HomeMy WebLinkAbout02/23/2023 - Responce to 1st Traffic & Parking Peer Review A /V'EiA /V Technical Excellence
Practical E r nce
Client Responsiveness
February 23, 2023
Jean Enright, Planning Director
Town of North Andover
120 Main Street
North Andover, MA 01845
Re: Traffic& Parking Peer Review: Comment Response
Proposed Mixed-Use Development
149 Main Street
North Andover, MA
Langan Project No. : 151028501
Dear Ms. Enright:
On behalf of Crespo Group, Langan is submitting this traffic engineering comment response letter
for the proposed mixed-use development at 149 Main Street in North Andover, MA.
Enclosed please find our responses to a letter addressed to you from Kevin R. Dandrade, PE,
PTOE, Principal, of TEC, Inc., dated December 16, 2022. Below please find each comment
followed by our response in bold.
PEER REVIEW COMMENTS
1. Langan estimated the site trip generation for the proposed mixed-use development.
Development includes twenty-four residential units and approximately 6,700 square-feet of
ground floor intensive commercial use. Using standard trip rates published in the Institute
of Transportation Engineers (ITE) publication entitled, Trip Generation, 11th Edition. They
employed Land Use Code (LUC) 220— Multifamily Housing (Low-Rise) and LUC 822 —Strip
Retail Plaza (<40,000 SF). Langan did not take credit for the existing unoccupied buildings
and reasonably calculated the number of new trips. The proposed level of traffic will be
comparable to the trip generating characteristics for the former bank use and will not result
in a noticeable change in traffic in this area. No response required.
COMMENT RESPONSE:Acknowledged.
2. Langan estimated the site's parking demand for the proposed mixed-use development
using standard parking demand rates published in the Institute of Transportation Engineers
(ITE) publication entitled, Parking Generation, 5t" Edition. They employed Land Use Code
(LUC) 220 — Multifamily Residential Use and LUC 820 — Shopping Center. These rates are
reasonable for a non-restaurant retail type of use. TEC does not recommend a restaurant
or cafe on this site given the higher parking demand (greater than 10 spaces per 1,000 SF),
100 Cambridge Street, Suite 1310 Boston, MA 02114 .824�91,00 IF 17.824.9101 www.11,ang,ain.com
New Jersey York Cnne.cfici,jt W5 hiusett Pennsylvania wahinn, hi 1111nor FloridaemasArizona*Colorado WashingtonCalifornia
Proposed Mixed-Use Development February 23, 2023
149 Main Street Page 2 of 5
North Andover, MA
Langan Project No. : 151028501
which may also compete with the residential parking needs during the overlapping morning
and evening peak hours.
COMMENT RESPONSE: Acknowledged. Restaurant use is not proposed for this
Project at this time.
3. The Town's zoning allows a parking ratio of 4.5 per 1,000 square feet for a medical office
use, whereas a clinic use would have a higher demand. ITE data suggests that the 851n
percentile parking demand for a medical-dental office will be similar to the Town's rate
listed above. Given the downtown overlay district, TEC believes that the actual parking
demand for a medical-dental office could be even lower due to the mix of other uses in
close proximity to the site and the potential for shared trips.
COMMENT RESPONSE:Acknowledged.
4. The Town should consider limiting the use of the proposed tandem parking spaces to the
tenants of the 2-bedroom residential units given the operational challenges associated with
the logistics of using the inner stall. TEC recommends that the Applicant formally assign
and sign/number the spaces accordingly.
COMMENT RESPONSE: The Applicant agrees to this recommendation.
5. The parking spaces under the proposed building will be difficult to access given the presence of
structural columns and constraints of the proposed 20-foot travel aisle. However, these residential
spaces are not likely to see considerable turnover.
COMMENT RESPONSE: These tandem parking spaces will be assigned to the
residential uses and are not expected have a high turnover.
6. The Applicant seeks a reduction of 35 percent in parking supply when compared to the
town's zoning bylaws. Based on the parking utilization assessment, the Town appears to
have surplus on-street parking stalls available for the proposed commercial use within the
"downtown area" limits as defined by Section 195-8.4 A, Note 7.
COMMENT RESPONSE:Acknowledged but since the peer review letter was received,
the Applicant has identified a total of 49 on-street parking spaces within a radius of
200 feet of the site that are identified as parking spaces available for commercial uses
where a total of 40 parking spaces are required under the Parking Table of the Zoning
Bylaw. is the other comments are confirmed in the Updated Traffic Assessment &
Parking Utilization Study, dated February 23, 2023, where additional data was
collected during a regular Sunday and within a 200-foot radius of the site again on
February 14 and 15.
