Loading...
HomeMy WebLinkAboutFall 2024 - Stormwater Pollution Prevention Plan (SWPPP) - - STORMWATER POLLUTION PREVENTION PLAN(SWPPP)MANUAL Lecture Hall Pro0ject at '6 Merrimack College 315 Turnpike St North Andover,MA 01845 CONSTRUCTION ACTIVITIES AT: Merrimack College 315 Turnpike Street North Andover, MA 01845 PREPARED ON BEHALF OF: Merrimack College 315 Turnpike Street North Andover, MA 01845 Anthony Preston (978)837-5000 Ext. 5454 prestonan@merrimack.edu PREPARED FOR: ProCon, Inc. 1359 Hooksett Road Hooksett, NH 03106 Brandom Gemmiti (603) 518-2212 �emmiti@proconinc.com PREPARED BY: kv Vanasse Hangen Brustlin, Inc. 260 Arsenal PI#260 Watertown, MA 02471 (617)924-1770 SWPPP Preparation Date: Fall 2024 Estimated Project Start Date: Fall 2024 Estimated Project End Date:Winter 2026 This page intentionally left blank. Table of Contents i. Introduction...........................................................................................................................................................vii a. How to Use this Manual b. What is a Project Operator? C. Eligibility for Permit Coverage................................................................................................................................................viii d. Compliance Requirements.........................................................................................................................................................ix e. Document Control.........................................................................................................................................................................ix 1 Contact Information/Responsible Parties...................................................................................................................................1 1.1 Operators(s)/Subcontractor(s)...................................................................................................................................................1 1.2 24-hour Emergency Contact Information.............................................................................................................................3 1.3 Stormwater Team...........................................................................................................................................................................4 1.3.1 Stormwater Team Formation/Staff Training Requirements........................................................................4 1.3.2 General Training Requirements For Stormwater Team Members...........................................................5 1.3.3 Training Requirements For Persons Conducting Inspections....................................................................6 1.3.4 Stormwater Team's Access To Permit Documents.........................................................................................6 1.3.5 Duties of Stormwater Team Members................................................................................................................6 1.4 Delegation of Authority...............................................................................................................................................................7 1.5 Personnel Responsible for Site and Dewatering Inspections.....................................................................................10 1.6 Personnel Responsible for Completing Corrective Actions.........................................................................................12 2 Site Evaluation and Planning.................................................................................................................................................13 2.1 Project/Site Information............................................................................................................................................................13 2.2 Discharge Information...............................................................................................................................................................14 2.2.1 Receiving Waters......................................................................................................................................................15 2.2.2 Impaired Waters........................................................................................................................................................15 2.2.3 Tier 2,2.5, or 3 Waters............................................................................................................................................16 2.3 Project Description......................................................................................................................................................................16 2.3.1 General Description.................................................................................................................................................16 2.3.2 Size/Footprint of the Project................................................................................................................................17 2.3.3 Pollution-generating Activities............................................................................................................................17 2.4 Sequence and Estimated Dates of Construction Activities..........................................................................................18 2.4.1 Projected Construction Sequence......................................................................................................................18 2.4.2 Construction Activity Logging Requirements................................................................................................19 2.5 Authorized Non-stormwater Discharges............................................................................................................................19 3 Compliance with Other Regulations....................................................................................................................................21 3.1 Endangered Species....................................................................................................................................................................21 3.1.1 Eligibility Criterion....................................................................................................................................................21 3.1.2 Supporting Documentation .................................................................................................................................23 3.2 Historic Property Screening Process....................................................................................................................................23 3.2.1 Appendix L,Step 1 ...................................................................................................................................................24 3.2.2 Appendix L,Step 2...................................................................................................................................................24 3.2.3 Appendix L,Step 3...................................................................................................................................................24 3.2.4 Appendix L,Step 4...................................................................................................................................................24 3.3 Safe Drinking Water Act Underground Injection Control Requirements...............................................................25 i Table of Contents S'Lmrmwa-terPoh-tio Preven-tion Man(S0::1R:::1)Mmo 4 Erosion and Sedimentation Controls and OowatehnQ Practices..................................................................................27 4.1 Natural Buffers or Equivalent Sediment Controls...........................................................................................................28 4.1.1 Buffer Compliance Alternatives...........................................................................................................................28 4.1.2 Buffer Exceptions......................................................................................................................................................3O ziZPerimeter Controls......................................................................................................................................................................31 42.1 General Perimeter Controls..................................................................................................................................31 422 Specific Perimeter Controls...................................................................................................................................31 4.3 Sediment Track-out....................................................................................................................................................................32 4.3.1 General Track-out Controls...................................................................................................................................]2 4.32 Specific Track-out Controls...................................................................................................................................B 4.4 Stockpiles or Land Clearing Debris Piles Comprised of Sediment or Soil.............................................................34 4.4.1 General Stockpile Controls....................................................................................................................................34 4.4.2 Specific Stockpile Controls....................................................................................................................................3S 4i5Minimize Dust...............................................................................................................................................................................35 4i6 Minimize the Disturbance of Steep Slopes........................................................................................................................3G 4.6.1 General Steep Slope Controls..............................................................................................................................3B 4.6.2 Specific Steep Slope Controls..............................................................................................................................37 4.7 Topsoil .............................................................................................................................................................................................37 4.8 Soil Compaction...........................................................................................................................................................................38 4.8.1 General Soil Compaction Controls.....................................................................................................................38 4.82 Specific Soil Compaction Controls.....................................................................................................................38 4.9 Storm Drain Inlets........................................................................................................................................................................39 4.9.1 General Storm Drain Inlet Controls...................................................................................................................39 4.9.2 Specific Storm Drain Inlet Controls....................................................................................................................39 4i10 Constructed Site OrainageFeatures-------------------------------------'.40 4.10.1 General Site Drainage Feature Controls..........................................................................................................40 4.102 Specific Site Drainage Feature Controls...........................................................................................................41 4.11 Sediment Basins or Similar Impoundments......................................................................................................................42 4.11.1 General Sediment Basin Controls.......................................................................................................................42 4.12 Chemical Treatment....................................................................................................................................................................43 4.12.1 General Chemical Treatment Controls.............................................................................................................44 4.12.2 Specific Chemical Treatment Controls.--------------------------------'.45 4.12.3 Treatment Chemicals...............................................................................................................................................45 4.12.4 Special Controls for Cationic Treatment Chemicals....................................................................................48 4.12.5 Schematic Drawings of Stormwater Controls/Chemical Treatment Systems....................................48 4.12.6 Training-----------------------------------------------..48 4i13 OewatehngPractices---------------------------------------------..46 4.13.1 General Oewatehng Practices..............................................................................................................................46 4.132 Specific Dewatehng Practices..............................................................................................................................47 4.14 Other Stonnwater Controls......................................................................................................................................................48 4.14.1 GeneraL-------------------------------------------------'48 4.14.2 Specific Stonnwater Control Practices -----------------------'.48 4.15 Site Stabilization...........................................................................................................................................................................49 4.15.1 General Site Stabilization Controls — _-----..50 4.152 Specific Site Stabilization Controls — ------..S1 5 Pollution Prevention Controls...............................................................................................................................................S3 5.1 Potential Sources of Pollution.................................................................................................................................................53 52 Fueling and Maintenance of Equipment or Vehicles.....................................................................................................B 5.3 VVashingofEquipmentandVehides---' —. ------..54 5.4 Storage, Handling,and Disposal of[onstrucdonProducts, K4ateha|s, andWastes----__----.55 S'Lmrmwa-terPoh-tio Preven-tion Man(SW[:1R:::1)Mmo 5/4.1 Building Products......................................................................................................................................................S6 5.42 Pesticides, Herbicides, Insecticides — _-----..S6 5.4.3 Diesel Fuel,Oil, Hydraulic Fluids, Other Petroleum Products,and Other Chemioa|s------S7 5.4.4 Hazardous orToxic Waste---' — _------S7 5/4.5 Construction and Domestic Waste — ------..S8 5.4.6 Large Structures Built or Renovated prior to January 198O -------S9 5.47 Sanitary Waste...........................................................................................................................................................S9 5.5 Washing of Applicators and Containers used for Stucco, Paint,Concrete or Other Mateha|s------59 5.6 Fertilizers.........................................................................................................................................................................................O1 5.7 Pavement Sweeping...................................................................................................................................................................61 5.8 Other Pollution Prevention Practices...................................................................................................................................61 5.9 Spill Prevention and Response...............................................................................................................................................62 5.9.1 Initial Notification.....................................................................................................................................................63 5.9.2 Further Notification..................................................................................................................................................63 5.9.3 Assessment Initial Containment.---------------------------------63 5.9.4 Reporting.....................................................................................................................................................................63 8 Inspections, Maintenance and Corrective Actions 61 Reductions in Inspection Frequency....................................................................................................................................56 61.1 Suspension of Construction Activities due to Frozen Conditions.........................................................66 612 Continuation of Construction Activities Despite Frozen Conditions....................................................66 62 Areas that must be inspected.................................................................................................................................................G7 63 Requirements for Inspections------------------------------------------..G7 64 Oewatehng Inspection Schedule...........................................................................................................................................68 65 Corrective Action Directives -----------------------------------..68 65.1 Corrective Action Timelines..................................................................................................................................G9 6.52 Corrective Action Reports.....................................................................................................................................G9 66 Amendments.................................................................................................................................................................................69 7 Turbidity Benchmark Monitoring for Oowathng Discharges...................................................................................... 1 71 General Requirements............................................................................................................................................................... 2 7.1.1 Construction Dewatehng Requirements......................................................................................................... 2 7.2 Pmcedures------------------------------------------------------.J3 72.1 Turbidity Monitoring............................................................................................................................................... 3 722 Coordinating Arrangements for Turbidity Monitoring.............................................................................. 7 72.3 Alternate Turbidity Benchmark.-----------------------------------78 7.24 Coordinating Arrangements for Turbidity Monitoring(if amdicable):........................................................ 8 72.5 Alternate turbidity benchmark(if applicab|e):............................................................................................... 9 8 Certification and Notifications----------.------------'_-----------.--_-------'8 8.1 SVVPPP Certification....................................................................................................................................................................81 8.1.1 Post AuthohzationstotheSVVPPP---------------------------------..81 8.12 On-site Availability of the SVVPPP......................................................................................................................81 8.1.3 SVVPPPModifications---------------------------------------'.82 8.2 Notice of Intent(ND|)................................................................................................................................................................B 8.3 Notice of Termination (NDT...................................................................................................................................................84 S'Lmrmwa-terPoh-tio Preven-tion Man(S0::1R:::1)Mmo List �� Tables v�n Table No. Description Pane Table Project Role: 1 Table Project Role:General Contractor.............................................................................................................................................2 Table 3 Project Role- [Optional 1] Subcontractoc _— ._-----2 Table Project Role: [Optional 2]............................................................................................................................................................2 Table 24-hour Emergency Contact(phmany)..................................................................................................................................3 Table 24-hour Emergency Contact(SecondanA............................................................................................................................3 Table Stonnwater Team........................................................................................................................................................................... Table Duly Authorized Representative or Position (phmany)....................................................................................................8 Table Duly Authorized Representative or Position (Secondary,optional)...........................................................................9 Tab|e1O Duly Authorized Representative or Position (Tertiary,optional).................................................................................9 Table 11 Stormwater Team Members Who Conduct Inspections Pursuant to CGP Part 4...............................................11 Table 12 Personnel Responsible for Completing Corrective Actions(PhmanA ------.12 Table 13 Personnel Responsible for Completing Corrective Actions(Secondary,optional)............................................12 Table14 Project Name and Address......................................................................................................................................................13 Tab|e1S Project Coordinates .. — -------13 Table16 Source for coordinate information.......................................................................................................................................13 Table 17 Horizontal Reference Datum...................................................................................................................................................14 Table 18 Receiving Waters — — -------1S Table19 Impaired Receiving Waters......................................................................................................................................................15 Table 20 Special Receiving Waters(Tier2,Tier Z5or Tier 3).......................................................................................................16 Tab|eZ1 Footprint of the Project Area..................................................................................................................................................17 Table 22 Projected Construction Sequence.........................................................................................................................................19 Table 23 Authorized Non'stonnwater Discharges Likely Occur atthe Project S ------..20 Tab|eZ4 Recording Requirements: Perimeter Controls..................................................................................................................31 Table 25 Maintenance Requirements:Straw Wattles and/or Composite Si ------32 Table 26 Maintenance Requirements:Straw Bale and Silt Fence................................................................................................32 Table 27 Recording Requirements:Sediment Track-out Controls.............................................................................................33 Table 31 Maintenance Requirements:Construction Entrance.....................................................................................................34 Table 29 Recording Requirements:Stockpile Controls...................................................................................................................35 Tab|e3O Recording Requirements: Dust Controls............................................................................................................................3S Table 31 Recording Requirements:Steep Slope Stabilization Controls...................................................................................38 Table 35 Recording Requirements:Topsoil Controls.......................................................................................................................98 Tab|eB Recording Requirements:Storm Drain Inlet Controls...................................................................................................39 Table 34 Maintenance Requirements:Storm Drain Inlet Controls.............................................................................................40 S'Lmrmwa-terPoh-tio Preven-tion Man(SW[:1R:::1)Mmo Table 35 Recording Requirements:Site Drainage Feature Controls..........................................................................................40 Table 36 Maintenance Requirements: Diversion Channels.------------------------------.41 Table 37 Recording Requirements:SedimentBasin [ontros------------------------------.42 Table 38 Maintenance Requirements:Sediment Basins or Similar Impoundments............................................................43 Table 39 Recording Requirements:Chemical Treatment Controls.............................................................................................43 Tab|e4O List of Treatment Chemicals and Dosage/Use tobe used on Site...........................................................................45 Table 41 Departures from Provider/Supplier Specifications.........................................................................................................45 Table 42 SoedfcDewatehngPractices------------------------------------------.47 Table 43 Specific Stonnwater Control Practices................................................................................................................................48 Table 44 Recording Requirements:Site Stabilization Controls....................................................................................................51 Tab|e4S Maintenance Requirements:Site Stabilization _. -------S2 Tab|e4G Pollutant Generating Activities and Pollutants Located on Site................................................................................S3 Tab|e4G VVashingEquipmentandVehidesPoUutionPreventionPractices— -------5S Table 47 Building Products Pollution Prevention Practices...........................................................................................................S6 Table 48 Pesticides, Herbicides, Insecticides Pollution Prevention Practices.........................................................................S6 Table 49 Diesel Fuel,and Other Chemicals Pollution Prevention Practices............................................................................S7 Tab|e5O Hazardous orToxic WastePoUutionPrevendonPectices---'_ -------58 Table51 Pollution Prevention Practices................................................................................................................................................58 Table52 Pollution Prevention Practices................................................................................................................................................59 Tab|eB Stucco Paint,Concrete,and Other Materials Pollution Prevention Practices...................................................GD Table 54 Fertilizers Pollution Prevention Practices...........................................................................................................................61 Table 55 Other Pollution Prevention Practices...................................................................................................................................62 Tab|eS6 Emergency Notification Phone Numbers...........................................................................................................................64 Table57 Emergency Response Equipment..........................................................................................................................................G4 Table58 Project Inspection Schedule....................................................................................................................................................6S ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... List of Appendices Appendix A: Site Maps Appendix B: 2022 Construction General Permit Appendix C: EPA NOls and EPA NOTs Appendix D: Site Inspection Form and Dewatering Inspection Form (if applicable) Appendix E: Corrective Action Log Appendix F: SWPPP Amendment Log Appendix G: Subcontractor Certifications/Agreements Appendix H: Grading and Stabilization Log Appendix I: Training Documentation Appendix J: Delegation of Authority Appendix K: Endangered Species Documentation Appendix L: Historic Preservation Documentation Appendix M: Rainfall Gauge Recording Appendix N: Turbidity Meter Manual and Manufacturer's Instructions Appendix 0: Buffer Documentation Appendix P: Spill Log and Template Forms Appendix Q: Chemical Information Appendix R: UIC Well Correspondence Appendix S: Local Orders of Condition Appendix T: Design Calculations for Stormwater Erosion Controls vi Table of Contents ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 11b,; i. Introduct'ion This Stormwater Pollution Prevention Plan (SWPPP) manual has been prepared to address the requirements of the U.S. Environmental Protection Agency(EPA) National Pollutant Discharge Elimination System (NPDES) Construction General Permit(CGP)for Stormwater Discharges from Construction Activity(2022, USEPA). A copy of the 2022 CGP is included in Appendix B. The CGP gives Project Operators of construction activities that meet the eligibility conditions of Part 1.1 of the 2022 CGP,authorization to discharge: > stormwater identified in Part 1.2.1 of the 2022 CGP,and > non-stormwater associated with some construction activities as defined in part 1.2.2 of the 2022 CGP > provided that adequate measures are taken to prevent pollution to receiving waters. This manual is specific to project sites in Massachusetts,where the EPA is the permitting authority for stormwater discharges from construction sites. a. How to Use this Manual This manual does not become a CGP-compliant SWPPP until the Project Operators: > finalize the SWPPP by completing the initial activities indicated on the following pages,and > by maintaining the SWPPP during the construction period in accordance with the 2022 CGP. Before the project activities begin,the Project Operators must review this manual,fill out relevant information in the spaces provided (or attach additional pages as necessary)and update and/or revise as necessary. Within the draft SWPPP presented to the Project Operators,VHB has provided instructions for the Project Operator in red text.These instructions are intended to guide the Project Operators in completing those portions of the SWPPP that are within their purview and control. Once the appropriate information in response to the red text directions is inserted within the SWPPP,the red directions should be deleted prior to the filing of a NOI with the EPA for the project. Optional items are highlighted in yellow to indicate that these may be added if needed. If not needed,the highlighted sections of the SWPPP can be deleted. b. What is a Project Operator? The 2022 CGP provides permit coverage for Project Operators(Operator)to discharge stormwater from construction sites.CGP Part 1.1.1 describes an Operator is any party associated with a construction project that meets either of the following two criteria: vii Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ > The party has operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications;or > The party has day-to-day operational control of those activities at a project,which are necessary to ensure compliance with a SWPPP for the site or other permit conditions(e.g.,they are authorized to direct workers at a site to carry out activities required by the SWPPP or comply with other permit conditions). Operators are responsible for maintaining compliance with the terms of the 2022 CGP. All operators who wish to obtain coverage to discharge stormwater under the 2022 CGP must submit and certify their own NO1 to the Environmental Protection Agency(EPA). The Site Owner,the Project Owner,and the site General Contractor, may all be considered Operators. In some cases, project subcontractors may also be considered Operators. c. Eligibilityfor Permit Coverage To be covered under the 2022 CGP,a party must meet the eligibility conditions and follow the requirements for obtaining permit coverage.To be eligible for coverage: > You must be an Operator of a construction site for which discharges will be covered under this permit. > The project's construction activities: > will disturb one(1)or more acres of land,or less than one(1)acre of land if the project is part of a larger common plan of development that will ultimately disturb one(1)or more acres of land. > have been designated by EPA as needing permit coverage under 40 CFR 122.26(a)(1)(v)or 40 CFR 122.26(b)(15)(ii). > Discharges from your site are not already covered by a different NPDES permit for the same discharge or in the process of having coverage under a different NPDES permit for the same discharge denied, terminated,or revoked. > The project can demonstrate compliance with one of the criteria in the Endangered Species Protection Section of the Notice of Intent that will be submitted for coverage under this permit,Per Part 1.4,with respect to the protection of the federally listed endangered or threatened species and federally designated critical habitat under the Endangered Species Act. > The project has completed the screening process in Appendix A of the 2022 CGP relating to the protection of historic properties. > The project complies with all requirements in Part 9 of the 2022 CGP. > The project meets the requirements relevant to water quality impacts to designated waters(Section 3.2. Refer to Part 1.1.8 and 1.1.9 of the 2022 CGP). Project Operators must file and certify an NO1 at least fourteen (14)days prior to the start of project activities. Ott s: . a. ov com fiance in s�����ere ruin viii Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ d. Compliance Requirements Compliance with the 2022 CGP is achieved by: > Developing a Stormwater Pollution Prevention Plan (SWPPP); > Identifying project operators and responsible parties and obtaining authorization to perform permit compliance activities.(Section 2.1 and Appendix C); > Submitting and certifying a Notice of Intent(NO1)to the Environmental Protection Agency(EPA) Construction General Permit Program; > Installing a sign or other notice posted conspicuously at a safe, publicly accessible location, in close proximity to the project site. At a minimum,the notice shall include: The NPDES Permit tracking number, A contact name and phone number for obtaining additional project information, The location where an EPA inspector or a member of the public may access a copy of the current SWPPP, The statement:"If you observe indicators of stormwater pollutants in the discharge or in the receiving waterbodies,contact the EPA through the following website:,..„,„ s: . . ov it forc ire int ire ort,...., nviironmenta violations. ...................................................................................................................................................................................................... > Updating this SWPPP as necessary and maintaining compliance with the CGP and any and all Orders of Conditions during construction period activities;and > Maintaining an updated copy of the SWPPP on the project site. e. Document Control Once the project is authorized for coverage under the 2022 NPDES CGP the SWPPP must include the following: > 2022 NPDES CGP; > A copy of you NO1 submitted to EPA along with correspondence with EPA related to coverage under the permit; > A copy of the acknowledgment letter received from NeT assigning your NPDES ID(Permit Tracking Number); A current copy of the SWPPP must be maintained at the site or an easily accessible location so that it can be made available at the time of an on-site inspection or upon request by: > EPA > a state,tribal or local agency that approves stormwater management plans; > the operator of a storm sewer system receiving discharges from the site; > or representatives of the U.S. Fish and Wildlife Service(USFWS)or the National Marine Fisheries Service (N M FS). If an on-site location is unavailable for storing these documents,a notice of the plan's location must be posted near the main entrance of the construction site. These documents may be made available to the general public by federal,state,or local agencies.These documents must be retained for at least 3 years from the date that the permit coverage expires or is terminated. ix Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ The SWPPP is a dynamic document,and must be continually updated by the Operator(s)throughout construction.It is the responsibility of the Operator(s)to update and complete this manual by including the following information and performing ongoing project activity logging as described in the remainder of this document. Task Completed Task See Sections DesignatevContact Information for the Responsible Appendix Section ProvideAppendix J confirming t i Provide11 construction schedule including dates of majorearthwork,stabilizationand/or Table 22 erosion control s i . Appendix Reviewr s s described in this manual and add or updates Section needed. Document the installation and maintenances i s® Appendix A Appendix Appendix Appendix 0 Identify any chemical treatments that may be appliedsite describe s4.12 application techniques,and trainingfor personnel. Appendix Appendix potential11 Identify sources Section .1 Providecumentation of correspondence congruent with the Endangered Species Act Section 3.1 Appendix Providec correspondence ss c s s Historical Commission.Submit Projectification Form(PNF)to Massachusetts Hist ric Commission 3.2Error.1 AppendixReference source not Provide t compliance wi i s 310 CIVIR 27.00(Underground Injection i Wells) Appendix R The SWPPP t be kept up to date throughout the constructioni il a Notice of Termination ) Form s been submitted to the EPA. Fromthe NOT form,the SWPPP documents be maintained )for a period of three s. x Contact Information/Responsible Parties Stormwater Pollution Prevention Plan(SWPPP)Manual 11b,a Contact Information/Responsible Parties 1.1 Operators(s)/Subcontractor(s) Individuals identified in this section are designated responsible parties for each of the project Operators. Project Operators may include,but not be limited to the site Owner,the project owner,and the general contractor. Amend this Section during the construction period if any ownership changes or any temporary or permanent staff changes occur. Please note that the 2022 CGP requires that all subcontractors involved with work covered must be listed below and that this list must be updated as these contractors change throughout the duration of the project. Table 1 Project Role:Owner Company or Organization: Merrimack College Name: Anthony Preston Address: 315 Turnpike Street City,State,Zip North Andover, MA 01845 Telephone: (978)837-5000 Ext.5454 Email: prestonan@merrimack.edu Title: AVP of Government, External Affairs and Institutional Projects 1 Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Table 2 Project Role:Construction Manager Company or Organization: ProCon, Inc. ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... . Name: Brandon Gemmiti ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... . Address: 1359 Hooksett Road City,State,Zip Hooksett, NH 03106 Telephone: (603) 518-2212 ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Email: bgemmiti@proconinc.com ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Title: Senior Project Manager Area of Control: Construction Project Mana er J............................................................................ ............................................................................................................................................................................................................................................................................................................................................................ Table 3 Project Role:Subcontractor Company or Organization: J. Masterson Construction ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... . Name: Mike Brown Address: 46 Prince Street ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... City,State,Zip Danvers, MA 01923 Telephone: (978)774-8782 Email: mike@jmasterson.com Title: Senior Project Manager Area of Control: Site Contractor ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Table 4 Project Role: Company or Organization: [enter] Name: t Address: [enter] City,State,Zip t ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... . Telephone: [enter] Email: Title: [enter] Area of Control: t ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Insert additional sheets as necessary. 2 Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 1.2 24-hour EmergencyContact Information The individuals identified in this Section will be available to respond to emergency conditions on the site 24 hours a day,7 days a week.Amend this Section during the construction period if any temporary or permanent staff changes occur. Table 5 24-hour Emergency Contact(Primary) Company or Organization: PROCON Name: Brandon Gemmtii ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Address: 1359 Hooksett Road City, State,Zip Hooksett, NH 03106 Telephone: 603-396-7222 Email: bgemmiti@proconinc.com Title: Senior PM Table 6 24-hour Emergency Contact(Secondary) Company or Organization: PROCON ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Name: Rob Danehy ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Address: 1359 Hooksett RD City, State,Zip Hooksett, NH,03106 Telephone: 603-722-4851 Email: !r in............ .. .............p..it , „in ii,irk. .. ............i . Title: Project Engineer ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. . Attach additional sheets as necessary. 3 Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 1.3 Stormwater Team 1.3.1 Stormwater Team Formation/Staff Training Requirements Each Operator or group of Operators must assemble a Stormwater Team to carry out compliance activities associated with the requirements of the 2022 CGP. Prior to the commencement of construction activities,the Operators must ensure that the personnel on the stormwater team understand the requirements of this permit and their specific responsibilities with respect to those requirements. All of the personnel responsible for the following activities must be trained to understand the relevant requirements under the terms of the 2022 CGP including: > The design, installation, maintenance,and/or repair of stormwater controls and pollution prevention controls(Part 6.1 of the 2022 CGP). > The application and storage of treatment chemicals(if applicable). > Conducting and documenting inspections(Part 4 of the 2022 CGP). > Performing and documenting corrective actions(Part 5 of the 2022 CGP). > Minimum training measures for the stormwater team must include Part 6.1 of the 2022 CGP. > Permit requirements and deadlines associated with the installation, maintenance,and removal of stormwater controls and as well as stabilization > The location of all stormwater controls on the site required by this permit and how they must be maintained. > The proper procedures to follow with respect to the permit's pollution prevention requirements. > When and how to conduct inspections, record findings,and take corrective actions.Specific training requirements for persons conducting site inspections are included in Part 6.3. All members of the stormwater team must be identified in the SWPPP pursuant to Part 7.2.2.6.2 and have easy access to an electronic or paper copy of the applicable portions of this permit,the most updated copy of the SWPPP, and other relevant documents associated with the SWPPP including logs and completed forms. > Individuals by name and position, responsibilities,who does inspections,design, maintenance,and/or repairs of SW controls,applications and treatment of chemicals,conducting inspections,and taking corrective actions. > Each member of SW Team must have access to applicable portions of 2022 CGP and understand the requirements of the 2022 CGP and SWPPP. > For projects to receive coverage under 2022 CGP after Feb 17,2023,to be a qualified person under Part 4.1 to conduct inspections, individual must have minimum of either: Completed EPA construction inspection course and passed exam; Hold a current valid construction inspection certificate or license from a program that at a minimum, covers the following: ■ Principles and practices of erosion and sediment control and pollution prevention practices at construction sites; 4 Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ ■ Proper installation,and maintenance of erosion and sediment controls and pollution prevention practices used at construction sites,and ■ Performance of inspections,including the proper completion of required reports and documentation, consistent with the requirements of Part 4 of the 2022 CGP regulations. > Include documentation of the above training in Appendix I of this SWPPP > For projects receiving coverage under the 2022 CGP prior to February 17,2023,any personnel conducting site inspections pursuant to Part 4 on the site must,at a minimum: Be knowledgeable in the principals and practice of erosion and sediment controls and pollution prevention, Possess the appropriate skills and training in conditions at the construction site that could impact stormwater quality,and Possess the appropriate skills and training in the effectiveness of any stormwater controls selected and installed to meet the requirements of this permit. The Training Log and Attendance Records are maintained in Appendix I. 1.3.2 General Training Requirements For Stormwater Team Members Prior to the commencement of construction activities,the operator must ensure that all persons assigned to the stormwater team understand the requirements of this permit and their specific responsibilities with respect to those requirements, including the following related to the scope of their job duties: a) The permit requirements and deadlines associated with installation, maintenance,and removal of stormwater controls,as well as site stabilization; b) The location of all stormwater controls on the site required by this permit and how they are to be maintained;The proper procedures to follow with respect to the permit's pollution prevention requirements;and Personnel who are responsible for the design, installation, maintenance,and/or repair of stormwater controls(including pollution prevention controls);2022 Construction General Permit(CGP); c) The proper procedures to follow with respect to the permit's pollution prevention requirements;and d) When and how to conduct inspections, record applicable findings,and take corrective actions.Specific training requirements for persons conducting site inspections are included in Part 6.3. If the person requiring training is a new employee who starts after the operator commences construction activities,the operator must ensure that this person has the proper understanding as required above prior to assuming particular responsibilities related to compliance with this permit. For emergency-related projects,the requirement to train personnel prior to commencement of construction activities does not apply, however,such personnel must have the required training prior to NO1 submission. The operator responsible for ensuring that all activities on the site comply with the requirements of this permit.The operator not required to provide or document formal training for subcontractors or other outside service providers (unless the subcontractors or outside service providers are responsible for conducting the inspections required in Part 4,in which case the operator must provide such documentation consistent with Part 7.2.2),but must ensure that such personnel understand any requirements of this permit that may be affected by the work they are subcontracted to perform. 