HomeMy WebLinkAboutNotice of Decision - - Doc: 130 , 805 11-27-2024 12 : 52 Ctf# : 32 81 �:�:_ F i �T 6: �• Town of North Andover Office of the Planning Department Community Development and Services Division y ' 12o Main Street North Andover,Massachusetts 01845 NOTICE OF DECISION LEMTED SITE PLAN REVIEW Date: November 26a 2024 Date of Dearing: October 15, 2024,November 12, 2024,November?6,2024 Date of Decision: November'-)6,2024 Petition of: Merrimack College, 315 Turnpike Street North Andover,IVIA 01845 Premises Affected: 315 Turnpike Street,North Andover IAA.,01845 A..ss sQ as Map ) Lot I3 ...j .3 CA, 10�C4,k 0 -rikle Referring to the above application for a Limited Site Plan Review Article 8 Supplementary Regulations, Part 3 Site Plan Review and Article 10 Administration 195-14.7 of the North Andover,honing Bylaw. Applicant proposes Construction of a 19,205 gross square-foot building situated along Aherne Road. The building wi.11 be composed of academic program space to serve as a Lecture Hall for College use. The P rgJi ec t includes path-va)fs to improve pedestrian circulation t h-rou gh out campus, utility infTastr ucture,a stormwater management plan and associated landscaping. The Site is located 'in the Residential 3 zoning district. After a public hearing given on the above dates and upon a motion by S. KeArlahan and 2nd by J. Simons to APPROVE the Limited Site Plan Revie subject to the following conditions. Vote was (5-0) in favor of the application. f r Jean Enright On behalf of the North Andover Planning Board Bitan Coldbera, Chairman Sean Kevl ah an Peter Boynton John Simons jk-&roc Copy Chris Koskore s M. PAUL IANNUCCILLO, REGISTER ESSEX NORTH REGISTRY OF DEEDS E-RECORDED Doc: 130 , 805 11-27-2024 12 : 52 Page 2 of 9 315 Turnpike Street Limited Site Plan Review Construction of a Lecture Hall November?6,22024 The Planning Board herein APPROVES the Limited Site Plan Review decision to allow for the construction of a 19,2 0 5 gross square-foot building situated along Aherne Road. The building will be composed of academic program space to serve as a Lecture Fall for College ese. The Project includes pathways to improve pedestrian circulation throughout campus,utility infrastructure,,a stormwa,ter management plan and associated landscaping. The Site is located in the Residential 3 zoning district. The Project is located at 315 Turnpike Street,North Andover,Massachusetts, 01845,Assessor's Map 25 Lot 13. This Limited Site Plan Review was requested by the Merrimack College, 315 Turnpike Street,North Andover,MA 01845. The application was filed by the.Applicant with the Planning Board on September 1..22 2024. The Applicant submitted a complete application,which was noticed and reviewed in accordance with the requirements of the Forth Andover Zoning Bylaw,Article 8 Supplementary Regulations,Part 3 Site Plan Review,Article 10 Administration Section 195-10.7 and MGL Ch. 40A,Sec 9. The public hearing on the above referenced application was opened an October 15,2024 and closed on November 265 2024. The Planning Board voted unanimously(by a vote of 5-0)to grant the Limited Site Flan Review decision, This decision specifically stated by the Planning Board makes the following FM INGS of FACT: FINDINGS OF FACT 1) The Project is considered an educational use, and is subject to MGL Chapter 40A Section 3, otherwise known as tho'`Dover Amendment''(see letter dated September 9,2024 from Paul Hutchins,Building Commissioner,to Attorney Mark B. Johnson,Johnson&Borenstein, LLC). As such,the Planning Board's authority is limited to reasonable consideration of structure bulk,height,yard sizes, lot area, setbacks, open space,parking and building coverage. 2) The specific Site is an aDDropriate location for such a use structure or condition. The specific Site is an appropriate location for the Project as it is located in the Residential 3 zoning district and conforms with both use and dimensional requirements of this district. 3 The use as developed will not adversely affect the neighborhood character. Building and development will be consistent with surrounding buildings. The Project provides appropriate building, landscaping, and screening from adjacent properties. 4) There will be no nuisance or serious hazard to vehicles or pedestrians._ The Applicant has demonstrated consideration for Site safety pedestrians,edestriansa service vehicle movement, delivery vehicle routes, emergency response access and handicap access. 5) Ado uate and appropriate facilities will be-provided for the proper operation of the proposed use. The Project is adequately serviced by necessary facilities and utilities to address the needs of the Project. 