Loading...
HomeMy WebLinkAbout08/12/2022 - Response to Stormwater Review Letter - - IVIL E S I GN RO UP LLC 21 High Street,Suite 8207 45 ) North Andover,MA 01845 7945400 ENGINEERING. LAND USE. PLANNING. PERMITTING. Tel 978. . www.cdgengineeringng.com August 12, 2022 via email Ms. Jean Enright Planning Director Town of North Andover 120 Main Street North Andover, MA 01845 Re: RCG J Wiley, LLC 93 Elm Street & 1 Elm Court North Andover, MA 01845 Response to Comments Dear Ms. Enright: On behalf of the applicant, RCG, LLC, Civil Design Group, LLC (CDG) is in receipt of the peer review letter issued by the Town Engineer dated 08/09/2022. In coordination with the development team, CDG's responses are provided in bold below the original comments and supporting plans and documentation are enclosed herein: 1. The drainage pipe after the first bend behind the 1 Elm Court homes is identified as "15 feet of pipe to bend sloped at 0.015 ft/ft". It appears the length of this pipe is closer to 45 feet. This label shall be corrected and inverts updated if necessary. CDG Response: The pipe length text has been revised to reflect a 45 lineal foot. The inverts and slope were correct. 2. The Applicant shall confirm the existing DMH that the new 18" HDPE is tying into is sufficient in size to allow the connection of an additional 18" diameter pipe. CDG Response: Acknowledged: Based on the 90 degree entry angle as compared to the existing pipe penetrations, it appears that the manhole can accommodate the proposed connection. However, the contractor shall expose the manhole and verify that it's in good condition and of sufficient size at time of construction. 3. The Applicant shall work with the DPW to confirm the extent of existing drain pipe that needs to be replaced within Water Street. If additional lengths need to be replaced this work will need to be completed before any of the sump pumps can be tied in and activated. CDG Response: Acknowledged. The Applicant shall coordinate with DPW's office prior to construction to discuss the same. Lise s:dbdVi§iais i iii i ii i s�bi 4� i::t fli iiJi(Ji III d IVIL E S I GN RO UP LLC 21 High Street,Suite 8207 45 ) North Andover,MA 01845 7945400 ENGINEERING. LAND USE. PLANNING. PERMITTING. Tel 978. . www.cdgengineeringng.com 4. Per the Unilock permeable paver detail, the minimum subbase material shall be a 6- inch layer of permeable stone base ASTM No. 57 above a 16-inch minimum layer of permeable open graded crushed/angular stone ASTM No. 2. The proposed permeable paver detail shall be revised to reflect the minimum subbase layer thicknesses per the manufacturer. CDG Response: The permeable paver detail has been revised accordingly. 5. The Applicant shall confirm during construction that the sidewalk along both Water Street and Elm Street are constructed to meet ADA requirements as necessary including the driveway aprons. CDG Response: Acknowledged. 6. The Applicant shall submit a long-term operation and maintenance plan that includes all manufacturer required maintenance activities for the permeable pavers including but not limited to the following: • Paver cleaning: Clean Permeable Concrete Pavers as needed to remove staining, dirt, debris, etc. • Clean per manufacturers recommendations. • Maintenance: Permeable Joint Aggregate Material. • Annually inspect Permeable Joint Aggregate material for areas clogged with debris. 2. Vacuum or sweep as necessary to restore surface infiltration. 3. Remove debris by vacuuming or sweeping Permeable Joint Aggregate a. Replenish removed Permeable Joint Aggregate material with clean aggregate material flush to paver lip. b. Sweep excess material from paver surface The Long-Term O&M Plan shall also include at a minimum an annual inspection of the proposed drainage system and cleanouts on-site and if necessary perform the immediate repairs/maintenance identified during the annual inspection. CDG Response: An Operation and Maintenance Plan has been prepared and includes the requested items above. 7. Per the Massachusetts Stormwater Handbook, signs indicating porous pavement/pavers shall be installed and the use of sand during winter months shall not be allowed along with minimizing the use of salt. Signs shall be installed as part of the construction and this maintenance information shall be included in the long-term O&M Plan along with any additional maintenance items identified in the Massachusetts Stormwater Handbook. iii miii(Jeii 4 iii di�11( d Lise st dbdVi§iais i iii i ii i° bi 4� i Yl t 'Ji III d IVIL E S I GN RO UP LLC 21 High Street,Suite 8207 45 ) North Andover,MA 01845 7945400 ENGINEERING. LAND USE. PLANNING. PERMITTING. Tel 978. . www.cdgengineeringng.com CDG Response: Signs have been added to plan set and same has been added to the Operation and Maintenance Plan. 8. Any work within the Town Right of Way including sidewalk work shall require a Street Opening Permit from the DPW prior to the start of any work. CDG Response: Acknowledged. We trust the responses provided above and the enclosed plans sufficiently address the comments issued by the Town Engineer. Please feel free to contact our office if you have any questions or require further clarification. Sincerely, CIVIL DESIGN GROUP, LLC Philip R. Henry, P.E. Principal cc. Mr.David Steinbergh,RCG Mr.Brian Vaughan,Esq. Enclosures Lise st dbdVi§iais i iii i ii i° bi 4� i 1 l t fli iiJi(Ji III d