HomeMy WebLinkAbout08/09/2022 - Stormwater Review Letter - - TOWN' OF NORTH ANDOVER DIVISION OF PUBLIC WORKS 384 OSGOOD STREET NORTH ANDOVER, M,ASSACHUSETTS 0 1,845-2909 JIM STANFORD DIRECTOR Telephone (97e.S' -0950 ,,lohn.]. Borges PE 68'5 Pax (978) 688-9573 Director of err August 9, 2022 Ms. Jean Enright Planning Director Town of North, Andover, 120 Main Street North Andover, M,A 01845 RE: RCG J Wiley, LLC — 93 Elm Street/1 Elm Court Special Permit - Site Plan Application Dear Jean, As requested, the engineering department has reviewed the proposed site plan application including, the plan set: "Site Plan Set for 93 Elm Street and 1 Elm Court, prepared by Civil Deslign Group, LLC dated May 27, 20122)), for the proposed site and drainage improvements located at 93 E,lm Street and 1 Elm Court. We offer the following comments, on the proposed site plan application: 1. The drainage pipe after the first bend behind the 1 Elm Court homes is identified as "l 5 feet of pipe to bend sloped at, 0.015 ft/ft It appears the length of this pipe is closer to 45 feet. This label shall be corrected and inverts updated if necessary. 2. The Applicant shall confirm the existing DMH that the new 18" HDPE is tying into is, sufficient in size to allow the connection of an additional 18" diameter pipe. 3. The Applicant shall work with the DPW to confirm the extent of existing drain pipe that needs to be replaced within Water Street. If additional lengths need, to be replaced this work will need to be completed before any of the sump pumps can be tied in and activated. 4. Per the Unilock permeable paver detail, the minimum subbase material shall be a 6-inch layer of permeable stone base AS,TM No. 57 above a 16-inc,h, minimum layer of permeable open graded crushed/angular stone AS No. 2. The proposed perm eabile paver detail shall be revised to reflect the minimum subbase layer thicknesses per the manufacturer. Page 2 08/09/22 5. The Applicant shall confirm during construction that the sidewalk along both Water Street and Elm Street are constructed to meet ADA requirements as necessary including the driveway aprons. 6. The Applicant shall submit a long-term operation and maintenance plan that includes all manufacturer required maintenance activities for the permeable pavers including but not limited to the following: A. Paver cleaning; Clean Permeable Concrete Pavers as needed to remove staining, dirt, debris, etc. 1. Clean per manufacturers recommendations. B. Maintenance: Permeable Joint Aggregate Material. 1. Annually inspect Permeable Joint Aggregate material for areas clogged with debris. Z. Vacuum or sweep as necessary to restore surface infiltration. 3. Remove debris by vacuuming or sweeping Permeable Joint Aggregate a. Replenish removed Permeable Joint Aggregate material with clean aggregate material flush to paver lip. b. Sweep excess material from paver surface The Long-Term O&M Plan shall also include at a minimum an annual inspection of the proposed drainage system and cleanouts on-site and if necessary perform the immediate repairs/maintenance identified during the annual inspection. 7. Per the Massachusetts Stormwater Handbook, signs indicating porous pavement/pavers shall be installed and the use of sand during winter months shall not be allowed along with minimizing the use of salt. Signs shall be installed as part of the construction and this maintenance information shall be included in the long-term O&M Plan along with any additional maintenance items identified in the Massachusetts Stormwater Handbook. 8. Any work within the Town Right of Way including sidewalk work shall require a Street Opening Permit from the DPW prior to the start of any work. If you have any questions please do not hesitate to call. Sincerely, John J. Borgesi, P.E. Assistant DPW Director/Town Engineer Cc file TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS 384 OSOOOD STREET NORTH ANDOVER., MASSACHUSETTS 01.845-2909