Loading...
HomeMy WebLinkAbout12/08/2023 - Application - - Special Permit Amendment-Site Plan Review Application for The Redevelopment of North Andover Mall North Andover Mall 350 Winthrop Ave. North Andover, MA Prepared For: DSM Realty Inc. 881 East Street Tewksbury, MA 01876 Prepared By: R.J. O'Connell & Associates 80 Montvale Avenue, Suite 201 Stoneham, MA 02180 Date: December 8, 2023 TABLE OF CONTENTS I. Special Permit— Site Plan Review Application II. Special Permit Application III. Project Narrative A. Introduction B. Existing Conditions C. Redevelopment Program D. Land Use Permits E. Standards for Approval of a Special Permit F. Stormwater Management IV. Appendix A— Traffic Impact and Access Memorandum (Prepared by VHB, dated November 17, 2023) V. Appendix B —Parking Utilization Study VI. Appendix C —Town of North Andover Abutter's List (300 ft radius) VII. Appendix D — City of Lawrence Abutter's List (300 ft radius) VIII. Appendix E— Permit Application Fee I. Special Permit — Site Plan Review Application • North Andover Mall Building & Site Renovations (pursuant to Section 195-8.17 — Revisions to Approved Site Plans) w 9 I +P 9 e 'r u!!t Ig: III IIII I� 00000000Y:1':: AP I III IN,�Ild IYI IP�jl� I III PLANNING DEPARTMENT Community& Economic Development Division Special Permit — Site Plan Review — Instructions Procedure and Requirements for Filing an Application for Site Plan Review; The following information must be submitted thirty(30)days prior to the first public hearing. Failure to submit the required information within the time periods prescribed may result in a dismissal by the Planning Board of an application as incomplete. The information herein is an abstract of more specific requirements listed in the Zoning Bylaw and is not meant to supersede them. ➢ Step 1: Pick up application package: The petitioner picks up complete application package Step 2: Special Permit Application Form: Petitioner completes three(3)copies of the application form.All information as required shall be completed. ➢ Step 3: Plan Preparation: Petitioner submits all of the required plan information as cited in sections 8.3 and 10.31 in the North Andover Zoning Bylaw. Step 4: Submit Application: On or before noon on the application deadline date the petitioner goes to the Town Clerk to obtain a time stamp on three(3) applications. Leave one application with the Town Clerk and bring two(2)time stamped applications to the Planning Department. Petitioner submits to the Planning Department two(2)sets of full size plans 1"=40'no larger than 24"x36" prepared by a Registered Professional Engineer or Land Surveyor. Petitioner submits an additional three(3)sets of plans no larger than 11"x17". Petitioner must submit an electronic PDF version of all submission material. Application must include submittal of outside consultant review escrow form. ➢ Step 5: Submit Filing Fees: The petitioner submits two separate checks for filing fees and outside consultant fees. SEE FEE SCHEDULE ➢ Step 6: Mail Application to Outside Consultant: The petitioner mails a copy of the plan and application to the outside consultant for review. Please contact the Planning Department for more information. ➢ Step 7: Notification of Parties in Interest: Petitioner picks up an updated certified abutters list from the Assessor's office(located at 120 Main St.) It is to be submitted as part of the application submittal. ➢ Step 8: Legal Notice: The petitioner is responsible for delivering the legal notice to the newspaper to be published and is responsible for costs for same. The petitioner is responsible for the costs for certified mailing of the legal notice to each abutter. See specific updated instructions for certified mailing of legal notices on the Planning Department website. ➢ Step 9: Public Hearing before the Planning Board: The petitioner should appear in his/her behalf,or be represented by an agent or attorney. In the absence of any appearance without due cause on behalf of the petitioner,the Planning Board shall decide on the matter by using the information it has otherwise been provided. Page 1 of 4 120 Main Street, Planning Dept., North Andover, Massachusetts 01845 Phone 978.688.9535 Fax 978.688.9542 Web www.northandoverma.gov ➢ Step 10: Decision: Decision is sent to the petitioner. Any appeal of the Planning Board's decision may be made pursuant to Massachusetts General Laws c.40A sec. 17 within 20 days after the decision is filed with the Town Clerk. ➢ Step 11: Recording Certificate of Decision Plans: The petitioner is responsible for recording certification of the decision and any accompanying plans at the Essex North Registry of Deeds, Lawrence Massachusetts. Petitioner should bring in one recorded copy of the decision and three paper copies of the recorded plan of land along with the proof of recording cash register slip to the Planning Department GENERAL REQUIREMENTS TO BE MET FOR OBTAINING A SITE PLAN REVIEW SPECIAL PERMIT Written Documentation Applications for a special permit must be supported by a legibly written or typed memorandum setting forth in detail all facts relied upon.Addressing each of the below points individually is required with this application. ➢ Encouraging the most appropriate use of land; ➢ Preventing overcrowding of land; ➢ Conserving the value of land and buildings; ➢ Lessening congestion of traffic; ➢ Preventing undue concentration of population; ➢ Providing adequate light and air; ➢ Reducing the hazards from fire and other danger; ➢ Assisting in the economical provision of transportation,water,sewerage,schools, parks,and other public facilities; ➢ Controlling the use of bodies of water, including watercourses; ➢ Reducing the probability of losses resulting from floods;and ➢ Reserving and increasing the amenities of the Town;AND ZONING BYLAW SECTION 10.31 The Special Permit Granting Authority must have all the following conditions met: ➢ The specific site is an appropriate location for such a use,structure or condition; ➢ The use as developed will not adversely affect the neighborhood; ➢ There will be no nuisance or serious hazard to vehicles or pedestrians; ➢ Adequate and appropriate facilities will be provided for the proper operation of the proposed use; ➢ The Special Permit Granting Authority shall not grant any Special Permit unless they make a specific finding that the use is in harmony with the general purpose and intent of this Bylaw. SPECIFIC REQUIREMENTS TO BE MET FOR OBTAINING A SITE PLAN REVIEW SPECIAL PERMIT Written Documentation Applications for a special permit must be supported by a legibly written or typed memorandum setting forth in detail all facts relied upon. See Bylaw Section 8.3 Site Plan Review. NOTE: A Special Permit once granted by the Planning Board will lapse in two (2) years if not exercised unless the Planning Board grants an extension. Page 2 of 4 120 Main Street, Planning Dept., North Andover, Massachusetts 01845 Phone 978.688.9535 Fax 978.688.9542 Web www.northandoverma.gov r tli I PLANNING DEPARTMENT Community&Economic Development Division EE: Special Permit — Site Plan Review A lication Please type or print clearly. 1. Petitioner: DSM Realty, Inc. Petitioner's Address: 881 East Street; Tewksbury, MA 01876 Telephone number: Attn: Normand Martin - 978-640-8117 2. Owners of the Land: Delta MB LLC c/o Demoulas Supermarkets, Inc. Address: 875 East Street; Tewksbury, MA 01876 Number of years of ownership: March 1976 3.Year lot was created: 1968 4. Description of Proposed Project: See attached Project Description 5. Description of Premises: Retail Shopping Center 6.Address of Property Being Affected: 350 Winthrop Ave. Zoning District: Business 3, Business 4 and Residence 4 Assessors Map: Lot#: Map 26 Block 6, 8, &9 Registry of Deeds: Book#: 140819 Page#: 27 Map 27 Block 27, 30, 31 & 32 7. Existing Lot: Lot Area(Sq. Ft): 1,822,900 sf Building Height: 1 story (24.0 ft) Street Frontage: (1) = see below Side Setbacks: 54.4 ft- Kohl's Front Setback: (2) = see below Rear Setback: 79.8 ft-Vacant Space#3 Floor Area Ratio: 0.130 Lot Coverage: 13.0% 8. Proposed Lot(if applicable): Not Applicable Lot Area(Sq. Ft): Building Height: Street Frontage: Side Setbacks: Front Setback: Rear Setback: Floor Area Ratio: Lot Coverage: (1) = 17762 +/- If-Winthrop Ave -698 +/- If Waverly Rd Page 3 of 4 (2) = 305.7 ft-Winthrop Ave- 225.2 ft-Waverly Rd 120 Main Street, Planning Dept., North Andover, Massachusetts 01845 Phone 978.688.9535 Fax 978.688.9542 Web www.northandoverma.gov 9. Required Lot(as required by Zoning Bylaw):(Business 3 District) Lot Area(Sq.Ft): 120 OQQ sf Building Height: 0 ........35il Street Frontage: 300 ft Side Setbacks: 100ft(1) Front Setback: 100 ft Rear Setback: 100,ft-N) Floor Area Ratio,, 0.40 Lot Coverage: (1)= Increases to 100 ft when abutting Residential Zoning District 10.Existing Building(if applicable)., Ground Floor St) -2'5 0 3,,,9BD— #of Floors: Total Sq.Ft.- 235,98:0 sf Height:—24.Q ft Use: Retail Sho pjn nter,p * Ceq Type of Construction: Masonry 5lock 11.Proposed Building: Ground Floor(Sq. Ft.): 2261984 sf #of Floors: Total Sq.Ft. 226,984 sf Height:,,,--24-,G_,ft- Use: Retail $)bhpp in _Center Type of Construction: Masonry Bloc 12.Has there been a previous application for a Special Permit from the Planning Board on these premises? Yes If so,when and for what type of construction? Parking spa reduction to correct existing ADA deficiencies-dated March 9, 2019 13.Section of Zoning Bylaw that Special Permit Is Being RequestedSection 1 -0.17 Revisions to 6pproved Site Plans ............. Section 195-10.7-Special Permits 14.Petitioner and Landowner signature(s): Every application for a Special Permit shall be made on this form, which is the official form of the Planning Board. Every application shall be filed with the Town Clerk's office. It shall be the responsibility of the petitioner to furnish all supporting documentation with this application.The dated copy of this application received by the Town Clerk or Planning Office does not absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses for filing and legal notification. Failure to comply with application requirements, as cited herein and in the Planning Board Rules and Regulations may result in,a dismissal y the Plannin Board of this application as incomplete. Petitioner's Signature: Print or type name here: Owner's Signature: G� zzll�A,4�5 Print or type name here.