5 Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 1.3.3 Training Requirements For Persons Conducting Inspections For projects that receive coverage under this permit on or after February 17,2023,to be considered a qualified person under Part 4.1 for conducting inspections under Part 4,the employee must,at a minimum,either: a) Have completed the EPA construction inspection course developed for this permit and have passed the exam;or b) Hold a current valid construction inspection certification or license from a program that,at a minimum, covers the following: I. Principles and practices of erosion and sediment control and pollution prevention practices at construction sites; II. Proper installation and maintenance of erosion and sediment controls and pollution prevention practices used at construction sites;and III. Performance of inspections, including the proper completion of required reports and documentation, consistent with the requirements of Part 4. For projects that receive coverage under this permit prior to February 17,2023,any personnel conducting site inspections pursuant to Part 4 on your site must,at a minimum, be a person knowledgeable in the principles and practice of erosion and sediment controls and pollution prevention,who possesses the appropriate skills and training to assess conditions at the construction site that could impact stormwater quality,and the appropriate skills and training to assess the effectiveness of any stormwater controls selected and installed to meet the requirements of this permit. If one of the following topics(e.g.,installation and maintenance of pollution prevention practices)is not covered by the non-EPA training program,you may consider supplementing the training with the analogous module of the EPA course(e.g., Module 4)that covers the missing topic. If you received coverage for a project prior to February 17, 2023,and construction activities for the same project will continue after February 17,2023,the personnel conducting inspections do not need to take the additional training specified in Parts 6.3a and 6.3b for inspections conducted on the project site. If the same operator obtains coverage for a different project on or after February 17,2023, personnel conducting inspections would be required to meet the requirements for a qualified person by completing the training in 2022 Construction General Permit(CGP) Page 40 either Part 6.3a or Part 6.3b. 1.3.4 Stormwater Team's Access To Permit Documents Each member of the stormwater team must have easy access to an electronic or paper copy of applicable portions of this permit,the most updated copy of your SWPPP,and other relevant documents or information that must be kept with the SWPPP. 1.3.5 Duties of Stormwater Team Members The specific duties of these personnel include one or more of the following: 1. Prepare the Draft SWPPP 2. Finalize the SWPPP 3. Implement the SWPPP 6 Contact Information/Responsible Parties Storm water Pob-tion Prevention Han( ::1R,,,1)Mam4 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 4. Oversee maintenance practices identified as BMPs in the SWPPP 5. Conduct or provide for inspection and monitoring activities 6. Identify other potential pollutant sources and make sure that they are added to the plan 7. Identify any amendments to the SWPPP necessitated by field conditions and make sure they are implemented 8. Ensure that any design changes during construction are addressed in the SWPPP All Operators and/or Subcontractors that will use this SWPPP for compliance with the terms of their CGP must provide a certification agreement to do so.The certification agreements are located in Appendix G. Table 7 Stormwater Team I Have Completed I Have Read the CGP and Training Required by Understand the Applicable Name and/or Position and Contact Responsibilities CGP Part 6.2 Requirements Diane Tran 1 Yes ❑ Yes ❑x Civil Engineer No x❑ Date: October 7,2024 (617)607-0082 dtran@vhb.com Brandon Gemmiti 2,3,4,5,6,7,8 Yes ❑ Yes x❑ Construction Manager No x❑ Date: 11-7-2024 (603)518-2212 bgemmiti@proconinc.com Insert Name of ResponsiblePerson Yes El Yes El Insert Position : Enter Date Here Insert n r Insert Email Insert of Responsible Person Yes s Insert Position Date: Enter Date Here Insert e e ne Number Insert Email necessary.Attach additional pages as 1.4 Delegation of Authority The individual authorized to sign/certify the NOI is granted the authority to sign the > SWPPP, > Inspection Reports, > Corrective Action Reports and > other permit documents. 7 Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Alternatively,the individual may delegate this authority.A duly authorized representative may only sign the documents if: > This authorization specifies either an individual or a position (e.g., Environmental Compliance Officer)who has the responsibility for the overall operation of the regulated area or who has overall responsibility for environmental matters. > This SWPPP includes a signed,dated written authorization. The duly authorized representative cannot be a subcontractor or a third party.A duly authorized third party may conduct inspections and corrective actions and may complete reports, but the NO1 signer/certifier or duly authorized representative identified here must sign the reports. Insert authorization signature pages into Appendix .Amend this Sectionto Appendixduring the construction period if any temporary or permanestaff Table 8 Duly Authorized Representative or Position (Primary) Company or Organization: PROCON Name: Lance Bennett Address: 1359 Hooksett RD City, State,Zip Hooksett, NH,03106 Telephone: 603-623-8811 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. . Email: I... ...........!..!�. ...............piroconiinc.c m Title: Co-President ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. . 8 Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Table 9 Duly Authorized Representative or Position (Secondary,optional) Company or Organization: ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Name: [ Address: City, State,Zip Telephone: Email: [ Title: Table 10 Duly Authorized Representative or Position (Tertiary,optional) Company or Organization: Name: Address: [ City, State,Zip Telephone: [ ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. . Email: r ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. . Title: [ Attach additional sheets as necessary. 9 Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 1.5 Personnel Responsible for Site and Dewatering Inspections Inspections are to be performed by"qualified personnel"as defined in Part 4.1 of the 2022 CGP. For projects that receive coverage under the 2022 CGP prior to February 17,2023,any personnel conducting site inspection pursuant to Part 4 on the site must,at a minimum, be a person knowledgeable in the principles and practices of erosion and sediment controls and pollution prevention,who possesses the appropriate skills and training to assess conditions at the construction site that could impact stormwater quality,and the appropriate skills and training to assess the effectiveness of any stormwater controls selected and stalled to meet the requirements of this permit. Inspections shall include all areas of the site disturbed by construction activity and areas used for materials storage that are exposed to precipitation.The Inspector must look for evidence of,or the potential for, pollutants entering the storm water system, inspect the BMPs installed as part of the Plan,inspect the site drainage outfalls, inspect the site egress points for tracking,and inspect material,waste, borrow,or equipment storage and maintenance areas.If, in the course of the inspection,the inspector identifies an eroded area or an area impacted by sedimentation,additional erosion and sedimentation controls will be implemented,the discharge will be documented,and the SWPPP will be revised to include these changes. More Site and Dewatering Inspections,including frequency of inspections,are discussed in more detail in Section 6.0 of this document. Inspection forms are available in Appendix D.Amend this Section during the construction period if any temporary or permanent staff changes occur. 10 Contact Information/Responsible Parties tormwater Pollution Prevention Flan( ::1PI:°1)Manual ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Table 11 Stormwater Team Members Who Conduct Inspections Pursuant to CGP Part 4 If Trainingis a non-EPA Training, Date Training s) Confirm that it Satisfied the MinimumElements Name and/or Position nt c Training s)Received Completed Insert Name of Responsible Person Insert Title of Training Enter Date Here ❑ Principles and practices of erosion and Insert Position Received sedimentation control and pollution prevention Insert Telephone Number practices at construction sites Insert Email El roper installation and maintenance of erosion and sedimentation controls and pollution prevention practices used at construction sites El Performance of inspections,including the proper completion of required reports and documentation,consistent with the requirements of Part Insert Name of Responsible Person Insert Title of Training Enter Date Here ❑ Principles and practices of erosion and Insert Position Received sedimentation control and pollution prevention Insert Telephone Number practices at construction sites 0 Proper installation an maintenance o erosion Insert Email and sedimentation controls and pollution prevention practices used at construction sites El Performance of inspections,including the proper completion of required reports and documentation,consistent with the requirements of Part Insert Name of Responsible Person Insert Title of Training Enter Date Here ❑ Principles and practices of erosion and Insert Position Received sedimentation control and pollution prevention Insert Telephone Number radices at construction sites Insert Email roper installation and maintenance of erosion and sedimentation controls and pollution prevention practices used at construction sites El Performance of inspections,including the proper completion of required reports and documentation,consistent with the requirements of Part [Insert or delete rows as necessary] 11 Contact Information/Responsible Parties ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 1.6 Personnel Responsible for CompletingCorrective Actions The following personnel are responsible for completing corrective action forms. Inserti signature pages into Appendixi c ion during the constructionif any temporaryr permanents changes occur. Table 12 Personnel Responsible for Completing Corrective Actions(Primary) Company or Organization: J. Masterson ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Name: Mike Brown ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Address: 46 Prince Street City, State,Zip Danvers, MA 01923 Telephone: 978-447-8782 Email m..<...............; st irson.coir Title: Senior Project Manager ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. . Table 13 Personnel Responsible for Completing Corrective Actions(Secondary,optional) Company or Organization: r Name: [ ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Address: ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. City, State,Zip [ Telephone: Email: [ Title: r Attach additional sheets as necessary 12 Contact Information/Responsible Parties Stormwater Pollution Prevention Plan(SWPPP)Manual Site Evaluation and Planning 2.1 Project/Site Information Table 14 Project Name and Address Project/Site Name: Lecture Hall Project at Merrimack College Project Street/Location: 315 Turnpike Street City: North Andover State: MA Zip: 01845 County: Essex Table 15 Project Coordinates Type Latitude Longitude Decimal degrees 42.6706 N 71.1238 W Table 16 Source for coordinate information Source ❑ USGS topographic map ❑ EPA Website ❑ GPS 0 Other:(Maps.google.com) 13 Site Evaluation and Planning ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Table 17 Horizontal Reference Datum Reference ❑ NAD 27 ❑ NAD 83 0 WGS 84 ❑ Unknown ❑ Other: Additional Information Yes No ❑ 0 Is the project/site located on Indian country lands,or located on a property of religious or cultural significance to an Indian tribe? If yes, provide the name of the Indian tribe associated with the area of Indian country (including the name of Indian reservation if applicable),or if not in Indian country, provide the name of the Indian tribe associated with the property: Response text here If you are conducting earth-disturbing activities in response to a public emergency, document the cause of the public emergency(e.g.,natural disaster,extreme flooding conditions), information substantiating its occurrence(e.g.,state disaster declaration), and a description of the construction necessary to reestablish effective public services: Response text here Are you applying for permit coverage as a"federal operator"as defined in Appendix El 0 A of the 2022 CGP? 2.2 Discharge Information Yes No 0 ❑ Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System (MS4)? ❑ 0 Are there any surface waters that are located within 50 feet of your construction disturbances? 14 Site Evaluation and Planning ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 2.2.1 Receiving Waters Name(s)of the first surface water(s)that receive stormwater directly from your site and/or from the MS4(note: multiple rows provided where your site has more than one point of discharge that flows to different surface waters) Table 18 Receiving Waters Number Name 1 Shawsheen River(MA83-19w) [via MS41 2 3 4 5 Add a ii iir��� s s iiitiii i W m , inecessary 2.2.2 Impaired Waters Use the interactive map of the 2022 integrated list of waters to identify impaired waters in the vicinity of the project area.The interactive map is available online at: outs Table 19 Impaired Receiving Waters Is this surface water listed as impaired? If you answered yes,then answer the following: What are pollutants Has a TMDL p been completed? causing the Title of the Pollutant(s)for which Yes No impairment? Yes No TMDL document there is a TMDL 1. 0 ❑ Benthic 0 ❑ Bacteria TMDL for the Fecal coliform Macroinvertebrates Shawsheen River Basin Escherichia Coli (E. Curly-Leaf Pondweed (Report MA83-01-2002- Coli) Escherichia Coli (E. 24) Coli) Fecal Coliform Fish Passage Barrier 2. ❑ ❑ ❑ ❑ 3. ❑ ❑ ❑ ❑ 4. ❑ ❑ ❑ ❑ 5. ❑ ❑ ❑ ❑ 15 Site Evaluation and Planning ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 2.2.3 Tier 2, 2.5, or 3 Waters In Massachusetts,Tier 2 waters are listed as"High Quality Waters."All surface waters in Massachusetts that are not designated as an Outstanding Resource Water are considered a High Quality Water(Refer to antidegradation designations, link below). In Massachusetts,Tier 2.5 waters are listed as Outstanding Resource Water, Public Water Supply,and/or Tributary to Public Water Supply, and all wetlands bordering Outstanding Resource Waters and all vernal pools. In Massachusetts,Tier 3 waters are defined as Special Resource Waters.(As of February 2022, no waters are listed as Special Resource Waters). Tier 2,Tier 2.5,and Tier 3 waters are identified and listed in the Massachusetts Water Quality Standards 314 CMR 4.00.See 314 CMR 4.06(1)(d)m for definitions.See the Tables and Figures associated with 314 CMR 4.06 available online at: a . Ott s: .mas,. ov ire u anions 314 IP 4 tl�e masaclusetts suer ace ateir ua iit ,....stand rds To determine applicability of specific antidegradation designations refer to: Ott.1ps: .mass® ov fii s d cuments 201 iry ide . df Table 20 Special Receiving Waters(Tier 2,Tier 2.5 or Tier 3) Is this surface water designated as a Tier 2, Tier 2.5 or Tier 3 water? If you answered es,specify which Tier(2,2.5,or 3) Y Y P Y Yes No the surface water is designated as. 1. 0 ❑ Unnamed Tributary—Tier 2 2. ❑ ❑ 3. ❑ ❑ 4. ❑ ❑ 5. ❑ ❑ 2.3 Project Description 2.3.1 General Description Merrimack College(Applicant), is proposing the construction of one building with academic program space located at Merrimack College in North Andover, Massachusetts(the Project).The Project will entail the construction of 19,205 square feet of building space and reconfiguration of existing paths to accommodate pedestrian circulation and accessible parking.The project will also include improvements to landscape, utility infrastructure,and stormwater management to support this use. No existing buildings will be demolished. 16 Site Evaluation and Planning ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Type of Construction Site(check all that apply): ❑ Single-family Residential ❑ Multi-family Residential ❑ Commercial ❑ Industrial 0 Institutional ❑ Highway or Road ❑ Utility ❑ Other Will you be discharging dewatering water from your site? ❑ Yes 0 No If yes,will you be discharging dewatering water from current or former ❑ Yes 0 No Federal or State remediation site? 2.3.2 Size/Footprint of the Project Appendix A contains the Project Site Plans for this project.including the: > Site Location Map > FEMA Flood Insurance Rate Map > Soil Map Table 21 Footprint of the Project Area Area Area Description (acres) Total property size 56.96 Total area of construction disturbance 1.25 Maximum area to be disturbed at any one time 1.25 2.3.3 Pollution-generating Activities List and describe all pollutant-generating activities and indicate for each activity the associated pollutants or pollutant constituents that could be discharged in stormwater from the construction site.Take into account where potential spills and leaks could occur that contribute pollutants to stormwater discharges,and any known hazardous or toxic substances,such as PCBs and asbestos that will be disturbed during construction. Contractor to provide input here: [enter] ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Pollutant-generating Activity: Asbestos Steam line removal ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Pollutants or Pollutant Constituents: [enter] ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Construction Support Activities: [enter] (only provide if applicable) ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 17 Site Evaluation and Planning ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Describe any construction support activities for the project(e.g.concrete or batch asphalt plants,equipment staging yards, material storage areas,excavated material disposal areas, borrow areas): Relocating Soils off site ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Insert Description of Construction Support Activity, including: Removal of excess soils trucked off site ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact information for construction support activity Name: Mike Brown ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Phone: 978-774-8782 E-mail: mike@jmasterson.com Address and/or Latitude/Longitude: .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. 2.4 Sequence and Estimated Dates of Construction Activities Construction activities, phasing,and sequencing are generally performed at the discretion of the General Contractor and may be determined or refined during the construction period. Project Operators are responsible for maintaining a construction log that address the following project activities. requires the following informationincluded withinthis section- Description construction sequence and durationmajor activities. > For each portion or phase of the construction i , include t : Commencementt ion activities, including clearing and grubbing, mass grading, demolition activities, i. .,excavating,cutting i i ,final grading,and creation soil and vegetation c s requiring stabilization. permanent0 Temporary or cessation construction civiportion site, 0 Temporary or final stabilization of s s for each portionsite.The dates for stabilization must reflect is s to whichsubject in part 2.2.1.4, and, Removalr controls and constructioni vehicles cessation construction - ivi i . > The construction sequenc it . 0 Part ® (installation stormwater controls); 0 Part ® . (stabilization s). 2.4.1 Projected Construction Sequence The projected construction sequence presented in this section is the best estimate of the construction sequence at the time that this SWPPP template was prepared. If the general 18 Site Evaluation and Planning ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ sequence presented here changes during the course of the project,amend the SWPPP to include the revised project construction sequence. Table 22 Projected Construction Sequence Area of Disturbance 1.25 Acres Projected Date Action (Estimated) Site-mobilization activities commence 12.4.2024 Install construction period stormwater controls 12.4.2024 Earth-disturbance activities commence 12.12.2024 Earth-disturbance activities cease 10.15.2025 Site stabilization measures commence 10.15.2025 Site stabilization measures cease 10.15.2025 Removal of construction period stormwater controls 12.15.2025 Removal of construction equipment and vehicles 12.15.2025 Cessation of pollutant-generating activities 12.15.2025 Construction activities cease 12.31.2025 Refer to Appendix H,Grading and Stabilizationr actual construction sequence c . 2.4.2 Construction Activity Logging Requirements For each phase of construction,document the dates for the following activities: > Installation ofst controls,and when they will be made operational; > Commencement and duration of earth-disturbing ivi i s, including clearing and grubbing, mass grading, i (i.e.,excavating,cutting and filling),final grading, soil vegetation stockpiles i stabilization; > Cessation,temporarily or permanently,of construction activitiessite,or in designatedportions of site;the > Final or temporary stabilization of ar s soil.The dates for stabilization s reflect the applicablei t . . ;and > Removal of temporary stormwater conveyances/channels ther stormwater controls, removal of construction equipment and vehicles, cessation - ctivi i s. Construction Activity s are maintainedin Appendix ,Grading and Stabilizations. 2.5 Authorized Non-stormwater Discharges Congruent with Section 1.2.2 of the 2022 CGP,the following non-stormwater discharges associated with construction activities are authorized under this permit provided that,with the exception of water used to control dust and to irrigate vegetation in stabilized areas,these 19 Site Evaluation and Planning ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ discharges are not routed to areas of exposed soil on the site and the discharges also meet the requirements of Part 2 of the 2022 CGP. Table 23 Authorized Non-stormwater Discharges Likely Occur at the Project Site Likely to be Present at the Site? Types of Authorized Non-Stormwater Discharges Present at the Site Yes No Discharges from emergency fire-fighting activities ❑ 0 Fire hydrant flushings 0 ❑ Landscape irrigation 0 ❑ Waters used to wash vehicles and equipment 0 ❑ Water used to control dust 0 ❑ Potable water including uncontaminated water line flushings 0 ❑ Routine external building wash down 0 ❑ Pavement wash waters 0 ❑ Uncontaminated air conditioning or compressor condensate 0 ❑ Uncontaminated,non-turbid discharges of ground water or spring water 0 ❑ Foundation or footing drains 0 ❑ Construction dewatering water ❑ 0 20 Site Evaluation and Planning ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 11b,; Compliance with Oth Regulat*ions 3.1 p Endangered S ecies Appendix D of the 2022 CGP describes eligibility requirements with regards to the protection of threatened and endangered species and designated critical habitat. 3.1.1 Eligibility Criterion Under which criterion listed in Appendix D of the 2022 CGP are you eligible for coverage under this permit? D A ❑ B ❑ C ❑ D ❑ E ❑ F > Criterion A. No federally listed threatened or endangered species or their designated critical habitat(s)are likely to occur in your site's"action area"as defined in Appendix A of the 2022 CGP. > Criterion B.The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A,C, D, E,or F and there is no reason to believe that federally-listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the"action area".To certify your eligibility under this Criterion,there must be no lapse of NPDES permit coverage in the other operator's certification. By certifying eligibility under this Criterion,you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based.You must include in your NO1 the tracking number from the other operator's notification of authorization under this permit.If your certification is based on another operator's certification under Criterion C,you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in your NO1 form. > Criterion C. Federally listed threatened or endangered species or their designated critical habitat(s)are likely to occur in or near your site's"action area,"and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat.This determination may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat.To make this certification,you must include the following in your NO1: 1)any federally listed species and/or designated habitat located in your"action area and 2)the distance between 21 Compliance with Other Regulations ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ your site and the listed species or designated critical habitat(in miles).You must also include a copy of your site map with your NOL > Criterion D.Coordination between you and the Services has been concluded.The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally designated critical habitat,and must have resulted in a written concurrence from the relevant Service(s)that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat.You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOL > Criterion E.Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under Section 7 of the ESA has been concluded.The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally listed threatened or endangered species and federally-designated critical habitat.The result of this consultation must be either: a biological opinion that concludes that the action in question(taking into account the effects of your site's discharges and discharge-related activities)is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat;or written concurrence from the applicable Service(s)with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally designated habitat. > You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOL > Criterion F.Your construction activities are authorized through the issuance of a permit under Section 10 of the ESA,and this authorization addresses the effects of the site's discharges and discharge-related activities on federally-listed species and federally designated critical habitat.You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOL > For reference purposes,the eligibility criteria listed in Appendix D of the 2022 CGP are as follows: 22 Compliance with Other Regulations ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 3.1.2 Supporting Documentation Provide documentation for the applicable eligibility criterion you select in Appendix K of the 2022 CGP,as follows: For criterion A, indicate the basis for your determination that no federally-listed threatened or endangered species or their designated critical habitat(s)are likely to occur in your site's action area (as defined in Appendix A of the 2022 CGP).Check the applicable source of information you relied upon: ❑ Specific communication with staff of the U.S. Fish & ❑x Publicly available ❑ Other source Wildlife Service or National Marine Fisheries Service. species list For criterion B, provide the Tracking Number from the other operator's notification of permit authorization: Provide a brief summary of the basis used by the other operator for selecting criterion A, B,C, D, E, or F: For criterion C, provide the following information: > Any federally listed species and/or designated habitat located in your"action area > The distance between your site and the listed species or designated critical habitat(in miles).You must also include a copy of your site with you NOL For criterion D, E,or F,attach copies of any letters or other communication between you and the U.S. Fish & Wildlife Service or National Marine Fisheries Service concluding consultation or coordination activities. Supporting documentation related to project compliance with the Endangered Species Act is provided in Appendix F. 3.2 Historic PropertyScreeningProcess Appendix L of the 2022 CGP describes eligibility requirements with regard to the protection of historic properties, including tribal lands. The Operator responsible for finalizing this SWPPP must: > Fill out the answers to the questions below for Appendix L,Step 2 w Appendix L,Step 3 Appendix L,Step 4 > Insert copies of any correspondance with the Massachusetts Historical Commission into Appendix L. 23 Compliance with Other Regulations ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 3.2.1 Appendix L, Step 1 Do you plan on installing any of the following stormwater controls at your site? Check all that apply below,and proceed to Appendix L,Step 2. ❑ Berm ❑ Culvert ❑X Catch Basin ❑ Channel ❑ Pond 0 Other type of ground-disturbing stormwater ❑ Constructed Site Drainage Feature(e.g.,ditch, control:Subsurface infiltration structures trench, perimeter drain,swale,etc.) (Note: If you will not be installing any ground-disturbing stormwater controls, no further documentation is required for this section of the SWPPP template.) 3.2.2 Appendix L, Step 2 If you answered yes in Step 1, have prior professional cultural resource surveys or other evaluations conducted on the site already determined that historic properties do not exist,or that prior disturbances at the site have precluded the existence of historic properties? ❑ YES ❑X NO If yes, no further documentation is required for this section of the SWPPP template. If no, proceed to Appendix L, Step 3. 3.2.3 Appendix L, Step 3 If you answered no in Step 2, have you determined that your installation of subsurface earth-disturbing stormwater controls will have no effect on historic properties? ❑ YES 0 NO If yes, provide documentation of the basis for your determination. If no, proceed to Appendix L, Step 4. 3.2.4 Appendix L, Step 4 If you answered no in Step 3,did the State Historic Preservation Officer(SHPO),Tribal Historic Preservation Office(THPO),or other tribal representative(whichever applies) respond to you within 15 calendar days to indicate their views as to the likelihood that historic properties are potentially present on your site and may be impacted by the installation of stormwater controls that require subsurface earth disturbance? 0 YES ❑ NO If no, no further documentation is required for this section of the SWPPP template. 24 Compliance with Other Regulations ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ If yes, describe the nature of their response: ❑ Written indication that no historic properties will be affected by the installation of stormwater controls. ❑ Written indication that adverse effects to historic properties from the installation of the stormwater controls can be mitigated by agreed upon actions. ❑ No agreement has been reached regarding measures to mitigate effects to historic properties from the installation of stormwater controls. Provide a description of any significant remaining disagreements regarding mitigation measures and 0 Other.•A MHC Project Notification Form(PNF)was provided to Massachusetts Historical Commission(MHC) on 0112812020.A response was received,indicating that it has been determined that this project is unlikely to affect significant historic or archaeological resources. The PNF is included in Appendix L. Supporting documentation related to project compliance with the Historic Preservation is provided in Appendix L. 3.3 Safe DrinkingWater Act Underground Injection Control Requ irements Do you plan to install any of the following controls? Check all that apply below. ❑ Infiltration trenches (if stormwater is directed to any bored,drilled,driven shaft or dug hole that is deeper than its widest surface dimension,or has a subsurface fluid distribution system) 0 Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults,chambers, or other devices designed to capture and infiltrate stormwater flow ❑ Drywells, seepage pits,or improved sinkholes(if stormwater is directed to any bored,drilled, driven shaft or dug hole that is deeper than its widest surface dimension,or has a subsurface fluid distribution system) If yes, insert copies of letters,emails,or other communicationt r and the State regionalis All stormwater structures meeting the definition of Underground Injection Control Wells shall be registered in accordance with DEP regulations 310 CMR 27.00.Copies of correspondence with the MassDEP or the EPA Regional Office should be included in the SWPPP 25 Compliance with Other Regulations ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Supporting documentation related to project compliance with the Safe Drinking Water Act is provided in Appendix Q. 26 Compliance with Other Regulations Storm aver Pobtion Prevention Plan(S u::1R,,,1)Manual ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 11b,; Erosion and S Controls and Dewater*ing Stormwater controls must be designed,installed,and maintained in compliance with Part 2.1 of the 2022 CGP. If any stormwater controls must be designed (e.g.,sediment basins or conveyance channels),the design documentation must be included in Appendix T. Erosion and Sediment Controls must be implemented to address the requirements of Part 2.2 of the 2022 CGP. This section of the SWPPP provides general guidance for compliance with the 2022 CGP. Ultimately the project Operators are responsible for making sure sufficient controls are implemented to effectively meet the conditions of the 2022 CGP. The purpose of an erosion and sedimentation control program is to minimize the discharge of pollutants from earth-disturbing activities during the construction phase of the project.The program describe in this SWPPP incorporates BMPs specified in guidelines developed by the DEN and the U.S. Environmental Protection Agency2 and complies with the requirements of the NPDES General Permit for Storm Water Discharges from Construction Activities. Proper implementation of the erosion and sedimentation control program will: > minimize exposed soil areas through temporary stabilization and construction sequencing; > minimize sediment track-out from the site; > minimize the generation of dust; > minimize soil compaction; > place structures to manage stormwater runoff and erosion;and > establish permanent vegetative cover or other forms of stabilization in accordance with Part 2.2.14 of the Permit. The Contractor will install of stormwater controls prior to the commencement of each phase of earth-disturbing activities per Part 2.1.3 of the 2022 CGP.All manufactured control measures will 1 Massachusetts Department of Environmental Protection,1993.Massachusetts Nonpoint Source Management Manual,The Megamanual:A Guidance Document for Municipal Officials. 2 United States Environmental Protection Agency,1992.Storm Water Management for Construction Activities:Developing Pollution Prevention Plans and Best Management Practices. 27 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ be installed and maintained in accordance with the manufacturer's specifications.The site Contractor will inspect all erosion and sediment controls in accordance with the applicable requirements in Part 4,document findings in accordance with Part 4,and perform corrective actions in accordance with Part 5 of the 2022 CGP. The following sections describe the erosion and sedimentation controls that may be used on this site.The Contractor will implement, modify,and amend the stormwater controls identified in this section as necessary. 2022 EPA Template notes this section should contain: > Describe erosion and sediment controls that will be implemented at the site to meet requirements of CGP Pa rt 2.2; > Describe applicable stormwater control design specifications(including references to any manufacturer specifications and/or erosion and sediment controls manuals/ordinances relied upon); > Describe any routine stormwater control maintenance specifications;and > Describe projected schedule for stormwater control installation/implementation. 4.1 Natural Buffers or Equivalent Sediment Controls The requirements for natural buffers are described in Parts 2.2.1 and 7.2.6.b.i and Appendix G of the 2022 CGP. This section of the SWPPP describes project compliance activities to maintain natural buffers in compliance with the 2022 CGP. Documentation of compliance with buffer requirements is located in Attachment 0. 4.1.1 Buffer Compliance Alternatives Are there any surface waters within 50 feet of the project's earth disturbances? ❑ YES ® NO (Note: If no,no further documentation is required under Section 4.1 of this SWPPP Manual.) If there are surface waters within 50 feet of the project's earth disturbances, continue below: ❑ The project will provide and maintain a 50-foot undisturbed natural buffer. Note(1): The project must show the 50-foot boundary line of the natural buffer on the Site Map. Note(2): The project must show on the Site Map how all discharges from the construction disturbances through the natural buffer area will first be treated by the site's erosion and sediment controls. Also,show on the site map any velocity dissipation devices used to prevent erosion within the natural buffer area. 28 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ ❑ The project will provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by additional erosion and sediment controls,which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buffer. Note(1): The project must show the 50-foot boundary line of the natural buffer on the Site Map. Note(2): The project must show on the Site Map how all discharges from the construction disturbances through the natural buffer area will first be treated by the site's erosion and sediment controls. Also,show on the site map any velocity dissipation devices used to prevent erosion within the natural buffer area. ❑ The project will provide and maintain a 50-foot undisturbed natural buffer. Note(1): The project must show the 50-foot boundary line of the natural buffer on the Site Map. Note(2): The project must show on the Site Map how all discharges from the construction disturbances through the natural buffer area will first be treated by the site's erosion and sediment controls. Also,show on the site map any velocity dissipation devices used to prevent erosion within the natural buffer area. > Insert either estimated sediment removal from a 50-foot buffer using applicable tables in 2022 CGP Appendix F;include information on buffer vegetation and soil type that predominate the site;or > Provide site specific calculations for the estimated sediment removal of a 50-foot buffer, providing the specific removal efficiency and information relied upon to make the site specific calculation; > Insert description of additional erosion and sediment controls to be used in combination with natural buffer area; > Insert the following information: > Specify the model or other tool used to estimate the sediment load reductions from the combination if the buffer area and the additional erosion and sediment controls installed at the site will meet or exceed the sediment removal efficience of a 50-foot buffer. It is infeasible to provide and maintain an undisturbed natural buffer of any size,therefore the project will implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer. > Insert rationale for concluding that it is infeasible to provide and maintain a natural buffer of any size; Insert either estimated sediment removal from q 50-foot buffer using applicable tables in 2022 CGP Appendix F;include information on buffer vegetation and soil type that predominate the site;or Provide site specific calculations for the estimated sediment removal of a 50-foot buffer, providing the specific removal efficiency and information relied upon to make the site specific calculation; Insert description of additional erosion and sediment controls to be used in combination with natural buffer area; 29 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Insert the following information: Insert description of how project will comply with these requirements; (Note 1: If alternately choose to comply with any of the options that are available to other sites in Part 2.2.1 a and F2.1 of this Appendix,then additional documentation may be needed). ❑ The project qualifies for one of the exceptions described in the 2022 CGP Appendix G, Part G.2.(If this box is checked, provide information on the applicable buffer exception that applies in Section 4.1.3. 4.1.2 Buffer Exceptions Indicate whether any of the following exceptions to the buffer requirements apply to the project site. Refer to Part 2.2.1 and Appendix G.2 of the 2022 CGP for more information. ❑ There is no discharge of stormwater to waters of the U.S.through the area between the disturbed portions of the site and any waters of the U.S.within 50 feet of the project site. Note(1): If this exception applies, no further documentation is required under Section 4.1 of this SWPPP Manual. ❑ No natural buffer exists due to preexisting development disturbances that occurred prior to the initiation of planning for this project. Note(1): If this exception applies, no further documentation is required to achieve compliance with Part 2.2.1. Note(2): Where some natural buffer exists but portions of the area within 50 feet of the surface water are occupied by preexisting development disturbances,the project must comply with Part 2.2.1 and Appendix G.2.2 of the 2022 CGP ❑ For a"linear project"(defined in Appendix A),site constraints(e.g., limited right-of-way) make it infeasible to implement one of the Part 2.2.1.a compliance alternatives provided that additional measures described in Appendix G.2.2 of the 2022 CGP are met. ❑ The project qualifies as"small residential lot"construction and meets the compliance alternatives described in Appendix G.3 of the 2022 CGP. If this applies,see information in Appendix F,2022 CGP ❑ Buffer disturbances are authorized under a CWA Section 404 permit. Note(1): If this exception applies, no further documentation is required under Section 4.1 of this SWPPP Manual. Note(2): This exception only applies to the limits of disturbance authorized under the Section 404 permit, and does not apply to any upland portion of the construction project. ❑ Buffer disturbances will occur for the construction of a water-dependent structure or water access area (e.g., pier, boat ramp,and trail). Note(1): If this exception applies, no further documentation is required under Section 4.1 of this SWPPP Manual. 30 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 4.2 Perimeter Controls Refer to Parts 2.2.3 and 7.2.6.b.ii of the 2022 CGP for information on the requirements for perimeter controls. Some exceptions apply to linear projects. From 2022 CGP SWPPP Template: > Describe sediment controls that will be used to meet Part 2.2.3 requirement to"install sediment controls along any perimeter area of the site that are downslope from any exposed soil or other disturbed areas." > For linear projects,where it has been determined that the use of perimeter controls in portions of the site is infeasible(e.g.due to a limited or restricted ROW),document other practices that will be implemented to control/restrict pollutant discharges to perimeter areas of the site. 4.2.1 General Perimeter Controls Installation of perimeter controls must be completed prior to the commencement of earth-disturbance activities.This section of the SWPPP provides examples of perimeter controls that the General Contractor may use to effectively control stormwater on constructions sites.The General Contractor may select and install perimeter controls at their discretion.The locations of perimeter controls should be clearly identified on the Site Map. The General Contractor will record activities associated with perimeter controls in the following project logs: Table 24 Recording Requirements: Perimeter Controls Action Recorded in Installation Construction Activities Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log 4.2.2 Specific Perimeter Controls GeneralIf the t is to use controls that arespecified is SWPPP manual,the contractor will prepares control inspection, c ,and removal procedures and record the actions in the appropriateproject logs. 4.2.2.1 Straw Wattles and/or Compost Siltsock Straw wattles consist of straw loosely encased in natural or synthetic webbing.They are appropriate for use as perimeter controls. The General Contractor will prepare and install straw wattles in accordance with manufacturer recommendations.Straw wattles and/or compost siltsock may be entrenched to prevent flow under the device. 