6) The use is in harmony with the oreneral pumose and intent of this Zoning Bylaw. The Project allows for the use of existing access, adequate fire/safety access,and causes no b arm to any resource areas. Doc: 130 , 805 11-27-2024 12 : 52 Page 3 of 9 315 Turnpike Street Limited Site Plan Review Construction of a Lec=e Hall November 26,2024 7) The Site lies outside of any wetland Resource Areas and their associated buffer zones. 8) The Site falls entirely within the Town of North Andover municipal boundary and lies within the surface watershed of the Shawsheen River. The Site is tributary to the Elm Street Detention Basin and falls within the extents of the Merrimack College Stormwater Management Plan(DEP File 4090-0750) as administered by the Andover Conservation Commission. 9) The Project includes the reconfiguration of existing head-in parking along Aherne Road to provide accessible spaces for the proposed building and Sullivan Hall. 10) The Project will require a National Pollutant Discharge Elimination System QQDES) Construction General Permit(CGP)to be filed with and obtained from the United States Environmental Protection Agency. 11) Stormwater Management: The stormwater management system is comprised of a series of catch basins to direct stormwater runoff to a subsurface infiltration system and subsequently to existing stormwater basins currently managing stormwater runoff from the college campus and incorporated in the college master plan. A.portion of the runoff from the Lecture Mall Site is directed to a water quality unit prior to entering the subsurface infiltration system. The Project is considered new development. The Project complies with Town Bylaw requirements and Best Management Engineering and Practices,the most recent version of the MA DEP Stormwater Handbook, and has been reviewed by the Town"s outside consulting engineer, Parsley Witten. There were extensive discussions between the Town's outside consultant engineer and the Project engineer related to the overall design and Stormwater Management System Stormwater Management System Operations and Maintenance Manual (See-correspondence from Horsley Witten dated October?8,2024,November 7,2024 and November 1.5, 2024 and response correspondence from VBB dated October 30, 2024 and November 13, 2024). 12) A signed Illicit Discharge Statement is included in the Stormwater Management Report dated September 12,.2024 (Appendix F). 13) All exterior lighting on the Site (parking areas and building) is to be arranged so as to prevent spillover or glare onto adjacent properties. 14) The application was reviewed by Town staff`as evidenced by email communications from Tiny Willett, DPW Operation, dated September 18,?02.4,Amy Maxner, Conservation Administrator, dated September 12, 2024,Lt. Bob Kilcoyne,Fire Prevention Officer, dated October 17, 2024, and Brian LaGrasse,Health Director, dated September 12,2024. F "WGS OF FACTS and DETERMINATIONS UNDER LUMTED SITE PLAN REVIEW The purpose of Limited Site Plan Review is to ensure that all religious and education uses, and all child care facilities are reasonably regulated in regards to bulk and height or structures and detexxninzn yard sizes, lot area setbacks, open space,paring and building coverage requirements.The Planning Board has the authority to place reasonable conditions on the aforementioned issues but are not permitted to 3 Doc: 130 , 805 11-27-2024 12 : 52 Page 4 of 9 31 5 Turnpike Street Limited Site Plan Review Construction of a Lecture.Hall November 26,20024 withhold approval of Limited Site Plan Review where there is an inability to satisfy proposed reasonable regulations. In reviewing the Limited Site Plan Review application for religious uses, educational uses and child care facilities,the following issues shall be considered: a) Relationship of the bulk of structures and adequacy of open spaces to the natural landscape, existing buildings and other community assets in the area and compliance with other requirements of this Bylaw, which includes,but is not limited to, building coverage requirements,yard sizes, lot areas and setbacks; The Board finds that the size, bulk and height of the proposed building is consistent with the surrounding existing buildings on the campus. The building footprints occupy 19,2.05 square feet within the limit of work, %vhile the non-building footprint area occupies approximately 24,356 square feet. The non--building footprint area as a percentage of limit of work represents 56°10 of open space_ b) Physical layout of the plan as it relates to convenience and safety of vehicular and pedestrian movement v�pithin the site,the location of driveway openings in relation to traffic or to adjacent streets and, when necessary, compliance with other regulations for the