- 15.Please list title of plans and documents you will be attaching to this it !S application. �ay L�0-'Lonnel- S111 ,anftx,sA ihe-121 ,- -R ,-As,saI. c1*ate,s,-,dated 10,12, '09,.',I,.,.,I,astzevisedA,21ZQ02,3,, A 1� 'g. enw-A afe-P R. vd, ppA -Rroj=-NaffAtve1 tifl-ed� L :-Prepared-by-RJ-Q'Conn,.el,l,,.&,.AswLj e `1Cnnn 11 As,sac,ia ar, maver ared y-EU. LRep rt---N t---p Q- ar dated 12/8/2023. Page 4 of 4 120 Main Street, Planning Dept., North Andover, Massachusetts 01845 Phone 978.688.9535 Fax 978.688.9542 Web wwanorthandove rm a,�. o v I 1110 PLANNING DEPARTMENT Building Conservation Health Planning Stevens Estate Zoning Certification of Payment of Municipal Taxes, Fees, Assessments, Betterments and Other Municipal Charges The Town of North Andover General Bylaw Chapter 129-1, provides that any application for a permit or license may be denied, suspended or revoked if the holder thereof has failed or refused to pay any taxes, fees, assessments, betterments or other municipal charges. By signing this application, the applicant represents that he or she has paid all such taxes and fees. l , certify under the penalties of perjury that to the best of my knowledge and belief, I have not neglected or refused to pay any municipal taxes, fees, assessments, betterments or any other municipal charge including amounts assessed under the provisions of section twenty-one D, or am not applying for a license or permit with respect to any activity, event or other matter which is the subject of such license or permit and which activity, event or matter is carried out or exercised or is to be carried out or exercised on or about real estate whose owner has neglected or refused to pay any local taxes, fees, assessments, betterments or any other municipal charge. Signed under oath: Na e Address Does the Property Owner own any additional property in North Andover(Yes or No)? N _(YIN). If yes, please list the property address of any additional property. Property Address: North Andover Tax Collector Signature Name Date 4. Description of Proposed Project: The Petitioner seeks approval to amend the existing special permit/site plan review decision dated March 9, 2019 to perform both building and site improvements to the North Andover Mall. The redevelopment program consists of renovating the existing Kohl's tenant space to accommodate the relocation of Market Basket. The vacated Market Basket tenant space will be renovated to accommodate Kohl's and approximately 17,600 +/- sf specialty retail shops. Upon the completion of the building renovations, there will be a net reduction in building footprint area by approximately 9,000 +/- sf.Additional improvements to the property include parking lot upgrades which have been designed to improve traffic circulation, increased landscape area, upgrades to the existing stormwater management system, site lighting upgrades and an overall net reduction in impervious surface area by approximately 55,000 +/- sf. II. Special Permit Application • Section 195-8.4 —Off-Street Parking Requirements (Reduction in Parking Spaces) • Section 195-8.18D (1) — Landscaping and Screening Requirements for Parking areas of Twenty (20) or more Parking Spaces I �r 1 J i 1 g iM r 11e,!,i I u!' M. J Tows of North Ando�ver Planning Department Community c ic Development Divisionr 1 fn Street North I Andover", a tt01845 'Town own North Andover Planning B Application for Special Permit EI ::::::: Please type or print c,learly. 1.Petitioner: DSM Realty Inc. " titi r's,Address: $$1 East Telephone number Attn: Normand Martin - 978-64 - 117 .Owners of the Land: Delta MB LLC c/o Demoulas Supermarkets Inc. Address: Number ofyears of ownership-, March 1976 3.Year,lot was created: 1968 .Description of Proposed Project-. See attached Project Description .Description of Premises: Retail Shopping Center t 6.Address of Property Being Affected: Zoning!,District: Rusiness_3__Busin, 1 Assessors Map: Lot : Map 26- Block 6, 8, & 9 Registry of Deeds:Book : 14088 P : 27 Map 27 - Block 27, 307 31 & 32 7.Biting Lot: Lot Area(8 .Ft),: 1 822 900 sf Building Height: 1 st (21O X Street Frontage:(1) = see below Side S t iack&: 54.4 ft- Kos- Front Setback: (2) = see below Rear 8 t a :7A A ft vacant-space#3 Floor Area Ratio: 0.130 Lot Der : 13.0% .Proposed Lot(if applicable): Not Applicable Lot Area (Sq.Ft)*,- Building Height: Street Frontage: Side Setbacks: (1) = 15762 +/- If Winthrop Ave - 698 +/- If Waverly rd 3 2 = 305.7 ft WinthropAve -225.2 WaverlyRd e I "' 120 Haire Street,PlunRIng Dept.,North Andover,Masisochu tt 1 18,45 Phone . 8.953 Fax 978.688.9542 Web,www.northondoverma.go,v Front Setback: Rear Setback: Floor Area Ratio:,, Lot Coverage: 9.Required Lot(as required by Zoning Bylaw):(Business 3 District) Lot Area(Sq.Ft): 19n-0,()()sf .... Building Height: 35-ft, Street Frontage: 300 ft Side Setbacks: lQ0 fit-0) Front Setback: 100 ft............ Rear Setback: 100 ft(1) ....... Floor Area Ratio: (),4()... Lot Coverage:-31 ffi� (1)= Increases to 100 ft when abutting Residential Zone Distict 10.Existing Building(if applicable)" Ground Floor,(Sq,,F4-2 �K Ls f—' #of Floors: Total Sqi Ft.. 2135 9,80s,f Height* 24.0 ft, Use. Retail S Blopk �1�io,p jp9p.,�,p— ter, Type of Construction:,Ma8onr 11.Proposed Building: ....... Ground Floor(Sq.Ft.): 92R W984.� #of Floors: IJ- 11 Total Sq.Ft., 226,W,,-sL.— Height:,_24,0-ft............ Use:Jjetafl-,9hoppjng-C-e�.....— Type of Construction: Masonry....131-ock 12.Has there been a previous application for a Special Permit from the Planning Board on these promises? Yes If so,when and for what type of construction? Parking-apace reduction to correct existing ADA 13.Section of Zoning Bylaw that Special Permit Is Being Existing ADA Deficiencies-dated March 9,2019 Requested See attached 14.Petit]oner an d La nd owne r si g nature(S) �wtiy applica6tott for a,SpecialFc-mill,sall be rna-de,on t1fis i.�t1it ofricial form ofthc PjannJog Bwrd.Every,a pplication shall be file d wit li 01c.Town,C.14irk 1,s offlice,itsh'al I bt Ito r csponlibli I ity of the,pet"11,1011er to fum IS11 311 sopparting,docurnmaatioa Willi this application,A7 1w,dated�cqpyaf ails application recciwd by the Tdkvn Clerk or Platinto'g office,does"oat absolve ow applicant ftwi,thii F R 11 It toll i bility.11"he pet it toncri,,hatl be fw�ponsible for all,expenses for A ling alld legal not"I ficatiol"I,Failuva to:wivply with appl," at" r os po-ns I �f - by the Planairpig Board.of this requirements,as�cited,fierein arld in ffie,Planning,R<,mard",Rulez,and R"11 tut'll t'lo'n's 11,14y rL'salt in a disinissal, application as incomplete. Petitioner's Signature: Ile) ....... Print or type name here; Owner's Si nature Print or type name here:., ?K111111"I'll zi 15.Please list title of plans,and documents you will be attaching to this application. -Site plans titled"Site Plan,for Re ;4 1,, A at nf Nn Ive n,re In tv I titl r[ RJ.L�Cja De,11J,L- A-1111 ated I nnell, -Stormwater, an ement Re ort- Xs—soclates-' dated 12/8/2023 Page 2 of 3 .................... 120 Main Street,Planning Dept.,North Andover,Massachusetts 01845 Phone 978.688.9535 Fox 978.688.9542 Web www.northandoverma.gov I 4 rr y PLANNING DEPARTMENT Building Conservation Health Planning Stevens Estate Zoning Certification of Payment of Municipal Taxes, Fees, Assessments, Betterments and Other Municipal Charges The Town of North Andover General Bylaw Chapter 129-1, provides that any application for a permit or license may be denied, suspended or revoked if the holder thereof has failed or refused to pay any taxes, fees, assessments, betterments or other municipal charges. By signing this application, the applicant represents that he or she has paid all such taxes and fees. M I Arthur Demoulas certify under the penalties of perjury that to the best of my knowledge and belief, I have not neglected or refused to pay any municipal taxes, fees, assessments, betterments or any other municipal charge including amounts assessed under the provisions of section twenty-one D, or am hot applying for a license or permit with respect to any activity, event or other matter which is the subject of such license or permit and which activity, event or matter is carried out or exercised or is to be carried out or exercised on or about real estate whose owner has neglected or refused to pay any local taxes, fees, assessments, betterments or any other municipal charge. Signed under oath: me Address Does the Property Owner own any additional property in North Andover(Yes or No)? N Y/N). If yes, please list the property address of any additional property. Property Address North Andover Tax Collector Signature Name Date 4. Description of Proposed Project The petitioner seeks approval to amend the existing Special Permit/Site Plan review decision dated March 9, 2019 to perform both building and site improvements to the North Andover Mall. The redevelopment program consists of renovating the existing Kohl's tenant space to accommodate the relocation of Market Basket. The vacated Market Basket tenant space will be renovated to accommodate Kohl's and approximately 17,600 +/- sf of specialty retail shops. Upon the completion of the building renovations, there will be a net reduction in building footprint area by approximately 9,000 +/- sf.Additional improvements to the property include parking lot upgrades which have been designed to improve traffic circulation increased landscape area, upgrades to the existing stormwater management system, site lighting upgrades and an overall net reduction in impervious surface area by approximately 55,000 +/- sf. 13. Section of Zoning Bylaw that Special Permit is being requested: The renovations planned for North Andover Mall will require the following special permits to be issued by the Planning Board: Section 195-8.4 Off-Street Parking Requirements—Pursuant to this section, the project will require 1,154 parking spaces to be constructed. Upon completion of the site renovations, 909 parking spaces will be provided. Section 195 — 8.18 (D)(1)—Landscaping and screening