Loading...
HomeMy WebLinkAbout2026/05/21 - Site Plan - 200 Bridle Path GENERAL NOTES: �v 1. WETLAND BOUNDARY WAS DELINEATED BY NORSE ENVIRONMENTAL SERVICES,INC.ON MARCH Plant Legend PROPOSED ENCLOSED EGRESS STAIRCASE _ 3,2025,AND LOCATED BY INSTRUMENT SURVEY PERFORMED BY ANDOVER CONSULTANTS, ELEVATED OFF GROUND,SUPPORTED BY - - — � INC. ¢7 HELICAL PILES(SEE CROSS SECTION B—B) — 7 SWEET PEPPERBUSH(CLETHRA AWIFOUA) N/F MARTIN SMOLAK ASSESSOR ID 104.C-14 D.H.(F D.) 2. ZONING INFORMATION:THE SUBJECT PARCEL IS LOCATED IN THE RESIDENTIAL R1 ZONING PROPOSED SECOND STORY PORCH DISTRICT AND IS WITHIN THE LAKE COCHICHEWICK WATERSHED OVERLAY DISTRICT. �. HIGHBUSH BLUEBERRY(VACCINIUM CORYMBOSUM) ELEVATED OFF GROUND, SUPPORTED BY HELICAL PILES 3. UNDERGROUND UTILITIES:THE LOCATIONS OF EXISTING UNDERGROUND PIPES,CONDUITS,AND ---- e---- -- ---- ---- ---- ---- (SEE CROSS SECTION A A) OTHER FEATURES ARE BASED ON AVAILABLE RECORDS AND ARE NOT GUARANTEED TO BE AREA TO BE SEEDED WITH WETLAND SEED MIX n ACCURATE OR COMPLETE.THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR: � 3.1. PRE-MARKING THE SITE,qC , 3.2. CONTACTING DIG SAFE IN ACCORDANCE WITH APPLICABLE LAWS AND TIMELINES, x zR 3.3. VERIFYING THE LOCATIONS OF ALL UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO ANY EXCAVATION. T -- WETLAND ENHANCEMENT PLANTINGS AND wt=TtAND �.. �-� F ��Sp 4. CONSTRUCTION ACCESS:DUE TO LOT SIZE AND CONSTRAINTS,ALL CONSTRUCTION ACCESS SEEDMIX.MITIGATION TO EXTEND 10'BEYOND EDGE OF ,_.�. SHALL BE LIMITED TO THE EXISTING DRIVEWAY OR AS SHOWN ON PLAN. '- WETLAND BOUNDARY AS SHOWN(TYP) v - BA 5. MATERIAL REMOVAL:GIVEN THE LIMITED LOT SIZE,ALL EXCESS MATERIAL GENERATED FROM SITE WORK SHALL BE TRUCKED OFF-SITE_ EXIST PROPANE TANK "' ` _ REPLACE PATIO AND DECK IN PLACE. N/F TOWN OF NORTH ANDOVER , DIMENSIONS TO MATCH EXISTING ASSESSOR ID 104-C-78 �A y� = 6. REFER TO PLANTING MITIGATION PLAN PREPARED BY NORSE ENVIRONMENTAL SERVICES FOR Rp / 1"X 1"WOODEN STAKE PLACED 8'0-G BUFFER PLANTINGS. -.. - RELOCATE EXIST — t`\\\� ' '" AC UNITS CONVERT THREE SEASON PORCH k_J _ o TO FOUR SEASON PORCH BLOWN/PLACED FILTER MEDIA WATTLE 7. TEST PITS SHALL BE CONDUCTED IN LOCATION OF PROPOSED DRYWELL AND RECHARGE / 46,361 S.F. TRENCH TO CONFIRM ESTIMATED SEASONAL HIGH GROUNDWATER AND SOIL TYPE. EROSION ND SEDIMENTATION ; L_, / L WORK AREA ARE TO E PROTECT D CONTROL BARRIER R ON CONTROL GENERAL NOTES. 