EPA-established or approved TMDL. If during your coverage under a previous permit, you were required to install and maintain stormwater controls specifically to meet the assumptions and requirements of an EPA-approved or established TMDL (for any parameter) or to otherwise control your discharge to meet water quality standards, you must continue to implement such controls as part of your coverage under this permit. 3.2 DISCHARGE LIMITATIONS FOR SITES DISCHARGING TO SENSITIVE WATERS44 For any portion of the site that discharges to a sediment or nutrient-impaired water or to a water that is identified by your state, tribe, or EPA as Tier 2, Tier 2.5, or Tier 3 for antidegradation purposes, you must comply with the inspection frequency specified in 4.3 and you must comply with the stabilization deadline specified in Part 2.2.14.a.iii.(c).45 If you discharge to a water that is impaired for a parameter other than a sediment- related parameter or nutrients, EPA will inform you if any additional controls are necessary for your discharge to be controlled as necessary to meet water quality standards, including for it to be consistent with the assumptions of any available wasteload allocation in any applicable TMDL, or if coverage under an individual permit is necessary. In addition, on a case-by-case basis, EPA may notify operators of new sites or operators of existing sites with increased discharges that additional analyses, stormwater controls, or other measures are necessary to comply with the applicable 44 Sensitive waters include waters that are impaired and Tier 2,Tier 2.5,and Tier 3 waters. "Impaired waters" are those waters identified by the state, tribe,or EPA as not meeting an applicable water quality standard and (1) requires development of a TMDL (pursuant to section 303(d) of the CWA;or (2) is addressed by an EPA-approved or established TMDL; or (3) is not in either of the above categories but the waterbody is covered by a pollution control program that meets the requirements of 40 CFR 130.7(b)(1).Your construction site will be considered to discharge to an impaired water if the first water of the U.S. to which you discharge is an impaired water for the pollutants contained in the discharge from your site. For discharges that enter a storm sewer system prior to discharge, the first water of the U.S.to which you discharge is the waterbody that receives the stormwater discharge from the storm sewer system. For assistance in determining whether your site discharges to impaired waters, EPA has developed a tool that is available both within the electronic NOI form in NeT, and at ..::...p ...®./ ................q..:: .lr.. as ov oll as,.l.------e n des s,.l.0irr cr1,eir dii chair e.cfrm. Tiers 2,2.5 and 3 refer to waters either identified by the state as high quality waters or Outstanding National Resource Waters under 40 CFR 131.12(a)(2) and (3). For the purposes of this permit,you are considered to discharge to a Tier 2,Tier 2.5,or Tier 3 water if the first water of the U.S. to which you discharge is identified by a state, tribe, or EPA as Tier 2,Tier 2.5, or Tier 3. For discharges that enter a storm sewer system prior to discharge,the water of the U.S. to which you discharge is the first water of the U.S. that receives the stormwater discharge from the storm sewer system.See list of Tier 2,Tier 2.5, and Tier 3 waters in Appendix F. EPA may determine on a case-by-case basis that a site discharges to a sensitive water. 45 If you qualify for any of the reduced inspection frequencies in Part 4.4,you may conduct inspections in accordance with Part 4.4 for any portion of your site that discharges to a sensitive water. Page 19 2017 Construction General Permit (CGP) (as modified) antidegradation requirements, or notify you that an individual permit application is necessary. If you discharge to a water that is impaired for polychlorinated biphenyls (PCBs) and are engaging in demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, you must: a. Implement controls46 to minimize the exposure of PCB-containing building materials, including paint, caulk, and pre-1980 fluorescent lighting fixtures, to precipitation and to stormwater; and b. Ensure that disposal of such materials is performed in compliance with applicable state, federal, and local laws. 4 SITE INSPECTION REQUIREMENTS 4.1 PERSON(S) RESPONSIBLE FOR INSPECTING SITE The person(s) inspecting your site may be a person on your staff or a third party you hire to conduct such inspections. You are responsible for ensuring that the person who conducts inspections is a "qualified person.1147 4.2 FREQUENCY OF INSPECTIONS.48 At a minimum, you must conduct a site inspection in accordance with one of the two schedules listed below, unless you are subject to the Part 4.3 site inspection frequency for discharges to sensitive waters or qualify for a Part 4.4 reduction in the inspection frequency: 4.2.1 At least once every seven (7) calendar days; or 4.2.2 Once every 14 calendar days and within 24 hours of the occurrence of a storm event of 0.25 inches or greater, or the occurrence of runoff from snowmelt sufficient to cause a discharge.49 To determine if a storm event of 0.25 inches or greater has occurred on your site, you must either keep a properly maintained rain gauge on your site, or obtain the storm event information from a weather station that is representative of your location. For any day of rainfall during normal business hours that measures 0.25 inches or greater, you must record the total rainfall measured for that day in accordance with Part 4.7.1 d. 46 Examples of controls to minimize exposure of PCBs to precipitation and stormwater include separating work areas from non-work areas and selecting appropriate personal protective equipment and tools, constructing a containment area so that all dust or debris generated by the work remains within the protected area, using tools that minimize dust and heat (<2120F). For additional information,refer to Part 2.3.3 of the CGP Fact Sheet. 47 A "qualified person" is a person knowledgeable in the principles and practice of erosion and sediment controls and pollution prevention,who possesses the appropriate skills and training to assess conditions at the construction site that could impact stormwater quality,and the appropriate skills and training to assess the effectiveness of any stormwater controls selected and installed to meet the requirements of this permit. 48 Inspections are only required during the site's normal working hours. 49 "Within 24 hours of the occurrence of a storm event" means that you must conduct an inspection within 24 hours once a storm event has produced 0.25 inches within a 24-hour period, even if the storm event is still continuing.Thus,if you have elected to inspect bi-weekly in accordance with Part 4.2.2 and there is a storm event at your site that continues for multiple days, and each day of the storm produces 0.25 inches or more of rain,you must conduct an inspection within 24 hours of the first day of the storm and within 24 hours after the end of the storm. Page 20 2017 Construction General Permit (CGP) (as modified) 4.3 INCREASE IN INSPECTION FREQUENCY FOR SITES DISCHARGING TO SENSITIVE WATERS. For any portion of the site that discharges to a sediment or nutrient-impaired water or to a water that is identified by your state, tribe, or EPA as Tier 2, Tier 2.5, or Tier 3 for antidegradation purposes (see Part 3.2), instead of the inspection frequency specified in Part 4.2, you must conduct inspections in accordance with the following inspection frequencies: Once every seven (7) calendar days and within 24 hours of the occurrence of a storm event of 0.25 inches or greater, or the occurrence of runoff from snowmelt sufficient to cause a discharge.To determine if a storm event of 0.25 inches or greater has occurred on your site, you must either keep a properly maintained rain gauge on your site, or obtain the storm event information from a weather station that is representative of your location. For any day of rainfall during normal business hours that measures 0.25 inches or greater, you must record the total rainfall measured for that day in accordance with Part 4.7.1 d. 4.4 REDUCTIONS IN INSPECTION FREQUENCY 4.4.1 Stabilized areas. a.. You may reduce the frequency of inspections to twice per month for the first month, no more than 14 calendar days apart, then once per month in any area of your site where the stabilization steps in 2.2.14a have been completed. If construction activity resumes in this portion of the site at a later date, the inspection frequency immediately increases to that required in Parts 4.2 and 4.3, as applicable. You must document the beginning and ending dates of this period in your SWPPP. b. Exception. For "linear construction sites" (as defined in Appendix A) where disturbed portions have undergone final stabilization at the same time active construction continues on others, you may reduce the frequency of inspections to twice per month for the first month, no more than 14 calendar days apart, in any area of your site where the stabilization steps in 2.2.14a have been completed. After the first month, inspect once more within 24 hours of the occurrence of a storm event of 0.25 inches or greater. If there are no issues or evidence of stabilization problems, you may suspend further inspections. If "wash-out" of stabilization materials and/or sediment is observed, following re-stabilization, inspections must resume at the inspection frequency required in Part 4.4.1 a Inspections must continue until final stabilization is visually confirmed following a storm event of 0.25 inches or greater. 4.4.2 Arid, semi-arid, or drought-stricken areas (as defined in Appendix A). If it is the seasonally dry period or a period in which drought is occurring,you may reduce the frequency of inspections to once per month and within 24 hours of the occurrence of a storm event of 0.25 inches or greater. You must document that you are using this reduced schedule and the beginning and ending dates of the seasonally dry period in your SWPPP.To determine if a storm event of 0.25 inches or greater has occurred on your site, you must either keep a properly maintained rain gauge on your site, or obtain the storm event information from a weather station that is representative of your location. For any day of rainfall during normal business hours that measures 0.25 inches or greater, you must record the total rainfall measured for that day in accordance with Part 4.7.1 d. 4.4.3 Frozen conditions: a. If you are suspending construction activities due to frozen conditions, you may temporarily suspend inspections on your site until thawing conditions (as defined in Appendix A) begin to occur if: Page 21 2017 Construction General Permit (CGP) (as modified) i. Runoff is unlikely due to continuous frozen conditions that are likely to continue at your site for at least three (3) months based on historic seasonal averages. If unexpected weather conditions (such as above freezing temperatures or rain events) make discharges likely, you must immediately resume your regular inspection frequency as described in Parts 4.2 and 4.3, as applicable; ii. Land disturbances have been suspended; and iii. All disturbed areas of the site have been stabilized in accordance with Part 2.2.14a. b. If you are still conducting construction activities during frozen conditions, you may reduce your inspection frequency to once per month if: i. Runoff is unlikely due to continuous frozen conditions that are likely to continue at your site for at least three (3) months based on historic seasonal averages. If unexpected weather conditions (such as above freezing temperatures or rain events) make discharges likely, you must immediately resume your regular inspection frequency as described in Parts 4.2 and 4.3, as applicable; and ii. Except for areas in which you are actively conducting construction activities, disturbed areas of the site have been stabilized in accordance with Part 2.2.14a. You must document the beginning and ending dates of this period in your SWPPP. 4.5 AREAS THAT MUST BE INSPECTED During your site inspection, you must at a minimum inspect the following areas of your site: 4.5.1 All areas that have been cleared, graded, or excavated and that have not yet completed stabilization consistent with Part 2.2.14a; 4.5.2 All stormwater controls (including pollution prevention controls) installed at the site to comply with this permit;50 4.5.3 Material,waste, borrow, and equipment storage and maintenance areas that are covered by this permit; 4.5.4 All areas where stormwater typically flows within the site, including drainageways designed to divert, convey, and/or treat stormwater; 4.5.5 All points of discharge from the site; and 4.5.6 All locations where stabilization measures have been implemented. You are not required to inspect areas that, at the time of the inspection, are considered unsafe to your inspection personnel. 4.6 REQUIREMENTS FOR INSPECTIONS During your site inspection, you must at a minimum: 4.6.1 Check whether all stormwater controls (i.e., erosion and sediment controls and pollution prevention controls) are properly installed, appear to be operational, and are working as intended to minimize pollutant discharges; 50 This includes the requirement to inspect for sediment that has been tracked out from the site onto paved roads, sidewalks, or other paved areas consistent with Part 2.2.4. Page 22 2017 Construction General Permit (CGP) (as modified) 4.6.2 Check for the presence of conditions that could lead to spills, leaks, or other accumulations of pollutants on the site; 4.6.3 Identify any locations where new or modified stormwater controls are necessary to meet the requirements of Parts 2 and/or 3; 4.6.4 Check for signs of visible erosion and sedimentation (i.e., sediment deposits) that have occurred and are attributable to your discharge at points of discharge and, if applicable, the banks of any waters of the U.S. flowing within or immediately adjacent to the site; 4.6.5 Identify any incidents of noncompliance observed; 4.6.6 If a discharge is occurring during your inspection: a.. Identify all discharge points at the site; and b. Observe and document the visual quality of the discharge, and take note of the characteristics of the stormwater discharge, including color; odor; floating, settled, or suspended solids; foam; oil sheen; and other indicators of stormwater pollutants. 4.6.7 Based on the results of your inspection, complete any necessary maintenance under Part 2.1.4 and corrective action under Part 5. 4.7 INSPECTION REPORT 4.7.1 You must complete an inspection report within 24 hours of completing any site inspection. Each inspection report must include the following: a.. The inspection date; b. Names and titles of personnel making the inspection; c. A summary of your inspection findings, covering at a minimum the observations you made in accordance with Part 4.6, including any necessary maintenance or corrective actions; d. If you are inspecting your site at the frequency specified in Part 4.2.2, Part 4.3, or Part 4.4.1 b, and you conducted an inspection because of rainfall measuring 0.25 inches or greater, you must include the applicable rain gauge or weather station readings that triggered the inspection; and e. If you determined that it is unsafe to inspect a portion of your site, you must describe the reason you found it to be unsafe and specify the locations to which this condition applies. 4.7.2 Each inspection report must be signed in accordance with Appendix I, Part 1.11 of this permit. 4.7.3 You must keep a copy of all inspection reports at the site or at an easily accessible location, so that it can be made available at the time of an on-site inspection or upon request by EPA. 4.7.4 You must retain all inspection reports completed for this Part for at least three (3) years from the date that your permit coverage expires or is terminated. 4.8 INSPECTIONS BY EPA You must allow EPA, or an authorized representative of EPA, to conduct the following activities at reasonable times.To the extent that you are utilizing shared controls that are Page 23 2017 Construction General Permit (CGP) (as modified) not on site to comply with this permit, you must make arrangements for EPA to have access at all reasonable times to those areas where the shared controls are located. 4.8.1 Enter onto all areas of the site, including any construction support activity areas covered by this permit, any off-site areas where shared controls are utilized to comply with this permit, discharge locations, adjoining waterbodies, and locations where records are kept under the conditions of this permit; 4.8.2 Access and copy any records that must be kept under the conditions of this permit; 4.8.3 Inspect your construction site, including any construction support activity areas covered by this permit (see Part 1.2.1 c), any stormwater controls installed and maintained at the site, and any off-site shared controls utilized to comply with this permit; and 4.8.4 Sample or monitor for the purpose of ensuring compliance. 5 CORRECTIVE ACTIONS 5.1 CONDITIONS TRIGGERING CORRECTIVE ACTION. You must take corrective action to address any of the following conditions identified at your site: 5.1.1 A stormwater control needs repair or replacement (beyond routine maintenance required under Part 2.1.4); or 5.1.2 A stormwater control necessary to comply with the requirements of this permit was never installed, or was installed incorrectly; or 5.1.3 Your discharges are causing an exceedance of applicable water quality standards; or 5.1.4 A prohibited discharge has occurred (see Part 1.3). 5.2 CORRECTIVE ACTION DEADLINES For any corrective action triggering conditions in Part 5.1, you must: 5.2.1 Immediately take all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events; 5.2.2 When the problem does not require a new or replacement control or significant repair, the corrective action must be completed by the close of the next business day; 5.2.3 When the problem requires a new or replacement control or significant repair, install the new or modified control and make it operational, or complete the repair, by no later than seven (7) calendar days from the time of discovery. If it is infeasible to complete the installation or repair within seven (7) calendar days,you must document in your records why it is infeasible to complete the installation or repair within the 7-day timeframe and document your schedule for installing the stormwater control(s) and making it operational as soon as feasible after the 7-day timeframe. Where these actions result in changes to any of the stormwater controls or procedures documented in your SWPPP, you must modify your SWPPP accordingly within seven (7) calendar days of completing this work. Page 24 2017 Construction General Permit (CGP) (as modified) 5.3 CORRECTIVE ACTION REQUIRED BY EPA You must comply with any corrective actions required by EPA as a result of permit violations found during an inspection carried out under Part 4.8. 5.4 CORRECTIVE ACTION REPORT For each corrective action taken in accordance with this Part, you must complete a report in accordance with the following: 5.4.1 Within 24 hours of identifying the corrective action condition, document the specific condition and the date and time it was identified. 5.4.2 Within 24 hours of completing the corrective action (in accordance with the deadlines in Part 5.2), document the actions taken to address the condition, including whether any SWPPP modifications are required. 5.4.3 Each corrective action report must be signed in accordance with Appendix I, Part 1.11 of this permit. 5.4.4 You must keep a copy of all corrective action reports at the site or at an easily accessible location, so that it can be made available at the time of an on-site inspection or upon request by EPA. 5.4.5 You must retain all corrective action reports completed for this Part for at least three (3) years from the date that your permit coverage expires or is terminated. 6 STAFF TRAINING REQUIREMENTS Each operator, or group of multiple operators, must assemble a "stormwater team" to carry out compliance activities associated with the requirements in this permit. 6.1 Prior to the commencement of construction activities, you must ensure that the following personnel51 on the stormwater team understand the requirements of this permit and their specific responsibilities with respect to those requirements: a.. Personnel who are responsible for the design, installation, maintenance, and/or repair of stormwater controls (including pollution prevention controls); b. Personnel responsible for the application and storage of treatment chemicals (if applicable); c. Personnel who are responsible for conducting inspections as required in Part 4.1; and d. Personnel who are responsible for taking corrective actions as required in Part 5. 6.2 You are responsible for ensuring that all activities on the site comply with the requirements of this permit. You are not required to provide or document formal training for subcontractors or other outside service providers, but you must ensure that such personnel understand any requirements of this permit that may be affected by the work they are subcontracted to perform. 51 If the person requiring training is a new employee who starts after you commence construction activities, you must ensure that this person has the proper understanding as required above prior to assuming particular responsibilities related to compliance with this permit. For emergency-related projects,the requirement to train personnel prior to commencement of construction activities does not apply, however,such personnel must have the required training prior to NOI submission. Page 25 2017 Construction General Permit (CGP) (as modified) 6.3 At a minimum, members of the stormwater team must be trained to understand the following if related to the scope of their job duties (e.g., only personnel responsible for conducting inspections need to understand how to conduct inspections): a. The permit deadlines associated with installation, maintenance, and removal of stormwater controls and with stabilization; b. The location of all stormwater controls on the site required by this permit and how they are to be maintained; c. The proper procedures to follow with respect to the permit's pollution prevention requirements; and d. When and how to conduct inspections, record applicable findings, and take corrective actions. 6.4 Each member of the stormwater team must have easy access to an electronic or paper copy of applicable portions of this permit, the most updated copy of your SWPPP, and other relevant documents or information that must be kept with the SWPPP. 7 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) 7.1 GENERAL REQUIREMENTS All operators associated with a construction site under this permit must develop a SWPPP consistent with the requirements in Part 7 prior to their submittal of the N01.52,53 The SWPPP must be kept up-to-date throughout coverage under this permit. If a SWPPP was prepared under a previous version of this permit, the operator must review and update the SWPPP to ensure that this permit's requirements are addressed prior to submitting an NOI for coverage under this permit. 7.2 SWPPP CONTENTS At a minimum, the SWPPP must include the information specified in this Part and as specified in other parts of this permit. 7.2.1 All Site Operators. Include a list of all other operators who will be engaged in construction activities at the site, and the areas of the site over which each operator has control. 7.2.2 Stormwater Team. Identify the personnel (by name or position) that are part of the stormwater team, as well as their individual responsibilities, including which members are responsible for conducting inspections. 52 The SWPPP does not establish the effluent limits and other permit terms and conditions that apply to your site's discharges; these limits,terms, and conditions are established in this permit. Where there are multiple operators associated with the same site, they may develop a group SWPPP instead of multiple individual SWPPPs. Regardless of whether there is a group SWPPP or multiple individual SWPPPs, each operator is responsible for compliance with the permit's terms and conditions. In other words, if Operator A relies on Operator B to satisfy its permit obligations,Operator A does not have to duplicate those permit-related functions if Operator B is implementing them for both operators to be in compliance with the permit. However, Operator A remains responsible for permit compliance if Operator B fails to implement any measures necessary for Operator A to comply with the permit. In addition, all operators must ensure, either directly or through coordination with other operators, that their activities do not compromise any other operators' controls and/or any shared controls. Page 26 2017 Construction General Permit (CGP) (as modified) 7.2.3 Nature of Construction Activities.54 Include the following: a.. A description of the nature of your construction activities, including the age or dates of past renovations for structures that are undergoing demolition; b. The size of the property (in acres or length in miles if a linear construction site); c. The total area expected to be disturbed by the construction activities (to the nearest quarter acre or nearest quarter mile if a linear construction site); d. A description of any on-site and off-site construction support activity areas covered by this permit (see Part 1.2.1 c); e. The maximum area expected to be disturbed at any one time, including on-site and off-site construction support activity areas; f. A description and projected schedule for the following: i. Commencement of construction activities in each portion of the site, including clearing and grubbing, mass grading, demolition activities, site preparation (i.e., excavating, cutting and filling), final grading, and creation of soil and vegetation stockpiles requiring stabilization; ii. Temporary or permanent cessation of construction activities in each portion of the site; iii. Temporary or final stabilization of exposed areas for each portion of the site; and iv. Removal of temporary stormwater controls and construction equipment or vehicles, and the cessation of construction-related pollutant-generating activities. g. A list and description of all pollutant-generating activities55 on the site. For each pollutant-generating activity, include an inventory of pollutants or pollutant constituents (e.g., sediment, fertilizers, pesticides, paints, caulks, sealants, fluorescent light ballasts, contaminated substrates, solvents, fuels) associated with that activity, which could be discharged in stormwater from your construction site. You must take into account where potential spills and leaks could occur that contribute pollutants to stormwater discharges, and any known hazardous or toxic substances, such as PCBs and asbestos, that will be disturbed or removed during construction; h. Business days and hours for the project; i. If you are conducting construction activities in response to a public emergency (see Part 1.4), a description of the cause of the public emergency (e.g., mud slides, earthquake, extreme flooding conditions, widespread disruption in essential public services), information substantiating its occurrence (e.g., state disaster declaration or similar state or local declaration), and a description of the construction necessary to reestablish affected public services. 7.2.4 Site Map. Include a legible map, or series of maps, showing the following features of the site: a.. Boundaries of the property; 54 If plans change due to unforeseen circumstances or for other reasons,the requirement to describe the sequence and estimated dates of construction activities is not meant to "lock in" the operator to meeting these dates. When departures from initial projections are necessary,this should be documented in the SWPPP itself,or in associated records, as appropriate. 55 Examples of pollutant-generating activities include paving operations; concrete, paint, and stucco washout and waste disposal; solid waste storage and disposal; and dewatering operations. Page 27 2017 Construction General Permit (CGP) (as modified) b. Locations where construction activities will occur, including: i. Locations where earth-disturbing activities will occur (note any phasing), including any demolition activities; ii. Approximate slopes before and after major grading activities (note any steep slopes (as defined in Appendix A)); iii. Locations where sediment, soil, or other construction materials will be stockpiled; iv. Any water of the U.S. crossings; v. Designated points where vehicles will exit onto paved roads; vi. Locations of structures and other impervious surfaces upon completion of construction; and vii. Locations of on-site and off-site construction support activity areas covered by this permit (see Part 1.2.1 c). c. Locations of all waters of the U.S.within and one mile downstream of the site's discharge point.Also identify if any are listed as impaired, or are identified as a Tier 2, Tier 2.5, or Tier 3 water; d. Areas of federally listed critical habitat within the site and/or at discharge locations; e. Type and extent of pre-construction cover on the site (e.g., vegetative cover, forest, pasture, pavement, structures); f. Drainage patterns of stormwater and authorized non-stormwater before and after major grading activities; g. Stormwater and authorized non-stormwater discharge locations, including: i. Locations where stormwater and/or authorized non-stormwater will be discharged to storm drain inlets;56 and ii. Locations where stormwater or authorized non-stormwater will be discharged directly to waters of the U.S. h. Locations of all potential pollutant-generating activities identified in Part 7.2.3g; i. Locations of stormwater controls, including natural buffer areas and any shared controls utilized to comply with this permit; and j. Locations where polymers, flocculants, or other treatment chemicals will be used and stored. 7.2.5 Non-Stormwater Discharges. Identify all authorized non-stormwater discharges in Part 1.2.2 that will or may occur. 