Loading...
HomeMy WebLinkAboutStormwater Management Report - - 364 JOHNSON STREET Storm apt er Management Report-364 Johnson Street STORMWATER MANAGEMENT REPORT Watershed Protection District Special Permit Project Address: 3,64 Johnson Street North Andover, MA Parcel IDI-, 038.0-0015-0000.0 Applicant: Gregory & Melissa Buitkus Prepared by: John J. McDonnell, P,E,, PLS Massachusetts Registration No.: 336,01' Data: 0 2025 T Page I of 13 S&mrmovvaterMaosgeoment Report-364 Johnson Street K. inspection and Monitoring Requirements......................................................................... I2 16) Inspection���mm���m:_—._.~.......—_—..~^.....~.........-._.__-._--....—_ 12 L^ Maintenance Agreement and Easements.......................................................................... 12 17) Maintenance Responsibility ......................... 12 M. Annual Reporting Requirements....... _^__',,~^,~........____,,~^.^.,,,~,,,.,~,__,,,, 12 18) Documentation.............................................................................................................. 12 V[ Compliance &Beoefi1s~^,~.,,^.^,,~_____~^^~.,^^~~,~~,.,_---_....-.^.~.~^^..^~^~^—^'^~~ 12 Vl& ....................................................~........................................................... 83 Page 3 of 13 Stormwater Management Report-364 Johnson Street ii. Design Parameters Table 1. Design parameters for current roof addition, total managed area, des'n storm, and 19 surface type. Parameter Value Current Roof Addition 376 sq ft (Sub,catchmen.�._. ...__..t 1S) Total Managed Area 376 sq ft Design Storm 1 00-year, 24-hou'r event (7.97 inches rainfall per NOAA Atlas, 14) Surface Type 100% impervious (CN = 98) .......... ............ .......... ......................... Page 5 of 13 Storm rater Management Report-316,4 Johnson Street IV. Stormwater Management System B. Overview The proposed system utilizes a subsurface infiltration, chamber (Cultec R-1801HD) as the primary means of storage and infiltration. The proposed system utilizes a mini dry well (Shea Mini-Dry Well) as the primary means of pretreatm,ent. The System Flow Path is the Following.- 0 Roof--* Gutters --* Downspouts Pretreatment Infiltration Groundwater C. Soil Conditiolls 1) Test Plit Investigation: 0 Performed by.-I John McDonnell P.E., C.S.E a Date: June 7, 2025 0 Test P*lt: 'TH-1 a Surface Elevation: 255.8 feet 2) S,oi rofile Description: 0 0" - 10": Horizon A, Fine Sandy Loam (FSL , I 01YR 3/4 (dark yellowish brown) a 10" - 23": Horizon Burr, Fine Sandy Loam (FSL), 10YR 6/8 (brownish yellow) 0 2311 m 74": Horizon C, Sandy Loam (SL), 2.5 `5/6 (light olive brown) 3) Subsurface Conditions a Motthrig observed at 418"1 depth (Elevation 251.8 feet), a Water weeping at 71" depth (Elevation 2,49.9 feet) 0 Somil texture: Predominantly sandy loam throughout profile 0 Infiltration capacity: Good infiltration potential based on soil texture Page 7 of 13 .,. _ _... ..._. —... ...__._._._.. —— ...._...._.._w_..,w..w —m.__. _..µ..._..._ ............._ _...._-- _.—... ___.._...,..__,. _..,.._._ _...........w.w_ System Spwectficatio Component �� ��...�....... �...,,,mw.,.,,.,�.,,..,�a...�.w..w®.w�...�...,�.,,.�..�,..,w.,.w...,..„.....,.w,_,.,m,.m,�,..,.�.,,.,.,,,�,..,.., .....�.....� ...�..,.,.,�.......�...,....�.,.,,.W�,.,„�.W...,m„ ................«....,.M..,.,,.,.....,�,,,.,..,,,,..,.,,. .,� �����,�..�w.....�,......w..,�.,�w,.,,..m,....,, ..,....,,.,,,........w.�....,.�,.,.. ...,,m,,,..,,,,....,,...,..�.,,...,,,M,.,.,,,.,.mm...