SOLAR CARPORT
203 TURNPIKE STREET
NORTH ANDOVER, MA 01845
FOR
AC Development, LLC
Andrew Kellar
7295 Surfbird Circle
Carlsbad, CA 92008
BY
NOBIS GROUP°
(80G) %`:9%
Nobis Project No. 101015.000
MARCH 5, 2026
UPDATED MARCH 30, 2026
UPDATED APRIL 21, 2026
www.nobis-group.com
TABLE OF CONTENTS
Introduction
Section 1 -Stormwater Management System— Operations and Maintenance
Section 2 - Illicit Discharge Statement
Appendices
Appendix A - Maintenance and Inspection Forms
Activity Guide
Comprehensive Annual Evaluation and Inspection Report
Annual Training Signoff Sheet
Weekly Inspection Checklist
Monthly Inspection Checklist
Quarterly Inspection Checklist
Annually Inspection Checklist
Appendix B — BMP Location Sketch
Operations and Maintenance Plan
INTRODUCTION
This Operations and Maintenance Plan has been prepared to ensure that the existing stormwater
management system for 203 Turnpike Street—North Andover, MA functions properly and to
develop and carry out suitable practices for source control and pollution prevention. It consists
of five sections:
Section 1 - Stormwater Management System-Operations and Maintenance, which describes the
various components of the stormwater management system, identifies the inspection and
maintenance tasks to be undertaken and a schedule for implementing these tasks to insure the
proper, long-term operation of the system.
Section 2 - Long Term Pollution Prevention Plan which identifies and implements suitable
measures, practices and procedures for source control and pollution prevention.
Section 3 - Illicit Discharge Statement.
Section 4 - Snow Management and Disposal Plan which describes how snow removal will be
managed and de-icing operations performed.
Section 5 - Public Safety Features which lists features of the stormwater management system to
insure the safety of the public.
1
SECTION 1 — STORMWATER MANAGEMENT SYSTEM- OPERATION AND
MAINTENANCE
The objectives of the stormwater management system are to effectively control and treat
stormwater runoff from the site in accordance with the Massachusetts Stormwater Management
Standards. To accomplish this objective, the following Best Management Practices (BMPs) are
included in 203 Turnpike Street—North Andover MA stormwater management system:
Pre-treatment BMPs
• Existing Catch Basins with Hooded Outlets installed to reduce the discharge of sediment
and pollutants.
To ensure the ongoing and proper functioning of the on-site stormwater management
system/BMPs, this Operations and Maintenance Plan has been developed.
In consideration of the foregoing, it is the ongoing responsibility of the Landowner, his
successors and assignees to adequately maintain the on-site stormwater management/BMP
facilities. Adequate maintenance is herein defined as good working condition so that these
facilities are performing their design functions.
Based on this, the Landowner, his successors and assignees are required to create a Pollution
Prevention Team (PPT) that will be responsible for implementing the Operations and
Maintenance Plan.
2
Property Information
Address: 203 Turnpike Street
North Andover MA 01845
Landowner and Pollution Prevention Team Leader
Owner's Name: North Andover Office Park Condominium Trust
Team Leader: Dan Bluestein
Title: President of Trust
Email: dbluesteinkgmail.com
v
Responsibilities: Coordinate all aspects of the Operations and Maintenance Plan, coordinate and
hire the other Pollution Prevention team members in order to conduct inspections, keep all
records, co-ordinate with contractors for maintenance and repairs of the stormwater management
system.
Spill Prevention & Control Contractor
The following contacts shall be notified only in those instances identified within MA DEP-310
CMR 40-subpart C.
Primary Contact: Dan Bluestein
Office Phone: 603-817-1175
Emergency Contact:
Company Name: TBD
Contact Name: TBD
Emergency Phone: TBD
Consultant Contact:
Company Name: TBD
Contact Name: TBD
Phone: TBD
Department of Environmental Protection (DEP) Contact
Spill Emergency Coordinator
Contact Name: TBD
Phone: 617-792-7653
Municipal Contacts:
Contact Name: Town of North Andover Engineering Department, John Borgesi, Town Engineer
Phone: 978-685-0950
Town of North Andover Fire Department, John Weir., Chief
Phone: 978-688-9590
Other Pollution Prevention Team Members
3
Member: Qualified Engineering and/or Environmental Consulting Firm(s)
Responsibilities: Conduct scheduled inspections, maintain records, advise the Team Leader of
maintenance needs, ensure inspection maintenance and repairs are completed, keep and maintain
all records and inspection reports.
Company Name(s): TBD
Address: TBD
Office Phone: TBD
Team Member Training
The Pollution Prevention Team Leader will coordinate an annual in-house training session with
the qualified Engineering and/or Environmental Consulting Firm to discuss the Operations and
Maintenance Plan, ongoing inspection and maintenance and preventative maintenance
procedures.
