Loading...
HomeMy WebLinkAbout2025/02/20 - Project Narrative - 203 Turnpike Street i I I I ur, 00000000000000000uiiihoo i '1146M nob *is February 20, 2025 File No. 101015.00 Town of North Andover- Planning Board 120 Main Street North Andover MA 01845 (978) 688-9500 Re: Project Narrative for Site Plan Application and Modification to Special Permit 203 Turnpike Street Solar Carport Tax Map 024.0-0028-0003.B 203 Turnpike Road - North Andover MA On behalf of AC Development LLC, Nobis Group (Nobis) is submitting this project narrative to the Town of North Andover Planning Board (PB) along with an application for Site Plan Review and Modification to Special Permit. The proposed project is located at 203 Turnpike Street, Tax Map 024.0-0028-0003.B (Site). Please also refer to the attached Site Plan drawings for additional information. BACKGROUND AND SITE CHARACTER The approximate 5.31-acre site is currently occupied by the North Andover Medical Park located at 203 Turnpike Street in North Andover Massachusetts. The North Andover Medical Park consists of 2 four story brick buildings that house various medical businesses, such as but not limited to Andover Pediatrics, Steward Medical Group, Primary Care & Women's Health Associates, Quest Diagnostics,Tallman Eye Associates,and Dr. Emma Wu&Associates. The site includes parking and access on each side of the building with the majority of parking in the rear. The Site is located in the Business district (B4) and is bounded by Turnpike Street to the north, Andover Street to the east, and a existing wetland area to the south and west. Nobis has coordinated with Conservation Agent (Amy Maxner) to conclude the project does not required a Notice of Intent(NOI) or Request for Determination of Applicability(RDA). Nobis met with the Conservation Agent (Amy Maxner) include an onsite walk thru to verify the existing Bording Vegetative Wetland (BVW) line. Nobis Group° 18 Chenell Drive www.nobis-group.com Concord,NH 03301 T(603)224-4182 I�II��IIIIIIIII�IIIIIII�III�I�I������ I. n I SITE PLAN APPLICATION & MODIFICATION TO SPECIAL PERMIT — PROJECT DESCRIPTION The proposed project is to construct 3 separate car ports with solar on the roof(solar car ports). The total solar roof area is approximately±11,900 SF. The solar car port is considered a medium- scale solar energy system whilst being under 25,000 SF but above 1,000 SF. It would also be considered a Solar Energy System, Roof-mounted which may be of any size (small, medium, or large). New electric utility lines shall be installed and connected to an existing pole with a new mounted transformer in coordination with National Grid.The installation of the carport and solar energy system shall maintain the existing patterns of access, parking, and stormwater management. We trust this project narrative meets the requirements of the Town of North Andover NH and we look forward to meeting with Board members. Please feel free to contact me with any questions or if you need additional documentation. Sincerely, /I VVVV'. rt 4�0v.. NOBIS GROUP® Jonathan Ralphs Project Manager jralphs@nobis-group.com (978) 703-6025 Page 2 of 2