31 Erosion and Sedimentation Controls and Dewatering Practices or der lPob-lion Prevention Han n( ::1R,,,1)Mam4 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Inspection and Maintenance Requirements Inspection and maintenance activities for straw wattles and/or composite siltsock will include: Table 25 Maintenance Requirements:Straw Wattles and/or Composite Siltsock Inspection Item Condition Maintenance Activity Condition Rotted Replace Continuity Break in continuous perimeter Re-install existing -or- Install new to close any gaps Sediment Build-up Accumulated sediment at one-half the above Remove the sediment and dispose properly ground height of the control 4.2.2.2 Straw bale and silt-fence Straw bale and silt-fence erosion control devices are commonly used to intercept,filter,and reduce the velocity of stormwater run-off.They are appropriate for use as perimeter controls. The General Contractor will place straw bale and silt-fences at the downgradient edge of disturbed areas, especially those adjacent to wetlands,waterways, roadways or at the base of slopes.They are held in place by wooden stakes. Inspection and Maintenance Requirements Inspection and maintenance activities for straw bale and silt fences will include: Table 26 Maintenance Requirements:Straw Bale and Silt Fence Inspection Item Condition Maintenance Activity Condition Rotted Replace Continuity Break in continuous perimeter Re-install existing -or- Install new to close any gaps Sediment Build-up Accumulated sediment at one-half the above Remove the sediment and dispose properly ground height of the control Placement Underside of straw bales not in contact with Reset,repair and/or re-install ground surface 4.3 Sediment Track-out Refer to Parts 2.2.4 and 7.2.6.b.iii of the 2022 CGP for information on the requirements for sediment track-out controls.Some exceptions apply to linear projects. 4.3.1 General Track-out Controls Sediment track-out controls may be structural or non-structural. Non-structural controls including: > Restricting vehicle use to properly designated exit points. 32 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ > Sweeping,shoveling,or vacuuming to manually remove sediment from public rights-of-way(hosing or sweeping sediment directly into a stormwater conveyance,storm drain inlet,or surface water is prohibited). In the event that sediment is tracked-out of the site onto the surface of off-site streets,other paved areas,and sidewalks,the contractor will remove the deposited sediment by the end of the same work day.If track-out occurs on a non-work day,the contractor will remove the sediment by the end of the next work day. The General Contractor may select and install structural sediment track-out controls at their discretion.The General Contractor shall specify locations of structural controls on the Site Map. The General Contractor will record activities associated with sediment track-out controls in the following project logs: Table 27 Recording Requirements:Sediment Track-out Controls Action Recorded in Installation Construction Activities Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log 4.3.2 Specific Track-out Controls If the GeneralContractor s to user that arespecified in this SWPPP manual,the contractor will preparecumentation describing the control installation, inspection, maintenance,and removal r recordand s in the appropriateproject s. 4.3.2.1 Stabilized Construction Entrance/Exit The General Contractor may grade a cross-slope at the construction entrance to direct runoff to a protected receiving area.If track-out is observed after construction begins,the General Contractor will take additional measures to address sediment track out. Additional measures could include a wash pad to wash off vehicle wheels before they leave the project site. Wash water discharges will be collected and treated in a manner consistent with the requirements of the 2022 CG P. Following completion of earth-disturbing activities,the General Contractor will remove the stabilized construction entrance/exit and installing final finishing materials. Inspection and Maintenance Requirements Inspection and maintenance activities for sediment track-out controls will include: 33 Erosion and Sedimentation Controls and Dewatering Practices ormw t r Pob-tion Prevention Han( ::1R,,,1)M m4 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Table 31 Maintenance Requirements:Construction Entrance Inspection Item Condition Maintenance Activity Construction access Sediment present on vehicle travel surfaces Sweep,shovel,or vacuum sediment from the routes adjacent to the surface,dispose of properly disturbance area Construction Entrance Muddy or sediment-laden Add a top-dressing of stone or gravel Condition 4.4 Stockpiles or Land ClearingDebris Piles Comprised of Sediment or Soil Refer to Parts 2.2.5 and 7.2.6 of the 2022 CGP for information on the requirements for stockpile controls. Refer to CMP for stockpile locations. 2022 CGP template notes: > Describe stormwater controls and other measures to be taken to minimize discharge of sediment or soil particles from stockpiled sediment or soils. Include a description of structural practices(e.g.diversions, berms,ditches,storage basins), including design, installation,and maintenance specifications,used to divert flows from stockpiled sediment or soil, retain or detail flows,or otherwise limit exposure and the discharge of pollutants from stockpiled sediment or soils. > Also,describe any controls or procedures used to minimize exposure resulting from adding to or removing from the pile. The Contractor will provide cover or appropriate temporary stabilization to stockpiles that will remain inactive/unused for more than 14 days.Temporary stabilization may be performed using vegetative or non- vegetative stabilization practices. Refer to Section 4.15 for more information on stabilization practices. 4.4.1 General Stockpile Controls In accordance with Parts 2.2.5 and 7.2.6 of the 2022 CGP,the contractor must comply with the following requirements for any stockpiles or land clearing debris composed, in whole or in part,of sediment or soil: > Locate the piles outside of any natural buffers established under Part 2.2.1 and physically separated from other stormwater conveyances,drain inlets,and areas where stormwater flows are concentrated. > Protect from contact with stormwater(including run-on) using a temporary perimeter sediment barrier; > Provide cover or appropriate temporary stabilization to avoid direct contact with precipitation or wind; > Do not hose down or sweep soil or sediment accumulated on pavement or other impervious surfaces into any stormwater conveyance storm drain inlet,or water of the U.S. 34 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Record activities associated with sediment stockpile controls in the following project logs: Table 29 Recording Requirements:Stockpile Controls Action Recorded in Installation Construction Activities Log Grading and Stabilization Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log Grading and Stabilization Log 4.4.2 Specific Stockpile Controls f the General Contractor elects to usecontrols that arespecified is SWPPP manual,the contractor will prepare describing ,inspection, maintenance, removal c r record actions in the appropriateproject . 4.4.2.1 Vegetative Stabilization Vegetative stabilization practices may include seeding exposed surfaces with a seed mix containing a blend of rapid germinating grasses that are indigenous to the appropriate region of Massachusetts.Once seeded,areas will be covered with a layer of straw mulch according to the recommendations provided by the manufacturer. Refer to Section 4.15.2.1 for more information. 4.4.2.2 Non-vegetative Stabilization Non-vegetative stabilization practices may include applying straw mulch or an erosion control blanket. Refer to Section 4.15.2.2 for more information. Straw wattles consist of straw loosely encased in natural or synthetic webbing.They are appropriate for use as perimeter controls. The General Contractor will prepare and install straw wattles in accordance with manufacturer recommendations.Straw wattles may be entrenched to prevent flow under the device.Sediment Track-out. Refer to Parts 2.2.4 and 7.2.6.b.iii of the 2022 CGP for information on the requirements for sediment track-out controls.Some exceptions apply to linear projects. 4.5 Minimize Dust Refer to Parts 2.2.6 and 7.2.6 of the 2022 CGP for information on the requirements for minimizing dust. The General Contractor record iv i s associated with dustcontrols in the following project logs- Table 30 Recording Requirements: Dust Controls Action Recorded in 35 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Installation Construction Activities Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log Soil wetting will be performed,as necessary,to minimize the movement of dust and fine-grained sediment.The General Contractor shall apply water as a fine spray to wet the upper 0.5 inch of soil. 4.6 Minimize the Disturbance of SteepSlopes Refer to Parts 2.2.7 and 7.2.6 of the 2022 CGP for information on the requirements for controls on steep slopes. Where a state,tribe,local government,or industry technical manual(e.g.,stormwater BMP manual)has defined what is to be considered a"steep slope",the 2022 CGP automatically adopts that definition.Where no such definition exists,steep slopes are automatically defined as those that are 15 percent or greater in grade. The General Contractor will record activities associated with steep-slopecontrols in the following projectm Table 31 Recording Requirements:Steep Slope Stabilization Controls Action Recorded in Installation Construction Activities Log Grading and Stabilization Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log Grading and Stabilization Log 4.6.1 General Steep Slope Controls During the design phase of the project,the design engineers minimized construction impacts to steep slopes to the maximum extent practicable. Where disturbances to steep slopes are still required,the General Contractor will minimize disturbances through the implementation of erosion and sediment control practices designed for use on steep slopes. Stabilization practices on steep slopes will occur within 14 days after grading or construction activities have temporarily or permanently ceased. 36 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 4.6.2 Specific Steep Slope Controls If the GeneralContractor elects to use controls c is SWPPP manual,the contractor will documentationprepare cri i control ti , ,maintenance,design specifications, removalr s and record c the appropriate ® c . 4.6.2.1 Vegetative controls Vegetative slope stabilization practices will be used to minimize erosion on slopes of 3:1 or flatter.Temporary, rapid stabilization will be completed using annual grasses,such as annual rye. Permanent stabilization will be completed with the planting of perennial grasses or legumes. A suitable topsoil,good seedbed preparation,soil amendments,and water will be provided for effective establishment of these vegetative stabilization methods.Vegetation may be applied via hydro seeding or sodding techniques. Mulch may also be applied following permanent seeding activities to protect soil from the impact of falling rain and to increase the capacity of the soil to absorb water. Refer to Section 4.15.2.1 for inspection and maintenance activities for vegetative stabilization controls. 4.6.2.2 Erosion Control Blanket Erosion control blankets may be combined with vegetative controls to minimize erosion on slopes 3:1 or steeper. Erosion control blankets shall consist of a non-woven bio-degradable material and shall be installed by anchoring the top of the blanket in a 6-inch deep trench.The trench shall be backfilled and compacted after the blanket is secured with staples.The erosion control blanket will be installed in the direction of potential flow. Edges of the blankets must be stapled with approximately 4 inches overlap where 2 or more strip widths are required. Refer to Section4.15.2.2 for inspection and maintenance activities for non-vegetative stabilization controls. 4.7 Topsoil Refer to Parts 2.2.8 and 7.2.6 of the 2022 CGP for information on the requirements for the preservation of topsoil. The General Contractor will record c iv i s associated with topsoil controls i c s: 37 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Table 35 Recording Requirements:Topsoil Controls Action Recorded in Stockpiling Construction Activities Log Grading and Stabilization Log Disposal Construction Activities Log Grading and Stabilization Log Topsoil will be preserved to the maximum extent practicable.Where it is infeasible to preserve topsoil in place, it will be repurposed throughout the site or stockpiled and disposed of in accordance with local,state and federal regulations,as necessary. 4.8 Soil Compaction Refer to Parts 2.2.9 and 7.2.6 of the 2022 CGP for information on the requirements for the reduction of soil compaction. To avoid soil compaction,the General Contractor will limit vehicle and equipment use in areas where final vegetative stabilization will occur or where infiltration practices will be installed. Prior to seeding or planting of areas where final vegetative stabilization will occur or where infiltration practices will be installed the soil will be inspected to determine if compaction will hinder vegetative growth. If compaction has occurred,techniques that condition soil to support vegetative growth will be implemented. Soil conditioning techniques shall be specified,as needed by the General Contractor. IF APPLICABLE;2022 CGP Template adds table(s)for Specific Soil Compaction Controls Action Recorded in Installation Construction Activities Log Grading and Stabilization Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log Grading and Stabilization Log 4.8.1 General Soil Compaction Controls If the General Contractor elects to use controls is SWPPP manual,the contractor will prepare documentation describing specific s for thesesections. 4.8.2 Specific Soil Compaction Controls 38 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 4.9 Storm Drain Inlets Refer to Parts 2.2.10 and 7.2.6.iv of the 2022 CGP for information on the requirements for the protection of storm drain inlets From 2022 CGP SWPPP Template include: > Describe controls(e.g. Inserts, rock-filled backs, or block and gravel) including design installation,and maintenance specifications that will be implemented to protect all inlets that carry stormwater flow from the project site to a receiving water, provided operator has access to the storm water drain inlet. Inlet protection measures are not required when storm drain inlets to which site discharges are conveyed to a sediment basin,sediment trap,or similarly effective control. Table 33 Recording Requirements:Storm Drain Inlet Controls Action Recorded in Installation Construction Activities Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log 4.9.1 General Storm Drain Inlet Controls Prior to any earth-disturbing activities inlet protection measures will be installed.Storm drain inlet controls are required at all storm drain inlets that carry stormwater flow from the project site to a water of the U.S.,even if they are located downgradient from a construction period stormwater BMP. 4.9.2 Specific Storm Drain Inlet Controls If the Generalt cs to uses that arec i ,the contractor will preparec control installation, inspection, maintenance,and removals recordand c s in the appropriateproject logs. 4.9.2.1 Siltsack Sediment Traps The General Contractor may choose to use Siltsack sediment traps at the project site.They may be installed at the inlets of existing and proposed catch basins.At locations where silt sacks are used,the catch basin grates will be placed over the siltsack to secure it into place. 39 Erosion and Sedimentation Controls and Dewatering Practices Stormwater Pobtien(Prevention Han( ::1R,,,1)Mam4 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 4.9.2.2 Inspection and Maintenance Requirements Inspection and maintenance activities for storm drain inlet controls includes: Table 34 Maintenance Requirements:Storm Drain Inlet Controls Inspection Item Condition Maintenance Activity Sediment accumulation Sediment buildup at filter Sweep,shovel,or vacuum sediment from the filter layer surface,dispose of properly. Continuity Breaks in continuous barrier Install new or re-install original barrier structure. Clogging Standing water Sweep,shovel,or vacuum sediment from the filter surface,dispose of properly. Install new or re-install restored filter layer. 4.10 Constructed Site Drainage Features Refer to Parts 2.2.11 and 7.2.6 of the 2022 CGP for information on the requirements for the constructed stormwater conveyance channels. From 2022 CGP Instructions for this secion: If you will be installing a constructed site drainage feature,describe control practices(i.e.,erosion controls and/or velocity dissapation devices such as check dams and sediment traps), include design specirfications and details(volume,dimensions,outlet structure),that will be implemented at the construction site. The General Contractor will recordcivic associated with constructed stormwater ri feature controls in the following project . Table 35 Recording Requirements:Site Drainage Feature Controls Action Recorded in Installation Construction Activities Log Grading and Stabilization Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log Grading and Stabilization Log 4.10.1 General Site Drainage Feature Controls The General Contractor may select and install constructed stormwater site drainage features at their discretion. The General Contractor shall specify locations of structural controls on the Site Map. 40 Erosion and Sedimentation Controls and Dewatering Practices ormwat r Pob-tion Prevention Han( ::1R,,,1)Mam4 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Constructed Stormwater site drainage feature may be used to collect runoff from construction areas and discharge to either sedimentation basins or protected catch basin inlets.The contractor may use erosion controls and velocity dissipation devices within and along the length of any stormwater ceRve, nce channel site drainage feature and at any outlet to slow runoff down and to minimize erosion. 4.10.2 Specific Site Drainage Feature Controls If the General Contractor elects to use controls specified i contractor will preparer installation,inspection,maintenance,and removalc r s and record the actions in the appropriatet logs. 4.10.2.1 Diversion Channels Diversion channels may be used to collect runoff from construction areas and discharge to either sedimentation basins or protected catch basin inlets. Inspection and Maintenance Requirement Diversion channels will be inspected in accordance with the inspection schedule. If breakout or erosion is observed,the diversion channel shall be reinforced or protected by an erosion control blanket. Inspection and maintenance activities for conveyance channel controls will include: Table 36 Maintenance Requirements: Diversion Channels Inspection Item Condition Maintenance Activity Surface Erosion Reinforce the surface using a vegetative or non- vegetative stabilization measure Inlet/Outlet Clogging Remove Obstruction Sediment Accumulation Sediment occupies one half of the Sweep,shovel,or vacuum sediment from the storage capacity of the basin basin sump and dispose of properly Embankment/Berm Cracking Identify root cause of embankment failure and repair or reconstruct as needed Embankment/Berm Erosion Reinforce the surface using a vegetative or non- vegetative stabilization measure Embankment/Berm Breakout Identify root cause of embankment failure and repair or reconstruct as needed 41 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 4.11 Sediment Basins or Similar Impoundments Refer to Parts 2.2.12 and 7.2.6.b.v.of the 2022 CGP for information on the requirements for construction period sediment basins. If the General Contractor elects to use sediment basin controls,the General Contractor will update the Site Map to show their location on the project site. From 2022 CGP SWPPP Template directions: If installing a sediment basin or similar impoundment, include design specifications and other details(volume, dimensions,outlet structure)that will be implemented in conformance with CGP Parts 2.2.12 and 7.2.6.b.iv. ContractorThe General cord activities associated with sediments logs- Table 37 Recording Requirements:Sediment Basin Controls Action Recorded in Installation Construction Activities Log Grading and Stabilization Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log Grading and Stabilization Log 4.11.1 General Sediment Basin Controls Constructed sediment basins may be used to collect runoff from construction areas to allow for suspended sediments to settle out of stormwater prior to discharge to points downstream.The following design criteria shall apply: > Sediment basins must be placed outside any water of the U.S.and any natural buffer established under Part 2.2.1 of the 2022 CGP. > Sediment basins must be designed and constructed to avoid collecting water from wetlands. > Sediment basins must be designed and constructed to provide storage for either: The volume of runoff generated from a 2-year,24-hour design storm, (see .1 .::.. eair,....24,....h uir,....st irm,....fir u ncii s), or 3,600 cubic feet per acre of contributing area. > Outlet structures must be designed to withdraw water from the surface of the basin (not the invert), if feasible,see note below. Inlets and outlets must be constructed to dissipate velocity and prevent erosion. Use erosion controls and velocity dissipation devices to prevent erosion at inlets and outlets. 42 Erosion and Sedimentation Controls and Dewatering Practices ormwat r Pob-tion Prevention Han( ::1R,,,1)Mam4 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Note: If the outlet structure must be designed to withdraw water from a place within the water column other than the surface,the basin must be designed to allow suspended soil particles to settle out of the water column prior to withdrawal. 4.11.1.1 Inspection and Maintenance Requirements Inspection and maintenance activities for sediment basins will include: Table 38 Maintenance Requirements:Sediment Basins or Similar Impoundments Inspection Item Condition Maintenance Activity Surface Erosion Reinforce the surface using a vegetative or non- vegetative stabilization measure Inlet/Outlet Clogging Remove Obstruction Sediment accumulation Sediment occupies one half of Sweep,shovel,or vacuum sediment from the basin the storage capacity of the sump and dispose of properly basin Embankment/Berm Cracking Identify root cause of embankment failure and repair or reconstruct as needed Embankment/Berm Erosion Identify root cause of embankment failure and repair or reconstruct as needed Embankment/Berm Breakout Identify root cause of embankment failure and repair or reconstruct as needed 4.12 Chemical Treatment Refer to Parts 2.2.13 and 7.2.6.b.vi of the 2022 CGP for information on the requirements for chemical treatment. Record activities associated withchemical ing projec s.. Table 39 Recording Requirements:Chemical Treatment Controls Action Recorded in Training Training Log Installation Construction Activities Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log 4.12.1 General Chemical Treatment Controls In general,chemical treatment may only be applied in the following situations: > Chemicals may only be applied where the treated stormwater is directed to a sediment control (e.g., a sediment basin, perimeter control) prior to discharge. 43 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ > Chemicals must be appropriately suited to the types of soils likely to be exposed during construction and present in the discharges being treated. > If chemicals will be stored on the project site,chemicals must be stored in leak-proof containers that are kept under storm-resistant cover and surrounded by secondary containment structures. > Use of chemicals must comply with applicable state and local requirements affecting the use of the selected treatment chemicals. > Use of the chemicals must be in accordance with good engineering practices and specifications of the chemical provider/supplier. > NOTE: Departures from provider/supplier specifications must be documented in this SWPPP. > All personnel who handle and/or use treatment chemicals must be undergo appropriate, product-specific training > There are additional restrictions for the use of cationic chemicals. Prior authorization is required (Part 1.1.9 of the 2022 CG)and authorization is conditioned on compliance with additional measures to ensure that the use of the chemicals will not cause and exceedance of the water quality standards. 4.12.2 Specific Chemical Treatment Controls The General Contractor will list all treatment chemicals in the table below. If any of the chemicals are cationic, the General Contractor will indicate whether the authorization has been obtained from the Regional Office (EPA). Include correspondence and indicate whether a record of the authorization is included in this SWPPP in Appendix Q. 4.12.3 Treatment Chemicals Table 40 List of Treatment Chemicals and Dosage/Use to be used on Site Cationic Authorization in Chemical_ Dosage and Application Details Appendix P NONE ❑ Table 41 Departures from Provider/Supplier Specifications Chemical_ Dosage and Application Notes NONE 44 Erosion and Sedimentation Controls and Dewatering Practices Stormwater Pollution Prevention Plan(SWPPP)Manual 4.12.4 Special Controls for Cationic Treatment Chemicals 4.12.5 Schematic Drawings of Stormwater Controls/Chemical Treatment Systems 4.12.E Training 4.13 Dewatering Practices Refer to Parts 2.4 and 7.2.6 of the 2022 CGP for information on the requirements for dewatering. 4.13.1 General Dewatering Practices If project activities require dewatering,the General Contractor will implement dewatering practices to comply with the following requirements.The General Contractor: > Will treat dewatering discharges with controls to minimize discharges of pollutants > Will not discharge visible floating solids or foam > Will use an oil-water separator or suitable filtration device that is designed to remove oil,grease,or other products if dewatering water is found to contain these materials. > Will discharge water to vegetated, upland areas of the site to promote infiltration. > Will comply with velocity dissipation requirements of Part 2.2.11 > Will handle backwash water by either hauling it away or returning it to the beginning of the treatment process > Will replace and clean the filter media used in the dewatering devices when the pressure differential equals or exceeds the manufacturer's specifications. The General Contractor may select and install dewatering controls at their discretion.The General Contractor shall specify locations of structural controls on the Site Map. 45 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ The General Contractor will record c iv i s associated with dewateringcontrols in the followingproject logs- Table 42 Specific Dewatering Practices Insert name of dewatering practice:to be installed: Description: we don't expect dewatering to be needed installed:Insert description of clewatering practice to be Description: InsertInstallation r iinstallation InsertMaintenance ce requirements for the clewatering practice. minimum, Requirements must comply with the following requirement r backwash water,either disposalhaul it away for cs , replace and clean filter media usedin clewateringdevices when the pressuredifferential r exceedsthe manufacturer'sspecifications.11 Designc copies of design specifications . Specifications s needed for additionalstabilization pract Action Recorded in Installation Construction Activities Log Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log 4.13.2 Specific Dewatering Practices f the General Contractor elects to uses that arespecified in thiscontractor i preparescri control installation,inspection, maintenance,and removal r s and recordc s in the appropriateproject . Straw Bale Basin The straw bale basin is an above-ground structure constructed using walls made of straw bales and a liner made of non-woven geotextile filter fabric and crushed stone. If the straw bale basin will be used as a construction period dewatering control device,construction site water will be pumped into the basin and allowed to drain through the fabric onto relatively flat, stabilized surfaces. Dewatering Filter Bag The dewatering filter bag consists of a non-woven geotextile filter fabric placed at the outlet of one(maximum diameter)six-inch discharge hose. If the dewatering filter bag will be used as a construction period dewatering control device,any bags will be placed on relatively flat terrain,free of brush and stumps. If rough ground conditions make punctures likely,a geotextile fabric 46 Erosion and Sedimentation Controls and Dewatering Practices Stormwater Pollution Prevention Plan(SWPPP)Manual will be placed beneath the filter bag. Unattended filter bags will be encircled with a straw bale and silt fence barrier. Inspection and Maintenance Requirements All dewatering structures will be placed as far away from wetland resources as practicable. Filter bags used during construction will be bundled and removed for proper disposal. Filter media shall be cleaned and replaced in all dewatering devices when the pressure differential equals or exceeds the manufacturer's specifications. 4.14 Other Stormwater Controls 4.14.1 General Insert general description of the problem this control is designed to address. 4.14.2 Specific Stormwater Control Practices Table 43 Specific Stormwater Control Practices Description: Insert Name of other stormwater controls to be installed Installation 12.4.2024 Maintenance Requirements Insert maintenance requirements for the stormwater control Design Specifications If applicable,include copies of design specifications here (Repeat as needed) 4915 Site Stabilization Refer to Parts 2.2.14 and 7.2.6.b.vii of the 2022 CGP for information on the requirements for site stabilization. The CGP requires the operator to immediately initiate stabilization when work in an area of the site has permanently or temporarily stopped,and to complete certain stabilization activities within prescribed deadlines. Construction projects disturbing more than 5 acres at any one time have a different deadline than disturbing 5 acres or less at any one time.See CGP Part 2.2.14.a.Construction projects in arid,semi-arid,and drought stricken areas during the seasonally dry period and projects discharging to asediment-or nutrient-impaired water or a Tier 2,2.5.or 3 have different stabilization deadlines.See CGP Part 2.2.14.b.SWPPP must include the following: > Describe specific vegetative and/or non-vegetative practices that will be used to stabilize exposed soils where construction activities have temporarily or permanently ceased.Avoid using impervious surfaces for stabilization whenever possible. > The stabilization deadline(s)that will be met in accordance with Parts 2.2.14.a and 2.2.14.b > Once construction begins,consider using the Grading/Stabilization Activities log in Appendix H of the Template to document compliance with the stabilization requirements of CGP Part 2.2.14. 47 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Total Amount of Land Disturbance Occurring at Any One Time ❑x Five Acres or less ❑ More than Five Acres The General Contractor c iv i s associated with sitestabilization mlogs- Insert site stabilizationi El Vegetative Non-vegetative TemporaryEl r > Insert descriptionstabilization r c is installed > Note how designi it is of Part 2.2.14.b.iii. Installation: Insert approximateinstallation .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Completion: (Must be completed as soon as practicable, t seven calendar days after stabilization s been initiated) Insert approximate completion date .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Maintenance Requirements: s c requirements stabilizationpractice P Design Specifications: Include copies of design specifications here. s needed for additionalstabilization praci s 4.15.1 General Site Stabilization Controls The contractor will implement and maintain stabilization measures that minimize erosion from exposed portions of the site in accordance with Parts 2.2.14a and 2.2.14b of the 2022 CGP. > Timeline:Initiate stabilization measures immediately in any areas of exposed soil where construction activities have ceased and will not resume for 14 or more calendar days.The EPA may propose an accelerated schedule if site conditions warrant additional protection measures.Some exceptions for unforeseen circumstances apply, refer to Parts 2.2.14(a)(iii)of the 2022 CGP. Document any departures from the standard timeline in the construction activities log. > Timeline:for discharges to sediment-or nutrient-impaired waters or to a water that is identified by Massachusetts or the EPA as a Tier 2,Tier 2.5,or Tier 3 water,complete stabilization as soon as practicable but no later than 7 calendar days after stabilization has been initiated. Site stabilization practices may be temporary or permanent,vegetative or non-vegetative. Table 44 Recording Requirements:Site Stabilization Controls Action Recorded in Installation Construction Activities Log Grading and Stabilization Log 48 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Inspection Inspection Log Maintenance Corrective Action Log Removal Construction Activities Log Grading and Stabilization Log ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 4.15.2 Specific Site Stabilization Controls This section of the SWPPP describes site stabilization practices that the contractor may use during the course of the work. f the General Contractors to usecontrols that arei is SWPPP manual,the contractor will preparesci control installation,inspection, maintenance,and removal c r s and record the appropriates. 4.15.2.1 Vegetative Stabilization Temporary, rapid vegetative stabilization will be completed using annual grasses,such as annual rye. Permanent stabilization will be completed with the planting of perennial grasses or legumes. Permanent vegetative stabilization will provide uniform perennial cover with a density of 70 percent or more of the natural background cover. The Contractor will provide a suitable topsoil,good seedbed preparation,soil amendments,and water for effective establishment of these vegetative stabilization methods.Vegetation may be applied via hydro seeding or sodding techniques. Mulch may also be applied following permanent seeding activities to protect soil from the impact of falling rain and to increase the capacity of the soil to absorb water. 4.15.2.2 Non-vegetative Stabilization Non-vegetative stabilization practices may consist of the application of mulch or erosion control blankets. Mulch Application If application of mulch is necessary,mulch will be applied at a rate of 90 pounds per 1,000 square feet.The mulch will be anchored with a tacking coat(non-tar)applied by a hydro seeder.Steeper slopes(greater than 10 percent) will be covered with a bonded fiber matrix. Erosion Control Blanket Erosion control blankets may consist of bio-degradable or non-biodegradable materials. Biodegradable materials are preferred. The Contractor may use mulch material encased in plastic netting,mats of woven jute fiber,and/or turf non-woven reinforcement matting(typically used within erodible channels). Erosion control blankets may be combined with vegetative controls. For permanent stabilization applications, erosion control blankets shall consist of a non-woven bio-degradable material and shall be installed by anchoring the top of the blanket in a 6-inch-deep trench.The trench shall be 49 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ backfilled and compacted after the blanket is secured with staples. Edges of the blankets must be stapled with approximately 4 inches overlap where two or more strip widths are required. Organic or synthetic materials applied to the soil surface as a continuous sheet.Used to protect disturbed areas from erosion and to enhance seed growth,typically where moving water is likely to wash out new vegetative plantings and mulches are ineffective. Inspection and Maintenance Requirements Inspection and maintenance activities for site stabilization will include: Table 45 Maintenance Requirements:Site Stabilization Inspection Item Condition _ Maintenance Activity Surface Erosion Reinforce the surface using a vegetative or non-vegetative stabilization measure SWPPP Maintain the SWPPP throughout the construction period in accordance with the terms of the 2022 CGP. 50 Erosion and Sedimentation Controls and Dewatering Practices ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 11b,; Pollut*ion Controls 5.1 Potential Sources of Pollution The following list identifies pollutant generating activities that are likely to occur on the project site in accordance with Parts 2.3.2 and 7.2.3..g of the 2022 CGP. Table 46 Pollutant Generating Activities and Pollutants Located on Site Location on Site (or reference SWPPP Pollutants or Pollutant Constituents(that could be discharged if site map where this is Pollutant-generating Activity exposed to stormwater) shown) Paving Operations Concrete constituents CMMP Painting Paint Vehicle/Building Cleaning Cleaning solvents,detergents Landscape Plantings Fertilizer Vehicle Maintenance Petroleum-based products Cleared &Graded Areas Soil erosion,fertilizer Portable Toilets Sewage Fuel Tanks Fuel oil,gasoline,other fuels Storage Areas Soil erosion,fuel oil,gasoline,asphalt,concrete,vehicle fluids, paints, solvents, pesticides,fertilizer 5.2 Fuelingand Maintenance of Equipment or Vehicles When fueling or maintaining equipment or vehicles,the contractor will adhere to the following requirements specified in Parts 2.3.1 and 7.2.6 of the 2022 CGP: > Provide an effective means of eliminating the discharge of spilled or leaked chemicals, including fuels and oils,from these activities. > If applicable,comply with the Spill Prevention Control and Countermeasures(SPCA requirements in 40 CFR 112 and Section 311 of the CWA; 51 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ > Ensure adequate supplies are available at all times to handle spills, leaks,and disposal of used liquids; > Use drip pans and absorbents under or around leaky vehicles; > Dispose of or recycle oil and oily wastes in accordance with other federal,state,tribal,or local requirements; > Clean up spills or contaminated surfaces immediately,using dry clean up measures where possible,and eliminate the source of the spill to prevent a discharge or a furtherance of an ongoing discharge. Do not clean surfaces by hosing the area down. Describe procedures to be usedv s s,spills, s s.The following must minimum:be implemented at a > Procedures for expeditiouslystopping,containing,and cleaning up spills, leaks,and other releases. Identify the name or title of the employee s) responsible for detections or spills,and > Procedures for notification of appropriate facility personnel,emergency response agencies,and regulatory agencies where a leak,s ,or otherr containing hazardous s s c r oili or in excess of a reportable quantitysit rt 2.3.6 and established r 40 CFR part 302,occurs duringr period.Contact information must locations that are readily accessiblev to all employees. Insert s r v response 5.3 WashingEquipmentof and Vehicles When washing equipment and/or vehicles,the contractor will adhere to the following requirements specified in Parts 2.3.2 and 7.2.6 of the 2022 CGP. > Provide an effective means of minimizing the discharge of pollutants from equipment and vehicle washing, wheel wash water,and other types of washing. > Ensure that there is no discharge of soaps,solvents, or detergents in equipment and vehicle wash water. > For storage of soaps,detergents,or solvents,the contractor must provide either cover(e.g., plastic sheeting or temporary roofs)to prevent these detergents from coming into contact with rainwater,or a similarly effective means designed to prevent the discharge of pollutants from these areas. Effective controls may include, but are not restricted to, locating activities away from surface waters and stormwater inlets or conveyances and directing wash waters to a sediment basin or sediments trap, using filtration devices,such as filter bags or sand filters,or using other similarly effective controls. Refer to Part 2.3.4 of the 2022 CGP for additional requirements for handling wash water associated with concrete, paint,or stucco. 2022 CGP SWPPP Template Instructions note: Describe how operator will prevent the discharge of soaps,detergents,or solvents and provide storage by either(1)cover(examples: plastic sheeting or temporary roofs)to prevent these 52 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ detergents from coming into contact with rainwater, or(2)a similarly effective means designed to minimize the discharge of pollutants from these areas. Specific Pollution Prevention Practices Table 46 Washing Equipment and Vehicles Pollution Prevention Practices Description:_ Descriptioni Installation: Insert approximateimplementation Maintenance Requirements: s c requirements r v practice Design Specifications: is s of designci is ti s 5.4 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes When storing, handling,and disposing of construction products, materials,and wastes,the contractor will adhere to the following good-housekeeping practices specified in part 2.3.3 of the 2022 CGP. > An effort will be made to store only enough product required to do the job; > All materials stored on-site will be stored in a neat,orderly manner in their appropriate containers,and (if possible) under a roof or other enclosure; > Products will be kept in their original containers with the original manufacturer's label; > Substances will not be mixed with one another unless recommended by the manufacturer; > Whenever possible,all of a product will be used before disposing of the container; > Manufacturer's recommendations for proper use and disposal will be followed;and > The site superintendent will inspect the storage area daily to ensure proper use and disposal of materials on-site. The following practices will reduce the risks associated with hazardous materials(e.g., petroleum products, solvents): > A copy of all Material Safety Data Sheets(MSDS)for materials or products used during construction will be kept in the office trailer; > Products will be kept in original containers unless they are not re-sealable; > Original labels and material safety data (MSD sheets)will be retained;they contain important product information;and > If surplus product must be disposed, manufacturer's or local-and state-recommended methods for proper disposal will be followed. > Specific Pollution Prevention Practices 53 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ General Pollution Prevention Practices Descri ion, Descri i ............ ........... irn p emented ............... Installation- s iimplementation Maintenance Requirements Insert maintenancerequirements for the pollution preventionpractice Design Specifications If applicable,include copies of designspecifications needed)(Repeat as 5.4.1 Building Products In accordance with CGP Parts 2.3.3.b and 7.2.6,all containers will be tightly sealed and covered with plastic sheeting or a temporary roof when not required for use.Excess materials will be properly disposed according to manufacturer's instructions or state and local regulations and shall not be discharged to the storm sewer system.No storage will occur within 100 feet of a wetland or waterway. If applicable, listspecific r vention practices. Description:Specific Pollution Prevention Practices Table 47 Building Products Pollution Prevention Practices Installation- x implementation Maintenance Reit s® Insert maintenance requirements for the pollution preventionpractice Designis i sm If applicable, include si specifications s 5.4.2 Pesticides, Herbicides, Insecticides Pesticides, herbicides,and insecticides will not be used at the Project Site. If used, must comply with CGP Part 2.3.3.b If applicable, listis pollution preventionpractices Specific Pollution Prevention Practices Table 48 ® Herbicides, Insecticides Pollution Prevention Practices Description: practice Installation r xiimplementation Maintenanceitements Insert maintenance requirements the pollutionprevention r is Design Specifications is , include copies of design specifications (Repeat as needed) 54 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 5.4.3 Diesel Fuel, Oil, Hydraulic Fluids, Other Petroleum Products, and Other Chemicals In accordance with CGP Part 2.3.3.c products stored on site will be contained in water-tight containers with either > a cover to minimize the exposure of the container to precipitation and to stormwater or > or a similarly effective means detained to minimize the discharge of pollutants from these areas such as secondary containment All on-site vehicles will be monitored for leaks and will receive regular preventive maintenance to reduce the chance of leakage.Spills will be cleaned up immediately,using dry clean-up methods where possible.The source of the spill will be eliminated to prevent continuation of an on-going discharge. No vehicle maintenance or handling of petroleum products will occur within 100 feet of a wetland or waterway. Any asphalt substances used on-site will be applied according to manufacturer's recommendations. No petroleum-based or asphalt substances will be stored within 100 feet of a wetland or waterway. If applicable, listSpecific pollution preventionis Specific Pollution Prevention Practices Table 49 Diesel Fuel,and Other Chemicals Pollution Prevention Practices Description: Insert Description of practice to be implemented Installation sert approximate date of implementation Maintenance Requirements Insert maintenanceit ion prevention practice Designc is ions If applicable, include copies of design specifications (Repeat as needed) 5.4.4 Hazardous or Toxic Waste In accordance with CGP Part 2.3.3.d,the contractor will: > Separate hazardous or toxic waste from construction and domestic waste; > Store waste in sealed containers,which are constructed of suitable materials to prevent leakage and corrosion,and which are labeled in accordance with applicable Resource Conservation and Recovery Act (RCRA) requirements and all other applicable federal,state,tribal,or local requirements; > Store all containers that will be stored outside within appropriately sized secondary containment(e.g.,spill berms,decks,spill containment pallets)to prevent spills from being discharged,or provide a similarly effective means designed to prevent the discharge of pollutants from these areas(e.g.,storing chemicals in covered area or having a spill kit available on site);and 55 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ > Clean up spills immediately, using dry clean-up methods where possible, and dispose of used materials properly. > Hosing will not be utilized as a method to clean surfaces or spills. > Eliminate the source of the spill to prevent a discharge or a furtherance of an ongoing discharge. All hazardous waste materials(e.g., petroleum products,solvents)will be disposed in the manner specified by local and state regulation,or by the manufacturer.Site personnel will be instructed in these practices,and the site construction supervisor will be responsible for seeing that these procedures are followed. If applicable, listspecific pollution preventionpractices Specific Pollution Prevention Practices InsertTable 50 Hazardous or Toxic Waste Pollution Prevention Practices Description: Insert Description of practice to be implemented Installation r iimplementation Maintenance Requirements c requirements for the pollutionv is Design Specifications C , include copies of design specifications needed)(Repeat as 5.4.5 Construction and Domestic Waste In accordance with CGP Part 2.3.3.e,the contractor will provide waste containers(e.g.,dumpster or trash receptacle)of sufficient size and number to contain construction and domestic wastes.Waste containers will be covered to prevent precipitation from entering the container and becoming a source of pollution.Alternatively, the waste container will be kept in secondary containment to prevent discharges of contaminated stormwater. Daily loose trash removal will prevent litter,construction debris,and construction chemicals exposed to stormwater from becoming a pollutant source for stormwater discharges.All loose trash will be placed in appropriate storage containers and will be disposed of properly. The General Contractor identify the areass storing s , compactors or other raw or wastethe Site . If applicable, listspecific tion prevention practices Specific Pollution Prevention Practices Table 51 Pollution Prevention Practices Description: Insert Description of practice to be implemented Installation r iimplementation Maintenanceit s Insert maintenancerequirements for the pollutionv c is 56 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Designis i s If applicable, include copies of designspecifications s 5.4.6 Large Structures Built or Renovated prior to January 1980 In accordance with CGP Part 2.3.3.f,the contractor will implement controls to minimize the exposure of PCB- containing building materials including paint,caulk,and pre-1980s fluorescent light fixtures to precipitation and stormwater and ensure that disposal of such materials is performed in compliance with applicable state,federal and local laws. 5.4.7 Sanitary Waste Portable toilets will be placed away from waters of the U.S.,stormwater inlets and/or conveyances and will be secured in place so that they will tip or be knocked over.All sanitary waste will be collected from the portable units by a licensed contractor as required,and disposed in compliance with state and local regulations. If applicable, listis pollution preventionc is s Specific Pollution Prevention Practices Table 52 Pollution Prevention Practices Description: Description Installations approximate ti Maintenance Requirements s requirements for the pollutionprevention is Design Specifications is , include copies of design specifications needed)(Repeat as 5.5 WashingApplicatorsof and Containers used for Stucco, Paint, Concrete or Other Materials In compliance with the prohibition in CGP Parts 2.3.4,the contractor must provide an effective means of eliminating the discharge of water from the washout and cleanout of stucco, paint,concrete,form release oils, curing compounds,and other construction materials.To comply with this requirement,the contractor must: > Direct all wash water into a leak-proof container or leak-proof pit.The container or pit must be designed so that no overflows can occur due to inadequate sizing or precipitation; > Handle washout or cleanout wastes as follows: Do not dump liquid wastes in storm sewers; Dispose of liquid wastes in accordance with applicable requirements in Part 2.3.3;and Remove and dispose of hardened concrete waste consistent with handling of other construction wastes in Part 2.3.3. 57 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ > Locate any washout or cleanout activities as far away as possible from surface waters and stormwater inlets or conveyances,and,to the extent practicable, designate areas to be used for these activities and conduct such activities only in these areas. > If applicable, list Specific pollution prevention practices > Specific Pollution Prevention Practices If applicable, list Specific pollution preventionc is s Specific Pollution Prevention Practices Table 53 Stucco, Paint,Concrete,and Other Materials Pollution Prevention Practices Description: Insert Description of practice to be implemented Installation sert approximate date of implementation Maintenance Requirements Insert maintenanceit i prevention is Designc is ions If applicable, include copies of design specifications here (Repeat as needed) 58 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 5.6 Fertilizers Only slow-release organic fertilizers will be used in landscaped areas.This protocol will limit the amount of potential nutrients that could enter the stormwater and wetland systems. Fertilizer use will be reduced once the vegetated stabilization measures are established. As included in CGP Part 2.3.5,the Contractor will adhere to the following requirements when applying fertilizer products: > Apply at a rate and in amounts consistent with manufacturer's specifications,or document departures from the manufacturer specifications where appropriate in Part 7.2.7.i of the CGP; > Apply at the appropriate time of year for the project location,and preferably timed to coincide as closely as possible to the period of maximum vegetation uptake and growth; > Avoid applying before heavy rains that could cause excess nutrients to be discharged; > Never apply to frozen ground; > Never apply to stormwater conveyance channels with flowing water;and > Follow all other federal, state,tribal,and local requirements regarding fertilizer application. > If applicable, list Specific pollution prevention practices > Specific Pollution Prevention Practices If applicable, listSpecific pollution preventionc is s Specific Pollution Prevention Practices Table 54 Fertilizers Pollution Prevention Practices Description: practice Installation xiimplementation Maintenance Requirements ce requirements for the pollutionv c is SpecificationsDesign is , include copies of design specifications (Repeat as needed) 5.7 Pavement Sweeping Pavement sweeping may be performed daily or as needed,when track-out has occurred.The sweeping program will remove sediments and contaminants directly from paved surfaces before their release into stormwater runoff. Pavement sweeping has been demonstrated to be an effective initial treatment for reducing pollutant loading into stormwater. 5.8 Other Pollution Prevention Practices 2022 CGP SWPPP Template Instructions: Describeit prevention is fit into the abovecategories. 59 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ If applicable, listSpecific pollution preventionpractices Specific Pollution Prevention Practices Table 55 Other Pollution Prevention Practices Description: Insert Description of practice to be implemented InsertInstallation r iimplementation Maintenance Requirements Insert maintenance requirements for the pollutionprevention practice Designc is applicable, include copies of designspecifications s ) 5.9 S ill Prevention and ResponseP The following practices will be followed for spill control, notification,and cleanup: The General Contractor is responsible for the daily operations and is also responsible for coordinating spill prevention and cleanup coordination.The General Contractor will designate at least three other site personnel to receive spill prevention and cleanup training.These individuals will each become responsible for a particular phase of prevention and cleanup.The names of the responsible spill personnel will be posted in the material storage area and in the on- site office trailer. > Spills of toxic or hazardous material in excess of reportable quantities,as established in the under 40 CFR 110,40 CFR 117,or 40 CFR 302,will be reported to the following agencies as soon as the General Contractor has knowledge of the release: Massachusetts Department of Environmental Protection Division of (617)292-5851 or Hazardous Waste (978)661-7679 National Response Center (800)424-8802 > All spills will be cleaned up immediately after discovery; > The spill area will be kept well ventilated and personnel will wear protective clothing to prevent injury from contact with a hazardous substance;and > Manufacturer's recommended methods for spill cleanup will be clearly posted and site personnel will be informed of the procedures and the location of the information and cleanup supplies; > Materials and equipment necessary for spill cleanup will be kept in the material storage area on-site. Equipment and materials will include, but will not be limited to the emergency response equipment listed herein; A comprehensive Spill Prevention Control and Countermeasure(SPCC)plan will be developed and implemented by the General Contractor and other Operators.At a minimum the SPCC,will discuss: > Spill prevention equipment; > Spill prevention supplies provided on-site;and > Spill prevention training to be provided by the Owner and/or Tenant to designated employees. 60 Pollution Prevention Controls ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 5.9.1 Initial Notification In the event of a spill the notify the 24-hour Emergency Contact(Section 1.2) immediately. The 24-hour Emergency Contact or their chosen delegate will immediately notify emergency response services and notify the local boards and commissions at the first possible opportunity: > Fire Department(immediately) > the Police Department, (immediately) > the Board of Health (at first opportunity) > and the Conservation Commission(at first opportunity) 5.9.2 Further Notification Based on the assessment from the Fire Chief,additional notification to a cleanup contractor may be made.The Massachusetts Department of Environmental Protection(DEP)and the EPA may be notified depending upon the nature and severity of the spill.The Fire Chief will be responsible for determining the level of cleanup and notification required.The attached list of emergency phone numbers shall be posted in the main construction/facility office and readily accessible to all employees.A hazardous waste spill report shall be completed as necessary using the attached form. 5.9.3 Assessment - Initial Containment The supervisor or manager will assess the incident and initiate containment control measures with the appropriate spill containment equipment included in the spill kit kept on-site.A list of recommended spill equipment to be kept on site is included on the following pages. 5.9.4 Reporting A copy of the Spill Report Template is included in Appendix P 61 Pollution Prevention Controls Storm aver Poh-tion Prevention Phan(S u::1R,,,1)Manua ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Table 56 Emergency Notification Phone Numbers 1A Facility Manager Merrimack College T(P): (978)895-3252 John Waters 1 B Alternate Contact Brandon Gemmiti T(P): (603)518-2212 2 Fire and Police 911 3 Cleanup Contractor Mike Brown T: 978-774-8782 4 MassDEP T(P): (800)340-1133 5A National Response Center T: (800)424-8802 5B USEPA T(E): (800)424-8802 T(B): (800)424-8802 6 North Andover Board of Health T(B): (978)688-9540 7 Andover Conservation Commission T(B): (978)623-8630 (P)=Primary,(S)=Secondary,(T)=Tertiary,(E)=Emergency,(B)=Business Post this list of emergency contact numbers in the main construction/facility office in a location that is readily accessible to all employees. Emergency Response Equipment The following is an example of an equipment and materials list that must be prepared by the Owner and Tenant. Equipment and Supplies on this list shall be maintained at all times and stored in a secure area for long-term emergency response need. Table 57 Emergency Response Equipment supply Quantit Supplier Sorbent Pillows(Pigs) 2 http://www.newpig.com Sorbent Boom/Sock 25 feet Item#KIT276 —mobile container with two pigs,26 feet of sock Sorbent Pads 50 50 pads,and five pounds of absorbent(or equivalent) Lite-Dri s Absorbent 5 pounds http://www.forestry-suppliers.com Shovel 1 Item#33934—Shovel (or equivalent) Pry Bar 1 Item#43210—Manhole cover pick(or equivalent) Goggles 1 pair Item#23334—Goggles(or equivalent) Heavy Gloves 1 pair Item#90926—Gloves(or equivalent) 62 Pollution Prevention Controls Stormwater Pollution Prevention Plan(SWPPP)Manual 11b,a Inspections, Maintenance and Corrective Actions Section 42 and Section 4.3 of the 2022 CGP specify minimum inspection frequencies.Section 4.2 specifies the minimum inspection frequency for a typical site.Section 4.3 specifies the minimum inspection frequency for locations on the site that discharge to sensitive waters.Sensitive waters are defined as sediment or nutrient- impaired waters or waters that are identified by the State,tribe or EPA as Tier 2,Tier 2.5,or Tier 3. Table 58 Project Inspection Schedule Does the project area discharge to sensitive waters? Inspection Frequency. ❑ Yes ❑ Once every 7 calendar days AND Within 24 hours of a storm event producing 0.25 inches of rain or greater within 24 hours OR a discharge caused by snow melt from a storm event that produces 3.25 inches or more of snow. 0 No Choose one option below: ❑ Once every 7 calendar days 0 Once every 14 calendar days AND Within 24 hours of a storm event producing 0.25 inches of rain or greater within 24 hours OR a discharge caused by snow melt from a storm event that produces 3.25 inches or more of snow. 63 Inspections, Maintenance and Corrective Actions ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ To determine if a storm event of 0.25 inch or greater has occurred on the site,data will be obtained from the weather station at Lawrence Municipal Airport(KLWM) ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ For any day of rainfall during norm al business hours that measures 0.25 inches or greater,the date and rainfall amount must be recorded in the Construction Activities Log (See Appendices H and M). The Site Inspection Log and Inspection Forms are maintained in Appendix D. Record daily rainfall that exceeds 0.25 inches in the Construction Activities Log (See Appendix M). 6.1 Reductions in Ins ection Frequencyp Inspection frequency may be reduced to once per month if: > The stabilization of the contributing area was completed more than one month prior and the stabilization activities are documented in the Construction Activities and the Grading and Stabilization Logs. > The project is experiencing frozen soil conditions. Exceptions may also be made for drought-stricken areas, refer to Part 4.4.2 for additional information. 6.1.1 Suspension of Construction Activities due to Frozen Conditions If the project will suspend construction activities due to frozen conditions,the project may temporarily suspend inspections on the site until thawing conditions begin to occur if: > Runoff is unlikely due to continuous frozen conditions that are likely to continue at the site for at least 3 months based on historic seasonal averages. If unexpected weather conditions(such as above freezing temperatures or rain on snow events) make discharges likely,the contractor must immediately resume regular inspection frequency as described in Parts 4.2 or 4.3,if applicable; > Land disturbances have been suspended;and > All disturbed areas of the site have been temporarily or permanently stabilized in accordance with Part 2.2.14.a of the CG P. 6.1.2 Continuation of Construction Activities Despite Frozen Conditions If the project will continue construction activities despite frozen conditions,the project may temporarily reduce inspections to once per month until thawing conditions begin to occur if: > Runoff is unlikely due to continuous frozen conditions that are likely to continue at the site for at least 3 months based on historic seasonal averages. If unexpected weather conditions(such as above freezing temperatures or rain on snow events) make discharges likely,the contractor must immediately resume regular inspection frequency as described in Parts 4.2 or 4.3,if applicable; > Land disturbances have been suspended;and > All disturbed areas of the site have been temporarily or permanently stabilized in accordance with Part 2.2.14.a of the CG P. Record changes in the inspection frequency in the Grading and Stabilization Log (Appendix G). 64 Inspections, Maintenance and Corrective Actions ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 6.2 Areas that must be inspected During each inspection,CGP Section 4.5 requires that areas to be inspected include: > Areas cleared,graded or excavated that have not yet completed stabilization per Part 2.2.1 a; > All stormwater controls, including pollution prevention controls, installed at the site to comply with the CGP Permit; > Material,waste, borrow,and equipment storage and maintenance areas that are covered by CGP Permit; > All areas where stormwater typically flows within the site, including constructed or natural site drainage features,designated to divert,convey and/or treat stormwater; > All areas where construction dewatering takes place, including controls to treat the dewatering discharge and any channelized flow of water to and from those controls; > All points of discharge from the site;and > All locations where stabilization measures have been implemented. 6.3 Requirements for Inspections During each inspection,CGP Section 4.6 requires the site inspection at a minimum must: > Check whether stormwater controls are properly installed,appear to be operational,and are working as intended to minimize pollutant discharges; > Check for the presence of conditions that could lead to spills, leaks or other accumulations of pollutants on the site; > Identify any locations where new or modified stormwater controls are necessary to meet the requirements of CGP parts 2 and/or 3; > Check for signs of visible erosion and sedimentation that have occurred and are attributable to discharge points from the project,and if applicable,on the banks of any receiving waters flowing within or immediately adjacent to the site; > Check for signs of sediment deposition visible from the site and attributable to discharge from the site, including unvegetated sand bars or buildup of sediment deposits on nearby streets,curbs,or open conveyance channels. > Identify any discharge points where sediment discharge is occurring during the inspection; > Observe and document the visual quality of discharge, noting characteristics of the stormwater discharge, including color,odor,floating,settled,or suspended solids,foam,oil sheen,and other indicators of stormwater pollutants. Dewatering Inspections undertaken in accord with Parts 4.3.2, reports must be completed within 24 hours of completing the inspections and include: > Inspection date; > Names and titles of personnel making the inspection; > Approximate times that the dewatering discharge began and ended on the day of the inspection; > Estimates of the rate(in gallons per day)of discharge on the day of inspection; > Whether or not any of the following indicators of pollutant discharge were observed at the point of discharge to any receiving water flow through or immediately adjacent to the site and/or constructed or natural site drainage features or storm drain inlets: A sediment plume,suspended solids,unusual color, presence of odor,decreased clarity or presence of foam;and A visible sheen on the water surface or visible oily deposits on the bottom of the shoreline; 65 Inspections, Maintenance and Corrective Actions ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ > Photographs of the dewatering water prior to treatment by a dewatering control,at the final discharge after treatment,and at the point of discharge to any receiving waters flowing through or immediately adjacent to the site or immediately adjacent to the site and/or constructed or natural site drainage features or storm drain inlets,and other conveyances to receiving waters. After the inspection,Operator must: > complete any necessary maintenance, repairs or replacements as required under Part 2.1.4 and/or Part 5, whichever applies;and > Update SWPPP site map in accordance with Part 7.4.1 to reflect changes to stormwater controls that are no longer accurately reflected on the current site plan.See Section 4.4 that follows. 6.4 DewateringInspection Schedule In compliance with CGP Part 4.3.2, Project Operators must conduct an inspection in accordance with Part 4.6.3 during the discharge once per day on which discharge from dewatering activities occurs. See Section 7, Turbidity Monitoring. 6.5 Corrective Action Directives Project Operators must take corrective action to address any of the following conditions if they appear at the project site: > A stormwater control needs a significant repair or a new or replacement > If it is necessary to repeatedly(Le.three(3)times or more times)conduct the same routine maintenance fix to the same control at the same location, unless it is documented that this action can still be addressed as a routine maintenance under Part 2.1.4 > A stormwater control necessary to comply with the permit was not installed,or was installed incorrectly > A discharge from the project site is causing an exceedance of water quality standards to receiving waters > A prohibited discharge has occurred (refer to Part 1.3 of the 2022 CGP) > During the discharge from site dewatering: The weekly average of your turbidity monitoring result exceeds the 50 NTU benchmark(or alternate benchmark if approved by EPA);or Observations or information provided by EPA, State or local authorities of the presence of conditions specified in Part 4.6.3e. 66 Inspections, Maintenance and Corrective Actions ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 6.5.1 Corrective Action Timelines For any required corrective action (refer to part 5.1 of the 2022 CGP), project operators must: > Immediately take all reasonable steps to address the condition,including cleaning up any contaminated surfaces so that the material will not discharge in subsequent storm events;and > When the problem does not require a new or replacement control or significant repair,the corrective action must be completed by the close of the next business day;or > When the problem requires a new or replacement control,or significant repair, install the new or modified control by no later than 7 calendar days from the time of discovery;or > If it is not possible to complete the action within 7 days, record the extenuating circumstances in detail on a Corrective Action Form (Appendix M). 6.5.2 Corrective Action Reports For each corrective action taken,complete a corrective action report in accordance with the following (refer to Part 5.4 of the 2022 CG P): > Within 24 hours of identifying the condition requiring corrective action, document the condition and the date/time it was identified. > Within 24 hours of completing the corrective action, document the action taken and note whether any modifications to the SWPPP are required. The Corrective Action Log and Corrective ction Report Forms are maintained in Appendix E. 6.6 Amendments This SWPPP must be amended and the amendments must be recorded in the amendment log if any of the following conditions apply: > Whenever new operators become active in construction activities on your site,or you make changes to your construction plans, stormwater controls,or other activities at your site that are no longer accurately reflected in your SWPPP.This includes changes made in response to corrective actions triggered under Part 5.You do not need to modify your SWPPP if the estimated dates in Part 7.2.3.f change during the course of construction; > To reflect areas on your site map where operational control has been transferred (and the date of transfer) since initiating permit coverage; > If inspections or investigations by EPA or its authorized representatives determine that SWPPP modifications are necessary for compliance with this permit; > Where EPA determines it is necessary to impose additional requirements on your discharge,the following must be included in your SWPPP: > A copy of any correspondence describing such requirements;and > A description of the controls that will be used to meet such requirements. > To reflect any revisions to applicable federal,state,tribal,or local requirements that affect the stormwater controls implemented at the site;and > If applicable, if a change in chemical treatment systems or chemically enhanced stormwater control is made, including use of a different treatment chemical,different dosage rate,or different area of application. The Amendment Log is maintained in Appendix F. 67 Inspections, Maintenance and Corrective Actions ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ This page intentionally left blank. 68 Inspections, Maintenance and Corrective Actions Stormwater Pollution Prevention Plan(SWPPP)Manual 11b,a Turbidity Benchmark Monitoring for Dewater*ing Discharges Procedures: Instructions(see CGP Part 3.3 and 7.2.8): > If you are required to comply with the Part 3.3 turbidity benchmark monitoring requirements,describe the procedures you will follow to: • Collect and evaluate samples, • Report results to EPA and keep records of monitoring information,and • Take corrective action when necessary. > Include the specific type of turbidity meter you will use for monitoring,as well as any manuals or manufacturer instructions on how to operate and calibrate the meter. > Describe any coordinating arrangement you may have with any other permitted operators on the same site with respect to compliance with the turbidity monitoring requirements, including which parties are tasked with specific responsibilities. > If EPA has approved of an alternate turbidity benchmark pursuant to Part 3.3.2.b,include any data and other documentation you relied onto request use of the specific alternative benchmark. 69 Turbidity Benchmark Monitoring for Dewatering Discharges ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 7.1 General Requirements 7.1.1 Construction Dewatering Requirements Comply with the following requirements to minimize the discharge of pollutants from dewatering operations. "Dewatering" is defined as"the act of draining accumulated stormwater and/or ground water from building foundations,vaults,and trenches, or other similar points of accumulation." > Route dewatering water through a sediment control (e.g.,sediment trap or basin, pumped water filter bag) designed to prevent discharges with visual turbidity; For the purposes of this permit,visual turbidity is present where there is a sediment plume in the discharge or the discharge appears cloudy,or opaque,or has a visible contrast that can be identified by an observer. > Do not discharge visible floating solids or foam; > The discharge must not cause the formation of a visible sheen on the water surface,or visible oily deposits on the bottom or shoreline of the receiving water.Use an oil-water separator or suitable filtration device (such as a cartridge filter)designed to remove oil, grease,or other products if dewatering water is found to or expected to contain these materials; > To the extent feasible, use well-vegetated (e.g.,grassy or wooded),upland areas of the site to infiltrate dewatering water before discharge. You are prohibited from using receiving waters as part of the treatment area; > To prevent dewatering-related erosion and related sediment discharges: • Use stable,erosion-resistant surfaces(e.g.,well-vegetated grassy areas,clean filter stone,geotextile underlayment)to discharge from dewatering controls; • Do not place dewatering controls,such as pumped water filter bags,on steep slopes and at all points where dewatering water is discharged,comply with the velocity dissipation requirements of Part 2.2.11 2022 CG P. > For backwash water,either haul it away for disposal or return it to the beginning of the treatment process; > Replace and clean the filter media used in dewatering devices when the pressure differential equals or exceeds the manufacturer's specifications;and > Comply with dewatering-specific inspection requirements in Part 4 2022 CGP. 7.2 Procedures 7.2.1 Turbidity Monitoring 7.2.1.1 Water Quality-based Effluent Limitations General note: All references below refer to the 2022 Construction General Permit 70 Turbidity Benchmark Monitoring for Dewatering Discharges ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 7.2.1.2 General Effluent Limitation to Meet Applicable Water Quality Standards Discharges must be controlled as necessary to meet applicable water quality standards. Discharges must also comply with any additional State or Tribal requirements that are in Part 9. In the absence of information demonstrating otherwise, EPA expects that compliance with the conditions in this permit will result in stormwater discharges being controlled as necessary to meet applicable water quality standards. If at any time you become aware,or EPA determines,that discharges are not being controlled as necessary to meet applicable water quality standards,you must take corrective action as required in Parts 5.1 and 5.2,and document the corrective actions as required in Part 5.4. EPA may insist that you install additional controls(to meet the narrative water quality-based effluent limit above)on a site-specific basis,or require you to obtain coverage under an individual permit,if information in your N01 or from other sources indicates that your discharges are not controlled as necessary to meet applicable water quality standards.This includes situations where additional controls are necessary to comply with a waste load allocation in an EPA-established or approved TMDL. If during your coverage under a previous permit,you were required to install and maintain stormwater controls specifically to meet the assumptions and requirements of an EPA-approved or established TMDL(for any parameter)or to otherwise control your discharge to meet water quality standards,you must continue to implement such controls as part of your coverage under this permit. 7.2.1.3 Water Quality-based Conditions for Sites Discharging to Certain Impaired and High Quality Receiving Waters For any portion of the site that discharges to a sediment or nutrient-impaired water or to a water that is identified by your State,Tribe,or EPA as Tier 2,Tier 2.5,or Tier 3 for antidegradation purposes,and you must comply with the stabilization deadline specified in Part 2.2.14b.iii.,you must comply with the inspection frequency specified in Part 58. Refer to Appendix A for definitions of"impaired water"and"Tier 2,""Tier 2.5,"and "Tier 3"waters. For assistance in determining whether your site discharges to impaired waters, EPA has developed a tool that is available at httl oo s. For assistance in determining whether your site discharges to a Tier 2,2.5,or 3 water, refer to the list of such waters at.h.ttj tools and,....tt m at s. If you qualify for any of the reduced inspection frequencies in Part 4.4,you may conduct inspections in accordance with Part 4.4 for any portion of your site that discharges to a sensitive water. If you discharge to a water that is impaired for a parameter other than a sediment-related parameter or nutrients, EPA will inform you if any additional controls are necessary for your discharge to be controlled as necessary to meet water quality standards.These controls might include those necessary for your discharge to be consistent with the assumptions of any 71 Turbidity Benchmark Monitoring for Dewatering Discharges ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ available waste load allocation in any applicable TMDL. In addition, EPA may require you to apply for and obtain coverage under an individual NPDES permit. In addition,on a case-by-case basis, EPA may notify operators of new sites or operators of existing sites with increased discharges that additional analyses,stormwater controls,and/or other measures are necessary to comply with the applicable antidegradation requirements,or notify you that an individual permit application is necessary. If you discharge to a water that is impaired for polychlorinated biphenyls(PCBs)and are engaging in demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980,you must: > Implement controls to minimize the exposure of PCB-containing building materials, including paint,caulk, and pre-1980 fluorescent lighting fixtures,to precipitation and to stormwater;and > Ensure that disposal of such materials is performed in compliance with applicable State, Federal, and local laws. Examples of controls to minimize exposure of PCBs to precipitation and stormwater include separating work areas from non-work areas and selecting appropriate personal protective equipment and tools,constructing a containment area so that all dust or debris generated by the work remains within the protected area, and using tools that minimize dust and heat(<212°F). For additional information, refer to Part 2.3.3 of the CGP Fact Sheet. 7.2.1.4 Turbidity Benchmark Monitoring for Sites Discharging Dewatering Water to Protect the Water Quality of Sensitive Waters For sites discharging dewatering water to"sensitive waters"(i.e., receiving waters listed as impaired for sediment or a sediment-related parameter(as defined in Appendix A, 2022 CGP), or receiving waters designated as a Tier 2,Tier 2.5,or Tier 3 for antidegradation purposes)you are required to comply with the benchmark monitoring requirements in this Part and document the procedures you will use at your site in your SWPPP pursuant to Part 7.2.8.A summary of these requirements is included in Table 1. EPA notes that the benchmark threshold is not an effluent limitation, rather it is an indicator that the dewatering controls may not be working to protect water quality,which the operator must investigate and correct as appropriate.A benchmark exceedance is not a permit violation. However,if a benchmark exceedance triggers corrective action in Part 5.1.5a,failure to conduct any required action is a permit violation. Where there are multiple operators associated with the same site,the operators may coordinate with one another to carry out the monitoring requirements of this Part in order to avoid duplicating efforts.Such coordinating arrangements must be described in the SWPPP consistent with Part 7.2.8. Regardless of how the operators divide the responsibilities for monitoring and reporting,each operator remains responsible for compliance with these requirements. For instance, if Operator A relies on Operator B to meet the Part 3.3.1 turbidity monitoring requirements,the Part 3.3.4 reporting and recordkeeping requirements,and the Part 5.2.2 corrective action provisions when applicable,Operator A does not have to duplicate these same 72 Turbidity Benchmark Monitoring for Dewatering Discharges ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ functions if Operator B is implementing them for both operators to be in compliance with the permit. However, Operator A remains responsible for complying with these permit requirements if Operator B fails to take actions that were necessary for Operator A to comply with the permit.See also footnote 83. EPA notes that both Operator A and B are required to submit turbidity monitoring reports as required under Part 3.3.4, however, Operator A's report does not need to include the data collected by Operator B as long as Operator B submits the required data and Operator A's report indicates that it is relying on Operator B to report the data.See Part 3.3.4a. 7.2.1.5 Turbidity monitoring requirements Operators may find it useful to consult EPA's Monitoring and Inspection Guide for Construction Dewatering, available at https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates,which provides guidelines on how to correctly monitor for turbidity,determine if the weekly average exceeds the benchmark,and, if so, how to proceed with corrective action. Sampling frequency.You must collect at least one turbidity sample from your dewatering discharge each day a discharge occurs. Sampling location.Samples must be taken at all points where dewatering water is discharged.Samples must be taken after the dewatering water has been treated by installed treatment devices pursuant to Parts 2.4.1 and 2.4.3 and prior to its discharge off site into a receiving water,constructed or natural site drainage feature,or storm drain inlet. Representative samples.Samples taken must be representative of the dewatering discharge for any given day as required in Appendix G (standard permit conditions), Part G.10.2. Test methods.Samples must be measured using a turbidity meter that reports results in nephelometric turbidity units(NTUs)and conforms with a Part 136-approved method (e.g., methods 180.1 and 2130).You are required to use the meter,and conduct a calibration verification prior to each day's use,consistent with the manufacturer's instructions. 7.2.1.6 Turbidity benchmark The benchmark threshold for turbidity for this permit is 50 NTUs(referred to elsewhere in this permit as the "standard 50 NTU benchmark") unless EPA has authorized the use of an alternate benchmark in accordance with Part 3.3.2b. Request for alternate benchmark threshold At any time prior to or during your coverage under this permit,you may request that EPA approve a benchmark for your site that is higher than 50 NTUs if you have information demonstrating the higher number is the same as your receiving water's water quality standard for turbidity. Unless EPA approves an alternate benchmark,you will be required to use the standard 50 NTU benchmark.To request approval of an alternate benchmark,you must submit the following information to your applicable EPA Regional Office(see Appendix K): (a)The current turbidity water quality standard that applies to your receiving water and the source/citation. For instance, if your site is located in Washington, DC,and you are discharging to a Class B water,for which the water quality standard is that turbidity may not increase above ambient levels by 73 Turbidity Benchmark Monitoring for Dewatering Discharges ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ more than 20 percent,you would reference"Water Quality Standards for the District of Columbia,Chapter 11, Section 1104.8.If (b) If the applicable turbidity water quality standard requires information on natural or background turbidity levels(e.g., "no more than 10 NTU above natural turbidity levels")to determine the specific standard for the receiving water, include available data that can be used to establish the natural turbidity levels of your receiving water(including literature studies or Federal,State,Tribal,or local government data). Data must be representative of the natural turbidity levels of your specific receiving water. Identify the source(s)of all data provided, including if the data are from samples you collected of the receiving water. EPA will inform you of its decision on whether to approve the requested alternate benchmark within 30 days.EPA may approve your request,request additional time(e.g.,if additional information is needed to substantiate the data you provided),or deny your request.Unless and until EPA approves your request to use an alternate benchmark,you are required to use the standard benchmark of 50 NTUs and take any required corrective actions if an exceedance occurs. 7.2.1.7 Comparison of turbidity samples to benchmark Compare the weekly average of your turbidity monitoring results to the standard 50 NTU benchmark,or alternate benchmark if approved by EPA.A"weekly average"is defined as the sum of all of the turbidity samples taken during a "monitoring week"divided by the number of samples measured during that week.Average values should be calculated to the nearest whole number. If the weekly average of your turbidity monitoring results exceeds the standard benchmark(or your approved alternate benchmark),you are required to conduct follow-up corrective action in accordance with Part 5.2.2 and document any corrective action taken in your corrective action log in accordance with Part 5.4. For averaging purposes,a "monitoring week"starts with a Monday and ends on Sunday.Once a new monitoring week starts,you will need to calculate a new average for that week of turbidity monitoring results.64 A weekly average may consist of one or more turbidity monitoring results.64 For example, if turbidity samples from your dewatering discharge in week 1 result in values of 30 NTU on Tuesday,40 NTU on Wednesday,and 45 NTU on Thursday,your weekly average turbidity value would be 38.33 NTU ((30+40+45) 3 = 38 NTU).If in week 2,your turbidity samples resulted in values of 45 NTU on Monday, 30 NTU on Tuesday, 25 NTU on Wednesday,and 15 NTU on Thursday,you would calculate a new average for that week,which would yield an average turbidity value of 28.75 NTU ((45+30+25+15) = 4 = 29 NTU). By comparison, if your samples on consecutive days from Friday to Monday were 60 NTU,45 NTU,40 NTU,and 43 NTU, respectively, and there are no other dewatering discharges for the remainder of the week,you would calculate one weekly average for the Friday to Sunday to be 48 NTU ((60+45+40) = 3 = 48 NTU),and a separate weekly average for the one Monday to be 43 NTU (43 = 1 =43 NTU). Although you are not required to collect and analyze more than one turbidity sample per day from your dewatering discharge, if you do collect and analyze more than one sample on any given day,you must include any additional results in the calculation of your weekly average(i.e.,add all individual results for that monitoring week and divide by the total number of samples). For example, if during a monitoring week you take two turbidity samples on Tuesday with a value of 30 NTU and 35 NTU,three samples on Wednesday with a value of 40 NTU,45 NTU, and 48 74 Turbidity Benchmark Monitoring for Dewatering Discharges ormwa er P b-tion Prevention Phan( W::1R,,,1)I anuA ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ NTU,and one sample on Thursday with a value of 45 NTU,your weekly average turbidity value for this week would be 41 NTU ((30+35+40+45+48+45) = 6 =41 NTU). If you are conducting turbidity monitoring for more than one dewatering discharge point,you must calculate a weekly average turbidity value for each discharge point and compare each to the turbidity benchmark. 7.2.1.8 Reporting and recordkeeping You must submit reports of your weekly average turbidity data to EPA no later than 30 days following the end of each monitoring quarter. If there are monitoring weeks in which there was no dewatering discharge,or if there is a monitoring quarter with no dewatering discharge, indicate this in your turbidity monitoring report.If another operator associated with your same site is conducting turbidity monitoring on your behalf pursuant to Part 3.3, indicate this in your turbidity monitoring report. For the purposes of this permit,the following monitoring quarters and reporting deadlines apply: Table 59. Monitoring Quarters and Deadlines for Reporting Turbidity Benchmark Monitoring Data Reporting Deadline Monitoring (no later than 30 days after end of the Quarter# Months monitoring quarter) ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1 January 1—March 31 April 30 2 April 1 —June 30 July 30 3 July 1 —September 30 October 30 4 October 1 —December 31 January 30 7.2.2 Coordinating Arrangements for Turbidity Monitoring You must use EPA's NPDES eReporting Tool (NeT)to electronically submit your quarterly turbidity data, unless, consistent with Part 1.4.2,you received a waiver from your applicable EPA Regional Office. If the EPA Regional Office grants you approval to use a paper turbidity monitoring report form,and you elect to use it,you must complete the form in Appendix K. If EPA approves of your request to use an alternate turbidity benchmark pursuant to Part 3.3.2b, EPA will substitute the alternate benchmark in your NeT account For each day in which you are required to monitor,you must record the monitoring information required by Appendix G, Parts G.10.2 and G.10.3 and retain all such information for a period of at least three years from the date this permit expires or from the date your authorization is terminated. Table 60.Summary of Turbidity Benchmark Monitoring Requirements Applicability Sampling Requirement Turbidity Benchmark Corrective Action Reporting ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Sites discharging Collect at least one Compare the weekly If the weekly average of Report all weekly dewatering water to a turbidity sample per day, average of your turbidity turbidity monitoring average turbidity sediment-impaired water from each discharge monitoring results to the results exceeds the 50 monitoring results on a or to a water designated point,on any day there 50 NTU benchmark(or NTU turbidity quarterly basis via NeT- as a Tier 2,Tier 2.5,or is a dewatering alternate benchmark if benchmark(or alternate CGP(unless use of the Tier 3 for discharge. approved by EPA). benchmark if approved paper monitoring form antidegradation Use turbidity sampling by EPA),you are required in Appendix K is purposes. procedures specified in to take follow-up approved by EPA)no Part 3.3.1. corrective action in later than 30 days 75 Turbidity Benchmark Monitoring for Dewatering Discharges Stormwater Pbdo n Prevention H a n( W,,1 P u,,,1)ManuJ ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... accordance with following the end of Part 5.2.2. each monitoring quarter. 