7.2.6 Description of Stormwater Controls. a.. For each of the Part 2.2 erosion and sediment control effluent limits, Part 2.3 pollution prevention effluent limits, and Part 2.4 construction dewatering effluent limits, as applicable to your site, you must include the following: i. A description of the specific control(s) to be implemented to meet the effluent limit; 56 The requirement to show storm drain inlets in the immediate vicinity of the site on your site map only applies to those inlets that are easily identifiable from your site or from a publicly accessible area immediately adjacent to your site. Page 28 2017 Construction General Permit (CGP) (as modified) ii. Any applicable stormwater control design specifications (including references to any manufacturer specifications and/or erosion and sediment control manuals/ordinances relied upon);57 iii. Routine stormwater control maintenance specifications; and iv. The projected schedule for stormwater control installation/implementation. b. You must also include any of the following additional information as applicable. i. Natural buffers and/or equivalent sediment controls (see Part 2.2.1 and Appendix G). You must include the following: (a) The compliance alternative to be implemented; (b) If complying with alternative 2, the width of natural buffer retained; (c) If complying with alternative 2 or 3, the erosion and sediment control(s) you will use to achieve an equivalent sediment reduction, and any information you relied upon to demonstrate the equivalency; (d) If complying with alternative 3, a description of why it is infeasible for you to provide and maintain an undisturbed natural buffer of any size; (e) For "linear construction sites" where it is infeasible to implement compliance alternative 1, 2, or 3, a rationale for this determination, and a description of any buffer width retained and/or supplemental erosion and sediment controls installed; and (f) A description of any disturbances that are exempt under Part 2.2.1 that occur within 50 feet of a water of the U.S. ii. Perimeter controls for a "linear construction site" (see Part 2.2.3). For areas where perimeter controls are not feasible, include documentation to support this determination and a description of the other practices that will be implemented to minimize discharges of pollutants in stormwater associated with construction activities. Note: Routine maintenance specifications for perimeter controls documented in the SWPPP must include the Part 2.2.3a requirement that sediment be removed before it has accumulated to one-half of the above-ground height of any perimeter control. iii. Sediment track-out controls (see Parts 2.2.4b and 2.2.4c). Document the specific stabilization techniques and/or controls that will be implemented to remove sediment prior to vehicle exit. iv. Sediment basins (see Part 2.2.12). In circumstances where it is infeasible to utilize outlet structures that withdraw water from the surface, include documentation to support this determination, including the specific conditions or time periods when this exception will apply. v. Treatment chemicals (see Part 2.2.13), you must include the following: (a) A listing of the soil types that are expected to be exposed during construction in areas of the project that will drain to chemical treatment systems. Also include a listing of soil types expected to be found in fill material to be used in these same areas, to the extent you have this information prior to construction; 57 Design specifications may be found in manufacturer specifications and/or in applicable erosion and sediment control manuals or ordinances.Any departures from such specifications must reflect good engineering practice and must be explained in the SWPPP. Page 29 2017 Construction General Permit (CGP) (as modified) (b) A listing of all treatment chemicals to be used at the site and why the selection of these chemicals is suited to the soil characteristics of your site; (c) If the applicable EPA Regional Office authorized you to use cationic treatment chemicals for sediment control, include the specific controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to an exceedance of water quality standards; (d) The dosage of all treatment chemicals to be used at the site or the methodology to be used to determine dosage; (e) Information from any applicable Safety Data Sheet (SDS); (f) Schematic drawings of any chemically enhanced stormwater controls or chemical treatment systems to be used for application of the treatment chemicals; (g) A description of how chemicals will be stored consistent with Part 2.2.13c; (h) References to applicable state or local requirements affecting the use of treatment chemicals, and copies of applicable manufacturer's specifications regarding the use of your specific treatment chemicals and/or chemical treatment systems; and (i) A description of the training that personnel who handle and apply chemicals have received prior to permit coverage, or will receive prior to use of the treatment chemicals at your site. vi. Stabilization measures (see Part 2.2.14). You must include the following: (a) The specific vegetative and/or non-vegetative practices that will be used; (b) The stabilization deadline that will be met in accordance with Part 2.2.14.a.i-ii; (c) If complying with the deadlines for sites in arid, semi-arid, or drought-stricken areas, the beginning and ending dates of the seasonally dry period and the schedule you will follow for initiating and completing vegetative stabilization; and (d) If complying with deadlines for sites affected by unforeseen circumstances that delay the initiation and/or completion of vegetative stabilization, document the circumstances and the schedule for initiating and completing stabilization. vii. Spill prevention and response procedures (see Part 1.3.5 and Part 2.3). You must include the following: (a) Procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases. Identify the name or position of the employee(s) responsible for detection and response of spills or leaks; and (b) Procedures for notification of appropriate facility personnel, emergency response agencies, and regulatory agencies where a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity consistent with Part 2.3.6 and established under either 40 CFR 110, 40 CFR 117, or 40 CFR 302, occurs during a 24-hour period. Contact information must be in locations that are readily accessible and available to all employees. You may also reference the existence of Spill Prevention Control and Page 30 2017 Construction General Permit (CGP) (as modified) Countermeasure (SPCC) plans developed for the construction activity under Part 311 of the CWA, or spill control programs otherwise required by an NPDES permit for the construction activity, provided that you keep a copy of that other plan on site.58 viii. Waste management procedures (see Part 2.3.3). Describe the procedures you will follow for handling, storing and disposing of all wastes generated at your site consistent with all applicable federal, state, tribal, and local requirements, including clearing and demolition debris, sediment removed from the site, construction and domestic waste, hazardous or toxic waste, and sanitary waste. ix. Application of fertilizers (see Part 2.3.5). Document any departures from the manufacturer specifications where appropriate. 7.2.7 Procedures for Inspection, Maintenance, and Corrective Action. Describe the procedures you will follow for maintaining your stormwater controls, conducting site inspections, and, where necessary, taking corrective actions, in accordance with Part 2.1.4, Part 4, and Part 5 of this permit. Also include: a.. The inspection schedule you will follow,which is based on whether your site is subject to Part 4.2 or Part 4.3, or whether your site qualifies for any of the reduced inspection frequencies in Part 4.4; b. If you will be conducting inspections in accordance with the inspection schedule in Part 4.2.2, Part 4.3, or Part 4.4.1 b, the location of the rain gauge or the address of the weather station you will be using to obtain rainfall data; c. If you will be reducing your inspection frequency in accordance with Part 4.4.1 b, the beginning and ending dates of the seasonally defined arid period for your area or the valid period of drought; d. If you will be reducing your inspection frequency in accordance with Part 4.4.3, the beginning and ending dates of frozen conditions on your site; and e. Any maintenance or inspection checklists or other forms that will be used. 7.2.8 Staff Training. Include documentation that the required personnel were, or will be, trained in accordance with Part 6. 7.2.9 Compliance with Other Requirements. a.. Threatened and Endangered Species Protection. Include documentation required in Appendix D supporting your eligibility with regard to the protection of threatened and endangered species and designated critical habitat. b. Historic Properties. Include documentation required in Appendix E supporting your eligibility with regard to the protection of historic properties. c. Safe Drinking Water Act Underground Injection Control (UIC) Requirements for Certain Subsurface Stormwater Controls. If you are using any of the following stormwater controls at your site, document any contact you have had with the applicable state agency59 or EPA Regional Office responsible for implementing the requirements for underground injection wells in the Safe Drinking Water Act and EPA's implementing 58 Even if you already have an SPCC or other spill prevention plan in existence,your plans will only be considered adequate if they meet all of the requirements of this Part,either as part of your existing plan or supplemented as part of the SWPPP. 59 For state UIC program contacts,refer to the following EPA website:... ...... ..........;;„;;p ®„ m p . uilc. Page 31 2017 Construction General Permit (CGP) (as modified) regulations at 40 CFR 144-147. Such controls would generally be considered Class V UIC wells: i. Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system); ii. Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow; and iii. Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system). 7.2.10 SWPPP Certification. You must sign and date your SWPPP in accordance with Appendix I, Part 1.11. 7.2.11 Post-Authorization Additions to the SWPPP. Once you are authorized for coverage under this permit, you must include the following documents as part of your SWPPP: a.. A copy of your NOI submitted to EPA along with any correspondence exchanged between you and EPA related to coverage under this permit; b. A copy of the acknowledgment letter you receive from NeT assigning your NPDES ID (i.e., permit tracking number); c. A copy of this permit (an electronic copy easily available to the stormwater team is also acceptable). 7.3 ON-SITE AVAILABILITY OF YOUR SWPPP You must keep a current copy of your SWPPP at the site or at an easily accessible location so that it can be made available at the time of an on-site inspection or upon request by EPA; a state, tribal, or local agency approving stormwater management plans; the operator of a storm sewer system receiving discharges from the site; or representatives of the U.S. Fish and Wildlife Service (USFWS) or the National Marine Fisheries Service (NMFS). EPA may provide access to portions of your SWPPP to a member of the public upon request. Confidential Business Information (CBI) will be withheld from the public, but may not be withheld from EPA, USFWS, or NMFS.60 If an on-site location is unavailable to keep the SWPPP when no personnel are present, notice of the plan's location must be posted near the main entrance of your construction site. 7.4 SWPPP MODIFICATIONS 60 Information covered by a claim of confidentiality will be disclosed by EPA only to the extent of, and by means of, the procedures set forth in 40 CFR Part 2,Subpart B. In general,submitted information protected by a business confidentiality claim may be disclosed to other employees, officers, or authorized representatives of the United States concerned with implementing the CWA.The authorized representatives, including employees of other executive branch agencies, may review CBI during the course of reviewing draft regulations. Page 32 2017 Construction General Permit (CGP) (as modified) 7.4.1 You must modify your SWPPP, including the site map(s), within seven (7) days of any of the following conditions: a.. Whenever new operators become active in construction activities on your site, or you make changes to your construction plans, stormwater controls, or other activities at your site that are no longer accurately reflected in your SWPPP. This includes changes made in response to corrective actions triggered under Part 5. You do not need to modify your SWPPP if the estimated dates in Part 7.2.3f change during the course of construction; b. To reflect areas on your site map where operational control has been transferred (and the date of transfer) since initiating permit coverage; c. If inspections or investigations by EPA or its authorized representatives determine that SWPPP modifications are necessary for compliance with this permit; d. Where EPA determines it is necessary to install and/or implement additional controls at your site in order to meet the requirements of this permit, the following must be included in your SWPPP: i. A copy of any correspondence describing such measures and requirements; and ii. A description of the controls that will be used to meet such requirements. e. To reflect any revisions to applicable federal, state, tribal, or local requirements that affect the stormwater controls implemented at the site; and f. If applicable, if a change in chemical treatment systems or chemically enhanced stormwater control is made, including use of a different treatment chemical, different dosage rate, or different area of application. 7.4.2 You must maintain records showing the dates of all SWPPP modifications. The records must include the name of the person authorizing each change (see Part 7.2.10 above) and a brief summary of all changes. 7.4.3 All modifications made to the SWPPP consistent with Part 7.4 must be authorized by a person identified in Appendix I, Part 1.1 l.b. 7.4.4 Upon determining that a modification to your SWPPP is required, if there are multiple operators covered under this permit, you must immediately notify any operators who may be impacted by the change to the SWPPP. 8 HOW TO TERMINATE COVERAGE Until you terminate coverage under this permit, you must comply with all conditions and effluent limitations in the permit. To terminate permit coverage, you must submit to EPA a complete and accurate Notice of Termination (NOT), which certifies that you have met the requirements for terminating in Part 8. 8.1 MINIMUM INFORMATION REQUIRED IN NOT 8.1.1 NPDES ID (i.e., permit tracking number) provided by EPA when you received coverage under this permit; 8.1.2 Basis for submission of the NOT (see Part 8.2); 8.1.3 Operator contact information; 8.1.4 Name of site and address (or a description of location if no street address is available); and Page 33 2017 Construction General Permit (CGP) (as modified) 8.1.5 NOT certification. 8.2 CONDITIONS FOR TERMINATING CGP COVERAGE You must terminate CGP coverage only if one or more of the following conditions has occurred: 8.2.1 You have completed all construction activities at your site and, if applicable, construction support activities covered by this permit (see Part 1.2.1 c), and you have met the following requirements: a.. For any areas that (1) were disturbed during construction, (2) are not covered over by permanent structures, and (3) over which you had control during the construction activities, you have met the requirements for final vegetative or non-vegetative stabilization in Part 2.2.14b; b. You have removed and properly disposed of all construction materials,waste and waste handling devices, and have removed all equipment and vehicles that were used during construction, unless intended for long-term use following your termination of permit coverage; c. You have removed all stormwater controls that were installed and maintained during construction, except those that are intended for long-term use following your termination of permit coverage or those that are biodegradable; and d. You have removed all potential pollutants and pollutant-generating activities associated with construction, unless needed for long-term use following your termination of permit coverage; or 8.2.2 You have transferred control of all areas of the site for which you are responsible under this permit to another operator, and that operator has submitted an NOI and obtained coverage under this permit; or 8.2.3 Coverage under an individual or alternative general NPDES permit has been obtained. 8.3 HOW TO SUBMIT YOUR NOT You must use EPA's NPDES eReporting Tool (NeT) to electronically prepare and submit your NOT for the 2017 CGP. To access NeT, go to h,.i,.l.. s: . . n s s irm r,..... i it scons ,..... . . . . ............... ....t r ...............::�Ji...............! ..::::.:............... ..[i.............li..[i.................. ...............Jr............... it ii n . Waivers from electronic reporting may be granted as specified in Part 1.4.1. If the EPA Regional Office grants you approval to use a paper NOT, and you elect to use it, you must complete the form in Appendix K. 8.4 DEADLINE FOR SUBMITTING THE NOT You must submit your NOT within 30 calendar days after any one of the conditions in Part 8.2 occurs. 8.5 EFFECTIVE DATE OF TERMINATION OF COVERAGE Your authorization to discharge under this permit terminates at midnight of the calendar day that a complete NOT is submitted to EPA. Page 34 2017 Construction General Permit (CGP) (as modified) 9 PERMIT CONDITIONS APPLICABLE TO SPECIFIC STATES, INDIAN COUNTRY LANDS, OR TERRITORIES The provisions in this Part provide modifications or additions to the applicable conditions of this permit to reflect specific additional conditions required as part of the state or tribal CWA Section 401 certification process, or the Coastal Zone Management Act (CZMA) certification process, or as otherwise established by the permitting authority.The specific additional revisions and requirements only apply to activities in those specific states, Indian country, and areas in certain states subject to construction projects by Federal Operators.States, Indian country, and areas subject to construction by Federal Operators not included in this Part do not have any modifications or additions to the applicable conditions of this permit. 9.1 EPA Region 1 9.1.1 NHR100000 State of New Hampshire a. If you disturb 100,000 square feet or more of contiguous area, you must also apply for an Alteration of Terrain (AoT) permit from DES pursuant to RSA 485-A:17 and Env-Wq 1500.This requirement also applies to a lower disturbance threshold of 50,000 square feet or more when construction occurs within the protected shoreline under the Shoreland Water Quality Protection Act (see RSA 483-B and Env-Wq 1400).A permit application must also be filed if your project disturbs an area of greater than 2,500 square feet, is within 50 feet of any surface water, and has a flow path of 50 feet or longer disturbing a grade of 25 percent or greater. Project sites with disturbances smaller than those discussed above, that have the potential to adversely affect state surface waters, are subject to the conditions of an AoT General Permit by Rule. b. You must determine that any excavation dewatering discharges are not contaminated before they will be authorized as an allowable non-stormwater discharge under this permit (see Part 1.2.2).The water is considered uncontaminated if there is no groundwater contamination within 1,000 feet of the groundwater dewatering location. Information on groundwater contamination can be generated over the Internet via the NHDES web site http://des.nh.gov/ by using the One Stop Data Mapper at htt.............p://des.nh.gov/onestop/ iq s.htm. If it is .... _ determined that the groundwater to be dewatered is near a remediation or other waste site you must apply for the Remediation General Permit (see https://www3.epa.gov/region 1/npdes/rgp.html.) c. You must treat any uncontaminated excavation dewatering discharges as necessary to remove suspended solids and turbidity.The discharges must be sampled at least once per week during weeks when discharges occur. Samples must be analyzed for total suspended solids (TSS) or turbidity and must meet monthly average and daily maximum limits of 50 milligrams per liter (mg/L) and 100 mg/L, respectively for TSS or 33 mg/I and 67 mg/I, respectively for turbidity.TSS (a.k.a. Residue, Nonfilterable) or turbidity sampling and analysis must be performed in accordance with Tables IB and II in 40 CFR 136.3 (http://www.ecfr.gov/cqi_ bin text- idx?SI D=0243e3c4283cbd7d8257ebbafc7ce9a2&mc=true&node=se40.25.136 13&r ....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... qn=div8). Records of any sampling and analysis must be maintained and kept with the SWPPP for at least three years after final site stabilization. d. Construction site owners and operators must consider opportunities for post- construction groundwater recharge using infiltration best management practices Page 35 2017 Construction General Permit (CGP) (as modified) (BMPs) during site design and preparation of the SWPPP. If your construction site is in a town that is required to obtain coverage under the NPDES General Permit for discharges from Municipal Separate Storm Sewer Systems (MS4) you may be required to use such practices.The SWPPP must include a description of any on-site infiltration that will be installed as apost-construction stormwater management measure or reasons for not employing such measures such as 1) The facility is located in a wellhead protection area as defined in RSA 485- C:2; or 2) The facility is located in an area where groundwater has been reclassified to GAA, GAI or GA2 pursuant to RSA 485-C and Env-DW 901; or 3) Any areas that would be exempt from the groundwater recharge requirements contained in Env-Wq 1507.04, including all land uses or activities considered to be a "High-load Area" (see Env- Wq 1502.30). For design considerations for infiltration measures see Env-Wq 1508.06. e. Appendix F contains a list of Tier 2, or high quality waters. Although there is no official list of tier 2 waters, it can be assumed that all NH surface waters are tier 2 for turbidity unless 1) the surface water that you are proposing to discharge into is listed as impaired for turbidity in the states listing of impaired waters (see Surface Water Quality- Watershed Report Cards at http://des.nh.gov/organization/divisions/water/wmb/swga/report cards.htm) or 2) sampling upstream of the proposed discharge location shows turbidity values greater than 10 NTU. A single grab sample collected during dry weather (no precipitation within 48 hours) is acceptable. f. To ensure compliance with RSA 485-C, RSA 485-A, RSA 485-A:13, I(a), Env-Wq 1700 and Env-Wq 302, the following information may be requested by NHDES.This information must be kept on site unless you receive a written request from NHDES that it be sent to the address shown in Part 9.1.4 (g). i. A site map required in Part 7.2.4, showing the type and location of all post- construction infiltration BMPs utilized at the facility or the reasons) why none were installed; ii. A list of all non-stormwater discharges that occur at the facility, including their source locations and the control measures being used (see Part 1.2.2). iii. Records of sampling and analysis of TSS required for construction dewatering discharges (see Part 9.1.4 (c)). g. All required or requested documents must be sent to: NH Department of Environmental Services, Wastewater Engineering Bureau, Permits & Compliance Section P.O. Box 95 Concord, NH 03302-0095 9.1.2 VTR10F000 Areas in the State of Vermont subject to construction by a Federal Operator a. Earth disturbance at any one time is limited to five acres. b. All areas of earth disturbance must have temporary or final stabilization within 14 days of the initial disturbance. After this time, disturbed areas must be temporarily or permanently stabilized in advance of any runoff producing event. A runoff producing event is an event that produces runoff from the construction site. Temporary stabilization is not required if the work is occurring in aself-contained Page 36 2017 Construction General Permit (CGP) (as modified) excavation (i.e. no outlet) with a depth of two feet or greater (e.g. house foundation excavation, utility trenches). Areas of a construction site that drain to sediment basins are not considered eligible for this exemption, and the exemption applies only to the excavated area itself. c. The use of the cationic polymers is prohibited unless approved under asite-specific plan. d. Site inspections on active construction sites shall be conducted daily during the period from October 15-April 15. e. Any applicant under EPA's CGP shall allow authorized Agency representatives, at reasonable times and upon presentation of credentials, to enter upon the project site for purposes of inspecting the project and determining compliance with this Certification. f. The Agency may reopen and alter or amend the conditions of this Certification over the life of the project when such action is necessary to assure compliance with the VWQS. 9.2 EPA Region 3 9.2.1 DCR100000 District of Columbia a. The permittee must comply with the District of Columbia Water Pollution Control Act of 1984, as amended, (D.C. Official Code § 8-103.01 et seq.) and its implementing regulations in Title 21, Chapters 1 1 and 19 of the District of Columbia Municipal Regulations. Nothing in this permit will be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to District of Columbia laws and regulations. b. The permittee must comply with the District of Columbia Stormwater Management, and Soil Erosion and Sediment Control in Chapter 5 of Title 21 of the District of Columbia Municipal Regulations. c. The permittee must comply with District of Columbia Flood Management control in Chapter 31 of Title 20 of the District of Columbia Municipal Regulations. d. The Department may request a copy of the Stormwater Pollution Prevention Plan (SWPPP) and the permittee is required to submit the SWPPP to the Department within 14 days of such request. The Department may conduct an inspection of any facility covered by this permit to ensure compliance with District's law requirements, including water quality standards. The Department may enforce its certification conditions. e. The Department may require the permittee to perform water quality monitoring during the permit term if monitoring is necessary for the protection of public health or the environment as designated under the authority in Chapter 19 of Title 21 of the District of Columbia Municipal Regulations. f. The Department may require the permittee to provide measurable verification of the effectiveness of Best Management Practices (BMPs) and other control measures used in the stormwater management program, including water quality monitoring. g. The Department has determined that compliance with this permit does not protect the permittee from enforcement actions deemed necessary by the Department Page 37 2017 Construction General Permit (CGP) (as modified) under its associated regulations to address an imminent threat to public health or a significant adverse environmental impact which results in a violation of the District of Columbia Water Pollution Control Act of 1984, as amended, (D.C. Official Code § 8-103.01 et seq.) and its implementing regulations. h. The Department reserves the right to modify this Section 401 Water Quality Certification if any changes, modifications, or deletions are made to this general permit. In addition, the Department reserves the right to add and/or alter the terms and conditions of this Section 401 Water Quality Certification to carry out its responsibilities during the term of this general permit with respect to water quality, including any revisions to District of Columbia Water Quality Standards in Chapter 1 1 of Title 21 of the District of Columbia Municipal Regulations. i. Should any violation of the District's Water Quality Standards, or the conditions of this Section 401 Water Quality Certification occur, the Department will direct the permittee to correct the violation(s). The Department has the right to take any action as authorized by the District laws and regulations to address the violations of this permit or the Water Pollution Control Act and implementing regulations. Substantial civil and criminal penalties are authorized for discharging into District waters in violation of an order or permit issued by the Department. This Section 401 Water Quality Certification does not relieve the permittee of the duty to comply with other applicable District's statutes and regulations. j. The permittee must submit copies of Notice of Intent (NOI) and Notice of Termination to DOEE at the same time these documents are submitted to EPA. k. The permittee shall allow DOEE to inspect any facilities, equipment, practices, or operations regulated or required under this permit and to access records maintained under the conditions of this permit. I. All required or requested documents shall be signed and sent to the: Department of Energy & Environment, 1200 First Street, N.E., 5th Floor, Washington, DC 20002, Attention:Associate Director, Inspection and Enforcement Division. 9.2.2 DER10F000 Areas in the State of Delaware subject to construction by a Federal Operator a. Federal agencies engaging in construction activities must submit, to DNREC, a sediment and stormwater management (S&S) plan and obtain approval from DNREC in accordance with 7 Del. C. §4010, 7 DE Admin. Code 5101, and 7 DE Admin. Code 7201. b. Federal agencies engaging in construction activities must provide for construction review by a certified construction reviewer in accordance with 7 Del. C. §§4010 & 4013 and 7 DE Admin. Code 5101, subsection 6.1.6. c. Federal agencies engaging in construction activities must certify that all responsible personnel involved in the construction project will have attended the blue card training prior to initiation of any land disturbing activity-see 7 Del. C. §§ 4002 &4014 and 7 DE Admin. Code 5101. Page 38 2017 Construction General Permit (CGP) (as modified) 9.3 EPA Region 5 9.3.1 MNR101000 Indian country within the State of Minnesota 9.3.1.1 Fond du Lac Band of Lake Superior Chippewa.The following conditions apply only to discharges on the Fond du Lac Band of Lake Superior Chippewa Reservation: a. A copy of the Stormwater Pollution Prevention Plan (SWPPP) must be submitted to the Office of Water Protection at least fifteen (15) days in advance of sending the Notice of Intent (NOI) to EPA.The SWPPP can be submitted electronically to richardgitar@FDLREZ.com or by hardcopy sent to: Fond du Lac Reservation Office of Water Protection 1720 Big Lake Road Cloquet, MN 55720 CGP applicants are encouraged to work with the FDL Office of Water Protection in the identification of all proposed receiving. b. Copies of the Notice of Intent (NOI) and the Notice of Termination (NOT) must be sent to the Fond du Lac Office of Water Protection at the same time they are submitted to EPA. c. The turbidity limit shall NOT exceed 10% of natural background within the receiving water(s) as determined by Office of Water Protection staff. d. Turbidity sampling must take place within 24 hours of a Y2-inch or greater rainfall event.The results of the sampling must be reported to the Office of Water Protection within 7 days of the sample collection. All sample reporting must include the date and time, location (GPS: UTM/Zone 15), and NTU. CGP applicants are encouraged to work with the Office of Water Protection in determining the most appropriate location(s) for sampling. e. Receiving waters with open water must be sampled for turbidity prior to any authorized discharge as determined by Office of Water Protection staff. This requirement only applies to receiving waters in which no ambient turbidity data exists. f. This Certification does not pertain to any new discharge to Outstanding Reservation Resource Waters (ORRW) as described in §105 b.3. of the Fond du Lac Water Quality Standards (Ordinance #12/98, as amended). Although additional waters may be designated in the future, currently Perch Lake, Rice Portage Lake, Miller Lake, Deadfish Lake, and Jaskari Lake are designated as ORRWs. New dischargers wishing to discharge to an ORRW must obtain an individual permit from EPA for stormwater discharges from large and small construction activities. g. All work shall be carried out in such a manner as will prevent violations of water quality criteria as stated in the Water Quality Standards of the Fond du Lac Reservation, Ordinance 12/98, as amended.This includes, but is not limited to, the prevention of any discharge that causes a condition in which visible solids, bottom deposits, or turbidity impairs the usefulness of water of the Fond du Lac Reservation for any of the uses designated in the Water Quality Standards of the Fond du Lac Reservation.These uses include wildlife, aquatic life,warm water fisheries, cold water fisheries, subsistence fishing (netting), primary contact recreation, secondary Page 39 2017 Construction General Permit (CGP) (as modified) contact recreation, cultural,wild rice areas, aesthetic waters, agriculture, navigation, and commercial. h. Appropriate steps shall be taken to ensure that petroleum products or other chemical pollutants are prevented from entering waters of the Fond du Lac Reservation. All spills must be reported to the appropriate emergency management agency (National Response Center AND the State Duty Officer), and measures shall be taken immediately to prevent the pollution of waters of the Fond du Lac Reservation, including groundwater. The Fond du Lac Office of Water Protection must also be notified immediately of any spill regardless of size. i. This certification does not authorize impacts to cultural, historical, or archeological features or sites, or properties that may be eligible for such listing. 