handicapped,minors and the elderly; The Project utilizes the existing access/egress drive and is situated aloD.g Aherne Road and Medina Drive. The Project includes reconfiguration of the existing paved path that runs alongside Sullivan Hall to a multi-use path for pedestrian use and maintenance access. Head-in parking along Aherne Road i s being adapted to provide accessible parking and a direct accessible route to the proposed b uil ding entrance. The Pro*ect also creates pedestrian connectivity throughout the Site, establishing accessible routes from the building to the parking lot and to the pathways in the Quad and in front of Sullivan Hall. c) Adequacy of the arrangement of parking and loading spaces in relation to the proposed uses of the premises; Dead-in parking along Aherne Road is being adapted to provide accessible parking and a direct accessible route to the proposed building entrance. d} physical lighting of the site, especially the adequacy o#'the method of exterior lighting for convenienceC2 , safety and security within the site and for protection of neighboring properties, roadways and the night slay; The PrgJect includes new high-efficiency Iighting on Site consistent with the Merrimack College campus standard themes,to ensure adequate lighting is provided for pedestrian safety on the pedestrian areas on Site. The proposed Iighting will minimize spill and glare onto adjacent areas. e) Protection of adjoining premises against seriously detrimental uses by provision for 4 Doc: 130 , 805 11-27-2024 12 : 52 Page 5 of 9 315 Tumpike Street Limited Site Plan Review Construction of a Lecture Hall November 26,2024 surface water drainage; The Project incorporates compliant stormwater drainage measures to protect adjoining premises. The sto rmw ater management system is described in Finding of Fact�#11. f) Adequacy of the methods of disposal of refuse and other wastes resulting from the uses permitted on the site; The Project does not include new durnpsters. The intent is for trash to be put in.bins and brought to other campus locations. g} Adequacy o f fire prate cti on aria.easures, and; Emergency access is provided for the new buildings in conformance with NFPA Section IS as shown on Exhibit D 1 Emergency Access Figure dated September 12, 2024. Fire access lanes with minimum unobstructed widths of 2 0-ft. are comprised of the surrounding roadways of Aherne Road, Medina]rive, and Flaherty Road. Dire access is provided-vvithin at least 250-ft of all portions of the fully-sprinkled building, and within 50-ft of at least one door-of the building. h) Incorporation of sustainability and resiliency principles into the site design that results in a plan that is responsive to the environment and actively contributes to the development of a more sustainable community. The Project will meet the near Stretch Energy Code Requirements. The building ill be solar(PV)ready and have law flow plumbing fixtures.Energy efficient LED lighting on site will meet dark-sky lighting requirements, minimizing light pollution. The proposed use of native plantings reduces the need for fertilisers and irrigation on site. Where needed,water efficient drip irrigation will be used on site. The Project will be incorporated rnto the existing on-and off campus shuttle program providing an alternative to single vehicle transit. ZD This Limited Site Plan Review decision was issued subject to the following conditions: SPECL4.L CONDITIONS: 15) For the purposes of the decision, the Planning Board approves the following Perron Definitions a) The"Locus"'or"Site"refers to approximately 1.2 5-ac re portion of the parcel of land with land fronting on Andover/Elm Street shown on Assessor's Map 25 Lot 13 and known as 315 Turnpike Street,North Andover, Massachusetts. b) The'cPlans"refer to the Plans prepared by VHB, 260 Arsenal Pl 92, Watertown INIA 02471 entitled "Merrimack College Lecture Hal?) dated September 12, 2024 and reprised to October 30, 20'?4 consisting of sheets Cover Sheet, C 1.0-05.0, C6,1-C6.3, L 1,L,2, and Sir-I. c} The"Project"refers to the proposed construction of a 19.205 gross square-foot building situated along Aherne road. The building Will be composed of academic program space to serve as a Lecture Hall for College use. The Project includes pathways to improve pedestrian circulation throughout, campus, utility infrastructure, a stormwater management plan and associated landscaping. The Site is i ocate d in the 5 Doc: 130 , 805 11-27-2024 12 : 52 Page 6 of 9 315 Turnpike Street Limited Site Plan Review Construction of a Lecture Hall November 26,2024 Residential 3 zoning district. d) The "Applicant" refers to Merrimack College in this Limited Site Plan Review decision, and its successors and assigns. e) The "Project Own e r" refers to the person or entity holding the fee interest to the title to the Locus from time to time, which can include but is not limited to the Applicant, developer, and owner. 