Annual training session will generally include the following:
• Discuss the Operations and Maintenance Plan
o What it is- identify potential sources of stormwater pollution and methods of
reducing or eliminating that pollution
o What it contains- emphasize good housekeeping measures and location
of potential pollution sources.
o Pollution Prevention Team-introduce the team and describe their responsibilities,
explain that the objective is to continually monitor the stormwater management
system and encourage input and assistance from all.
• Review and explain the storm drainage system, how it works and its components, note
the receiving resource area in which the storm drainage system discharges into and the
role each one of these components play.
• Emphasize the importance of maintaining current and up-to-date inspection reports and
maintenance records of BMPs. Documentation shall include any changes to the O&M
Plan's procedures to accommodate changes and revisions to BMPs.
The components of the stormwater management system must be inspected, monitored and
maintained in accordance with the following in order to ensure that the on-site stormwater
management/BMPs for 203 Turnpike Street are functioning as designed. Routine inspection and
proper maintenance of these individual components is essential to providing the long-term
operation of the drainage system.
4
Deep Sump Catch Basins:
Stormwater runoff from pavement areas is directed to catch basins via site grading and curbing.
Catch basins are equipped with a deep (4ft) sump and a hood. The sumps are designed to capture
sediment and coarse particles and the hoods prevent hydrocarbons and other floatable debris
from entering the drainage system. To ensure proper functioning of catch basins, each will be
inspected and maintained as follows:
Inspection: Beginning of March, June, September and December. Structural damage and other
malfunctions are to be noted and reported. Basins shall also be inspected after every major rain
event (3.2 inches or greater in 24 hours) to ensure the grates are not clogged and are functioning
properly.
Maintenance: Catch basins to be pumped and cleaned when sump is half full of sediment.
Cleaning shall be performed by a licensed contractor. Sediment and hydrocarbons will be
properly handled and legally disposed of off-site in accordance with local, state, and federal
guidelines and regulations. Any structural damage to catch basins and/or castings will be
repaired upon discovery.
Sweeping and Site Clean-Up
Routine sweeping of paved areas is an effective method to provide important nonpoint source
pollution control and will be performed by mechanical sweepers. Most stormwater pollutants
travel with the suspended solids contained in the stormwater runoff and regular sweeping will
help reduce a portion of this load. Sweeping, especially during the period immediately following
winter snowmelt (April) when road sand and other debris has accumulated on the pavement, will
capture a peak sediment load before spring rains wash residual sand from winter applications
into nearby resource areas.
Inspection: Paved areas will be inspected for litter on a weekly basis and picked up and disposed
of immediately.
Maintenance: Parking area and driveways and other impervious surfaces (except roofs) will be
swept clean of sand, litter, trash, etc. annually (April). A log of land/lot sweeping and cleanup
will be kept. Additional cleanup services will be conducted as necessary.
Please refer to Appendix A for the Inspection Forms, which are to be used by the
Pollution Prevention Team member responsible for conducting the scheduled
inspections.
5
SECTION 2 - ILLICIT DISCHARGE STATEMENT
These types of discharges will be allowed under the conditions that no pollutants will be
allowed to come in contact with the water prior to or after its discharge. The existing control
measures which have been listed previously in this report will be strictly followed to ensure
that no contamination of these non-storm water discharges takes place. Illicit discharges, if
they exist currently, will be contained and eliminated in the manner specified by local, state
and federal regulations, and will be prohibited in the proposed development.
North Andover Office Park Condominium Trust
6
Appendix A
203 Turnpike Street
North Andover MA
Maintenance and Inspection Forms
203 Turnpike Street—North Andover MA
Operation and Maintenance Plan
Activity Guide
The table below is a list of the minimum inspection and maintenance activities the Pollution Prevention Team needs to conduct for
the Stormwater Operations and Management Plan and who is responsible for the activity. The Activity Guide is provided to assist
the Pollution Prevention Team Leader and ensure that the activities are being conducted as scheduled.
Timing Activity Responsible Par
Weekly Inspect lot/land PPT
Pet waste management PPT
Monthly PPT
PPT/Contractor
Quarterly Inspect catch basins, Inspect Outfalls PPT
PPT/Contractor
Semi-Annually Clean catch basins, Contractor
Contractor
Contractor
Annually Pollution Prevention Team training PPT Leader
Comprehensive annual stormwater evaluation and PPT Leader
inspection report
Remove sediment and debris from outfall structures PPT/Contractor
April Sipring clean-up, Street Sweeping PPT/Contractor
Between Fall clean-up, sweeping PPT/Contractor
November 14 and
December 15
203 Turnpike Street—North Andover MA
Operations and Maintenance Plan
Comprehensive Annual Evaluation and Inspection Report
Once a year, the Pollution Prevention Team Leader must inspect and evaluate all aspects and provisions of the Opeations and
Maintenance Plan, complete the following report and keep a copy on file at the site.