requirements for parking areas of twenty (20) or more parking spaces. g:\ma\north andover\market basket\submittals\2023-11-xx-north andover mall renovation special permit\2023-12-08-special permit project description.docx III. Project Narrative A. Introduction The owners of North Andover Mall Shopping Center, Delta MB LLC is seeking approvals from the Planning Board acting as the Special Permit Granting Authority (SPGA)pursuant to Section 195-8.17 and Section 195-10.7 of the Zoning Ordinance to amend the existing special permit decision dated March 9, 2019 to perform both building and site improvements to the North Andover Mall. The redevelopment program consists of renovating the existing Kohl's tenant space to accommodate the relocation of Market Basket. The vacated Market Basket tenant space will be renovated to accommodate Kohl's and 17,600 +/- sf of small store specialty retail shops. In addition to performing building renovations, improvements to the site are planned and include the following: parking lot upgrades to improve traffic circulation, enhanced landscape areas within the parking lot area, upgrades to the existing stormwater management system and site lighting system and an overall net reduction in impervious surface area by approximately 5500 +/- sf. In addition to seeking approvals to amend the existing special permit/site plan review decision, the renovations planned will require the following special permits to be issued by the SPGA: • Section 195-8.4—Off-Street Parking Requirements: Pursuant to this section, the project will require 1,154 parking spaces to be constructed. Upon completion of the site renovations, 909 parking spaces will be provided. • Section 195-8.18D (1)—Landscape and Screening Requirements for Parking areas of twenty (20) or more parking spaces. B. Existing Conditions The subject site is comprised of multiple parcels of land which totals 41.8+/- ac of land with a property address of 350 Winthrop Avenue. The site is bounded to the north by a wetland resource area that is a tributary to the Shawsheen River, to the south by residential properties which front along Waverly Road, to the east by residential properties with frontage along Waverly Road and to the west by Winthrop Ave. (Rt. 114— Salem Turnpike). The property is developed, and its current use is that of a retail shopping center.An existing single-story structure with approximately 236,000 +/- sf of gross leasable area (gla) and 1,011 parking spaces are provided to support the use of the property as a shopping center. The site is serviced by two (2) curb cuts.A full access curb cut operating under traffic signal control is located at the south end of the site with an"exit" only curb cut located at the north end of the property. The majority of the parking lot area which fronts along Winthrop Ave. is located within the 100-year flood zone (Zone AE) as depicted on the Flood Insurance Rate Map for the Town of North Andover, Essex County Massachusetts, Panel 217 of 600, Map Number 25009CO217F, effective date July 3, 2012. (See existing conditions plans, Dwg. Nos. EX- 1 —EX-3 for limits of the delineated flood zone area). The property is also encumbered with vegetated wetland areas which are located along both its northerly and southerly property boundaries with an intermittent stream located along the property frontage to Winthrop Ave. with its discharge being to the Shawsheen River. The property is also serviced by municipal water and sewer with its connection point being to Waverly Road. Electric, telephone and natural gas also service the shopping center with their respective connection points being within the Waverly Road right of way. C. Redevelopment Program The petitioner is seeking approval to amend the existing special permit/site plan review decision dated March 9, 2019 to perform both building and site improvements to the North Andover Mall. The redevelopment program consists of renovating the existing Kohl's tenant space to accommodate the relocation of Market Basket. The vacated Market Basket tenant space will then be renovated to accommodate Kohl's an approximately 17,600 +/- sf of small store specialty retail shops. Upon completion of the building renovations there will be a net reduction in building footprint area by approximately 9,000 +/- sf. Improvements to the site include but are not limited to the following: parking lot upgrades which have been designed to improve traffic circulation and support nine hundred and nine (909) parking spaces, pedestrian connectivity is being provided from the shopping center store fronts to Winthrop Ave., increased landscape areas, upgrades to the existing stormwater management system are planned which have been designed to enhance pollutant removal from stormwater runoff, site lighting upgrades and an overall net reduction in impervious surface area by approximately 5500 +/- sf. The majority of the front parking area is also located within the 100-year flood plain. The parking lot area has been regraded such that there will be additional flood storage capacity provided at each contour interval as compared to the existing site condition. D. Land Use Permits A review of the Town of North Andover's zoning map indicates the subj ect property is located within the following zoning districts. Business 3, Business 4 and Residence 4 zone districts (for delineation of the zoning districts, refer to Dwg. No OS-1 titled "Overall Site Plan". The North Andover Mall development program is located entirely within the Business 3 zoning district with undeveloped land located within both the Business 4 and Residence 4 zoning districts. For the purposes of this special permit- site plan review application, the building and site improvements were designed to meet the design criteria for projects located within the Business 3 Zoning District. The property is subject to two (2) special permit decisions as issued by the Planning Board (SPGA). The initial special permit was issued in September 1988 for the construction of a 5,600 +/- sf addition to Market Basket. The second special permit was issued in March 2019 to perform certain improvements to the storefront sidewalk and parking area to correct existing ADA deficiencies. To correct the ADA deficiencies, the improvements resulted in a loss of on-site parking spaces, and as a result, the parking spaces provided to support the shopping center is below the minimum required as outlined in the zoning ordinance pursuant to Section 195-8.4—Table of Off-Street Parking Regulations. The Petitioner's redevelopment program will require the following special permits to be granted by the Planning Board: A) Special Permit/Site Plan Review—Pursuant to Section 195-8.17—Revisions to Approved Site Plans, the Director of Planning has determined that the Petitioner's redevelopment program are substantial enough that the Petitioner will be required to submit a special permit/site plan review application seeking approval from the Planning Board to amend the existing special permit decision as issued in March 2019. B.) Special permit for a reduction to the minimum parking requirements as required under Section 195-8.4—Off-Street Parking Requirements. The renovations planned for the shopping center will result in a loss of 102 parking spaces as compared to the existing site conditions. The special permit issued in March 2019 allows the shopping to operate with 1,011 parking spaces. The redevelopment program provides 909 parking spaces. The Planning Board pursuant to Section 195- 8.8 may grant a special permit to reduce the minimum parking requirements subject to meeting the performance standards as outlined under Section 195-8.8.D (5) (b) which requires the Petitioner to submit a calculated parking demand for combined land uses based on methodologies and indices of the Institute of Transportation Engineers, Urban Land Institute or other recognized methodology approved in writing by the Planning Board. RJOC performed a parking utilization study from April 23, 2018 to May 12, 2018 in support of the special permit/site plan review application filed in January 2019 to correct certain ADA deficiencies and again from October 9, 2023 to October 21, 2023 in support of the current special permit/site plan review application. In both studies occupied parking spaces were counted during the weekday pm peak time period of 4pm to 6pm and the Saturday peak period timeframe of 11 am to 2pm. The results of the 2018 parking study indicated the peak parking demand during the weekday occurred on Monday,April 30th in which 404 of the 1,025 parking spaces were occupied for a parking utilization rate of 39.4%. The peak parking demand for Saturday occurred on April 28 in which 493 parking spaces were occupied for a parking utilization rate of 48.1%. The results of the 2023 parking utilization study indicates the peak parking demand during the weekday occurred on Tuesday, October IOth in which 372 of the 1,011 parking spaces were occupied for a parking utilization rate of 36.8%. The peak parking demand for Saturday occurred on October 21"in which 496 parking spaces were occupied for parking utilization rate of 49.1%. The parking study concludes that during the weekday evening peak hour, there was a net reduction in occupied spaces by approximately 2.6% (39.4% in 2018 to 36.8% in 2023) and a slight increase in parking demand of 1.0% during the Saturday peak hour demand(48.1% in 2018 to 49.1% in 2023). In addition to the performance of field observations to understand the parking demand being experienced at the shopping center. The Petitioner's Traffic Engineering consultant,VHB performed an independent analysis in determining the minimum parking requirements to support the shopping center. The analysis was based on studies performed by both the Institute of Transportation Engineers (ITE) and the Urban Land Institute (ULI). The ITE data recommends that for a shopping center up to 400,000 sf in size, the parking demand is estimated to be 2.44 spaces per thousand square feet of leasable area, which equates to 554 parking spaces being provided for at North Andover Mall. ULI recommends for the same size shopping center, the parking demand be estimated