9.3.1.2 Grand Portage Band of Lake Superior Chippewa. The following conditions apply only to discharges on the Grand Portage Band of Lake Superior Chippewa Reservation: a. The CGP authorization is for construction activities that may occur within the exterior boundaries of the Grand Portage Reservation in accordance to the Grand Portage Land Use Ordinance.The CGP regulates stormwater discharges associated with construction sites of one acre or more in size. Only those activities specifically authorized by the CGP are authorized by this certification (the "Certification"). This Certification does not authorize impacts to cultural, historical, or archeological features or sites, or properties that may be eligible for listing as such. b. All construction stormwater discharges authorized by the CGP must comply with the Water Quality Standards and Water Resources Ordinance, as well as Applicable Federal Standards (as defined in the Water Resources Ordinance).As such, appropriate steps must be taken to ensure that petroleum products or other chemical pollutants are prevented from entering the Waters of the Reservation (as defined in the Water Resources Ordinance). All spills must be reported to the appropriate emergency-management agency, and measures must be taken to prevent the pollution of the Waters of the Reservation, including groundwater. c. The 2017 CGP requires inspections and monitoring reports of the construction site stormwater discharges by a qualified person. Monitoring and inspection reports must comply with the minimum requirements contained in the 2017 CGP. The monitoring plan must be prepared and incorporated into the Stormwater Pollution Prevention Plan (the "SWPPP"). A copy of the SWPPP must be submitted to the Board at least 30 days in advance of sending the requisite Notice of Intent to EPA. The SWPPP should be sent to: Grand Portage Environmental Resources Board P.O. Box 428 Grand Portage, MN 55605 Copies of the Notice of Intent and Notice of Termination required under the CGP must be submitted to the Board at the address above at the same time they are submitted to the EPA. d. If requested by the Grand Portage Environmental Department, the permittee must provide additional information necessary for a case-by-case eligibility determination to assure compliance with the Water Quality Standards and any Applicable Federal Standards. Page 40 2017 Construction General Permit (CGP) (as modified) e. Discharges that the Board has determined to be or that may reasonably be expected to be contributing to a violation of Water Quality Standards or Applicable Federal Standards are not authorized by this Certification. f. The Board retains full authority provided by the Water Resources Ordinance to ensure compliance with and to enforce the provisions of the Water Resource Ordinance and Water Quality Standards, Applicable Federal Standards, and these Certification conditions. g. Appeals related to Board actions taken in accordance with any of the preceding conditions may be heard by the Grand Portage Tribal Court. 9.3.2 WIR101000 Indian country within the State of Wisconsin, except the Sokaogon Chippewa (Mole Lake) Community 9.3.2.1 Bad River Band of Lake Superior Tribe of Chippewa Indians: The following conditions apply only to discharges on the Bad River Band of the Lake Superior Tribe of Chippewa Indians Reservation: a. Only those activities specifically authorized by the CGP are authorized by this Certification. This Certification does not authorize impacts to cultural properties, or historical sites, or properties that may be eligible for listing as such.61,62 b. All projects which are eligible for coverage under the CGP and are located within the exterior boundaries of the Bad River Reservation shall be implemented in such a manner that is consistent with the Tribe's Water Quality Standards (WQS) in order to protect Reservations waters that may be impacted by stormwater discharge including embankments, outlets, adjacent streambanks, slopes, and downstream waters.63 c. Operators are not eligible to obtain authorization under the CGP for all new discharges to an Outstanding Tribal Resource Water (or Tier 3 water).64 Outstanding Tribal Resource Waters, or Tier 3 waters, include the following: Kakagon Slough and the lower wetland reaches of its tributaries that support wild rice, Kakagon River, Bad River Slough, Honest John Lake, Bog Lake, a portion of Bad River, from where it enters the Reservation through the confluence with the White River, and Potato River.65 d. An operator proposing to discharge to an Outstanding Resource Water (or Tier 2.5 water) under the CGP must comply with the antidegradation provisions of the Tribe's WQS. Outstanding Resource Waters, or Tier 2.5 waters, include the following: a portion of Bad River, from downstream the confluence with the White River to Lake Superior, White River, Marengo River, Graveyard Creek, Bear Trap Creek, Wood Creek, Brunsweiler River, Tyler Forks, Bell Creek, and Vaughn Creek.66 The antidegradation demonstration materials described in provision EA.iii. must be submitted to the following address: 61 Bad River Band of Lake Superior Tribe of Chippewa Indians Water Quality Standards adopted by Resolution No. 7-6-1 1-441 (hereafter,Tribe's WQS). 6236 C.F.R. § 800.16(1)(2). 63See footnote 61. 64 Tribe's WQS:See provisions E.3.ii. and E.4.iv. 65 Tribe's WQS:See provision E.2.iii. 66 Tribe's WQS:See provision E.2.ii. Page 41 2017 Construction General Permit (CGP) (as modified) Bad River Tribe's Natural Resources Department Attn: Water Resources Specialist P.O. Box 39 Odanah, WI 54861 e. An operator proposing to discharge to an Exceptional Resource Water (or Tier 2 water) under the CGP must comply with the antidegradation provisions of the Tribe's WQS. Exceptional Resource Waters, or Tier 2 waters, include the following: any surface water within the exterior boundaries of the Reservation that is not specifically classified as an Outstanding Resource Water (Tier 2.5 water) or an Outstanding Tribal Resource Water (Tier 3 water).67 The antidegradation demonstration materials described in provision E.4.ii. must be submitted to the following address: Bad River Tribe's Natural Resources Department Attn: Water Resources Specialist P.O. Box 39 Odanah, WI 54861 f. Projects utilizing cationic treatment chemicals68 within the Bad River Reservation boundaries are not eligible for coverage under the CGP.69 g. A discharge to a surface water within the Bad River Reservation boundaries shall not cause or contribute to an exceedance of the turbidity criterion included in the Tribe's WQS, which states: Turbidity shall not exceed 5 NTU over natural background turbidity when the background turbidity is 50 NTU or less, or turbidity shall not increase more than 10%when the background turbidity is more than 50 NTU.70 h. All projects which are eligible for coverage under the CGP within the exterior boundaries of the Bad River Reservation must comply with the Bad River Reservation Wetland and Watercourse Protection Ordinance, or Chapter 323 of the Bad River Tribal Ordinances, including the erosion and sedimentation control, natural buffer, and stabilization requirements. Questions regarding Chapter 323 and requests for permit applications can be directed to the Wetlands Specialist in the Tribe's Natural Resources Department at (715) 682-7123 or................................�:....................! ..................................... ..............................irii...........................1r::::::, ,i ...in.. v. i. An operator of a project,which is eligible for coverage under the CGP, that would result in an allowable discharge under the CGP occurring within the exterior boundaries of the Bad River Reservation must notify the Tribe prior to the commencing earth-disturbing activities.71,72 The operator must submit a copy of the Notice of Intent (NOI) to the following addresses at the same time it is submitted to the U.S. EPA: 67 Tribe's WQS:See provision E.2.i. 68 See definition of cationic treatment chemicals in Appendix A of the CGP. 69 Tribe's WQS:See provisions E.6.ii.a. and E.6.ii.c. 70 Tribe's WQS:See provision E.7.iii. 71 See footnote 61. 72 See footnote 62. Page 42 2017 Construction General Permit (CGP) (as modified) Bad River Tribe's Natural Resources Department Attn: Water Resources Specialist P.O. Box 39 Odanah, WI 54861 Bad River Tribe's Natural Resources Department Attn:Tribal Historic Preservation Officer (THPO) P.O. Box 39 Odanah, WI 54861 The operator must also submit a copy of the Notice of Termination (NOT) to the above addresses at the same time it is submitted to the U.S. EPA. j. The Tribal Historic Preservation Officer (THPO) must be provided 30 days to comment on the project.73 k. The operator must obtain THPO concurrence in writing. This written concurrence will outline measures to be taken to prevent or mitigate effects to historic properties. For more information regarding the specifics of the cultural resources process, see 36 CFR Part 800. A best practice for an operator is to consult with the THPO during the planning stages of an undertaking.74 I. An operator of a project,which is eligible for coverage under the CGP, that would result in an allowable discharge under the CGP occurring within the exterior boundaries of the Bad River Reservation must submit a copy of the Stormwater Pollution Prevention Plan (SWPPP) to the following address at the same time as submitting the NOI:75 Bad River Tribe's Natural Resources Department Attn: Water Resources Specialist P.O. Box 39 Odanah, WI 54861 m. Any corrective action reports that are required under the CGP must be submitted to the following address within one (1) working day of the report completion:76 Bad River Tribe's Natural Resources Department P.O. Box 39 Odanah, WI 54861 n. An operator shall be responsible for meeting any additional permit requirements imposed by the U.S. EPA necessary to comply with the Tribe's antidegradation policies if the discharge point is located upstream of waters designated by the Tribe.77 73 36 C.F.R. § 800.3(c)(4). 7436 C.F.R. § 800.3(b). 75 See footnote 61. 76 See footnote 61. 77 See footnote 61. Page 43 2017 Construction General Permit (CGP) (as modified) 9.3.2.2 Lac du Flambeau Band of Lake Superior Tribe of Chippewa Indians: The following conditions apply only to discharges on the Lac du Flambeau Band of the Lake Superior Tribe of Chippewa Indians Reservation: a. A copy of the Stormwater Pollution Prevention Plan must be submitted to the following office, for the Traival environmental review process, at least thirty (30) days in advance of sending the Notice of Intent (NOI) to EPA: Lac du Flambeau Tribal Land Management P.O. Box 279 Lac du Flambeau, WI 54538 CGP applicants are encouraged to work with the LdF Water Resources Program in the identification of all proposed receiving waters. b. Copies of the NOI and the Notice of Termination (NOT) must be sent to the LdF Water Resources Program at the same time they are submitted to EPA. c. All work shall be carried out in such a manner as will prevent violations of water quality criteria as stated in the Water Quality Standards of the Lac du Flambeau Reservation. This includes, but is not limited to, the prevention of any discharge that cause a condition in which visible solids, bottom deposits, or turbidity impairs the usefulness of water of the Lac du Flambeau Reservation for any of the uses designated in the Water Quality Standards of the Lac du Flambeau Reservation. d. Appropriate steps shall be taken to ensure that petroleum products or other chemical pollutants are prevented from entering waters of the Lac du Flambeau Reservation. All spills must be reported to the appropriate emergency management agency, and measures shall be taken immediately to prevent the pollution of waters of the Lac du Flambeau reservation, including groundwater. e. This certification does not authorize impacts to cultural, historical, or archeological features or sties, or properties that may be eligible for such listing. f. Due to the significant ecological and cultural importance of the Lac du Flambeau Reservation, any operator requesting a permit for a point source discharge of pollutants (i.e., discharge) associated with the Stormwater Discharge will need a stormwater pollution prevention plan in place that does not violate Lac du Flambeau Water Quality Standards to protect Reservation Waters. 9.4 EPA Region 6 9.4.1 NMR100000 State of New Mexico, except Indian country a. If construction dewatering activities are anticipated at a site, permittees must complete the following steps: i. Investigative information must be documented in the facility SWPPP. ii. Refer to the GWQB Mapper at]h.-tt. s: is. . n .nr . AND the PSTB Mapper (Go Mapper) at https://gis.web.env.nm.gov/GoNM/ Page 44 2017 Construction General Permit (CGP) (as modified) and check if the following sources are located within the noted distance from your anticipated construct site groundwater dewatering activity: Project Location Relative to a Source of Constituents likely to be required for Potential Groundwater Contamination testing Within 0.5 mile of an open Leaking BTEX (Benzene, Toluene, Ethylbenzene, Underground Storage Tank (LUST) site and Xylene) plus additional parameters depending on site conditions.* Within 0.5 mile of an open Voluntary All parameters listed in Appendix A (or Remediation site an alternate list approved by the NMED Within 0.5 mile of an open RCRA SWQB)** Corrective Action Site Within 0.5 mile of an open Abatement Site Within 0.5 mile of an open Brownfield Site Within 1.0 mile or more of a Superfund site or National Priorities List (NPL) site with associated groundwater contamination. *For further assistance determining whether dewatering may encounter impacted groundwater, the permittee may contact the NMED Ground Water Quality Bureau at:505-827-2965. **EPA approved-sufficiently sensitive methods must be used-approved methods are listed in 40 CFR Part 136.3. ii. Indicate on the NOI that dewatering activities are anticipated. Provide information on flow and potential to encounter impacted groundwater. iii. Permittee must test the quality of the groundwater according to the chart above. Hardness and pH must also be measured. iv. Permittee must send test result data to EPA Region 6 and the NMED Surface Water Quality Bureau. If the test data exceed standards, it cannot be discharged from the construction site into surface waters under this permit. Discharge to surface waters must be conducted under a separate NPDES individual permit to ensure proper treatment and disposal. V. If disposal will be to the ground surface or in an unlined pond, the permittee must submit an NO/to the NMED Ground Water Quality Bureau. b. Operators are not eligible to obtain authorization under this permit for all new and existing storm water discharges to outstanding national resource waters (ONRWs) (also referred to as"Tier 3"waters.) c. Operators who intend to obtain authorization under this permit for new and existing storm water discharges from construction sites must satisfy the following condition: i. The SWPPP must include site-specific interim and permanent stabilization, managerial, and structural solids, erosion and sediment control best management practices (BMPs) and/or other controls that are designed to prevent to the maximum extent practicable an increase in the sediment yield and flow velocity from pre-construction, pre-development conditions to assure that applicable standards in 20.6.4.NMAC, including the antidegradation policy, or TMDL waste load allocations (WLAs) are met. This requirement applies to discharges both during construction and after construction operations have been completed.The SWPPP must identify Page 45 2017 Construction General Permit (CGP) (as modified) and document the rationale for selecting these BMPs and/or other controls. The SWPPP must also describe design specifications, construction specifications, maintenance schedules (including a long term maintenance plan), criteria for inspections, and expected performance and longevity of these BMPs. For sites greater than 5 acres in size, BMP selection must be made based on the use of appropriate soil loss prediction models (i.e.SEDCAD, RUSLE,SEDIMOT, MULTISED, etc.) OR equivalent generally accepted (by professional erosion control specialists) soil loss prediction tools. ii. For all sites, the operator(s) must demonstrate, and include documentation in the SWPPP, that implementation of the site-specific practices will assure that the applicable standards or TMDL WLAs are met, and will result in sediment yields and flow velocities that, to the maximum extent practicable,will not be greater than the sediment yield levels and flow velocities from preconstruction, pre-development conditions. iii. All SWPPPs must be prepared in accordance with good engineering practices by qualified (e.g. CPESC certified, engineers with appropriate training) erosion control specialists familiar with the use of soil loss prediction models and design of erosion and sediment control systems based on these models (or equivalent soil loss prediction tools). Qualifications of the preparer (e.g., professional certifications, description of appropriate training) must be documented in the SWPPP.The operator(s) must design, implement, and maintain BMPs in the manner specified in the SWPPP. d. Permittees can call 505-827-9329 for emergencies at any time and 505-476-6000 for non-emergencies during business hours from 5am-5pm, Monday through Friday. 9.4.2 NMR101000 Indian country within the State of New Mexico.. except Navajo Reservation Lands that are covered under Arizona permit AZR101000 and Ute Mountain Reservation Lands that are covered under Colorado permit COR101000. 9.4.2.1 Pueblo of Isleta. The following conditions apply only to discharges on the Pueblo of Isleta Reservation: a. CGP at 1.3 Prohibited discharges:Stormwater discharges associated with construction activity that EPA or the Pueblo of Isleta, prior to authorization under this perm it, determines will cause, have the reasonable potential to cause, or may reasonably be expected to contribute to a violation or excursion of any applicable water quality standard, including the antidegradation policy, or the impairment of a designated use of receiving waters are not authorized by this permit. b. CGP at 1.4.1 How to Submit Your NOI: The operator shall provide a copy of the Notice of Intent ("NOI") to the Pueblo of Isleta at the same time it is submitted to the U.S. Environmental Protection Agency, for projects occurring within the exterior boundaries of the Pueblo of Isleta. The operator shall also notify the Pueblo of Isleta when it has submitted the Notice of Termination ("NOT"). The NOI and NOT shall be sent to the Pueblo of Isleta at the following address: Water Quality Control Officer Pueblo of Isleta Environment Department PO Box 1270 Page 46 2017 Construction General Permit (CGP) (as modified) Isleta, NM 87022 (505) 869-9819 E-mail: P0136871 @isletapueblo.com ............................................................................................................................._Overnight/Express Mail Deliver Pueblo of Isleta Environment Department 6 Sagebrush St. Albuquerque, NM 87105 c. CGP at 1.5 Requirement to post a notice of your permit coverage: Amend to read:"You must post a sign or other notice of your permit coverage at a safe, publicly accessible location in close proximity to the construction site.The notice must be located so that it is visible from the public road or tribal road that is nearest to the active part of the construction site..." d. CGP at 7.2.6 Description of stormwater controls:The SWPPP will be considered to be incomplete if the operator has not coordinated requirements under this Part with the Pueblo of Isleta Environment Department. e. CGP 1.12.6.1 at pg.1-6 of 8.The Pueblo of Isleta requests notification within 10 hours (rather than 24 hrs.) if health or the environment become endangered. f. CGP at 1.12.2 Anticipated noncompliance: Amend to read:"You must give advance notice to EPA and the Pueblo of Isleta at the address indicated in 1.4.1 (a) of any planned changes in the permitted facility or activity which may results in noncompliance with permit requirements." g. CGP at 1.12.6.1: Any noncompliance for projects within the exterior boundaries of the Pueblo of Isleta which may endanger health or the environment shall be reported directly to the EPA Regional Office [(see contacts at https://www2.e pa.gov/national-pollutant-discharge-elimination-system-npdes/contact-us- stormwater#regional)I and to the Pueblo of Isleta Water Quality Control Officer. Any information must be provided orally with n 12 hours of the time you become aware of the circumstances. Other requirements of this Part for a written submission apply. Electronic communication (E-mail) shall be provided as soon as practical. Verbal notice shall be provided to: Water Quality Control Officer Pueblo of Isleta E-mail: P0136871 @isletapueblo.com (505) 869-9819 (505) 917-8346 mobile (505) 869-3030 Police Dispatch h. CGP at 2.2 Erosion and sediment control requirements: Erosion and sediment controls shall be designed to retain sediment on-site. i. CGP at 2.2 Under Sediment control requirements,Standard Permit Condition Duty to Mitigate Volumes of sediment at or over (five) 5 cubic yards must be removed and placed for disposal within a tribally approved sediment Disposal Site, located on Pueblo of Isleta lands. CGP 2.2 at pg. 8. j. Under Minimize erosion, a permittee must secure permission from the Pueblo or affected Pueblo of Isleta land assignment owner if a dissipation device needs to Page 47 2017 Construction General Permit (CGP) (as modified) be placed up- or down- elevation of a given construction site. CGP 2.2.11 at pg. 11. k. CGP at 2.3.6 Emergency spill notification requirements: You must notify the Pueblo of Isleta Water Quality Control Officer and National Response Center (NRC) [at (800) 424-8802 or, in the Washington, DC metropolitan area, call (202) 267-2675 in accordance with the requirements of 40 CFR 1 10, 40 CFR 1 17, and 40 CFR 302] as soon as you have knowledge of the release. Verbal and electronic notice shall be provided as specified in I.12.6.1 I. CGP at C.3 Equivalent analysis waiver: Parties wishing to apply for an Equivalent Analysis Waiver (see Appendix D, Section C) must provide a copy of the waiver analysis to the Pueblo of Isleta Water Quality Control Officer at the address indicated in 1.4.1 (a). 9.4.2.2 Pueblo of Sandia. The following conditions apply only to discharges on the Pueblo of Sandia Reservation: a. Only those activities specifically authorized by the CGP are authorized by the Pueblo of Sandia's Water Quality certification.The Pueblo of Sandia's Water Quality Certification does not authorize impact to cultural properties, historical sites or properties that may be eligible as such. b. Copies of all Notices of Intent (NOI) submitted to the EPA must also be sent concurrently to the Pueblo of Sandia at the following address. Discharges are not authorized by this permit unless an accurate and complete NOI has been submitted to the Pueblo of Sandia, either by mail or electronically. Regular U.S. Delivery Mail: Pueblo of Sandia Environment Department Attention: Scott Bulgrin, Water Quality Manager 481 Sandia Loop Bernalillo, New Mexico 87004 Electronically. sbulgrin@sandiapueblo.nsn.us c. Any correspondences between the applicant and EPA related to analytical data,written reports, corrective action, enforcement, monitoring, or an adverse incident written reports should likewise be routed to the Pueblo of Sandia at the above address. d. The Stormwater Pollution Prevention Plan (SWPPP) must be available to the Pueblo of Sandia Environment Department either electronically or hard copy upon request for review.The SWPPP must be made available at least fourteen (14) days before construction begins. The fourteen (14) day period will give Pueblo staff time to become familiar with the project site, prepare for construction site inspections, and determine compliance with the Pueblo of Sandia Water Quality Standards. Failure to provide a SWPPP to the Pueblo of Sandia may result in the delay or denial of the construction project. e. If requested by the Pueblo of Sandia Environment Department, the permittee must provide additional information necessary for a case-by-case eligibility determination to assure compliance with the Pueblo of Sandia Water Quality Standards and/or applicable Federal Standards not authorized by this certification. f. An "Authorization to Proceed Letter"with site specific mitigation requirements may Page 48 2017 Construction General Permit (CGP) (as modified) be sent out to the permittee when a review of the NOI and SWPPP, on a case- by- case basis is completed by the Pueblo of Sandia Environment Department.This approval will allow the application to proceed if all mitigation requirements are met. g. The Pueblo of Sandia will not allow Small construction Waivers (Appendix C) or the Rainfall Erosivity Waiver (Appendix C.1) to be granted for any small construction activities. h. Before submitting a Notice of Termination (NOT) to the EPA, permittees must clearly demonstrate to the Pueblo of Sandia Environment Department through a site visit or documentation that requirements for site stabilization have been met and any temporary erosion control structures have been removed. A short letter stating the NOT is acceptable and all requirements have been met will be sent to the permittee to add to the permittee's NOT submission to EPA. i. Copies of all NOT submitted to the EPA must also be sent concurrently to the Pueblo of Sandia through the mail or electronically. Regular U.S. Delivery Mail: Pueblo of Sandia Environment Department Attention: Scott Bulgrin, Water Quality Manager 481 Sandia Loop Bernalillo, New Mexico 87004 Electronically: sbulgrin@sandiapueblo.nsn.us j. The Pueblo of Sandia may require the permittee to perform water quality monitoring for pH, turbidity, and total suspended solids (TSS) during the permit term if the discharge is to a surface water leading to the Rio Grande for the protection of public health and the environment. 9.4.2.3 Pueblo of Santa Ana.The following conditions apply only to discharges on the Pueblo of Santa Ana Reservation: a. The permittee shall provide a copy of the Notice of Intent (NOI) to the Pueblo of Santa Ana (the Pueblo), at the same time it is submitted to the U.S. Environmental Protection Agency (EPA), for projects with discharges onto the lands of the Pueblo as defined in the Pueblo's antidegradation policy within the Pueblo of Santa Ana Water Quality Standards. b. The permittee shall provide a final copy of the Stormwater Pollution Prevention Plan (SWPPP) to the Pueblo that is associated with any project identified in the NOI, at the same time that an NOI is submitted to the EPA.The SWPPP should include any projects with discharges onto the lands of the Pueblo as defined in Page 49 2017 Construction General Permit (CGP) (as modified) the antidegradation policy within the Pueblo of Santa Ana Water Quality Standards. c. The operator shall provide copies of inspections reports and of corrective action reports to the Pueblo at the address below for review, upon request. d. Upon completion of the project identified in the NOI, the permittee will submit a Notice of Termination (NOT) to the Pueblo. e. All required or requested permittee specific information identified above shall be submitted to the following address: Pueblo of Santa Ana Department of Natural Resources, Attention: Water Resources Division 2 Dove Road Santa Ana Pueblo, NM 87004 f. Discharges are not authorized by permittee unless an accurate and complete NOI and SWPPP have been submitted to the Pueblo. Failure to provide an accurate and complete NOI and SWPPP may result in a denial of the discharge permit or a delay in groundbreaking or construction. g. The permittee will not proceed with site work until authorized by the Pueblo. The Pueblo requires review of the complete and final SWPPP before authorization to proceed.The Pueblo will provide an "Authorization to Process" notice after review and approval of the SWPPP. h. The permittee could be required to perform water quality monitoring, sampling or analysis during the active permit dates for constituents determined by the Pueblo. i. Before submitting a NOT, permittees must certify to the Pueblo's Department of Natural Resources in writing that requirements for site stabilization have been met, and any temporary erosion control structures have been removed. Documentation of the Pueblo's review that such requirements have been reviewed and met will be provided for the permittee to add to the permittee's NOT submission to EPA. Copies of all NOT submitted to the EPA must also be sent to the Pueblo at the address provided above. 9.4.2.4 Pueblo of Santa Clara. The following conditions apply only to discharges on the Pueblo of Santa Clara Reservation: a. The operator must provide a copy of the Notice of Intent (NOI) and Notice of Termination (NOT) to the Santa Clara Pueblo Governor's Office at the same time it is provided to the US Environmental Protection Agency. b. A copy of the Storm water Pollution Prevention Plan shall be made available to the Pueblo of Santa Clara staff upon request. 9.4.2.5 Pueblo of Tesuque. The following conditions apply only to discharges on the Pueblo of Tesuque Reservation: a. Based on the Section 401 Certification provisions within the CWA, no discharges that will exceed or cause the exceedance of the Pueblo of Tesuque Water Quality Standards will be allowed within the boundaries of the Pueblo of Tesuque. b. The operator shall provide a copy of the Notice of Intent (NOI) to the Pueblo of Tesuque Governor's Office in care of the Department of Environmental and Natural Resources (DENR) at the same time it is submitted to the Environmental Page 50 2017 Construction General Permit (CGP) (as modified) Protection Agency, for projects occurring within the boundaries of Tesuque tribal lands.The operator shall also notify the Pueblo of Tesuque Governor's Office in care of the DENR when it submits the Notice of Termination (NOT), but not before the DENR post-construction inspection has been completed as described below. The NOI and NOT shall be sent to the following address: Pueblo of Tesuque Office of the Governor Attn: DENR 20 TP828 Administration Bldg. Santa Fe, NM 87506-5512 Alternatively, the operator may arrange with DENR to email the documents. c. The operator shall also provide a copy of the Stormwater Pollution Prevention Plan, copies of inspection reports, and copies of corrective action reports to the DENR. d. Construction requiring this permit will not commence until the above document submissions have been made and DENR provides the operator with notice to proceed. Operators will not demobilize until DENR personnel inspect the site for complication of stabilization. Once the inspection has taken place and all SWPPP- related work has been completed to the satisfaction of DENR, the operator will submit its NOT as described above and then demobilize. 9.4.2.6 Taos Pueblo.The following conditions apply only to discharges on the Taos Pueblo Reservation: a. The operator shall provide a copy of the Notice of Intent (NOI) to the Taos Pueblo Governor's Office, War Chief's Office and Environmental Office, at the same time it is submitted to the U.S. Environmental Protection Agency, for projects occurring within the exterior boundaries of Taos Pueblo. The operator shall also notify Taos Pueblo when it has submitted the Notice of Termination (NOT). The NOI and NOT shall be sent to the Taos Pueblo at the following addresses: i. Taos Pueblo Governor's Office P.O. Box 1846 Taos NM 87571 ii. Taos Pueblo War Chief's Office P.O. Box 2596 Taos NM 87571 iii. Environmental Office Attn: Program Manger P.O. Box 1846 Taos NM 87571 Page 51 2017 Construction General Permit (CGP) (as modified) b. Taos Pueblo requests that in the event Indian artifacts or human remains are inadvertently discovered on projects occurring near or on Taos Pueblo lands that consultation with the tribal Governor's Office occur at the earliest possible time. c. The operator shall provide a copy of the Stormwater Pollution Prevention Plan, copies of inspections reports, and copies of corrective action reports to staff in the Taos Pueblo Environmental Office for review and copy, upon request. 