7. TEC agrees with the Applicant's proposal to limit the driveway flow to one-way clockwise
around the building. However, the use of a 20-foot access aisle will be challenging for high-
turnover parking needs that may be associated with the proposed retail use because there
LA/VAN
ftArmomm
Am
Proposed Mixed-Use Development February 23, 2023
149 Main Street Page 3 of 5
North Andover, MA
Langan Project No. : 151028501
are structural elements of the building, such as columns, at the edge of the aisle. Although
the 20-foot aisle is permitted in the Town's zoning regulations, it may be prudent to consider
angled parking stalls along the southerly edge of the parcel to facilitate easier parking
maneuvers. This may affect the proposed landscape buffer strip.
COMMENT RESPONSE: The proposed 20-foot aisle is one-way and is suitable for the
proposed uses. Angled parking will result in a loss of parking spaces and landscape
area, which is not practical for this project.
8. TEC recommends that the project team review the fire truck access with the Fire
Department. There are areas near the proposed exit where the truck movement may
conflict with the curb line or may not provide sufficient flexibility for snowbanks.
COMMENT RESPONSE: Acknowledged. We have submitted the plans, including a
swept path analysis and snow management plan, to the Fire Department for review.
9. The site plan does not depict an area for loading or dumpster operations for the residential
and commercial uses. The Applicant should provide a description of their intended loading
operations either on-site or off-site.
COMMENT RESPONSE: The trash enclosure will be located within the building along
drive aisle near the Main Street entrance,see below. Staff will pull out trash bins when
needed for the day of scheduled trash pickup, and replace the emptied trash bins
within the building.
iu 1P 9 u lu, II
ou �" RI SPOT Y 06DA.'dPu.arT �' AB A SPOT N q
4
I III Y lu lui Y
I
IY 1 N M I it pl I
Pop I Y Y
Vi �M' 1ih I Y Y
Q
Po .,Ipi x u Y Y u I
Id „w I II IVl I
m on n
I
V
YI
Y
I
I
M
UI
IN
I
I
I
I
iu
IVi
r
ff M1 ,
Y
III uum uuu uuuu uuuu m uum Y —
r ry
LR",��U «TER FU MP TWAABOVE SIR
.I
w
1117111711711711111
JLJ
M�"ESTIIBI.WI L � ,r_ w n
I tl,��� I� W WI
IMP
o I ur+rr r % urr urn TRIr:
LA/VftAN
Proposed Mixed-Use Development February 23, 2023
149 Main Street Page 4 of 5
North Andover, MA
Langan Project No. : 151028501
10. The Applicant should review any temporary traffic control plans with the Department of
Public Works for work related to the utility modifications within Main Street. Given the
extent of trenching to terminate existing services and construct new services, TEC
recommends that the Planning Board consider a requirement for milling, overlay, and new
roadway striping within Main Street along the property frontage.
COMMENT RESPONSE. Acknowledged.
11. The Langan traffic study documented the sight lines for the proposed driveway location on
Second Street at approximately 300 feet. This assessment does not appear to consider the
presence of vehicles that may be parked on Second Street. At a minimum, TEC
recommends that the sight lines meet the minimum safe stopping sight distance
recommendations for approximately 20 miles per hour (115 feet). This assumed speed
would be reasonable for vehicles approaching the stop sign at the end of Second Street or
turning from Main Street onto Second Street.
COMMENT RESPONSE. Acknowledged. We have revised the sight line figures to
address the comments and include the intersection of Second Street and Main Street.
Sight lines function in accordance with applicable standards.
12. The study did not describe the sight distance characteristics for the intersection of Main
Street at Second Street, which is currently obstructed by the existing building to the south
and partially obscured by on-street parking to the north. The property is located on the
"inside" of the horizontal curve on Main Street. TEC recommends that the proposed
building edge be offset from the front property line to provide the AASHTO-recommended
intersection sight distance of 280 feet for the 25-mph posted speed zone in front of the site.
COMMENT RESPONSE. Acknowledged. We have revised the sight line figures to
address the comments and include the intersection of Second Street and Main Street.
It should be noted that the decision point of the departure sight triangle is made from
the edge of the major road travel way as stated in section 9.5.3.2.1 of the AASHTO
Green Book. This section also states that when needed, drivers will stop the front of
their vehicle 6.5 feet or less from the edge of the major road travel way. In the case of
the intersection of Second Street and Main Street, where parking is allowed on both
sides (east and west of Second Street), the decision point will be the edge of the
parking lane, allowing drivers a safe refuge and proper sight distance.
LA/VAN
ftArmomm
Proposed Mixed-Use Development February 23, 2023
149 Main Street Page 5 of 5
North Andover, MA
Langan Project No. : 151028501
Sincerely,
Langan Engineering and Environmental Services, Inc.
Maximo Polanco
Project Engineer
cc: Daniel Clarey (Langan)
Hilary Holmes (Langan)
John Smolak (Smolak &Vaughan)
Wangan.com\data\BOS\data5\151028501\Project Data\Correspondence\Comment Response\23 February 2023 Comment Response-North Andover.docx
LA/VftAN