based on 4.0 spaces per thousand square feet of leasable area or 907 spaces should be provided on-site. The results of the parking utilization study as performed by RJOC (see Appendix B) and the findings from VHB's traffic memorandum dated November 17, 2023 (see Appendix A) concludes that 909 parking spaces being provided at the completion of the site renovation is more than sufficient to meet the operational needs of the shopping center. C.) Special Permit for compliance with the Screening and Landscaping of Off-Street Parking Areas as required under Section 195-8.18D (1) for parking areas of 20 or more spaces. Specifically, a special permit is being requested to waive the interior landscape requirement "where two (2) rows of parking spaces contain a total of 10 or more parking spaces face each other, a landscaped open space not less than six (6') feet in width shall be provided. The landscape strip may be provided either of the following: 1) between the rows of parking spaces parallel to the aisle or 2) in two or more strips parallel to the spaces and extending from the aisle serving one row of spaces to the aisle serving the other row of spaces. "The Planning Board pursuant to Section 195- 8.8.1)(8) may modify screening and landscaping requirements where it can be demonstrated to the satisfaction of the Planning Board that the plan for screening and landscaping would be enhanced without detriment to the surrounding neighborhood through the waiver or modification of the screening requirements. The Petitioner is seeking a waiver from this requirement as compliance would result in a loss of additional on-site parking spaces and as a result, the amount of available parking would be below the suggested recommendations as outlined in VHB's memorandum dated November 17, 2023 (See Appendix A). The redevelopment program will result in an increase in interior parking lot landscape area by approximately 28,000 sf as compared to the existing site conditions. The waiver request to reduce the interior landscaping requirement will not have a detrimental impact to abutting properties as the site abuts regulated wetland resource areas along its northerly and southerly property boundaries. E. Standards for Approval of a Special Permit Pursuant to Section 195-10.7— Special Permits, the Special Permit Granting Authority shall not approve any application for a special permit unless it finds that in its judgement, the following conditions are met: 1. The specific site is an appropriate location for such a use, structure or conditions. Response: The subject site is currently developed and operates as a retail shopping center. The property is located within the Business 3, Business 4 and Residence 4 zoning districts. The existing shopping center is located entirely within the Business 3 zoning district. Retail, eating and drinking establishments, grocery, personal care facility and bank type uses which currently reside at the shopping center are all permitted uses within the Business 3 zoning district (see Section 195-4.1 —Table 1 Summary of Use Regulations). The Petitioner's Special Permit Application does not propose any change to the uses that currently operate within the shopping center. 2. The use as developed will not adversely affect the neighborhood. Response: The Applicant is seeking approval to perform building and site renovations to an existing shopping center. The improvements consist of renovating the existing Kohl's tenant space to accommodate the relocation of Market Basket. The vacated Market Basket tenant space will be renovated to accommodate Kohl's and 17,600 +/- sf of specialty retail shops. In addition to the building renovations, the following site improvements are planned: • Net reduction in building footprint area of 9,000 +/- sf • The reduction in the size of the shopping center will result in a minor reduction in total traffic entering/exiting the site. • Parking lot upgrades are planned which have been designed to improve both traffic and pedestrian circulation. • Pedestrian sidewalk system has been incorporated into the planned site improvements which will provide patrons a safe means of egress from Winthrop Ave. to the storefronts of the Shopping Center. • Increased landscape areas resulting in an enhanced planning plan • Upgrades to the parking lot lighting system, which have been designed to be dark sky compliant. • Upgrades to the existing Stormwater Management System, which are designed to comply with the redevelopment standards of the MAPEP Stormwater Management Policy and the Town of North Andover's Chap 250 Stormwater Management and Erosion Control requirements. • Net reduction in impervious surface area by approximately 55,000 +/- sf The planned building and site renovations will not have an adverse effect to the neighborhood as the improvements will be performed within existing developed areas and as a result, there will be no land disturbances performed within existing undeveloped areas on-site. 3. There will be no nuisance or serious hazard to vehicles or pedestrians. Response: The planned site improvements will not be a nuisance or create a hazard to vehicles or pedestrians. The site improvements planned to be integrated into the existing parking facilities have been designed to improve traffic circulation with the installation of curbed islands at the beginning and ends of the parking rows, modifications to the southerly driveway allows for additional on-site queuing to occur and minimize traffic conflicts with parking lot circulation, interior longitudinal landscape islands have been incorporated into every fourth parking row, curbing will be installed along the perimeter edge of the access drive, new crosswalks, traffic control signage and striping have been integrated into the design of the parking facilities.Additional improvements include the following: • ADA designated parking spaces will be clearly delineated with signage and evenly distributed along the tenant storefronts. The ADA designated parking spaces have been designed in accordance with the standards as outlined under 521 CMR of the Massachusetts Architectural Access Board (MAAB) and the ADA Standards for Accessible Design as published by the Department of Justice. • Internal sidewalk system is proposed which provides pedestrian connectivity from the shopping center storefronts to Winthrop Ave. • Parking lot site lighting system has been designed to be dark sky compliant with the use of energy efficient LED light fixtures with no light spillage onto abutting properties. The site improvements as described above have been designed to provide a safe means of egress for pedestrians and vehicular movements which include the accessibility for public safety apparatus. 4. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. Response: The renovation of the North Andover Mall will have adequate and sufficient infrastructure and facilities in place to continue operating as a grocery anchored retail shopping center. The existing utility infrastructure that currently services the property, (i.e.: sewer, water, gas, electric and telephone) is sufficiently sized and has adequate capacity to accommodate the renovations planned for the property. The existing stormwater management infrastructure has been upgraded to incorporate best management practices (bmp's) which are designed to remove total suspended solids JSS) and reduce phosphorus loading of the first inch (1") of rainfall runoff prior to its discharge to the Shawsheen River. The Planning Board granted the Petitioner a special permit (see special permit decision dated March 9, 2019) to reduce the minimum parking requirements from 1,025 to 1,011 spaces. The renovations planned for the shopping center will result in a loss of an additional 102 parking spaces as compared to the existing stie conditions. The redevelopment program provides 909 parking spaces. To determine if the loss of 102 parking spaces will have a detrimental impact to the parking facilities that support the shopping center, RJOC supplemented the parking utilization study performed in 2018 with a parking utilization study performed during the timeframe of October 9, 2023 to October 21, 2023 in support of the current special permit application. In both instances, occupied parking spaces were counted during the weekday pm peak hour timeframe from 4pm to 6pm and the Saturday pm peak period between 11 am to 2pm. The parking study concluded that during the weekday evening peak hour, there was a net reduction in occupied spaces by approximately 2.6% (39.4% in 2018 to 36.8% in 2023) and a slight increase in parking demand of 1.0% during the Saturday peak hour demand (48.1% in 2018 to 49.1% in 2023). In addition to the performance of field observations to understand the parking demand being experienced at the shopping center, the Petitioner's Traffic Engineering consultant, VHB performed an independent analysis in determining the minimum parking requirements to support the shopping center. The analysis was based on studies performed by both the Institute of Transportation Engineers (ITE) and the Urban Land Institute (ULI). The ITE data recommends that for a shopping center up to 400,000 sf in size, the parking demand is estimated to be 2.44 spaces per thousand square fee of leasable area, which equates to 554 parking spaces being provided for at North Andover Mall. ULI recommends for the same size shopping center the parking demand be estimated based on 4.0 spaces per thousand square feet of leasable area or 907 parking spaces should be provided on-site. The results of the parking utilization study as performed by RJOC (see Appendix B) and the findings from VHB's traffic memorandum dated November 17, 2023 (see Appendix A) concludes that 909 parking spaces being provided at the completion of the site renovations is more than sufficient to meet the operational needs of the shopping center. Additional upgrades to the shopping center include the following: • Internal sidewalk system is proposed which provides pedestrian connectivity from the shopping center storefronts to Winthrop Ave. • Parking lot site lighting system has been designed to the dark sky compliant with the use of energy efficient LED light fixtures. 