9.4.2.7 Ohkay Owingeh. The following conditions apply only to discharges on the Ohkay Owingeh Reservation: a. Prior to commencement of any construction activity on Ohkay Owingeh Lands requiring permit coverage under EPA's Construction General Permit, the operator(s) shall submit to Ohkay Owingeh Office of Environmental Affairs, a copy of the electronic "Notice of Intent," submitted to the Environmental Protection Agency, immediately following EPA's electronic notification that the NOI has been received. A copy of the Stormwater Pollution Prevention Plan(s) must be made available to the Ohkay Owingeh Office of Environmental Affairs upon the tribe's request either electronically or hard copy. Operator(s) shall also submit to Ohkay Owingeh Office of Environmental Affairs a copy of the electronic Notice of Termination (NOT) submitted to the Environmental Protection Agency. Documents shall be submitted to Ohkay Owingeh at the following address: Ohkay Owingeh Office of Environment Affairs Attention: Environmental Programs Manager P.O. Box 717 Ohkay Owingeh, New Mexico 87566 Office # 505.852.4212 Fax # 505.852.1432 Electronic mail:,irk..............................!r ...................ir .. .. ...................::�................... .................... ..................... . r b. Ohkay Owingeh will not allow the Rainfall Erosivity Waivers (see Appendix C) to be granted for any small construction activities. c. All vegetation used to prevent soil loss, seeding or planting of the disturbed area(s) to meet the vegetative stabilization requirements must utilize native seeds/vegetation commonly known to the area. All temporary erosion control structures, such as silt fences must be removed as soon as stabilization requirements are met. 9.4.2.8 Pueblo of Laguna. The following conditions apply only to discharges on the Pueblo of Laguna Reservation: a. The operator must provide a paper and electronic copy of the Notice of Intent (NOI) and Notice of Termination (NOT) to the Pueblo of Laguna at the same time it is provided to the U.S. Environmental Protection Agency. The NOI and NOT should be provided to the following address: Pueblo of Laguna, Office of the Governor Attn: Environmental & Natural Resources Department P.O. Box 194 Laguna, NM 87026 Email: setter@pol-nsn.gov b. The operator must provide an electronic copy of the Storm Water Pollution Page 52 2017 Construction General Permit (CGP) (as modified) Prevention Plan to the Pueblo of Laguna Environmental Program at the same time the NOI is submitted to the above listed email addresses. Any correspondences between the applicant and EPA related to analytical data,written reports, corrective action, enforcement, monitoring, or an adverse incident written reports threshold likewise be routed to the Pueblo of Laguna Environmental Program. c. Immediate initiation of consultation with the Pueblo of Laguna is required should any human remains or artifacts be unearthed during the project that fall under the Native American Graves Protection and Repatriation Act guidelines. If human remains are unearthed, contact the Pueblo of Laguna Police Department at 505.552.6666. If artifacts are unearthed, contact the Pueblo of Laguna Tribal Historic Preservation Office at 505.552.5033. 9.4.2.9 Picuris Pueblo. The following conditions apply only to discharges on the Picuris Pueblo Reservation: a. The operator, landowner and construction operators doing earth-disturbance work must meet the definition of "operator" under the Construction General Permit (CGP), and must provide an electronic and paper copy of the Notice of Intent (NOI) and Notice of Termination (NOT) to both The Office of the Picuris Pueblo Governor and the Picuris Pueblo Environmental Department at the same time it is provided to the U.S. Environmental Protection Agency (USEPA).The NOI and NOT should be provided to the following address: Picuris Pueblo The Office of the Governor PO BOX 127 Penasco, NM 87553 575-587-2519 575-587-1071 (Fax) Governor: earn r icuiris u r Picuris Pueblo Environmental Department PO BOX 158 Penasco, NM 87553 575-587-01 10 575-587-0223 (Fax) Environmental Director:...............! ...........iiir.............irk!r ...............i ..�:...................piicuriis u r b. The operator must provide an electronic copy of the Storm Water Pollution Prevention Plan to the Picuris Pueblo Environmental Department at least 30 days prior to submitting the NOI to USEPA and the Picuris Pueblo by email to Picuris Pueblo Environmental Department:,, i ............ii..r..............i „irk ,ir ,,, i uiriss u . it . 9.4.2.10 Pueblo of Pojoaque. The following conditions apply only to discharges on the Pueblo of Pojoaque Reservation: a. The operator, landowner and construction operators doing earth-disturbance work must meet the definition of "operator" under the CGP and must provide a copy of the Notice of Intent (NOI) to the Pueblo of Pojoaque Governor's Office and Environmental Department within 3 days following U.S. Environmental Protection Agency's electronic confirmation that the NOI was certified and submitted and is undergoing its 14-day review period. Additionally, a copy of the Notice of Termination (NOT) must be provided the same day electronic confirmation is Page 53 2017 Construction General Permit (CGP) (as modified) received from the U.S. Environmental Protection Agency that the NOT has been accepted.The NOI and NOT should be provided to the following address: Pueblo of Pojoaque Office of the Governor 78 Cities of Gold Road Santa Fe, NM 87506 Pueblo of Pojoaque Environmental Department 39 Camino Del Rincon Santa Fe, NM 87506 b. The operator must provide an electronic copy of the Stormwater Pollution Prevention Plans to the Pueblo of Pojoaque Environmental Department by email to Adam L Duran (aduran@pojoaque.org) at least 30 days prior to submitting the NOI to EPA and the Pueblo of Pojoaque. 9.4.2.11 Nambe Pueblo. The following conditions apply only to discharges on Nambe Pueblo: a. The operator must provide a copy of the Notice of Intent (NOI) and Notice of Termination (NOT) to the Nambe Pueblo Governor's Office at the same time it is provided to the US Environmental Protection Agency.The NOI and NOT should be provided to the following address: Office of the Governor Nambe Pueblo 15A N P 102 WEST Nambe Pueblo, NM 87506 b. The operator must provide a copy of the Stormwater Pollution Prevention Plan to Nambe Pueblo at the same time it is submitted to the EPA, either by email to srydeen@nambepueblo.orq or mailed to the above address. 9.4.3 OKR101000 Indian country within the State of Oklahoma 9.4.3.1 Pawnee Nation.The following conditions apply only to discharges within Pawnee Indian country: a. Copies of the Notice of Intent (NOI) and Notice of Termination (NOT) must be provided to the Pawnee Nation at the same time it is submitted to the Environmental Protection Agency to the following address: Pawnee Nation Department of Environmental Conservation and Safety P.O. Box 470 Pawnee, OK 74058 Or email to mmatlock@pawneenation.orq b. The Storm Water Pollution Prevention Plan must be available to Departmental inspectors upon request. c. The Department must be notified at 918-762-3655 immediately upon discovery of any noncompliance with any provision of the permit conditions. Page 54 2017 Construction General Permit (CGP) (as modified) 9.4.4 OKR10F000 Discharges in the State of Oklahoma that are not under the authority of the Oklahoma Department of Environmental Quality, including activities associated with oil and gas exploration, drilling, operations, and pipelines (includes SIC Groups 13 and 46, and SIC codes 492 and 5171), and point source discharges associated with agricultural production, services, and silviculture (includes SIC Groups 01, 02, 07, 08, 09). a. For activities located within the watershed of any Oklahoma Scenic River, including the Illinois River, Flint Creek, Barren Fork Creek, Upper Mountain Fork, Little Lee Creek, and Lee Creek or any water or watershed designated "ORW" in Oklahoma's Water Quality Standards, this permit may only be used to authorize discharges from temporary construction activities. Certification is denied for any on-going activities such as sand and gravel mining or any other mineral mining. b. For activities located within the watershed of any Oklahoma Scenic River, including the Illinois River, Flint Creek, Barren Fork Creek, Upper Mountain Fork, Little Lee Creek, and Lee Creek or any water or watershed designated "ORW" in Oklahoma's Water Quality Standards, certification is denied for any discharges originating from support activities, including concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, or borrow areas. c. In order to company with Oklahoma's Water Quality Standards, these conditions and restrictions also apply to any construction projects located wholly or partially on Indian Country lands within the State of Oklahoma. 9.5 EPA Region 8 9.5.1 COR101000 Indian country within the State of Colorado, as well as the portion of the Ute Mountain Reservation located in New Mexico. 9.5.1.1 The Ute Mountain Ute Tribe. The following conditions apply only to discharges on the Ute Mountain Ute Reservation. a. Permittees must send the Stormwater Pollution Prevention Plan (SWPPP) to the Tribal Environmental Department for review and approval at least 30 days before construction starts. b. Before submitting the Notice of Termination (NOT), permittees must clearly demonstrate to the Tribal Environmental Department during an on-site inspection that requirements for site stabilization have been met. c. The permittee must send a copy of the Notice of Intent (NOI) and the Tribal Environmental Department. d. Permittees may submit their SWPPPs and NOI and NOT requests electronically to: c�la...................iririi. ... ...................0 --l:..............irk............... ..in--l�................ii..l ....m...............ir,g. e. Written NOls,SWPPPs, and NOTs may be mailed to: Colin Larrick, Water Quality Program Manager Ute Mountain Ute Tribe Environmental Department P.O. Box 448 Towaoc, CO 81334 Page 55 2017 Construction General Permit (CGP) (as modified) 9.5.2 MTR101000 Indian country within the State of Montana 9.5.2.1 The Confederated Salish and Kootenai Tribes of the Flathead Nation.The following conditions apply only to discharges on the Confederated Salish and Kootenai Tribes of the Flathead Nation Reservation: a. Permittees must submit the Stormwater Pollution Prevention Plan (SWPPP) to the Confederated Salish and Kootenai Tribes at least 30 days before construction starts. b. Before submitting the Notice of Termination (NOT), permittees must clearly demonstrate to an appointed Tribal staff person during an onsite inspection that requirements for site stabilization have been met. c. The permittee must send a copy of the Notice of Intent (NOI) and the NOT to CSKT. d. Permittees may submit their SWPPPs, NOIs and NOTs electronically to: clintf@cskt.orq. .......................................................................................................................................... e. Written SWPPPs, NOIs and NOTs may be mailed to: Clint Folden, Water Quality Regulatory Specialist Confederated Salish and Kootenai Tribes Natural Resources Department P.O. Box 278 Pablo, MT 59855 9.6 EPA Region 9 9.6.1 AZR101000 Indian Country within the state of Arizona, as well as Navajo Nation lands in New Mexico and Utah 9.6.1.1 Navajo Nation.The following conditions apply only to discharges on the Navajo Nation reservation: a. Courtesy copies of Notice of Intents and stormwater pollution prevention plans shall be made available to Navajo EPA. b. Copies of all monitoring reports must be provided to Navajo EPA. c. Facilities covered under the CGP will be subject to compliance inspections by Navajo EPA staff with active Federal Inspector Credentials under the authority of the Clean Water Act. d. Specific awareness and adherence to Sections 201 -Anti-degradation Policy, 203- Narrative WQS, and 207.H -Turbidity. 9.6.2 CAR101000 Indian country within the State of California 9.6.2.1 Twenty-Nine Palms Band of Mission Indians. The following conditions apply only to discharges on the Twenty-Nine Palms Band of Mission Indians Reservation: a. At the time the applicant submits its Notice of Intent (NOI) to the EPA, the applicant must concurrently submit written notification of the NOI and a copy of the Stormwater Pollution Prevention Plan (SWPPP) to the Twenty-Nine Palms Band of Mission Indians at the address below: Tribal Environmental Coordinator Twenty-Nine Palms Band of Mission Indians 46-200 Harrison Place Page 56 2017 Construction General Permit (CGP) (as modified) Coachella, CA 92236 b. The applicant must also concurrently submit to the Tribal Environmental Coordinator written notification of any other forms or information submitted to the EPA, including waivers, reporting, and Notice of Termination (NOT). c. Permitted entities under the CGP must keep the Tribal EPA informed of authorized discharges under the CGP by submitting written information about the type, quantity, frequency and location, intended purpose, and potential human health and/or environmental effects of their activities.These requirements are pursuant to Section 4 of the Twenty-Nine Palms Band of Mission Indians Water Pollution Control Ordinance (022405A).This information may be submitted to Tribal EPA in the form of Stormwater Pollution Prevention Plans (SWPPPs), monitoring reports, or other reports as required under the CGP.Spills, leaks, or unpermitted discharges must be reported in writing to Tribal EPA within 24 hours of the incident. 9.6.2.2 Morongo Band of Mission Indians.The following conditions apply only to discharges on the Morongo Band of Mission Indians Reservation: a. This certification does not exempt, and is provisional upon compliance with, other applicable statutes and codes administered by federal and tribal agencies. Pursuant to the Morongo Band of Mission Indians Surface Water Quality Protection Ordinance (Ordinance 39), all unpermitted discharges must be reported to the Morongo Band of Mission Indians Environmental Protection Department (Morongo EPD) within 24 hours of the incident. b. Each operator shall submit a signed hard copy of the Notice of Intent (NOI) and stormwater pollution prevention plan (SWPPP) to the Morongo EPD at the same time it is submitted electronically to the EPA. c. The operator shall allow the Morongo EPD or its designee to inspect and sample at the construction site as needed. Correspondence should be submitted to: Morongo Band of Mission Indians Environmental Protection Department 12700 Pumarra Road Banning, CA 92220 Phone: (951) 755-5128 Email: .e pd@morongo-nsn.gov 9.6.3 GUR100000 Island of Guam.The following conditions apply only to discharges on the Island of Guam: a. Any earth-moving operations which require a permit must be obtained from the Department of Public Works (DPW) with clearance approval from various Government of Guam Agencies including Guam EPA prior to the start of any earth- moving activity. b. In the event that the construction sites are within the Guam Sole Source Aquifer, the construction site owner and operator must consider opportunities to facilitate groundwater recharge for construction and post-construction implementing infiltration Best Management Practices.Stormwater disposal systems shall be designed and operated within the boundaries of the project. Stormwater systems shall not be permitted within any Wellhead Protection Zone unless the discharge meets the Guam Water Quality Standards within the zone. Waters discharged Page 57 2017 Construction General Permit (CGP) (as modified) within the identified category G-2 recharge zone shall receive treatment to the degree required to protect the drinking water quality prior to it entering the category G-1 resource zone. c. All conditions and requirements set forth in the 22 Guam Administrative Rules and Regulations (GARR), Division II, Water Control, Chapter 10, Guam Soil Erosion and Sediment Control Regulations (GSESCR) that are more protective than the CGP regarding construction activities must be complied with. d. All standards and requirements set forth in the 22 GARR, Division II, Water Control, Chapter 5, Guam Water Quality Standards (GWQS) 2001 Revisions, must be complied with to include reporting GWQS exceedance to Guam EPA. e. All operators/owners of any property development or earth moving activities shall comply with the erosion control pre-construction and post-construction BMP design performance standards and criteria set forth in the 2006 CNMI and Guam Stormwater Management Manual. f. All conditions and requirements regarding dewatering activities set forth in 22 Guam Administrative Rules and Regulations Chapter 7, Water Resources Development and Operating Regulations must be complied with to include securing permits with Guam EPA prior to the start of any dewatering activities. g. If a project to be developed is covered under the Federal Stormwater Regulations (40 CFR Parts 122 & 123), a Notice of Intent (NOI) to discharge stormwater to the surface and marine waters of Guam must be submitted to the U.S. EPA and a copy furnished to Guam EPA, pursuant to Section 10, 104(B)(5)(d) 22GAR, Division II, Chapter 10. h. Guam EPA shall apply the Buffer Requirements listed in Appendix G of the CGP NPDES Permit for construction activities as it pertains to Waters of the U.S. in Guam. Guam EPA shall also apply the same buffer requirements for sinkholes in Guam. i. When Guam EPA, through its permit review process, identifies that the proposed construction activity is close proximity to marine waters, contractors and owners will be informed that any activity that may impair water quality are required to stop during peak coral spawning periods as per the Guam Coral Spawning Construction Moratoriums. j. The Proposed Construction General Permit must set appropriate measures and conditions to protect Guam's Threatened and Endangered Species and Outstanding Resource Waters of exceptional recreational or ecological significance as determined by the Guam EPA Administrator as per Guam Water Quality Standards 2001 Revisions, §5102, Categories of Waters, D. Outstanding Resource Waters. k. When Guam EPA through its permit review process identifies that proposed construction activity is in close proximity to any Section 303d impaired waters, which includes marine waters and surface waters, shall ensure that construction activity does not increase the impaired water's ambient parameters. I. When Rainfall Erosivity and TMDL Waivers reflected in the CGP, Appendix C, are submitted to the U.S. EPA, Guam EPA will review waivers on a project by project basis. m. Prior to submission of the Notice of Termination (NOT) to the U.S. EPA, permittees must clearly demonstration to Guam EPA that the project site has met all soil Page 58 2017 Construction General Permit (CGP) (as modified) stabilization requirements and removal of any temporary erosion control as outlined in the GSESCR. 9.7 EPA Region 10 9.7.1 IDR100000 State of Idaho, except Indian country a. Idaho's An tide aradation Policx.The WQS contain an antidegradation policy providing three levels of protection to water bodies in Idaho (IDAPA 58.01.02.051). 1. Tier I Protection. The first level of protection applies to all water bodies subject to Clean Water Act jurisdiction and ensures that existing uses of a water body and the level of water quality necessary to protect those existing uses will be maintained and protected (IDAPA 58.01.02.051.01; 58.01.02.052.01). Additionally, a Tier 1 review is performed for all new or reissued permits or licenses (IDAPA 58.01.02.052.05). 2. Tier II Protection.The second level of protection applies to those water bodies considered high quality and ensures that no lowering of water quality will be allowed unless deemed necessary to accommodate important economic or social development (IDAPA 58.01.02.051.02; 58.01.02.052.08). 3. Tier III Protection.The third level of protection applies to water bodies that have been designated outstanding resource waters and requires that activities not cause a lowering of water quality (IDAPA 58.01.02.051.03; 58.01.02.052.09). DEQ is employing a water body by water body approach to implementing Idaho's antidegradation policy.This approach means that any water body fully supporting its beneficial uses will be considered high quality (IDAPA 58.01.02.052.05.a). Any water body not fully supporting its beneficial uses will be provided Tier I protection for that use, unless specific circumstances warranting Tier II protection are met (IDAPA 58.01.02.052.05.c).The most recent federally approved Integrated Report and supporting data are used to determine support status and the tier of protection (IDAPA 58.01.02.052.05). b. Pollutants of Concern. The primary pollutants of concern associated with stormwater discharges from construction activities are sediment, typically measured as total suspended solids and turbidity. Other potential pollutants include the following: phosphorus, nitrogen, pesticides, organics, metals, PCBs, petroleum products, construction chemicals, and solid wastes. c. Receiving Water Body Level of Protection. The CGP provides coverage to construction activities throughout the entire State of Idaho. Because of the statewide applicability, all of the jurisdictional waters within Idaho could potentially receive discharges either directly or indirectly from activities covered under the CGP. DEQ applies a water body by water body approach to determine the level of antidegradation awater body will receive. All waters in Idaho that receive discharges from activities authorized under the CGP will receive, at minimum Tier I antidegradation protection because Idaho's antidegradation policy applies to all waters of the state. Water bodies that fully support their aquatic life or recreational uses are considered to be high quality waters and will receive Tier II antidegradation protection. Although Idaho does not currently have any Tier III designated outstanding resource waters (ORWs) designated, it is possible for a water body to be designated as an ORW during the life of the CGP. Because of this potential, the antidegradation review also assesses whether the permit complies with the Page 59 2017 Construction General Permit (CGP) (as modified) outstanding resource water requirements of Idaho's antidegradation policy. To determine the support status of the receiving water body, persons filing a Notice of Intent (NOI) for coverage under this general permit must use the most recent EPA-approved Integrated Report, available on Idaho DEQ's website: n i-t ri n .assess..................... .irk...............in't. ai,i ..::�................ r l ,...r ir.l.. . High quality waters are identified in Categories 1 and 2 of the Integrated Report. If a water body is in either Category 1 or 2, it is a Tier II water body. Unassessed waters are identified as Category 3 of DEQ's Integrated Report. These waters require a case-by-case determination to be made by DEQ based on available information at the time of the application for permit coverage. If a water body is unassessed, the applicant is directed to contact DEQ for assistance in filing the NOI. Impaired waters are identified in Categories 4 and 5 of the Integrated Report. Category 4(a) contains impaired waters for which a TMDL has been approved by EPA. Category 4(b) contains impaired waters for which controls other than a TMDL have been approved by EPA. Category 5 contains waters which have been identified as "impaired," for which a TMDL is needed.These waters are Tier I waters, for the use which is impaired. With the exception, if the aquatic life uses are impaired for any of these three pollutants dissolved oxygen, pH, or temperature and the biological or aquatic habitat parameters show a health, balanced biological community, then the water body shall receive Tier II protection, in addition to Tier I protection, for aquatic life uses (IDAPA 58.01.02.052.05.c.i.). DEQ's webpage also has a link to the state's map-based Integrated Report which presents information from the Integrated Report in a searchable, map-based format: h,.l,.L : . .i h sails inc it s uirc s irn s,..... -t . Water bodies can be in multiple categories for different causes. If assistance is needed in using these tools, or if additional information/clarification regarding the support status of the receiving water body is desired, the operator is directed to make contact with the appropriate DEQ regional office of the State office in the table below: Regional Address Phone Email and State Number Office Boise 1445 N. 208-373- Iii.c rk.......................i ri......r J ahoa oy .....................Orchard Rd., 0550 Boise 83706 Coeur 2110Ironwood 208-769- Jun .b it uis-t Jdah d'Alene Parkway, 1422 Coeur D'Alene 83814 Idaho Falls 900 N. Skyline, 208-528- ...I�................ .s f e .ii h . Suite B., Idaho 2650 Falls 83402 Page 60 2017 Construction General Permit (CGP) (as modified) Lewiston 1 118 "F" St., 208-799- .................... ..!r.....�.........................................r..............................................................®.I................ ... ...................... Lewiston 83501 4370 Pocatello 444 Hospital 208-236- ............ nn.v ne r .i . way, #300 6160 Pocatello 83201 Twin Falls 650 Addison 208-736- . ....................::�..�...............................Ir.. ..u ... .li..............................i� ............................................i!.............................. .................Q.... Ave., W., Suite 2190 110,Twin Falls 83301 State 1410 N. Hilton 208-373- . V..li. ...................................®..............................ii..l ................!r...............................li. . . ............................... .ii Office Rd., Boise 0502 83706 d. Turbidity Monitorin_g. The permittee must conduct turbidity monitoring during construction activities and thereafter on days where there is a direct discharge of pollutants from an unstabilized portion of the site which is causing a visible plume to a water of the U.S. A properly and regularly calibrated turbidimeter is required for measurements analyzed in the field (preferred method), but grab samples may be collected and taken to a laboratory for analysis. If the permittee can demonstrate that there will be no direct discharge from the construction site, then turbidity monitoring is not required. When monitoring is required, a sample must be taken at an undisturbed area immediately upstream of the project area to establish background turbidity levels for the monitoring event. Background turbidity, location, date and time must be recorded prior to monitoring downstream of the project area. A sample must also be taken immediately downstream from any point of discharge and within any visible plume. The turbidity, location, date and time must be recorded.The downstream sample must be taken immediately following the upstream sample in order to obtain meaningful and representative results. Results from the compliance point sampling or observation78 must be compared to the background levels to determine whether project activities are causing an exceedance of state WQS. If the downstream turbidity is 50 NTUs or more than the upstream turbidity, then the project is causing an exceedance of WQS.Any exceedance of the turbidity standard must be reporting to the appropriate DEQ regional office within 24 hours. The following six (6) steps should be followed to ensure compliance with the turbidity standard: 1. If a visible plume is observed, quantify the plume by collecting turbidity measurements from within the plume and compare the results to Idaho's instantaneous numeric turbidity criterion (50 NTU over the background). 78 A visual observation is only acceptable to determine whether BMPs are functioning properly. If a plume is observed,the project may be causing an exceedance of WQS and the permittee must collect turbidity data and inspect the condition of the projects BMPs. If the BMPs appear to be functioning to their fullest capability and the turbidity is 50 NTUs or more than the upstream turbidity,then the permittee must modify the activity or implement additional BMPs (this may also include modifying existing BMPs). Page 61 2017 Construction General Permit (CGP) (as modified) 2. If turbidity is less than 50 NTU instantaneously over the background turbidity; continue monitoring as long as the plume is visible. If turbidity exceeds background turbidity by more than 50 NTU instantaneously then stop all earth disturbing construction activities and proceed to step 3. 3. Take immediate action to address the cause of the exceedance.That may include inspection the condition of project BMPs. If the BMPs are functioning to their fullest capability, then the permittee must modify project activities and/or BMPs to correct the exceedance. 4. Notify the appropriate DEQ regional office within 24 hours. 5. Possibly increase monitoring frequency until state water quality standards are met. 6. Continue earth disturbing construction activities once turbidity readings return to within 50 NTU instantaneously and 25 NTU for more than ten consecutive days over the background turbidity. Copies of daily logs for turbidity monitoring must be available to DEQ upon request.The report must describe all exceedances and subsequent actions taken, including the effectiveness of the action. e. Reporting of Discharges Containing Hazardous Materials or Petroleum Products. All spills of hazardous material, deleterious material or petroleum products which may impact waters (ground and surface) of the state shall be immediately reported. Call 911 if immediate assistance is required to control, contain or clean up the spill. If no assistance is needed in cleaning up the spill, contact the appropriate DEQ regional office in the table below during normal working hours or Idaho State Communications Center after normal working hours. If the spilled volume is above federal reportable quantities, contact the National Repose Center. For immediate assistance: Call 911 National Response Center: (800) 424-8802 Idaho State Communications Center: (208) 632-8000 Regional office Toll Free Phone Number Phone Number Boise 888-800-3480 208-373-0321 Coeur d'Alene 877-370-0017 208-769-1422 Idaho Falls 800-232-4635 208-528-2650 Lewiston 977-547-3304 208-799-4370 Pocatello 888-655-6160 208-236-6160 Twin Falls 800-270-1663 208-736-2190 9.7.2 IDR101000 Indian country within the State of Idaho, except Duck Valley Reservation lands (see Region 9) 9.7.2.1 Shoshone-Bannock Tribes. The following conditions apply only to discharges on the Shoshone-Bannock Reservation: f. Each operator shall submit a signed hard copy of the Notice of Intent (NOI) to the Shoshone-Bannock Tribes Water Resources Department at the same time it is Page 62 2017 Construction General Permit (CGP) (as modified) submitted electronically to the Environmental Protection Agency (EPA) and shall provide the Shoshone-Bannock Tribes Water Resources Department the acknowledgement of receipt of the NOI from the EPA within 7 calendar days of receipt from the EPA. 9.7.3 WAR10F000 Areas in the State of Washington, except those located on Indian country, subject to construction activity by a Federal Operator. The following conditions apply only to discharges on federal facilities in the State of Washington: a. Discharges shall not cause or contribute to a violation of surface water quality standards (Chapter 173-201 A WAC), groundwater quality standards (Chapter 173- 200 WAC), sediment management standards (Chapter 173-204 WAC), and human health-based criteria in the National Toxics Rule (40 CFR Part 131.36). Discharges that are not in compliance with these standards are not authorized. b. Prior to the discharge of stormwater and non-storm water to waters of the State, the Permittee must apply all known, available, and reasonable methods of prevention, control, and treatment (AKART). This includes the preparation and implementation of an adequate SWPPP,with all appropriate BMPs installed and maintained in accordance with the SWPPP and the terms and conditions of this permit. c. Permittees who discharge to segments of waterbodies listed as impaired by the State of Washington under Section 303(d) of the Clean Water Act for turbidity, fine sediment, phosphorus, or pH must comply with the following numeric effluent limits: Parameter Identified Parameter Unit Analytical Method Numeric in 303(d) Listing Sampled Effluent Limit • Turbidity Turbidity NTU SM2130 or EPA 180.1 25 NTUs at the • Fine Sediment point where the • Phosphorus stormwater is discharged from the site. High pH pH Su pH meter In the range of 6.5-8.5 d. All references and requirements associated with Section 303(d) of the Clean Water Act mean the most current EPA approved listing of impaired waters that exists on February 16, 2017, or the date when the operator's complete permit application is received by EPA, whichever is later. e. Discharges to waterbodies subject to an applicable Total Maximum Daily Load (TMDL) for turbidity, fine sediment, high pH, or phosphorus, shall be consistent with the assumptions and requirements of the TMDL. i. Where an applicable TMDL sets specific waste load allocations or requirements for discharges covered by this permit, discharges shall be consistent with any specific waste load allocations or requirements establish by the applicable TMDL. ii. Where an applicable TMDL has established a general waste load allocation for construction stormwater discharges, but no specific requirements have been identified, compliance with this permit will be assumed to be consistent with the approved TMDL. Page 63 2017 Construction General Permit (CGP) (as modified) iii. Where an applicable TMDL has not specified a waste load allocation for construction stormwater discharges, but has not excluded these discharges, compliance with this permit will be assumed to be consistent with the approved TMDL. iv. Where an applicable TMDL specifically precludes or prohibits discharges from construction activity, the operator is not eligible for coverage under this permit. V. Applicable TMDL means a TMDL for turbidity, fine sediment, high pH, or phosphorus, which has been completed and approved by EPA prior to February 16, 2017, or prior to the date the operator's complete NOI is received by EPA,whichever is later. 