s, Jean,Enright, Plann ink rector
Plaiming Department
Town of North Andover
120 Main, Sheet
Res., lnit1a Storm Ater Peer Review es s
Proposed Improvements—364 Johnson Street
North Andover, Massachusetts
Dear s. Enright and,Board Members:
Thank you for providing the Initial Slormwafer Peer Review report dated July 7, 2025, Prepared
by J'anet Carter Bernardo, P.E. of t'l H sley Witten Group, Inc. ("Town's Consultant"). We
have carefully reviewed all thirteen (13) c e is and reconunendationscontained wfi e
Town's Consultant's letter and have c nsive y ess each item
This letter serves as the applicant's ffirmal response to the Peer review commen.ts and
accompanies our enhanced submission ma a,I is for,the Watershed SpecialrAppli,cation
r the,proposed, 376 square, food expansion of the existing dwelling at 364, Johnson Street.
Based on the Towns, Consultant's `eedback, we have made adjustments the plans, and our
design,,to meet the n's requirements for approval within the Watershed Protecti,onis is .
Enhanced a lsto ei Include,
1. Updated h the Plot Plan -1 incorporates all peed review feedbackinto -the
original submitted plan. Note however several of the decal is included on, the revised plan
are of insufficient size to be easily understood. As a result,, see Sheet 2.
2. New Sheet,2 f e "" - ' scale) - This e a le plan, sheet has been developed
in response to the peer review to clearly show the newly designed erosion. and s
control measures, construction sequencing etalls, drainage connections., nd system.
components that aree uired for proj ect approval. The Town req uirement thate plan.be
pry palredat a scale of 1.inch, =40 feet resulted, in a plan that was too sm,all to include ail. of
the information reqw"Ired by the '1`own's Consultant. As a result, a second sheet has been
prepared at a scale of I 'inch,.= 10 feet which,provides sufficient space for the detail
requested by the Town's Consultant. Thus, the requested, Information has now been
include to better capture,the details of the stormwater management system.
3. Revised Stormwater Manon gement Report,- Updated to remove the future paved area
that is now not included within the scope ofwork and which.would have been outside of
the no discharge zone., The system capacity remains consiestent and rernains oversized for,
the demand of the runoff affected by the addition,
1
4. Complete HydroC'AD Analysis Results - Full, modeling output report including the
I 00-dear event calculations and stage storage tables for infiltration system drawdown
calculations,, as requested in the peer review
5. Field Infiltration Test Report- Comprehen&,ive documentation of"'pen-ea bility testing
performs d to validate the design infiltraion rates
6. Operation and Maintenance Plan, and Log - Comprehensive pla,n with inspection and
maintenance log and simple sketch,clearly labeling the storm,water practices for use by,
the homeowner
7. Horsley Witten,
"), Group's Peer Review wfth Responses incorporated - A copy,
I I
of the orilgina.l. HW peer revi ew comments has t)een prepared with.the applicant's detailed
responses inc uded directly below each numbered paragrapti for lease of review and
verifii,cation of'our compliance with each recommiendation
Summary of Design Enhancements-,
In response to the peer review, the applicant has developed comprehensive erosi.on and sediment
control measures including strategically placed s1Jt socks, construction matting,, newly designed
earthen berms for clean stor water diversion around the work zone, along, with,,the defiined.
construction access points ,with designated stockpile locations. The storin.water management
system designhas been enhanced with,detailed elevations throughout, clearly, defined drainage
connections fron-t, roof and, surf"ace runoff,, and, comprehensive grading plans. The Shea Mini
Drywell has been fully detailed as an, "integral system component providing Water distri,I oration
and,pretreatment with concrete bottom and accessible manhole cover for long-term inter once.
Importantly, we have removed the future 1900 square fort paved area from our proposal and
confirm that any future paving would be located outside the,Jurisdictional area,of the Watershed,
Protection District. We have al,so included a comprehensive Operation,and Maintenance Plan
with insp,ection and maintenance log for use by the homeowner.
We believe this, enhanced submisslon fully addresses all peer review comments and,demonstrates
C 1"' ''a Y-%,0 Itrl* 4 -�4.19
Omp iance with the North, Andover Watershed Protection Dis ict requirements under §195
ofthe Zoning Bylaws. The proposed storn-mater management system incorporates best
I
manage ment practices for erosion, siltation, and stormwater control to preserve groundwater
purity,, maintain the groundwater table, and p rotect the filtration.and purification, functi,ons of the
land.
We respectfully request the Planning Board's approval of the Watershed Special. Permit for thlis,
project. Please contact e at 97,8-569-7850 or John @J'ohnMc Donn ellLaw,xom if you require
I
any additi.onal information or clarification regarding this submisswn.
Thank you, for your time and cons ideration.
&w
Incerely,
Joh.. cDo,nn.ell, MSCE, PE, PLS
Pmfessional Engineer,—Mass. License No. .4 1 5 7'
Professional and Surveyor—Mass. License No. 33601
two, Cullen,Circle
Andover, Massachusetts 0 18,10
On behalf'of:
Gregory and Melissa Buitkus
364 Johnson Street
North Andover, Massachusetts
cc,.-, net Carter Be,m,ardo,, ,P,E,,, Horsley Witten Grou Inc.