5. The Special Permit Granting Authority shall not grant any Special Permit unless they make a specific finding that the use is in harmony with the general purpose and intent of this By-Law. Response: The subject property is comprised of multiple parcels of land which totals 41.8+/- ac in area.A review of the Town of North Andover's zoning map indicates the property is located within the following zoning districts: Business 3, Business 4 and Residence 4 zoning district. The shopping center is located entirely within the Business 3 zoning district with undeveloped land located within both the Business 4 and Residence 4 zoning districts. The shopping center development program is comprised of a single story structure approximately 236,000 +/- sf in size and accommodates the following uses: Restaurant, Grocery, Retail, Personal Care Facility, Bank with drive-thru and Clinic use. The uses outlined herein are all allowed uses within the Business 3 Zoning District. The redevelopment of the shopping center consists of renovating the existing Kohl's tenant space to accommodate the relocation of Market Basket. The vacated Market Basket tenant spaces will be renovated to accommodate Kohl's and additional small store specialty retail shops. Upon completion of the building renovations, the tenant mix that currently exists will remain. The Applicant's planned building and site renovations will not have an adverse impact to the use of the property, to the residents of North Andover, nor will it create a hardship and/or burden on Town services such as police, fire, transportation, water, sewage or other public facilities. The renovations to the property will result in the following: • Net reduction in building footprint area of 8,300 +/- sf • The reduction in the size of the shopping center will result in a minor reduction in the total traffic entering/exiting the site. • Parking facilities have been designed to improve traffic circulation and accommodate emergency service apparatus with the integration of curbed traffic islands, new crosswalks, traffic control signage and parking lot striping. • ADA designated parking spaces will be clearly delineated with signage and evenly distributed along tenant storefronts. The parking facilities have been designed in accordance with the standards as outlined under 521 CMR of the Massachusetts Architectural access Board (MAAB) and the ADA standards for Accessible Design as published by the Department of Justice. • Internal sidewalk system is planned which provides pedestrian connectivity from the shopping center storefronts to Winthrop Ave. • Existing utility infrastructure has adequate capacity to accommodate the renovation program. • Upgrades to the existing stormwater management system have been designed to comply with the redevelopment standards of the MADEP Stormwater Management Policy and the Town of North Andover's Chap. 250 Stormwater Management and Erosion Control requirements. • Parking lot site lighting system has been designed to be dark sky compliant with the use of energy efficient LED light fixtures with no light spillage onto abutting properties. • Increased landscape areas resulting in an enhanced landscape planting plan. • Increase in the volume of flood storage on site as a result of the grading upgrades planned for the site. The building and site improvements planned for the shopping center have been designed to meet the design objectives as outlined within the zoning ordinance. F. Stormwater Management The site improvements planned for the shopping center includes performing significant upgrades to the existing stormwater management system. Currently, stormwater runoff from the parking lot area sheet flows in an east to west direction into an intermittent stream that is located along the property's frontage which outlets to the Shawsheen River. The existing on- site stormwater management system provides no stormwater best management practices (bmp's) which are designed to remove accumulated pollutants typically contained within stormwater runoff prior to its discharge to the intermittent stream. The renovations to the shopping center includes significant upgrades to the onsite stormwater management system, which have been designed to comply with the redevelopment standards of the MADEP Stormwater Management Policy and the Town of North Andover's Chap 250 Stormwater Management and Erosion Control requirements. The drainage patterns that exist under the existing site conditions will remain the same under the redevelopment conditions however non-structural stormwater best management practices (bmp's) have been integrated into the site for the purposes of collecting and treating the first one (1") inch of rainfall runoff prior to its discharge to the intermittent stream located along the property's frontage with Winthrop Ave. The non-structural bmp treatment train includes a grass channel swale, sediment forebay and a wet basin and as a result with these bmp's working in concert with each other an 80%total suspended solids (TSS) removal efficiency rate and a phosphorus removal rate of 52%will be achieved. The drainage system located to the rear of the shopping center is a closed system consisting of catch basins, drain manholes and a piped system with two (2) discharge points to the wetland resource area located at the northeasterly portion of the property. The renovations planned for the rear of the shopping center will not require any alterations to the existing stormwater conveyance system with the following exception: the renovations planned for Market Basket includes the construction of three (3) loading dock bays. Stormwater runoff collected within the loading dock area will be routed through a Hydrodynamic Particle Separator for pollutant removal prior to its discharge to the on-site drainage system. In addition to the upgrades to the on-site stormwater management system as described herein, additional upgrades include the following: a) No new point source drainage discharge points are planned. b) There will be a reduction to the peak flow discharge rate from the property under the redevelopment condition as compared to the existing developed condition. This is a result of an increase in pervious area on-site by approximately 55,000 +/- sf. c) There will be an annual increase in groundwater recharge as compared to the existing site conditions. This is a result of an increase in pervious area on site by approximately 55,000 sf. d) A Construction Pollution Prevention Plan and Erosion/Sediment Control plan has been prepared to manage stormwater runoff during construction. e) APost-Construction Operations and Maintenance Plan has been prepared which outlines the inspection and maintenance requirements to be performed to the on-site Stormwater Management System upon completion of construction to ensure the stormwater bmp's will operate at peak efficiency. f) There will be no illicit stormwater discharges from the site. g) A majority of the front parking area is located within the 100-year flood plain. The parking lot area has been regraded such that additional flood storage capacity will be provided as compared to the existing site conditions. With the implementation of the above referenced "best management practices" (burps), there will be an overall improvement to stormwater runoff that is discharged from the site as compared to the existing site conditions. Appendix A Traffic Impact and Assessment Memorandum, prepared by VHB, dated November 17, 2023 000 I 0 hb(#) l ° I� .......hi � J ry.' `s ........... I�.i I l 'lid 4 023 2. � Memorandum 11, II�� Y III.................... .. 1 S 111''�iii IIII el s III��R Iio a d, Si�lil te 1 1 I� � II � o ' ,J le ° l l ril„1 itlllllll��i h������������ ii��m'd� ii�.�wi........Illllll..„ �l �l Illy 111 �.�. 1, l l °:mull l llllllll l.. ... I III III III III Ill�l' III III III°l lil IIL IIL III III III ..III III 1111 II�l 111°v lllll�lll� III III lido l IIII IIII III � 1 Ills l IIII IIP �III III l IIIri t l III° IIri c iil III IIII IIII°°llllll )III°1°,III,°III Li` ........................................................................... III°.°III III"IIII I''�I IIh,."t �':III ll131 Ilr i III�IIII� III"�III'�III IIII�� �Il�� �11 � ��''III"„°� At the request of Demoulas Super Markets "DSM", VHB has prepared the attached technical memorandum to review the transportation and parking elements of the proposed redevelopment of the North Andover Mall, located on Route 114 (Winthrop Avenue/Salem Turnpike) in North Andover. The findings of this review note that the adjustments to the Mall layout and parking as proposed will result in slightly less traffic being generated by the proposed development and that the parking supply will be suitable to meet the needs of the project based on both empirical data and a review of current parking industry standards. Project Proposal The proposed project involves the redevelopment and renovation of the existing North Andover Mall to accommodate a modernization of the mall and the shift of some existing tenants within the buildings to new locations. The most notable change associated with the redevelopment would be shifting the existing Market Basket supermarket from its current offset location within the mall to a more prominent centralized location within the site'. Associated with the building modifications, the proponent is seeking to make adjustments to the southern access driveway to improve egress from the site as well as: Adjust the interior pedestrian experience by providing sidewalk connections out to Route 114 and significantly upgrading the pedestrian network interior to the site, > Modifying the current parking layout to provide for improved circulation around the parking area, and Upgrading the interior and exterior landscaping and water quality elements. In total, the modifications result in a net reduction in the overall buildings size from it's current 235,980 sf to 226,984 sf(a net reduction of 8,906 sf). The parking supply would also be reduced from the current 1,011 spaces to 909 spaces to accommodate the modifications noted previously. As is noted later in this memorandum, the reduction in the parking supply