7.2.3 Alternate Turbidity Benchmark Reporting results and keeping Describe how you will report results to EPA and keep monitoring monitoring information records information records ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Taking corrective action when Describe how you will take corrective action when necessary. ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, necessary Type of turbidity meter Insert the type of turbidity meter. ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Turbidity meter manuals and manufacturer's instructions Insert a copy of any manual and manufacturer's instructions in Appendix N of this SWPPP 7.2.4 Coordinating Arrangements for Turbidity Monitoring (if applicable): Permitted operator name Insert operator name , Permitted operator N PDES ID Insert operator N PDES ID , Coordinating Arrangement Describe the coordinating arrangement including which parties are tasked with specific responsibilities 7.2.5 Alternate turbidity benchmark (if applicable): Alternate turbidity benchmark(NTU) Insert alternate turbidity benchmark Data and documentation used to Insert the data and documentation that was submitted to EPA to request the alternate benchmark request the alternate benchmark s r . 76 Turbidity Benchmark Monitoring for Dewatering Discharges ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ This page intentionally left blank. 77 Turbidity Benchmark Monitoring for Dewatering Discharges Stormwater Pollution Prevention Plan(SWPPP)Manual 11b,a Certification and Notifications 8.1 SWPPP Certification Your signatory must sign and date your SWPPP in accordance with Appendix G, Part G.11,2022 CGP. 8.1.1 Post Authorizations to the SWPPP Once you are authorized for coverage under this permit,you must include the following documents as part of your SWPPP: > A copy of your N01 submitted to EPA along with any correspondence exchanged between you and EPA related to coverage under this permit; > A copy of the acknowledgment letter you receive from NeT assigning your NPDES ID(i.e.,permit tracking number); > A copy of this permit(an electronic copy easily available to the stormwater team is also acceptable). 8.1.2 On-site Availability of the SWPPP You must keep a current copy of your SWPPP at the site or at an easily accessible location so that it can be made available at the time of an on-site inspection or upon request by EPA;a State,Tribal,or local agency approving stormwater management plans;the operator of a storm sewer system receiving discharges from the site;or representatives of the U.S. Fish and Wildlife Service(USFWS)or the National Marine Fisheries Service (NMFS). The SWPPP maybe prepared,signed,and kept electronically,rather than in paper form, if the records are: (a) in a format that can be read in a similar manner as a paper record; (b) legally dependable with no less evidentiary value than their paper equivalent;and (c)immediately accessible to the inspector during an inspection to the same extent as a paper copy stored at the site would be,if the records were stored in paper form. For additional guidance on the proper practices to follow for the electronic retention of the SWPPP, refer to the Fact Sheet discussion related to Part 4.7.3 of the 2022 CGP. 78 Certification and Notifications ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ EPA may provide access to portions of your SWPPP to a member of the public upon request.Confidential Business Information (CBI)will be withheld from the public, but may not be withheld from EPA, USFWS, or NMFS.93 93 Information covered by a claim of confidentiality will be disclosed by EPA only to the extent of,and by means of,the procedures set forth in 40 CFR part 2,Subpart B. In general, submitted information protected by a business confidentiality claim may be disclosed to other employees,officers,or authorized representatives of the United States concerned with implementing the CWA.The authorized representatives, including employees of other executive branch agencies, may review CBI during the course of reviewing draft regulations. If an on-site location is unavailable to keep the SWPPP when no personnel are present, notice of the plan's location must be posted near the main entrance of your construction site. 8.1.3 SWPPP Modifications 8.1.3.1 You must modify your SWPPP, including the site map(s),within seven (7) days of any of the following conditions: > Whenever new operators become active in construction activities on your site,or you make changes to your construction plans, stormwater controls,or other activities at your site that are no longer accurately reflected in your SWPPP.This includes changes made in response to corrective actions triggered under Part 5.You do not need to modify your SWPPP if the estimated dates in Part 7.2.3f change during the course of construction; > To reflect areas on your site map where operational control has been transferred (and the date of transfer) since initiating permit coverage; > If inspections or investigations by EPA or its authorized representatives determine that SWPPP modifications are necessary for compliance with this permit; > Where EPA determines it is necessary to install and/or implement additional controls at your site in order to meet the requirements of this permit,the following must be included in your SWPPP: > A copy of any correspondence describing such measures and requirements;and > A description of the controls that will be used to meet such requirements. > To reflect any revisions to applicable Federal, State,Tribal,or local requirements that affect the stormwater controls implemented at the site;and > If applicable, if a change in chemical treatment systems or chemically enhanced stormwater control is made, including use of a different treatment chemical,different dosage rate,or different area of application. 79 Certification and Notifications ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 8.1.3.2 You must maintain records showing the dates of all SWPPP modifications.The records must include the name of the person authorizing each change (see Part 7.2.9 above) and a brief summary of all changes. 8.1.3.3 All modifications made to the SWPPP consistent with Part 7.4 must be authorized by a person identified in Appendix G, Part G.11.b. 8.1.3.4 Upon determining that a modification to your SWPPP is required, if there are multiple operators covered under this permit,you must immediately notify any operators who may be impacted by the change to the SWPPP. 8.2 Notice of Intent (NOI All "operators"(as defined in Appendix A of the 2022 CGP)associated with your construction site who meet the Part 1.1 eligibility conditions requirements,and who seek coverage under this permit, must submit to EPA a complete and accurate NO1 prior to commencing commencement of construction activities(as defined in Appendix A). Prerequisite for Submitting Your NO1 You must develop a SWPPP consistent with Part 7 of the 2022 CGP before submitting your NO1 for coverage under this permit. Following the completion of the draft SWPPP, project operators may submit their NOls to the EPA. Project operators must use EPA's NPDES eReporting Tool (NeT)to electronically prepare and submit your NOI for coverage under the 2022 CGP.To access NeT,go to Pub.ps® .epa. ov cd . Permit coverage does not begin until 14 calendar days from the date that the NO1 is certified by a person authorized in accordance with Appendix I of the 2022 CGP. Within 14 calendar days,the EPA may notify the Operator(s)that the authorization has been delayed or denied. Project NOls and authorizations are maintained in Appendix C. 80 Certification and Notifications ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ 8.3 Notice of Termination (NOT Operators are required to continue to comply with all conditions and requirements in the permit until coverage is terminated under this permit. permitTo terminate v s must submit complete and accurateto the EPA.The NOT certifiess met the requirements for terminations listed in Part 8 of the CGP.Operators must electronically submit an NOT for the 2022 CGP including photoclocumentation consistent . . . Ott sP m . ov n d s stoirm teir,....discl� it s constiruction ctiviti es.--ge ire oortiln Operators must submit calendar days after any of the triggerings listed of the . An Operator's authorization to discharge under the CGP terminates at midnight of the calendar day that a complete NOT is processed and posted on EPA's website. Project NOTs and authorizations are maintained in Appendix C. 81 Certification and Notifications ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix A: Site Maps A-1 Appendix A:Site Maps \\vhb com\gbIUproJ\Wat-LD\11625 37 Merrimack Lecture Ha II\cad\Id\Eng\Stormwater\SWPPP\Site Map\1162537-Site Map-dwg Notes 1y^x 1 X"x4'WOOD STAKE SIX SITE sc'(MIN) /n oN CENTER THIS BASE PLAN ILLUSTRATES THE MINIMUM PERIMETER EROSION&SEDIMENTATION CONTROLS.THE SWPPP OPERATOR SHALL UPDATE THIS PLAN THROUGHOUT THE DURATION OF CONSTRUCTION TO SHOW THE LOCATIONS OF PROPOSED/CONSTRUCTED E&5 CONTROLS DEEMED OR APPROVED EQUAL /n, NECESSARY TO MEET THE REQUIREMENTS OF THE NPDES CGP. slLr FENCE 11 LT­1"X1'•VOOD STAKE' CATCH BASIN GRATE /n' STAPLES 12° 1` PROJECT E&S NARRATIVE: PLACED ILL GO SIDE F ON CENTER I 4„ THE PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF ONE(1)BUILDING WITH ACADEMIC PROGRAM SPACES.THE PROJECT INCLUDES THE RECONFIGURATION OF EXISTING PARKING ALONG AHERNE ROAD AND PATHWAYS ALONGSIDE SULLIVAN HALL TO IMPROVE ACCESSIBLE DowNH ILL SIDE of 1"REPAR FOR SILTSOCK a EXISTING OVERI,P PARKING AND PEDESTRIAN CIRCULATION.THE PROJECT WILL ALSO INCLUDE ENHANCEMENTS TO UTILITY INFRASTRUCTURE,A STORMWATER MANAGEMENT REPORT,AND ASSOCIATED LANDSCAPING.THE APPROXIMATELY 1-ACRE SITE WILL BE DEVELOPED AS ASINGLE-PHASE PROJECT.THE „. SILTSACK BAG REMOVAL �' PAVEMENT \ (MIND PROJECT DISTURBANCE EXCEEDS 1 ACRE THEREFORE IS SUBJECT TO THE REQUIREMENTS OF THE EPA CONSTRUCTION GENERAL PERMIT. \ i /// PLAN VIEW \ EROSION AND SEDIMENTATION CONTROL TECHNIQUES PROTECTED AREA 1R!QRK // THE EROSION AND SEDIMENTATION CONTROLS SHOWN HEREON ARE PERIMETER MEASURES ONLY AND ARE PROVIDED AS A STARTING POINT FOR CONTRACTOR'S STORMWATER POLLUTION PREVENTION PLAN(SWPPP).THE CONTRACTOR IS REQUIRED TO PROVIDE ADDITIONAL INTERIM EA EROSION AND SEDIMENTATION CONTROLS,INCLUDING BUT NOT LIMITED TO THOSE LISTED BELOW.THE CONTRACTOR SHALL MANAGE EROSION AND SEDIMENTATION DURING CONSTRUCTION TO PREVENT IMPACTS TO RESOURCE AREAS,ROADWAYS,AND ABUTTING PROPERTIES.THE SITE so'(MINE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE EROSION AND SEDIMENTATION CONTROLS THROUGHOUT THE DURATION OF CONSTRUCTION. BIODEGRADABLE PLAN VIEW EXISTING / 3,. INSTALL SUPPLEMENTAL 4"(MINE PAVEMENT mKaPosT MATERIAL MESH NETTING CATCH BASIN PROTECTION ILTER MOUNTABLE BERM ILTSACK CATCH BASIN GRATE u. NEWLY CONSTRUCTED AND EXISTING CATCH BASINS WILL BE PROTECTED WITH SILT SACKS THROUGHOUT CONSTRUCTION. GROL HELD', COMPOE FILLED - \ TOP OF S F / ND (l2"TYPJ SILTSACK FP BRIC 1Y°CRUSHED STONE (1 / STAPLE 1r GRAVEL AND CONSTRUCTION ENTRANCE/EXIT / oN CENTER A TEMPORARY CRUSHED-STONE CONSTRUCTION ENTRANCE/EXIT WILL BE CONSTRUCTED.ACROSS SLOPE WILL BE PLACED IN THE ENTRANCE TO DIRECT RUNOFF TO THE SEDIMENT TRAP. CROSS-SECTION I I I 6 LOAM&SEED s n n n OVERFLQ`N PORT NOTES 1 N 1 H VEGETATIVE SLOPE STABILIZATION O TYPI 11 G STAPLES STABILIZATION OF OPEN SOIL SURFACES WILL BE IMPLEMENTED WITHIN 14 DAYS AFTER GRADING OR CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED,UNLESS THERE IS SUFFICIENT SNOW COVER TO PROHIBIT IMPLEMENTATION.VEGETATIVE SLOPE STABILIZATION EXPANSION RESTRAINT 1��XIFT\VIRTH SHALL BE 47NEN-FIVE(25)FOOT MINIMUM,BUT NOT NO GAUGE WHO Lss THAN THE FuuwIDTH AT POINTS V✓HERE INGRESS OR EGRESS WILL BE USED TO MINIMIZE EROSION ON SLOPES OF 3:1 OR FLATTER.ANNUAL GRASSES,SUCH AS ANNUAL RYE,WILL BE USED TO ENSURE RAPID GERMINATION AND PRODUCTION OF ROOTMASS.PERMANENT STABILIZATION WILL BE COMPLETED WITH THE PLANTING OF PERENNIAL GRASSES OCCURS. NOTES OR LEGUMES.ESTABLISHMENT OF TEMPORARY AND FERMAN ENT VEGETATIVE COVER MAY BE ESTABLISHED BY HYDRO-SEEDING OR SODDING.A SUITABLE TOPSOIL,GOOD SEEDBED PREPARATION,AND ADEQUATE LIME,FERTILIZER AND WATER WILL BE PROVIDED FOR EFFECTIVE T SILTSOCK SHALL BE FILTRExX SILTSOTS,OR APPROVED EQUAL SECTION VIEW z.THE EXIT SHALL BE MAINTAINED IN A CONDITION WHICH SHALL ESTABLISHMENT OF THESE VEGETATIVE STABILIZATION METHODS.MULCH WILL ALSO BE USED AFTER PERMANENT SEEDING TO PROTECT SOIL FROM THE IMPACT OF FALLING RAIN AND TO INCREASE THE CAPACITY OF THE SOIL TO ABSORB WATER. J_ SILTSOCKS SHALLOVERLAPA MINIMUM(IF IJ_IN(HE'. PREVENT TRACKING OR FLOWING OF SEDIMENTONTO PUBLIC 1.BEGIN ATTHETOP OF BLANKET INSTALLATION AREA BY ANCHORING BLANKET IN A6" NOTES RIGHTS-OF-\NA\'.THIS MAY REQUIRE PERIODIC TOP DRESSING WITH DEEP TRENCH BA<KFILL ANO COP.IPACT TRENCH AFTER STAPLING. B. SILTSOCK SHALL BE INSPECTED PEMOLI"ALL`\AND AFTERALLATOF M ADDITIONAL STONEAS CONDITIONS DEMAND AND REPAIR OR TEMPORARY SEDIMENT BASINS ,\ „ 1.IID TALLSILTSACKIN ALLCATCH BASINSw'HERE INDICATED ON THE PLAN CLEANOUTOFANY MEASURES USEDTOTRAP SEDIMENT ALL 2.ROLLTHE EIANKET DOWN THE SWALE IN THE DIRECTION OFTHE WATER FLOW. AS NEEDED REPAY:.R nEPLACEMENTSHALETIE PEP,FCRMED PR:Fnrn\' BEFORE COMMENCING WORK OR IN PAVED AREAS AFTER RIM:IER(GORSE I; SEDIMENT SPILLED,DROPPED.wASHED ORTRACKED ONTO PUBLIC TEMPORARY SEDIMENT BASINS WILL BE DESIGNED EITHER AS EXCAVATIONS OR BERMED STORMWATER DETENTION STRUCTURES(DEPENDING ON GRADING)THAT WILL RETAIN RUNOFF FOR A SUFFICIENT PERIOD OF TIME TO ALLOW SUSPENDED SOIL PARTICLES TO SETT LE OUT PRIOR TO AS NEEDED. PLACEDAND HAY SALES HAVE BEEN REMOVED. RIGHTS-OF SWAY MUST BE REMOVED u.1MEGIATEPf BERM SHALL BE s.rHE EDGESOF BLANKETS MUST BE STAPLED WITH APPROX.4 INCH OVERLA-HERE2 DISCHARGE.THESE TEMPORARY BASINS WILL BE LOCATED BASED ON CONSTRUCTION NEEDS AS DETERMINED BY THE CONTRACTOR AND OUTLET DEVICES WILL BE DESIGNED TO CONTROL VELOCITY AND SEDIMENT.POINTS OF DISCHARGE FROM SEDIMENT BASINS WILL BE STABILIZED TO PERMITTED.PERIODIC INSPECTION AND MAINTENANCE SHALL BE OR MORE STRIP W IDTHS ARE REQUIRED. 4. uTE,SDESTABILED BYTHEENSt\STMATERWL SHALL BE DtsPERSED ON PROVIDED AS NEEDED. MINIMIZE EROSION.AT MINIMUM,SEDIMENTATION BASINS SHALL BE DESIGNED AND CONSTRUCTED TO PROVIDE STORAGE FOR THE VOLUME OF RUNOFF GENERATED FROM A 2-YR,24-HR DESIGN STORM,OR AT LEAST 3,600 CUBIC FEET OF STORAGE PER ACRE DRAINING TO THE BASIN. SITE,SITETERMINED BYTHEEN.:INBBR. J.GRATE TO BE PLACED OVER SILTSACK. 4.V•`HEN BLANKETS MUST BE SPLICED DOWN THE SWALE,PLACE UPPER BLANKET END B. IF COLLECTED [ NETTING IS U':ED THE NETTIN,,SHALL BE B,SILTSAS AND CLEANING INSPECTED PERALLCRMFP NM 3-STABI MATERIALS BEING INSTALLED, ALL BE REMOVED PRIOR TO FINAL ZED EXIT OVER LOWER END WITH 6 INCH MIN.OVE-P AND STAPLE BOTH TOGETHER. EVENTSAN DC LEANING M REPLACEMENT SHALL BE ADEA'4HAV FINISH MATERIALS BEING INSTALLED. STOCKPILE MANAGEMENT COLLECTEUPNC CISPOSEU(F FFSITE. 5.METHOD OF INSTALLATION SHALL BE AS PER MANUFACTURER'S RECOMMENDATIONS. PPROMPT N ERMANENTS STABIDZ MOAINTAINUNTIL UPSTREAM AREAS HAVE BEEN 6 EROSION CONTROL BLANKETS SHALL BE USED IN ALL ARE4$!VHERE SLOPES EXCEED 31 SIDESLOPES OF STOCKPILED MATERIAL SHALL BE NO STEEPER THAN 2:1.STOCKPILES NOT USED WITHIN 30 DAYS NEED TO BE SEEDED AND MULCHED IMMEDIATELY AFTER FORMATION OF THE STOCKPILE.STRAW BALES AND SILT FENCE ARE TO BE PLACED AROUND THE STOCKPILE AREA . . APPROXIMATELY 10 FEET FROM THE TOE OF SLOPE. Siltsock/Silt Fence Barrier 10/20 Siltsack Sediment Trap 1/20 Stabilized Construction Exit 1/16 Erosion Control Blanket Slope Installation 10/20 DUST CONTROL N.T.S. Source:VHB LD 666-A N.T.S. Source:VHB LD 674 N.T.S. $ounce:VH8 LD 682 N.T.S. Source:VHB LD 660 - - - - PERIODICALLY MOISTEN EXPOSED SURFACES ON UNPAVED TRAVELWAYS TO KEEP THE TRAVELWAY DAMP AND REDUCE DUST. ` PROVIDE SILTSOCK AT BACK TEMPORARY EROSION AND SEDIMENTATION CONTROL MAINTENANCE(THROUGHOUT CONSTRUCTION) ` - OF CURB OPENI THE SITE CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES ON A WEEKLY BASIS(MINIMUM)OR AS REQUIRED PER THE �t STORMWATER POLLUTION PREVENTION PLAN(SWPPP).THE CONTRACTOR SHALL ADDRESS DEFICIENCIES AND MAINTENANCE ITEMS WITHIN TWENTY-FOUR HOURS OF INSPECTION.CONTRACTOR SHALL PROPERLY DISPOSE OF SEDIMENT SUCH THAT IT DOES NOT ENCUMBER OTHER -- - ' - -- - - DRAINAGE STRUCTURES AND PROTECTED AREAS.RECORDS OF THE INSPECTIONS WILL BE PREPARED AND MAINTAINED ON-SITE BY THE CONTRACTOR. SILT SHALL BE REMOVED FROM BEHIND BARRIERS IF GREATER THAN 6-INCHES DEEP OR AS NEEDED. DAMAGED OR DETERIORATED ITEMS WILL BE REPAIRED IMMEDIATELY AFTER IDENTIFICATION. woo ' - - - - - - - - - - -- SEDIMENT THAT IS COLLECTED IN STRUCTURES SHALL BE DISPOSED OF PROPERLY AND COVERED IF STORED ON-SITE. EROSION CONTROL STRUCTURES SHALL REMAIN IN PLACE UNTIL ALL DISTURBED EARTH HAS BEEN SECURELY STABILIZED.AFTER REMOVAL OF ., STRUCTURES,DISTURBED AREAS SHALL BE REGRADED AND STABILIZED AS SOON AS PRACTICAL. MAINTAIN THE CONSTRUCTION ENTRANCE IN A CONDITION WHICH WILL PREVENT TRACKING AND WASHING OF SEDIMENTS ONTO PAVED AHERNE ROAD SURFACES. INFILTRATION AREA PROTECTION DURING CONSTRUCTION ". ..APPROXIMATE LIMITS F "-__ ___ FOR THE LONG-TERM FUNCTION OF THE INFILTRATION BASINS STRUCTURES CARE SHALL BE TAKEN IN THE INFILTRATION AREAS DURING BY OTHERS CONSTRUCTION TO TION FENC4,CMP � 'NVA CONSTRUCTION THE CONTRACTOR SHALL EMPLOY THE FOLLOWING MINIMUM BEST MANAGEMENT PRACTICES(BMPs): BE - ---- ,'�� ': COORDINATED WIT COLLEGE H ♦ I 1.INFILTRATION AREAS SHALL NOT BE USED AS TEMPORARY CONSTRUCTION SEDIMENTATION BASINS WITHOUT THE PRIOR APPROVAL OF THE ENGINEER.IF INFILTRATION AREAS ARE USED AS TEMPORARY SEDIMENTATION BASINS DURING CONSTRUCTION,THEN THE SOILS SHALL BE o EXCAVATED A MINIMUM OF 2'FROM THE TEMPORARY BASIN BOTTOM TO REMOVE CLOGGED SOILS. I 36"E NG TREE TO BE REM ED --� - ---- - T 1'J _�6_,,,,� T ® 2.STORMWATER RUNOFF FROM EXPOSED SURFACES SHALL BE DIRECTED AWAY FROM THE INFILTRATION BASIN(S)/STRUCTURE(S)DURING ' �HYD "--- _ * *- * o CONSTRUCTION. c TRAFFIC,PARKING OF VEHICLE AND STOCKPILING OF CONSTRUCTION MATERIALS SHALL BE LOCATED / Y-� - - o£ I � 3 CONSTRUCTION EQUIPMENT,VEHICULAR IC P ES A \ * EN V - - - OUTSIDE OF THE INFILTRATION AREAS. 28"EXISTING TREE TO BE REMOVED g o 3 4.EXCAVATION FOR CONSTRUCTION OF THE INFILTRATION BASIN(S)/STRUCTURE(S)SHALL ENSURE THAT THE SOIL AT THE BOTTOM OF THE IF Do 26"EXISTING TREE TO BE REMOVED `' EXCAVATION IS NOT COMPACTED OR SMEARED. '\ I\. 50'BUFFER FROM r 236 APPROXIMATE LIMIT 6.THE PERIMETER OF THE INFILTRATION AREAS SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF THE AREA FOR ACTIVITIES THAT MIGHT ' - 22"EXISTING TREE TO BE REMOVED o x OF WORK DAMAGE THE INFILTRATION ABILITY OF THE SYSTEM. \ # HALL �. \ ` SWPPP NOTES: J r PROPOSED LEC 1T U RE HALL ` 1.THE QUANTITIES AND LOCATIONS OF EROSION/SEDIMENTATION CONTROL MEASURES(INCLUDING TEMPORARY SEDIMENTATION BASINS) r M.. 19,205 GSIF SHOWN ON THIS SITE MAP ARE APPROXIMATE,THIS SITE MAP,LIKE THE SWPPP,IS A DYNAMIC DOCUMENT,AND MUST BE CONTINUALLY ' K,�' z LEVELS UPDATED BY THE OPERATOR(S)THROUGHOUT CONSTRUCTION.PROJECT OPERATOR(S)SHALL UPDATE SITE MAP TO SHOW FINAL LOCATIONS OF ' ® ` STORMWATER CONTROL MEASURES AND PROVIDE INFORMATION FOR TYPES OF CONTROLS PROVIDED.PROJECT OPERATORS ARE RESPONSIBLE - TO IMPLEMENT,INSPECT,MAINTAIN,REPAIR,AND MODIFY EROSION/SEDIMENTATION CONTROL MEASURES(INCLUDING TEMPORARY ' - APPROXIMATE LIMIT ` SEDIMENTATION BASINS). EN EN = _ OF WORK 2.STORMWATER CONTROLS MUST BE DESIGNED,INSTALLED AND MAINTAINED IN COMPLIANCE WITH PART 2.1 OF THE 2022 CGP. EAK/SILT FENCE BR 3.EROSION AND SEDIMENT CONTROLS MUST BE IMPLEMENTED TO ADDRESS THE REQUIREMENTS OF PART 2.2 OF THE 2022 CGP. AR EN 4.IF ANY STORMWATER CONTROLS MUST BE DESIGNED(E.G.,SEDIMENT CHANNELS),_ MUST BE INCLUDED IN ATTACHMENT S OF THE SWPPP MANUAL. NT BASINS OR CONVEYANCE ,HE DESIGN DOCUMENTATION LS T 6.THE ITEMS LISTED BELOW ARE REQUIRED TO BE SHOWN ON THIS SITE MAP PER PART 7.2.4 OF THE 2022 CGP.THIS SITE MAP ALREADY INCLUDES 1 - RA SOME OF THE ITEMS IDENTIFIED BELOW,BUT IT IS THE RESPONSIBILITY OF THE PROJECT OPERATOR(S)TO SUPPLEMENT THE INFORMATION INCLUDED HEREON TO ENSURE THAT ALL REQUIRED ITEMS ARE PROVIDED.PROJECT OPERATOR(S)SHALL CONTINUALLY UPDATE THIS SITE PLAN - - TO DOCUMENT THESE ITEMS THROUGHOUT CONSTRUCTION,INCLUDING BUT NOT LIMITED TO. N ` •BOUNDARIES OF THE PROPERTY LOCATIONS WHERE CONSTRUCTION ACTIVITIES WILL OCCUR,INCLUDING: Mti ti _ I •• LOCATIONS WHERE EARTH-DISTURBING ACTIVITIES WILL OCCUR(NOTE ANY PHASING),INCLUDING ANY DEMOLITION ACTIVITIES; L w N T ---- - ---- •• APPROXIMATE SLOPES BEFORE AND AFTER MAJOR GRADING ACTIVITIES(NOTE ANY STEEP SLOPES(AS DEFINED IN APPENDIX A); rF ' SILTSACK SEDIMENT M l I ° •• LOCATIONS WHERE SEDIMENT,SOIL,OR OTHER CONSTRUCTION MATERIALS WILL BE STOCKPILED;ANY RECEIVING WATER CROSSINGS; *', \ j /! ' TREE PROTECTION ' •• DESIGNATED POINTS WHERE VEHICLES WILL EXIT ONTO PAVED ROADS,LOCATIONS OF STRUCTURES AND OTHER IMPERVIOUS SURFACES TRAP(TYP) ----. FENCE(TYP)..... -- -- ---- ---- UPON COMPLETION OF CONSTRUCTION;AND LOCATIONS OF ON-SITE AND OFF-SITE CONSTRUCTION SUPPORT ACTIVITY AREAS w COVERED BY TH IS PERMIT(SEE PART 1.2.1 C). •LOCATIONS OF ANY RECEIVING WATERS WITHIN THE SITE AND ALL RECEIVING WATERS WITHIN ONE MILE DOWNSTREAM OF THE SITE'S L236- DISCHARGE () R2 ALSO IDENTIFY IF ANY OF THESE RECEIVING WATERS ARE LISTED AS IMPAIRED OR ARE IDENTIFIED AS A TIE TIER 26 T\ OR TIER 3 T4:::E : ,�#x--,_x 236 -" ,,x--:_x : : x _-x--_ •ANY A WATER;AREAS OF FEDERALLY LISTED CRITICAL HABITAT WITHIN THE ACTION AREA OF THE SITE AS DEFINED IN APPENDIX A; •TYPE AND EXTENT OF PRE-CONSTRUCTION COVER ON THE SITE E.G.,VEGETATIVE COVER,FOREST,PASTURE,PAVEMENT,STRUCTURES); •DRAINAGE PATTERNS OF STORMWATER AND AUTHORIZED NON-STORMWATER BEFORE AND AFTER MAJOR GRADING ACTIVITIES VCI ' STORMWATER AND AUTHORIZED NON-STORMWATER DISCHARGE LOCATIONS,INCLUDING: ""'� �.. �• •• LOCATIONS D ZING A NOTATION OFVWHETHERT AND/OR INLETRIZED NON-STORMWATER HE LECONVE SSORMWA ER TO A SEDIMEENT BA IN,D TO STORM SSEDIIMENNT DRAIN RAP INCLUDING OR SIMILARLY IA EFFECTIVE CONTROL(THE REQUIREMENT TO SHOW STORM DRAIN INLETS IN THE IMMEDIATE VICINITY OF THE SITE ON YOUR SITE MAP 000 '< " ONLY APPLIES TO THOSE INLETS THAT ARE EASILY IDENTIFIABLE FROM YOUR SITE OR FROM A PUBLICLY ACCESSIBLE AREA IMMEDIATELY -0 ADJACENT TO YOUR SITE.); •• LOCATIONS WHERE STORMWATER OR AUTHORIZED NON-STORMWATER WILL BE DISCHARGED DIRECTLY TO RECEIVING WATERS(I.E., NOT VIA A STORM DRAIN INLET);AND I. - ! •• LOCATIONS WHERE TURBIDITY BENCHMARK MONITORING WILL TAKE PLACE TO COMPLY WITH PART 3.3,IF APPLICABLE TO YOUR SITE. ` AN AN ' LOCATIONS OF ALL POTENTIAL POLLUTANT-GENERATING ACTIVITIES IDENTIFIED IN PART 7.2.3G; I \ ' DESIGNATED AREAS WHERE CONSTRUCTION WASTES THAT ARE COVERED BY THE EXCEPTION IN PART 2.3.3E11 BECAUSE THEY ARE NOT s - ` POLLUTANT-GENERATING WILL BE STORED; •LOCATIONS OF STORMWATER CONTROLS,INCLUDING NATURAL BUFFER AREAS AND ANY SHARED CONTROLS UTILIZED TO COMPLY WITH �0 THIS PERMIT;AND \ •LOCATIONS WHERE POLYMERS,FLOCCULANTS,OR OTHER TREATMENT CHEMICALS WILL BE USED AND STORED. I000 �r ----Now V bi Lecture Hall Project at Site Plan Merrimack 0 10 20 40 Feet North Andover,MA October 2024 xm*N -1" Gmi Figure 2 IWLFC[D RFG Mi A\/WH FEMA "fI3 ff ASF c _ m L ! \.r j o v . i & Dt V R1 y \ - r v y vv� R DQ -I Q H I ZWK�DH `may r F \ � R C)FW WF�BI F V6O1u pO ;: sl vim )4tWH&;MLWLFQ/WM -MJG F-D�WK { K` F;G$-\N C3-I WR fWW \ z 1L 1� s F � t-I�11/LYHMv y y $JF-D R 8MiWE'C�G P F;G-M1G41, ° y 1! 1°R\fW1`YT RJ&VRJRHEU RAT 1 \\ \�� LI ladt tL��Vfl tT1.JCa[1� \ `\ 'vu \\ � --= \ \\ \ v L Irl D y \ - `\ NIL\ ` �\ 1 Q 1RCIDJ � 3JRLOHO/DkOLCH I -G1RUG8K- YIDIVXIH r E \ \ \ e f;LIWDQ CIi/ OEE)H - F I \ 7MS-QCLV3D CE-G F;QWM BS LV DQ DBRJIJL ENH � � 'ROV ikD HWI-G E3 WTI Xk-U DEC CP4N UFBJR DQDWK:ULWDIVLYH9JF�3-MORDNLF;Q Y I `I ii 7K-VP6FF8DLFVZWK V\AND aG/lRJ WK-AHR G-LWDD 0R;GEBJL LW LVMV)fLGD/3i/R1LH-GH-1JFV— CFFXJDRVUVD G/ \ i�1 4 ` t 7kF�IGIGLQI�JB�IILI�LV�UL�rt-G�.0 GIU vy t v y WK WF-G F D CRN UHO F-F W RIDQ V)8rHWRWK-VCDNHDOG — rMOVINHR/VL R1 r \ El VX3 VVF�I F�FI F�FdJH R WF�I IFS G FEC�I P6 e 7�V P�L DI-I LV YRG L FOFFONVCPCRN D83-W L RFUI C)I C)CEFflV O M:DD H E� EE RUB W1 L L L F-UV .,_ � I�C3�VH C3 a ) {fl QEFU DES),%i IF-FWLYHCIYVH GSL B-FV IRJ UFO DN JI S U3l,W 0Al+- 6,BHAER4JFH M 3NLFCOD 06 Hydrologic Soil Group—Essex County, Massachusetts, Northern Part O O 325500 325600 325700 325800 325900 326000 326100 326200 326300 326400 �.F _ 420 40'25"N �� � � �� _ � 420 40'25"N s 04 _ - ~` W - _ s � y a F>; 420 40'5"N � - �� w> �� _ ��� ��' __ ��� _ 420 40'5"N 325500 325600 325700 325800 325900 326000 326100 326200 326300 326400 M Map Scale:1:4,500 if printed on A landscape(11"x 8.5")sheet. O Meters N 0 50 100 200 300 Feet 0 200 400 800 1200 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 19N WGS84 usDA Natural Resources Web Soil Survey 10/11/2024 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Essex County, Massachusetts, Northern Part MAP LEGEND MAP INFORMATION Area of Interest(AOI) 13 C The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 13 C/D 1:155800. Soils 13 D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons A Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil A/D Water Features line placement.The maps do not show the small areas of B Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation ® B/D Rails Please rely on the bar scale on each map sheet for map 0 C Interstate Highways measurements. 0 C/D us Routes Source of Map: Natural Resources Conservation Service �� Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts A distance and area.A projection that preserves area,such as the Aerial Photography Albers equal-area conic projection,should be used if more A/D accurate calculations of distance or area are required. B This product is generated from the USDA-NRCS certified data as B/D of the version date(s)listed below. C Soil Survey Area: Essex County, Massachusetts, Northern Part Survey Area Data: Version 20,Aug 27,2024 C/D Soil map units are labeled(as space allows)for map scales D 1:50,000 or larger. Not rated or not available Date(s)aerial images were photographed: Mar 1,2023—Sep 1, Soil Rating Points 2023 13 q The orthophoto or other base map on which the soil lines were 13 compiled and digitized probably differs from the background A/D compiled displayed on these maps.As a result,some minor B shifting of map unit boundaries may be evident. ® B/D usDA Natural Resources Web Soil Survey 10/11/2024 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Essex County, Massachusetts, Northern Part Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 70A Ridgebury fine sandy D 14.4 14.9% loam,0 to 3 percent slopes 72A Whitman fine sandy D 19.5 20.1% loam,0 to 3 percent slopes 310A Woodbridge fine sandy C/D 57.1 58.8% loam,0 to 3 percent slopes 310B Woodbridge fine sandy C/D 0.9 0.9% loam,3 to 8 percent slopes 311 B Woodbridge fine sandy C/D 4.5 4.6% loam,0 to 8 percent slopes,very stony 651 Udorthents,smoothed A 0.6 0.6% Totals for Area of Interest 97.1 100.0% usDA Natural Resources Web Soil Survey 10/11/2024 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Essex County, Massachusetts, Northern Part Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff:None Specified Tie-break Rule: Higher usDA Natural Resources Web Soil Survey 10/11/2024 Conservation Service National Cooperative Soil Survey Page 4 of 4 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix B: 2022 ConstructionGeneral Permit Refer to Section 1 of this SWPPP Manual for more information. 6-1 Appendix 6:2022 Construction General Permit 2022 Construction General Permit (CGP) National Pollutant Discharge Elimination System (NPDES) Construction General Permit(CGP)for Stormwater Discharges from Construction Activities In compliance with the provisions of the Clean Water Act, 33 U.S.C. §1251 et. seq., (hereafter CWA), as amended by the Water Quality Act of 1987, P.L. 100-4, "operators" of construction activities (defined in Appendix A) that meet the requirements of Part 1.1 of this National Pollutant Discharge Elimination System (NPDES) Construction General Permit (CGP), are authorized to discharge pollutants in accordance with the effluent limitations and conditions set forth herein. Permit coverage is required from the "commencement of construction activities" (see Appendix A) until one of the conditions for terminating CGP coverage has been met (see Part 8.2). This permit becomes effective on 12:00 am, February 17,2022. This permit and the authorization to discharge expire at 1 1:59pm, February 16, 2027. Signed and issued this 18 day of January 2022 Signed and issued this 18 day of January 2022 Digitallysined b Digitally signed by CHARLES MAGUIREDEBORAH CHARLES DIN:c=US,o=U S.Government,ou=Environmental Protection Agency, SZARO Date:2022.01.18 MAG U I RE cn=CHARLESMAGUIRE, 0.9.2342.19200300.100.1.1=68001003650036 08:31:14-05'00' Date:2022.01.18 14:06:55-06'00' Deborah Szaro, Charles W. Maguire, Acting Regional Administrator, EPA Region 1. Director,Water Division, EPA Region 6. Signed and issued this 18 day of January 2022 Signed and issued this 18 day of January 2022 JAV I E R Digitally Digitally signed by AVIER LAUREANO J E F F E RY JEFFERY ROB CHAUD LAU REAN O Date: 162.01.18 ROB I CHAU D Date:2022.0,1.18 14:41:37-06 00 Javier Laureano, Jeffery Robichaud, Director, Water Division, EPA Region 2. Director,Water Division, EPA Region 7. Signed and issued this 18 day of January 2022 Signed and issued this 18 day of January 2022 CARMEN Digitally signed by CARMEN DARCY Digitally signed by GUERRERO GUERRERO PEREZ DARCY OCONNOR Date:2022.01.18 10:19:51 O C O N N O R Date:2022.01.18 PEREZ -04'00' 14:00:05-07'00' Carmen Guerrero-Perez, Darcy O'Connor, Director, Caribbean Environmental Protection Director,Water Division, EPA Region 8. Division, EPA Region 2. Signed and issued this 18 day of January 2022 Signed and issued this 18 day of January 2022 CATH E RI N E Digitally CATHERINE signeLdIBERTZ by TOMAS Digitally signed by TOMAS TORRES L I B E RTZ Date:2 42.01.18 T O R R E S Date:2022.0,1.1,8 13:30:16-08 00 Catherine A. Libertz, Tomas Torres, Director, Water Division, EPA Region 3. Director,Water Division, EPA Region 9. Signed and issued this 18 day of January 2022 Signed and issued this 18 day of January 2022 J EAN EAN N E Digitally signed by DAN I E L Digitally signed by DANIEL OPALSKI JEANEANNE GETTLE GETTLE 13:09 48-05'00'$ O PAL S K I 15:10 20-08'00'8 Jeaneanne Gettle, Daniel D. Opalski, Director, Water Division, EPA Region 4. Director,Water Division, EPA Region 10. Signed and issued this 18 day of January 2022 Digitally signed by TERA � * FONG " Date:2022.01.18 13:03:49-06'00' Tera Fong, Director, Water Division, EPA Region 5. Page 1 2022 Construction General Permit (CGP) CONTENTS 1 How to Obtain Coverage Under the Construction General Permit(CGP)...................................1 1.1 Eligibility Conditions .................................................................................................................... 1 1.2 Types of Discharges Authorized ................................................................................................3 1.3 Prohibited Discharges.................................................................................................................4 1.4 Submitting your Notice of Intent (NOI).....................................................................................5 1.5 Requirement to Post a Notice of Your Permit Coverage.......................................................7 2 Technology-Based Effluent Limitations.............................................................................................8 2.1 General Stormwater Control Design, Installation, and Maintenance Requirements.........8 2.2 Erosion and Sediment Control Requirements........................................................................ 10 2.3 Pollution Prevention Requirements......................................................................................... 17 2.4 Construction Dewatering Requirements................................................................................22 3 Water Quality-Based Effluent Limitations........................................................................................23 3.1 General Effluent Limitation to Meet Applicable Water Quality Standards .......................23 3.2 Water Quality-based Conditions for Sites Discharging to Sensitive Waters44 ....................23 3.3 Water quality-based conditions For sites discharging To Sensitive Waters From Construction Dewatering activities ....................................................................................................24 4 Site Inspection Requirements..........................................................................................................28 4.1 Person(s) Responsible for Inspecting Site...............................................................................28 4.2 Frequency of Inspections.........................................................................................................28 4.3 Increase in Inspection Frequency for Certain Sites. .............................................................29 4.4 Reductions in Inspection Frequency......................................................................................30 4.5 Areas that Must Be Inspected.................................................................................................31 4.6 Requirements for Inspections ..................................................................................................32 4.7 Inspection Report......................................................................................................................33 4.8 Inspections By EPA....................................................................................................................34 5 Corrective Actions............................................................................................................................34 5.1 Conditions Triggering Corrective Action............................................................. .................34 5.2 Corrective Action Deadlines...................................................................................................35 5.3 Corrective Action Required by EPA.......................................................................................36 5.4 Corrective Action Log..............................................................................................................36 6 Stormwater Team Formation/Staff Training Requirements..........................................................36 6.1 Stormwater Team......................................................................................................................36 6.2 General Training Requirements For Stormwater Team Members.......................................37 6.3 Training Requirements For Persons Conducting Inspections...............................................37 6.4 Stormwater Team's Access To Permit Documents ...............................................................38 Page i 2022 Construction General Permit (CGP) 7 Stormwater Pollution Prevention Plan (SWPPP)..............................................................................38 7.1 General Requirements.............................................................................................................38 7.2 SWPPP Contents........................................................................................................................38 7.3 On-Site Availability of Your SWPPP..........................................................................................46 7.4 SWPPP Modifications................................................................................................................46 8 How to Terminate Coverage...........................................................................................................47 8.1 Minimum Information Required in NOT..................................................................................47 8.2 Conditions for Terminating CGP Coverage ..........................................................................47 8.3 How to Submit Your NOT..........................................................................................................48 8.4 Deadline for Submitting the NOT............................................................................................49 8.5 Effective Date of Termination of Coverage..........................................................................49 9 Permit Conditions Applicable to Specific States, Indian Country Lands, or Territories.............49 AppendixA: Definitions........................................................................................................................A-1 Appendix B: Permit Areas Eligible for Coverage and EPA Regional Addresses........................... B-1 Appendix C: Small Construction Waivers and Instructions..............................................................C-1 Appendix D: Eligibility Procedures Relating to Threatened & Endangered Species Protection. D-1 Appendix E: Historic Property Screening Process..............................................................................E-1 Appendix F: Buffer Requirements..........................................................................................................F-1 Appendix G: Standard Permit Conditions......................................................................................... G-1 Appendix H: Notice of Intent(NOI) Form and Instructions..............................................................H-1 Appendix I: Notice of Termination (NOT) Form and Instructions...................................................... 1-1 Appendix J: Suggested Format for Request for Chemical Treatment.............................................J-1 Appendix K: Turbidity Benchmark Monitoring Report Form ............................................................K-1 Page ii 2022 Construction General Permit (CGP) 1 HOW TO OBTAIN COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT(CGP) To be covered under this permit, you must meet the eligibility conditions and follow the requirements for obtaining permit coverage in this Part. 1.1 ELIGIBILITY CONDITIONS 1.1.1 You are an "operator" of a construction site for which discharges will be covered under this permit. For the purposes of this permit and in the context of stormwater discharges associated with construction activity, an "operator" is any party associated with a construction project that meets either of the following two criteria: a. The party has operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications; or b. The party has day-to-day operational control of those activities at a project that are necessary to ensure compliance with the permit conditions. Where there are multiple operators associated with the same project, all operators must obtain permit coverage.' Subcontractors generally are not considered operators for the purposes of this permit. 1.1.2 Your site's construction activities: a. Will disturb one or more acres of land, or will disturb less than one acre of land but are part of a common plan of development or sale (as defined in Appendix A) that will ultimately disturb one or more acres of land; or b. Have been designated by EPA as needing permit coverage under 40 CFR § 122.26(a)(1)(v) or 40 CFR § 122.26(b)(15)(ii); 1.1.3 Your site is located in an area where EPA is the permitting authority and where coverage under this permit is available (see Appendix B); 1.1.4 Discharges from your site are not: a. Already covered by a different NPDES permit for the same discharge; or b. In the process of having coverage under a different NPDES permit for the same discharge denied, terminated, or revoked.2, 3 1.1.5 You can demonstrate you meet one of the criteria in the Endangered Species Protection section of the Notice of Intent (NOI) that you submit for coverage under this permit, per Part 1.4, with respect to the protection of Federally listed endangered or threatened species and Federally designated critical habitat under the Endangered Species Act If the operator of a "construction support activity" (see Part 1.2.1 c) is different than the operator of the main site,that operator must also obtain permit coverage.See Part 7.1 for clarification on the sharing of permit-related functions between and among operators on the same site and for conditions that apply to developing a SWPPP for multiple operators associated with the same site. 2 Parts 1.1.4a and 1.1.4b do not include sites currently covered under the 2017 CGP that are in the process of obtaining coverage under this permit, nor sites covered under this permit that are transferring coverage to a different operator. 3 Notwithstanding a site being made ineligible for coverage under this permit because it falls under the description of Parts 1.1.4a or 1.1.4b, above, EPA may waive the applicable eligibility requirement after specific review if it determines that coverage under this permit is appropriate. Page 1 2022 Construction General Permit (CGP) (ESA). If the EPA Regional Office grants you a waiver from electronic reporting per Part 1.4.2, you must complete the ESA worksheet in Appendix D to demonstrate you meet one of the criteria and submit it with your paper NOI (Appendix 1). 1.1.6 You have completed the screening process in Appendix E relating to the protection of historic properties; and 1.1.7 You have complied with all requirements in Part 9 imposed by the applicable State, Indian Tribe, or Territory in which your construction activities and/or discharge will occur. 1.1.8 For "new sources" (as defined in Appendix A) only: a. EPA has not, prior to authorization under this permit, determined that discharges from your site will not meet applicable water quality standards. Where such a determination is made prior to authorization, EPA may notify you that an individual permit application is necessary. However, EPA may authorize your coverage under this permit after you have included appropriate controls and implementation procedures designed to bring your discharge into compliance with this permit, specifically the requirement to meet water quality standards. In the absence of information demonstrating otherwise, EPA expects that compliance with the requirements of this permit, including the requirements applicable to such discharges in Part 3, will result in discharges that meet applicable water quality standards. b. Discharges from your site to a Tier 2, Tier 2.5, or Tier 3 water4 will not lower the water quality of the applicable water. In the absence of information demonstrating otherwise, EPA expects that compliance with the requirements of this permit, including the requirements applicable to such discharges in Part 3.2,will result in discharges that will not lower the water quality of such waters. 1.1.9 If you plan to add "cationic treatment chemicals" (as defined in Appendix A) to stormwater and/or authorized non-stormwater prior to discharge, you may not submit your NOI until you notify your applicable EPA Regional Office (see Appendix J) in advance and the EPA Regional Office authorizes coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will result in discharges that meet applicable water quality standards. 4 Note:Your site will be considered to discharge to a Tier 2,Tier 2.5, or Tier 3 water if the first receiving water to which you discharge is identified by a State,Tribe, or EPA as a Tier 2,Tier 2.5, or Tier 3 water. For discharges that enter a storm sewer system prior to discharge,the first receiving water to which you discharge is the waterbody that receives the stormwater discharge from the storm sewer system.The current list of Tier 2,Tier 2.5,and Tier 3 waters located in the areas eligible for coverage under this permit can be found at,Ih1;;i;„I s: . a. ov in des conslirucliiOn eneirall irir iil iresouirces 1.0olls and lei Ila.l. s. You can also use EPA's Discharge Mapping Tool (�h ::::::pa . p. ro.g�ov/nodes/spas sloirinr aleir diisclh�air e ,!..g. piiin i loolls to assist you in identifying whether an receiving waters to which you discharge are listed .... ..I ) Y Y g Y g Y g as impaired (and the pollutant for which it is impaired) and whether an approved total maximum daily load (TMDL) exists for that waterbody. Page 2 2022 Construction General Permit (CGP) 1.2 TYPES OF DISCHARGES AUTHORIZED5 1.2.1 The following stormwater discharges are authorized under this permit provided that appropriate stormwater controls are designed, installed, and maintained (see Parts 2 and 3): a. Stormwater discharges, including stormwater runoff, snowmelt runoff, and surface runoff and drainage, associated with construction activity under 40 CFR § 122.26(b)(14) or§ 122.26(b)(15)(i); b. Stormwater discharges designated by EPA as needing a permit under 40 CFR §122.26(a)(1)(v) or§ 122.26(b)(15)(ii); c. Stormwater discharges from on or off-site construction support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) provided that: L The support activity is directly related to the construction site required to have permit coverage for stormwater discharges; ii. The support activity is not a commercial operation, nor does it serve multiple unrelated construction sites; HE, The support activity does not continue to operate beyond the completion of the construction activity at the site it supports; and iv. Stormwater controls are implemented in accordance with Part 2 and Part 3 for discharges from the support activity areas; and d. Stormwater discharges from earth-disturbing activities associated with the construction of staging areas and the construction of access roads conducted prior to active mining. 