9.7.4 WAR101000 Indian country within the State of Washington 9.7.4.1 Confederated Tribes of the Colville Reservation. The following conditions apply only to discharges on the Colville Indian Reservation (CIR) and on other Tribal trust lands or allotments of the Confederated Tribes of the Colville Reservation: a. A copy of the Stormwater Pollution Prevention Plan must be submitted to the following office at least thirty (30) days in advance of sending the Notice of Intent (NOI) to EPA: Environmental Trust Department Confederated Tribes of the Colville Reservation PO Box 150 Nesepelem, WA 99155 b. Copies of the Notice of Intent (NOI) and Notice of Termination (NOT) must be sent to the ETD at the same time they are submitted to EPA. c. Discharges to Omak Creek, the Okanogan River, and Columbia River downstream of Chief Joseph Dam may affect threatened or endangered species, and shall only be permitted in adherence with Appendix D of the CGP. d. All work shall be carried out in such a manner as will prevent violations of water quality criteria as stated in Chapter 4-8 Water Quality Standards of the Colville Law and Order Code, as amended. e. Appropriate steps shall be taken to ensure that petroleum products or other chemical pollutants are prevented from entering waters of the CIR. All spills must be reported to the appropriate emergency management agency and the ETD, and measures shall be taken immediately to prevent the pollution of waters of the CIR, including groundwater. f. Stormwater site inspections shall be conducted at least once every 7 calendar days, within 24-hours of the occurrence of a rain event of 0.25 inches or greater in a 24-hour period, and daily during periods of saturated ground surface or snowmelt with accompanying surface runoff. g. Results of discharge sampling must be reported to the ETD within 7 days of sample collection. All sample reporting must include the date and time, location, and individual performing the sampling. h. Any corrective action reports that are required under the CGP must be submitted to the ETD at the above address within one (1) working day of the report completion. Page 64 2017 Construction General Permit (CGP) (as modified) i. This certification does not authorize impacts to cultural, historical, or archeological features or sites, or proprieties that may be eligible for such listing. 9.7.4.2 Lummi Nation.The following conditions apply only to discharges on the Lummi Reservation: a. The Lummi Nation reserves the right to modify this 401 certification if the final version of the NPDES General Permit for Storm Water Discharges Associated with Construction Activity (CGP) on tribal lands in the State of Washington (Permit No. WAR101000) is substantively different than the draft version of the proposed permit that was made available for public comments during April 2016.The Lummi Nation will determine if the final version of the NPDES CGP is substantively different than the draft version following review of the final version once the EPA makes it available. b. This certification does not exempt and is provisional upon compliance with other applicable statutes and codes administered by federal and Lummi tribal agencies. Pursuant to Lummi Code of Laws (LCL) 17.05.020(a), the operator must also obtain a land use permit from the Lummi Planning Department as provided in Title 15 of the Lummi Code of Laws and regulations adopted thereunder. c. Pursuant to LCL 17.05.020(a), each operator shall develop and submit a Storm Water Pollution Prevention Plan to the Lummi Water Resources Division for review and approval by the Water Resources Manager prior to beginning any discharge activities. d. Pursuant to LCL Title 17, each operator shall be responsible for achieving compliance with the Water Quality Standards for Surface Waters of the Lummi Indian Reservation (Lummi Administrative Regulations [LAR] 17 LAR 07.010 through 17 LAR 07210 together with supplements and amendments thereto). e. Each operator shall submit a signed hard copy of the Notice of Intent (NOI) to the Lummi Water Resources Division at the same time it is submitted electronically to the Environmental Protection Agency (EPA) and shall provide the Lummi Water Resources Division the acknowledgement of receipt of the NOI from the EPA and the associated NPDES tracking number provided by the EPA within 7 calendar days of receipt from the EPA. f. Each operator shall submit a signed hard copy of the Notice of Termination (NOT) to the Lummi Water Resources Division at the same time it is submitted electronically to the EPA and shall provide the Lummi Water Resources Division the EPA acknowledgement of receipt of the NOT. g. Storm Water Pollution Prevention Plans, Notice of Intent, Notice of Termination and associated correspondence with the EPA shall be submitted to: Lummi Natural Resources Department ATTN: Water Resources Manager 2665 Kwina Road Bellingham, WA 98226-9298 9.7.4.3 Makah Tribe. The following conditions apply only to discharges on the Makah Reservation: a. The operator shall be responsible for achieving compliance with the Makah Tribe's Water Quality Standards. Page 65 2017 Construction General Permit (CGP) (as modified) b. The operator shall submit a Storm Water Pollution Prevention Plan to the Makah Tribe Water Quality Program and Makah Fisheries Habitat Division for review and approval at least thirty (30) days prior to beginning any discharge activities. c. The operator shall submit a copy of the Notice of Intent to the Makah Tribe Water Quality Program and Makah Fisheries Habitat Division at the same time it is submitted to EPA. d. Storm Water Pollution Prevention Plans and Notices of Intent shall be submitted to: Aaron Parker Makah Fisheries Management Water Quality Specialist (360) 645-3162 Cell 206-356-0319 Aaron.parker@makah.com PO Box 115 Neah Bay WA 98357 9.7.4.4 Puyallup Tribe of Indians. The following conditions apply only to discharges on the Puyallup Tribe of Indians Reservation: a. Each permittee shall be responsible for achieving compliance with the Puyallup Tribe's Water Quality Standards, including antidegradation provisions.The Puyallup Natural Resources Department will conduct an antidegradation review for permitted activities that have the potential to lower water quality.The antidegradation review will be consistent with the Tribe's Antidegradation Implementation Procedures.The Tribe may also impose additional controls on a site-specific basis, or request EPA to require the operator obtain coverage under an individual permit, if information in the NOI or from other sources indicates that the operator's discharges are not controlled as necessary to meet applicable water quality standards. b. The permittee shall be responsible for meeting any additional permit requirements imposed by EPA necessary to comply with the Puyallup Tribe's antidegradation policies if the discharge point is located within 1 linear mile upstream of waters designated by the Tribe. c. Each permittee shall submit a copy of the Notice of Intent (NOI) to be covered by the general permit to Char Naylor (char.naylor@puyalluptribe.com) and Russ Ladley (.1russ.ladley@puyalluptribe.com) by email or at the address listed below at ...................................................................................the same time it is submitted to EPA. Puyallup Tribe of Indians 3009 E. Portland Avenue Tacoma, WA 98404 ATTN: Russ Ladley and Char Naylor d. All supporting documentation and certifications in the NOI related to coverage under the general permit for Endangered Species Act purposes shall be submitted to the Tribe's Resource Protection Manager (.russ.Iadey9pu.I......................................................................................... yalluptribe.com) and Char Naylor (char.naylor(&,puyalluptribe.com) for review. e. If EPA requires coverage under an individual or alternative permit, the permittee shall submit a copy of the permit to Russ Ladley and Char Naylor at the address listed above. Page 66 2017 Construction General Permit (CGP) (as modified) f. The permittee shall submit all stormwater pollution prevention plans to Char Naylor for review and approval prior to beginning any activities resulting in a discharge to tribal waters. g. The permittee shall conduct benchmark monitoring for turbidity (or transparency) and, in the event of significant concrete work or engineered soils, pH monitoring as well. Monitoring, benchmarks, and reporting requirements contained in Condition S.4. (pp.13-20) of the Washington State Construction Stormwater General Permit, effective January 1, 2016, shall apply, as applicable. h. The permittee shall notify Char Naylor (253-680-5520) and Russ Ladley (253-680- 5560) prior to conducting inspections at construction sites generating storm water discharged to tribal waters. i. Treat dewatering discharges with controls necessary to minimize discharges of pollutants in order to minimize the discharge of pollutants to groundwater or surface waters from stormwater that is removed from excavations, trenches, foundations, vaults, or other storage areas. Examples of appropriate controls include sediment basins or sediment traps, sediment socks, dewatering tanks, tube settlers,weir tanks, and filtration systems (e.g., bag or sand filters) that are designed to remove sediment. To the extent feasible, utilize vegetated, upland areas of the site to infiltrate dewatering water before discharge. At all points where dewatering water is discharged, comply with the velocity dissipation requirements of Part 2.2.11 of EPA's 2016 General Construction Stormwater Permit. Examples of velocity dissipation devices include check dams,sediment traps, riprap, and grouted riprap at outlets. j. The permittee shall provide and maintain natural buffers to the maximum extent possible (and/or equivalent erosion and sediment controls) when tribal waters are located within 100 feet of the site's earth disturbances. If infeasible to provide and maintain an undisturbed 100 foot natural buffer, erosion and sediment controls to achieve the sediment load reduction equivalent to a 100-foot undisturbed natural buffer shall be required. 9.7.4.5 Spokane Tribe of Indians. The following conditions apply only to discharges on the Spokane Tribe Reservation: a. Pursuant to Tribal Law and Order Code (TLOC) Chapter 30 each operator shall be responsible for achieving compliance with the Surface Water Quality Standards of the Spokane Tribe. The operator shall notify the Spokane Tribe, Water Control Board (WCB) of any spills of hazardous material and; b. Each operator shall submit a signed hard copy of the Notice of Intent (NOI) to the WCB at the same time it is submitted to EPA. c. The permittee shall allow the Tribal Water Control Board or its designee to inspect and sample at the construction site as needed. d. Each operator shall submit a signed copy of the Notice of Termination (NOT) to the WCB at the same time it is submitted to EPA. The correspondence address for the Spokane Tribe Water Control Board is: Water Control Board c/o. Brian Crossley PO Box 480 Wellpinit WA 99040 Page 67 2017 Construction General Permit (CGP) (as modified) (509)626-4409 Crossl......................................................ey@spokanetribe.com 9.7.4.E Swinomish Indian Tribal Community.The following conditions apply only to discharges on the Swinomish Reservation: a. Owners and operators seeking coverage under this permit who intend to discharge to Regulated Surface Waters must submit a copy of the Notice of Intent (NOI) to the DEP at the same time the NOI is submitted to EPA. b. Owners and operators seeking coverage under this permit must also submit a Stormwater Pollution Prevention Plan to the DEP for review and approval by DEP prior to beginning any discharge activities. c. Owners and operators must also submit to the DEP Changes in NOI and/or Notices of Termination at the same time they are submitted to EPA. 9.7.4.7 Tulalip Tribes. The following conditions apply only to discharges on the Tulalip Reservation: a. This certification does not exempt and is provisional upon compliance with other applicable statues and codes administered by federal and Tulalip tribal agencies. Pursuant to Tulalip Tribes code of law, the operator must also obtain a land use permit from the Tulalip Tribes Planning Department as provided in Title 7 of the Tulalip Tribal Code (http://www.codepublishinq.com/WA/Tulalip/?Tulalip02/Tulalip0205.html). b. Each CGP operator shall be responsible for achieving compliance with Tulalip Tribes Water Quality Standards. c. Each CGP operator shall submit their Stormwater Pollution Prevention Plan (SWPPP) to the: Tulalip Natural &Cultural Resources Department Tulalip Tribes 6406 Marine Drive Tulalip, WA 98271 Page 68 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix C-Copy of NOI and EPA Authorization email NPDES UNITED STATES ENVIRONMENTAL PROTECTION AGENCY FORM FORM �"�,E�q WASHINGTON,DC 20460 Approved OMB No. 3510-9 NOTICE OF INTENT(NOI)FOR THE 2017 NPDES CONSTRUCTION PERMIT 2040-0004 Submission of this Notice of Intent(NOI)constitutes notice that the operator identified in Section III of this form requests authorization to discharge pursuant to the NPDES Construction General Permit(CGP)permit number identified in Section II of this form.Submission of this NOI also constitutes notice that the operator identified in Section III of this form meets the eligibility requirements of Part 1.1 CGP for the project identified in Section IV of this form.Permit coverage is required prior to commencement of construction activity until you are eligible to terminate coverage as detailed in Part 8 of the CGP.To obtain authorization,you must submit a complete and accurate NOI form.Discharges are not authorized if your NOI is incomplete or inaccurate or if you were never eligible for permit coverage.Refer to the instructions at the end of this form. Permit Information v This form has not yet been certified. NPDES ID: State/Territory to which your project/site is discharging:MA Is your project/site located on federally recognized Indian Country lands?No "FederalO erato"as defined in Appendix A(https://www.epa.gov/sites/production/files/2019-05/documents/final_2017_cgp_appendix_a_-_definitions.pdf)?No Are you requesting coverage under this NO as a ,,,,,,�,,,,,,,,,,,,,,,,,,r,,, Have stormwater discharges from your current construction site been covered previously under an NPDES permit?No Will you use polymers,flocculants,or other treatment chemicals at your construction site?No Has a Stormwater Pollution Prevention Plan(SWPPP)been prepared in advance of filling this NOI,as required?Yes Are you able to demonstrate that you meet one of the criteria listed in Appendix D(https://www.epa.gov/sites/production/files/2017-02/documents/2017_cgp_final_appendix_d_-_endangered_species_regs_508.pdf)with respect to protection of threatened or endangered species listed under the Endangered Species Act(ESA)and federally designated critical habitat? Yes Have you completed the screening process in Appendix E(https://www.epa.gov/sites/production/files/2017-02/documents/2017_cgp_final_appendix_e_-_historic_properties_regs_508.pdf)relating to the protection of historic properties? Yes Indicating"Yes"below,I confirm that I understand that CGP only authorized the allowable stormwater discharges in Part 1.2.1 and the allowable non-stormwater discharges listed in Part 1.2.2.Any discharges not expressly authorized in this permit cannot become authorized or shielded from liability under CWA section 402(k)by disclosure to EPA,state or local authorities after issuance of this permit via any means,Including the Notice of Intent(NOI)to be covered by the permit,the Stormwater Pollution Prevention Plan(SWPPP),during an Inspection,etc.If any discharges requiring NPDES permit coverage other than the allowable stormwater and non-stormwater discharges listed in Parts 1.2.1 and 1.2.2 will be discharged,they must be covered under another NPDES permit. Yes Operator Information v Operator Information Operator Name:Aho Construction Inc. Operator Mailing Address: Address Line 1:30 Trincit Road Address Line 2: City:New Ipswich ZIP/Postal Code:03071 State:NH County or Similar Division:Hillsborough Operator Point of Contact Information First Name Middle Initial Last Name:Abram Aho Title:Project Manager Phone:603-878-3150 Ext.:106 Email:ajaho@ahocon.com NOI Preparer Information G This NOI is being prepared by someone other than the certifier. First Name Middle Initial Last Name:JASON S HILL Organization:TFMORAN INC. Phone:(603)472-4488 Ext.: Email:jhill@tfmoran.com Project/Site Information v Project/Site Name:Climate-Controlled Self-Storage Project/Site Address Address Line 1:Beechwood Drive Address Line 2: City:North Andover ZIP/Postal Code:01845 State:MA County or Similar Division:Essex Latitude/Longitude:42.73026°N,71.11183°W Latitude/Longitude Data Source:Map Horizontal Reference Datum:NAD 83 Project Start Date: 10/13/2021 Project End Date: 12/01/2022 Estimated Area to be Disturbed:2 Types of Construction Sites: • Commercial Will there be demolition of any structure built or renovated before January 1,1980?No Was the pre-development land use used for agriculture?No Have earth-disturbing activities commenced on your project/site?No Is your project/site located on federally recognized Indian Country lands?No Is your project/site located on a property of religious or cultural significance to an Indian tribe?No Discharge Information v Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System(MS4)?No Are there any waters of the U.S.within 50 feet of your project's earth disturbances?No Are any of the waters of the U.S.to which you discharge designated by the state or tribal authority under its antidegradation policy as a Tier 2(or Tier 2.5)water(water quality exceeds levels necessary to support propagation of fish,shellfish,and wildlife and recreation in and on the water)or as a Tier 3 water(Outstanding National Resource Water)?See Appendix F(https://www.epa.gov/sites/production/files/2017- 02/documents/2017_cgp_final_appendix_f-_tier_3_tier_2_and_tier_2.5_waters_508.pdf) No 001:Unnamed Tributary discharging to Merrimack River Latitude/Longitude:42.730114°N,71.112128°W Tier Designation: Is this receiving water impaired(on the CWA 303(d)list)?No Has a TMDL been completed for this receiving waterbody?No Stormwater Pollution Prevention Plan(SWPPP) v First Name Middle Initial Last Name:Abram Aho Organization: Title:Project Manager Phone:603-878-3150 Ext.:106 Email:ajaho@ahocon.com Endangered Species Protection Using the Instructions in Appendix D of the CGP,under which criterion listed in Appendix D are you eligible for coverage under this permit?Criterion A Provide a brief summary of the basis for criterion selection listed above(the necessary content for a supportive basis statement is provided under the criterion you selected.): The proposed project is not located in Estimated Habitat or Rare Wildlife.Determination made by Estimated Habitat Map of State-Listed Wetland Wildlife published by the Natural Heritage of Endangered Species program(NHESP). Historic Preservation v Are you installing any stormwater controls as described in Appendix E(https://www.epa.gov/sites/production/files/2017-02/documents/2017_cgp_final_appendix_e_-_historic_properties_regs_508.pdf)that require subsurface earth disturbances?(Appendix E(https://www.epa.gov/sites/production/files/2017-02/documents/2017_cgp_final_appendix_e_-_historic_properties_regs_508.pdf),Step 1) Yes 1* Have prior surveys or evaluations conducted on the site already determined historic properties do not exist,or that prior disturbances have precluded the existence of historic properties?(Appendix E (https://www.epa.gov/sites/production/files/2017-02/documents/2017_cgp_final_appendix_e_-_historic_properties_regs_508.pdo,Step 2): No �► Have you determined that your installation of subsurface earth-disturbing stormwater controls will have no effect on historic properties?(Appendix E(https://www.epa.gov/sites/production/files/2017- 02/documents/2017_cgp_final_appendix_e_-_historic_properties_regs_508.pdf),Step 3) Yes Certification Information v Form has not been certified yet. Jason Hill From: Abram Aho <AJAho@ahoconzom> Sent: Monday, September Z7, 2O21 12:59PK4 To: Jason Hill Subject FVV You successfully signed adocument Jason, See email below from EPA Thanks, Abram Aho A-HO CaVy"MEMA1111K Aho Construction Inc. 3OTricnitRoad New Ipswich, NHO3O7l T(GO3) 078'3l5Ox1OG F (GO3) 878'lZ58 From: he|pdesk@epacdx.net«he|pdesk@epacdx.net> Sent:Thursday, September 23, 2O2llO:47AM To:Abram Aho<AJAho@ahocon.com> Subject:You successfully signed adocument You have successfully signed your CDX submission using the CROMERR E-Signature process.To view the details of this [ROMERR activity please click here. This message is being sent to you as confirmation of your submission. If you did not perform this submission please contact the CDXHe|pdesk. If you have questions concerning this message,you may contact CDX Help Desk by email at or by calling the CDX Technical Support Staff through our toll free telephone support on 888-890-1995, Monday through Friday from 8:00 am to 6:00 pm ET. For International callers,the CDX Help Desk can also be reached at (970) 494-5500 or you may contact the CDXHe|pdesk . The CDXHe|pdesh Chat service is available during our regular open hours of Monday through Friday, 8:OOamto6:OOprnEST/EDT. [DX Registration Homepage United States Environmental Protection Agency Central Data Exchange 1 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix D-Copy of Inspection Form SWPPP Inspection Report # General Information Project Name Climate-Controlled Self-Storage—The Stubblebine Company NPDES Tracking No. Location Beechwood Drive North Andover, MA Date of Inspection Start/End Time Inspector's Name(s) Inspector's Title(s) Inspector's Contact Information Inspector's Qualifications Describe present phase of construction Type of Inspection: ❑Re ular ❑Pre-storm event JDuring storm event ❑Post-storm event Weather Information Summary of Weather since Last Inspection: Has there been a storm event since the last inspection? ❑Yes ❑No If yes,provide: Storm Start Date &Time: Storm Durations (hrs): Approximate Amount of Precipitation(in): Weather at time of this inspection? ❑Clear ❑Cloudy ❑Partly Cloudy ❑Rain ❑ Sleet ❑ Fog ❑ Snow ❑ High Winds ❑ Other: Temperature: Have any discharges occurred since the last inspection? ❑Yes ❑No If yes,describe: Are there any discharges at the time of inspection? ❑Yes ❑No If yes,describe: Notes: Climate-Controlled Self-Storage- The Subblebine Company-SWPPP Inspection Report Page 1 of 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and disturbed ❑Yes ❑No ❑Yes ❑No areas not actively being worked properly stabilized? 2 Are natural resource areas ❑Yes ❑No ❑Yes ❑No (e.g., streams,wetlands, mature trees,etc.)protected with barriers or similar BMPs? 3 Are perimeter controls and ❑Yes ❑No ❑Yes ❑No sediment barriers adequately installed(keyed into substrate)and maintained? 4 Are discharge points and ❑Yes ❑No ❑Yes ❑No receiving waters free of any sediment deposits? 5 Are storm drain inlets ❑Yes ❑No ❑Yes ❑No properly protected? 6 Is the construction exit ❑Yes ❑No ❑Yes ❑No preventing sediment from being tracked into the street? 7 Is trash/litter from work ❑Yes ❑No ❑Yes ❑No areas collected and placed in covered dumpsters? 8 Are washout facilities(e.g., ❑Yes ❑No ❑Yes ❑No paint,stucco,concrete) available,clearly marked, and maintained? 9 Are vehicle and equipment ❑Yes ❑No ❑Yes ❑No fueling,cleaning, and maintenance areas free of spills,leaks,or any other deleterious material? 10 Are materials that are ❑Yes ❑No ❑Yes ❑No potential stormwater contaminants stored inside or under cover? 11 Are non-stormwater ❑Yes ❑No ❑Yes ❑No discharges(e.g.,wash water,dewatering)properly controlled? 12 (Other) ❑Yes ❑No ❑Yes ❑No Climate-Controlled Self-Storage— The Subblebine Company-SWPPP Inspection Report Page 2 of 3 Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and title: Signature: Date: Climate-Controlled Self-Storage— The Subblebine Company-SWPPP Inspection Report Page 3 of 3 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix E-Copy of Corrective Action Form No. Description of the Corrective Date of Prepared by [Name(s) and Title] Action Action Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix F-SWPPP Amendment Log No. Description of the Amendment Date of Amendment Prepared by[Name(s) Amendment and Title Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix G-Subcontractor Certifications/Agreements SUBCONTRACTOR CERTIFICATION STORMWATER POLLUTION PREVENTION PLAN Project Number: Project Title: Climate-Controlled Self-Storage-North Andover, MA Operator(s): Aho Construction Inc. As a subcontractor, you are required to comply with the Stormwater Pollution Prevention Plan (SWPPP) for any work that you perform on-site. Any person or group who violates any condition of the SWPPP may be subject to substantial penalties or loss of contract. You are encouraged to advise each of your employees working on this project of the requirements of the SWPPP. A copy of the SWPPP is available for your review at the office trailer. Each subcontractor engaged in activities at the construction site that could impact stormwater must be identified and sign the following certification statement: certify under the penalty of law that I have read and understand the terms and conditions of the SWPPP for the above designated project and agree to follow the practices described in the SWPPP. This certification is hereby signed in reference to the above named project: Company: Address: Telephone Number: Type of construction service to be provided: Signature: Title: Date: Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix H-Grading and Stabilization Activities Log Date Description of Grading Activity Description of Stabilization Measure Date Grading Date When Grading and Location Activity Ceased Stabilization Activity (Indicate Measures Initiated Temporary or Initiated Permanent Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix I-SWPPP Training Log Stormwater Pollution Prevention Training Log Project Name: Project Location: Instructor's Name(s): Instructor's Title(s): Course Location: Date: Course Length (hours): Stormwater Training Topic: (check as appropriate) LJ Sediment and Erosion ❑ Emergency Procedures Controls LJ Stabilization Controls ❑ Inspections/Corrective Actions LJ Pollution Prevention Measures Specific Training Objective: Attendee Roster: (attach additional pages as necessary) No. Name of Attendee Company 1 2 3 4 5 6 7 8 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix J -Delegation of Authority Form I, (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state,zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in Appendix I of EPA's Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative" as set forth in Appendix I. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: Company: Title: Signature: Date: Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix K- Endangered Species Documentation Massachusetts Department of Environmental Provided by MassDEP: Protection MassDEP File#: Bureau of Resource Protection-Wetlands eDEP Transaction#:1254966 WPA Form 3 - Notice of Intent City/Town:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L. c. 1311 §40 a.number of new stream crossings b.number of replacement stream crossings C.Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program (NHESP)? a. III7'Yes II 'No If yes,include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road Westborough,MA 01581 b.Date of map:FROM MAP VIEWER If yes,the project is also subject to Massachusetts Endangered Species Act(MESA)review(321 CMR 10.18).... c.Submit Supplemental Information for Endangered Species Review*(Check boxes as they apply) 1.III7 Percentage/acreage of property to be altered: (a)within Wetland Resource Area percentage/acreage (b)outside Resource Area percentage/acreage 2.III7' Assessor's Map or right-of-way plan of site 3.III7' Project plans for entire project site,including wetland resource areas and areas outside of wetland jurisdiction,showing existing and proposed conditions,existing and proposed tree/vegetation clearing line,and clearly demarcated limits of work a.III7'Project description(including description of impacts outside of wetland resource area&buffer zone) b.III7' Photographs representative of the site c.III7 MESA filing fee(fee information available at:http://www.mass.,!i4ov/eea/agencies/dfg/dfw/natural-heritage/regulatory- review/mass-endan eg red-species-act-mesa/mesa-fee-schedule.html) Make check payable to"Natural Heritage&Endangered Species Fund"and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: d.III7'Vegetation cover type map of site e.III7'Project plans showing Priority&Estimated Habitat boundaries d.OR Check One of the following 1.III7' Project is exempt from MESA review.Attach applicant letter indicating which MESA exemption applies.