will still meet the demands expected for this development. Traffic Impacts In order to estimate the resulting impacts of the change in size of the site, VHB conducted a traffic generation comparison of the site using information provided by the Institute of Transportation Engineers' (ITE) Trip Generation manual. ITE estimates the number of vehicle trips associated with various different land uses based on observations of similar uses throughout the United States. In this case, the land use that most closely resembles that of the North II A'III uumuu l 1 III J� III III Ii lI t I V I,',I (1 IN� s I 11,��e i s, p e IaI�,� ��oi ��� H1�I I �IIII���� y����w���������l ������ w III I I 1 � z I� 'I l�l� I Ipp Engineers I Scientists I Planners Designers 101 WaIlhinut Stireet III„) 1:3ox 9151, t lire lir), Massachusetts 024„ 1 I11P, 61„7.924.1770 IIIF 617.924.2286 wwwmhb.cuirn mi uu 111 6""1""i IIII 1111�01 eV III�`1. .,...ulm������ �������������Ilil��� 2 23 Memorandurn Andover Mall is defined as "Shopping Center"'. As defined by ITE, a Shopping Center is "an integrated group of commercial establishments that is planned, developed, owned, and managed as a unit". It often has one or more anchor stores. In the specific case of a shopping center with a supermarket anchor (such as this Mall), ITE notes that centers that are greater than 150,000 sf should not be broken down into individual components, but rather reviewed as a single development. It is specific that Shopping Center's should use this approach for estimating vehicle trips for the development with a super market anchor within it. Table 1 below presents the trip generation estimates for the existing and proposed shopping center based on the DSM's proposal and notes that there will be an overall reduction in traffic generation resulting from the change in size of the development. Condition Existing Proposed Difference (235,980 sf) (226,984 sf) (-8,996 sf) Weekda -------------------------------------------- ----------l---_' __Tota_Dail -___________________=35__________________- Morning Peak Enter 169 166 -3 Hour Exit 104 707 -3 Total 274 267 -6 Evening Peak Hour Enter 503 489 -14 Exit 544 529 -15 Total 1,047 1,018 -29 S-a_tu_rd-a ___TotaL Dail____________________________________1.5,343_______________________________15,01.8_________________________________=_325_________________. Midday Peak Hour Enter 664 645 -19 Exit 613 595 -18 Total 11277 11240 -37 Source:ITE Trip Generation, Land Use Code 820(Shopping Center less than 150ksf). 1 Daily traffic volume estimates are combined two way volumes(enter and exiting)over a typical 24-hour period. 2 Peak hour traffic volume estimates are as noted over a typical peak hour of the adjacent street(7-9am and 4-6pm weekdays and between 11 am and 2pm on Saturday). As illustrated in Table 1, the expected decrease in overall size of the development results in a nominal reduction in total traffic arriving and departing from the site.As these volumes are minor in nature, the overall changes to the traffic generation are not likely to be noticeable. It is expected that the current traffic activity at the site will not change as a result of the site modifications. However, given the current driveway configuration at the site, DSM proposes to make minor changes to the southernmost site driveway to allow for additional on-site vehicle queuing to occur and improved circulation around the parking fields, which should translate to an improved visitor experience. This driveway, which is signalized, has traditionally seen some backups into the site during peak periods of activity. The changes are being proposed to IIII III� �� � � . � � III� I� � ��� �e rie � . '� � ������������ �� I u �i i � � "d� I � III III size' '��� ��s�� ,��iii III°liu������).� III° III��������i��� mi uu 111 6""1""1 IIII 111101 eV III`1. .,...„I������� ������������Illli�� 2 23 Memorandurn IIIa g el 3 better define how drivers arrive and depart from the site through this signal and better contain activity to the driveway areas (and away from the parking areas) within the site. Parking As noted, in addition to the overall reduction in the square footage for the facility, DSM is seeking to improve the overall experience for visitors to the site by improving the overall landscaping within the site's parking area, providing for pedestrian connections to the Route 114 street network, and generally improving vehicular flow interior to the site. In making these changes, the parking supply on the site will be reduced from its current 1,011 spaces to 909 spaces. Per the Town of North Andover's zoning requirements, the required zoning at the site is calculated to be 1,153 spaces, which results in a deficit of 244 spaces provided with the new site plan. Per the North Andover Zoning By-Laws, a special permit authorizing deviation from the normal zoning standards can be granted if the calculated parking demand for the land uses indicates they're adequate to support the Project. It goes on to note that the calculations should be based on Institute of Transportation Engineers, ULI, or other recognized methodology. In order to provide a reasonable assessment of the parking supply for the site given the various uses contained at the shopping center, VHB reviewed both the ITE and ULI standards for parking supply to determine if the recommended parking supply for the site will meet the estimated demand. Similarly, in order to provide a reasonable estimate of actual parking demands at the site, parking observation of the actual parking were conducted in October 2023 (attached) to determine how many of the existing parking spaces are currently being utilized at the site given the current users within the facility. The information suggests that the proposed 909 spaces will support the typical parking demands at the site. rirE ParlcUrig Gelnera t 1 IIn The Institute of Transportation Engineers (ITE) provides estimates of the number of parking spaces that various land uses should provide based on observations at similar land uses. ITE's Parking Generation manua13, estimates the parking demands for Shopping Centers in very much the same way it estimates traffic generation for land uses, by studying similar sites and developing rates that can be applied universally to new land uses.Table 2 below highlights the typical parking demands for this land use using the ITE data. In this case, the Shopping Center rates provided in the Parking Generation manual suggest that the demands for parking range from 1.90 spaces/ksf on typical weekdays and 2.44 spaces/ksf on weekends. Of note, ITE no longer generates parking separately for peak holiday seasons with this new 6t" Edition release of Parking Generation, instead noting that post-pandemic parking demands during the holiday seasons have not reached demands measured in the 1990s and 2000s for all retail and service land uses. ITE goes on to state that the continued evolution of on-line shopping and accelerated use of home delivery services has changed the holiday shopping dynamic and associated parking demands for these uses. III�S 111i� ���� � � I I�� .�� ������������� � � � � � � �����. I� � I � . �� ............ „..„ „ P. I 1 i��° � �I � III III�i ............... �i.�� III l III mi uu 111 6""11""1 IIII 1111�OI eV . .,...„I������� ������������Illli��� 2 23 III m e em andu Ilullll"� "" . IIII '� IIrd s tllu II III Ilu II Similarly to ITE, the Urban Land Institute (ULI) has estimated parking requirements for a number of uses and publishes their findings in several documents4 that are comparable to ITEs findings. Specifically for a shopping center that is smaller than 400,000 sf, instead of providing a specific number, ULI takes a more conservative approach and recommends that parking supply consider a number of factors including seasonality and accessibility for other modes of transportation. While ULI data has not been updated to reflect the post-pandemic impacts of online shopping and direct-to-home shipping of these goods, it does reflect a conservative assessment of parking potential at a site like this one. Ultimately, ULI recommends that that a 4.0 spaces/ksf rate be provided to accommodate both employee and visitor demand for a shopping center use such as this one. Obse1rved I Ir l llw Iri IIDemand Finally, the Project team conducted observations of parking demand during peak shopping periods at the site in October of 2023 to better understand the current demands experienced at the site. Important to note, according to the owner, of the total 235,980 of GFA in the mall, approximately 15,777 sf were vacant at the time of the observations. The results of these peak period observation indicate that the site, in its current layout and design (and adjusting for the vacant space within the facility), is occupied at a 1.69 space/ksf rate during the weekday and 2.25 spaces/ksf on a Saturday. These observations are lower than the typical ITE estimates for an average shopping mall, further supporting that this facility has adequate parking supply for the demands being placed on it and likely to be placed on it in the future. Table 2 below notes both the ITE and Urban Land Institute (ULI) estimates for parking demand assuming the full occupancy of the shopping center land uses and also provides observations of parking supply during the peak hours of the facility conducted by the Project team. Table 2- Projected Parkilng Demands for Proposed Development Source Peak Rate Weekend Demand Zoning' 5.05 spaces/ksf 11153 ITE2 2.44 spaces/ksf 554 UL13 4.0 spaces/ksf 907 ObservationS4 2.25 spaces/ksf 510 1 Per the North Andover Zoning requirements for parking at the site,see parking chart on OS-1 of the site plan package for a full breakdown. 2 Based on Saturday peak period parking demands per ITE's Parking Generation,61 Edition for a Saturday condition(note weekday parks at a lower rate) 3 Based on recommended parking rate per ULI's Shared Parking and Parking Requirements for Shopping Centers 4 As observed on Saturday October 23,2023 during the midday peak hours(note that shopping center was reduced by 15,777 sf of vacant space and that the weekday observations were lower) m III11 � , �� � ����.