1.2.2 The following non-stormwater discharges associated with your construction activity are authorized under this permit provided that, with the exception of water used to control dust and to irrigate vegetation in stabilized areas, these discharges are not routed to areas of exposed soil on your site and you comply with any applicable requirements for these discharges in Parts 2 and 3: a. Discharges from emergency fire-fighting activities; b. Fire hydrant flushings; c. Landscape irrigation; d. Water used to wash vehicles and equipment, provided that there is no discharge of soaps, solvents, or detergents used for such purposes; e. Water used to control dust; f. Potable water including uncontaminated water line flushings; 5 See "Discharge" as defined in Appendix A. Note:Any discharges not expressly authorized in this permit cannot become authorized or shielded from liability under CWA Section 402(k) by disclosure to EPA,State, or local authorities after issuance of this permit via any means, including the Notice of Intent (NOI) to be covered by the permit, the SWPPP, or during an inspection. Page 3 2022 Construction General Permit (CGP) g. External building washdown, provided soaps, solvents, and detergents are not used, and external surfaces do not contain hazardous substances (as defined in Appendix A) (e.g., paint or caulk containing polychlorinated biphenyls (PCBs)); h. Pavement wash waters, provided spills or leaks of toxic or hazardous substances have not occurred (unless all spill material has been removed) and where soaps, solvents, and detergents are not used. You are prohibited from directing pavement wash waters directly into any receiving water, storm drain inlet, or constructed or natural site drainage features, unless the feature is connected to a sediment basin, sediment trap, or similarly effective control; L Uncontaminated air conditioning or compressor condensate; j. Uncontaminated, non-turbid discharges of ground water or spring water; k. Foundation or footing drains where flows are not contaminated with process materials such as solvents or contaminated ground water; and I. Uncontaminated construction dewatering water6 discharged in accordance with Part 2.4. 1.2.3 Also authorized under this permit are discharges of stormwater listed above in Part 1.2.1, or authorized non-stormwater discharges listed above in Part 1.2.2, commingled with a discharge authorized by a different NPDES permit and/or a discharge that does not require NPDES permit authorization. 1.3 PROHIBITED DISCHARGES? The discharges listed in this Part are prohibited outright or authorized only under the identified conditions.To prevent the discharges in Parts 1.3.1 through 1.3.5, operators must comply with the applicable pollution prevention requirements in Part 2.3 or ensure the discharge is authorized by another NPDES permit consistent with Part 1.2.3 for commingled discharges. 1.3.1 Wastewater from washout of concrete, unless managed by an appropriate control as described in Part 2.3.4; 1.3.2 Wastewater from washout and/or cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; 1.3.3 Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 1.3.4 Soaps, solvents, or detergents used in vehicle and equipment washing or external building washdown; and 1.3.5 Toxic or hazardous substances from a spill or other release. 6 EPA notes that operators may need to comply with additional procedures to verify that the dewatering discharge is uncontaminated. Operators should review Part 9 to determine if any of these requirements apply to their discharge and should ensure that they have complied with any State,Tribal, or local dewatering requirements that apply. 7 EPA includes these prohibited non-stormwater discharges here as a reminder to the operator that the only non-stormwater discharges authorized by this permit are at Part 1.2.2.Any unauthorized non-stormwater discharges must be covered under an individual permit or alternative general permit. Page 4 2022 Construction General Permit (CGP) 1.4 SUBMITTING YOUR NOTICE OF INTENT(NOI) All "operators" (as defined in Appendix A) associated with your construction site who meet the Part 1.1 eligibility conditions, and who seek coverage under this permit, must submit to EPA a complete and accurate NOI in accordance with the deadlines in Table 1 prior to commencement of construction activities (as defined in Appendix A). Exception: If you are conducting construction activities in response to a public emergency (e.g., mud slides, earthquake, extreme flooding conditions, widespread disruption in essential public services), and the related work requires immediate authorization to avoid imminent endangerment to human health, public safety, or the environment, or to reestablish essential public services, you may discharge on the condition that a complete and accurate NOI is submitted within 30 calendar days after commencing construction activities (see Table 1) establishing that you are eligible for coverage under this permit. You must also provide documentation in your Stormwater Pollution Prevention Plan (SWPPP) to substantiate the occurrence of the public emergency pursuant to Part 7.2.3i. 1.4.1 Prerequisite for Submitting Your NOI You must develop a SWPPP consistent with Part 7 before submitting your NOI for coverage under this permit. 1.4.2 How to Submit Your NOI You must use EPA's NPDES eReporting Tool (NeT) to electronically prepare and submit your NOI for coverage under the 2022 CGP unless you received a waiver from your applicable EPA Regional Office. To access NeT, go to„.t s: c x. . o c x. Waivers from electronic reporting may be granted based on one of the following conditions: a. If your operational headquarters is physically located in a geographic area (i.e., ZIP code or census tract) that is identified as under-served for broadband Internet access in the most recent report from the Federal Communications Commission; or b. If you have limitations regarding available computer access or computer capability. If the EPA Regional Office grants you approval to use a paper NOI, and you elect to use it, you must complete the form in Appendix H. 1.4.3 Deadlines for Submitting Your NOI and Your Official Date of Permit Coverage Table 1 provides the deadlines for submitting your NOI and the official start date of your permit coverage,which differ depending on when you commence construction activities. Page 5 2022 Construction General Permit (CGP) Table 1 NOI Submittal Deadlines and Official Start Date for Permit Coverage Type of Operator NOI Submittal Deadline$ Permit Authorization Date9 Operator of a new site (i.e., a site At least 14 calendar days before 14 calendar days after EPA where construction activities commencing construction notifies you that it has commence on or after February 17, activities. received a complete NOI, 2022) unless EPA notifies you that your authorization is delayed or denied. Operator of an existing site (i.e.,a site No later than May 18,2022. 14 calendar days after EPA with 2017 CGP coverage where notifies you that it has construction activities commenced received a complete NOI, prior to February 17,2022) unless EPA notifies you that your authorization is delayed or denied. Provided you submit your NOI no later than May 18,2022, your authorization under the 2017 CGP is automatically continued until you have been granted coverage under this permit or an alternative NPDES permit, or coverage is otherwise terminated. New operator of a permitted site (i.e., At least 14 calendar days before 14 calendar days after EPA an operator that through transfer of the date the transfer to the new notifies you that it has ownership and/or operation replaces operator will take place. received a complete NOI, the operator of an already permitted unless EPA notifies you that construction site that is either a "new your authorization is delayed site" or an "existing site") or denied. Operator of an "emergency-related No later than 30 calendar days You are considered project" (i.e., a project initiated in after commencing construction provisionally covered under response to a public emergency activities. the terms and conditions of (e.g., mud slides,earthquake, this permit immediately, and extreme flooding conditions, fully covered 14 calendar disruption in essential public services), days after EPA notifies you for which the related work requires that it has received a immediate authorization to avoid complete NOI, unless EPA imminent endangerment to human notifies you that your health or the environment,or to authorization is delayed or reestablish essential public services) denied. 8 If you miss the deadline to submit your NOI, any and all discharges from your construction activities will continue to be unauthorized under the CWA until they are covered by this or a different NPDES permit. EPA may take enforcement action for any unpermitted discharges that occur between the commencement of construction activities and discharge authorization. 9 Discharges are not authorized if your NOI is incomplete or inaccurate or if you are not eligible for permit coverage. Page 6 2022 Construction General Permit (CGP) 1.4.4 Modifying your NOI If after submitting your NOI you need to correct or update any fields, you may do so by submitting a "Change NOI" form using NeT. Waivers from electronic reporting may be granted as specified in Part 1.4.2. If the EPA Regional Office has granted you approval to submit a paper NOI modification, you may indicate any NOI changes on the same NOI form in Appendix H. When there is a change to the site's operator, the new operator must submit a new NOI, and the previous operator must submit a Notice of Termination (NOT) form as specified in Part 8.3. The following modifications to an NOI form will result in a 14-day review process: • Changes to the name of the operator; • Changes to the project or site name; • Changes to the estimated area to be disturbed; • Changes to the name of the receiving water10, or additions to the applicable receiving waters; • Changes to eligibility information related to endangered species protection or historic preservation; • Changes to information provided related to the use of chemical treatment at your site; and • Changes to answers provided regarding the demolition of structures over 10,000 square feet of floor space built or renovated before January 1, 1980. During the 14-day review process, you may continue to operate based on the information provided in your original NOI, but you must wait until the review period has ended before you may commence or continue activities on any portion of your site that would be affected by any of the above modifications, unless EPA notifies you that the authorization is delayed or denied. 1.4.5 Your Official End Date of Permit Coverage Once covered under this permit, your coverage will last until the date that: a. You terminate permit coverage consistent with Part 8; or b. You receive permit coverage under a different NPDES permit or a reissued or replacement version of this permit after expiring on February 16, 2027; or c. You fail to submit an NOI for coverage under a reissued or replacement version of this permit before the deadline for existing construction sites where construction activities continue after this permit has expired. 1.5 REQUIREMENT TO POST A NOTICE OF YOUR PERMIT COVERAGE You must post a sign or other notice of your permit coverage at a safe, publicly accessible location in close proximity to the construction site. The notice must be located so it is visible from the public road that is nearest to the active part of the construction 10 As defined in Appendix A,a "receiving water" is "a "Water of the United States" as defined in 40 CFR §122.2 into which the regulated stormwater discharges. Page 7 2022 Construction General Permit (CGP) site, and it must use a font large enough to be readily viewed from a public right-of- way.11 At a minimum, the notice must include: a. The NPDES ID (i.e., permit tracking number assigned to your NOI and the EPA webpage where a copy of the NOI can be found . . . ; b. A contact name and phone number for obtaining additional construction site information; c. The Uniform Resource Locator (URL) for the SWPPP (if available), or the following statement: "If you would like to obtain a copy of the Stormwater Pollution Prevention Plan (SWPPP) for this site, contact the EPA Regional Office at [include the appropriate CGP Regional Office contact information found at 1;" and d. The following statement "If you observe indicators of stormwater pollutants in the discharge or in the receiving water, contact the EPA through the following website: n,.I.. i ,.I..ii ns." 2 TECHNOLOGY-BASED EFFLUENT LIMITATIONS You must comply with the following technology-based effluent limitations in this Part for all authorized discharges.12 2.1 GENERAL STORMWATER CONTROL DESIGN.. INSTALLATION.. AND MAINTENANCE REQUIREMENTS You must design, install, and maintain stormwater controls required in Parts 2.2, 2.3, and 2.4 to minimize the discharge of pollutants in stormwater from construction activities.13To meet this requirement, you must: 2.1.1 Account for the following factors in designing your stormwater controls: a. The expected amount, frequency, intensity, and duration of precipitation;14 b. The nature of stormwater runoff (i.e., flow) and run-on at the site, including factors such as expected flow from impervious surfaces, slopes, and site drainage features. You must design stormwater controls to control stormwater volume, velocity, and peak flow rates to minimize discharges of pollutants in stormwater and to minimize channel and streambank erosion and scour in the immediate vicinity of discharge points; and c. The soil type and range of soil particle sizes expected to be present on the site. >> If the active part of the construction site is not visible from a public road, then place the notice of permit coverage in a position that is visible from the nearest public road and as close as possible to the construction site. 12 For each of the effluent limits in Part 2, as applicable to your site,you must include in your SWPPP (1) a description of the specific control(s) to be implemented to meet the effluent limit; (2) any applicable design specifications; (3) routine maintenance specifications; and (4) the projected schedule for installation/implementation.See Part 7.2.6. 13 The permit does not recommend or endorse specific products or vendors. 14 Stormwater controls must be designed using the most recent data available to account for recent precipitation patterns and trends. Page 8 2022 Construction General Permit (CGP) If your site is exposed to or has previously experienced major storms, such as hurricanes, storm surge, extreme/heavy precipitation, and flood events, you should also include consideration of and contingencies for whether implementing structural improvements, enhanced/resilient stormwater controls, and other mitigation measures may help minimize impacts from stormwater discharges from such major storm events. 2.1.2 Design and install all stormwater controls in accordance with good engineering practices, including applicable design specifications.15 2.1.3 Complete installation of stormwater controls by the time each phase of construction activities has begun. a. By the time construction activity in any given portion of the site begins, install and make operational any downgradient sediment controls (e.g., buffers, perimeter controls, exit point controls, storm drain inlet protection) that control discharges from the initial site clearing, grading, excavating, and other earth-disturbing activities.16 b. Following the installation of these initial controls, install and make operational all stormwater controls needed to control discharges prior to subsequent earth- disturbing activities. 2.1.4 Ensure all stormwater controls are maintained and remain in effective operating condition during permit coverage and are protected from activities that would reduce their effectiveness. a. Comply with any specific maintenance requirements for the stormwater controls listed in this permit, as well as any recommended by the manufacturer.17 b. If at any time you find that a stormwater control needs routine maintenance (i.e., minor repairs or other upkeep performed to ensure the site's stormwater controls remain in effective operating condition, not including significant repairs or the need to install a new or replacement control), you must immediately initiate the needed work, and complete such work by the close of the next business day. If it is infeasible to complete the routine maintenance by the close of the next business day, you must document why this is the case and why the repair or other upkeep to be performed should still be considered routine maintenance in your inspection report under Part 4.7.1 c and complete such work no later than seven (7) calendar days from the time of discovery of the condition requiring maintenance. c. If you must repeatedly (i.e., three (3) or more times) make the same routine maintenance fixes to the same control at the same location, even if the fix can be completed by the close of the next business day, you must either: i. Complete work to fix any subsequent repeat occurrences of this same problem under the corrective action procedures in Part 5, including keeping any records 15 Design specifications may be found in manufacturer specifications and/or in applicable erosion and sediment control manuals or ordinances.Any departures from such specifications must reflect good engineering practices and must be explained in your SWPPP.You must also comply with any additional design and installation requirements specified for the effluent limits in Parts 2.2,2.3, and 2.4. 16 Note that the requirement to install stormwater controls prior to each phase of construction activities for the site does not apply to the earth disturbance associated with the actual installation of these controls. Operators should take all reasonable actions to minimize the discharges of pollutants during the installation of stormwater controls. 17 Any departures from such maintenance recommendations made by the manufacturer must reflect good engineering practices and must be explained in your SWPPP. Page 9 2022 Construction General Permit (CGP) of the condition and how it was corrected under Part 5.4; or ii. Document in your inspection report under Part 4.7.1 c why the specific reoccurrence of this same problem should still be addressed as a routine maintenance fix under this Part.18 d. If at any time you find that a stormwater control needs a significant repair or that a new or replacement control is needed, you must comply with the corrective action deadlines for completing such work in in Part 5.2.1 c. 2.2 EROSION AND SEDIMENT CONTROL REQUIREMENTS You must implement erosion and sediment controls in accordance with the following requirements to minimize the discharge of pollutants in stormwater from construction activities. 2.2.1 Provide and maintain natural buffers and/or equivalent erosion and sediment controls for discharges to any receiving waters that is located within 50 feet of the site's earth disturbances. a. Compliance Alternatives. For any discharges to receiving waters located within 50 feet of your site's earth disturbances, you must comply with one of the following alternatives: i. Provide and maintain a 50-foot undisturbed natural buffer; or ii. Provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by erosion and sediment controls that achieve, in combination, the sediment load reduction equivalent to a 50-foot undisturbed natural buffer; or HE, If infeasible to provide and maintain an undisturbed natural buffer of any size, implement erosion and sediment controls to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer. See Appendix F, Part F.2 for additional conditions applicable to each compliance alternative. b. Exceptions. See Appendix F, Part F.2 for exceptions to the compliance alternatives. 2.2.2 Direct stormwater to vegetated areas and maximize stormwater infiltration and filtering to reduce pollutant discharges, unless infiltration would be inadvisable due to the underlying geology(e.g., karst topography) and ground water contamination concerns, or infeasible due to site conditions.19 18 Such documentation could include,for example, that minor repairs completed within the required timeframe are all that is necessary to ensure that the stormwater control continues to operate as designed and installed and that the stormwater control remains appropriate for the flow reaching it. 19 Operators should consider whether factors such as specific contaminant concerns from the construction site,the underlying soils or geology, hydrology, depth to the ground water table, or proximity to source water or wellhead protection area(s) make the site unsuitable for infiltrating construction stormwater.Site conditions that may be of particular concern include proximity to: a current or future drinking water aquifer; a drinking water well or spring (including private/household wells); highly conductive geology such as karst; known pollutant hot spots, such as hazardous waste sites, landfills, gas stations, brownfields; an on- site sewage system or underground storage tank; or soils that do not allow for infiltration. Operators may find it helpful to consult EPA's IDrii.inkiiir aleir a iin Iliacaliion Io I irolecl SOuirce aleirs ID IDS . DWMAPS is an online mapping tool that can be used to locate drinking water providers, potential sources of contamination, polluted waterways, and information on protection initiatives in the site area. Page 10 2022 Construction General Permit (CGP) 2.2.3 Install sediment controls along any perimeter areas of the site that are downslope from any exposed soil or other disturbed areas.20 a. The perimeter control must be installed upgradient of any natural buffers established under Part 2.2.1, unless the control is being implemented pursuant to Part 2.2.1 a.ii-iii; b. To prevent stormwater from circumventing the edge of the perimeter control, install the perimeter control on the contour of the slope and extend both ends of the control up slope (e.g., at 45 degrees) forming a crescent rather than a straight line; c. After installation, to ensure that perimeter controls continue to work effectively: i. Remove sediment before it has accumulated to one-half of the above-ground height of any perimeter control; and ii. After a storm event, if there is evidence of stormwater circumventing or undercutting the perimeter control, extend controls and/or repair undercut areas to fix the problem. d. Exception. For areas at "linear construction sites" (as defined in Appendix A) where perimeter controls are infeasible (e.g., due to a limited or restricted right-of-way), implement other practices as necessary to minimize pollutant discharges to perimeter areas of the site. 2.2.4 Minimize sediment track-out. a. Restrict vehicle use to properly designated exit points; b. Use appropriate stabilization techniques21 at all points that exit onto paved roads; i. Exception: Stabilization is not required for exit points at linear utility construction sites that are used only episodically and for very short durations over the life of the project, provided other exit point controls22 are implemented to minimize sediment track-out; c. Implement additional track-out controls23 as necessary to ensure that sediment removal occurs prior to vehicle exit; and d. Where sediment has been tracked-out from your site onto paved roads, sidewalks, or other paved areas outside of your site, remove the deposited sediment by the end of the same business day in which the track-out occurs or by the end of the next business day if track-out occurs on a non-business day. Remove the track-out by sweeping, shoveling, or vacuuming these surfaces, or by using other similarly effective means of sediment removal. You are prohibited from hosing or sweeping tracked-out 20 Examples of perimeter controls include filter berms; different types of silt fence such as wire-backed silt fence,super silt fence, or multi-layer geotextile silt fence; compost filter socks; gravel barriers; and temporary diversion dikes. 21 Examples of appropriate stabilization techniques include the use of aggregate stone with an underlying geotextile or non-woven filter fabric, and turf mats. 22 Examples of other exit point controls include preventing the use of exit points during wet periods; minimizing exit point use by keeping vehicles on site to the extent possible; limiting exit point size to the width needed for vehicle and equipment usage; using scarifying and compaction techniques on the soil; and avoiding establishing exit points in environmentally sensitive areas (e.g., karst areas;steep slopes). 23 Examples of additional track-out controls include the use of wheel washing, rumble strips, and rattle plates. Page 1 1 2022 Construction General Permit (CGP) sediment into any constructed or natural site drainage feature, storm drain inlet, or receiving water.24 2.2.5 Manage stockpiles or land clearing debris piles composed, in whole or in part, of sediment and/or soi1:25 a. Locate the piles outside of any natural buffers established under Part 2.2.1 and away from any constructed or natural site drainage features, storm drain inlets, and areas where stormwater flow is concentrated; b. Install a sediment barrier along all downgradient perimeter areas of stockpiled soil or land clearing debris piles;26 c. For piles that will be unused for 14 or more days, provide cover27 or appropriate temporary stabilization (consistent with Part 2.2.14); d. You are prohibited from hosing down or sweeping soil or sediment accumulated on pavement or other impervious surfaces into any constructed or natural site drainage feature, storm drain inlet, or receiving water. 2.2.6 Minimize dust. On areas of exposed soil, minimize dust through the appropriate application of water or other dust suppression techniques to control the generation of pollutants that could be discharged in stormwater from the site. 2.2.7 Minimize steep slope disturbances. Minimize the disturbance of "steep slopes" (as defined in Appendix A).28 2.2.8 Preserve native topsoil, unless infeasible.29 2.2.9 Minimize soil compaction.30 In areas of your site where final vegetative stabilization will occur or where infiltration practices will be installed: 24 Fine grains that remain visible (e.g.,staining) on the surfaces of off-site streets, other paved areas, and sidewalks after you have implemented sediment removal practices are not a violation of Part 2.2.4. 25 The requirements in Part 2.2.5 do not apply to the storage of rock, such as rip rap, landscape rock, pipe bedding gravel, and boulders. Refer to Part 2.3.3a for the requirements that apply to these types of materials. 26 Examples of sediment barriers include berms, dikes,fiber rolls,silt fences, sandbags, gravel bags, or straw bale. 27 Examples of cover include tarps, blown straw and hydroseeding. 28 Where disturbance to steep slopes cannot be avoided, operators should consider implementing controls suitable for steep slope disturbances that are effective at minimizing erosion and sediment discharge (e.g., preservation of existing vegetation, hydraulic mulch, geotextiles and mats, compost blankets, earth dikes or drainage swales, terraces,velocity dissipation devices).To identify slopes and soil types that are of comparatively higher risk for sediment discharge in areas of the country where the CGP is in effect, operators can use the tables in Appendix F (see Tables F-2 thru F-6). 29 Stockpiling topsoil at off-site locations,or transferring topsoil to other locations,is an example of a practice that is consistent with the requirements in Part 2.2.8. Preserving native topsoil is not required where the intended function of a specific area of the site dictates that the topsoil be disturbed or removed. For example,some sites may be designed to be highly impervious after construction, and therefore little or no vegetation is intended to remain, or may not have space to stockpile native topsoil on site for later use,in which case it may not be feasible to preserve topsoil. 30 Minimizing soil compaction is not required where the intended function of a specific area of the site dictates that it be compacted. Page 12 2022 Construction General Permit (CGP) a. Restrict vehicle and equipment use in these locations to avoid soil compaction; and b. Before seeding or planting areas of exposed soil that have been compacted, use techniques that rehabilitate and condition the soils as necessary to support vegetative growth. 2.2.10 Protect storm drain inlets. a. Install inlet protection measures that remove sediment from discharges prior to entry into any storm drain inlet that carries stormwater from your site to a receiving water, provided you have authority to access the storm drain inlet.31 Inlet protection measures are not required for storm drain inlets that are conveyed to a sediment basin, sediment trap, or similarly effective control; and b. Clean, or remove and replace, the inlet protection measures as sediment accumulates, the filter becomes clogged, and/or performance is compromised. Where there is evidence of sediment accumulation adjacent to the inlet protection measure, remove the deposited sediment by the end of the same business day in which it is found or by the end of the following business day if removal by the same business day is not feasible. 2.2.11 Control stormwater discharges, including both peak flowrates and total stormwater volume, to minimize channel and streambank erosion and scour in the immediate vicinity of discharge points.32 2.2.12 If you install a sediment basin or similar impoundment: a. Situate the basin or impoundment outside of any receiving water. and any natural buffers established under Part 2.2.1; b. Design the basin or impoundment to avoid collecting water from wetlands; c. Design the basin or impoundment to provide storage for either: i. The calculated volume of runoff from a 2-year, 24-hour storm;33 or ii. 3,600 cubic feet per acre drained. d. Utilize outlet structures that withdraw water from the surface of the sediment basin or similar impoundment, unless infeasible;34 e. Use erosion controls and velocity dissipation devices to prevent erosion at inlets and outlets; and 31 Inlet protection measures can be removed in the event of flood conditions or to prevent erosion. 32 Examples of stormwater controls that can be used to comply with this requirement include the use of erosion controls and/or velocity dissipation devices (e.g., check dams,sediment traps),within and along the length of a constructed site drainage feature and at the outfall to slow down stormwater. 33 Operators may refer to Ih�..::1::::1:..p..... ./.................................................a. ..p. ...m.gOv/nldes/c ns,.Liruc,.Lii n,....,geneirall,....,peiririi,.L,....,ireOuirces,....,,.L0011s,....,and,...., „ IIa��I s for guidance on determining the volume of precipitation associated with their site's local 2-year, ....I g g p p Y 24-hour storm event. 34 The circumstances in which it is infeasible to design outlet structures in this manner are rare. Exceptions may include areas with extended cold weather,where using surface outlets may not be feasible during certain time periods (although they must be used during other periods). If you determine that it is infeasible to meet this requirement,you must provide documentation in your SWPPP to support your determination, including the specific conditions or time periods when this exception will apply. Page 13 2022 Construction General Permit (CGP) f. Remove accumulated sediment to maintain at least one-half of the design capacity and conduct all other appropriate maintenance to ensure the basin or impoundment remains in effective operating condition. 2.2.13 If using treatment chemicals (e.g., polymers, flocculants, coagulants): a. Use conventional erosion and sediment controls before and after the application of treatment chemicals. Chemicals may only be applied where treated stormwater is directed to a sediment control (e.g., sediment basin, perimeter control) before discharge. b. Select appropriate treatment chemicals. Chemicals must be appropriately suited to the types of soils likely to be exposed during construction and present in the discharges being treated (i.e., the expected turbidity, pH, and flow rate of stormwater flowing into the chemical treatment system or area). c. Minimize discharge risk from stored chemicals. Store all treatment chemicals in leak- proof containers that are kept under storm-resistant cover and surrounded by secondary containment structures (e.g.,spill berms, dikes, spill containment pallets), or provide equivalent measures designed and maintained to minimize the potential discharge of treatment chemicals in stormwater or by any other means (e.g., storing chemicals in a covered area, having a spill kit available on site and ensuring personnel are available to respond expeditiously in the event of a leak or spill). d. Comply with State/local requirements. Comply with applicable State and local requirements regarding the use of treatment chemicals. e. Use chemicals in accordance with good engineering practices and specifications of the chemical provider/supplier. Use treatment chemicals and chemical treatment systems in accordance with good engineering practices, and with dosing specifications and sediment removal design specifications provided by the provider/supplier of the applicable chemicals, or document in your SWPPP specific departures from these specifications and how they reflect good engineering practice. f. Ensure proper training. Ensure all persons who handle and use treatment chemicals at the construction site are provided with appropriate, product-specific training prior to beginning application of treatment chemicals. Among other things, the training must cover proper dosing requirements. g. Perform additional measures specified by the EPA Regional Office for the authorized use of cationic chemicals. If you have been authorized to use cationic chemicals at your site pursuant to Part 1.1.9, you must perform all additional measures as conditioned by your authorization to ensure the use of such chemicals will not result in discharges that do not meet water quality standards. 2.2.14 Stabilize exposed portions of the site. Implement and maintain stabilization measures (e.g., seeding protected by erosion controls until vegetation is established,35 sodding, mulching, erosion control blankets, hydromulch, gravel) that minimize erosion from any areas of exposed soil on the site in accordance with Part. 35 If you will be evaluating the use of some type of erosion control netting to the site as part of your site stabilization, EPA encourages you to consider employing products that have been shown to minimize Page 14 2022 Construction General Permit (CGP) a. Stabilization Deadlines:36 Table 2 Deadlines for Initiating and Completing Site Stabilization. Total Amount of Land Disturbance Deadline Occurring At Any One Time37 i. Five acres or less(55.0) Initiate the installation of stabilization measures immediately38 in any areas of exposed soil where Note:this includes sites disturbing more construction activities have permanently ceased or will than five acres(>5.0)total over the be temporarily inactive for 14 or more calendar days;39 course of a project, but that limit and disturbance at any one time ri.e.,phase Complete the installation of stabilization measures as the disturbance) to five acres or less soon as practicable, but no later than 14 calendar days <_5.0 impacts on wildlife. For instance,the U.S. Fish &Wildlife Service provides recommendations on the type of netting practices that are considered "wildlife friendly," including those that use natural fiber or 100 percent biodegradable materials and that use a loose weave with a non-welded, movable jointed netting, as well as those products that are not wildlife friendly including square plastic netting that are degradable (e.g., photodegradable, UV-degradable, oxo-degradable), netting made from polypropylene, nylon, polyethylene, or polyester.Other recommendations include removing the netting product when it is no longer needed.See htl. s: .f s. ov mid esl easlllansiin Iliilbirai df illdlliifel iriieindll IEirosiioin n-.l.irolllPiroduc-.l.'s it viised. df for further information.There also may be State,Tribal, or local requirements about using wildlife friendly erosion control products. 36 EPA may determine, based on an inspection carried out under Part 4.8 and corrective actions required under Part 5.3,that the level of sediment discharge on the site makes it necessary to require a faster schedule for completing stabilization. For instance, if sediment discharges from an area of exposed soil that is required to be stabilized are compromising the performance of existing stormwater controls, EPA may require stabilization to correct this problem. 37 Limiting disturbances to five (5) acres or less at any one time means that at no time during the project do the cumulative earth disturbances exceed five (5) acres.The following examples would qualify as limiting disturbances at any one time to five (5) acres or less: 1. The total area of disturbance for a project is five (5) acres or less. 2. The total area of disturbance for a project will exceed five (5) acres, but the operator ensures that no more than five (5) acres will be disturbed at any one time through implementation of stabilization measures. In this way,site stabilization can be used to "free up" land that can be disturbed without exceeding the five (5)-acre cap to qualify for the 14-day stabilization deadline. For instance,if an operator completes stabilization of two (2) acres of land on a five (5)-acre disturbance,then two (2) additional acres could be disturbed while still qualifying for the longer 14-day stabilization deadline. 38 The following are examples of activities that would constitute the immediate initiation of stabilization: 1. Prepping the soil for vegetative or non-vegetative stabilization as long as seeding, planting, and/or installation of non-vegetative stabilization products takes place as soon as practicable, but no later than one (1) calendar day of completing soil preparation; 2. Applying mulch or other non-vegetative product to the exposed area; 3. Seeding or planting the exposed area; 4. Starting any of the activities in # 1 -3 on a portion of the entire area that will be stabilized; and 5. Finalizing arrangements to have stabilization product fully installed in compliance with the deadlines for completing stabilization. 39 The requirement to initiate stabilization immediately is triggered as soon as you know that construction work on a portion of the site is temporarily ceased and will not resume for 14 or more days, or as soon as you know that construction work is permanently ceased. In the context of this provision, "immediately" means as soon as practicable, but no later than the end of the next business day, following the day when the construction activities have temporarily or permanently ceased. Page 15 2022 Construction General Permit (CGP) Total Amount of Land Disturbance Deadline Occurring At Any One Time37 after stabilization has been initiated.40 ii.More than five acres(>5.0) Initiate the installation of stabilization measures immediately41 in any areas of exposed soil where construction activities have permanently ceased or will be temporarily inactive for 14 or more calendar days;42 and • Complete the installation of stabilization measures as soon as practicable, but no later than seven (7) calendar days after stabilization has been initiated.43 b. Exceptions: i. Arid,semi-arid, and drought-stricken areas (as defined in Appendix A). If it is the seasonally dry period (as defined in Appendix A)44 or a period in which drought is occurring, and vegetative stabilization measures are being used: (a) Immediately initiate and,within 14 calendar days of temporary or permanent cessation of work in any portion of your site, complete the installation of temporary non-vegetative stabilization measures to the extent necessary to prevent erosion; (b) As soon as practicable, given conditions or circumstances on the site, complete all activities necessary to seed or plant the area to be stabilized; and (c) If construction is occurring during the seasonally dry period, indicate in your SWPPP the beginning and ending dates of the seasonally dry period and your site conditions. Also include the schedule you will follow for initiating and completing vegetative stabilization. ii. Unforeseen circumstances. Operators that are affected by unforeseen circumstances45 that delay the initiation and/or completion of vegetative stabilization: 40 If vegetative stabilization measures are being implemented,stabilization is considered "installed"when all activities necessary to seed or plant the area are completed, including the application of any non- vegetative protective cover (e.g., mulch, erosion control blanket), if applicable. If non-vegetative stabilization measures are being implemented,stabilization is considered "installed"when all such measures are implemented or applied. 41 See footnote 38. 42 See footnote 39. 43 See footnote 40. 44 The term "seasonally dry period" as defined in Appendix A refers to a month in which the long-term average total precipitation is less than or equal to 0.5 inches. Refer to EPA's Seasonally Dry Period Locator Too at,I�..::..::::.:..p........�. .......... . ..p.g...m.. ov in d s coin ,.l.iruc,.l.ii n,...., eneirall,...., eirir ii,.l.,....,ir s0uirce ,....,,.Iooll [eimio Ila,.l. s and supporting maps for assistance in determining whether a site is operating during a seasonally dry period for the area. 45 Examples include problems with the supply of seed stock or with the availability of specialized equipment and unsuitability of soil conditions due to excessive precipitation and/or flooding. Page 16 2022 Construction General Permit (CGP) (a) Immediately initiate and,within 14 calendar days, complete the installation of temporary non-vegetative stabilization measures to prevent erosion; (b) Complete all soil conditioning, seeding,watering or irrigation installation, mulching, and other required activities related to the planting and initial establishment of vegetation as soon as conditions or circumstances allow it on your site; and (c) Document in the SWPPP the circumstances that prevent you from meeting the deadlines in Part 2.2.14a and the schedule you will follow for initiating and completing stabilization. iii. Discharges to a sediment- or nutrient-impaired water or to a water that is identified by your State,Tribe, or EPA as Tier 2,Tier 2.5, or Tier 3 for antidegradation purposes. Complete stabilization as soon as practicable, but no later than seven (7) calendar days after stabilization has been initiated. c. Final Stabilization Criteria (for any areas not covered by permanent structures): i. Establish uniform, perennial vegetation (i.e., evenly distributed, without large bare areas) to provide 70 percent or more of the vegetative cover native to local undisturbed areas; and/or ii. Implement permanent non-vegetative stabilization measures46 to provide effective cover of any areas of exposed soil. HE, Exceptions: (a) Arid,semi-arid, and drought-stricken areas (as defined in Appendix A). Final stabilization is met if the area has been seeded or planted to establish vegetation that provides 70 percent or more of the vegetative cover native to local undisturbed areas within three (3) years and, to the extent necessary to prevent erosion on the seeded or planted area, non-vegetative erosion controls have been applied to provide cover for at least three years without active maintenance. (b) Disturbed areas on agricultural land that are restored to their preconstruction agricultural use. The Part 2.2.14c final stabilization criteria do not apply. (c) Areas that need to remain disturbed. In limited circumstances, stabilization may not be required if the intended function of a specific area of the site necessitates that it remain disturbed, and only the minimum area needed remains disturbed (e.g., dirt access roads, utility pole pads, areas being used for storage of vehicles, equipment, materials). 2.3 POLLUTION PREVENTION REQUIREMENTS47 You must implement pollution prevention controls in accordance with the following requirements to minimize the discharge of pollutants in stormwater and to prevent the discharge of pollutants from spilled or leaked materials from construction activities. 46 Examples of permanent non-vegetative stabilization measures include riprap, gravel, gabions, and geotextiles. 47 Under this permit,you are not required to minimize exposure for any products or materials where the exposure to precipitation and to stormwater will not result in a discharge of pollutants, or where exposure of a specific material or product poses little risk of stormwater contamination (such as final products and materials intended for outdoor use). Page 17 2022 Construction General Permit (CGP) 2.3.1 For equipment and vehicle fueling and maintenance: a. Provide an effective means of eliminating the discharge of spilled or leaked chemicals, including fuels and oils, from these activities;48 b. If applicable, comply with the Spill Prevention Control and Countermeasures (SPCC) requirements in 40 CFR part 112 and Section 311 of the CWA; c. Ensure adequate supplies are available at all times to handle spills, leaks, and disposal of used liquids; d. Use drip pans and absorbents under or around leaky vehicles; e. Dispose of or recycle oil and oily wastes in accordance with other Federal, State, Tribal, or local requirements; and f. Clean up spills or contaminated surfaces immediately, using dry clean up measures (do not clean contaminated surfaces by hosing the area down), and eliminate the source of the spill to prevent a discharge or a continuation of an ongoing discharge. 2.3.2 For equipment and vehicle washing: a. Provide an effective means of minimizing the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other types of wash waters;49 b. Ensure there is no discharge of soaps, solvents, or detergents in equipment and vehicle wash water; and c. For storage of soaps, detergents, or solvents, provide either (1) cover (e.g., plastic sheeting, temporary roofs) to minimize the exposure of these detergents to precipitation and to stormwater, or (2) a similarly effective means designed to minimize the discharge of pollutants from these areas. 2.3.3 For storage, handling, and disposal of building products, materials, and wastes:so a. For building materials and building products,51 provide either (1) cover (e.g., plastic sheeting, temporary roofs) to minimize the exposure of these products to 48 Examples of effective means include: • Locating activities away from receiving waters,storm drain inlets, and constructed or natural site drainage feature so that stormwater coming into contact with these activities cannot reach waters of the U.S.; • Providing secondary containment (e.g.,spill berms, dikes, spill containment pallets) and cover where appropriate; and • Having a spill kit available on site and ensuring personnel are available to respond expeditiously in the event of a leak or spill. 