8A = MIN. f E1 OSIPRIOR TO STARTING ANYOTHER WORK ON THE SITE,THE CONTRACTOR SHALL NOTIFY APPROPRIATE AGENCIES tivTT, AND SHALL INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE PLANS AND AS IDENTIFIED IN FEDERAL, - �'-PIN(FND.) i1000PRECAST CONCRETE 1000 GALLON JUMBO � RECHARGE CHAMBER STATE,AND LOCAL APPROVAL DOCUMENTS PERTAINING TO THIS PROJECT. 9A �� DOWNSPOUT WTH - j SECTION 10A T OVERFLOW 2. CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES,AND REMOVE SEDIMENT SE ,: _- _- _= '— ,� RD 9"WATTLE 13A - = / ® THEREFROM ON A WEEKLY BASIS AND WITHIN TWELVE HOURS AFTER EACH STORM EVENT AND DISPOSE OF 12A A PROP DRIVEWAY , PROP 13'xzs' - I SEDIMENTS IN AN UPLAND AREA SUCH THAT THEY DO NOT ENCUMBER OTHER DRAINAGE STRUCTURES AND �— _ WIDENING ADDITION �_ _ f — / LIMIT OF WORK AREA TO BE PROTECTED PROTECTED AREAS. PROP 3. CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT SEDIMENTATION SHALL CRUSHED -----STONE RECHARGE N/F CLY-KWY NOMINEE REALTY TRUST WATER FLOW NOT AFFECT REGULATORY PROTECTED AREAS,WHETHER SUCH SEDIMENTATION IS CAUSED BY WATER,WIND, �- � TRENCH / ASSESSOR ID 104.c-80 OR DIRECT DEPOSIT. -- WOODEN STAKE PLACED 8'O.C. sTAew'ED WORK AREA 4. CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE EXPOSED FOR CONSTRUCTION - A MINIMUM OF TIME BEFORE THEY ARE COVERED,SEEDED,OR OTHERWISE STABILIZED TO PREVENT EROSION. `A'A ENTRANCE _ — [�L STOCKPILE AREA-TO BE PROTECTED PI AKIL 5. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OF PERMANENT GROUND COVER,CONTRACTOR BY EROSION AND SEDIMENTATION SHALL REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND CLEAN SEDIMENT AND DEBRIS FROM CONTROL BARRIER- STRAW WATTLE DETAIL ENTIRE DRAINAGE AND SEWER SYSTEMS. CONSTRUCTION ACCESS 6. ALL DISTURBED AREAS SHALL BE LOAMED AND SEEDED UPON COMPLETION OF WORK. NOT TO SCALE 0 A SITE o MIN EXIST CATCH BASINS SS/H(FND) \ - 10'6, _ i I.- !v�z,0..Q.4.;ryo EX MEN 100'WETLAND BUFFER ZONE AND �/ /�PATH 20"DIA.INSPECTION COVER �.e;ai°=o:ea:;•c,;9a;tr°:';,a,�'? ."P'a° 100'NON—DISTURBANCE BUFFER ZONE H I OWNER: / - Plan View bo RYAN&ALYSSA HEFFERNON I I I 200 BRIDLE PATH NORTH ANDOVER,MA 01845 - SITE 30' DEED REFERENCE: MIN. PAIVEMEN "(MIN- T �-� r- 4 3'S7 BOOK 15673-202 FILTER oMOUNTABLE BERM ASSESSOR REFERENCE: FABRIC TOP VIEW 1"CRUSHED STONE ID 104.C-0079 REMOVE COVER AT ACCESS OPENINGS Cross-section 2—"DIA INSPECTION COVER NON—WOVEN