HomeMy WebLinkAbout2026/04/21 - Response to 2nd Stormwater Peer Review - - i I I I ur, 00000000000000000uiiihoo i ,1146M nob *is April 21, 2026 File No. 101015.00 Town of North Andover- Planning Board 120 Main Street North Andover MA 01845 (978) 688-9500 Re: Response to Town Comments and Peer Review Comments 2 203 Turnpike Street Solar Carport Tax Map 024.0-0028-0003.B 203 Turnpike Road - North Andover MA On behalf of AC Development LLC (Owner) Nobis Group (Nobis) is submitting this response to the Town of North Andover Public hearing comments and the Horsley Witten Group peer review comments 2 dated April 3, 2026 for the proposed project located at 203 Turnpike Street in North Andover MA. Comments are shown below as black italicized font and responses are shown in "bold blue font". Town of North Andover Public Hearing Comments • The travel ways are a concern to the planning board. Please add width dimensions to the aisleways adjacent to the Carports. 0 Response: Dimensions s ,,,en added to the C-1 Site plan. that show a 24 foot drive aisle 'between the Carports. "'r e space 'between t. existing es are r t,,,,r than ,,,,t. Addi'fionally,the Carport product s been selectedwith the current.widths f the r ports. See attached. • Traffic patterns on the site are a mess. Please add `One way" directional arrows were appropriate. One . traffic 'Pavement marking h ..,,,, e . added to the - i t,,,, Plan. Page 1 of 9 I�II��IIIIIIIII�IIIIIII�III�I�I������ I. n I • The planning board would like to see a section of comparable structures. Please provide an example. Response-. The r rt components havebeenselected. tt e . r the car port product t documents. • Per the previous peer review comments, please add street sweeping to the O&M plan to provide additional treatment on site. Response: Streets sweeping has be„gin add to the operation. and maintenancerequested t peer r re.i,,, ��Ww. tr t sweepng wiell be requl*red t least once a year, i all i*n Aprid after snow melt, to clean and. clear debrl*s fromthe pavement. North Andover Fire Department Can you request the actual measurements (widths) of these access routes? I definitely would like to know the distance between the carport and the island. I also want 25ft between the buildings and our ladder truck when it is deployed to ensure an acceptable angle for any ladder operation. Again, I think there is probably a 25 ft distance already, but I would want to see the actual measurement on a submitted plan. Response,: A dimensi onto the listand. -to the car port has been added.t -the plan. A dihnensi*on from the 'b-ui*ldl*ng to the carport ,,,, added also. Eachl en.smeets the min.im.-um requirements r width. North Andover Sewer One of the structures is to be built over the Town's sewer easement. Normally a permenant structure is not allowed, but in this case I believe we could still access the sewer line under the proposed structure,which is fairly open. One support is shown on the edge of the easement and it should be moved several feet outside the easement so we can have betteraccess to the sewer if needed. Response-. The u„ „ rt to the carport hasbeen shi*fted 9 feet to the southeast whl*ch moves it out of the sewer easement. Page 2 of 9 nobis Stormwater Management Design Peer Review 1. Standard 1:No new stormwater conveyances (e.g., outfalls) may discharge untreated stormwater directly to or cause erosion in wetlands or waters of the Commonwealth. a. The Applicant has analyzed the pre- and post-development stormwater runoff to two points of analysis(POA). (1) POA-1 is an existing 12-inch drainpipe that outfalls into the wetland resource area on the west corner of the parcel. Wetland flag series 1 B though 14B. (2) POA-2 is an existing 12-inch drainpipe that outfalls into the wetland resource area on the south corner of the parcel. Wetland flag series 1 D through 12D. April 3, 2026:No further action is requested Response: Noted b. HW recommends that the Applicant confirm that the two outfalls are not currently causing erosion in wetlands or waters of the Commonwealth. April 3, 2026: The Applicant has confirmed that the existing site is not currently causing erosion at either outfall.HW would not expect the post-development conditions to impact the existing outfalls. No further action is requested Response: Noted 2. Standard 2: Stormwater management systems shall be designed so that post-development peak discharge