Inspector/Reviewers:
Date of Inspection/Review:
Note any changes to the Plan in the space below and in the appropriate section of the Plan.
1. Review the Pollution Prevention Team list and update if necessary. Does the Pollution Prevention Team list need updating?
(circle one) Yes No
2. Review the Operations and Maintenance Plan(O&M Plan). Are there sections of the O&M Plan that need updating?
(circle one) Yes No
3. Review Monthly and Weekly Checklists. Update these as necessary.
-Are there any updates needed to Spill and Leak History and/or the checklists?
(circle one) Yes No
4. Review site drawings and update if necessary
- Are there updates needed to any of the drawings? (circle one) Yes No
Requested Changes (attach revisions)
203 Turnpike Street—North Andover, MA
Operations and Maintenance Plan
Annual Training Signoff Sheet
For each Operations and Maintenance Plan training session, the Team Leader should keep records of all attending Team Members
using the signoff sheet below, as well as the training agenda, notes, etc.
Training Date: Topic:
Trainer:
Team Member Name Team Member Signature
203 Turnpike Street—North Andover, MA
Operations and Maintenance Plan
Weekly Inspection Checklist
The site will be checked each week for trash and debris by a member of the Pollution Prevention Team. If any trash or debris is
observed in the specified area, write "yes" in the 2°d column and note the problem and corrective measures taken in the appropriate
space. Make a new copy of this checklist each week.
Date: Checklist completed by:
GROUNDS AREA TO TRASH OR DEBRIS PRESENT? DESCRIPTION OF CORRECTIVE MEASURES
CHECK PROBLEM TAKEN
Parking Lot&
Roadways
Landscaped Areas
Dumpster Areas
Perimeter of Property
203 Turnpike Street—North Andover, MA
Operations and Maintenance Plan
Monthly Inspection Checklist
The following will be checked each month for sources of pollutants by a member of the Pollution Prevention Team. If the condition
in the"check for" column is observed, note the problem and corrective measures taken in the appropriate space. Make a new copy of
the checklist each month.
Date: Checklist completed by:
LOCATION CHECK FOR... DESCRIPTION OF CORRECTIVE MEASURES
PROBLEM (IF PRESENT) TAKEN
203 Turnpike Street—North Andover, MA
Operations and Maintenance Plan
Quarterly Inspection Checklist
The following will be checked each quarter for sources of pollutants by a member of the Pollution Prevention Team. If the condition
in the"check for" column is observed, note the problem and corrective measures taken in the appropriate space. Make a new copy of
the checklist each month.
Date: Checklist completed by:
BMP CHECK FOR... DESCRIPTION OF CORRECTIVE MEASURES
PROBLEM (IF PRESENT) TAKEN
Catch Basins Trash, excessive sediment, oil sheen,
hood(securely fastened)
Inspect Outfalls Trash, Excessive sediment, scour,
erosion
203 Turnpike Street—North Andover, MA
Operations and Maintenance Plan
Annual Inspection Checklist
The following will be checked each quarter for sources of pollutants by a member of the Pollution Prevention Team. If the condition
in the"check for" column is observed, note the problem and corrective measures taken in the appropriate space. Make a new copy of
the checklist each month.
Date: Checklist completed by:
BMP CLEAN AND REMOVE... DESCRIPTION OF CORRECTIVE MEASURES
PROBLEM (IF PRESENT) TAKEN
Pollution Prevention Prepare annual stormwater evaluation
Team Training and inspection report
Street Sweeping Sand, trash, and debris in April after
Snow melt
Appendix B
1
=m A-LFZ
w
SALEM [ = = TURNPIKE 1. TU P P K E - EED REEC_
R
E GAS_O C M D-R O U-D—
-u
F - -
_ \ OF DOM
- C WA____
OHET
_ - _
f D
_o__
-__ -
OF - _ - ` _
—160
CATCH BASIN
E E3 -
a _
- —
CN
4= - -
_ O
—DOVER - =
_
D - - -
_[REE[ -C - -
- BU -- _4
- - - - �:  -
- -- _ ,_ - - - - E
e ` c
#d_-
e = - eC -
CATCH BASIN
o_
—A
ff
Lu
-- `--` ml
- <F T__
- = _
- CATCH OWN
-
- .� v1 -T -
Lo
- - r- - c
i f __
`I-
_ _ i �Dm_
OUTFALL
- _ � _
96
- _ -
# r =
--- [-
gm r
SNOW STORAGE AM
_ - CATCH BWN
-, I = E
_
rill
OF to_ & „--*---_=WAY -
-SNOW STORAGE AREA
�4t
- _- IV7 4
0 60' 120'
BD
__
GRAPHIC SCALE
NO-
SNOW STORAGE AND BMP SKETCH � 1 =a