(See 321 CMR 10.14,hqp://www.mass.gov/eea/agencies/dfg/dfw/laws-regulations/cmr/321-cmr-1000-massachusetts-endan eg red- species-act.html#10.14;the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2.Il17 Separate MESA review ongoing. a.NHESP Tracking Number b.Date submitted to NHESP 3.I7' Separate MESA review completed. Page 4 of 7 *ELECTRONIC COPY Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix L-Massachusetts Historical Commission Project Notification Form 950 CMR: OFFICE OF THE SECRETARY OF THE COMMONWEALTH APPENDIX A MASSACHUSETTS HISTORICAL COMMISSION 220 MORRISSEY BOULEVARD BOSTON, MASS. 02125 617-727-84701 FAX: 617-727-5128 PROJECT NOTIFICATION FORM Project Name: Climate-Controlled Self-Storage Location/Address: Beechwood Drive City/ Town: North Andover Project Proponent Name: The Stubblebine Company Address: 1 Cranberry Hill#103 City/Town/Zip/Telephone: Lexington,MA 02421 Phone: 781-862-6188 Agency license or funding for the project(list all licenses,permits,approvals,grants or other entitlements being sought from state and federal agencies). Agency Name Type of License or funding(specify) MassDEP NOI Project Description(narrative): This project involves the construction of a 3 story,90,000 GSF(30,000 SF footprint)building with first level overhead door access to storage units with associated site improvements. The project also consists of an 8-space public parking field for customers and 18 spaces in the interior for tenant access,an underground recharge area for infiltration of stormwater,and perimeter fencing with gated access to tenant storage units. The project will be serviced by municipal water and gas,on-site septic,and underground utilities. Does the project include demolition? If so, specify nature of demolition and describe the building(s)which are proposed for demolition. The project does not include demolition. Does the project include rehabilitation of any existing buildings? If so, specify nature of rehabilitation and describe the building(s) which are proposed for rehabilitation. The project does not include rehabilitation of any existing buildings. Does the project include new construction? If so,describe (attach plans and elevations if necessary). See Project Description above. 5/31/96(Effective 7/l/93)-corrected 950 CMR- 275 950 CMR: OFFICE OF THE SECRETARY OF THE COMMONWEALTH APPENDIX A (continued) To the best of your knowledge, are any historic or archaeological properties known to exist within the project's area of potential impact? If so, specify. To the best of our knowledge and belief,there are no known histroic or archaeological properties known to exist within the project's area. What is the total acreage of the project area? Woodland 2.66 acres Productive Resources: Wetland 0.2 acres Agriculture acres Floodplain acres Forestry acres Open space acres Mining/Extraction acres Developed acres Total Project Acreage 2.86 acres What is the acreage of the proposed new construction? 2± acres What is the present land use of the project area? The project area is currently undeveloped and entirely wooded. Please attach a copy of the section of the USGS quadrangle map which clearly marks the project location. This Project Notification Form has been submitted to the MHC in compliance with 950 CMR 71.00. Signature of Person submitting this form.. Date: 9/13/2021 Name: Jason Hill with TFMoran,Inc. Address: 48 Constitution Drive City/Town/Zip: Bedford,NH 03110 Telephone: 603-472-4488 REGULATORY AUTHORITY 950 CMR 71.00: M.G.L. c. 9, §§ 26-27C as amended by St. 1988, c. 254. 7/1/93 950 CMR- 276 ­_," I I 1 . , - - . " , , " ,& 11I I '. , ". , � % e",� I ,,I.I " AN �,III,I..III. 01 - .I) 11, r , ,,, , I A "_ r 0 I ", 'I",,I I '111111%...... ill, "iff U IeUll , II� ". I, I I I jit lo ilf", I I I I I _ In I A111 ,�, "Jimil f.;, , , , �% I f IfI/ I� ,� I I I" --�1 I - ,I1101, �,i Ir All, I ,/ � "I 111, ir I I ,, er(....... ill, ')1I,, ." f "'I", "i � I I I I .[�/ 11....1116"`11�11111, iIIA " , "" / `­, I I I I 11e, M lil II, %. ,III I I I I Ir r 11- � I )0 I 1 1 ll I ..I I le I I I l I I I I I���I I "Iliffl/I ::r:7,11;w z"."i"I"�l A iL I %!,,, IF l,,01�111� WII`ip,")�l I 1, 11 "Ill-"' � 1, I ll� al,/;� I �Jlll All lil I 0 1 h; fell , 'n� ,irti"�,� , I , [iIi /" , I)I ;;;; ��, 1 1-1, , ,j, " 0 IF ", F 0, i I I jlil�1)1 I A ....j lil, el � 1-11111' I I,,� " I I/ Fell' I I c" f r, /)(r, v r m p % '1� `,* I 011" �,l I 1, - If/ I" l I f I Ilf Cc -,jI W 01, ,Ep, 9 Ip "I,T(, " L m, I " /, ,/ ...1 1 1 1 1 , / j I'll I W ,I: ''I", 0111" 1//1 H"' I �',­ I I I , , Of I I I "I If," I :I j , ,YWIIIIII�Ifjmul I L I , 11" 11. I � J , * "r-1 -,Jf.......ill I f f i, 0 I 1, , "T'l.... :1 ? i 1� I 'I ��1, I ,�� , or ,,,)I),pj"ff" willu-,P111 I 11 1�, NI " , I I 1 III � ,11 ij"I , ,,N"'l�­',',',,�l.........-�,::::, 11 l ", I I I ; �l Hill" 11 Ilpl` I I i"I"', 410 p I " p"', JI, 1 III I 1if 1,1111 �/,,111)1 all 1411 /, k ," , I , ""i,p...... J.", j,", I ,f , ,)I �11 ) "I , "I I `I I I � I), I I .I i,I�, I 14 Nil 41IIII, Cmd I ,I'll f, C ,� I ,,,�i`i` �,'/Ill 111f _� � If, El , my I I $, 1110, 9, ,0b, ,)I I '# ......"I . 11 b sm%*ow e))...... I w I " N111 I I f, I ff", W11111 %ill 11 1 1 r - 1 / " 1"""""""�ll,l)""",�"I llk�l� " I / j f I 11, j �� " 0F � / "I � , -,1 1" ol 4 JI, J . a 9 I I L `//�l ill I I I I 1)1­,(f,ff 1A, J 'I'l I W I oolllll�"l 'f 1k, I I , I I of I I"I f 1, 11 I full , 11�1111111111II­1111.1111 )#Il lor, FrAl"',-- 0, Id"1114 to 1 1 1 1 "I . �!111'1 ,,it./ "'I jj I A 0J I- lilij; j.l)pd/,")- N "I I I IN � ,, , ...... - .... , ­UlL I , III,"if)"iIIIII"k"N 07 r w ",it./6111 I , ",it./6111 ; , ",it./6111 � " , h I . I'll 1� , `,it./((11111111 I 11 11 11 11 11 III 11111111 I, I' UW, In;^ 4 1 1 , __I 1 001 -IIII- "WT, ,I ".J�� , , w � I I a _Q I I Aw % I I Ili 0 , -._ /.,,j I I I.,-1 (I I. � "//, W I lil , / il%j 1 6 I I `111111­%, ,.1 AN I,` "I po d h � j I'lif , I I� " o...WT, , lm lip, � li,01..... . 11 I I Jtj I 11�1 I I I I I I I I" I Il�1�I�11, , �i I If, r� ,ow-11111111, Ell,/,I /..../­"�,/ I's I I , I P, I / N yo " I N I, 1�, Ill"I "I I, ,`�J,�fl IN I N. ')I),I ,I / " / r I , I,........ A, I ol ,11I Ill r'll)/��,, I ,� it,.Ol ", � "", �i, " ,_I I I, "'I") aso;�=� "'.1, �)p­%,f� ) 11 I nl� p 1 is ,", "I 1 5b�, ,",/W�', ,/"11111111.......�('r"�'j"�illillilill",(",", I:"":"Illl,.,"�-11,�l")I�1,11)"",f -""', I111% 11) , ", %I I I I !,�;11�,kl,,, 01 ,Ijj,/,/ ,/,:, I'll,11 "I III I 1, ife, I I q it I ol q 1, 0 J, , le , li, , " " 1 k �I �Ijjii�I I ik%, itill" ,/,.�,�,iiiiiiiiiiiiiiiiiiiiillo`/�`-."�`,/�j vs I mlO'lk�__Iio % il 10 //p r I a---,, Ii ,/ )ill ,/li I I 11 �jf I i jjj,�, ,"i))" i I CC i V i k r�Aii IT 47'111%I'll F il), lip ...0111" 0,0o"111",�iiii"o-...III......./ " I " IN r ­ 0 , ,,'I'll,/ or, ; " - 1 1 ; - s '/ / ," I )l % / 11"/j" 1011 __ / 10, �Np IR q,IN , � / A � .11 I % �,im ),,j 4 III �Irl fo#, r r; A .a 1, h 11 111 "11(iiii I lb"ol I & " l(i�",,/",""", % 0 f I l� I 1�, �� I N Q Ill A ,.� ,L,1111, Is f,I ,[�, g, Ij U,IlI" Z11, "I 11 I I I"I I 0 I =----- ,I 11 A , I J,l) y 1`1111111"Ill I I " , /,/ ,,, I 11 I "I mllw , F I, I I " --n 1 1 , I I 1 I , 1 ,11, fl, i I " )g N, ir, f1i �� I I 11 ii 1,j if l'Ir dililip, 0 0 1 1 %I/Ili' ,)f I ly/j/( ,� 44111tillillilli����������illillilli����������illillillillillillilliillillilliillillillillillillilliillilI. 'o "" 1, ,/I�, - Ty pi I I ,f, , �� i , I ,Ill'It""If ON, I ICl I�p v I I�...", ,(I ,, W �,,�)#` 11 1 � I I " -1 I I I I I%,IL 11, /(( � k 0 I...... Wl 1� �,il� �g " "i" 56 �rf,� 0 T �111111 11 11.11 Y11111 I , jf Jl I!( 11, 1� 1"������� IN I I p 1 II oi bf� a / f p I A NO Of - ,I', 01% I I "I ) 1% fj, )'li I &-j", ,,,,li I a N II, 1 1 I I 1 V1 I IIIIii I I'll �, 111101 . A vk� ,/" )lJHjIlmM,,,",",I, I jr%/V� I i I I i iii, II, , / 11 "" - I'S I I I I I I I I I 1'4,9�1 , p p - .Illy, /, plil yt, "g A, I "m'I lll� N�Il k 11111II1 'III 1­111j F, 11,� 1p. 11 I I 11 w n � p w �/'// J) -If fl� 11 I'll 4w" p .I Ij em l"'I 011I ,�),�i �l,1, 1/��/,. I I YI� , ,y!! " / %,I,���, I'll .,.,�1F,//`/`////­`11`lll1 ;��1111,' )IR", I I ,I , / )�)`111 Slfl_10`011111� ,�, 'i j, f ,i)... w J g',I/� ?" I I � I,/,/, , Nwl,% ­/ mijit I'mi,", 15�..11111,, 11 � ."Il R0 dill I" ill, I I� A,j?" :j)/l I ", I g 0 1, Ig,_p ,"') - If if -%-W"1,11 h 0 1 A J, , ...... po Opp, I f p . g "", I ,I," ��`,� ,I 116f,w/-,Ill"I1111111) / �J/11111111, l IJ 17�" "llill, , Ili),` I ..I% I � 1), 1,rl/ I r 11 � , 10 �� 11 ,� wi, ii;I % "j,"'111-11,/ H­ '­jl,� , /, ,)i 11 11, ", '111 A, I WEEW ,"I'll""j,","'y "IlIll�)Ijl '-frj III, 't ....... """, , B/Sim" off,IIIINIF PEI� fi,ii� / I I'll, I'll k"k, i�� I ")...�d,`1111111 J /,I, 'l, I I I I I N B) I Iii,11f, ij)� 4, 1/� lul "111 P.0 I�IIINIR I It I I ....I'll., '01111IN1111 )1111 , ') "" lo Cl ."1111,11,lif,' I I I " I "I ,,,/I%, I W......�111 ,,�Uf I 1, III,% , 1, I �`rrf�� I..if,lrr(�),vq�l lil�), _Zi.,','�......,III,,,"I I I , ...... 1�kbl ,I I'l 6`11-1111111111111111111, ,9457 IN "' 4 N I I mvp jillil,...� 1.111,11, ,­ III I '), 9w V I� I�,,. Ilo,111111111110 'AR )1,1Il fs, I % Q m ',��,�:I.. 1�11111111111111111", ,, F1111111 i)lf' 1�'11,11 �,, Ij 1 1 ON L"")1 r j > %.I 0 Ill,I 'I" ... �� y 4, , lk , �%l,"Il " R / F I r "),p�[ I I'll , I N, / �� In I,M6 11 ,% 10 �%oil I fil � �'"I)VAI K , ...,, N (", 1� 11 %% I, A , , till jl, .p 1, , %N ...ijl��1$#'�Ili Ili NI I IS 111111111"' �` li� POM06" - fl/' I, r, III", oll"'I I "I'll, )4, lw ­1 I'll"I 'At "16r, ",/, I /0 11,111,111,1111, I rrr ....Ill 1j#­#))#1 ,,,,,�Y,�11.11'.11��"��""'-"-"",� I W rrp,,,','AZ//"/,;/��6,1,,�//�,,���-��ll,"-""- I'll )11 I Id, m / PRITHommimm" . ,� ""111- ) , I'll- if I�/ I - , od Iff", ......)I. / , 7 ,I �`1114 ll 1), "I'll.), 111I.......V//) III dp/ ,/ all", J, 1, ll, I., jj ,/ 4millip"j oll�'ll""I'll""I'll",'ll"�-111.11,111-11.11,11I/ 0 . I ... ,ii'al,, i""cif"IIIII", - if(ml 0"Wil ,�N, ",'l- 11 PI V, , "I f', 10II), r 1,11"11111",F 1, ,� I ,� " " if), 01 IP, /, 111jp, I l .I III // ," 'If , 1111lig , f, I I "I ""�")"�,f,�11A)�����ililillll,"i�', I I, p /� ll)� , Fm �III � I , ��,, I vlo IN 111%1% , 'JIl offle, Ilip, � 1 L-1 I W R �� 0AIII. I Is L T IIIII...�....f',�,"Il! / 7 F " 1111111111111111111111- 11j" / 11 ,,I,111 ,,,, ..... I I ", ;!,�I: .�r'llf",�.�Ill""I'll"ll""",ll,�"..- I), lj�lj" Y Ill" litt r(I �d I I,...I I I on 1) ( , / I .I..... -N, 71, . ", , F ,,, iji I,Ili N_dI V r.1 ,Y, I 0! �, I'j,I I1111111111111I�I��[I=": m p PC wr... llo pi"'i o : 0 0 11 "//(1`111 ...."I...............f", "' A, N I . p I ,,, I I "I',) IN411S 1;f,�, , I li­N' ,,-, I" ""'j.1,11 /1 1 i(""",� Q "III "I q, lf� ,"li,I I� I ,(/ #0 ) � "' % L 1 "'h'S�"'1/,..."IS'I w � jj,".fll I y"P", ,1"'V, "'i'll,0",/" , Is " /Ill , 1/1, I III "I il" , ", lF, ",//' P,j, 1 I TA)'ll'o Tt I ,,))Iljtj J111111I,)j ,lil ....../'J"I 'w )I I f, pi", "I �,�,/, -I , /�....I RIIII#)", ,11 1-1-0400 1 1 ) , 1 II "I I I"I , , I �)Jjr N , - ,,, f ­ I I ��-,//////,///,w,: I '),)g Tq� ...% 11 " 11 ,,,e- o _11,11", ,pill, " -1 I,I I I ,1 k "I'll, /7 pe""' , , � 1 ,�",, 11 w " m#00 7 il A / ,,'/'I./ I ly .11111111111111111111ilill-I'���"I V/, o 0, 11 " It f � I "I __ .... l 111- , " jVI1, "I"J"/, J11 " , /, " , ,ml, �111,111p, "1111111II ")II ` 11 / I 11 I"ell', , N 'Im/i,I) Ill ,I�iil �, % I...",Ijllll"".,��'ll""I'������������,�ji,�,,�l,vllI " 1- , 0�1 11, F, A �,I, � 1�1 '­J)p, "',,,-,,��p1m II 111��l 111 I" I " , ,/`I16V a I"II, I ,ja 111111111111. I—, -a I "k ­"m.0 0 -',-,�, � j I fil ",,'I'll, ...�I i, I,��j))IllllllllID2jl,),,��v��N�illillillillillillija I 1, 11, fl] ,)",-,,,,Or"" "Ill,"I 11 "' - i . I I li'll.i& W, " ir, '. rf, � % i t 41 I'll, --- P, � I , 0 f, , If)% / " " 1A, r I �j '� 11111 00, 'I', I �,""""d I..i"/ ... "iIi _� "I j/1", a r , )1,�I,) 11 "III I,,"101�..".""'11�11l,..7""�,,vl I I , '10 "" "I , 111-I-111111111"Aild"i ,fllij)ly,....f, 1, I I �,:, M, It 11liq , iiji m ao!: IN - �f Jillil " / I, F Ill I , 111) :"/'��.......)""". " I I'm, "mr.6' "ll'-ff, i e If r".... . )/ L NIIIII , .11�11)11. I'll, ,"I'l ,, ,` ", 11, ,,/ 11 " PA I I ., I 11 1­1 111 �l/i-�,i,i-iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii,if"","""'P�/� V I "I'lliv, mr, , 111101wo'a - ./)" "I'll,., " I'll "'11111,69m, ,I r,-,m4,,j ,0010,F - ,/ , VP All dll�� 11 ., r k "I I",F , ,/jjjj)) ,ftl , , Nool I I , I - o 1111� 11 )),j,1111, l�,, p I..."111/11"ll (f ,,� ", , ,., I" A I I "I'l P/111- 11j",�l",)I,�,,�,�'ll�6,,,�lo�""(Ij,I I "',I, #,"'16",..........X,1111�i... 'J",( ,,, I A I i y "Ill 2 1 1 1 (m 1�1 I"ml " " - I , Wd ,I= , 11/1,11/11, .1111j, -wilil.", , ,�)"I.,',,,'��Ilf(mr, I 1, I�,''wif, md,7, ",11 f "I ,, ,( I_f).......I.f, 11111i, 1%� "I, �"116111111111,%.." '1"'. W I,/,",)'I,", "I'll, W ,IfI;1j1 I I I , ,p S w-mm"..", ljj;))-I I-,� IIIIIII...,,,,, " 'If"i I 9 1)", ,_11, p I f 11 I I" I A........ " -,". jlij))" I III,�o.ii,� " I `"In"p, I( P�,l) iji'll'll, a IP. fdl e"In I )"', ","Itir' ,". S11s, "'llf"),T, 11 A 1 " FI-.1111l�l 111/1,1111 11 F, p !�' I ji, , � ,,, ­// 1116 111, ,-", " f,)i , "j"I"..,") 1­11111111111111111111-, -A �.....I...................,_%` I'll,11II� "I'll )/11_111111"//,_",a,l 0 I , if 0 j, jf)III )4 I.Ill................. 'I'll, IV, Ir f I "ll I'll,I/"I'll" " I f I I F�� , ,,�Ipl , V, 1 4 'iyw, 1?1 , ",,/,/........, 'j, 1,/I N lif, / I...III, vs III� 1111 0 j, " . 17 gr Ill " ,, " 4% w eI,_,. I'll Ill ", It [I "I'll, ), ,� " W _� "I, 111111111-I 'Ili'Ta...%� 11 I'lli, 12 Ile A, 0, ," I I ,�� 119, I,I jj 1;;;`"I I 11 0 1 -, ,, I or-, p "k Sk '06 I ; A"wl, , A,111111/1/1/1 S& ol�) 11 g,",I I I) 1, ,I` - illf I -, ", V, ", 11 il Ili, / Ili ji I I,,,, m I gl� I�q "" Ill�'i `0 / )Ill A 11 1�11 j))jI,I ), / jjjjll , 1 I f)jjj) " " I I Ill , I', pytil , NR I III, % 10 I,-11,ll, 11-7 /,X, . ilir / j , ,/ I/ - I & pliffi/T", �, - I I'll " ." q )VO P (1).....I_,III, 1-11/1,11 IV",I , ti s NW I N "I If `­J� V.� 11 , I 01 "1),j ,/"",P,',� 0 I" "I ...Z01, 11 6 III %% 11 ,,, �1/1111 /- U p I I III III ­1 I 11 I Ill"11,'I"... low I I & "Jel k.,.........11,11111,lffl",��'ll�,j�������I )IIN )YT ,'111,1100 "' "I I 1�"//�Ipi', "5 'li�,,ijj iii, II­­ , , iiiI J/I "I ,f Y1 I 'p, F 1 W" ii), I , 11 I I IS L I �i% , dim" I `�N,� 111 jfj, �����," ­T4 11fill f � ,/ , P ., I , r jid/ij, ,1111111(........... %, , 5 I 04 d1j. 11. -1 "" yf I / "i", I i rl," . I IN �j 1%. I 11 I N. , lij 1111"If", lmd)`I�11111� I I 11 (011 ,,'), r�­'.­'.,/`" (" "...", , I oj ­INN�Ile" M p" r Ill f ­­­­­�­ , " . . I , I .11- 1, �Illlp�..�,,� ,ii Im ­'��,,, R oll'? jim), "Jo a fil' ......�/ , ,I 11 11"�It 111011,11% __ T I �� 11 "I ,/a.....",," I ", I I k % I, "11111111lar lis ,jr I 0 f,/10 il ,I , � lll - `1'11'11�1 I I v / I m IT"��I 6 11 I I 11 �;) j; P, y I" � I 11 I 00 , �)� I I" I'll # 0 I/1�1, ,)�/01/1"I 11,I A 111"'1`11 I 's 10 I" � �)) ""'lir I v I Wq I �/"arW ,6 )"11111111111iiiiij.l."� 'J., "'. 'I, " ""ll"I " ,pla( III,// ....111 , , 0 6" I � 1 1 1 " I jill )11;)/ I 1� 1/1 I I /, itil" F, i", " I -I 1% K W`I am 11 I � J I lil�, I I 1111# ,/p ,/, )i .' 0, 'r, if F� Ilp I I-" l/ I ....�)11� 11,111II)W11111j, "I e ,,, KlIl In......=V/11-l- ('r, III I I I I , "",`­ "I.......I,,.I, , ,,'/ //i "Ill � ,ii�... 01111"))I' ,�,Il 11)I,)" 11, J1,11--1 w% I I w III"/, �", _'l...lRi... Ri, 11 `­ " lif �' '1111"' P I i ,oj?)ll , a 0 � N __U­----.%V, ."r 21/1(1/( "f"",Plf��'l"""Illlllllllllllillillillillillillilliiiiiilillill"llj, _111�11!m/ ,/� ......I,, ,�"I'll r, ., , f" ["ll" I'll ,", 7 ,#I, I,, 1/1 ...)1limg i, 00), , � , / ,�, ,11111%, ,, , ,0" A l _)t` i'll"I" , 11, 1. 4 I," " "I IF / '��,' r 1, ,, l, l, ,,�,I I ]/�, I L IN 'Iliil,l,wj,�........r(.......... 0 JII , "'v-, 9 I 11 e­` it, / ,j V/,�I I �I,i, 111, ,, ,, I I'll 11110", I'll), "I I I " I I o,oj)))); -1-111"", , ,, 1, I j 1)p I: ff, I --!I I j, j" III, j I Y, , No F , // �. I I IN it, d , J vu N 0 �j �f," "pe iff 1/101), p a... ."I I jjjrr , / 011 I I Ili 'I'd 11) '(pi` I ,,000 ",'mil . ­,f, I " 11­ I , 11 �A I j ), 1. 1% -,""I'll ill I . 01 A "dIii, r � 1 %, ,0 ,)l 11 I / � F' / 'T"W" I,,,, [][I 1110"I'l_Ijlllllo-"/,,,, I I I r1l",I, "ll I..I 0, '!....=mf � f 11 I I 'p, jjjjj)l"�i . I I I),t - hi*m"o/I �lRi` I III I V",f "I"d ..�//", " ;p, , il I,"111jr �J, 1 I ,(I ,I 1� r I I I 11 I I fl li", e - )" '4 ON 11 l...liviop", I , f 0/1 I, A ff a ", -1.11111111111"'., I r...I'di I I I j If jj�,Il� (11 III ii " a / Afir 11 I ,g,", �Ilyl I I �� ,­ ii I I 1 4 /,I,, 111,�"` A " 11 ll,"ll� "I �,I ,,/ "III I ) , 11 -0, 11 1`1 d "il,11,1111111 III...vy, J, /, j ill ", I� , r ,ei p I I I....I "I 11C x ,11-1... 111111I��1111�- , I " I I ,j/f I. ," )J�lf`lplll� f... A '/ f 0�1, I ), Iij ,1"" l ff "), I 0" " r, 1j, ,% ,* Y,... it I� I 4 L.., 1111fal"111111" ) l I'll I. V I r/ I ,I R, I A" I. .jIj I �fjll If" I mjill�lj)� .I.,...�,",�",,/',"",)),,,,,,,"",""", ), "W I ""00 A Ill 11 ,I, I .OF"I ,, I %,.".."'s ­ , !7 W, ,­­ III ..- , I)Pl , I , JBIl"Ay J, ,�Iwl, ",jj-1 /2", ,x " � /I/Jvjjj��(�;, �fL.///,.�//11' A /I; J)m 1 /I A F , jpi I "/��,///' mill f I j 4 �1111 III Will Op" / I'll, �, / �, lif, , ,,� : , V , 1� I I I /.`�` ,, 11 I" -ll;,1.'AF/`///I`lp I M1 I',, !fj" 1 1 1 � , j/ 0 j A if I, ,/,,,,,/ J, ifil 'J" 7, , , 111110 '011 I' III t"', ' f 01 6 i 0 1111P I' I fl,",I IffiIIIN1,111111 71 1)/"/)" 41f, // a ""!")"��il,i a 17 11 ,/�k "I'Y11, I P) ,/ ,f, , �/ � I III ,` ,,�.���,.,6�l����ll""IIIIIIIIIIIIIIII1111111111- IN, ,- -�"`11�...."t'll I I `/�I�,, IlIl � "�� �rol ) 666 0 v1`1110011 I, 11 ���111 , /il",d 01 ll� II/ I/ li" " "I ,/I'l,,f , / ,," /-/I;­,,I 0 ')�,,l .)'o e ��6I,, ( +��,P,11 , .11110m,,,, //, ,,, ,"""IIIIIII1111.11-1- ,, I " I J, 11, 11!"! /,, "� �, m. 7 /�,, ll , " , . 9"r,�'ff'(If�rimAj�ffiv���,�,,,,,I I I I I...I...I...I...III..........I.I.-III11111"did.........1. 111114 ,//1//1, .....I w I 1 I, 17; I" 0", oldill,peo,i � �, III, il "jo " , , /I'll"I'll' ) W11 " ))"le */or" , .......Jill ) , "I?J) � '61, ,luilimill lild ­70111 ��_ Iii, R 0 " Ir IiI, ,�,, lilli, / / / " I111111111da / ,# I 1­11 p / p ,Ili I " iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillijjjjlll[i�i�� f I ;I �Ir"­,.....I .I I I-2�I I I I I I I I.",f",),_"I"I"Im"Imm w p"" , dR)I I ., I ill r I "" "" 1111� 1, Ili) , ; r 01",,I', If , 1 If ,;l...... 'p"J1" top e" ",orj . , 7 f ,"� , " . r� , W " , , 7 Y" ,,, j� 1111...... ; ww" , ko I #"""/I, I'll ,/ "I . , ,, 0 I I Vill 01, ""I'l All, I f�Jjll I p �j )" 1)111 r V ) 1 r , I NO, I il, �_/////,l oll a , ;r, 11, r, � / , I " - i,I 11 , , " � 0, , �)f ,,,fy l V �, 0 I/ I jk�#O 01, lil , "fit j� , r v/ �,��... , --II" ( I�4 0 /,Al �r 111111,111.........��I �jill�, 11114 01111 J) ... ��I I "" Tfl, 0, I I I " 0,,vIll 11, "lw illir ...... "jt / 0� 0.Mlw lf I i I", f?, �)�);Irl - 1, I t f r ,", / ,� il, , IJ14 jo f 1/13111 I jI, F I ") 11 ,I, - � " all j) , I.....I ,f .0" 11111,11, , e," I )rj, f , I " ),I l?jj� rx",oI " 190, I "I ll, r ,I,ff I pill, 11 idp� jf JIM )III . me 11"'t, /lAi 11, 11 I I, rj �"/di" 11, f//,� f R I l/,11/1� ( ( 110 \ . j, j i"I `� th 111111"i" 'I I ,�(/,..,jpil il",rlfl.0, �j / /1 'Roll " r 011,/,* �lI 11 I"'ofj i " 0, i�, IjIF I, ,,.." . I rj�illi���,�,�,�'ll.Illllaj,((,Il�,����,I p I ,///// ",- I, ow V" ) , Ill /-- / / N on '. I I'dis qjil A pl� 0 dI(I,e i " i I 1 I I 11, 11 0 111T, I I I N'I' ,�, jl�ll Ii�l &, f 1;I " � I I Al, S 1, ) 11111 II V),".dill �,;, 0 10�), 11 � it" i III M --11111111111111111111illillillillillI..../'.1,101111111 �.11,111,I ill .111111111 III P,IIII_ ii, , I )", X I I , , ill"'I k1 III A / - � I do ,Ij,,i,,,,, I i, �wp,i Ill I " � '111) / I 41 ",i &�, ii 11...111111,111011111",, "I NOMIR I," OF � 11 I I �'11 " ,rd, . iN4%mmoo 'IF ill, A IiII,, I f/I" lif)),lj I ( i 11 l�) � IS .­111110 I .......911 , I I/��' , rr,-I,I...11" Ill aj 111111- ��l fi� �ji - I R, I 11 ",',I, FIT t_111 j Ill, mpg li I 11, ,I, )III'. 11 "', I'll � I H , % '11III" ij, I , 1)(00f, I j 11), . � r�, N , I ii I ,I %, I .1111, , m "I 111" 0 I'd I I 1 J)P , dy -11, 11,111,111, /I Al I q I v, I "I I ,, I, , W_ /// r"I", . .0 11 11._1111IIJJ,Ild� I I 1) I'll % p ." jjv,, ,/� "9 011 I v . V, OF' pf f I/Y � 11 - , 1,11111 I v ,,", 0 11ij -.....I- `11 I I I I ; f�ijj, %l "i', I., I, - " " ......... I , I ,,,,,,�,��,��,�l,,,(,I,I""�lf,�,-.""""Iflf I'll 111110111"i 111d"", I I if I I ,/, I ppl. I"If, w I � o" .1% II 0, , OR �1!111 I Ill dw ?` I ll�i I II ,",/.,.�I I� - , I�1, I 1/101 � I "111 I�"', 11 I, j ) � rril. I Ill [ /ij I� "' v "m /, o" i?, �Ir "IIjitef I I 11 ,I 1 ,, Pill I0 I I 111111 .." ) "I "I r pol z I� I ,III, I , I ", 16ps. J 11 "I'll- 11 %ii ,,P( , I I "I "I r � "If (),, I *ll". 1 'o-....rVI­"', , 1, A I � �; " I a I V I I ,r j/jii, I I'll I ,,!­-ra-0-l" ��".lfll_ " �I lik"n"1111111j" I I * III '� I I , 0 1 1[ .1111 il,l lyfi& NQ I r ,I , e ,I f, 1�1 r/,,�! I : I i 1 6 5 p "I! , I'�, - yf/ "I! , , ,,, 11 "11 A I i , , �I if' , I "%---Ill T j")........./......- l fij,", � if T I A. 11111fjmo,", ,,,,­-)',/,; 1�It / I ; I , "I � 1111j, ", I 0 0 1 , ".F,jjjj- " f F � I 1, 1'r,"jell I I I 0 ,,. ,)� )RJJ Q"), II, if pp � � p W11J` 111-11111111,"' o ", 9� 90 I "I , /;//"' I 10 ,"Ir F, T,,J) I / ,I, I I IIj1I_,_, W I, )) "m, _��/ ,IF llrlp,�l fm jyj ", '111". "' IF , , I... I, "I ),If,.,;�, 11 , , j) 'e"', , ,-m-,,_/),��/ 11, � "P, ,� 11, "jjj.11llllllllllllliiiiiii,,V,""�/, '0111111110mloill�"" ,I )....... iv_ * 111 I / 11 I 11 ­1111111111 impomll ," IR /A/ jull I r I I � �, ) � i 11 ��11 , I d , I I J111 �1/1 ,.'/ I�Y, , J� 11 � " ,I, , l) I, Irf, It III/ e "', I'll - I lo )I... � r,�, I I . ........///-, ,)///"' //, o'l ":;, 011" "'I ,I I " ��, I'll I w �111111 I) 111/1, � I , 11 / All-111101111 , Ir 11 11 /�.......'llp I� ll�",,I'll , _jv..........J 1111P 111j,mm", Me No INVENEWilim, I I , -,"I'll.,�,� I ��f , 11` ,1 11 / � / / /.. ,/ 11 v ?l I . III -p / lill , I I 511 I pit , Ill `,,�w,,, "I , �, 0 l , .1 ,11111�1111ml I I I I" ,,,",- ........I.� _­ 'I'///-, I I tf "I mo �1 Ilp I".." I �__, -4, ////", 0,1I I( I ___ I-/ / I, I, / /,/, i, I I � //"I"ill"�� "I I mo I 11. ...... _,"11111111"I'll,f IV/,I",­ I'll, , I "p 11 I , I,, If 11), "Ji ffllll�� ,f jill", Jil, �,f�l,,M I, � P, I il , I /, ,il ll ,// /// ),11110l ap -- I � " I,IN 4 lill" , � I M I j)(i III I I I ,), I, olr_ f , � -�` I I / (I 11 I Il , ,/,(�,�, 1",I," %� ,* "i III W."', - ' F f I ioll " I I I I , 'I, /',_` W r jjjjjj T , � � I I I I1011) f )it il "I :',�/,/ I (I il,` , ­ #0 -a,�.....��.....III,,, I I 0 1 ill 11 IIIIJ, I % k � - d!�, 11 wy,"JIl 11% m/0 I 1 f/, 1) Ir a I P1111,111 �l , ",'Illiiiiiiilljrl"- I," I" I I 11 ,I 0 1 1 , ""pj, I% *Ilt/.).Hill."I"O, I, I , d,,)'c",/:l­ OF, 0111111111, 'fl "', " 11 1111 k, , Fs,"" //" jl�r[[ j I loom,", IIIA11)"111111,111111111" / r re I .-I 1�, "" j u p I il" - i ,or", 'I� 1111III$" "I'll'--I- % I 0 1 1 . I ll iii I I', � �1' I -�__ ," po 1)),""/,)),Illllllllllllloll�,5,),,,,, f,r j j I I, , I'A"", IF I " "I'l""I'll""I'll'll""I'll""I'll",'ll""I'll""I'll",Ill""-"",Ill""I'll"lffffffli�wl--, I I 1� " ,�r II 11P I 11 V11 1� - 1 � I I . .p J. . -7/111, r p, - p- � F , , 'j,Iwq SAw pvp� III'11116, q, , j "I��J �I P I f , .... i�lf I "' / 11111! V% 11 4 1 11, I , I, g p, a r t) I I , � ill 11111�/,))",/',�/,­'i.vj , J, 11 __ I 14 J /�11`11 t- I I'll, A le?� rf , k / IT�'f F1 "J�� , I IF Fr 0 1 I ,"fffl, ""mo f1l.l.-Il"'S " ll� 1, re" I 11 ; 11 1I, n%,'%%.. ji, ,9 m ,0" p I I // �, "0 I I , ,le, , I lj� 'I�tja II I N 0111 diolly, ,,�,@ P, , " 1�1/�- . I OF I d I I'll I I e�), / mg ." , �� , , -, , I$ I , , ,g"P / , YL 'fill I jjffi� / I/ ,�!`...1111p, f I J/ IIIN I III L, 11 I I . If",,,, " I, ), �jlsljj l 11p,I ,91 , '70" I , k ��, P, I�j g/ " Y" I 'p, j ,,)I I, ,) , 1, p. );1/1 1,)))��I 111fl,, / J I li,� ,/, I I '!I'1", - A -, ,,�,f,j, 61ho , I 000 0- ,f I 1�1 21.I p", j))))),/ f I "I"",. I jmk ) I I `1 i_,1111- '11",if, 111111, I .I 1%, 1 V/, 1 (11 110mol p" 10 r, ))'O I"Il,e� 4...I'll, i'll ". //, 11 11 11"I ii,111111111 , 0 f N I I I ­vq "I I I I Ill". ,,/. I 11 ou �ollll : ,I V 1A �, I I N 11 5 I I I",',""I'll.I,"IIII. III I JV­ Yll", III ill"01 : " lil�U "O. IN I I IIII,,�.....I,"j" " 'y I ll 11111III % K"I f, Y � I, ij, Ill-'pr, I 111 I 0 / lilf) "O, ����� C il �, � v I'll I e A lI , ""-, I I A J er "I"I / jj, I� 'N .II"f"1111111,111111), !, `1 III, i ,J�#0 0 -.1 111111111111111111111I 11 I ", �IIIIIIIIIIII ky I'll " `11( "If ), .11, r(", 11) I,FiI , "'III,,_ (411li, � �y "I pit"i�it 11 I� ....... ,/ larOwl"a/., ,% I I)) I I i� il, I 5 I A I ( , f p � 1 IiI , - 1p )), ," '.11 "I- "? , I I 11 / I R '11, , I �� 111111II, mi, 111111"llY A J, I'll I ,4, Rh Vs "1, & ........(" / I , flI�)j 14YI)II Yj 1, ..I I T .1"lly I p, �#)),I, Il, -. . I V f ) 1�w �,9,1111N,....m.".1 /, , ,j)) 61, it I �11 11 ,, I I'�,�,,�l�ll,�l""I","".�""f"�f"le�,�....).......I,", /I "fj I) I V ,, '111 1,1­111 Mi 111// I f 11F � 'I% 1 �/! % I..I` "I'll / ". OPP 0 I 01,21//1 ,J7 7 r , , !011.1)10,III), fl'lf Y A I � " S, ......)"Tru, III ,'MA " f"J" J�,loilIId jo,. K11 W00"'11111,0- f, IiI 1111IIJ IJ , 0 11 , ""IF/ ,I,, I III I'll a,I11jjjjj I , "I 1 ".&P, jim, p" _1 �� lF1_I ,.I.....�` p7"' lf� j"/ ii� )� I"I / , , , If 1� "'I'll 11 I il� I,yx JA , I, I I " /1, 11 I Vo I 11"T, 'iq, �­(mi, IlI111111111i, / i"/, !I 11 /ljr//"­#, 111 I F 0 e I',", I 0 ", �,', 0 III , I w j ri ,if",0%II 11% iiiiiiiiiiiiiiiii�lilllmjlp)IA�l�r­ ,(j I....11 lj1I7 1/`?",irr", jIj,g,f........11.1 -.1all-4/1111/ - I ,ill, I , , I-ill- , " I , -,,� I p,, iff, ?IJ, W, 11 t` 11 I I "allo I 'fli/, I pro f IN jia,� �)......... 1111111 lol wip"',0 III \9/ Nilli, )` 11 I I I &I I If IIII11 � i//1I1/) I - �,I "IT im", , iiw� / ,11I -1 (111111III'll"I'l ,�f((Ifl�ll���illillillillilli�[lijilij)).��ll,l,�'ll""I'll',� �F`, %I ,/ - I " '. I T r I I I I I NiQ "_ yI,",41". ".p,01 01101111 I ... 0, ilv I I �, i(i��, & .19 A /, "I 1. - W", 0 11 al/ I I.....Ilj�,,111111,14 i I Am " 11 . III . 1 ,; wi ilid � 11 &,'_ 1`1 1) J I ."t,/ 191, , Simill "".00 y it A I`111 71 i'/, I k I I 0 r r I "/�"��"������/"`/�"'�'ll"���l".�.11)"",,.,Illlllj�1j). ,I - 0),I"/ N)RI&I'l, vlli� ( , I'll, � III 1 I A 'T1,11111111111111111I ,, lli�f I � )'a;u".1., JIB,pw poll", 11 I A I ,I, IJ."do",` I I 11 ropAr-,-,...l ......I'l"101flij,(, a),P"', jw#wl�11 I I ,)I I "I 11 " 1, a I 111III) I( I ". - Or ,/ ". � 11 11 K I e ill If I m 111% '1111,11% If III, I y/ "I ,I ill" ,pol, III- "Y W.Ili,PI,�lli or- 11 , jolio') /mm,., )NI r 1/1 if I, 'o f ,, %a 11 I, lJ11611,�, 1 1 I ;;00�' m4L *1 i I "�," 111 I I l Jff " 1 A- , � ­&Aao�`I#o�m m II 4 // /, ///�_/ , If op I 4111 � I I I I �I I/ �, j,j', 11 III I II �"", �0 .1 if 1 , A If , '11111.11101", ll I I III,, � 10 I! I I BI&I'll")"I, I, I f � �I I-m..._�d,pffi,, ill, tillIllill - J� � , 6 wti,% _apill,ij, %,WI...1410 - 1--w- f j 9"'.1111",`­ I I Iffi-pp),,911"I......I.-I )0� "(11", 1"11, fj 'I, ��I, 'I.... 9 r p FIN I p W,/, (As"II I, I/ 1 1 1 � ill, � "ok I % 11ldl % ST liplIll 11% I II....//`,I if, ri ��' 11 I......... 11 '11/1, I I 1p � "Iffil", ill tillal Ill Nq_� I ii1N /, I /�­�/ , of , " d I I , Al"p. 111� ,,7 1111� , pom , III ),."".Mil...- elf II-, I , , I N� ,/ , I jr I or, I ...%j V, I/ 6 f" 11 , ,, I I I ",,/I, ......"I'l""I'll""I'll'll""I'll""� tl� , / If"I. 1 111(r)i ,, , Il I ......VAIII'j") I i lil,...... I I �, ,� I ji,� IV, ,jo v 111"Y'll I "Ilis "Ill ,/I 11 ) IN11111 1).& "' 11 I IN / jill.lij�111/1,11)�),,�///"�""-",', r 1111%, 0 ."111,%/ ", , I piff, V, ,,� .11,111111)", 11 I I g­ Aw pol pill 1,111p, `­%/l - 'rlf�,, I I �I"1, id,1111 � , "llitili *%umumm , I 10, f"', 4 , I If, ",im",k")"Illllllll"",'ll""I'lI..."I'll",_,,"'., of III 0 11"Mili, Aii)i"' .1%, �, I ; ill I 11 ,�......."Ill,� "" ,I# � � �II Ill);(I ��", ,�, 1_11I �, I I(�/�I"_ , If , 1! ypj ll F Il I . ......- '' d fr , I I 01 f Irr;F I W -111)) ,/`///1�.11.11­_11,,,)..................,/­­,/ (( , 11- 4,III11111111111/�l" W", . ......- "', � r ,'f"I", �l #111 . ......- . ......- . ......- . ......- rf, . ......- r"I'll I ) ......- I ', 11 - - - - 1/11%iij .j 1',�f// I 11), I, / f, 'I,' -I i 1( 111111­1111,',� W,11111111111111�11jfl,�11 �, 1111�" A I 11 I "I 110 0 ? /" , I,,; 111111F, 11 11� y giv/0" 1 11 1, � d"P1111 11(, 1111 , I I I X 11 A" ­_,'�l I 1,il ",',Ilyl 60d, 16 _Ji I= of, ,Ijilk, j I ill I " f H­ Ji� Q111 , III , ,,,,, "I I A/ r of , ,.%v/, 11 'l "' ( �, I, "11j)), i" ,,,, I.j, N1,11", 1/5". I i''Irlell -1 jR III ,,I, I Ill",,/,))/'It'," 11 m,I L, I I'll p I 1� III "A "Ili V T I "ot / I V 1 , I � 11 - I [") ... �I �11 A /6)I 1#1 I . I - 11111111'I it I 'I"'1111), I pill 11I � / W, I 111Cd1,,,,V///Yp,....,jillid), "k " ....pie ill K I 11% I 11,11111i"'.) ,",��.......11111111,�111_111111�f_11"', ,� I ". I, , W I I I I /I � I&,,,I1,j1,,,jfk f), �P I le, In 11) i "'�%iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiio, " 1.11l I, ,.I,.,V ,,,,A�,'�'N I , I om l 11 11 IIII I 11, 100/ I jF 1/1", , ORT 1 11,11 � ,�,,I 501 P, " j I '­"i, li, , � - / if L-, 1, ,� I ,�� � 11 TI ITEl " j ­V11111111 f % If" i , /,I',,( I� I��I I ///�.......bi 0/1_11# , f o" I 0 11 �� ,i,n,,�, P", I 111� , "Ji " W-W F 0 �, ."..,".111111"", II. 11/(�, 11 , I ill I A 0 i 'N(i p-I h d, 0� L I I I Uf)), If, I Il", "', I I 00 ".11 1111111, 1/11 � ,t� .�., - 1 1 or 1411%, ,// io� r , 11 IF 11 � � ­ 4, "I T11 � w "11 1 I � I,I � p all, � /,////// V I J, V,1 - lij I I ' P)r 1� 1 ,J), I !� � ,� 1� U 1% jj,,Ijl,,), I "'P, " I10 - ..­11" "I j / " I 1"I'% 1_11411.Rli "All , " IM 11rw �,� ,1 " III p 01 I I% 111-111, 1-1 ",'I, , /",/, f4l"")... ��l , 0I I I 1� ,g ,I r I ,? jII­ I #7 i*iI.V I..I I a",ofM /""pso I , WA 1111 /�., 0 I "",(!',1�11 ,s I ii I.;�Ifi , I11111,11)(Vililill /, ))�l ))jp,A,m ,W�IJIP, [1, -, " I p ."7! ,...,d) �� "'�����'ll""I'll,�.11�'ll"�"I ,, I, , , '�, 1/10 .........P..../` , , )", ..I v.... 1_1 I // ", ,_1111111111"N'so , m)), ,�f J, Al ._ r j) "'), I )),)I,/ 'p; I , I ill rd"101, I I il�/, . A I �.... ,,, �1 II j�,/ q Art'llill', ) , I p'. I §11111 1- r/1 - " I 1117111 11 " V, IN I I fill l - � Iul //m(W ,J)", 11 , ''I 50"I.,mm. l� 1111I I NP-1161111111,10" Of 111 �r �11 I i,aF , ­1 ill " I V ill I � lloll/iil , f to )pW 0 , V) 0 o/"�,I 6, Ill""...N/Nn-I Ill r v I 11 100 IN ,�,r I(I / g 0 J ........Iil , jl% ;..............FIITV I fioll"g,ph"I, " , I , R ,� f I, H " , , lk / I t /. ?I " Mlv "'11A, x�� ff� `11,... 0 � ,p.....I.,;, iim&lllj11)I1I1 �I V011,1111111 , )1"I I 1p, � l�� mdypi- v 01, #0� ,I P, , s 1411 ITY.lmrj 01j, 11111ii .I 00 )VI , "/ l "I) ,"0 1100 /I 11, 'I I "o 11,/ e , 1%_l,llll0# _­ W__�"I Y11 rwkw/mlo , ll�j 111, , jm/ )", 010 I jJ11110 III " , 11 & du 11 10 pilip .... 11i,,,1011111111-111"" ( I I j" IN I I ,I` I 11111l�� )/Y ld", I""' , ,00 I pe 0 3/11,F',N, ....... - ��If I] N,% 0/11 ,­lljj//,/ pi ", I k I i �ji- OMANI AmPolial ,�la e"(11-11111111 jf!`�` ,///////...../0"I" T--o do, 2 1 � ",I I 11 I � ,/ ,/ _.-"'...V j I _IF "p"', I yo !" - , " " , k /­,,,W".Illljllf,lllllillillillillo��), 111ilto 010 "/))III'm I 11", I 11 " 1II o ,� "I I p..I 1 11i" ,l , ll1k, IF W"'AU I liv 1, I Ill, I I 7 ...p/. jjml/ hEl , 114)( 11, 11 j , IN, I Wro, I Ill Iff )"� 1), oor - 41 I'll h Is . , if p I ,"111101' ��Il`j',Irj I 11. I I N '11)� J), 'TfIl, 111, folw, I w mr ,`iO � �" /�,,Iuill, " I WIP R, � yff , WK, I I I ' 4 .,14, 111/011 C%I,Nmdlf"I/ �i,plll,N 7% d I-", / I "I I 11 1 , 'I I,, 1?m � , V�, q I. , `I//, ,,,r I or... , "'301 I ,Ijplm� i If� ,, IlIll 91 I I I N, III,, %%Rm /, JOIN ,q ,�, ,/ I I ii`lli)/��piiiil­ "­ 111f, , ,!,,�/�, ir j I T"I'll"Willill/ ill, I I , 01010' ."I """ IV ,, I'll Ift( � IfOF ""-1_­11 ),....r ,11 ,I I I 1% li, 'i, VP, i f .1�JWI I .,�'v r"11111. - / ,�', - I'll / ,,,, , ,,,�" 'I - e , �)� ,Ii ji,j, , "" f" I iiii INI,J).I I 11, u ON I, ii,it" `1 I W, , 11 11 iliI,11 I MR "I((illg/ "I'll,��'ll"�Ill""Illilllllllllll11111�.��IlIzellI,14AI�I "..."I I'l-Iffir-.........)........1.1111r, lilfi�i,", 11ii%.1'),,////�, I , I �,_ h ! a Ile" I 1, , �jj -1 ....I I I I I!III I 1� I , � p... J, ill 1, l��l I , 't I, wo I'Ka", 11�", M, � "011111 ",... I I ljR,",0 1 , , ,e it�I....�,ff�llillillillill-iiiiiiiilllllof,I I..),)))..........�,/&� lih ii, r-I, po "lip I" / rf, -�.....­11111d I/ � - , I ,/ ,,,,,�....�,,,.//////,/I..........� 11, lia, `III 1jjj ­-.1l �I I,...I �e I " 1i I. )"', "',-jj. I I-11 mi-.1%. j'�',1111 I .), "I'll , A il,1, ,)OP, "Ill .11- ',,//;II,j I I Ill I 11 /, f I (", 111% , I l * I` "', I dl")j, - Per, I'll " ,,/1111jjjj ,I// 11 I 11111111j, �11,_� % I , I I I...... " 0 ilI` ,. I. , a... 11 I,% )�(r iiiiiiiiiij I A 111- . I r , ­, 'I'llip, ll-1,/...f, " I 1111t, I= 1), .I.,.� 111111111j,"I'l, I,m ',I , "I­996-I � I I I , 11111. ......� I._, 11 / IIIIIII, _%W"9 /�").../......11111. '11,11111dif,1111111111 , I i ,g) , sku .r .....ffilloo[glI, // / / . .r , .r / .r , .r / .r � I I,).di'lij r 1 )""frolmaii.7 "/ / �,,�', ,// , � I / /1)II-11111111I.,1111111lr , IF I 11 er ; 1111 I I I �� NI,Ili) .... ,�. "I'l ""' ,lit � III 11 J I 11 ,,,, J-1.1- 6%...�.........,l) /I,�, /IiI. I, ""1111 ,"I "Nil ,_,,,,,,`,�:I, 111111III-11 _1110,111IN) / , .,,)( f f e a 410 &.,,,, ,"I Wok".111i,1111.601111 I "I VE , / I I 1'11�l % 11)1�1'11_ �- I I I , Ill .11,1,g " - - vlwam...i �,�)l lij Pill ," .....I�, I IIII�.....I�, I 1­1111,1,1.11111�1 )`��Illlj�I­14) -,/_///// ,�.....I�/,/,II mmiiiiiiiiiiiiiiiiiiiillillillillifflillilillilill��)�R�u�m I a_0 I j, 1 1)", I I- W.,�I ; W . fi, I � , i, '. ...6..........9 .......F,......... 1.l1!!!:!*::7:::�� I'll � r�, "ill _� ,////... fj, '01",-, Nowid-IIII A I "" I I/N T III-!'WI"","""""",'ll""I'll",�,�fl)))))"","ml),)jTlfl)lilmp,p6m��nwal11#op,rfI 1, I 11 'I p I tip", "I 11//�1111 ,001...I 11111111I.J. 111.111111111II f -- ,� ,,I ,I, -1 I I I pi, pr J�P, ,/."��1111 --II'l I I 1111, , 111 .11 "I . I 0 1 ,I 1�'I I / I -%% I 1 R ,;,,, I d ill, I-0,,",'11, Ii is , , `:/1"I", iiiiiiiiiiiiiiiiiiiiiillillillillillillilli111.1111�[ - 111114 .........11"k � 11 P% .))))