HomeMy WebLinkAbout2026.4.29 Minutes ZBA 40B approved - tlm
Approved
Town of North Andover
ZONING BOARD OF APPEALS
Members Associate Member
Michael T. Lis., Chair Matthew J. Ginsburg
Laura Craig-Comin, Vice-Chair Zachary J. Hachey
Frank J. Killilea, Clerk Melissa Rutherford
James M. Testa Zoning Enforcement Officer
Alexandria A. Jacobs, Esq Paul G. Hutchins
MEETING MINUTES
Date of Meeting: Wednesday, April 29, 2026
Time of Meeting: 7:00 p.m.
Location of Meeting: Town Hall, 120 Main Street, North Andover, MA 01845
Signature: Terri MacNeil
1. Call to Order called at 7:00 p.m.
Members Present: Michael T. Lis, Frank J. Killilea (on line), Alexandria A. Jacobs (on line), Laura
Craig-Comin, James M. Testa, Melissa Rutherford and Zachary J. Hachey
Legal & Staff: Carolyn Murray (KP Law), Emmalee Israel (KP Law), Judi Barrett (Barrett
Planning Group) and Andrew Shapiro (Assistant Town Manager/Director of
Community & Economic Development Town of North Andover)
Peer Reviewer: Ken Carlson (Woodard & Curran) and Nicole Lewis (Weston & Sampson)
Applicant Team: David Steinbergh (RCG LLC), Phil Henry (Civil Design Group), Daniel C.
LaCivita (Traffic Engineer - VAI) and Attorney John Smolak
Staff Present: Terri MacNeil
Gavel given to: Michael T. Lis, Chair
Pledge of Allegiance
2. Acceptance of Minutes from March 24, Meeting
James Testa makes a motion to accept the minutes from the March 24, 2026 Zoning Board of
Appeals meeting, Laura Craig-Comin seconded the motion; Unanimous vote to accept the minutes
from the March 24, 2026 meeting.
3. New Public Hearing of 65 Berkeley Road
Melissa Rutherford as acting Clerk, reads the public notice into the record.
Chris Crump (CWC Design): Representing the homeowners (the Davisons).
Notices and agendas are to be posted 48 hours in advance of a meeting excluding Saturdays, Sundays, and legal holidays. Please keep in mind the
Town Clerk's hours of operation and make necessary arrangements to be sure that posting is made in an adequate amount of time. A listing of topics
the Chair reasonably anticipates will be discussed at a meeting are to be listed on the Agenda. Note: Matters may be called out of order and not as
they appear in the Agenda.
Page 1 of 6
Town of North Andover
ZONING BOARD OF APPEALS
The applicant seeks relief of a side setback variance from 15 feet to 11 feet, which is a relief of
4 feet to build a 900-square-foot ADU for the homeowners' aging parents. Key design features
mentioned include:
Integration: Roughly half of the ADU footprint is being repurposed from the existing house
to minimize the extension into the yard.
Low Profile: The structure is single-story with a roofline that slopes down toward the
neighbor’s side to minimize visual impact.
Privacy: Only one small window is planned for the wall facing the neighbor, and a 6-foot
privacy fence already exists between the lots.
Public Concerns & Abutter Testimony
Lynn Jackobek, owns 57 and 105 Berkeley Road, the neighbor most affected by the setback,
expressed several concerns:
Notification: She claimed she did not receive the official registered notice for the meeting.
Property Value & Proximity: She felt 11 feet was too close and feared it would negatively
impact her property value.
Drainage: She noted historical flooding and wetland issues in the area.
Construction Nuisance: She voiced concerns about the placement of a dumpster during
construction.
Applicant Response: Chris Crump clarified that they moved the plan back from an initial 6-foot
request to 4 feet to be less impactful. He noted that the neighbor’s garage is near the property line,
meaning there is still roughly 26 feet between the two actual structures. Regarding drainage, he
stated they would install gravel infiltration pits to manage runoff.
Board Deliberation & Decision
The Board members ultimately sided with the applicant, noting several points:
Minimal Impact: The members felt the 4-foot difference was not "measurably impactful"
given the existing fence and the fact that the neighbor’s abutting structure is a garage, not a
living space.
Efficient Design: They praised the applicant for incorporating part of the existing house
rather than building an entirely new footprint.
Topography: The sloped roof design was seen as a thoughtful way to prevent a "looming"
wall effect.
Final Action: Melissa Rutherford made a motion to grant the variance incorporating revised design
plans by CCW design, consisting of nine pages dated February 24, 2026. The motion was seconded
by James Testa. The motion passed unanimously.