GEOTEXTILE FRAME&COVER TO TOP&SIDES ROOF STRUCTURE ROOF STRUCTURE GRADE(SEE PLAN) NOTES: 1"TAPER' \/v/\\'\\'���v��fvf 1 TRACKING ORFLOWING OF SEDIMENT ONTO PUBL CTI RIGHTS ICOFSWAYL THIS MAY � REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED,DROPPED,WASHED OR TRACKED ONTO PUBLIC RIGHTS—OF—WAY 4."TOP: MUST BE REMOVED IMMEDIATELY. BERM SHALL BE PERMITTED. PERIODIC INSPECTION AND MAINTENANCE SHALL BE PROVIDED AS NEEDED. O O O (aO O O O 2.STABILIZED CONSTRUCTION EXIT SHALL BE REMOVED PRIOR TO FINAL FINISH MATERIALS BEING INSTALLED. 2'-10 .---� '� i -2- STABILIZED CONSTRUCTION ENTRANCE SCREENING EXTERIOR WALL _ BOTTOM ELEVATION NOT TO SCALE RAILING ADU DRAINAGE HOLE54"TO 251DE DVIEWAPER REVISIONS PER CONSERVATION COMMISSION / / PORCH STAIRWELL DOUBLE WASHED 1"-1Z"0 5 WAIVER REQUEST 5 21 2026 FINISH 2ND FLOOR EXTERIOR WALL—___, FINISH 2ND FLOOR CRUSHED STONE 4 ADD WETLAND ENHANCEMENT PLANTINGS 5/8/2026 r SHL'A PRECAST CONCRETE 3 ADD WETLAND ENHANCEMENT PLANTINGS 4/17/2026 FLOOR STRUCTURE C-- 1000 GALLON JUMBO DRYWELL 2 REVISIONS PER CONSERVATION COMMISSION 4/9/2026 F-- NOT To SCALE COMMENTS MUDRooM �ExISTING EXTERIOR WALL 1 REVISIONS PER PEER REVIEW COMMENTS 3/3/2026 STRUCTURAL POST­,., LAUNDRY FINISH GRADE Revision No.Revision Description Date OPEN AREA GARAGE FINISH 1ST FLOOR GARAGE FINISH 1ST FLOOR \ 'o BELOW — — OPEN BELOW O"`—"O::C moo PROPOSED SITE PLAN HELICAL PILE FLOOR STRUCTURE 200 BRIDLE PATH STRUCTURAL POST FOUNDATION EXISTING FOUNDATION N O O�O DRIVEWAY FINISH GARAGE FLOOR FINISH GARAGE FLOOR NORTH ANDOVER MASS O O O GRAVEL BASE f EXISTiNGFouNDAnON PREPARED FOR:RYAN&ALYSSA HEFFERNON HELICAL PILE 3/4"TO 1-1/2" FOUNDATION CRUSHED STONE DATE:FEBRUARY 11,2026 2' SCALE:1"= 20' OF tM,18 DENNIS A yc CRUSHED STONE GCIVIL EXISTING FINISH GRADE EXISTING FINISH GRADE andover U CIVIL No 49318 RECHARGE TRENCH consultants o sE�, �oT�sr� NOT TO SCALE inc. �SS�OMAL ECG CROSS SECTION A-A CROSS SECTION B-B NOTES 1. RECHARGE TRENCH SHALL BE INSPECTED AT LEAST ANNUALLY AND AFTER MAJOR STORM EVENTS, 1 East River Place TYPICALLY AS PART OF ROUTINE RESIDENTIAL YARD MAINTENANCE.. ACCUMULATED SEDIMENT AND DEBRIS(LEAVES,LITTER,ETC)SHALL BE REMOVED TO ENSURE THAT RUNOFF IS ABLE TO ENTER Methuen,Mass. 01844 ' TRENCH UNIMPEDED AND REPAIR OR REPLACE STONE AS NECESSARY. Telephone:978-687-3828 Reg.Prof.Engineer 0 20 40 60 80 Ft. P:\25\25-05\dwg\Site Plan-Bridle Path.dwg