Loading...
HomeMy WebLinkAbout01/11/2024 - Bob Kilcoyne (NAFD) Comment - - 7 I *1/171 , :40 AM Town of Forth Andover Mail K 350 Winthrop Ave-forth Andover Mall ..................0 A, NbOVER N RT14' - I Jean Enright<jenri htgn rthando er .go 3 350 Winthrop Avew North Andover Mall Bob Kilcoyne kilcoyne@northando errna.gov Thu, Jan 11, 2024 at 5:10 PM To:Jean Enright <jenr1ght@northandoverrna.gov Jean, Thee comments from the TRC meeting are accurate with the exception of the hydrants} the fire department e t would benefit with the addition of 3 hydrants in the front of the buildings* Fire Department Cht 34 review donne by a design professional will be required. Prior to construction a I IFPA 241 Plan (site safety plan)will need to be provided. The Swept Path should snow trucks going through parking lot and across the front of the building. During construction, any impalement of the fire alarm/sprinkler system should be communicated to NAFD ahead of time.Would like key bones on both sides of the building. Only I fire hydrant on the far left side of the plaza exists. If possible,would like this one to be tapped off of to provide a second hydrant in front of the building. BDA needs to be tested for. Each unit should have its own address number and corresponds with the fire alarm panel for the unit it is in. As tenants change the panel number has to be updated. Bob On Thu, Dec 14, 2023 at 11:58 AM Jean Enright jenright@r orth ndcver a.gc wrote: [Quoted text hidden] } http ,UrnalLgoogle.com/mail/u/0/?i k= o f ie � t search=aII&permm sg 1d=r g-f:1 787833663606380976&slrnpl=m g 4:178783 3663 6063809761/1