�� � ������������� � I��� ������� ���� ���� �� Ir����I I a D � �� I i r I � � � �III i � ��� � ����� ������� ��������III1 III �'�I III ili III�� �j lil III III .��i������IIII .�i� III ���110 �� °�������� i�������ellIII '"��������������� III������������ ili�����ili��III�� J a iii i e s II III............��'���1iii ""I .00 III Iip�0 eV 71 2 02 31 Memorandum III iIl g el 5 As noted,while the zoning for the site requires 1,153 spaces at the facility, both ITE and ULI support a lower parking supply for the facility. This is supported by the observations conducted at the site in October 2023 which indicate an even lower parking demand than the reference materials. Considering that the ULI recommendation suggests the most conservative parking demand of the sources referenced, VHB recommends that the parking supply be designed to meet this projection. Per discussions with the site engineer, the parking supply has been set to meet this demand (908 spaces). Conclusion The preceding information is provided to support DSMIs application for a site plan modification at the North Andover Mall site on Route 114 in North Andover. The site plan changes being offered will make improvements to the overall experience for visitors to the site while resulting in a minor decrease in overall traffic per ITE estimates. The introduction of improved pedestrian connection throughout the site and connecting to the Route 114 pedestrian network, coupled with upgrades to landscaping,vehicular circulation, and water quality elements will result in an impact to the parking supply, but the available industry research and observation of parking conditions that the site support the reduced supply. Attachments • ITE Trip Generation Shopping Center Description &Worksheets • ITE Parking Generation Shopping Center • Observations Land Use: 820 Shopping Center (>1 50k) Description A shopping center is an integrated group of commercial establishments that is planned, developed, owned, and managed as a unit. Each study site in this land use has at least 150,000 square feet of gross leasable area (GLA). It often has more than one anchor store. Various names can be assigned to a shopping center within this size range, depending on its specific size and tenants, such as community center, regional center, superregional center, fashion center, and power center. A shopping center of this size typically contains more than retail merchandising facilities. Office space, a movie theater, restaurants, a post office, banks, a health club, and recreational facilities are common tenants. A shopping center of this size can be enclosed or open-air. The vehicle trips generated at a shopping center are based upon the total GLA of the center. In the case of a smaller center without an enclosed mall or peripheral buildings,the GLA is the same as the gross floor area of the building. The 150,000 square feet GLA threshold value between community/regional shopping center and shopping plaza (Land Use 821) is based on an examination of trip generation data. For a shopping plaza that is smaller than the threshold value,the presence or absence of a supermarket within the plaza has a measurable effect on site trip generation. For a shopping center that is larger than the threshold value,the trips generated by its other major tenants mask any effects of the presence or absence of an on-site supermarket. Shopping plaza (40-1 50k) (Land Use 821), strip retail plaza (<40k) (Land Use 822), and factory outlet center (Land Use 823) are related uses. Additional Data Many shopping centers—in addition to the integrated unit of shops in one building or enclosed around amall—include outparcels (peripheral buildings or pads located on the perimeter of the center adjacent to the streets and major access points). These buildings are typically drive-in banks, retail stores, restaurants, or small offices. Although the data herein do not indicate which of the centers studied include peripheral buildings, it can be assumed that some of the data show their effect. The technical appendices provide supporting information on time-of-day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip- ................................................................................. and-parking-generation/). ...................................... The sites were surveyed in the 1980s, the 1990s,the 2000s, and the 2010s in Alberta (CAN), California, Colorado, Connecticut, Delaware, Florida, Georgia, Illinois, Indiana, Iowa, Kentucky, iturr General Urban/Suburban and Rural (Land Uses 800-999) 175 Maryland, Massachusetts, Michigan, Minnesota, New Jersey, New York, North Carolina, Ohio, Oklahoma, Pennsylvania,Tennessee, Texas, Vermont, Virginia, Washington, West Virginia, and Wisconsin. Source Numbers 77, 110, 154, 156, 159, 190, 199, 202, 204, 213, 251, 269, 294, 295, 299, 304, 305, 307, 308, 309, 311, 314, 3151 316, 317, 319, 365, 385, 404, 414, 4231 442, 446) 562) 6291 702) 7151 7281 868) 871) 880, 899, 912, 926, 946, 962, 973, 974, 978, 1034, 1040, 1067 176 Trip Generation Manual 11 th Edition •Volume 5 its- Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday Setting/Location: General Urban/Suburban Number of Studies- 108 Directional Distribution- 50% entering, 50% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 50,000 40,000 w 30,000 20,000 9 �X"a >�o X xx 10,000 00 236 500 1,000 11500 X= 1000 Sq. Ft. GLA Study Site IFitted Curve Average Rate Fitted Curve Equation:T=26.11(X)+5863.73 R2=0.60 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies- 44 Directional Distribution- 62% entering, 38% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 1,500 -0 1,000 w 500 X WX X 0 236 500 1,000 11500 X= 1000 Sq. Ft. GLA Study Site Fitted Curve Average Rate Fitted Curve Equation:T=0.59(X)+133.55 R2=0.56 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies- 126 Directional Distribution- 48% entering, 52% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 8,000 6,000 w 4,000 X '0 X X A X X 2,000 X� X?&X X 47 10 _OrC :s>& X 00 236 500 1,000 1500 21000 X= 1000 Sq. Ft. GLA Study Site IFitted Curve Average Rate Fitted Curve Equation: Ln(T)=0.72 Ln(X)+3.02 R2=0.70 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Saturday Setting/Location: General Urban/Suburban Number of Studies- 48 Directional Distribution- 50% entering, 50% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 60,000 50,000 w 40,000 ii 30,000 20,000 15343 -7— X X, >S< X XX 10,000 00 236 500 1,000 11500 X= 1000 Sq. Ft. GLA Study Site I Fitted Curve Average Rate Fitted Curve Equation:T=36.03(X)+6840.22 R2=0.74 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Saturday, Peak Hour of Generator Setting/Location: General Urban/Suburban Number of Studies- 81 Directional Distribution- 52% entering, 48% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 6,000 w .� 4,000 ii 2,000 X Xx 14 - -- —4; X X 1038 00 236 500 1,000 11500 X= 1000 Sq. Ft. GLA Study Site IFitted Curve Average Rate Fitted Curve Equation: Ln(T)=0.76 Ln(X)+3.00 R2=0.75 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday Setting/Location: General Urban/Suburban Number of Studies- 108 Directional Distribution- 50% entering, 50% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 50,000 40,000 w 30,000 20,000 '9'e >8�(X A>0< X X X �<o 10,000 00 227 500 1,000 11500 X= 1000 Sq. Ft. GLA Study Site IFitted Curve Average Rate Fitted Curve Equation:T=26.11(X)+5863.73 R2=0.60 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Saturday, Peak Hour of Generator Setting/Location: General Urban/Suburban Number of Studies- 81 Directional Distribution- 52% entering, 48% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 6,000 w .� 4,000 ii 2,000 X Xx 14 00 227 500 1,000 11500 X= 1000 Sq. Ft. GLA Study Site IFitted Curve Average Rate Fitted Curve Equation: Ln(T)=0.76 Ln(X)+3.00 R2=0.75 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies- 126 Directional Distribution- 48% entering, 52% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 8,000 6,000 w 4,000 X '0 X X A X X 2,000 X� X?&X X 4rC 00 227 500 1,000 1500 21000 X= 1000 Sq. Ft. GLA Study Site IFitted Curve Average Rate Fitted Curve Equation: Ln(T)=0.72 Ln(X)+3.02 R2=0.70 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Saturday Setting/Location: General Urban/Suburban Number of Studies- 48 Directional Distribution- 50% entering, 50% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 60,000 50,000 w 40,000 ii 30,000 20,000 15018 -X— X X, >S< X XX 10,000® ® ®® 00 227 500 1,000 11500 X= 1000 Sq. Ft. GLA Study Site I Fitted Curve Average Rate Fitted Curve Equation:T=36.03(X)+6840.22 R2=0.74 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Vehicle Trip Ends vs: 1000 Sq. Ft. GLA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies- 44 Directional Distribution- 62% entering, 38% exiting Vehicle Trip Generation per 1000 Sq. Ft. GLA Average Rate Range of Rates Standard Deviation Data Plot and Equation 1,500 -0 1,000 w 500 �, - - -- - - X� WX X 00 227 500 1,000 11500 X= 1000 Sq. Ft. GLA Study Site Fitted Curve Average Rate Fitted Curve Equation:T=0.59(X)+133.55 R2=0.56 Trip Gen Manual, 11 th Edition • Institute of Transportation Engineers Shopping Center (>150k (820) Peak Period Parking Demand vs: 1000 Sq. Ft. GLA On a: Weekday (Monday -Thursday) Setting/Location: General Urban/Suburban Number of Studies- 11 Peak Period Parking Demand per 1000 Sq. Ft. GLA r /85th 95% Confidence Standard Deviation Averager i Variation) ® % Data Plot and Equation 2,000 1,500 (1) a� a) 11000 ca 11 500 382 XX 00 200 229 400 600 800 1,000 1,200 X= 1000 Sq. Ft. GLA Study Site I Fitted Curve Average Rate Fitted Curve Equation: P=1.55(X)+53.20 R2=0.95 Parking Generation Manual, 6th Edition 9 Institute of Transportation Engineers Shopping Center (>150k (820) Peak Period Parking Demand vs: 1000 Sq. Ft. GLA On a: Saturday Setting/Location: General Urban/Suburban Number of Studies- 18 Peak Period Parking Demand per 1000 Sq. Ft. GLA r /85th 95% Confidence Standard Deviation Averager i Variation) ® % Data Plot and Equation 105000 8,000 a� a� 6,000 a) ca 4,000 2,000 -§5*2 7 55 0 1,000 2,000 3,000 4,000 X= 1000 Sq. Ft. GLA Study Site I Fitted Curve Average Rate Fitted Curve Equation: P=2.43(X)+1.23 R2=0.99 Parking Generation Manual, 6th Edition 9 Institute of Transportation Engineers RJOCI """O'CONNELL ASSOCIATES, INC. CIVIL ENGINEERS,SURVEYORS&LAND PLANNERS 80 MONTVALE AVENUE'SUITE 201 STONEHAM,MA 0 180 PHONE-781. 