16) Ali stormwater management best practices shall be maintained as specified in the approved Stormwater Management System Operation and Maintenance Manual, dated September 12, -024, revised to November 13,2024. 17) The Applicant shall provide the P 1 ann i n g Department with a copy of the carnpus-avid e Operations and Management plan that is submitted to the Andover Conservation Commission as part of the Order of Conditions review. 18) Per Lt. Kilcoyne,the building is required to have an Emergency Radio Responder Ccverage test to ensure coverage for the North Andover Police and Fire department communication systems. 19) Except as may be provided for in these conditions all Construction activities shall be in conformance with these conditions and the approved plans referenced in condition-947. PRIOR TO ISSUAINCE of SITE WORK,BUILDING PERMIT,OR CONSTRUCTION 20) If applicable,the Applicant will provide copies of all Decisions,Notification, and Orders of Conditions from the North Andover Conservation Commission. 1) Two(2)copies of the signed,recorded decision and with endorsed plans attached must be delivered to the Planning Departrnent. 2 2) The Applicant shall provide the Planning Department a copy of the Andover Conservation C ommi s slon's final approval of the stormwater management design. 23) 1n consultation with the Director of Planning; the Applicant shall contract with VED as a Construction Monitor. The monitor shall read, sign, and return to the Planning Director the Letter of Agreement.ement. TheConstruction Monitor must be available upon four(4)hours' notice to inspect the site with the Planning Board designated official. The rnon.itor shall male at least twice monthly inspections of the Project during active site work phases, provide monthly reports to the Planning Department through out the duration of the Project, and detail any areas of non--compliance and corrective actions, The monitor will also provide reports following heavy rain events. In the event that construction shall cease the Applicant shall notify the Planning Department and reporting shall not be required until the Applicant notifies the Planning Department that construction has commtl xnced. Additionally,the monitor shall assist Town Staff ire overseeing the implementation and updating of the SWPP throughout the development process. 24) At least 14 days prior to the start of land disturbing activities, the Applicant shall provide to the Nanning Department a copy of its Stormwater Pollution Prevention Plan (SWPP) prepared in consultation with the Applicants' site contractor(s) and Project engineers. The S wPP P shall be prepared in accordance with the U.S Environmental Protection Agency's Storrnwater Construction General Permit (USEPA, 2017), as amended, and related guidance 6 Doc: 130 , 805 11-27-2024 12 : 52 Page 7 of 9 315 Turnpike Street Li-mited Site Plan Review Construction of a Lecture Hail November 26,2024 document entitled "Developing Your Stormwater Pollution Prevention Plan; A. Guide for Construction Operators." 25) A, copy of all local, state and federal permits required for the Project shall be submitted to the Planning Department. 26) A construction schedule shall be submitted to the Planning Staff for the purpose of tracking the construction and informing the public of anticipated activities. 27) A,bond in the amount of forty thousand dollars (S40,000.00) shall be posted for the purpose of insuring that the Site is constructed in accordance with the approved plan and that a final as-built plan is provided, showing the location of all on-site structures(Site utilities, structures, curb cuts,parking spaces and drainage facilities, including invert elevations of all stormwater structures). This bond shall be in a form acceptable by statute. 28} Construction traffic associated with this Limited Site Plan Review decision shall be regulated by the Building Commissioner. Prior to commencing hauling operations,a hauling route shall have been reviewed and approved by the Building Commissioner. Construction trucks shall be defined as large trucks hauling earth moving equipment, dump trucks,trucks hauling building materials, and cement trucks. ? } All erosion control measures as shown on the Plan must be in place and reviewed by the Planning Director. 