......... -,iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilillill.,ilI -r/1', oelAj � ,/...,�(11111111,AN ...il )"11", 7 W, %I I I""40i'll, 11 "; / I ,( 11 I I ill U,Iff "111,,,,, " jll"� " Ij , /I ,_ 4,w, ,W, wi , , , , ,I j,))/......._" I'l"11--- , , m ,, I....... ,/, It, 11 . 11, I , % / fill 1111111pi ".'I" / iii ,'flil, I t1l"'I I I I ""i I "III 11 l, I& ", de, -��I III�/....... I ,11 - ------- �1% II .4 I ":I=, " fa I, III"// N. f 4� " f , """P1111" / //, ,/,/ "I,""))) !, 11 A ...../ �, , AlIg �,ll` V, ,.­/ I j" . "I''I"I", 9 'r �"11111111111111111111w�w 11 )111p I I 1�1 I ,�If "I � -,// 4 1 , / , I Aw "). I,/, "I 11 I I . 4 11,ON, 11....... �..../,", � "...... ''I I I N", I 1 F/I" I l I Y Ul If' A. 1)), - "I ", "I i W , "I", ), I "111111'.III...)-------F p 011p, "I I I I 11 'Al',., I!, I, jj 'p- --A A 11// , I "I'll, I , x 0... I .......................- I'e d I 11", , 1f� J je� " ya" 'Wit, f R "I� I 11) 111/'I/All, �,� 11, '%14, i , ,ri --ii, / 11-11 1-11"I II..... W 11111111... I, fy � ,,,, I I ` 11111j I Ill" I ",If "I'll" 1,1111II111"'I'll, "I'll, I II / W, I%_ 4.1j" "', I w("M��"Ill... �� Pff "ill (,11�11I, I 'll I vw("`lq��, `� I " 11 I 11 j I Ilf 1 . , i. 11111;1f, I ; ,I Ili , I, 1, �."Ji. Im."11""I, , ,I I 6'r�j ,il, I I f"Ify"ImpQ,1, 1 fl l),Ill Ill � ,))....../, //, 1`11% I "'I'll," ,f"), A I 1 /)......111111 , , , , , �......... 111/1 11ir �',1 6 1,I � ��11 'ip" ,,/,'I"/ i), -, f"'l......... I!,1!, ,� "1111II11L, "ll 11(�, I I I I 4, I r, JI IT , " Il--"/-,- ,,i, I...k, Y .f I lTjrrj ill )i , "'.-IIIIII 91 Ilaillokuhlim I , I .ill, III 114m I,f, ,11 .)� " %Ifii. pill: 11,01 - 11 "", III 411ii -JA ..............I 1111111111111111IIIII I I A . III, ", � ,,, minq$m", 11 I ti I $ I w � I. . A 11 ,/m,". �,,,,, 1, ,, 11 "I 1), , f,J1.1 , �,,/ III­_% � " ll - �� � I p'11,K-7'y-'p",gill, I,� 1%l I& p '11, I I ", / i 1),�ANII I , " , , I'll, I, I, 1% 10"i'l, / ,,/ �, l �� I 111. J� � I I.....I I 11111111111/ �� f, ((, '),Wfill 2 -'­�­..... I I 11 I), 16', 't.". "I 11" ,I I �"", I,I,1111­11,01�4� I'll, L " , �?, I " - I�JI/I.",�11f,��,,��/�//�,1.11,111,111I....I,- 11�lf �,(., ml1,omp14­I,,,//A o^_Ifli, M " � I 11, '.` .111, I e,,, /jl�111111 I liliq , , 11p X,,") %I'll - ... -III ,". lif'i....... IPIJ4,,f , I 0 1 1 N. L / �,j I ", ,101 v/11_.I"I'll, I No I1j, "� III 0 / 11 _" 1/111, I, - "I'll, Ilk-j j/4 1, �gj�� f ]Ill I� , 11 I // 1.1111, :11,...� I-, I I...", "', �A N -q) 'W'W'o, i� I'll � Il n ��, "llu".." "",�")"",",//,�����"",/,�//,l.-O.", Ili......I.. I"I I�jiilm )"111111- ,-.vf 1) -I `1 i� , , IV , , .)I/ If,,, ,P 1 I ,, , %11"%. 1111% /1'.1.....I z 41"m k, 11 �0, 01 11 Nil I I q I ,/, (111P,, l" - I�L 00 , 4, - / I �I.1.A awl"II I 1, 11 11 111AU 11 ,///, elskims 1�4 11 WWI/ I I ,I& il )) )m f'' 1%;. , I "I - "i,hil"'. %/ il w, r Ill, "I'll moor, I ., \� 1 t1d6`2 I q I �I RA 11p I, ll oll �Tar"FM5 ,),,,,,, I'll I'll, ,Il�"�/, 1jil ir j � ,1111"I 11111�111111111 111,I Il ��%��,� I g � 1:11 13 ,If k q %, % I,"I I ]I I 11- , , 'Ij 1 I "'pnll R 111111�/,,, I "',&I I pq III �ffj 191" jl�jlim,&(rj I'll I I ,- 111111j,111 I ......� i1j I jll,1111,1,,.11� I .- I11,11111111.'11jIll, I .I I I yd"�,Ilk I,- - ll I / " �� 111111,j I v I I ......I """","",,*1 . "i, 1,N %/ 1//// I I ,//, " I,, "� I" ,/%.11110,II I il... 11 ,I "I ......F"' ; ,��,,."' 1 "I" - .....�'­,"_ / 4 I,, � 1, ,,/', " 11�1, r� /, 11j, ,,,,,�,�,�,­,, Tf `1111111 111. ,,","I I'll 111111] I'll, Hill ll% ....Il,....�� I "Ill "Ifilf Sff %, Ill""' ,,, I,/ l'), ',� , - �"s 1. w % I A I II I'lik Iii, - , %*l Is I 111111.11,I "I'll I. ."Ill 4 11,I I�,",_�_ f,"'1111, ,� "Ill-........I I I._IIIIIIIIII,., �Ilaf '11III 91111111jiliI "Il'i's )"",im'/P ­_', ,.", "!" f I I, Q"m I q ,on.n1j" �J'7, ,'�/, , ',', I " 'o A 11 J,11� .,,,,Ar a ",J11 " k; 11 561 limillillil,' I " " ill, li�r,"l �1`41, It L/ I "'-, 1"", "I I il, lfll, �, Tj 0,I -1,111 I'll,... -l I 11 - li "I I, 11 )61*1! ",",­, jjl�/..I........_//I.........�,,. 7, rjr _1'fl�,,,:_1111 A 'p""',,"", J ,I 4, , , , ilm"""I"-aammmmumi, I, ,,, ,"Y�.�� It, 11, , , iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiimmuiA I �, i I Jim 11, , " ,Ill I f ,,',"",'I,""_/// ",­Imlio....... " /111/), w ,, ,l �Il� oil' ,1�11),,��'I"', U 1 , ""r," Ak -//,_,,­ 111) "" Ill, "',-�111 jlLil��11111111111 jjrj,//,..J,� II d I II /, I 4 L ..........)11111'1f� F IF In 0 1 1 1)) 11 60 d t, / `� /// �", i,III 1111 IN, x l , , I I I I I," I I 1" 1�11114 Ir , I 11 , - ,/I'll, , , l "" I 11 IF "v I,,Q ; "I'l'i �i p/ f'ell , So:,., 1. I if ill, 14is"I", Ill I V , V, I/." I % j sw JW � �1'1 Iluilill ,", '11111IIi- ',`!'�/J� , 'e,"f,), �, I" I III, f, ,)I 1111111111�" "'I'll I liell , ,, liell liell li 1 III141111 -- Ili - ,�//Ij"""""""""'ll""I'll""IlI liell I I,,llj,l, I W!",10" 11,11 NII% ��?':,m"'l I , 11), 1- q W, 1,fo [�j " 1� , I ,fl I N IT,id %ps 'i I _11111�1f_ "�.","","""""",'ll""I'll""I'll",'ll""I'll""I'll""I'll""'ll""�_,),)),Illllllll�iiiiiiiiiiiiiiI" I 1p W" dl IN, oll " " i// �/, 11 I I I / . I I I I " � 11,i ", ,I w Iii /�f ,1,/ I I I /, � ",""I'll 0,Z 9. 1 If,;, f _,l?, &I liilil�111,/,,.f, "li"I'l'i IT � d�.. .....I /, 1,11 "I ,,,, '" I " III / I", I I P it /k 11 , % Ni I)f �i"Iii, i �jxj , ,",� / �)� 11 I A T`11,III)..... L,/ "m I `1 ,i4 "� "i-6,00W V/, �.,ql...��l, -�/.,­'� I v I I a 4))'A 111111111 I. �",��i��1))�,�?,�,)�)�)���?m�l�jjj)llI - MR 11.111S I I 11 k I X),�j f",j', I 11;1"- rf, �,�' " "I Y'11 , �jl & I I I I I �, '.,/ pq r1f, I I�;fwl,,)),I"� ",�,. ) �� I/ "I,;,I l9w 4 -IS T I , I, - " I W A-,ll� it, , ,,,,jl� ­­111 I I 1� An 1 lk lIl., '_� , I'L7,11ill" r"),,�gx , �,Iijjj` Ad, 1, f � i))",_" /, 'I ar...l..........�e A, ,fill � a �,,jjoi,W/, "I I'll lill III I ,111 mm- ,,,ill I p", -::1lij,,,/`,.`,///`i.` 11, I'll, , f"'I 10 I, '�R ", , l'III"111P, , OW&W, . 4 I I I'll I'., ,z . P"iIII,111l,fl"I'll �", ar d!%;: ...Jl ��,�"//,/"�l),////////////////////I Ill.;` 'IN 1 ftb�IT , 'i'll-I %11 F�111l,jj , "', I " 4 )011�',1 Iiiii, ll"11,If 10 `�l "I ,,/ � 11 " , "" S, *4111d �� I 11�� IN I o" ,Z`fl,I,'! , " " ,)" I III) A I� �� "I "',- /, I, III l I.......I I,/I"A/ ,/. '%�imll:I )o yo:Q I ,I j f� , jjj"Y", , , , , III I , �,Y/I 11 I , III " -"--:I ,� Ili " �I� 1 4031 11 11111"S,,/­),),; j� ,wo ,l 11.�"17 Ap, 'Ir ,­­ I q 4 0///'111111,I'l, '11111 I I m � I is' jir)) -'p"'11111 � li, eli,1111111T "I.,.I'll ,,� jj1II � " 11111111 N n "',I'll ,":��,, I %Q;j 1040", I j" � , 111­11, r w""I - 1� I ;I 6 11 I W11�11 I % ,� ,I %& , drrmIl q-w- If -,le"011 IIII1111111 �'Wll w",11111111IT111 11 I" ,j, , , OF P 0 1 h,:SAY �,W f p I "!III, III '),11-11- I 1 7 1 9i "" I , " 111111011 I ....D" 6...I I.1), I, I id.,I , ,yI1,1))), , I/ J5011111 r,/I ljaldl '%I ��,�� I 11 I ....i .II. "I. `,111 I ,...'�..., I �"I " -p 1, / "I I'll I W I / , I'll I" - I - I 'I kill - Ill I ') 0 1 - III , ,�/. 'll","ll,",%, Ill, ',ji, - �11, I'll n' ...�, mi, " / � ...I ,(",I"' )III II 11.1,11111"/.........lip/l,"1,i, I ,li , ....I. , " 1/1 "ili ",Ill I '� A:w I'll, ,,� , j m% I I I F 11/1 I.,11�11, rh) ,:I I I "I'll ;��,111),,, I - I filw�� I'd,",,/"66, ,�_z I �`�),?'�K lip/p, 11 liell) "I / ILIJ , " , //", I 111111111111111111111ililllllllI[[[[[[I 13, `111�ff)vfl " I, �o... - W-­ � , I I i1j,jj,_,- ", I#I/ I ,/, - ", :00 " "W-0, 11 jo iiiii 11 f 1, "II"N, `9*%...I, .j _., I // q�),l -)....I " ", " �f�,1,1,11­yli, _7 I 0�(, . I 4,10 I 'I'll PENN= ,'I I. @111111, i . It I , )_ "I e�') o/ . � "%, / A I'll, I III I III ,0 I AW ,'/'/ � " I I lw,�, ,,, I , 1 I III ,�_..!, I J �0 p u ,IIIN��4 ,,, , -p N nil f/�'Ilwlql , r 11 I I I 11Y I 111i� I y mr I A.I � I * , - , I 0 r,,,1­t , /"/`1 � f r III j"(" ,/ ,11 j rc 11 j� IN I I & I IN, - FISINIIJ p "I'll # I 1I I , I "No I %f%1111(i III `I!Ill�"-ill e - " 4 ,/ 0 1 ; I I I % i 1) � 1i I " I , ,'I% , Illy "'r �111 11 , 4 f v I LI f I,% IAN orns 0 '�ll ,,,I) " j", f ri; ,,IIIIIIIII�i�� A "" ""'ll) I �, 11"Wemill"I'll ij, I ,� % ......l, Jim 0 f L ill I " N " "I, v H� �ij All., 4%, ", I J e A"/` I ill,� ",.1l N, - � I " J)", ",I "&/a 1 I / III, ly ch%IIIS 1 , cc dl I .1j fX�t'V, I../ " I 11,19 11j�I......11111 N I - - I ""' " ., 1 I W�Ill 111111, 4m I'll ,,,,/ I 11 �) I , IIII,m il ol I , )1_1 Ifl,�,Ill IN, I I Owl A 111 "I I I I I "I" to,....._11 I0,11.111 , , ......IlIt"is "I I I i .11 11111"11-1 / A _., �� e .1 -qq �, r, jm� 1%" N f "'N.Ill:js,, ",,iliP p p,�� ,"l?",4��r'f;/`p)"f',",I ,II I JI........IT 1J) p H"P - im I I, 11 %. tl//, � ,I V 11 0 p- IA il �, 1 1 1, ,, ,46, I 11 f'r, `. ? ,�� "I'll I IF ,, ,I � 0IO, ,rf�, ,�,, ", o)#),lr,�I ill, '1_ -11" 0,(i e " �,,,,, 1 I f W I I 0 1, �I 1/, I , , ell 11jit I I I ll S li,�,I "fol , I 1 1, � p � 1, I/ IV"l IlIkIll",�,",Illi ,/,,%,, dil 9, X", 1/'1' " "I'��i*"-""",�ll,""6"i,I"I'll ll�,""//,)1111111.... - ,, , "I...liu";,, ,I , "Il ""11 - , ,�� /, fj"11% 1,I',,IIN , � , ,, !/", , �Iif k) Il 1 �, 'IS,`% , ,I j t All,..... I " M de I I It*A I I 1 I r, ,", 1/m,"Illf ,jr,�l I I"If"p I , I /, i'll � 1,N , �t 1"Ilijill j J III I r �, % � � I r 1 04 111111II'I It I I ),* � �, r" Fill Illf Al m Ile, w�, lo / - % wq 1 I " I � 1 l 111 N111 f',`11 "", �"­1///1 I-,,", ,., ".) r - "I'l""I'll""I'll'll""I'��������l.....� 1, 0(s� "11 I 11 � " ," � I ' �f) 0 0 1 f, " I / ) ( " ` ` ` / " ' I / / / ', 0 " / , � f �� il,;" / I,/ I I Al f � ('pit"'I" ) I )I 11 III 1�� /1 1 111� l",� / I / le `� ` f � i 'I I` 11 I fl;� ( 1LOP" I I.I I I I � /,I � � - 1�z 1 ". IN i I 11�, IS ,11 ), 11 11 11i I r,) I. I I I 01 Al imr, 0 w- - d ,# ,g I mi... I I " "'11111 �11 r", ,� " V, I I'll, ,, 8,�j#,),"'jjpl��l �p))p /,T ,.", I r­". m I 0,I f 0,"ra i, 1� ��if 1­1 I,',,/�', 1­1,,­),&_/.'/,­'I, it To, 'lill I I it :1111 d"�" J 'W"d......�� I III " ), 1,'m .// _W­%," le i" - I ,� " ) f 1///((i1';1IV/,1// , N S*46/, il� I ­/...... 'I d" !�f W;0" If, [ I e d , li I, "(1 W" - 0 , A ,", �l III Ill)," J-1 I �)& 111 14 I I ...%I , I , I( ­/­ " " , II ,,I III I 1 II11 I I f/ I 0 jr pi, )j, I " Iii, I "I"'m 11%I / Inii, : ii" f , If 10, "' V-111111111.........I.� 5 1%N "I ik///,, 1) �� """ fiv /1111//1111-'r Ad �i, I Ill, 11��,�_Illjl i 1, 1� "I'll, I � I I.,�Ij, II Ilf v I I �, i,, �, I gv,/l, 11111�1 1 k IS ,5�I......�Ily I �/, "Ill , 'Ili , u, " 11111. % , 11,11111,"I 0 1, j O& - I,it . - I � "plI111111111111 , .) '16 , 7.111111111�1111_1 I itI . ,, ". I I", , "I /11.11 I`.I , '/(I ,I 11i lli�1.11. I A. J, ml 0 , 'IR I 111-1p -� ij� I'll,...I ... ,-'k", 14/1 ,­�'m , /, % I A "I E I I /N"ll l6llv i, I F , . 11 Ii "W" "", p I y `�1111�11ij Ilk, -0 rl�,,T` I I ", "' __%. "�...r',Ilit", A WE )e(1 , I U ())Y)� Ili II 4 __,r" ­�'P,kl I L i 11 -L - . &m //1 ill, " wil Wi `1�1(11�ssp IIII1% ) I "' I if I[if, I , ;f f tir ff �plmp` , � , , loo I M*it ON mI 1) ,,,, L"I AN A I W, " ,l" N N&I­%, : " � , pjO .I i f I .1 r, I �, *_"l "it Ir I I 111"I'll", I" mm I I I , , -%>I 5, )II/Ell,%" ��),I %WIN W I gli'llotilill N�):,',, 1�, - .v U, Np ls�,"h,t/-',p,1 1 ......jp - I A %I 'p, hb,", 10% - "." �, �",%),,,,ll i/ " 'pilliffi-, 01111�,A/0­111,' �... g I P,/%1. ,'ji ?/" 1� , _11., 1r): "'i��,��,;,�,��;",f)))"Illll,f�;""��"fiI i"', , ,i"Io,ni , I", , 0 �J, A 11�1 � r A" 0-*ffi-Rl I 1 ","I lif", ra4l", "".)",- ) , " I A00mmeAw ` Ili ,� 11 / "",I 1,I!i,,, "'4%, -%h M Li "N'loirf"111111111 -.Mw-%, � J, � CC I/I I , I a& 111`c;1';11;1:1:',1' I , " i III, "Mm. �,'),-, 1 5" I N ­111 "IT1111 11 � -dill', ` - -" Ir 11111, I ( I t f I I " �1111 I Ji I 0 All-All ""I"I 11 L"1�ll ,,,Illk. ;? , � 111 "), I/W�) i "dill \\ \ y \ massachusetts S"te Ak AL Cultural bafion R - MACRIS Search Results Search Criteria: Town(s):North Andover; Resource Type(s):Area,Building,Burial Ground,Object,Structure; • Property Name • NAD.A North Andover Center Historic District North Andover NAD.B North Andover Historic District North Andover NAD.0 Machine Shop Village Historic District North Andover NAD.D First Period Buildings of Eastern Massachusetts North Andover NAD.E Tavern Acres Historic District North Andover NAD.F Osgood Hill North Andover NAD.G Harold Parker State Forest-Berry Pond Area North Andover NAD.H Harold Parker State Forest-Stearns Pond Area North Andover NAD.I Broadfields North Andover NAD.J Kittredge Mansion North Andover NADX Davis and Furber Double Worker Housing North Andover NADI Ridgewood Cemetery North Andover NAD.800 Burying Ground,Old Academy Rd North Andover c 1662 NAD.801 1817 Burying Ground Academy Rd North Andover 1817 NAD.147 32 Academy Rd North Andover NAD.27 Kittredge Mansion 56 Academy Rd North Andover 1784 NAD.115 Kittredge,Francis Barn 56 Academy Rd North Andover r 1840 NAD.26 Carleton-Stevens House 83 Academy Rd North Andover 1833 NAD.25 Loring,Rev.Bailey House and Farm 84 Academy Rd North Andover c 1818 NAD.24 Clark-Stevens-Hodgetts House-Prospect 114 Academy Rd North Andover c 1820 House NAD.148 135 Academy Rd North Andover NAD.23 Stevens,Capt.Nathaniel House 140 Academy Rd North Andover 1846 NAD.1 Ballard-Johnson House 153 Academy Rd North Andover r 1800 NAD.2 North Parish Church 190 Academy Rd North Andover 1833 NAD.15 Hay Scales Building,Old Andover St North Andover 1818 NAD.900 Wilcox,Charles Blacksmith Shop Marker Andover St North Andover 1974 Friday,September 17, 2021 Page 1 of 12 Property Name Z NAD.901 Brooks, Phillip Statue Andover St North Andover 1916 NAD.923 Kitteredge Memorial Andover St North Andover c 1907 NADA Kimball,Thomas H.House 26 Andover St North Andover c 1830 NAD.5 French-McDonald House 36 Andover St North Andover r 1830 NAD.6 44 Andover St North Andover r 1830 NAD.153 86 Andover St North Andover NAD.154 92 Andover St North Andover NAD.8 Stevens-Coolidge House#2 113-115 Andover St North Andover r 1835 NAD.7 Stevens-Coolidge House 139 Andover St North Andover c 1800 NAD.108 169 Andover St North Andover 1836 NAD.32 Hervey,Albert House 179 Andover St North Andover 1833 NAD.101 Adams,John G.House 207 Andover St North Andover r 1846 NAD.70 Noyes,Dr.Nicholas House 309 Andover St North Andover c 1725 NAD.69 Parker,Joseph Jr.Homestead 330 Andover St North Andover r 1738 NAD.302 Faulkner,John House 141 Appleton St North Andover r 1705 NAD.907 Harold Parker State Forest-Berry Pond Pavilion Berry Pond Rd North Andover 1935 NAD.917 Harold Parker State Forest-Berry Pond Stone Berry Pond Rd North Andover 1935 Wall NAD.918 Harold Parker State Forest-Berry Pond Berry Pond Rd North Andover NAD.803 Berry Farm Cemetery 16 Berry St North Andover 1764 NAD.64 Towne House,Old 338 Berry St North Andover r 1775 NAD.33 Davis and Furber Worker Housing 3-5 Bixby Ave North Andover c 1866 NAD.279 4-8 Bixby St North Andover NAD.278 11 Bixby St North Andover NAD.277 14-22 Bixby St North Andover NAD.276 15-17 Bixby St North Andover NAD.275 22 Bixby St North Andover NAD.274 26 Bixby St North Andover NAD.322 Hammond House 9 Bradstreet Rd North Andover 1920 NAD.323 Emmons,Arthur House 15 Bradstreet Rd North Andover 1920 NAD.324 Vetter,Carl House 27 Bradstreet Rd North Andover 1920 NAD.325 Bradbury House 28 Bradstreet Rd North Andover 1920 NAD.326 Curran,C.Ernest House 37 Bradstreet Rd North Andover c 1922 NAD.327 Storey House 38 Bradstreet Rd North Andover 1920 NAD.328 Battles,Joseph House 43 Bradstreet Rd North Andover 1920 NAD.329 Woosman,William House 44 Bradstreet Rd North Andover c 1920 NAD.330 Mowat,George House 49 Bradstreet Rd North Andover 1920 NAD.331 Ewart,James House 50 Bradstreet Rd North Andover c 1920 Friday,September 17, 2021 Page 2 of 12 Property Name Z NAD.332 Cass,Herman House 54 Bradstreet Rd North Andover c 1923 NAD.333 Downing,Charles House 55 Bradstreet Rd North Andover 1920 NAD.334 Fenton, Dr.J.W.House 59 Bradstreet Rd North Andover c 1923 NAD.280 14 Brown's Ct North Andover NAD.246 18 Brown's Ct North Andover NAD.247 20 Brown's Ct North Andover NAD.31 Tavern on the Boston-Haverhill Road 13 Chestnut St North Andover r 1800 NAD.92 Hall,William A.Jr.House 156 Chestnut St North Andover c 1890 NAD.93 Hall,William A.Jr.Carriage House 172 Chestnut St North Andover c 1890 NAD.95 Mills,Hiram House 300 Chestnut St North Andover c 1888 NAD.65 710 Chestnut St North Andover c 1825 NAD.34 Bonney, Henry House 857 Chestnut St North Andover r 1923 NAD.248 27 Church St North Andover NAD.35 Downing,Samuel House 30 Church St North Andover c 1874 NAD.250 32-34 Church St North Andover NAD.251 40-42 Church St North Andover NAD.252 48 Church St North Andover NAD.253 54 Church St North Andover NAD.254 56-58 Church St North Andover NAD.255 59-61 Church St North Andover NAD.256 64 Church St North Andover NAD.36 Davis and Furber Worker Housing 1-3 Clarendon St North Andover r 1865 NAD.214 5-7 Clarendon St North Andover NAD.215 10-12 Clarendon St North Andover NAD.216 14 Clarendon St North Andover NAD.217 25-27 Clarendon St North Andover NAD.71 Austen,John House 307 Clark St North Andover c 1743 NAD.300 Costello,James P.House 13 Cleveland St North Andover 1895 NAD.301 O'Brien,John P.House 21-23 Cleveland St North Andover c 1894 NAD.909 Stone Arch Railroad Bridge at Sutton's Mills Cochickewick Brook North Andover 1890 NAD.40 Chickering,Jacob House 15 Court St North Andover r 1847 NAD.91 Way,Sarah E.House 16 Court St North Andover c 1889 NAD.344 Bridges,James-Stevens, Isaac House 125 Court St North Andover c 1690 NAD.96 Johnson-Dale-Appleton Farm 158 Dale St North Andover c 1800 NAD.66 Dale Street,922 922 Dale St North Andover r 1715 NAD.100 Hubbard-Foster,Nathan House 997 Dale St North Andover r 1848 NAD.37 Downing,Clara House 25 Dudley St North Andover r 1875 NAD.212 2-4 East Water St North Andover Friday,September 17, 2021 Page 3 of 12 Property Name Z NAD.211 6-8 East Water St North Andover NAD.210 10-12 East Water St North Andover NAD.209 18-20 East Water St North Andover NAD.207 19-21 East Water St North Andover NAD.208 24-26 East Water St North Andover NAD.206 28-30 East Water St North Andover NAD.205 31-41 East Water St North Andover NAD.204 34-44 East Water St North Andover NAD.303 Hodges Block-Ellis Block-Len-Ova Houses Ellis Ct North Andover 1830 NAD.46 Davis and Furber Machine Shop Elm St North Andover 1855 NAD.269 Davis and Furber Main Office Elm St North Andover NAD.270 Davis and Furber Company Elm St North Andover NAD.102 Blanchard,S.M.House 10 Elm St North Andover c 1881 NAD.38 Quealey,William House 30 Elm St North Andover r 1848 NAD.257 33 Elm St North Andover NAD.39 Greenleaf,George House 34 Elm St North Andover c 1850 NAD.259 44 Elm St North Andover NAD.60 Downing,Leverett H.House 45 Elm St North Andover 1906 NAD.260 46 Elm St North Andover NAD.61 McClary,Thomas House 52 Elm St North Andover r 1876 NAD.258 55 Elm St North Andover NAD.262 56 Elm St North Andover NAD.261 59 Elm St North Andover NAD.263 62 Elm St North Andover NAD.264 65 Elm St North Andover NAD.265 69-73 Elm St North Andover NAD.90 Trinitarian Congregational Church 70 Elm St North Andover 1865 NAD.104 Wright, Elijah House 77 Elm St North Andover r 1905 NAD.103 Wiley-Wright House 83 Elm St North Andover r 1894 NAD.266 88 Elm St North Andover NAD.42 Wiley,John A.House 93 Elm St North Andover 1864 NAD.267 Parker,Stephen Store 94-96 Elm St North Andover 1860 NAD.268 100 Elm St North Andover NAD.114 Farnum's Saw Mill Farnum St North Andover r 1750 NAD.72 Farnum,Capt.Benjamin House 397 Farnum St North Andover 1787 NAD.242 12 Garden St North Andover NAD.243 13 Garden St North Andover NAD.244 22 Garden St North Andover Friday,September 17, 2021 Page 4 of 12 Property Name Z NAD.245 25 Garden St North Andover NAD.107 North Andover Grange 3 Great Pond Rd North Andover c 1911 NAD.289 Broadfields 121 Great Pond Rd North Andover 1906 NAD.342 Simonds,George H.Barn 121 Great Pond Rd North Andover 1906 NAD.906 Simonds,George H.Estate Grounds 121 Great Pond Rd North Andover 1906 NAD.43 Adams,Capt.John House 326 Great Pond Rd North Andover c 1760 NAD.290 Sutton,William A.House and Boathouse 400 Great Pond Rd North Andover 1900 NAD.112 North Andover Water Works Engineer's House 420 Great Pond Rd North Andover 1912 NAD.113 North Andover Water Works Pumping Station 420 Great Pond Rd North Andover 1898 NAD.291 North Andover Country Club 500 Great Pond Rd North Andover c 1865 NAD.292 Allen, Ethan-Tyson,Russell House 666 Great Pond Rd North Andover 1921 NAD.73 Foster-Bigelow House 808 Great Pond Rd North Andover c 1850 NAD.97 Foster,Charles House 894 Great Pond Rd North Andover r 1805 NAD.293 Carlton,Richard House 933 Great Pond Rd North Andover c 1815 NAD.294 Barker,Nathan House 1046 Great Pond Rd North Andover c 1785 NAD.295 Foster,Daniel House 1160 Great Pond Rd North Andover 1761 NAD.296 Russell,William A House-Lakeview Farms 1160 Great Pond Rd North Andover 1885 NAD.297 Russell,William A.-Lakeview Farms 1160 Great Pond Rd North Andover 1871 NAD.298 Russell, Richard S.House-Oakland 1160 Great Pond Rd North Andover 1902 NAD.94 Byers,Susan Kunhardt House 1399 Great Pond Rd North Andover c 1909 NAD.299 Barker House 1439 Great Pond Rd North Andover c 1820 NAD.62 Kunhardt,George Estate-Campion Hall 1518 Great Pond Rd North Andover 1906 NAD.321 Lena, Frank House 64 Green St North Andover 1920 NAD.98 Poor,Joseph House 254 Greene St North Andover c 1800 NAD.127 Parker-Chickering House 310 Greene St North Andover r 1770 NAD.343 Harold Parker State Forest-Headquarters Harold Parker Rd North Andover 1937 Building NAD.919 Harold Parker State Forest-Stearns Pond Harold Parker Rd North Andover 1936 NAD.920 Harold Parker State Forest-Stearns Pond Dam Harold Parker Rd North Andover 1936 NAD.921 Harold Parker State Forest-Stearns Pond Picnic Harold Parker Rd North Andover 1936 NAD.89 Phelps,Henry House 104 High St North Andover 1836 NAD.88 Davis and Furber Worker Housing 108-110 High St North Andover r 1881 NAD.304 Doran, Patrick House 20 Hodges St North Andover 1893 NAD.902 1-495 Bridge over Shawsheen River 1-495 North Andover 1963 NAD.903 1-495 Bridge over Merrimack Street 1-495 North Andover 1963 NAD.904 1-495 Ramp L over Merrimack Street 1-495 North Andover 1963 NAD.905 1-495 Ramp N over Sutton Street 1-495 North Andover 1963 NAD.17 Hay Scales Exchange 2-4 Johnson St North Andover c 1890 Friday,September 17, 2021 Page 5 of 12 Property Name Z NAD.3 Brick Store,The 3-7 Johnson St North Andover 1829 NAD.118 6-8 Johnson St North Andover c 1890 NAD.139 10-12 Johnson St North Andover NAD.16 Cochichewick Lodge 15 Johnson St North Andover r 1910 NAD.18 18 Johnson St North Andover r 1780 NAD.19 20 Johnson St North Andover r 1780 NAD.138 Swan,Joseph House 23 Johnson St North Andover NAD.20 32-34 Johnson St North Andover c 1890 NAD.137 North Andover Center Community Center 33 Johnson St North Andover NAD.21 36-38 Johnson St North Andover c 1890 NAD.67 79 Johnson St North Andover c 1845 NAD.911 Patriot's Memorial Park Main St North Andover 1922 NAD.912 World War I Monument Main St North Andover 1921 NAD.924 North Andover Soldiers and Sailors Monument Main St North Andover 1913 NAD.63 Andover and Haverhill Railroad Freight House 12 Main St North Andover c 1840 NAD.305 Costello,Dennis J.House 22-24 Main St North Andover c 1900 NAD.306 Carleton House 39-41 Main St North Andover c 1852 NAD.307 Bradstreet School 70 Main St North Andover 1911 NAD.308 Morrissey Boarding House 98-100 Main St North Andover 1893 NAD.309 North Andover Town Hall and Fire Station 120 Main St North Andover 1925 NAD.310 Murphy,John P.Drugstore 126-128 Main St North Andover 1896 NAD.311 Leitch,James Stove and Kitchen Store 130-132 Main St North Andover 1896 NAD.47 Stone Mill Building 146 Main St North Andover 1825 NAD.159 Saint Gregory's Armenian Apostolic Church 153 Main St North Andover NAD.160 159 Main St North Andover NAD.161 163 Main St North Andover NAD.162 173-175 Main St North Andover NAD.163 178 Main St North Andover NAD.165 179-181 Main St North Andover NAD.166 185-187 Main St North Andover NAD.164 190 Main St North Andover NAD.167 193 Main St North Andover NAD.168 196 Main St North Andover NAD.170 205-207 Main St North Andover NAD.169 206-208 Main St North Andover NAD.171 219 Main St North Andover NAD.172 222 Main St North Andover NAD.173 225-227 Main St North Andover Friday,September 17, 2021 Page 6 of 12 Property Name Z NAD.174 226 Main St North Andover NAD.175 233 Main St North Andover NAD.176 234 Main St North Andover NAD.177 242-244 Main St North Andover NAD.86 Clarke, Francis C.House 247 Main St North Andover 1880 NAD.178 250 Main St North Andover NAD.87 Wilson,George E.House 257 Main St North Andover c 1882 NAD.54 Hodges,George House 266 Main St North Andover r 1845 NAD.315 Stevens Memorial Library 345 Main St North Andover 1907 NAD.52 Ryan, Patrick House 364 Main St North Andover c 1900 NAD.317 Emmons House 395 Main St North Andover 1921 NAD.53 Saint Paul's Episcopal Church 398 Main St North Andover 1881 NAD.318 Disney,Robert House 399 Main St North Andover 1920 NAD.319 Coats,Wallace House 405 Main St North Andover 1920 NAD.320 Leck, Perley House 411 Main St North Andover c 1920 NAD.68 11 Marble Ridge Rd North Andover c 1690 NAD.85 Brainerd-Jewett House 22 Marblehead St North Andover c 1880 NAD.84 Phelps,Charles W. House 31 Marblehead St North Andover c 1880 NAD.83 Wood-King House 46 Marblehead St North Andover c 1880 NAD.14 Merrimack Valley Textile Museum Massachusetts Ave North Andover 1964 NAD.350 595 Massachusetts Ave North Andover c 1930 NAD.13 730 Massachusetts Ave North Andover c 1960 NAD.48 North Andover Mill Mill Pond Rd North Andover 1839 NAD.286 Carlton-Frie-Tucker House 140 Mill Rd North Andover c 1709 NAD.9 38 Osgood St North Andover c 1840 NAD.10 46 Osgood St North Andover c 1800 NAD.11 58 Osgood St North Andover r 1835 NAD.55 Gile,William House 80 Osgood St North Andover r 1835 NAD.155 100 Osgood St North Andover NAD.156 110 Osgood St North Andover NAD.117 Carriage House 117 Osgood St North Andover c 1900 NAD.158 117 Osgood St North Andover NAD.157 120 Osgood St North Andover NAD.146 129-131 Osgood St North Andover NAD.30 Phillips New Store 139 Osgood St North Andover r 1820 NAD.29 Phillips Manse 168 Osgood St North Andover 1752 NAD.28 Barnard,Parson House 179 Osgood St North Andover c 1715 NAD.116 Barnard,Parson Barn 179 Osgood St North Andover r 1800 Friday,September 17, 2021 Page 7 of 12 Property Name Z NAD.109 Osgood,Samuel House 440 Osgood St North Andover 1740 NAD.56 Osgood,Clayton Barn 547 Osgood St North Andover c 1850 NAD.287 Osgood,Col.John House 547 Osgood St North Andover c 1720 NAD.82 Curwen,George House 676 Osgood St North Andover c 1887 NAD.337 Osgood Hill-Stevens,Moses Tyler House 723 Osgood St North Andover r 1885 NAD.338 Osgood Hill-Stevens,Moses Tyler Stable 723 Osgood St North Andover r 1885 NAD.339 Osgood Hill-Stevens,Moses Tyler Carriage 723 Osgood St North Andover r 1885 House NAD.340 Osgood Hill-Stevens,Moses Tyler Gardners 723 Osgood St North Andover r 1885 House NAD.341 Osgood Hill-Stevens,Moses Tyler Gatehouse 723 Osgood St North Andover r 1885 NAD.913 Osgood Hill-Stevens,Moses Tyler Swimming 723 Osgood St North Andover c 1970 Pool NAD.914 Osgood Hill-Stevens,Moses Tyler Ball Court 723 Osgood St North Andover c 1970 NAD.915 Osgood Hill-Stevens,Moses Tyler Parking Lot 723 Osgood St North Andover c 1960 NAD.916 Osgood Hill-Stevens,Moses Tyler Tennis Court 723 Osgood St North Andover c 1960 NAD.74 Osgood,Dr.Joseph House 814 Osgood St North Andover c 1755 NAD.316 MacDonald,James House 2 Park Way North Andover 1920 NAD.335 Bedell,Frank House 14 Park Way North Andover 1920 NAD.81 Anderson,Frank H.House 50 Pilgrim St North Andover 1920 NAD.179 9 Pleasant St North Andover NAD.75 Davis and Furber Worker Housing 14 Pleasant St North Andover c 1850 NAD.180 15 Pleasant St North Andover NAD.181 19-21 Pleasant St North Andover NAD.182 20-22 Pleasant St North Andover NAD.183 25-27 Pleasant St North Andover NAD.184 26-28 Pleasant St North Andover NAD.185 31-33 Pleasant St North Andover NAD.186 32-34 Pleasant St North Andover NAD.187 37-39 Pleasant St North Andover NAD.188 38-40 Pleasant St North Andover NAD.189 43-45 Pleasant St North Andover NAD.190 44-46 Pleasant St North Andover NAD.191 49-51 Pleasant St North Andover NAD.192 52 Pleasant St North Andover NAD.193 55-57 Pleasant St North Andover NAD.194 60-62 Pleasant St North Andover NAD.195 61-63 Pleasant St North Andover NAD.196 67-69 Pleasant St North Andover Friday,September 17, 2021 Page 8 of 12 Property Name Z NAD.197 70-72 Pleasant St North Andover NAD.198 71-73 Pleasant St North Andover NAD.199 77-79 Pleasant St North Andover NAD.200 87-89 Pleasant St North Andover NAD.201 93-95 Pleasant St North Andover NAD.202 105-107 Pleasant St North Andover NAD.203 115-117 Pleasant St North Andover NAD.922 Christ the Teacher Rt 114 North Andover 1956 NAD.76 Pollard, Dustin House 10 Salem St North Andover c 1847 NAD.136 Foster,Moses House 24 Salem St North Andover c 1825 NAD.314 Berry,Capt.Nathaniel House 166 Salem St North Andover c 1906 NAD.345 Ridgewood Cemetery Administration Building 177 Salem St North Andover r 1925 NAD.346 Ridgewood Cemetery Hearse House 177 Salem St North Andover 1854 NAD.347 Ridgewood Cemetery Storage Shed 177 Salem St North Andover c 1855 NAD.348 Ridgewood Cemetery Maintenance Building 177 Salem St North Andover r 1965 NAD.349 Ridgewood Cemetery Shed 177 Salem St North Andover 2005 NAD.804 Ridgewood Cemetery 177 Salem St North Andover 1850 NAD.925 Ridgewood Cemetery Circulation System 177 Salem St North Andover c 1850 NAD.926 Ridgewood Cemetery Perimeter Walls 177 Salem St North Andover 1853 NAD.927 Ridgewood Cemetery Main Entrance Gate 177 Salem St North Andover 1909 NAD.928 Ridgewood Cemetery-Atkins Gate 177 Salem St North Andover 1944 NAD.929 Ridgewood Cemetery Receiving Tomb 177 Salem St North Andover 1854 NAD.930 Ridgewood Cemetery Bridge 177 Salem St North Andover NAD.931 Ridgewood Cemetery Monoliths 177 Salem St North Andover r 1980 NAD.932 Ridgewood Cemetery-Gilbert,George Family 177 Salem St North Andover 1894 Plot NAD.933 Ridgewood Cemetery-Davis,George Family 177 Salem St North Andover 1874 Plot NAD.934 Ridgewood Cemetery-Farnham-Johnson 177 Salem St North Andover 1853 Family Plot NAD.935 Ridgewood Cemetery-Stone,J.M.Family Plot 177 Salem St North Andover 1887 NAD.936 Ridgewood Cemetery-G.A.R.Area 177 Salem St North Andover r 1880 NAD.937 Ridgewood Cemetery-Allen-Kunhardt Family 177 Salem St North Andover r 1920 Plot NAD.938 Ridgewood Cemetery-Kittredge Family Plot 177 Salem St North Andover r 1880 NAD.939 Ridgewood Cemetery-Long,Sarah Jane Marker 177 Salem St North Andover c 1850 NAD.940 Ridgewood Cemetery-Ingalls,Capt. Francis 177 Salem St North Andover c 1850 Marker NAD.941 Ridgewood Cemetery-Smith,Susan Farnham 177 Salem St North Andover c 1880 Marker Friday,September 17, 2021 Page 9 of 12 Property Name Z NAD.942 Ridgewood Cemetery-Stevens,Phineas 177 Salem St North Andover c 1864 Monument NAD.943 Ridgewood Cemetery-Hovey,Richard Marker 177 Salem St North Andover c 1900 NAD.944 Ridgewood Cemetery-Phelps,William Marker 177 Salem St North Andover c 1894 NAD.945 Ridgewood Cemetery-Farnaham,Susan Marker 177 Salem St North Andover c 1855 NAD.946 Ridgewood Cemetery-Wallwork, Ellen Marker 177 Salem St North Andover c 1919 NAD.947 Ridgewood Cemetery-Tyler,John Ford Marker 177 Salem St North Andover c 1919 NAD.948 Ridgewood Cemetery-Chickering,Anne R. 177 Salem St North Andover c 1935 Marker NAD.949 Ridgewood Cemetery-Frisbee, Frank Marker 177 Salem St North Andover c 1934 NAD.950 Ridgewood Cemetery-Metcalf,John W.Marker 177 Salem St North Andover c 1937 NAD.951 Ridgewood Cemetery Memorial Benches 177 Salem St North Andover r 1950 NAD.110 Stevens,Abiel House 280 Salem St North Andover r 1714 NAD.77 Fish,Benjamin House 1132 Salem St North Andover c 1800 NAD.312 Smith Wallpaper and Paint Shop 28 Saunder St North Andover c 1918 NAD.313 Cronin,Helen T.House 44-46 Saunders St North Andover c 1895 NAD.288 Davis and Furber Machine Company Worker 19-25 Second St North Andover c 1874 Housing NAD.908 Boston and Maine Shawsheen River Railroad Shawsheen River North Andover 1937 Bridge NAD.57 Stevens,Asa Farm 315 South Bradford St North Andover c 1746 NAD.41 Stevens,J.P.Company Mill Stevens St North Andover 1887 NAD.45 Johnson,Timothy House 18-20 Stevens St North Andover r 1720 NAD.283 447 Stevens St North Andover NAD.149 450 Stevens St North Andover NAD.128 451-453 Stevens St North Andover NAD.150 454 Stevens St North Andover NAD.129 455 Stevens St North Andover NAD.130 459-461 Stevens St North Andover NAD.151 460 Stevens St North Andover NAD.131 465 Stevens St North Andover NAD.99 Bradley,George House 469 Stevens St North Andover r 1837 NAD.132 470 Stevens St North Andover NAD.152 474 Stevens St North Andover NAD.133 475-477 Stevens St North Andover NAD.134 479 