ZBA Minutes for April 29, 2026
Page 2 of 6
Town of North Andover
ZONING BOARD OF APPEALS
4. Continued Public Hearing of 0 Prescott Street
Infrastructure & Environmental Updates
Water & Sewer: Peer reviewers confirmed that the existing infrastructure has sufficient
capacity for the proposed 296 units. Significant redesign (a 50% increase in demand) would
be required to trigger further review.
Wetlands: A potential wetland was discovered behind the facility garage. Initial soil tests
suggest it is under 1,000 square feet, which would make it non-jurisdictional under local
bylaws, though final verification from the Conservation Agent is pending.
Traffic & Safety Concerns
Capacity: The traffic sensitivity study (assuming a 30% increase in volume) showed that
most intersections would maintain acceptable service levels, though vehicle queuing might
increase slightly.
Pedestrian Safety: The Board expressed grave concerns regarding the safety of children
walking to school, noting a missing sidewalk on one-third of Prescott Street.
Post-Occupancy Monitoring: The Board is exploring conditions for a safety study at 75–
80% occupancy to measure actual crash rates and pedestrian impact, though the applicant's
counsel cautioned against "blanket" mitigation requirements.
Board Site’s Visit
The site visit heavily influenced the Board’s stance on the building's physical footprint:
Northwest Wing: Chairman Lis and other members described the proximity to 39 Prescott
Street as "invasive" and "uncomfortably close." The building is proposed to stand 45 feet
tall, just feet from the property line.
Chairman Lis’ position is that a minimum requirement of pulling the building
back 15 feet further from that corner.
Vice Chair Craig-Comin suggested the height be lowered in that section if a further
setback is impossible.
John Smolak, attorney for the Applicant
o Traffic Mitigation: Smolak pushes back against "post-permit" mitigation, arguing that
their traffic engineers and the town’s independent peer reviewers have already agreed on
sufficient safety measures. He suggests that further demands would exceed standard
safety requirements.
o Building Setbacks: A major point of contention. Smolak explicitly states that keeping
the building at the existing setback is a "non-starter" and financially unfeasible. The
Board counters that they have "strong feelings" about the building’s position.
o Waivers & Compromise: The applicant is willing to reduce requested waivers and
adjust the design to be more sensitive to the neighborhood, but Smolak warns that the
applicant will not provide a "blank check" for a mitigation "wish list."
ZBA Minutes for April 29, 2026
Page 3 of 6
Town of North Andover
ZONING BOARD OF APPEALS
Board’s Perspective: Vice Chair Craig-Comin clarifies that the town isn't looking for a "cash
grab" but rather exploring what is typical for unexpected project impacts. Chair Lis emphasizes
that he is "polling for numbers" now to avoid "sandbagging" the developer with a rejection later.
Public & Abutter Feedback
Kelley Sarnie, 39 Prescott Street
Proximity and Setbacks: Resident strongly oppose waivers for height and setbacks. Kelley
Sarnie noted that the parking garage and "Building 1" are only 15 feet from her property line,
raising concerns about privacy, natural light, and property values.
Environmental Hazards: Potential exposure to carcinogens (VOCs and benzene) from
concentrated vehicle exhaust in the garage, as well as heat retention from the partially enclosed
structure.
Safety and Privacy: Fear that security cameras will record into private homes and that garage
lighting will act as a "spotlight" on neighboring houses.
Water and Snow: Concerns that the garage will divert snow and runoff onto adjacent properties,
potentially damaging structures or causing flooding (citing the 2006 "Mother’s Day flood").
Construction Impact: Residents requested vibration monitoring to protect their home
foundations and pools, noting that past nearby construction caused significant shaking.
Jim Holland – 43 Mount Vernon Street
Project Scale and Fairness
Proportionality: Holland argues the building is too large for the neighborhood and that
residents' proposals for a smaller project should be given as much weight as the technical
"setbacks" currently being debated.
Disproportionate Burden: He contends that the neighborhood (and his immediate neighbors)
is being forced to solve a town-wide housing problem that has built up over years, which he
characterizes as a fundamental fairness issue.
Infrastructure and Traffic
Infrastructure Deficits: He highlights a critical safety hazard: one-third of the sidewalk on
Prescott Street is missing.
Traffic Volume: He questions the neighborhood’s ability to handle the increased traffic volume
generated by a project of this size.
Responsibility and Mitigation
Traffic Report Accuracy: Holland requests that the traffic report be updated to explicitly state
the lack of sidewalks, arguing the current version does a "disservice to the public information."