49 Examples of effective means include locating activities away from receiving waters and storm drain inlets or constructed or natural site drainage features and directing wash waters to a sediment basin or sediment trap, using filtration devices,such as filter bags or sand filters, or using other similarly effective controls. 50 Compliance with the requirements of this permit does not relieve compliance requirements with respect to Federal,State, or local laws and regulations governing the storage, handling, and disposal of solid, hazardous, or toxic wastes and materials. 51 Examples of building materials and building products typically present at construction sites include asphalt sealants, copper flashing,roofing materials, adhesives, concrete admixtures, and gravel and mulch stockpiles. Page 18 2022 Construction General Permit (CGP) precipitation and to stormwater, or (2) a similarly effective means designed to minimize the discharge of pollutants from these areas. Exception: Minimization of exposure is not required in cases where the exposure to precipitation and to stormwater will not result in a discharge of pollutants, or where exposure of a specific material or product poses little risk of stormwater contamination (such as final products and materials intended for outdoor use). b. For pesticides, herbicides, insecticides, fertilizers, and landscape materials: L In storage areas, provide either (1) cover (e.g., plastic sheeting, temporary roofs) to minimize the exposure of these chemicals to precipitation and to stormwater, or (2) a similarly effective means designed to minimize the discharge of pollutants from these areas; and ii. Comply with all application and disposal requirements included on the registered pesticide, herbicide, insecticide, and fertilizer label (see also Part 2.3.5). c. For diesel fuel, oil, hydraulic fluids, other petroleum products, and other chemicals: The following requirements apply to the storage and handling of chemicals on your site. If you are already implementing controls as part of an SPCC or other spill prevention plan that meet or exceed the requirements of this Part, you may continue to do so and be considered in compliance with these provisions provided you reference the applicable parts of the SPCC or other plans in your SWPPP as required in Part 7.2.6b.viii. L If any chemical container has a storage capacity of less than 55 gallons: (a) The containers must be water-tight, and must be kept closed, sealed, and secured when not being actively used; (b) If stored outside, use a spill containment pallet or similar device to capture small leaks or spills; and (c) Have a spill kit available on site that is in good working condition (i.e., not damaged, expired, or used up) and ensure personnel are available to respond immediately in the event of a leak or spill. ii. If any chemical container has a storage capacity of 55 gallons or more: (a) The containers must be water-tight, and must be kept closed, sealed, and secured when not being actively used; (b) Store containers a minimum of 50 feet from receiving waters, constructed or natural site drainage features, and storm drain inlets. If infeasible due to site constraints, store containers as far away from these features as the site permits. If site constraints prevent you from storing containers 50 feet away from receiving waters or the other features identified, you must document in your SWPPP the specific reasons why the 50-foot setback is infeasible, and how you will store containers as far away as the site permits; (c) Provide either (1) cover (e.g., temporary roofs) to minimize the exposure of these containers to precipitation and to stormwater, or (2) secondary containment (e.g., curbing, spill berms, dikes, spill containment pallets, double-wall, above-ground storage tank); and (d) Have a spill kit available on site that is in good working condition (i.e., not Page 19 2022 Construction General Permit (CGP) damaged, expired, or used up) and ensure personnel are available to respond immediately in the event of a leak or spill. Additional secondary containment measures are listed at 40 CFR § 1 12.7(c)(1). iii. Clean up spills immediately, using dry clean-up methods where possible, and dispose of used materials properly. You are prohibited from hosing the area down to clean surfaces or spills. Eliminate the source of the spill to prevent a discharge or a furtherance of an ongoing discharge. d. For hazardous or toxic wastes:52 L Separate hazardous or toxic waste from construction and domestic waste; ii. Store waste in sealed containers, constructed of suitable materials to prevent leakage and corrosion, and labeled in accordance with applicable Resource Conservation and Recovery Act (RCRA) requirements and all other applicable Federal, State, Tribal, or local requirements; iii. Store all outside containers within appropriately-sized secondary containment (e.g.,spill berms, dikes, spill containment pallets) to prevent spills from being discharged, or provide a similarly effective means designed to prevent the discharge of pollutants from these areas (e.g., storing chemicals in a covered area, having a spill kit available on site); iv. Dispose of hazardous or toxic waste in accordance with the manufacturer's recommended method of disposal and in compliance with Federal, State, Tribal, and local requirements; v. Clean up spills immediately, using dry clean-up methods, and dispose of used materials properly. You are prohibited from hosing the area down to clean surfaces or spills. Eliminate the source of the spill to prevent a discharge or a furtherance of an ongoing discharge; and A. Follow all other Federal, State, Tribal, and local requirements regarding hazardous or toxic waste. e. For construction and domestic wastes:s3 L Provide waste containers (e.g., dumpster, trash receptacle) of sufficient size and number to contain construction and domestic wastes; (a) For waste containers with lids, keep waste container lids closed when not in use, and close lids at the end of the business day and during storm events. For waste containers without lids, provide either (1) cover(e.g., a tarp, plastic sheeting, temporary roof) to minimize exposure of wastes to precipitation, or (2) a similarly effective means designed to minimize the discharge of pollutants (e.g., secondary containment); (b) On business days, clean up and dispose of waste in designated waste 52 Examples of hazardous or toxic waste that may be present at construction sites include paints,caulks, sealants, fluorescent light ballasts,solvents, petroleum-based products,wood preservatives, additives, curing compounds, and acids. 53 Examples of construction and domestic wastes include packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, styrofoam, concrete, demolition debris; and other trash or discarded materials. Page 20 2022 Construction General Permit (CGP) containers; and (c) Clean up immediately if containers overflow, and if there is litter elsewhere on the site from escaped trash. ii. Waste containers are not required for the waste remnant or unused portions of construction materials or final products that are covered by the exception in Part 2.2.3a provided that: (a) These wastes are stored separately from other construction or domestic wastes addressed by Part 2.3.3e.i (i.e., wastes not covered by the exception in Part 2.3.3a). If the wastes are mixed, they must be stored in waste containers as required in Part 2.3.3e.i; and (b) These wastes are stored in designated areas of the site, the wastes are described in the SWPPP (see Part 7.2.6b.ix), and identified in the site plan (see Part 7.2.4i). f. For sanitary waste, position portable toilets so they are secure and will not be tipped or knocked over, and are located away from receiving waters, storm drain inlets, and constructed or natural site drainage features. 2.3.4 For washing applicators and containers used for stucco, paint, concrete,form release oils, curing compounds, or other materials: a. Direct wash water into a leak-proof container or leak-proof and lined pit designed so no overflows can occur due to inadequate sizing or precipitation; b. Handle washout or cleanout wastes as follows: i. For liquid wastes: (a) Do not dump liquid wastes or allow them to enter into constructed or natural site drainage features, storm inlets, or receiving waters; (b) Do not allow liquid wastes to be disposed of through infiltration or to otherwise be disposed of on the ground; (c) Comply with applicable State, Tribal, or local requirements for disposal ii. Remove and dispose of hardened concrete waste consistent with your handling of other construction wastes in Part 2.3.3e; and c. Locate any washout or cleanout activities as far away as possible from receiving waters, constructed or natural site drainage features, and storm drain inlets, and, to the extent feasible, designate areas to be used for these activities and conduct such activities only in these areas. 2.3.5 For the application of fertilizers: a. Apply at a rate and in amounts consistent with manufacturer's specifications, or document in the SWPPP departures from the manufacturer specifications where appropriate in accordance with Part 7.2.6b.x; b. Apply at the appropriate time of year for your location, and preferably timed to coincide as closely as possible to the period of maximum vegetation uptake and growth; Page 21 2022 Construction General Permit (CGP) c. Avoid applying before heavy rains that could cause excess nutrients to be discharged; d. Never apply to frozen ground; e. Never apply to constructed or natural site drainage features; and f. Follow all other Federal, State, Tribal, and local requirements regarding fertilizer application. 2.3.6 Emergency Spill Notification Requirements Discharges of toxic or hazardous substances from a spill or other release are prohibited, consistent with Part 1.3.5. Where a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR part 1 10, 40 CFR part 117, or 40 CFR part 302 occurs during a 24-hour period, you must notify the National Response Center (NRC) at (800) 424-8802 or, in the Washington, DC metropolitan area, call (202) 267-2675 in accordance with the requirements of 40 CFR part 1 10, 40 CFR part 1 17, and 40 CFR part 302 as soon as you have knowledge of the release. You must also, within seven (7) calendar days of knowledge of the release, provide a description of the release, the circumstances leading to the release, and the date of the release. State, Tribal, or local requirements may necessitate additional reporting of spills or discharges to local emergency response, public health, or drinking water supply agencies. 2.4 CONSTRUCTION DEWATERING REQUIREMENTS Comply with the following requirements to minimize the discharge of pollutants from dewatering54 operations. 2.4.1 Route dewatering water through a sediment control (e.g., sediment trap or basin, pumped water filter bag) designed to prevent discharges with visual turbidity;55 2.4.2 Do not discharge visible floating solids or foam; 2.4.3 The discharge must not cause the formation of a visible sheen on the water surface, or visible oily deposits on the bottom or shoreline of the receiving water. Use an oil-water separator or suitable filtration device (such as a cartridge filter) designed to remove oil, grease, or other products if dewatering water is found to or expected to contain these materials; 2.4.4 To the extent feasible, use well-vegetated (e.g., grassy or wooded), upland areas of the site to infiltrate dewatering water before discharge.56 You are prohibited from using receiving waters as part of the treatment area; 2.4.5 To prevent dewatering-related erosion and related sediment discharges: a. Use stable, erosion-resistant surfaces (e.g., well-vegetated grassy areas, clean filter stone, geotextile underlayment) to discharge from dewatering controls; 54 "Dewatering" is defined in Appendix A as "the act of draining accumulated stormwater and/or ground water from building foundations,vaults, and trenches, or other similar points of accumulation." 55 For the purposes of this permit, visual turbidity is present where there is a sediment plume in the discharge or the discharge appears cloudy, or opaque, or has a visible contrast that can be identified by an observer. 56 See footnote 19. Page 22 2022 Construction General Permit (CGP) b. Do not place dewatering controls, such as pumped water filter bags, on steep slopes (as defined in Appendix A); and c. At all points where dewatering water is discharged, comply with the velocity dissipation requirements of Part 2.2.11. 2.4.6 For backwash water, either haul it away for disposal or return it to the beginning of the treatment process; 2.4.7 Replace and clean the filter media used in dewatering devices when the pressure differential equals or exceeds the manufacturer's specifications; and 2.4.8 Comply with dewatering-specific inspection requirements in Part 4. 3 WATER QUALITY-BASED EFFLUENT LIMITATIONS 3.1 GENERAL EFFLUENT LIMITATION TO MEET APPLICABLE WATER QUALITY STANDARDS Discharges must be controlled as necessary to meet applicable water quality standards. Discharges must also comply with any additional State or Tribal requirements that are in Part 9. In the absence of information demonstrating otherwise, EPA expects that compliance with the conditions in this permit will result in stormwater discharges being controlled as necessary to meet applicable water quality standards. If at any time you become aware, or EPA determines, that discharges are not being controlled as necessary to meet applicable water quality standards, you must take corrective action as required in Parts 5.1 and 5.2, and document the corrective actions as required in Part 5.4. EPA may insist that you install additional controls (to meet the narrative water quality- based effluent limit above) on a site-specific basis, or require you to obtain coverage under an individual permit, if information in your NOI or from other sources indicates that your discharges are not controlled as necessary to meet applicable water quality standards. This includes situations where additional controls are necessary to comply with a wasteload allocation in an EPA-established or approved TMDL. If during your coverage under a previous permit, you were required to install and maintain stormwater controls specifically to meet the assumptions and requirements of an EPA-approved or established TMDL (for any parameter) or to otherwise control your discharge to meet water quality standards, you must continue to implement such controls as part of your coverage under this permit. 3.2 WATER QUALITY-BASED CONDITIONS FOR SITES DISCHARGING TO CERTAIN IMPAIRED AND HIGH QUALITY RECEIVING WATERS For any portion of the site that discharges to a sediment or nutrient-impaired water or to a water that is identified by your State, Tribe, or EPA as Tier 2, Tier 2.5, or Tier 3 for antidegradation purposes,57 you must comply with the inspection frequency specified in Part 4.3 and you must comply with the stabilization deadline specified in Part 2.2.14b.iii.58 57 Refer to Appendix A for definitions of "impaired water" and "Tier 2," "Tier 2.5," and "Tier 3" waters. For assistance in determining whether your site discharges to impaired waters, EPA has developed a tool that is available at,Ih ::::::..p..s....... m. a. o n des e as sloirir aLeir dii clh�ait inr a iin LoolIs. For assistance in determining whether your site discharges to a Tier 2,2.5, or 3 water, refer to the list of such waters at Ih�ll s� .e a. ov in es c nslirucliion eneirall eirir iil' iresources l.00lls and l.ei Ilai. S. 58 If you qualify for any of the reduced inspection frequencies in Part 4.4,you may conduct inspections in Page 23 2022 Construction General Permit (CGP) If you discharge to a water that is impaired for a parameter other than a sediment- related parameter or nutrients, EPA will inform you if any additional controls are necessary for your discharge to be controlled as necessary to meet water quality standards. These controls might include those necessary for your discharge to be consistent with the assumptions of any available wasteload allocation in any applicable TMDL. In addition, EPA may require you to apply for and obtain coverage under an individual NPDES permit. In addition, on a case-by-case basis, EPA may notify operators of new sites or operators of existing sites with increased discharges that additional analyses, stormwater controls, and/or other measures are necessary to comply with the applicable antidegradation requirements, or notify you that an individual permit application is necessary. If you discharge to a water that is impaired for polychlorinated biphenyls (PCBs) and are engaging in demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, you must: a. Implement controls59 to minimize the exposure of PCB-containing building materials, including paint, caulk, and pre-1980 fluorescent lighting fixtures, to precipitation and to stormwater; and b. Ensure that disposal of such materials is performed in compliance with applicable State, Federal, and local laws. 3.3 TURBIDITY BENCHMARK MONITORING FOR SITES DISCHARGING DEWATERING WATER TO PROTECT THE WATER QUALITY OF SENSITIVE WATERS For sites discharging dewatering water to "sensitive waters" (i.e., receiving waters listed as impaired for sediment or a sediment-related parameter (as defined in Appendix A), or receiving waters designated as a Tier 2, Tier 2.5, or Tier 3 for antidegradation purposes) you are required to comply with the benchmark monitoring requirements in this Part and document the procedures you will use at your site in your SWPPP pursuant to Part 7.2.8. A summary of these requirements is included in Table 1. EPA notes that the benchmark threshold is not an effluent limitation, rather it is an indicator that the dewatering controls may not be working to protect water quality, which the operator must investigate and correct as appropriate. A benchmark exceedance is not a permit violation. However, if a benchmark exceedance triggers corrective action in Part 5.1.5a, failure to conduct any required action is a permit violation. Where there are multiple operators associated with the same site, the operators may coordinate with one another to carry out the monitoring requirements of this Part in order to avoid duplicating efforts. Such coordinating arrangements must be described in the SWPPP consistent with Part 7.2.8. Regardless of how the operators divide the accordance with Part 4.4 for any portion of your site that discharges to a sensitive water. 59 Examples of controls to minimize exposure of PCBs to precipitation and stormwater include separating work areas from non-work areas and selecting appropriate personal protective equipment and tools, constructing a containment area so that all dust or debris generated by the work remains within the protected area, and using tools that minimize dust and heat (<2120F). For additional information, refer to Part 2.3.3 of the CGP Fact Sheet. Page 24 2022 Construction General Permit (CGP) responsibilities for monitoring and reporting, each operator remains responsible for compliance with these requirements.60 3.3.1 Turbidity monitoring requirements61 a. Sampling frequency. You must collect at least one turbidity sample from your dewatering discharge each day a discharge occurs. b. Sampling location. Samples must be taken at all points where dewatering water is discharged. Samples must be taken after the dewatering water has been treated by installed treatment devices pursuant to Parts 2.4.1 and 2.4.3 and prior to its discharge off site into a receiving water, constructed or natural site drainage feature, or storm drain inlet. c. Representative samples. Samples taken must be representative of the dewatering discharge for any given day as required in Appendix G (standard permit conditions), Part G.10.2. d. Test methods. Samples must be measured using a turbidity meter that reports results in nephelometric turbidity units (NTUs) and conforms with a Part 136-approved method (e.g., methods 180.1 and 2130). You are required to use the meter, and conduct a calibration verification prior to each day's use, consistent with the manufacturer's instructions. 3.3.2 Turbidity benchmark a. The benchmark threshold for turbidity for this permit is 50 NTUs (referred to elsewhere in this permit as the "standard 50 NTU benchmark") unless EPA has authorized the use of an alternate benchmark in accordance with Part 3.3.2b. b. Request for alternate benchmark threshold. i. At any time prior to or during your coverage under this permit, you may request that EPA approve a benchmark for your site that is higher than 50 NTUs if you have information demonstrating the higher number is the same as your receiving water's water quality standard for turbidity. Unless EPA approves an alternate benchmark, you will be required to use the standard 50 NTU benchmark. To request approval of an alternate benchmark, you must submit the following information to your applicable EPA Regional Office (see Appendix K) (a) The current turbidity water quality standard that applies to your receiving 60 For instance, if Operator A relies on Operator B to meet the Part 3.3.1 turbidity monitoring requirements, the Part 3.3.4 reporting and recordkeeping requirements, and the Part 5.2.2 corrective action provisions when applicable, Operator A does not have to duplicate these same functions if Operator B is implementing them for both operators to be in compliance with the permit. However, Operator A remains responsible for complying with these permit requirements if Operator B fails to take actions that were necessary for Operator A to comply with the permit.See also footnote 83. EPA notes that both Operator A and B are required to submit turbidity monitoring reports as required under Part 3.3.4, however, Operator A's report does not need to include the data collected by Operator B as long as Operator B submits the required data and Operator A's report indicates that it is relying on Operator B to report the data.See Part 3.3.4a. 61 Operators may find it useful to consult EPA's Monitoring and Inspection Guide for Construction Dewatering, available at i sources l.00l and....................... „-..g.j Ilafes,which provides guidelines on how to correct) monitor for turbidity, determine if the week) ....I p g Y Y- Y average exceeds the benchmark, and, if so, how to proceed with corrective action. Page 25 2022 Construction General Permit (CGP) water and the source/citation.62 (b) If the applicable turbidity water quality standard requires information on natural or background turbidity levels (e.g., "no more than 10 NTU above natural turbidity levels") to determine the specific standard for the receiving water, include available data that can be used to establish the natural turbidity levels of your receiving water (including literature studies or Federal, State, Tribal, or local government data). Data must be representative of the natural turbidity levels of your specific receiving water. Identify the source(s) of all data provided, including if the data are from samples you collected of the receiving water. ii. EPA will inform you of its decision on whether to approve the requested alternate benchmark within 30 days. EPA may approve your request, request additional time (e.g., if additional information is needed to substantiate the data you provided), or deny your request. Unless and until EPA approves your request to use an alternate benchmark, you are required to use the standard benchmark of 50 NTUs and take any required corrective actions if an exceedance occurs. 3.3.3 Comparison of turbidity samples to benchmark. Compare the weekly average63 of your turbidity monitoring results to the standard 50 NTU benchmark, or alternate benchmark if approved by EPA. a. If the weekly average of your turbidity monitoring results exceeds the standard benchmark (or your approved alternate benchmark), you are required to conduct follow-up corrective action in accordance with Part 5.2.2 and document any corrective action taken in your corrective action log in accordance with Part 5.4. b. For averaging purposes, a "monitoring week" starts with a Monday and ends on Sunday. Once a new monitoring week starts, you will need to calculate a new average for that week of turbidity monitoring results.64 A weekly average may consist of one or more turbidity monitoring results. c. Although you are not required to collect and analyze more than one turbidity sample per day from your dewatering discharge, if you do collect and analyze more than one sample on any given day, you must include any additional results in the 62 For instance, if your site is located in Washington, DC, and you are discharging to a Class B water,for which the water quality standard is that turbidity may not increase above ambient levels by more than 20 percent,you would reference "Water Quality Standards for the District of Columbia, Chapter 11,Section 1104.8.55 63 A "weekly average" is defined as the sum of all of the turbidity samples taken during a "monitoring week" divided by the number of samples measured during that week.Average values should be calculated to the nearest whole number. 64 For example, if turbidity samples from your dewatering discharge in week 1 result in values of 30 NTU on Tuesday, 40 NTU on Wednesday, and 45 NTU on Thursday,your weekly average turbidity value would be 38.33 NTU ((30+40+45) =3=38 NTU). If in week 2,your turbidity samples resulted in values of 45 NTU on Monday, 30 NTU on Tuesday, 25 NTU on Wednesday, and 15 NTU on Thursday,you would calculate a new average for that week,which would yield an average turbidity value of 28.75 NTU ((45+30+25+15) =4=29 NTU). By comparison, if your samples on consecutive days from Friday to Monday were 60 NTU,45 NTU,40 NTU, and 43 NTU, respectively, and there are no other dewatering discharges for the remainder of the week,you would calculate one weekly average for the Friday to Sunday to be 48 NTU ((60+45+40) =3=48 NTU), and a separate weekly average for the one Monday to be 43 NTU (43= 1 = 43 NTU). Page 26 2022 Construction General Permit (CGP) calculation of your weekly average (i.e., add all individual results for that monitoring week and divide by the total number of samples).65 d. If you are conducting turbidity monitoring for more than one dewatering discharge point, you must calculate a weekly average turbidity value for each discharge point and compare each to the turbidity benchmark. 3.3.4 Reporting and recordkeeping. a. You must submit reports of your weekly average turbidity data to EPA no later than 30 days following the end of each monitoring quarter. If there are monitoring weeks in which there was no dewatering discharge, or if there is a monitoring quarter with no dewatering discharge, indicate this in your turbidity monitoring report. If another operator associated with your same site is conducting turbidity monitoring on your behalf pursuant to Part 3.3, indicate this in your turbidity monitoring report. b. For the purposes of this permit, the following monitoring quarters and reporting deadlines apply: Table 3.Monitoring Quarters and Deadlines for Reporting Turbidity Benchmark Monitoring Data. Monitoring Months Reporting Deadline (no later than 30 Quarter# days after end of the monitoring quarter 1 January 1 -March 31 April 30 2 April 1 -June 30 July 30 3 July 1 -September 30 October 30 4 October 1 -December 31 1 January 30 c. You must use EPA's NPDES eReporting Tool (NeT) to electronically submit your quarterly turbidity data, unless, consistent with Part 1.4.2, you received a waiver from your applicable EPA Regional Office. If the EPA Regional Office grants you approval to use a paper turbidity monitoring report form, and you elect to use it, you must complete the form in Appendix K. If EPA approves of your request to use an alternate turbidity benchmark pursuant to Part 3.3.2b, EPA will substitute the alternate benchmark in your NeT account. d. For each day in which you are required to monitor, you must record the monitoring information required by Appendix G, Parts G.10.2 and G.10.3 and retain all such information for a period of at least three years from the date this permit expires or from the date your authorization is terminated. 65 For example,if during a monitoring week you take two turbidity samples on Tuesday with a value of 30 NTU and 35 NTU,three samples on Wednesday with a value of 40 NTU,45 NTU, and 48 NTU,and one sample on Thursday with a value of 45 NTU,your weekly average turbidity value for this week would be 41 NTU ((30+35+40+45+48+45) =6=41 NTU). Page 27 2022 Construction General Permit (CGP) Table 4.Summary of Turbidity Benchmark Monitoring Requirements. Applicability Sampling Turbidity Corrective Action Reporting Requirement Benchmark Sites discharging Collect at least Compare the If the weekly Report all weekly dewatering water one turbidity weekly average of average of average turbidity to a sediment- sample per day, your turbidity turbidity monitoring results impaired water or from each monitoring results monitoring results on a quarterly to a water discharge point, to the 50 NTU exceeds the 50 basis via NeT-CGP designated as a on any day there benchmark (or NTU turbidity (unless use of the Tier 2,Tier 2.5, or is a dewatering alternate benchmark (or paper monitoring Tier 3 for discharge. benchmark if alternate form in Appendix K antidegradation Use turbidity approved by EPA). benchmark if is approved by purposes. EPA)approved by EPA), sampling no later than procedures you are required 30 days following specified in Part to take follow-up the end of each corrective action monitoring 3.3.1. in accordance quarter. with Part 5.2.2. 4 INSPECTION REQUIREMENTS 4.1 PERSON(S) RESPONSIBLE FOR CONDUCTING SITE AND DEWATERING INSPECTIONS The person(s) inspecting your site may be a person on your staff or a third party you hire to conduct such inspections. You are responsible for ensuring that any person conducting inspections pursuant to this Part is a "qualified person." A qualified person is someone who has completed the training required by Part 6.3. 4.2 FREQUENCY OF INSPECTIONS.66 At a minimum, you must conduct a site inspection in accordance with one of the two schedules listed below, unless you are subject to the Part 4.3 site inspection frequency for discharges to sediment or nutrient-impaired or high quality waters, or qualify for a Part 4.4 reduction in the inspection frequency: 4.2.1 At least once every seven (7) calendar days; or 4.2.2 Once every 14 calendar days and within 24 hours67 of the occurrence of: a. A storm event that produces 0.25 inches or more of rain within a 24-hour period. L If a storm event produces 0.25 inches or more of rain within a 24-hour period (including when there are multiple, smaller storms that alone produce less than 0.25 inches but together produce 0.25 inches or more in 24 hours), you are required to conduct one inspection within 24 hours of when 0.25 inches of rain or more has fallen. 66 Inspections are only required during the site's normal working hours. 67 For the purposes of the inspection requirements in this Part,conducting an inspection "within 24 hours" means that once either of the two conditions in Parts 4.2.2a or 4.2.2b are met you have 24 hours from that time to conduct an inspection. For clarification,the 24 hours is counted as a continuous passage of time, and not counted by business hours (e.g.,3 business days of 8 hours each). When the 24-hour inspection time frame occurs entirely outside of normal working hours, you must conduct an inspection by no later than the end of the next business day. Page 28 2022 Construction General Permit (CGP) ii. If a storm event produces 0.25 inches or more of rain within a 24-hour period on the first day of a storm and continues to produce 0.25 inches or more of rain on subsequent days, you must conduct an inspection within 24 hours of the first day of the storm and within 24 hours after the last day of the storm that produces 0.25 inches or more of rain (i.e., only two inspections would be required for such a storm event).68 b. A discharge caused by snowmelt from a storm event that produces 3.25 inches69 or more of snow within a 24-hour period. You are required to conduct one inspection once the discharge of snowmelt from a 3.25-inch or more snow accumulation occurs. Additional snowmelt inspections are only required if following the discharge from the first snowmelt, there is a discharge from a separate storm event that produces 3.25 inches or more of snow. 4.2.3 To determine whether a storm event meets either of the thresholds in Parts 4.2.2a or 4.2.2b: a. For rain, you must either keep a properly maintained rain gauge on your site, or obtain the storm event information from a weather station that is representative of your location. For any 24-hour period during which there is 0.25 inches or more of rainfall, you must record the total rainfall measured for that day in accordance with Part 4.7.1 d. b. For snow, you must either take measurements of snowfall at your site,70 or rely on similar information from a local weather forecasting provider that is representative of your location. 4.3 INCREASE IN INSPECTION FREQUENCY FOR CERTAIN SITES. The increased inspection frequencies established in this Part take the place of the Part 4.2 inspection frequencies for the portion of the site affected. 4.3.1 For any portion of the site that discharges to a sediment or nutrient-impaired water or to a water that is identified by your State..Tribe, or EPA as Tier 2,Tier 2.5, or Tier 3 for antidegradation purposes (see Part 3.2), you must conduct an once every seven (7) calendar days and within 24 hours of the occurrence of a storm event that produces 0.25 inches or more of rain within a 24-hour period, or within 24 hours of a snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period. 68 For example, if 0.30 inches of rain falls on Day 1,0.25 inches of rain falls on Day 2, and 0.10 inches of rain fall on Day 3,you would be required to conduct a first inspection within 24 hours of the Day 1 rainfall and a second inspection within 24 hours of the Day 2 rainfall, but a third inspection would not be required within 24 hours of the Day 3 rainfall. 69 This is the amount of snow that is equivalent to 0.25 inches of rain, based on information from the National Oceanic and Atmospheric Administration (NOAA) indicating that 13 inches of snow is, on average, equivalent to 1 inch of rain.See.Ih�.::I::::I:..p.5..m.. ..inssll.irk.........aa....gov/educa�.l.-ii n/svi x101/ iinfer/fa /. 70 For snowfall measurements, EPA suggests use of NOAA's National Weather Service guidelines at lh�eir.gov/III/sino measuiremeryL These guidelines recommend use of a "snowboard" (a piece of wood about 16 inches by 16 inches) that is placed in an unobstructed part of the site on a hard surface. Page 29 2022 Construction General Permit (CGP) Refer to Parts 4.2.3a and 4.2.3b for the requirements to determine if a storm event produces enough rain or snow to trigger the inspection requirement. 4.3.2 For sites discharging dewatering water, you must conduct an inspection in accordance with Part 4.6.3 during the discharge once per day on which the discharge occurs. The Part 4.2 inspection frequency still applies to all other portions of the site, unless the site is affected by either the increased frequency in Part 4.3.1 or the reduced frequency in Part 4.4. 4.4 REDUCTIONS IN INSPECTION FREQUENCY 4.4.1 Stabilized areas. a. You may reduce the frequency of inspections to twice per month for the first month, no more than 14 calendar days apart, then once per month until permit coverage is terminated consistent with Part 8 in any area of your site where the stabilization steps in Part 2.2.14a have been completed. If construction activity resumes in this portion of the site at a later date, the inspection frequency immediately increases to that required in Parts 4.2 and 4.3, as applicable. You must document the beginning and ending dates of this period in your SWPPP. b. Exception. For "linear construction sites" (as defined in Appendix A) where disturbed portions have undergone final stabilization at the same time active construction continues on others, you may reduce the frequency of inspections to twice per month for the first month, no more than 14 calendar days apart, in any area of your site where the stabilization steps in Part 2.2.14a have been completed. After the first month, inspect once more within 24 hours of the occurrence of a storm event that produces 0.25 inches of rain or more within a 24-hour period, or within 24 hours of a snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period. If there are no issues or evidence of stabilization problems, you may suspend further inspections. If "wash-out" of stabilization materials and/or sediment is observed, following re-stabilization, inspections must resume at the inspection frequency required in Part 4.4.1 a. Inspections must continue until final stabilization is visually confirmed following a storm event that produces 0.25 inches of rain or more within a 24-hour period. 4.4.2 Arid, semi-arid, or drought-stricken areas (as defined in Appendix A). If it is the seasonally dry period7l or a period in which drought is occurring, you may reduce the frequency of inspections to once per month and within 24 hours of the occurrence of a storm event that produces 0.25 inches of rain or more within a 24-hour period, or within 24 hours of a snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period. You must document that you are using this reduced schedule and the beginning and ending dates of the seasonally dry period in your SWPPP. Follow the procedures in Part 4.2.3a and 4.2.3b, accordingly, to determine if a storm event occurs that produces 0.25 inches or more of rain or 3.25 inches or more of snow within a 24-hour period. For any 24-hour period during which there is 0.25 inches or more of rainfall, or 3.25 inches or more of snow, you must record the total rainfall or snow measured for that day in accordance with Part 4.7.1 d. >> See footnote 44. Page 30 2022 Construction General Permit (CGP) 4.4.3 Frozen conditions: a. If you are suspending construction activities due to frozen conditions, you may temporarily suspend inspections on your site until thawing conditions (as defined in Appendix A) begin to occur if: i. Discharges are unlikely due to continuous frozen conditions that are likely to continue at your site for at least three (3) months based on historic seasonal averages.72 If unexpected weather conditions (such as above freezing temperatures or rain events) make discharges likely, you must immediately resume your regular inspection frequency as described in Parts 4.2 and 4.3, as applicable; ii. Land disturbances have been suspended; and iii. All disturbed areas of the site have been stabilized in accordance with Part 2.2.14a. b. If you are still conducting construction activities during frozen conditions, you may reduce your inspection frequency to once per month if: i. Discharges are unlikely due to continuous frozen conditions that are likely to continue at your site for at least three (3) months based on historic seasonal averages. If unexpected weather conditions (such as above freezing temperatures or rain events) make discharges likely, you must immediately resume your regular inspection frequency as described in Parts 4.2 and 4.3, as applicable; and ii. Except for areas in which you are actively conducting construction activities, disturbed areas of the site have been stabilized in accordance with Part 2.2.14a. You must document the beginning and ending dates of this period in your SWPPP. 4.5 AREAS THAT MUST BE INSPECTED During your site inspection, you must at a minimum inspect the following areas of your site: 4.5.1 All areas that have been cleared, graded, or excavated and that have not yet completed stabilization consistent with Part 2.2.14a; 4.5.2 All stormwater controls, including pollution prevention controls, installed at the site to comply with this permit;73 4.5.3 Material, waste, borrow, and equipment storage and maintenance areas that are covered by this permit; 4.5.4 All areas where stormwater typically flows within the site, including constructed or natural site drainage features designed to divert, convey, and/or treat stormwater; 4.5.5 All areas where construction dewatering is taking place, including controls to treat the dewatering discharge and any channelized flow of water to and from those controls; 72 Use data sets that include the most recent data available to account for recent precipitation patterns and trends. 73 This includes the requirement to inspect for sediment that has been tracked out from the site onto paved roads,sidewalks, or other paved areas consistent with Part 2.2.4. Page 31 2022 Construction General Permit (CGP) 4.5.6 All points of discharge from the site; and 4.5.7 All locations where stabilization measures have been implemented. You are not required to inspect areas that, at the time of the inspection, are considered unsafe to your inspection personnel. 4.6 REQUIREMENTS FOR INSPECTIONS 4.6.1 During each site inspection, you must at a minimum: a. Check whether all stormwater controls (i.e., erosion and sediment controls and pollution prevention controls) are properly installed, appear to be operational, and are working as intended to minimize pollutant discharges. b. Check for the presence of conditions that could lead to spills, leaks, or other accumulations of pollutants on the site. c. Identify any locations where new or modified stormwater controls are necessary to meet the requirements of Parts 2 and/or 3. d. Check for signs of visible erosion and sedimentation (i.e., sediment deposits) that have occurred and are attributable to your discharge at points of discharge and, if applicable, on the banks of any receiving waters flowing within or immediately adjacent to the site; e. Check for signs of sediment deposition that are visible from your site and attributable to your discharge (e.g., sand bars with no vegetation growing on top in receiving waters or in other constructed or natural site drainage features, or the buildup of sediment deposits on nearby streets, curbs, or open conveyance channels). f. Identify any incidents of noncompliance observed. 4.6.2 If a discharge is occurring during your inspection: a. Identify all discharge points at the site; and b. Observe and document the visual quality of the discharge, and take note of the characteristics of the stormwater discharge, including color; odor; floating, settled, or suspended solids; foam; oil sheen; and other indicators of stormwater pollutants. Check also for signs of these same pollutant characteristics that are visible from your site and attributable to your discharge in receiving waters or in other constructed or natural site drainage features. 4.6.3 For dewatering inspections conducted pursuant to Parts 4.3.2, record the following in a report within 24 hours of completing the inspection: a. The inspection date; b. Names and titles of personnel making the inspection; c. Approximate times that the dewatering discharge began and ended on the day of inspection;74 d. Estimates of the rate (in gallons per day) of discharge on the day of inspection; 74 If the dewatering discharge is a continuous discharge that continues after normal business hours, indicate that the discharge is continuous. Page 32 2022 Construction General Permit (CGP) e. Whether or not any of the following indications of pollutant discharge were observed at the point of discharge to any receiving waters flowing through or immediately adjacent to the site and/or to constructed or natural site drainage features or storm drain inlets:75 L a sediment plume, suspended solids, unusual color, presence of odor, decreased clarity, or presence of foam; and/or H. a visible sheen on the water surface or visible oily deposits on the bottom or shoreline of the receiving water; and f. Photographs of (1) the dewatering water prior to treatment by a dewatering control(s) and the final discharge after treatment; (2) the dewatering control(s); and (3) the point of discharge to any receiving waters flowing through or immediately adjacent to the site and/or to constructed or natural site drainage features, storm drain inlets, and other conveyances to receiving waters. You must also comply with the Part 4.7.2, 4.7.3, and 4.7.4 requirements for signing the reports, keeping them available on site, and retaining copies. 4.6.4 Based on the results of your inspection: a. Complete any necessary maintenance repairs or replacements under Part 2.1.4 or under Part 5, whichever applies; and b. Modify your SWPPP site map in accordance with Part 7.4.1 to reflect changes to your stormwater controls that are no longer accurately reflected on the current site map. 4.7 INSPECTION REPORT 4.7.1 You must complete an inspection report within 24 hours of completing any site inspection. Each inspection report (except for dewatering inspection reports, which are covered in Part 4.6.3) must include the following: a. The inspection date; b. Names and titles of personnel making the inspection; c. A summary of your inspection findings, covering at a minimum the observations you made in accordance with Part 4.6, including any problems found during your inspection that make it necessary to perform routine maintenance pursuant to Part 2.1.4b or corrective action pursuant to Part 5. Include also any documentation as to why the corrective action procedures under Part 5 are unnecessary to fix a problem that repeatedly occurs as described in Part 2.1.4c; d. If you are inspecting your site at the frequency specified in Part 4.2.2, Part 4.3, or Part 4.4.1 b, and you conducted an inspection because of a storm event that produced rainfall measuring 0.25 inches or more within a 24-hour period, you must include the applicable rain gauge or weather station readings that triggered the inspection. Similarly, if you conducted an inspection because of a snowmelt discharge from a storm event that produced 3.25 inches or more of snow within a 24-hour period, you must include any measurements taken of snowfall at your site, or weather station information you relied on; and 75 If the operator observes any of these indicators of pollutant discharge, corrective action is required consistent with Parts 5.1.5b and 5.2.2. Page 33 2022 Construction General Permit (CGP) e. If you determined that it is unsafe to inspect a portion of your site, you must describe the reason you found it to be unsafe and specify the locations to which this condition applies. 4.7.2 Each inspection report must be signed by the operator's signatory in accordance with Appendix G, Part G.1 1 of this permit. 