Stevens St North Andover NAD.135 481 Stevens St North Andover NAD.78 Frisbee,Alice J. House 46 Stonington St North Andover c 1895 NAD.105 Sutton,Gen.Eben Bowling Alley 71 Sutton Hill Rd North Andover r 1885 Friday,September 17, 2021 Page 10 of 12 Property Name Z NAD.106 Sutton,Gen.Eben Bowling Alley 85 Sutton Hill Rd North Andover r 1885 NAD.50 Sutton Mill Sutton St North Andover 1846 NAD.237 9-11 Sutton St North Andover NAD.238 15 Sutton St North Andover NAD.239 17-19 Sutton St North Andover NAD.240 21-23 Sutton St North Andover NAD.241 35-37 Sutton St North Andover NAD.281 39 Sutton St North Andover NAD.51 Scholfield,James Woolen Mill 172 Sutton St North Andover c 1802 NAD.910 Boston and Maine Railroad Bridge Sutton's Driveway North Andover 1930 NAD.58 Morse,Jacob House 23 Third St North Andover r 1876 NAD.79 Davis and Furber Worker Housing 33-35 Third St North Andover c 1863 NAD.80 Godfrey,Oscar M.House 54 Third St North Andover r 1908 NAD.284 Driscoll,John House 89 Turnpike St North Andover 1889 NAD.111 Frie,Samuel House 920 Turnpike St North Andover r 1715 NAD.802 Farnham,Seth Gravesite 1801 Turnpike St North Andover 1845 NAD.126 Davis and Furber Worker Housing 6-8 Water St North Andover c 1850 NAD.125 Davis and Furber Worker Housing 12-14 Water St North Andover c 1850 NAD.124 Davis and Furber Worker Housing 16-18 Water St North Andover c 1850 NAD.123 Davis and Furber Worker Housing 22-24 Water St North Andover c 1850 NAD.122 Davis and Furber Worker Housing 26-28 Water St North Andover c 1850 NAD.121 Davis and Furber Worker Housing 32-34 Water St North Andover c 1850 NAD.120 Davis and Furber Worker Housing 36-38 Water St North Andover c 1850 NAD.49 Davis and Furber Worker Housing 40-42 Water St North Andover c 1850 NAD.236 46 Water St North Andover NAD.235 50 Water St North Andover NAD.232 52-56 Water St North Andover NAD.234 53-55 Water St North Andover NAD.233 57-59 Water St North Andover NAD.231 61-67 Water St North Andover NAD.230 69 Water St North Andover NAD.229 North Andover Police Station 73 Water St North Andover 1865 NAD.228 125 Water St North Andover NAD.227 131 Water St North Andover NAD.226 141 Water St North Andover NAD.225 142-144 Water St North Andover NAD.224 148-150 Water St North Andover NAD.222 154-156 Water St North Andover Friday,September 17, 2021 Page 11 of 12 Property Name M NAD.223 155-157 Water St North Andover NAD.221 160-162 Water St North Andover NAD.220 166-168 Water St North Andover NAD.219 172-174 Water St North Andover NAD.218 178-180 Water St North Andover NAD.285 Thomson Elementary School 266 Waverly Rd North Andover c 1924 NAD.59 Wiley Tenement 10-12 Wiley Ct North Andover c 1881 NAD.273 15 Wiley Ct North Andover NAD.271 25-27 Wiley Ct North Andover NAD.282 25-27 Wiley Ct North Andover NAD.272 30-32 Wiley Ct North Andover NAD.145 Stevens-Coolidge Barn Wood Ln North Andover NAD.143 4 Wood Ln North Andover NAD.144 5 Wood Ln North Andover NAD.142 15 Wood Ln North Andover Friday,September 17, 2021 Page 12 of 12 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix M-Project Permits o M 40, 1 PLANNING DEPARTMENT Community Development Division 120 Main Street North Andover, Massachusetts, 01845 NOTICE OF DECISION SITE PLAN REVIEW SPECIAL PERMIT CORRIDOR DEVELOPMENT DISTRICT SPECIAL PERMIT Any appeal shall be filed within (20) days after the date of filing this notice in the office of the Town Clerk. Date: April 6, 2021 Date of Hearing: March 16, 2021,April 6, 2021 Date of Decision: April 6, 2021 Petition of: The Stubblebine Company 1 Cranberry Hill#103 Lexington, MA 02421 Premises Affected: Assessors 34 Lot 50 The above application for a Corridor Development District(CDD) Special Permit is in accordance with the requirements of the North Andover Zoning Bylaw,Article 8, Supplementary Regulations,Part 1 Off-Street Parking & Loading and Part 3 Site Plan Review, Article 10 Administration, Section 195-10.7 and Massachusetts General Law Chapter 40A, Section 9. So as to allow the construction of a 90,000 SF three-story self-storage warehouse facility with associated parking,landscaping,utilities,lighting and stormwater management design. The property is located in CDD 3 zoning district. After a Public Hearing given on the above date, and upon a motion by X and 2nd by X to APPROVE the Corridor Development District (CDD) Special Permit in accordance with the requirements of the North Andover Zoning Bylaw, Article 8, Supplementary Regulations, Part 3 Site Plan Review, Article 10 Administration, Section 195-10.7, as amended, and based upon the following conditions. The vote was 5-0, unanimous in favor of the application. On behalf of the North Andover Planning Board Eitan Goldberg, Chairman John Simons Aaron Preston Kate Bargnesi Peter Boynton 1 Stubblebine Company 1 Cranberry Hill,#103 Map 34 Lot 50 CDD 3 Special Permit; Site Plan Review Special Permit April 6,2021 The Corridor Development District (CDD) Special Permit in accordance with the requirements of the North Andover Zoning Bylaw,Article 8, Supplementary Regulations,Part 1 Off-Street Parking&Loading and Part 3 Site Plan Review,Article 10 Administration,Section 195-10.7 application was filed with the Planning Board on February 11,2021. The Public Hearing on the above referenced application was opened on March 16,2021 and closed by the North Andover Planning Board on April 6,2021. On April 6,2021,upon a motion made by X and a second by X to APPROVE,as amended, a Site Plan Review Special Permit and CDD Special Permit to authorize the construction of a 90,000 SF three-story self storage warehouse facility with associated parking,landscaping,utilities,lighting and stormwater management design. The Project is located at 0 Beechwood Drive,North Andover,Massachusetts, 01845,Assessors Map 34 Parcel 50 within the Corridor Development District 3 Zoning District.The parcel totals approximately 2086 acres with frontage on Beechwood Drive. The Special Permits were requested by The Stumblebine Company, 1 Cranberry hill, #103, Lexington, MA 01845. The Applicant submitted a complete application, which was noticed and reviewed in accordance with Article 16, Corridor Development District and Article 8, Supplementary Regulations, Part 1 Off-Street Parking & Loading and Part 3 Site Plan Review, Article 10 Administration, Section 195-10.7 and Massachusetts General Law Chapter 40A, Section 9. The motion to approve was subject to the FINDINGS OF FACTS and SPECIAL CONDITIONS set forth in this decision. The Planning Board vote was 5—0,unanimous,in favor. A special permit issued by the special permit granting authority requires a vote of at least four members of a five-member board. The Applicant is hereby notified that should the Applicant disagree with this decision, the Applicant has the right, under MGL Chapter 40A, Section 17, to appeal to this decision within twenty days after the date this decision has been filed with the Town Clerk. The Planning Board makes the finding that the intent of the Bylaw,as well as its specific criteria are met. This decision specifically stated by the Planning Board makes the following FINDINGS OF FACT: FINDINGS OF FACT: 1) The specific Site is an appropriate location for the Project as it is deemed a warehouse use which is a permitted use in the CDD 3 zoning district. 2) The use as developed will not adversely affect the neighborhood as the property is located in a CDD 3 zoning district. The building is sited 475' +/-from the nearest residential dwelling. The Plans maintain a vegetated buffer to the East of the lot. The proposed massing and use is consistent with the overall composition of the commercial businesses fronting on Osgood Street. 3) There will be no nuisance or serious hazard to vehicles or pedestrians. 4) Adequate and appropriate facilities will be provided for the proper operation of the proposed use. 5) The Project has been reviewed by the Town's Stormwater Review consultant,Horsley Witten.The Project proposes a closed catch basin and pipe drainage system to capture runoff from the Proj ect. An underground chamber system will provide stormwater detention and treatment of stormwater pollutants via infiltration through native soil. (See correspondence from Horsley Witten dated February 25. 2021, and X,2021 and 2 Stubblebine Company 1 Cranberry Hill,#103 Map 34 Lot 50 CDD 3 Special Permit; Site Plan Review Special Permit April 6,2021 response to those correspondences dates March 11,2021 from TRM). 6) The Project has been satisfactorily reviewed by the Police Department(confirming email Lt. Lanen dated March 29,2021),the Fire Department(confirming emails Lt.Bob Kilcoyne dated March 25,2021),DPW Operations(confirming email dated March 5,2021,Building Department(confirming email February 12, 2021), 7) The Project is subject to septic design and approval (confirming email Health dated March 5, 2021 and March 29,2021). 8) The Applicant has file a Notice of Intent with the Conservation Commission on X. 9) Zoning Enforcement Officer confirmed a parking reduction special permit application was not necessary as 23 spaces are required and 26 spaces are provided. Therefore,the applicant submitted and the Planning Board accepted a request to withdraw without prejudice the parking reduction special permit. 10) Finally the Planning Board finds that this Project generally complies with the Town of North Andover Zoning Bylaw requirements as listed in Article 16 Corridor Development District and Article 8, Supplementary Regulations, Part 1 Off-Street Parking & Loading and Part 3 Site Plan Review, but requires conditions in order to be fully in compliance. The Planning Board hereby grants an approval to the Applicant provided the following Conditions are met: SPECIAL CONDITIONS: 11) Permit Definitions: a. The "Locus" or"Site"refers to the 2.86+/- acre parcel of land fronting on 0 Beechwood Drive as shown on Assessors Map 34, Parcel 50. b. The "Plans" refer to the plans prepared by TFM, 48 Constitution Drive, Bedford, NH, entitled "Climate-Controlled Self-Storage, Beechwood Drive, North Andover, MA", dated December 8, 2020, and most recently revised to March 26, 2021, consisting of C-1, C-2, Sheet 1 of 1, C-3, C-4, C-51 C-61 C-7, C-81 C-9 through C-15,P-1, L-1. c. The Project refers to the construction of a 3-story self-storage warehouse facility with associated parking, landscaping, utilities, lighting and stormwater management design, and lighting. The Project is located in the CDD 3 zoning district. d. The "Applicant" refers to The Stubblebine Company, 1 Cranberry Hill, #103, Lexington, MA 02421, the Applicant for the Special Permits, its successors and assigns. e. The "Project Owner" refers to the person or entity holding the fee interest to the title to the Locus from time to time,which can include but is not limited to the Applicant, developer, and Owner. 12) The following requested WAIVERS and MODIFICATION are granted: a. Zoning Bylaw, Section 8.14 (22)Fiscal Impact and Section 8.14 (23) Community Impact: The Project does not require significant community resources. The Project is not anticipated to generate any significant fiscal impacts. For these reasons a waiver is not be contrary to the spirit and intent of the regulations. b. The Project proposes parallel parking for tenants along the east side of the building, allowing for a 20' wide (total width 29', less 1' for bollards, less 8' for parallel parking space)where 25' are is required,two-way drive-aisle. Given the nature of the Site there is limited traffic anticipated to be on the property at one time, even during the peak usage. As such, the proposed drive-aisle will have adequate width to allow for parking along with two-way traffic from other tenants. The 3 Stubblebine Company 1 Cranberry Hill,#103 Map 34 Lot 50 CDD 3 Special Permit; Site Plan Review Special Permit April 6,2021 proposed design allows for a minimization of unnecessary impervious areas and Site disturbance. The modification granted pursuant to Article 8, Part 1 Off-Street Parking&Loading, Section 195-8.5(A)Design Standards. 13) According to the Traffic & Parking Memorandum submitted by Robert Duval, PE TFMORAN, INC, dated December 14, 2020 the weekday AM peak trip generation hour will result in 5 vehicles entering the Site and 4 vehicles exiting the Site for a total of 9 vehicles. The weekday PM peak trip generation hour will result in 7 vehicles entering the Site and 8 vehicles exiting the Site for a total of 15 vehicles. 14) The proposed development must not demonstrate any demonstrable adverse impact on the surrounding area resulting from excessive noise, dust, smoke, or vibrations which are higher than levels now experienced from uses permitted in surrounding areas. 15) The commercial use shall comply with the applicable state air pollution control regulations and policies in connection with sound levels. 16) All outdoor lighting shall be designed so as not to adversely impact surrounding uses and residential properties,while also providing a sufficient level of illumination for access and security purposes. Such lighting shall not blink, flash, oscillate or be of unusually high intensity of brightness. 17) Any outdoor lighting fixture newly installed or replaced shall be shielded so that it does not produce a strong, direct light beyond the Site boundaries, and shall be directed toward the object or area to be illuminated. Sight shall be directed away from residences. 18) The Planning Director shall approve any changes made to these Plans. Any changes deemed substantial by the Planning Director would require a Public Hearing and Modification by the Planning Board. PRIOR TO ANY LAND DISTURBANCE and/or BUILDING PERMIT 19) Two (2) copies of the signed recorded Notice of Decision and Plans shall be delivered to the Planning Department. 20) The Property Owner provide a signed version of the Illicit Discharge Statement two weeks prior to the beginning of any land disturbance. 21) The Property Owner shall provide a signed copy of the Inspection and Maintenance Manual to the Planning Department 22) The Applicant shall provide the Planning Board with copies of permits, plans and decisions received from all North Andover land use Boards. 23) At least 30 days prior to the start of land disturbing activities,the Applicant shall provide to the Planning Department for review and comment a copy of its Stormwater Pollution Prevention Plan (SWPPP) prepared in consultation with the Applicants' Site contractor(s) and Project engineers. The SWPPP shall be prepared in accordance with the U.S Environmental Protection Agency's Stormwater Construction General Permit (USEPA, 2012) and related guidance document entitled "Developing Your Stormwater Pollution Prevention Plan: A Guide for Construction Operators". In addition to erosion control measures,the construction sequencing plan/SWPPP shall address when in the development 4 Stubblebine Company 1 Cranberry Hill,#103 Map 34 Lot 50 CDD 3 Special Permit; Site Plan Review Special Permit April 6,2021 process the various long term stormwater BMPs will be brought on line and how stormwater flows from the Site can or will be managed in the interim. 24) In consultation with the Planning Director,the Applicant shall designate an independent environmental monitor. The monitor shall read, sign, and return to the Town Planner the Letter of Agreement for Independent Monitors. Upon the start of Site work, the monitor shall make weekly inspections of the Project(any suspension in monitoring due to inactivity on the Site shall be pre-approved by the Town Planner),provide monthly reports to the Planning Department, and detail any areas of non-compliance and corrective actions. The monitor will also provide reports following heavy rain events.Additionally, the monitor shall assist Town Staff in overseeing the implementation and updating of the SWPPP throughout the development process. The monitor must also be available upon notice to inspect the Site accompanying a Planning Department designated official. 25) A detailed construction sequencing plan shall be submitted to the Planning Staff for the purpose of tracking the construction and informing the public of anticipated activities on the Site. 26) A bond in the amount of ten thousand dollars ($10,000.00) shall be posted for the purpose of insuring that the Site is constructed in accordance with the approved plan and that a final as-built plan is provided, showing the location of all on-site structures. This bond shall be in the form of a check made out to the Town of North Andover. This check will then be deposited into an interest bearing bond account. 27) All applicable erosion control measures must be in place and reviewed and approved by the Planning Director. Should the Planning Director determine additional erosion control measures are necessary the Applicant shall provide said measures at his own expense. 28) A pre-construction meeting must be held with the developer, their construction employees, Planning Department and other applicable departments,to discuss scheduling of inspections to be conducted and the construction schedule. DURING CONSTRUCTION 29) Dust mitigation must be performed weekly, or more frequently as directed by the Town Planner, throughout the construction process. 30) In an effort to reduce noise levels, the developer shall keep in optimum working order, through regular maintenance, any and all equipment that shall emanate sounds from the structures or Site. 31) Any stockpiling of materials(dirt,wood,construction material,etc.)must be shown on a plan and reviewed and approved by the Planning Staff. Any approved piles must remain covered at all times and fenced off to minimize any dust problems that may occur with adjacent properties. 32) It shall be the responsibility of the developer to assure that no erosion from the construction Site shall occur which will cause deposition of soil or sediment upon adjacent properties or public ways,except as normally ancillary to off-site construction. Off-site erosion will be a basis for the Planning Board making a finding that the Project is not in compliance with the plan;provided,however, that the Planning Board shall give the developer written notice of any such finding and three days to cure said condition. PRIOR TO CERTIFICATE OF OCCUPANCY 5 Stubblebine Company 1 Cranberry Hill,#103 Map 34 Lot 50 CDD 3 Special Permit; Site Plan Review Special Permit April 6,2021 3 3) The Applicant must submit a letter from the Project engineer stating that the building,landscaping, lighting and Site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. The Applicant must also submit a letter from a professional engineer certifying that there are no illicit connections to the storm drainage system. Alternatively,the Applicant and/or property Owner may provide a bond,determined by the Planning Board,to cover the full amount of the landscaping materials and installation if weather conditions do not permit the completion of the landscaping prior to the use of the building. PRIOR TO THE FINAL RELEASE OF ALL SECURITY AND ESCROWED FUNDS 34) The Planning Staff shall review the Site. Any screening as may be reasonably required by the Planning Staff will be added at the Project Owner's expense. 35) A final as-built plan showing final topography,the location of all on- site utilities, structures,curb cuts, parking spaces and drainage facilities, including invert elevations of all stormwater structures,must be submitted to the Planning Department. The as-built must be provided in paper form as well as in SDF (Standard Digital File) format. The as-built shall also provide a calculation showing the increase in impervious area. 36) The Planning Board must by a majority vote make a finding that the Site is in conformance with the approved plan. GENERAL CONDITIONS 37) Any plants, tree, shrubs, or fencing that have been incorporated into the Landscape Plan approved in this decision that die or fall into disrepair must be replaced by the Project Owner in perpetuity. 3 8) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 3 9) Gas,Telephone,Cable and Electric utilities shall be installed underground as specified by the respective utility companies. 40) The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday through Friday and between 8:00 a.m. and 5:00 p.m. on Saturday. 41) No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 42) The Owner shall apply to the Board of Health for the appropriate dumpster permit, if needed. 43) The provisions of this conditional approval shall apply to and be binding upon the Applicant, its employees and all successors and assigns in interest or control. 44) Any action by a Town Board,Commission,or Department,which requires changes in the plan or design of the building, as presented to the Planning Board, may be subject to modification by the Planning Board. 45) Any revisions shall be submitted to the Planning Director for review. If these revisions are deemed substantial, the developer must submit revised plans to the Planning Board for approval using the process outlined in Section 195-8.17 (Revision to Approved Site Plan) of the Zoning Bylaw 6 Stubblebine Company 1 Cranberry Hill,#103 Map 34 Lot 50 CDD 3 Special Permit; Site Plan Review Special Permit April 6,2021 46) This Special Permit approval shall be deemed to have lapsed after April 6, 2023 (two years from the date permit granted), exclusive of the time required to pursue or await determination of any appeals, unless substantial use or construction has commenced within said two-year period or for good cause. For purposes of this development,the developer shall be deemed to have undertaken substantial use or construction if the developer has begun any Site grading or tree clearing. 47) This decision must be filed with the North Essex Registry of Deeds. The following information is included as part of this decision: Plan titled: Climate-Controlled Self-Storage, Beechwood Drive,North Andover, MA Prepared for: The Stubblebine Company, LLC 1 Cranberry Hill, #103 Lexington, MA 02421 Prepared by: TFM 48 Constitution Drive Bedford,NH 03110 Scale: 1"=30' Date: December 8,2020, revised to March 26,2021 Sheets: C-1, C-2, Sheet 1 of 1, C-31 C-4, C-51 C-61 C-71 C-8, C-9 through C-15,P-1, L-1. Report: Stormwater Management Report Self-storage, 0 Beechwood Drive,North Andover, MA Prepared for: Norwood Realty 116 S. River Toad Bedford,NH 03110 Prepared by: TFM 48 Constitution Drive Bedford,NH 03110 Date: December 20,2020,Revised March 22,2021 Report: Inspection and Maintenance Manual Prepared for: Norwood Realty 116 S. River Toad Bedford,NH 03110 Prepared by: TFM 48 Constitution Drive Bedford,NH 03110 cc: Town Departments Applicant Engineer Abutters Assessor 7 Massachusetts Department of Environmental Provided by MassDEP: Protection MassDEP File#: Bureau of Resource Protection-Wetlands eDEP Transaction#:1254966 WPA Form 3 - Notice of Intent City/Town:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L. c. 1311 §40 E.Fees 1. Fee Exempt:No filing fee shall be assessed for projects of any city,town,county,or district of the Commonwealth,federally recognized Indian tribe housing authority,municipal housing authority,or the Massachusetts Bay Transportation Authority. Applicants must submit the following information(in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form)to confirm fee payment: 2.Municipal Check Number 3.Check date 4.State Check Number 5.Check date 6.Payer name on check:First Name 7.Payer name on check:Last Name F.Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans,documents,and supporting data are true and complete to the best of my knowledge.I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations,310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application,pursuant to the requirements of M.G.L.c.131,§40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail(return receipt requested)to all abutters within 100 feet of the property line of the project location. 2 ,. 2 1,,, 1. ture of Applicant 2.Date Authorized Age -TFMorari 3.Signature of Property Owner(if different) 4.Date 5.Signature of Representative(if any) 6.Date For Conservation Commission: Two copies of the completed Notice of Intent(Form 3),including supporting plans and documents,two copies of the NOI Wetland Fee Transmittal Form,and the city/town fee payment,to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent(Form 3),including supporting plans and documents,one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office(see Instructions)by certified mail or hand delivery. Other: If the applicant has checked the"yes"box in Section C,Items 1-3,above,refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously.Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Page 7 of 7 *ELECTRONIC COPY Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix N -NRCS Soils Data Soil Map—Essex County, Massachusetts, Northern Part OD o Ln N CD CD ° ° 326770 326860 326950 327040 327130 327220 327310 327400 327490 327580 420 43 56"N y 420 43 56"N im Iw ail lis Ili _ r IMMOI NOME Rk �\ v p ,i \ d z \ \\\ - \\ O \`\ •\v\ \ \,\� � \ co \y Ng \` AS `a\ 04 it Q ,\ ~ \\ O Soil flap a not be �alicl at this sca=1£�. ~ N 420 43'38'N - - 420 43'38"N 326770 326860 326950 327040 327130 327220 327310 327400 327490 327580 co 0 Ln Map Scale:1:3,990 if printed on A landscape(11"x 8.5")sheet. Meters °� N 0 50 100 200 300 M AFeet 0 150 300 600 900 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 19N WGS84 usDA Natural Resources Web Soil Survey 11/24/2020 Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—Essex County, Massachusetts, Northern Part MAP LEGEND MAP INFORMATION Area of Interest(AOI) laeg Spoil Area The soil surveys that comprise your AOI were mapped at .................................. 1:15,800. Area of Interest(AOI) Stony Spot Soils _ Very Stony Spot Warning:Soil Map may not be valid at this scale. Soil Map Unit Polygons 7 Wet Spot Enlargement of maps beyond the scale of mapping can cause Soil Map Unit Lines misunderstanding of the detail of mapping and accuracy of soil Other Soil Map Unit Points line placement.The maps do not show the small areas of Special Line Features contrasting soils that could have been shown at a more detailed Special Point Features scale. Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map Borrow Pit measurements. Transportation Clay Spot Rails Source of Map: Natural Resources Conservation Service =- Closed Depression Web Soil Survey URL: Interstate Highways Coordinate System: Web Mercator(EPSG:3857) Gravel Pit US Routes l� Maps from the Web Soil Survey are based on the Web Mercator r Gravelly Spot Major Roads projection,which preserves direction and shape but distorts 4 Aldistance and area.A projection that preserves area,such as the Landfill Local Roads Albers equal-area conic projection,should be used if more Lava Flow accurate calculations of distance or area are required. Background §€ Marsh or swamp NoAerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s)listed below. Mine or Quarry Soil Survey Area: Essex County, Massachusetts, Northern Part Miscellaneous Water Survey Area Data: Version 16,Jun 9,2020 Perennial Water Soil map units are labeled(as space allows)for map scales -- Rock Outcrop 1:50,000 or larger. Saline Spot Date(s)aerial images were photographed: Aug 28,2019—Sep 20,2019 £-- Sandy Spot The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background Sinkhole imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. Slide or Slip Sodic Spot usDA Natural Resources Web Soil Survey 11/24/2020 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Essex County, Massachusetts,Northern Part Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 31 B Walpole fine sandy loam,3 to 6.6 9.0% 8 percent slopes 255B Windsor loamy sand,3 to 8 4.2 5.8% percent slopes 255C Windsor loamy sand,8 to 15 23.1 31.9% percent slopes 255D Windsor loamy sand, 15 to 25 0.2 0.3% percent slopes 256A Deerfield loamy fine sand,0 to 4.4 6.0% 3 percent slopes 257E Hinckley and Windsor soils,25 2.2 3.0% to 35 percent slopes 300C Montauk fine sandy loam,8 to 4.9 6.7% 15 percent slopes 305C Paxton fine sandy loam,8 to 0.0 0.0% 15 percent slopes 306D Paxton fine sandy loam, 15 to 1.6 2.1% 25 percent slopes,very stony 310C Woodbridge fine sandy loam,8 1.3 1.8% to 15 percent slopes 311 B Woodbridge fine sandy loam,0 2.3 3.2% to 8 percent slopes,very stony 602 Urban land 9.3 12.8% 651 Udorthents,smoothed 12.6 17.4% Totals for Area of Interest 72.6 100.0% usDA Natural Resources Web Soil Survey 11/24/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 Hydrologic Soil Group—Essex County, Massachusetts, Northern Part OD o Ln N CD CD ° ° 326770 326860 326950 327040 327130 327220 327310 327400 327490 327580 420 43 56"N y 420 43 56"N im Iw ail lis Ili _ r IT NIMMKIL p \\ \\ \ ............ U a IR ........... ow- 101 \V � �o \\\`\ OPEN \\ \IR \WMEN` \\ \ \ \ \ \\\ \ \ \ \\y\ \\ \\ \ \ _ c ti \\ CO Soil flap ay not be valid at this sca=1�. � �� M O _ E4 420 43 38"N — �� _ 420 43 38"N 326770 326860 326950 327040 327130 327220 327310 327400 327490 327580 co 0 Ln Map Scale:1:3,990 if printed on A landscape(11"x 8.5")sheet. Meters °� N 0 50 100 200 300 M AFeet 0 150 300 600 900 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 19N WGS84 usDA Natural Resources Web Soil Survey 11/24/2020 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Essex County, Massachusetts, Northern Part MAP LEGEND MAP INFORMATION Area of Interest(AOI) 13 C The soil surveys that comprise your AOI were mapped at .................................. Area of Interest(AOI) 1:15,800. 13 C/D Soils 13 D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons A Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil A/D Water Features line placement.The maps do not show the small areas of B Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation ® B/D Rails Please rely on the bar scale on each map sheet for map 0 C Interstate Highways measurements. 0 C/D us Routes Source of Map: Natural Resources Conservation Service �� Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts A distance and area.A projection that preserves area,such as the Aerial Photography Albers equal-area conic projection,should be used if more A/D accurate calculations of distance or area are required. B This product is generated from the USDA-NRCS certified data as B/D of the version date(s)listed below. C Soil Survey Area: Essex County, Massachusetts, Northern Part Survey Area Data: Version 16,Jun 9,2020 C/D Soil map units are labeled(as space allows)for map scales D 1:50,000 or larger. Not rated or not available Date(s)aerial images were photographed: Aug 28,2019—Sep Soil Rating Points 20,2019 13 q The orthophoto or other base map on which the soil lines were 13 compiled and digitized probably differs from the background A/D compiled displayed on these maps.As a result,some minor B shifting of map unit boundaries may be evident. ® B/D usDA Natural Resources Web Soil Survey 11/24/2020 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Essex County, Massachusetts, Northern Part Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 31 B Walpole fine sandy A/D 6.6 9.0% loam,3 to 8 percent slopes 255B Windsor loamy sand,3 A 4.2 5.8% to 8 percent slopes 255C Windsor loamy sand,8 A 23.1 31.9% to 15 percent slopes 255D Windsor loamy sand, 15 A 0.2 0.3% to 25 percent slopes 256A Deerfield loamy fine A 4.4 6.0% sand,0 to 3 percent slopes 257E Hinckley and Windsor A 2.2 3.0% soils,25 to 35 percent slopes 300C Montauk fine sandy C 4.9 6.7% loam,8 to 15 percent slopes 305C Paxton fine sandy loam, C 0.0 0.0% 8 to 15 percent slopes 306D Paxton fine sandy loam, C 1.6 2.1% 15 to 25 percent slopes,very stony 310C Woodbridge fine sandy C/D 1.3 1.8% loam,8 to 15 percent slopes 311 B Woodbridge fine sandy C/D 2.3 3.2% loam,0 to 8 percent slopes,very stony 602 Urban land 9.3 12.8% 651 Udorthents,smoothed A 12.6 17.4% Totals for Area of Interest 72.6 100.0% USDA Natural Resources Web Soil Survey 11/24/2020 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Essex County, Massachusetts, Northern Part Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff:None Specified Tie-break Rule: Higher usDA Natural Resources Web Soil Survey 11/24/2020 Conservation Service National Cooperative Soil Survey Page 4 of 4 Stormwater Pollution Prevention Plan (SWPPP) Climate Controlled Self Storage Facility Appendix O-Completed Inspections