Developer Accountability: He suggests the developer should provide community benefits to
mitigate the project's impact.
ZBA Minutes for April 29, 2026
Page 4 of 6
Town of North Andover
ZONING BOARD OF APPEALS
The "Set Table" Principle: He concludes that the development should not be approved until a
clear plan for infrastructure upgrades (like the sidewalk) is finalized and funded, stating that
currently, no one is taking responsibility for these necessary improvements.
The Discrepancy: Jim Holland questioned why a volume and speed study was conducted for
High Street but not for Prescott Street.
Michael Hakim – Representing his son at 55 Prescott Street
Extreme Density: Michael Hakim pointed out that this project proposes 48.3 units per acre,
which is significantly higher than other local high-density projects like Berry Farms (26.09) or
Avalon (9.57).
Economic Feasibility: Hakim urged the board to demand a "pro-forma" to see if the project
remains viable with fewer units.
Michael Ronayne, 24 Prescott Street
Visual Impact & Height: Ronayne emphasizes that a 45-foot-high structure directly across
the street will "engulf" the front of his house. He argues that the height is excessive and will
fundamentally disrupt the character of the street.
Scale vs. Setbacks: He contends that while the developers mention matching setbacks of
existing homes, the comparison is irrelevant because the proposed building's massive width is
far greater than the typical 30-foot-wide houses in the area.
High Density: Ronayne points out that the project’s density (48 units per acre) is nearly double
that of "The Farms" (a 40B project at 26 units per acre), calling the difference "drastic."
Neighborhood Character:
o Family Environment: As a first-time homeowner looking to start a family, he feels the
project is inappropriate for a residential family neighborhood.
o Exclusivity: He notes that the developers confirmed the proposed playground would be for
residents only, which he interprets as a sign that the project will not be a collaborative or
integrated part of the community.
Developer’s Rebuttals (David Steinbergh & Team)
Parking & Snow: RCG plans to phase construction to maintain parking for current tenants.
Regarding snow, they agreed to a condition that snow will not be dumped onto neighboring
properties, suggesting it could be moved to designated storage areas or melted.
Security: The developer stated they haven't designed the camera layout yet but are open to a
condition that cameras cannot be aimed at private residences.
Traffic: The traffic consultant, Daniel LaCivita, argued that a speed study on Prescott Street
wasn't necessary because all project traffic enters/exits via High Street. He maintained that sight
lines remain safe.
The Rationale: Daniel explained that High Street was the priority because the project’s only
driveway connects directly to it. Therefore, 100% of the site's traffic will impact High Street,
making speed data essential for calculating safe "sight distances" (the visibility required for cars
to pull out safely).
ZBA Minutes for April 29, 2026
Page 5 of 6
Town of North Andover
ZONING BOARD OF APPEALS
Safety Concerns: Vice Chair Craig-Comin raised a concern that the new building might
obstruct the "sight lines" for drivers traveling down Prescott Street toward High Street,
regardless of the driveway location.
The Defense: Daniel argued that the building is set back far enough (over 14.5 feet) that it
shouldn't block visibility. He also noted that there is sufficient line-of-sight between the project
driveway and existing mill driveways nearby.
Legal Constraints & Next Steps
The Pro-Forma Rule: Special Counsel Carolyn Murray clarified that the Board cannot ask for
a density reduction simply to see if it’s "economically feasible." They must first identify a
specific health, safety, or environmental concern that justifies the reduction.
Timeline: The public hearing must close by June 30, 2026. The Board plans to review a specific
Waiver List and a Draft List of Conditions in upcoming meetings.
However, the Board’s counsel (Carolyn Murray) clarified that under regulations that govern
40Bs in Massachusetts, a board cannot review a pro-forma to force a unit reduction unless a
specific health or safety violation is first identified.
Next Steps and Board Position
The Board expressed empathy regarding the 15-foot buffer, acknowledging that such close proximity
makes issues like snow removal and privacy much more acute. They discussed the possibility of:
Imposing specific conditions on snow management and camera orientation.
Requiring a Construction Management Plan (CMP) to address dust, noise, and truck routing.
Exploring vibration monitoring requirements if the project involves significant ground
improvement or rock breaking.
Next Meeting: Continued to May 21, 2026, at 7:00 PM at Town Hall, focusing on parking peer review
and revised design studies.
5. Adjournment: 10:00 P.M.
Motion made by Laura Craig-Comin to adjourn the meeting. Seconded by James Testa. The vote to
adjourn is unanimous. Meeting adjourned at 10:00 p.m.
ZBA Minutes for April 29, 2026
Page 6 of 6