79.0180 RJOCONNELL.COM PARKING UTILIZATION STUDY- NORTH ANDOVER MALL Winthrop Avenue- Route 114 - Salem Turnpike Time Interval With Max OCCUPIED PARKING UNOCCUPIED TOTAL PARKING PARKING Day Date #of Cars SPACES PARKING SPACES SPACES UTILIZATION Tuesday 10-Oct-23 4:00 PM-4:30 PM 372 639 1011 36.8% Wednesday 11-Oct-23 4:00 PM-4:30 PM 316 695 1011 31.3% Thursday 12-Oct-23 4:00 PM-4:30 PM 338 673 1011 33.4% Saturday 14-Oct-23 1:00 PM - 1:30 PM 442 569 1011 43.7% Tuesday 17-Oct-23 4:00 PM-4:30 PM 342 669 1011 33.8% Wednesday 18-Oct-23 4:00 PM-4:30 PM 369 642 1011 36.5% Thursday 19-Oct-23 4:30 PM-5:00 PM 358 653 1011 35.4% Saturday 21-Oct-23 11:30 AM - 12:00 PM 496 515 1011 49.1% Average Utilization 37.5% AVERAGE OCCUPIED SPACES 380 Appendix B Parking Utilization Study • 2018 Parking Utilization Study • 2023 Parking Utilization Study RJOCI """O'CONNELL ASSOCIATES, INC. CIVIL ENGINEERS,SURVEYORS&LAND PLANNERS 80 MONTVALE AVENUE'SUITE 201 STONEHAM,MA 0 180 PHONE-781. 79.0180 RJOCONNELL.COM PARKING UTILIZATION STUDY- NORTH ANDOVER MALL Winthrop Avenue- Route 114 - Salem Turnpike Time Interval With Max OCCUPIED PARKING UNOCCUPIED TOTAL PARKING PARKING Day Date #of Cars SPACES PARKING SPACES SPACES UTILIZATION Tuesday 10-Oct-23 4:00 PM-4:30 PM 372 639 1011 36.8% Wednesday 11-Oct-23 4:00 PM-4:30 PM 316 695 1011 31.3% Thursday 12-Oct-23 4:00 PM-4:30 PM 338 673 1011 33.4% Saturday 14-Oct-23 1:00 PM - 1:30 PM 442 569 1011 43.7% Tuesday 17-Oct-23 4:00 PM-4:30 PM 342 669 1011 33.8% Wednesday 18-Oct-23 4:00 PM-4:30 PM 369 642 1011 36.5% Thursday 19-Oct-23 4:30 PM-5:00 PM 358 653 1011 35.4% Saturday 21-Oct-23 11:30 AM - 12:00 PM 496 515 1011 49.1% Average Utilization 37.5% AVERAGE OCCUPIED SPACES 380 RJOCI """O'CONNELL ASSOCIATES, INC. CIVIL ENGINEERS,SURVEYORS&LAND PLANNERS 80 MONTVALE AVENUE'SUITE 201 STONEHAM,MA 0 180 PHONE-781. 79.0180 RJOCONNELL.COM PARKING UTILIZATION STUDY- NORTH ANDOVER MALL Winthrop Avenue - Route 114- Salem Turnpike Time Interval OCCUPIED PARKING UNOCCUPIED TOTAL PARKING PARKING Day Date With Max#of SPACES PARKING SPACES SPACES UTILIZATION Cars Tuesday 24-Apr-18 6:00 PM 297 728 1025 29.0% Wednesday 25-Apr-18 5:30 PM 272 753 1025 26.5% Thursday 26-Apr-18 4:00 PM 375 650 1025 36.6% Saturday 28-Apr-18 2:00 PM 493 532 1025 48.1% Monday 30-Apr-18 4:00 PM 404 621 1025 39.4% Wednesday 2-May-18 5:00 PM 301 724 1025 29.4% Tuesday 8-May-18 6:00 PM 318 707 1025 31.0% Wednesday 9-May-18 5:00 PM 289 736 1025 28.2% Thursday 10-May-18 5:00 PM 359 667 1026 35.0% Saturday 12-May-18 12:30 PM 477 548 1025 46.5% F rage Utilization 35.0% AGE OCCUPIED SPACES 359 SPACES Appendix C Town of North Andover Abutter's List (300 ft radius) Abutter to Abutter Building Dept. Conservation (X) Zoning ( ) TOWN OF NORTH ANDOVER ABUTTER LIST REQUIREMENT: MGL 40A,Section 11 states in part"Parties in interest as used in this chapter shall mean the petitioner, abutters,owners of land directly opposite on any public or private way,and abutters to abutters within three hundred(300)feet of the property line of the pettitioner as they appear on the most recent applicable tax list,not withstanding that the land of any such owner is located in another city or town,the planning board of the city or town,and the planning board of every abutting city or town," SUBJECTID'S LOCATION OWNER ADDRESS TOWN STATE ZJP 026.0-0006-0000.0 WINTHROP AVENUE DELTA MB LLC 875 EAST STREET TEWKSBURY MA 01876 026.0-0008-0000.0 WINTHROP AVENUE DELTA MB LLC 875 EAST STREET TEWKSBURY MA 01876 026.0-0009-0000.0 WINTHROP AVENUE DELTA MB LLC 875 EAST STREET TEWKSBURY MA 01876 027.0-0027-0000.0 350 WINTHROP AVENUE DELTA MB LLC 875 EAST STREET TEWKSBURY MA 01876 026.0-0030-0000.0 WINTHROP AVENUE DELTA MB LLC 875 EAST STREET TEWKSBURY MA 01876 026.0-0032-0000.0 WINTHROP AVENUE DELTA MB LLC 875 EAST STREET TEWKSBURY MA 01876 026.0-0031-0000. WINTHROP A VENUE DELTA MB LLC 875 EAST STREET TEWKSBURY MA 01676 PARCELID LOCATION OWNER ADDRESS CITY STATE ZIP 02ZO-0001-0509.0 509 WAVERLY ROAD KUMAR,SUBRAMANIAN S. 509 WAVERLY ROAD NORTH ANDOVER MA 01845 022.0-0001-0511.0 511 WAVERLY ROAD KANTHARAJ,ASH IN BYRANAYAKANAHALLI 511 WAVERLY ROAD NORTH ANDOVER MA 01845 022.0-0014-0000.0 376 WOOD LANE ROCHE TRUST,JAMES T 478 WAVERLY ROAD NORTH ANDOVER MA 01845 022�0-0138-0012.0 12 HAWTHORNE PLACE KERLEY,CHRISTOPHER 12 HA HORDE PLACE NORTH ANDOVER MA 01845 022.0-0138-0014.0 14 HAWTHORNE PLACE PASOVSCHI,MICHELLE 14 HAWTHORNE PLACE NORTH ANDOVER MA 01845 022,,0-0139-0515.0 5115 WAVERLY ROAD SOROKIN,SERGEY 515 WAVERLY ROAD NORTH ANDOVER MA 01845 022.0-0139-0517.0 517 WAVERLY ROAD AHAMED,RI AZ 517 WAVERLY ROAD NORTH ANDOVER MA 01845 022,0-0140-0004.0 4 MARENGO STREET D-AENTREMONT,ELIZABETH ANNE 4 MARENGO STREET NORTH ANDOVER MA 01845 022.0-0140-0006, 6 MARENGO STREET KRONMAN,DAVID A. 6 MARENGO STREET NORTH ANDOVER MA 01845 022.0-0140-0018.0 18 MARENGO STREET GAETANO,PHILIP 18 MARENGO STREET NORTH ANDOVER MA 01845 022.0-0140-0019.0 19 MARENGO STREET MATIAS,VANESSA S. 19 MARENGO STREET NORTH ANDOVER MA 01845 022.0-0140-0020,0 20 MARENGO STREET DU BE,DANIEL,D 20 MARENGO STREET UA NORTH ANDOVER MA 01845 022.0-0140-0021.0 21 MARENGO STREET MARID N E.LANGAN 21 MARENGO STREET NORTH ANDOVER MA 01845 022.0-0140-0022,,0 22 MARENGO STREET FOX,MICHELE,K. 22 MARENGO STREET NORTH ANDOVER MA 01845 022.0-0140-0023.0 23 MARENGO STREET GUTIERREZ,RUTH,E,,,MEDINA 23 MARENGO STREET NORTH ANDOVER MA 01845 022.0-0140-0024.,0 24 MARENGO STREET RAZA,SYEDA SHERMEEN 24 MARENGO STREET NORTH ANDOVER MA 01845 022.0-0140-0025 0 25 MARENGO STREET CUI,LEI 12 VALLEY CREEK RD MALVERN PA 19355 022.0-0140-0026,,0 26 MARENGO STREET THOMPSON,CAROL,A. 26 MARENGO STREET U.-7 NORTH ANDOVER MA 01845 023.0-0001-0000.0 WAVERLY ROAD ROMAN CATHOLIC 118 SO BROADWAY LAWRENCE MA 01843 023.0-0002-0000 0 WAVERLY ROAD TRUSTEES OF RESERVATIONS 200 HIGH STREET,4TH FLOOR BOSTON MA 02110 023.0-0007-0000.0 10 WOODRIDGE DRIVE WOOD RIDGE HOMES LLC 10 WOODRIDGE DRIVE NORTH ANDOVER MA 01845 021,0-0041-0000,,O 738 WAVERLY ROAD HAVICAN,JOHN 738 WAVERLY ROAD NORTH ANDOVER MA 01845 026.0-0007-0000.0 260 WINTHROP AVENUE GLOBAL COMPANIES LLC 800 SOUTH STREET SUITE 200 WALTHAM MA 02043 026 0-0019-0000,,,0 20 HA HORDE PLACE RSON,RICHARD 20 HA HORDE PLACE NORTH ANDOVER MA 01845 026,0-0020-0000.0 26 HAWTHORNE PLACE WASZCZUKO,CHRISTOPHER M 26 HAWTHORNE PLACE NORTH ANDOVER MA 01845 026,0-0021-0000,,0 BELFAST STREET ESSEX COUNTY GREENBELT ASSOC INC 82 EASTERN AVENUE ESSEX MA 01929 027.0-0001-0000,,0 432 WINTHROP AVENUE LE LAND PROPERTIES,INC. 500 CLARK ROAD TEWKSBURY MA 01876 027.0-0002-0000.0 707 WAVERLY ROAD DAVID ANNE WEBSTER,REV TRST 707 WAVERLY ROAD NORTH ANDOVER MA 01845 027,0-0003-0000.0 701 WAVERLY ROAD CASALE,MICHAEL,P. 701 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0004-0000.0 697 WAVERLY ROAD BICKING,MARJORIE 697 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0005-0000.0 691 WAVERLY ROAD CORRELLE 2015 REVOCABLE TRUST 691 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0007-0669.0 669 WAVERLY ROAD BRODERICK,SUZETTE,C. 669 WAVERLY ROAD NORTH ANDOVER MA 01845 027,.0-0007-0671.0 671 WAVERLY ROAD NIZAMOV,ARTEMIY 671 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0008-0000.0 667 WAVERLY ROAD ADLEY,THOMAS,F. 667 WAVERLY ROAD NORTH ANDOVER MA 01845 027,0-0009-0000.0 659 WAVERLY ROAD CO ALLY,JILLIAN 659 WAVERLY ROAD NORTH ANDOVER MA 01845 027,,0-0010-0000.0 655 WAVERLY ROAD RIVERA,LAWRENCE 655 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0011-0000.0 647 WAVERLY ROAD ASARO,WILLIAM 647 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0012-0000.0 639 WAVERLY ROAD DESOUSA,SUSAN B 639 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0013-0000.0 633 WAVERLY ROAD PARK,WON 633 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0014-0000.0 629 WAVERLY ROAD ETCHIN,GENNADIY 629 WAVERLY ROAD NORTH ANDOVER MA 01845 027.,0-0015-0000.0 420 WINTHROP AVENUE CONNOLLY FAMILY TRUST 420 WINTHROP AVENUE NORTH ANDOVER MA 01845 027m0-0034-0000.0 717 WAVERLY ROAD RILEY,GLORIA 717 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0035-0725.0 725 WAVERLY ROAD ROTOLO,ELAINE M 725 WAVERLY ROAD NORTH ANDOVER MA 01845 027.0-0035-0727.0 727 WAVERLY ROAD SYED,MUBBASHAR,HUSSAIN 727 WAVERLY ROAD NORTH ANDOVER MA 01845 LAWRENCE MA LAWRENCE CITY HALL 200 COMMON STREET LAWRENCE MA 01840 This Godwies that#*"am"appooft 0 owl As AAA* recorGS of cerMfled b)rr Appendix D City of Lawrence Abutter's List (300 ft radius) List of owners to receive notice Petitioner: DSN REALTY INC Mailing Address: 881 EAST ST,TEWKSBURY, MA 01876 Site Address:WAVERLY RD LAWRENCE MA 01841 List all owners within three hundred 300 feet of the site. MAP LOT OWNER MAILING ADDRESS CITY STATE ZIP CODE SITE: 3 1 CITY OF LAWRENCE 200 COMMON ST LAWRENCE MA 01840 ABUTTERS: 1 1 TOM ANDOVER PARK LLC 1 N LASALLE STREET STE 2100 CHICAGO IL 60602-3918 18 1 RIVER POINTT RR OWNER LLC 4401 N MESA EL PASO TX 79902 18 2 DABBAK REALTY LLC 329 WINTHROP AVENUE LAWRENCE MA 0184 18 3 F&B REALTY TRUST II 2 HUMMINGBIRD LANE SALEM NH 03079 18 4 FREIJE I T 230 WINTHROP AVE LAWRENCE MA 01843 19 1 PMG NORTHEAST LLC 2900 TELRSTAR COURT FALLS CHURCH VA 2204 19 2 ALBRITR REALTY 25 LINCOLN STREET NORTH ANDOVER MA 01845 19 3 COMMONWEALTH OF MASS 05-239 WINTHROP AVE LAWRENCE MA 0184 19 5 22 WINTHROP LLC 189 WATCH HILL RD WESTERLY RI 0891 2 1 CORT LAWRENCE LLC 30 KIMBALL AVE STE 101 SO. BURLINGTON VT 05403 3 1 CITY OF LAWRENCE WAVERLY RD LAWRENCE MA 01841 35 1 TSSTX COUNTY GREENBELT ASSOC. 82 EASTERN AVENUE ESSTX MA 0199 37 21 CHAMPY CONST CO INC 95 STILES RD#205 SALEM NH 03079 For Tax Assessor's Use Only According to our records of this date, certified by the City of Lawrence Board of Assessors. This review is based upon our existing parcel maps,which are compiled for assessing purposes only;therefore.they are drawn to survey accuracy for conveyances. This certification does not include any recent transfers ownerships that have not been reeve th assessor's office. Every effort has been ade to maint, -in these records as legally required. Tax Assessors Signature - imee C.Valdez,Assessor yped Name and Title IPaqL.of