rates do not exceed pre-development peak discharge rates. a. The Applicant has illustrated that the post-development stormwater runoff will be identical to the pre-development runoff. The Applicant is not altering the impervious surface within the parking lot and has not proposed any detention or retention stormwater practices. No further action is requested. April 3, 2026:No further action is requested. b. HW recommends that the Applicant clarify which direction the solar panels will pitch. It appears that the downgradient side of the panels will be on the east side.HW recommends that for clarity the Applicant include a note on the Site Plan. April 3, 2026: The Applicant has stated that the solar panels will be pitched to the southwest. This appears to be reasonable for the two sets of panels closest to Building B. However, the panels closest to Building A will pitch onto the adjacent Page 3 of 9 nobis retaining wall.HW recommends that the Applicant confirms this is the intention and that the retaining wall will not be compromised. c. Per§250-22 B. (5)(b) and§250-23 A. (1) of the North Andover Stormwater Regulations, Low-Impact development(LID)site planning and design strategies must be implemented to the maximum extent feasible. HW recommends that the Applicant document any LID options it considered within the Project Area. April 3, 2026: The Applicant included in its response letter a list of LID practices that were considered and eliminated as not being feasible.No further action is requested. d. In accordance with §250-22 B. (5)(c), HW recommends that the Applicant identify the watershed basin and the downgradient water body that stormwater from the project site discharges into. April 3, 2026: The Applicant has noted that the downgradient water body is the Shawsheen River. No further action is requested. e. In accordance with§250-23 E. (19), the Applicant must utilize the 24-hour rainfall data taken from National Oceanic and Atmospheric Administration (NOAA)Atlas 14 for the rainfall precipitation depths. The Applicant has used the Cornell Extreme Precipitation Rates Rainfall values, which are similar. April 3, 2026:No further action is requested. f HW recommends that the Applicant use a grass and woods surface condition of`good" instead of`fair." HW understands that this suggestion will not have any impact on the design, as the existing and proposed conditions are identical. April 3, 2026: The Applicant has updated the Existing and Proposed HydroCAD model using a surface condition of`good"for woods. No further action is requested. Page 4 of 9 I�II��IIIIIIIII�IIIIIII�III�I�I������ I. n I Response-. Standard. 2 Response Noteda. . . The existingr et flows storm-water runoff to the existingwall. In generalr stormwater runoff Willbe introduced. r . 'The existingbituminous has been pav-ed. and sealed up to the wall. No impact to l s anticipated. . Noted Noted Notede. . Noted 3. Standard 3 requires that the annual recharge from post-development shall approximate annual recharge from pre-development conditions. a. The Applicant has illustrated that the post-development annual recharge will be identical to the pre-development recharge. The Applicant is not increasing or decreasing the impervious surface within the parking lot. No further action is requested. April 3, 2026:No further action is requested. �,�:�,., sp;, III .se,: Noted.„t .. 4. Standard 4 requires that the stormwater system be designed to remove 80%Total Suspended Solids (TSS) and to treat 1-inch of volume from the impervious area for water quality. a. The Applicant has proposed to add hooded outlets (Eliminators) to the existing catch basins to improve the TSS removal obtained.HW recommends that the Applicant confirm that the existing catch basins have 4-foot-deep sumps. April 3, 2026: The Applicant has noted that the catch basins require maintenance to confirm the depth of the sumps. The Planning Board may choose to require confirmation of the catch basin cleaning as a condition of approval. b. In Section 1 of the Stormwater Operation &Maintenance Plan the Applicant notes that riprap overflow controls will be placed at the outlets to provide energy dissipation. HW recommends that the Applicant confirms if any riprap is proposed at the existing outfalls. April 3, 2026: The Applicant has removed this statement.No further action is requested. c. HW recommends that the Applicant