Loading...
HomeMy WebLinkAboutNotice of Decision (Insubstantial Change) - - i F r Torn of North Andover >;: .:r ....: office of the Planning Department Community Development Division 1� 3 120 Main Street k North Andover, Massachusetts 01845 NOTICE OF DECISION(Insubstantial Change) Date of Decision: September=�,"J, 2025 Petition of: Town of North Andover . , 120 Main Street _Y North Andover,MA 01845 Site Affected; 495 Main Street North Andover,MA 01845 Assessor's Map 45.B Lot 30, Map 44 Lot 42 and Map 57 Lot 22 BACKGROUND On April 2, 2019, the Planning Board approved a Site Plan Review Special Permit to allow for the renovation/reconstruction of the Site by constructing one(1) softball field, one(1) 90' baseball field, two (2) multipurpose fields,two(2)bocce courts,two (2)shuffle ball courts,two(2)half-court basketball courts,and two(2)children's playgrounds,two(2)multipurpose courts,two(2)picnic areas,an amphitheater,a concession stand, storage buildings, bathroom facilities, 160 additional parking spaces, and associated paved walkways/emergency/maintenance paths, and stormwater management systems, and other amenities as referenced in the Plans, The Property is located in the Residential 4 (R4)Zoning District. On August 25,2025 the Petitioner submitted a request for Insubstantial Change to address design updates to address a reduction of scope in the project, as the project will be built in phases according to the Phasing Plan referenced below. The current project is for Phase 1,which is the western side of the project. The project proposes a revision to the area along the western boundary of the Recreation Complex property. FINDINGS OF FACTS 0 The location of the softball field and walkway are the same as in the previously permitted plans. ® The fence at this western boundary is proposed to be removed and replaced along the existing fenceline, instead of being installed at the property line that is shown on the survey Plan of Land by Christiansen& Sergi, dated November 23,2018 (Rev 21512019). 0 The landscaping along the fenceline has been revised to fit the narrower space between the fenceline and the wall{moray. Instead of deciduous trees along the fenceline, a.mix of evergreen arborvitae trees (mature height of 20' tall)and deciduous and evergreen shrubs (mature height of 6-8' tall)will be planted for screening where space allows. The revised plantings will all be native species. 0 A.poured in place concrete gall is proposed between the walkway and the fenceline,to make up the grades between the fields (whose elevation has not changed) and the abutting properties. This wall has a maximum height of 2'. t 7. Insubstantial Change 495 Main Street -ReePiex September 2, 2025 Assessor's Map 45.B Lot 30, Map 44 Lot 42 and Map 57 Lot 22 Page 2 of 2 * The locations of the catch basins along the fenceline have been revised to match the runoff patterns of the new grading and capture stormwater runoff before it reaches the abutting property. * The walkway lighting has been revised from the previously permitted plans. Instead of pole lighting, 3.5' high, bollard lighting is proposed along the perimeter walkway. The bollard lights will utilize ❑ptics that distribute the light along the length of the walkway and not across the fenceline. The change in walkway lighting significantly reduces light spill across the property line. * The sports lighting is unchanged, except the light pole at the right field corner of the softball field has been shifted away from the property line approximately 15'. The amount of light across the property line is approximately the same as in the permitted plans. ® An additional scoreboard is proposed to be added for the Multipurpose Field section of the proposed Phase 1 field. (The Multipurpose Field is the rectangular section of the field east of the softball diamond,which is shown in the plans with soccer lines.) The Multipurpose Field was originally designed to be for practice use,with the Phase 2 field designed to be for game use. However, because only Phase 1 is being constructed at this time,the Multipurpose Field is expected to receive increase game use, and a scoreboard for this field will increase its functionality for games. The scoreboard would face away from the western property line and the top would be approxii-nately 15' above the ground. * The stormwater drainage structures were modified to work with the phased construction and with the revised area at the western boundary. The Phase 1 drainage structures, instead of connecting to the Phase 2 drain structures,now connect to the existing drainage system. The rest of the drainage design is the same as the previously permitted plans and continues to meet stormwater regulations as described in the Storm.water Report referenced below. * The proposed stormwater design revisions have been reviewed by the Town's stormwater peer review consultant,Janet Bernardo,P.F. Horsley Witten Group,Inc. (See letters dated August d,2025 and .August 22,2025, and email correspondence dated August 25, 2025 and response letters dated August 19)2025 and August 25, 2025 from The Waterfield Design Group). * After discussion and amendment to the draft Notice of Decision at the September 2, 2025 Planning Board meeting, and upon a motion by S. Kevlahan to deem the plan changes as Insubstantial Changes for 495 Main Street.P. Boynton seconded the motion. The vote was 3--0,unanimous in favor. The finding of Insubstantial Change is conditioned on the following: CONDITIONS * The Petitioner shall comply with all existing conditions rendered in the Special Permits for the site. * This Notice of Decision shall be recorded with the Northern Essex Registry of Deeds and evidence of recording shall be provided to the Planning Department. * The following information shall be deemed part of the decision: Plans Titled: Recreation Complex Phase 1 Insubstantial Change 495 Main Street--ReePlex September 2, 2025 Assessor's Map 45.B Lot 30, Map 44 Lot 42 and Map 57 Lot 22 Page 3 of 3 Prepared By: Waterfield Design Group 39 Cross Street Winchester,MA 01890 Sheets: G--1, G-2, EC--1, EC--2, SP--1, SP-2,LM-1, LM-2,DU-0,DU--1, DU-2,DU-3, GR-I,LS--1,Details D-1 through D--10 Scale: 1"=3 0 y Date: August 19,2025 Plan Titled: Site Plan--Phasing Prepared By: Waterfield Design Group Sheet: I of I Date: May 22,2025 Plan Titled: Proposed Construction Site Access Sheet: 1 of I Dated: May 28,2025 Plan Titled: North Andover Recreation Complex Prepared By: Musco Lighting Sheets: 14 pages Dated: April 2,2025 Plan Titled: Photometric Plan Combined Spoils Field&Walkway Lighting Prepared By: Waterfield Design Group Sheets: L-1,L--2,L--3 Date: June 5,2025 Deport: Storm water Management Plan Recreation Complex—Phase I Prepared By: Waterfield Design Group Date: May 2025 Je Enright, Pla ing Director On Behalf of the North Andover Planning Board Eitan Goldberg Peter Boynton Sean Kevlahan