HomeMy WebLinkAboutSeptic - As-Built Plan / Installation Certificate Form - 59 BANNAN DRIVE 11/22/2013 DH
(FND
' SYSTEM ELEVATIONS:
'l LOCATION DESIGN INVERT AS—BUT T INVERT
HOUSE OUT(F1) 99.44
HOUSE OUT(F2) 99.90 99.56
SEPTIC TANK IN 98.45 98,40
SEPTIC TANK OUT 98.208.15 y
i
MAP 38,PARCEL 112 DISTRIBUTION BOX IN 98.12 .06
DISTRIBUTION BOX OUT 97.95 9-_90
i N/F VISCID& DUNHAM
BANNAN
34 7,3&t E
11`5
DRIVE �f
1 LEGEND:
a
FLOOR F '
FINISH /
BENCHMARK c>s N/F SWIMM EXISTING CONTOUR
I ( MAP 65 PARCEL 283 Y m
ELEV.= 100.00
(ASSUMED DATUM)
PROPOSED CONTOUR 100
SEWER LINE S
r
f � � BENCH MARK _ AS � � o
EROSION CONTROL Iti TED ON PLAN to
t, SEDIMENT SOCK >
LJ
Q _
F `A (may�j ifs Y
/ Y t 55
f
r., /If
/ CLEAN ,
1, I
2 t _
! 1500 CAL.
O / z SEPTIC TANK,:IIt
F�
W
f D—BOX
I
g
m
C?
s <ctG Oj?
Li_J � 'I
STUB
s ` t CLLn
1
F _
z
>rvE,t_ANCS aINE I
4 _ (F_%�CED BY OTHERS) i o a >< >
MAP 38,PARCEL 114
N/F LEDUC
L�
�. ?, o� o
.' z Co F_ z
3 C
� �
�oS
., IR �
t 5 NO DISTURB
NOTES: o ��9��� �. z iS zo GRAPHIC SCALE
12 as 1
o
E F:EN AL,DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE
®,
INfTRDMENTS OF SERVICE IN RESPECT OF THE PROJECT. I
1,POINT 2 IS THE LEFT DOOR JAMB OF EXTERIOR DOOR INTO GARAGE. lr'�'"` THY ARE NOT INTENDED OR REPRESENTED TO DE SUITABLE
2,PROPOSED ADDITION AND BECK NOT CONSTRUCTED AT TIME OF 50'NO BUILD` �IN FEET) F REUSE BY OWNER OR OTHERS ON EXTENSIONS OF
T PROJECT OR ON ANY OTHER PROJECT.ANY REUSE
i BUFFER i 1 inch=20 f. WI=OUT WRITTEN VERIFICATION OR ADAPTATION BY PENNON[
INSPECTION.
J,
10V.H�aFE ASOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE
AT,OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL
0 ASSOCIATES AND OWNER SHALL
I
EX OSURE T PENNON[ 7
l t INiEMNIFY AND HOLD HARMLESS PENNON[ASSOCIATES
F)M ALL CLAIMS,DAMAGES,LOSSES AND EXPENSES
CURRENT
PROPER I Y CANNER
� � AF+ISING OUT OF OR RESULTING THEREFROM.
AS BUILT TIESPLAN
�SANDRA _
litSHAW1
59 BANNAN D RI VE ( JOB NO.
TO TANK ACCESS NORTH ANDOVER, MA 01845 ELKS 1301
2 TO TANK ACCESS 36.0'
3 1 TO CLEAN—OUT 38.5'
ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR
i L TO CLEAN OUT 27.4t AND OWNER MUST BE N0 _I IED OFANY I SHEET1 OF 1
I I A TI N DISCREPANCIES BEFORE PROCEEDI NC WITH THE WORK NORTH
s ? TO D-SOX 48.5'
C<ERT E
2
TO [)—B()}{ 43.0' PENNONI ASSOCIATES INC.CERTIFIES THAT THE MODIFICATIONS AND GALE DRAWING NO.
REPAIRS MADE TO THE SUBSURFACE SEWAGE DISPOSAL SYSTEM AT �1>f= 20'
} 59 BANNAN DRIVE,NORTH ANDOVER,MA COMPLY WIT
4 �3 4 c RAWN BY
' PLAN DATED. 10/09/13,REVISED:11/12/13,TITL IL L
z REGULATIONS EXCEPS AS NOTED. =" DRS
F
d km
03wi' ATE
f� f CIVIL
r1-A I i 1 1 f 22/13
N C.OSGOOD Jr P.
Pennoni
BENJ I
PPROVED
BCOal
I,