include street sweeping on a routine schedule in compliance with Volume 2, Chapter 1,page 9 of the MSH. Page 5 of 9 I�II��IIIIIIIII�IIIIIII�III�I�I������ I. n I April 3, 2026: The Applicant has stated that because of the parked cars, street sweeping would be considered a burden while providing minimal benefit. HW defers discussion of this long-term maintenance program to the Planning Board. HW imagines that there are typical times during a week when the parking lot of this medical office building is not full of cars. d. HW recommends that the Applicant address the Phosphorous removal calculations in accordance with§250-23 C. (1) of the North Andover Stormwater Regulations. April 3, 2026: The Applicant has provided the required calculations. There will be no reduction of phosphorous from the existing site conditions.No further action is requested. a. . „„� ap]��)]..jicaiiiiiiiil seelk..s approval. f0iiii l.e ca.d u li. laba, W i.1111111. SUMPS Ibe e.ii-1.. l ..afterb. Not-.-ed.. . Street :,.in.:: ] . s 1 .en. ad.d.ed. to tf.ie ]�� r do e.n.a .w,,,,m plan.. d.. Note . 5. Standard 5 is related to projects with a Land Use of Higher Potential Pollutant Loads(LUHPPL). a. The Applicant has indicated that the project is considered a L UHPPL, likely because of the vehicle trips per day. The Applicant has also noted that it is meeting Standard 5 to the maximum extent practicable by improving the TSS removal.No further action is requested at this time. April 3, 2026:No further action is requested. R,..esp� orise: Noted. 6. Standard 6 is related to projects with stormwater discharging into a critical area, a Zone II, or an Interim Wellhead Protection Area of a public water supply. a. The proposed development is not discharging near or into a critical area, Zone II or an I WPA area. Standard 6 is not applicable. April 3, 2026:No further action is requested. Page 6 of 9 I�II��IIIIIIIII�IIIIIII�III�I�I�I�II� I. n I 7. Standard 7 is related to projects considered Redevelopment. A redevelopment project is required to meet the following Stormwater Management Standards only to the maximum extent practicable: Standard 2, Standard 3, and the pretreatment and structural best management practice requirements of Standards 4, 5, and 6. Existing stormwater discharges shall comply with Standard 1 only to the maximum extent practicable. A redevelopment project shall also comply with all other requirements of the Stormwater Management Standards and improve existing conditions a. This project is considered a redevelopment. As listed above, the Applicant is required to meet the standards to the maximum extent practicable and improve existing conditions. HW recommends that the Applicant describe how it is improving existing conditions. April 3, 2026: The Applicant is improving existing conditions by adding hoods to the existing catch basins and submitting a Long-term Operation&Maintenance Plan for the property. HW supports the installation of solar panels on the existing parking lot. However, it would appear that something more could be done to improve the stormwater management of the parking lot runoff that is directed towards the adjacent resource area. Suggestions include regular sweeping of the parking lot, confirming and/or installing catch basins throughout the parcel that have four-foot sumps, and/or removing excessive impervious surfaces in the southern corner of the lot.HW defers further discussion of any improvements to the Planning Board s „ n s ': SMeet,t-- , eel„ n.,. ][ ..w Ibeen. u u.' .. to 1 perat...n.an.d. Mai tt.ten.an.cep l[an.t provi'.Je 8. Standard 8 requires a plan to control construction related impacts including erosion, sedimentation, or other pollutant sources. a. The Applicant has provided erosion controls on Sheet C-1 and the associated details on Sheet C-3. The catch basins will be installed with silt sacks, and an erosion control barrier will be placed at the edge of the pavement closest to the resource areas. HW notes that the area of land disturbance is relatively minimal, including 10 columns to hold the canopies, and the installation of the electrical cables beneath the existing asphalt. No further action is requested. April 3, 2026:No further action is requested. Page 7 of 9 nobis b. HW notes that the limit of disturbance will be less than 1 acre therefore a Construction General Permit (CGP) and a Stormwater Pollution Prevention Plan (SWPPP) is not required by EPA. April 3, 2026:No further action is requested. Response: Standard 8 Response a. Noted b. Noted 9. Standard 9 requires a Long-Term Operation and Maintenance (O &M)Plan to be provided. a. The Applicant has provided an Operation and Maintenance Plan as Appendix D in the Stormwater Management Report. The document can easily be removed as a standalone reference. The plan lists the Landowner and Team Leader. However, there are several contacts that are noted as TBD and references to the Town of Walpole that should be corrected. The Planning Board may choose to require receipt of a final signed O&M Plan prior to land disturbance as a condition of approval. April 3, 2026:Suggested condition of approval. b. HW recommends that the Applicant include inspection of the outfalls and sweeping of the parking lot in the O&M Plan. April 3, 2026: The Applicant has included inspection of the outfalls in the O&M Plan. It has removed the sweeping of the parking lot. It is HW's opinion that the parking lot should be swept a minimum of once a year. c. HW recommends that the Applicant provides a simple sketch that includes the stormwater practices for the entire parcel, specifically all catch basins and outfalls. HW further recommends that the sketch includes snow storage locations. April 3, 2026: The Applicant has included a sketch, with its response to comments, that indicates where the existing snow storage is located on the site. HW recommends that a simple sketch that clearly calls out each catch basin and outfall is attached to the O&M Plan for the benefit of the property owner.HW further notes that the Table of Contents provided in the O&M Plan and the list of items included in Appendix A should be reviewed and updated. Page 8 of 9 I�II��IIIIIIIII�IIIIIII�III�I�I������ I. n I III.. Noted.. b . Street- . .e ,,p� 1..gin ..r has been..ad.d.t.l.d. to the e i r:: ii�i. xiiii. plan. per"th.e peer iiir Ili.. oiiiiniiii.ce a yelar i iiiri. :fte'r the silin.ow iIIIrne l : ]*A-]*A-t the u. A si.iiiiri. ', . s � c]a. �1.t��illli. .��.�� to l I. lb � .Ill�IIII. , :t ].].s ari.d. Illillli. . .., iIlr III-e 11ave. b iiil` 10. Standard 10 requires an Illicit Discharge Compliance Statement be provided. a. The Applicant has provided an unsigned Illicit Discharge Compliance statement. The Planning Board may choose to require receipt of a signed version as a condition of approval. April 3, 2026:Suggested condition of approval. Response: Noted Please contact me if you have any questions or need additional information at 978-703-6024 or iralphsgnobis-group.com. Sincerely, 64��_ Jon Ralphs Project Manager Page 9 of 9 'III';Its i'IiPVili I„ rggu ii CARPORTSTRUCTURES SOLAR CARPORT STYLE SINGLE COLUMN SINGLE T DESIGN CRITERIA Wind Load: 90 MPH minimum Ground Snow Load: 30 psf minimum All Federal, State and Local codes reviewed. COLUMNS , N s HSS ASTM A-500 Grade B Coating Options: Primed or Hot Dip Galvanized BEAMS Wide Flange A 992 Grade 50 Steel. � Coating Options: Primed or Hot Dip Galvanized PURLINS 16 GA. Cold Rolled G-90 Galvanized Steel µmom ft-aftooft-0 ., RACKING 16 GA. Cold Rolled G-90 Galvanized Steel `TT T Cold formed Z or hat shaped section pre-punched tol receive solar module. °TITAffffff OPTIONS o Fixed Tilt slope up to 100 Hot Dip Galvanizing Site Specific Layout and Configuration Solar Racking End Overhangs 1' Roof Sheeting Soffit Under Sheeting -- o� ' ... . TILTANGLE 0-10IDEG ILT GA RACKING E info@carportstructures.com i r . n , i 'III';Its�i'�IiPVili r�ggu ii SOLAR CARPORT CARPORTSTRUCTURES BEAM OVER - DOUBLE DESIGN CRITERIA Wind Load: 90 MPH minimum Ground Snow Load: 30 psf minimum All Federal, State and Local codes reviewed. @wu.- WIOma- W COLUMNS r HSS ASTM A-500 Grade B A-500 Coating Options: Primed or Hot Dip Galvanized BEAMS Wide Flange A-992 Grade 50 Steel. Coating Options: Primed or Hot Dip Galvanized PURLINS � �u Wide Flange a-992 Grad 50 Steel. CoastingOptions: Primed or Hot Dip Galvanized RACKING Solar modules mount directly to Purlins. OPTIONS Fixed Tilt slope up to 10' Hot Dip Galvanizing Site Specific Layout and Configuration BEAM crvERHaruc 10 Fr MAX Solar Racking End Overhangs - up to 10 ft w. Roof Sheeting 30 DEG BEVE CUT Soffit Under Sheeting _ a 18'-2�0'TYP' I 40' P'URLINS LOCATED ABOV BEAM S CANOPY TILTr_ IPV MODULES 0-10 D'Ec� 1 2 LANDSCAPE Tv r.....:._ . HSS COLUMN HHS BEAM T _ d ; �f r info@carportstructures.com i