3 0) A pre-construction meeting must be held with the developer,their general contractor, Planning Department(and other applicable departments)to discuss scheduling of inspections to be conducted on the Project,reviewing these conditions,and the construction schedule. DURING CONSTRUCTION 31) Dust mitigation must be performed weekly,or more frequently as directed by the Planning Director,throughout the construction process. The Site must be kept clean and swept regularly. �' P d y '2) Any stockpiling of materials(dirt,wood,construction material,etc.)must be shown on a Plan and reviewed and approved by the Planning Department staff. Any approved piles must remain covered at all times and fenced off to minimize any dust problems that may occur with adjacent properties. 33) It shall be the responsibility of'the developer to assure that no erosion from the construction Site shall occur which will cause deposition of soil or sediment upon adjacent properties or public ways,except as normally ancillary to off-site construction. Off-site erosion will be a basis for the Plarmiung Board making a finding that the Project is not in compliance with the Plan; provided,however,that the Planning Board shall give the developer written notice of any such finding and seven days to cure said condition. PRIOR TO.A CERTI[FIC iTE OF OCCUPANCY 34) The Applicant must subunit a letter from the Project engineer stating that the building landscaping, b� 1 fighting and Site I ayout substantially comp ly with the Plans other than punch list items which completiori is secured by the bond referenced at the end of this decision as endorsed by the Planning Board and that the stormwater management structures are functioning as designed. 7 Doc: 130 , 805 11-27-2024 12 : 52 Page 8 of 9 31 i Turnpike Street Limited Site Plan Review Construction of a Lecture Hall November 26,2024 35) All stormwater structures shall be cleaned, in accordance with the approved Stormwater Management System Operations and Maintenance Manual. 3 6) The Planning Staff will review the Site. Any screening as may be reasonably required as determined by the PlaTming Director will be added at the Project Owner's expense. PRIOR TO THE RELEASE DE THE PERFORMANCE BOND 37) The Applicant shall submit an as-built plan stamped by a.Registered Professional Land Surveyor in Massachusetts that shows all construction, including stormwater structures and other pertinent Site features. This as-built plan shall be submitted to the Town Planner for approval and must be provided in paper form as well as in SDF(Standard Digital File) format. 3 S) The Planning Board must by a majority vote make a finding that the Site is in conformance with the approved playa. GENERAL CONDITIONS 39) Any plants,tree, shrubs, or fencing that have been incorporated into the Plans approved in this Notice of Decision that die. or fall into disrepair must be replaced by the Project Owner in perp etuity. 40) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 41) Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the respective utility companies. 42) The hours for exterior construction shall be limited to between 7:00 a.m.and.,00 p.m.Monday througZD h Friday, and between 8.00 a.m. and 5:0 0 p.m. on Saturday. 43) No open burning shall be done except as is permitted during burning season wader the Fire Department regulations. 44) The provisions of this conditional approval shall apply to and be binding upon the Applicant, its employees,and all successors and assigns in interest or control. 45) Any action by a Town,Board, Commission, or Department, which requires changes in the Plans or design of the building, as presented to the Plann*ng Board,may be subiect to modification by the Planning Board. 46) Other than normal field changes,the Planning Director shall approve any changes made to these plans. Any changes deemed substantial by the Town Planner would require a public meeting to review the modification to the Lim ited Site Plan Review decision by the Planning Board in accordance with Ch. 195-8.17 of the Zoning Bylaw. 47) The following information shall be deemed part of the decision: Plan titled: Merrimack College Lecture Hall Prepared for: Merrimack College 315 Turnpike Street Doc: 130 , 805 11-27-2024 12 : 52 Page 9 of 9 315 Turnpike Street Limited Site Plan Review Construction of a Lecture Hall November 26,?024 North Andover, MA. 01845 Sheets: Cover page, C 1.O-05.0, C6.I--C6.3,LI, L211, Sv-1 Prepared by: VHB 60 Arsenal PI#2 Watertown,MA 02471 Date: September 12,2024,revised to October 3 0,2024 Stormwater Management Report Prepared for: Merrimack College Prepared by: V B 260 Arsenal Street 92 Watertown,MA 02471 Date September 12,2024,revised to November 13,2024 Stormwater Management System Operations&Maintenance Manual Prepared by: vED 260 Arsenal Street#2 Watertown, MA 02 471 Date: September 12,2024}revised to November 13,2024 oo: Applicant Enbineer Ab'xtters Owner