�...�.,,.,,,...,.�.m,,m,.........mmmm..........�... .,.,,. ����....,.. �����.���..,�..,..w..,�,.....,.w.....,,.»..,...,,,m.. Confi �uratioln 3 chambers in stone field Dimensions µ m 9. ,�m� . 1�2.0 . ,2.83deep _ w Storage capacity 166.7 cubic feet (0.004 ;acre-feet) ...,.,.__._.._,.,,.,,,.. ..... ............�.....,..,,,�.......�.. _.._........._.._ .._m.,.,,.,.,........,.,..,...... .� — -------...�.__._------------- Infiltration Rate 12 inches/hour (derived from,, field percolation .._ . yielding l --- inches/hour with factor of safety of'2.0 applied) _. ._ ... __ ... _ _a _, m .m mm-...._ , Emergency Emergency overflow pipes installed per manufacturer spl ciIfi'c,ations Overflow System design prevents surface discharge during 1 -year, 4-hour, storm events through adequate storage capacity and infiltration rates. Pond 2 ,* Infultration Chia -Chamber Wizard Stone 'l Chamber Model=Cu to R- 0HD(For r s° n'tial use only Effective Size= 33.6,"' x 201_0"' =>3.44 sf x 6.33L=21.8 f Overall Baas=36.0"W x 20. "H x 7-33 .w" th 1- "Overlap Row Length Adjustaient= + . "x 3_44 sf x 3,rows, 6. "'Wilde+ .. "'Spacing 42. ""C-C w Spicing Chamiber r x 6..33,"Long+ -00'Row Adjustment=7-33Row Length, +12. ""End Stone x 2 9-33 Base Length Rows,x 3 _ ":Wide +6. ""Spacing x 2-i�- *1 2_ "Side Stoma x 2 = 12.00"Base Width 6. "l Stone Base,-*-20.E" Chamber Heigh - .0""Stoma Cover=2.7 1' Field Height Chambers x 21.8 cf --t-1.00" Row Adjustment x TM 4 sf x 3 Rows 75.6 cf Chamber Storage 303,.2 cf Field-75.6 cf Chambers'22 w6 cf Stone x 4 .0%Voids 91.0 cf Stone Storage Chamber Storage+Stoma Storage= 166.7cf 0.004 auf Overall Storage Efficiency=55.10% Overall System Size 91.33x .00"x 2.7 Chambers 1.2 cy Field .4 cy Stone liiiiiiiiiiiillllllllllllllll d Figure 3. Modeled Infiltration Chamber System Embedded in ,stone Field Page 9 of 1 Stormwater Management Re port-36,4 Johnson Street Pond 2P: Infullitration Chamber Hydrolgraph 0.07 cfs EM inflow —— — I -— ---- EJ oufflow M Discarded 'U da ow-A 9 1" /211 Primary 0.0175 ev 0.0 7- ------ 0.065. A 0,0-af— Ile 01.06. 0.055 0,05. I O Ell M c OM c i 40 0.045. 0 0.03 ifs 0.04 ......... 0.035 0.03. 0.025- 0.02- 0.0 15. 01 0.00-efs 0 0 -4 8 10 '12 14, 16 '18 20 22 24 '26 28'' 30 32 34 36 38 40 42 44 46 48 Time (hours) Figure 4. Infiltration Chamber Hydrograph shows all runoff infiltrated through subsurface system 12)Drawdown Analysis (Time to Empty) 0 2-year storm: 6.5 minutes 0 1 0-year storm: 11.7 minutes a 25-year storm: 15.4 minutes 0 1 00-year storm.: 21.9 minutes V. OPERATION AND MAINTENANCNE PLAN H. Slystern Components and Responsibilities 13),Ho�m,e own e,r Res pons ibi I' es: a Routine inspection of roof gutters and downspouts • Seasonal cleaning of debris from system inlets • Annual inspection of pretreatment chamber • Prompt repair of any system deficiencies Page I I of 13 Stormwater Management Report-364 Johnson Street I Groundwater Recharge: All stormwater is returned to the groundwater system through infiltration, maintaining natural hydrology. VIL Recommendation The proposed infiltration system exceeds typical stormwater management requiremen,ts by providing complete volume control and substantial peak flow attenuation for both,, current and anticipated future development. The system design ensures no adverse impact to the watershed and supports the Town's stormwater management objectives. Analysis prepared using Hy dr C ADI software, following SCS TR-20 methodology Prepared By.- John J McDonnell,PE,, PLS Page 13 of 13