4.7.3 You must keep a copy of all inspection reports at the site or at an easily accessible location, so that it can be made immediately available at the time of an on-site inspection or upon request by EPA.76 4.7.4 You must retain all inspection reports completed for this Part for at least three (3) years from the date that your permit coverage expires or is terminated. 4.8 INSPECTIONS BY EPA You must allow EPA, or an authorized representative of EPA, to conduct the following activities at reasonable times. To the extent that you are utilizing shared controls, that are not on site, to comply with this permit, you must make arrangements for EPA to have access at all reasonable times to those areas where the shared controls are located. 4.8.1 Enter onto all areas of the site, including any construction support activity areas covered by this permit, any off-site areas where shared controls are utilized to comply with this permit, discharge locations, adjoining waterbodies, and locations where records are kept under the conditions of this permit; 4.8.2 Access and copy any records that must be kept under the conditions of this permit; 4.8.3 Inspect your construction site, including any construction support activity areas covered by this permit (see Part 1.2.1 c), any stormwater controls installed and maintained at the site, and any off-site shared controls utilized to comply with this permit; and 4.8.4 Sample or monitor for the purpose of ensuring compliance. 5 CORRECTIVE ACTIONS 5.1 CONDITIONS TRIGGERING CORRECTIVE ACTION. You must take corrective action to address any of the following conditions identified at your site: 5.1.1 A stormwater control needs a significant repair or a new or replacement control is needed, or, in accordance with Part 2.1.4c, you find it necessary to repeatedly (i.e., three (3) or more times) conduct the same routine maintenance fix to the same control at the same location (unless you document in your inspection report under Part 4.7.1 c that the specific reoccurrence of this same problem should still be addressed as a routine maintenance fix under Part 2.1.4); or 5.1.2 A stormwater control necessary to comply with the requirements of this permit was never installed, or was installed incorrectly; or 76 Inspection reports may be prepared,signed, and kept electronically, rather than in paper form, if the records are: (a) in a format that can be read in a similar manner as a paper record; (b) legally dependable with no less evidentiary value than their paper equivalent; and (c) immediately accessible to the inspector during an inspection to the same extent as a paper copy stored at the site would be,if the records were stored in paper form. For additional guidance on the proper practices to follow for the electronic retention of inspection report records,refer to the Fact Sheet discussion related to Part 4.7.3. Page 34 2022 Construction General Permit (CGP) 5.1.3 Your discharges are not meeting applicable water quality standards; 5.1.4 A prohibited discharge has occurred (see Part 1.3); or 5.1.5 During discharge from site dewatering activities: a. The weekly average of your turbidity monitoring results exceeds the 50 NTU benchmark (or alternate benchmark if approved by EPA pursuant to Part 3.3.2b); or b. You observe or you are informed by EPA, State, or local authorities of the presence of the conditions specified in Part 4.6.3e. 5.2 CORRECTIVE ACTION DEADLINES 5.2.1 If responding to any of the Part 5.1.1, 5.1.2, 5.1.3, or5.1.4 triggering conditions, you must: a. Immediately take all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events; and b. When the problem does not require a new or replacement control or significant repair, the corrective action must be completed by the close of the next business day; or c. When the problem requires a new or replacement control or significant repair, install the new or modified control and make it operational, or complete the repair, by no later than seven (7) calendar days from the time of discovery. If it is infeasible to complete the installation or repair within seven (7) calendar days, you must document in your records why it is infeasible to complete the installation or repair within the 7-day timeframe and document your schedule for installing the stormwater control(s) and making it operational as soon as feasible after the 7-day timeframe. Where these actions result in changes to any of the stormwater controls or procedures documented in your SWPPP, you must modify your SWPPP accordingly within seven (7) calendar days of completing this work. 5.2.2 If responding to either of the Part 5.1.5 triggering conditions related to site dewatering activities, you must: a. Immediately take all reasonable steps to minimize or prevent the discharge of pollutants until you can implement a solution, including shutting off the dewatering discharge as soon as possible depending on the severity of the condition77 taking safety considerations into account; b. Determine whether the dewatering controls are operating effectively and whether they are causing the conditions; and c. Make any necessary adjustments, repairs, or replacements to the dewatering controls to lower the turbidity levels below the benchmark or remove the visible plume or sheen. » For instance, if the weekly average of your turbidity monitoring results or a single sample is extremely high (e.g., a single turbidity sample results in 355 NTUs or higher),you should take action to safely shut off the discharge so that you can evaluate the cause of the high turbidity. Note:A single turbidity sample of 355 NTUs or higher means that the weekly average turbidity value will exceed 50 NTU regardless of the turbidity values the other days during the week. Page 35 2022 Construction General Permit (CGP) When you have completed these steps and made any changes deemed necessary, you may resume discharging from your dewatering activities. 5.3 CORRECTIVE ACTION REQUIRED BY EPA You must comply with any corrective actions required by EPA as a result of permit violations found during an inspection carried out under Part 4.8. 5.4 CORRECTIVE ACTION LOG 5.4.1 For each corrective action taken in accordance with this Part, you must record the following in a corrective action log: a. Within 24 hours of identifying the corrective action condition, document the specific condition and the date and time it was identified. b. Within 24 hours of completing the corrective action (in accordance with the deadlines in Part 5.2), document the actions taken to address the condition, including whether any SWPPP modifications are required. 5.4.2 Each entry into the corrective action log, consisting of the information required by both Parts 5.4.1 a and 5.4.1 b, must be signed by the operator's signatory in accordance with Appendix G, Part G.1 1.2 of this permit. 5.4.3 You must keep a copy of the corrective action log at the site or at an easily accessible location, so that it can be made immediately available at the time of an on-site inspection or upon request by EPA.78 5.4.4 You must retain the corrective action log for at least three (3) years from the date that your permit coverage expires or is terminated. 6 STORMWATER TEAM FORMATION/STAFF TRAINING REQUIREMENTS 6.1 STORMWATER TEAM Each operator, or group of multiple operators, must assemble a "stormwater team" that will be responsible for carrying out activities necessary to comply with this permit. The stormwater team must include the following people: a. Personnel who are responsible for the design, installation, maintenance, and/or repair of stormwater controls (including pollution prevention controls); b. Personnel responsible for the application and storage of treatment chemicals (if applicable); c. Personnel who are responsible for conducting inspections as required in Part 4.1; and d. Personnel who are responsible for taking corrective actions as required in Part 5. Members of the stormwater team must be identified in the SWPPP pursuant to Part 7.2.2. 78 The corrective action log may be prepared,signed, and kept electronically, rather than in paper form, if the records are: (a) in a format that can be read in a similar manner as a paper record; (b) legally dependable with no less evidentiary value than their paper equivalent; and (c) immediately accessible to the inspector during an inspection to the same extent as a paper copy stored at the site would be, if the records were stored in paper form. For additional guidance on the proper practices to follow for the electronic retention of corrective action log records, refer to the Fact Sheet discussion related to Part 4.7.3. Page 36 2022 Construction General Permit (CGP) 6.2 GENERAL TRAINING REQUIREMENTS FOR STORMWATER TEAM MEMBERS Prior to the commencement of construction activities, you must ensure that all persons79 assigned to the stormwater team understand the requirements of this permit and their specific responsibilities with respect to those requirements, including the following related to the scope of their job duties: a. The permit requirements and deadlines associated with installation, maintenance, and removal of stormwater controls, as well as site stabilization; b. The location of all stormwater controls on the site required by this permit and how they are to be maintained; c. The proper procedures to follow with respect to the permit's pollution prevention requirements; and d. When and how to conduct inspections, record applicable findings, and take corrective actions. Specific training requirements for persons conducting site inspections are included in Part 6.3. You are responsible for ensuring that all activities on the site comply with the requirements of this permit. You are not required to provide or document formal training for subcontractors or other outside service providers (unless the subcontractors or outside service providers are responsible for conducting the inspections required in Part 4, in which case you must provide such documentation consistent with Part 7.2.2), but you must ensure that such personnel understand any requirements of this permit that may be affected by the work they are subcontracted to perform. 6.3 TRAINING REQUIREMENTS FOR PERSONS CONDUCTING INSPECTIONS For projects that receive coverage under this permit on or after February 17, 2023, to be considered a qualified person under Part 4.1 for conducting inspections under Part 4, you must, at a minimum, either: a. Have completed the EPA construction inspection course developed for this permit and have passed the exam; or b. Hold a current valid construction inspection certification or license from a program that, at a minimum, covers the following:80 L Principles and practices of erosion and sediment control and pollution prevention practices at construction sites; ii. Proper installation and maintenance of erosion and sediment controls and pollution prevention practices used at construction sites; and HL Performance of inspections, including the proper completion of required reports and documentation, consistent with the requirements of Part 4. 79 If the person requiring training is a new employee who starts after you commence construction activities, you must ensure that this person has the proper understanding as required above prior to assuming particular responsibilities related to compliance with this permit. For emergency-related projects,the requirement to train personnel prior to commencement of construction activities does not apply, however, such personnel must have the required training prior to NOI submission. 80 If one of the following topics (e.g., installation and maintenance of pollution prevention practices) is not covered by the non-EPA training program,you may consider supplementing the training with the analogous module of the EPA course (e.g., Module 4) that covers the missing topic. Page 37 2022 Construction General Permit (CGP) For projects that receive coverage under this permit prior to February 17, 2023, any personnel conducting site inspections pursuant to Part 4 on your site must, at a minimum, be a person knowledgeable in the principles and practice of erosion and sediment controls and pollution prevention, who possesses the appropriate skills and training to assess conditions at the construction site that could impact stormwater quality, and the appropriate skills and training to assess the effectiveness of any stormwater controls selected and installed to meet the requirements of this permit.81 6.4 STORMWATER TEAM'S ACCESS TO PERMIT DOCUMENTS Each member of the stormwater team must have easy access to an electronic or paper copy of applicable portions of this permit, the most updated copy of your SWPPP, and other relevant documents or information that must be kept with the SWPPP. 7 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) 7.1 GENERAL REQUIREMENTS All operators associated with a construction site under this permit must develop a SWPPP consistent with the requirements in Part 7 prior to their submittal of the N01.82,83, 84 The SWPPP must be kept up-to-date throughout coverage under this permit. If a SWPPP was prepared under a previous version of this permit, the operator must review and update the SWPPP to ensure that this permit's requirements are addressed prior to submitting an NOI for coverage under this permit. 7.2 SWPPP CONTENTS At a minimum, the SWPPP must include the information specified in this Part and as specified in other parts of this permit. 7.2.1 All Site Operators. Include a list of all other operators who will be engaged in construction activities at the site, and the areas of the site over which each operator has control. 81 If you receive coverage for a project prior to February 17,2023,and construction activities for the same project will continue after February 17,2023,the personnel conducting inspections do not need to take the additional training specified in Parts 6.3a and 6.3b for inspections conducted on the project site. If the same operator obtains coverage for a different project on or after February 17,2023, personnel conducting inspections would be required to meet the requirements for a qualified person by completing the training in either Part 6.3a or Part 6.3b. 82 The SWPPP does not establish the effluent limits and/or other permit terms and conditions that apply to your site's discharges; these limits, terms, and conditions are established in this permit. 83 Where there are multiple operators associated with the same site,they may develop a group SWPPP instead of multiple individual SWPPPs. Regardless of whether there is a group SWPPP or multiple individual SWPPPs, each operator is responsible for compliance with the permit's terms and conditions. In other words, if Operator A relies on Operator B to satisfy its permit obligations, Operator A does not have to duplicate those permit-related functions if Operator B is implementing them such that both operators are in compliance with the permit. However, Operator A remains responsible for permit compliance if Operator B fails to take actions necessary for Operator A to comply with the permit. In addition,all operators must ensure, either directly or through coordination with other operators,that their activities do not cause a violation or compromise any other operators' controls and/or any shared controls.See also footnote 60. 84 There are a number of commercially available products to assist operators in developing the SWPPP, as well as companies that can be hired to help develop a site-specific SWPPP.The permit does not state which are recommended, nor does EPA endorse any specific products or vendors.Where operators choose to rely on these products or services,the choice of which ones to use to comply with the requirements of this Part is a decision for the operator alone. Page 38 2022 Construction General Permit (CGP) 7.2.2 Stormwater Team. Identify the personnel (by name and position) that you have made part of the stormwater team pursuant to Part 6.1, as well as their individual responsibilities, including which members are responsible for conducting inspections. Include verification that each member of the stormwater team has received the training required by Part 6.2. Include documentation that members of the stormwater team responsible for conducting inspections pursuant to Part 4 have received the training required by Part 6.3. If personnel on your team elect to complete the EPA inspector training program pursuant to Part 6.3a, you must include copies of the certificate showing that the relevant personnel have completed the training and passed the exam. If personnel on your team elect to complete a non-EPA inspector training program pursuant to Part 6.3b, you must include documentation showing that these persons have successfully completed the program and their certification or license is still current. You must also confirm that the non-EPA inspector training program satisfies the minimum elements for such programs in Part 6.3b. 7.2.3 Nature of Construction Activities. Include the following: a. A description of the nature of your construction activities, including the age or dates of past renovations for structures that are undergoing demolition; b. The size of the property (in acres or length in miles if a linear construction site); c. The total area expected to be disturbed by the construction activities (to the nearest quarter acre or nearest quarter mile if a linear construction site); d. A description of any on-site and off-site construction support activity areas covered by this permit (see Part 1.2.1 c); e. The maximum area expected to be disturbed at any one time, including on-site and off-site construction support activity areas; f. A description and projected schedule for the following:85 i. Commencement of construction activities in each portion of the site, including clearing and grubbing, mass grading, demolition activities, site preparation (i.e., excavating, cutting and filling), final grading, and creation of soil and vegetation stockpiles requiring stabilization; ii. Temporary or permanent cessation of construction activities in each portion of the site; HE, Temporary or final stabilization of exposed areas for each portion of the site; and iv. Removal of temporary stormwater controls and construction equipment or vehicles, and the cessation of construction-related pollutant-generating activities. 85 If plans change due to unforeseen circumstances or for other reasons,the requirement to describe the sequence and estimated dates of construction activities is not meant to "lock in"the operator to meeting these dates. When departures from initial projections are necessary,this should be documented in the SWPPP itself, or in associated records, as appropriate. Page 39 2022 Construction General Permit (CGP) g. A list and description of all pollutant-generating activities86 on the site. For each pollutant-generating activity, include an inventory of pollutants or pollutant constituents (e.g., sediment, fertilizers, pesticides, paints, caulks, sealants, fluorescent light ballasts, contaminated substrates, solvents, fuels) associated with that activity, which could be discharged in stormwater from your construction site. You must take into account where potential spills and leaks could occur that contribute pollutants to stormwater discharges, and any known hazardous or toxic substances, such as PCBs and asbestos, that will be disturbed or removed during construction; h. Business days and hours for the project; i. If you are conducting construction activities in response to a public emergency (see Part 1.4), a description of the cause of the public emergency (e.g., mud slides, earthquake, extreme flooding conditions, widespread disruption in essential public services), information substantiating its occurrence (e.g., State disaster declaration or similar State or local declaration), and a description of the construction necessary to reestablish affected public services. 7.2.4 Site Map. Include a legible map, or series of maps, showing the following features of the site: a. Boundaries of the property; b. Locations where construction activities will occur, including: i. Locations where earth-disturbing activities will occur (note any phasing), including any demolition activities; ii. Approximate slopes before and after major grading activities (note any steep slopes (as defined in Appendix A)); HE, Locations where sediment, soil, or other construction materials will be stockpiled; iv. Any receiving water crossings; v. Designated points where vehicles will exit onto paved roads; A. Locations of structures and other impervious surfaces upon completion of construction; and vii. Locations of on-site and off-site construction support activity areas covered by this permit (see Part 1.2.1 c). c. Locations of any receiving waters within the site and all receiving waters within one mile downstream of the site's discharge point(s). Also identify if any of these receiving waters are listed as impaired or are identified as a Tier 2, Tier 2.5, or Tier 3 water; d. Any areas of Federally listed critical habitat within the action area of the site as defined in Appendix A; e. Type and extent of pre-construction cover on the site (e.g., vegetative cover, forest, pasture, pavement, structures); f. Drainage patterns of stormwater and authorized non-stormwater before and after major grading activities; 86 Examples of pollutant-generating activities include paving operations;concrete, paint, and stucco washout and waste disposal; solid waste storage and disposal; and dewatering activities. Page 40 2022 Construction General Permit (CGP) g. Stormwater and authorized non-stormwater discharge locations, including: i. Locations where stormwater and/or authorized non-stormwater will be discharged to storm drain inlets, including a notation of whether the inlet conveys stormwater to a sediment basin, sediment trap, or similarly effective control;87 ii. Locations where stormwater or authorized non-stormwater will be discharged directly to receiving waters (i.e., not via a storm drain inlet); and HE, Locations where turbidity benchmark monitoring will take place to comply with Part 3.3, if applicable to your site. h. Locations of all potential pollutant-generating activities identified in Part 7.2.3g; i. Designated areas where construction wastes that are covered by the exception in Part 2.3.3e.ii because they are not pollutant-generating will be stored; j. Locations of stormwater controls, including natural buffer areas and any shared controls utilized to comply with this permit; and k. Locations where polymers, flocculants, or other treatment chemicals will be used and stored. 7.2.5 Non-Stormwater Discharges. Identify all authorized non-stormwater discharges in Part 1.2.2 that will or may occur. 7.2.6 Description of Stormwater Controls. a. For each of the Part 2.2 erosion and sediment control requirements, Part 2.3 pollution prevention requirements, and Part 2.4 construction dewatering requirements, as applicable to your site, you must include the following: i. A description of the specific control(s) to be implemented to meet these requirements; ii. The design specifications for controls described in Part 7.2.6a.i (including references to any manufacturer specifications and/or erosion and sediment control manuals/ordinances relied upon);$$ HE, Routine stormwater control maintenance specifications; and iv. The projected schedule for stormwater control installation/implementation. b. You must also include any of the following additional information as applicable. i. Natural buffers and/or equivalent sediment controls (see Part 2.2.1 and Appendix F). You must include the following: (a) The compliance alternative to be implemented; (b) If complying with alternative 2, the width of natural buffer retained; 87 The requirement to show storm drain inlets in the immediate vicinity of the site on your site map only applies to those inlets that are easily identifiable from your site or from a publicly accessible area immediately adjacent to your site. 88 Design specifications may be found in manufacturer specifications and/or in applicable erosion and sediment control manuals or ordinances.Any departures from such specifications must reflect good engineering practice and must be explained in the SWPPP. Page 41 2022 Construction General Permit (CGP) (c) If complying with alternative 2 or 3, the erosion and sediment control(s) you will use to achieve an equivalent sediment reduction, and any information you relied upon to demonstrate the equivalency; (d) If complying with alternative 3, a description of why it is infeasible for you to provide and maintain an undisturbed natural buffer of any size; (e) For "linear construction sites" where it is infeasible to implement compliance alternative 1, 2, or 3, a rationale for this determination, and a description of any buffer width retained and/or supplemental erosion and sediment controls installed; and (f) A description of any disturbances that are exempt under Part 2.2.1 that occur within 50 feet of a receiving water. ii. Perimeter controls for a "linear construction site" (see Part 2.2.3d). For areas where perimeter controls are not feasible, include documentation to support this determination and a description of the other practices that will be implemented to minimize discharges of pollutants in stormwater associated with construction activities. Note: Routine maintenance specifications for perimeter controls documented in the SWPPP must include the Part 2.2.3c.i requirement that sediment be removed before it has accumulated to one-half of the above-ground height of any perimeter control. iii. Sediment track-out controls (see Parts 2.2.4b and 2.2.4c). Document the specific stabilization techniques and/or controls that will be implemented to remove sediment prior to vehicle exit. iv. Inlet protection measures (see Part 2.2.1 Oa). Where inlet protection measures are not required because the storm drain inlets to which your site discharges are conveyed to a sediment basin, sediment trap, or similarly effective control, include a short description of the control that receives the stormwater flow from the site. v. Sediment basins (see Part 2.2.12). In circumstances where it is infeasible to utilize outlet structures that withdraw water from the surface, include documentation to support this determination, including the specific conditions or time periods when this exception will apply. A Treatment chemicals (see Part 2.2.13), you must include the following: (a) A listing of the soil types that are expected to be exposed during construction in areas of the project that will drain to chemical treatment systems. Also include a listing of soil types expected to be found in fill material to be used in these same areas, to the extent you have this information prior to construction; (b) A listing of all treatment chemicals to be used at the site and why the selection of these chemicals is suited to the soil characteristics of your site; (c) If the applicable EPA Regional Office authorized you to use cationic treatment chemicals for sediment control, include the specific controls and implementation procedures designed to ensure that your use of cationic Page 42 2022 Construction General Permit (CGP) treatment chemicals will not lead to a discharge that does not meet water quality standards; (d) The dosage of all treatment chemicals to be used at the site or the methodology to be used to determine dosage; (e) Information from any applicable Safety Data Sheet (SDS); (f) Schematic drawings of any chemically enhanced stormwater controls or chemical treatment systems to be used for application of the treatment chemicals, (g) A description of how chemicals will be stored consistent with Part 2.2.13c; (h) References to applicable State or local requirements affecting the use of treatment chemicals, and copies of applicable manufacturer's specifications regarding the use of your specific treatment chemicals and/or chemical treatment systems; and (i) A description of the training that personnel who handle and apply chemicals have received prior to permit coverage, or will receive prior to use of the treatment chemicals at your site. vH* Stabilization measures (see Part 2.2.14). You must include the following: (a) The specific vegetative and/or non-vegetative practices that will be used; (b) The stabilization deadline that will be met in accordance with Part 2.2.14; (c) If complying with the deadlines for sites in arid, semi-arid, or drought-stricken areas, the beginning and ending dates of the seasonally dry period (as defined in Appendix A)89 and the schedule you will follow for initiating and completing vegetative stabilization; and (d) If complying with deadlines for sites affected by unforeseen circumstances that delay the initiation and/or completion of vegetative stabilization, document the circumstances and the schedule for initiating and completing stabilization. viii.Spill prevention and response procedures (see Parts 1.3.5, 2.3.3c, 2.3.3d, and 2.3.6). You must include the following: (a) Procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases. Identify the name or position of the employee(s) responsible for detection and response of spills or leaks; and (b) Procedures for notification of appropriate facility personnel, emergency response agencies, and regulatory agencies where a leak, spill, or other release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity consistent with Part 2.3.6 and established under either 40 CFR part 1 10, 40 CFR part 117, or 40 CFR part 302, occurs 89 See footnote 44. Page 43 2022 Construction General Permit (CGP) during a 24-hour period. Contact information must be in locations that are readily accessible and available to all employees. You may also reference the existence of SPCC plans developed for the construction activity under Section 311 of the CWA, or spill control programs otherwise required by an NPDES permit for the construction activity, provided that you keep a copy of that other plan on site.90 ix. Waste management procedures (see Part 2.3.3). Describe the procedures you will follow for handling, storing, and disposing of all wastes generated at your site consistent with all applicable Federal, State, Tribal, and local requirements, including clearing and demolition debris, sediment removed from the site, construction and domestic waste, hazardous or toxic waste, and sanitary waste. You must also include the following additional information: (a) If site constraints prevent you from storing chemical containers 50 feet away from receiving waters or the other site drainage features as required in Part 2.3.3c.ii(b), document in your SWPPP the specific reasons why the 50-foot setback is not feasible, and how you will store containers as far away as the site permits; and (b) If there are construction wastes that are subject to the exception in Part 2.3.3e.ii, describe the specific wastes that will be stored on your site. x. Application of fertilizers (see Part 2.3.5). Document any departures from the manufacturer specifications where appropriate. 7.2.7 Procedures for Inspection.. Maintenance, and Corrective Action. Describe the procedures you will follow for maintaining your stormwater controls, conducting site inspections, and, where necessary, taking corrective actions, in accordance with Part 2.1.4, Part 4, and Part 5 of this permit, accordingly. Also include: a. The inspection schedule you will follow, which is based on whether your site is subject to Part 4.2 or Part 4.3, or whether your site qualifies for any of the reduced inspection frequencies in Part 4.4; b. If you will be conducting inspections in accordance with the inspection schedule in Part 4.2.2, Part 4.3, or Part 4.4.1 b, the location of the rain gauge or the address of the weather station you will be using to obtain rainfall data; c. If you will be reducing your inspection frequency in accordance with Part 4.4.1 b, the beginning and ending dates of the seasonally defined arid period for your area or the valid period of drought; d. If you will be reducing your inspection frequency in accordance with Part 4.4.3, the beginning and ending dates of frozen conditions on your site; and e. Any maintenance or inspection checklists or other forms that will be used. 7.2.8 Procedures for Turbidity Benchmark Monitoring from Dewatering Discharges (if applicable). If you are required to comply with the Part 3.3 turbidity benchmark 90 Even if you already have an SPCC or other spill prevention plan in existence,your plans will only be considered adequate if they meet all of the requirements of this Part,either as part of your existing plan or supplemented as part of the SWPPP. Page 44 2022 Construction General Permit (CGP) monitoring requirements, describe the procedures you will follow to collect and evaluate samples, report results to EPA and keep records of monitoring information, and take corrective action when necessary. Include the specific type of turbidity meter you will use for monitoring, as well as any manuals or manufacturer instructions on how to operate and calibrate the meter. Describe any coordinating arrangement you may have with any other permitted operators on the same site with respect to compliance with the turbidity monitoring requirements, including which parties are tasked with specific responsibilities. If EPA has approved of an alternate turbidity benchmark pursuant to Part 3.3.2b, include any data and other documentation you relied on to request use of the specific alternative benchmark. 7.2.9 Compliance with Other Requirements. a. Threatened and Endangered Species Protection. Include documentation required in the Endangered Species Protection section of the NOI in NeT, or the ESA worksheet in Appendix D, supporting your eligibility with regard to the protection of threatened and endangered species and designated critical habitat. b. Historic Properties. Include documentation required in Appendix E supporting your eligibility with regard to the protection of historic properties. c. Safe Drinking Water Act Underground Injection Control (UIC) Requirements for Certain Subsurface Stormwater Controls. If you are using any of the following stormwater controls at your site, document any contact you have had with the applicable State agency91 or EPA Regional Office responsible for implementing the requirements for underground injection wells in the Safe Drinking Water Act and EPA's implementing regulations at 40 CFR § 144-147. Such controls would generally be considered Class V UIC wells: i. Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system); ii. Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow; and iii. Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system). 7.2.10 SWPPP Certification. Your signatory must sign and date your SWPPP in accordance with Appendix G, Part G.1 1. 7.2.11 Post-Authorization Additions to the SWPPP. Once you are authorized for coverage under this permit, you must include the following documents as part of your SWPPP: a. A copy of your NOI submitted to EPA along with any correspondence exchanged between you and EPA related to coverage under this permit; b. A copy of the acknowledgment letter you receive from NeT assigning your NPDES ID (i.e., permit tracking number); 91 For State UIC program contacts,refer to the following EPA website:,I ::::::p. .... ®. ..p. ...®.o o.../ iic. Page 45 2022 Construction General Permit (CGP) c. A copy of this permit (an electronic copy easily available to the stormwater team is also acceptable). 7.3 ON-SITE AVAILABILITY OF YOUR SWPPP You must keep a current copy of your SWPPP at the site or at an easily accessible location so that it can be made available at the time of an on-site inspection or upon request by EPA; a State, Tribal, or local agency approving stormwater management plans; the operator of a storm sewer system receiving discharges from the site; or representatives of the U.S. Fish and Wildlife Service (USFWS) or the National Marine Fisheries Service (NMFS).92 EPA may provide access to portions of your SWPPP to a member of the public upon request. Confidential Business Information (CBI) will be withheld from the public, but may not be withheld from EPA, USFWS, or NMFS.93 If an on-site location is unavailable to keep the SWPPP when no personnel are present, notice of the plan's location must be posted near the main entrance of your construction site. 7.4 SWPPP MODIFICATIONS 7.4.1 You must modify your SWPPP, including the site map(s), within seven (7) days of any of the following conditions: a. Whenever new operators become active in construction activities on your site, or you make changes to your construction plans, stormwater controls, or other activities at your site that are no longer accurately reflected in your SWPPP. This includes changes made in response to corrective actions triggered under Part 5. You do not need to modify your SWPPP if the estimated dates in Part 7.2.3f change during the course of construction; b. To reflect areas on your site map where operational control has been transferred (and the date of transfer) since initiating permit coverage; c. If inspections or investigations by EPA or its authorized representatives determine that SWPPP modifications are necessary for compliance with this permit; d. Where EPA determines it is necessary to install and/or implement additional controls at your site in order to meet the requirements of this permit, the following must be included in your SWPPP: L A copy of any correspondence describing such measures and requirements; and 92 The SWPPP may be prepared, signed, and kept electronically, rather than in paper form, if the records are: (a) in a format that can be read in a similar manner as a paper record; (b) legally dependable with no less evidentiary value than their paper equivalent; and (c) immediately accessible to the inspector during an inspection to the same extent as a paper copy stored at the site would be, if the records were stored in paper form. For additional guidance on the proper practices to follow for the electronic retention of the SWPPP, refer to the Fact Sheet discussion related to Part 4.7.3. 93 Information covered by a claim of confidentiality will be disclosed by EPA only to the extent of, and by means of, the procedures set forth in 40 CFR part 2,Subpart B. In general, submitted information protected by a business confidentiality claim may be disclosed to other employees, officers, or authorized representatives of the United States concerned with implementing the CWA.The authorized representatives,including employees of other executive branch agencies, may review CBI during the course of reviewing draft regulations. Page 46 2022 Construction General Permit (CGP) ii. A description of the controls that will be used to meet such requirements. e. To reflect any revisions to applicable Federal, State, Tribal, or local requirements that affect the stormwater controls implemented at the site; and f. If applicable, if a change in chemical treatment systems or chemically enhanced stormwater control is made, including use of a different treatment chemical, different dosage rate, or different area of application. 7.4.2 You must maintain records showing the dates of all SWPPP modifications. The records must include the name of the person authorizing each change (see Part 7.2.9 above) and a brief summary of all changes. 7.4.3 All modifications made to the SWPPP consistent with Part 7.4 must be authorized by a person identified in Appendix G, Part G.1 l.b. 7.4.4 Upon determining that a modification to your SWPPP is required, if there are multiple operators covered under this permit, you must immediately notify any operators who may be impacted by the change to the SWPPP. 8 HOW TO TERMINATE COVERAGE Until you terminate coverage under this permit, you must comply with all conditions and effluent limitations in the permit. To terminate permit coverage, you must submit to EPA a complete and accurate Notice of Termination (NOT),which certifies that you have met the requirements for terminating in Part 8. 8.1 MINIMUM INFORMATION REQUIRED IN NOT 8.1.1 NPDES ID (i.e., permit tracking number) provided by EPA when you received coverage under this permit; 8.1.2 Basis for submission of the NOT (see Part 8.2); 8.1.3 Operator contact information; 8.1.4 Name of site and address (or a description of location if no street address is available); and 8.1.5 NOT certification. 8.2 CONDITIONS FOR TERMINATING CGP COVERAGE You may terminate CGP coverage only if one or more of the conditions in Parts 8.2.1, 8.2.2, or 8.2.3 has occurred. Until your termination is effective consistent with Part 8.5, you must continue to comply with the conditions of this permit. 8.2.1 You have completed all construction activities at your site and, if applicable, construction support activities covered by this permit (see Part 1.2.1 c), and you have met all of the following requirements: a. For any areas that (1) were disturbed during construction, (2) are not covered by permanent structures, and (3) over which you had control during the construction activities, you have met the requirements for final vegetative or non-vegetative stabilization in Part 2.2.14c. To document that you have met these stabilization requirements, you must take either ground or aerial photographs that show your site's compliance with the Part 2.2.14 stabilization requirements and submit them with your NOT. If any portion of your Page 47 2022 Construction General Permit (CGP) site is covered by one of the exceptions in Part 2.2.14c.iii, indicate which exception applies and include a supplementary explanation with your photographs that provides the necessary context for why this portion of the site is in compliance with the final stabilization criteria even though it appears to be unstabilized. You are not required to take photographs of every distinct part of your site that is being stabilized, however, the conditions of the site portrayed in any photographs that are submitted must be substantially similar94 to those of the areas that are not photographed. You must also comply with the following related to these photographs: L Take photographs both before and after the site has met the final stabilization criteria in Part 2.2.14c; ii. All photographs must be clear and in focus, and in the original format and resolution; and HE, Include the date each photograph was taken, and a brief description of the area of the site captured by the photograph (e.g., photo shows application of seed and erosion control mats to remaining exposed surfaces on northeast corner of site). b. You have removed and properly disposed of all construction materials, waste and waste handling devices, and have removed all equipment and vehicles that were used during construction, unless intended for long-term use following your termination of permit coverage; c. You have removed all stormwater controls that were installed and maintained during construction, except those that are intended for long-term use following your termination of permit coverage or those that are biodegradable (as defined in Appendix A); and d. You have removed all potential pollutants and pollutant-generating activities associated with construction, unless needed for long-term use following your termination of permit coverage; or 8.2.2 You have transferred control of all areas of the site for which you are responsible under this permit to another operator, and that operator has submitted an NOI and obtained coverage under this permit; or 8.2.3 Coverage under an individual or alternative general NPDES permit has been obtained. 8.3 HOW TO SUBMIT YOUR NOT You must use EPA's NPDES eReporting Tool (NeT) to electronically prepare and submit an NOT for the 2022 CGP. To access NeT, go to.h.t s: c x. cdx. Waivers from electronic reporting may be granted as specified in Part 1.4.2. If the EPA Regional Office grants you approval to use a paper NOT, and you elect to use it, you must complete the form in Appendix I. 94 Stabilization conditions that are substantially similar would include areas that are using the same type of stabilization measures and that have similar slopes,soils, and topography, and have achieved the same level of stabilization. Page 48 2022 Construction General Permit (CGP) 8.4 DEADLINE FOR SUBMITTING THE NOT You must submit an NOT within 30 calendar days after any one of the conditions in Part 8.2 occurs. 8.5 EFFECTIVE DATE OF TERMINATION OF COVERAGE Your authorization to discharge under this permit terminates at midnight of the calendar day that a complete NOT is submitted to EPA. 9 PERMIT CONDITIONS APPLICABLE TO SPECIFIC STATES.. INDIAN COUNTRY LANDS.. OR TERRITORIES The provisions in this Part provide additions to the applicable conditions of this permit to reflect specific additional conditions required as part of the State or Tribal CWA Section 401 certification process, or the Coastal Zone Management Act (CZMA) certification process, or as otherwise established by the permitting authority. The specific additional revisions and requirements only apply to activities in those specific States, Indian country, and areas in certain States with Federal Facilities or areas subject to construction projects by Federal Operators. States, Indian country, and other areas not included in this Part do not have any additions to the applicable conditions of this permit. 9.1 EPA REGION 1 9.1.1 N H R 100000 State of New Hampshire a. Should the permit coverage for an individual applicant be insufficient to achieve water quality standards, the New Hampshire Department of Environmental Services (NHDES) may prepare additional 401 certification conditions for that applicant. Any additional 401 certification conditions will follow all required NHDES public participation requirements. b. If you disturb 100,000 square feet or more of contiguous area, you must also comply with RSA 485-A:17 and Env-Wq 1500, and, unless exempt, apply for an Alteration of Terrain (AoT) permit from NHDES. This requirement also applies to a lower disturbance threshold of 50,000 square feet or more when construction occurs within the protected shoreline under the Shoreland Water Quality Protection Act (see RSA 483-B and Env-Wq 1400). A permit application must also be filed if your project disturbs an area of greater than 2,500 square feet, is within 50 feet of any surface water, and has a flow path of 50 feet or longer disturbing a grade of 25 percent or greater. Project sites with disturbances smaller than those discussed above, that have the potential to adversely affect state surface waters, are subject to the conditions of an AoT General Permit by Rule (Env-Wq 1503.03). c. You must determine that any excavation dewatering discharges are not contaminated before they will be authorized as an allowable non-stormwater discharge under this permit (see Part 1.2.2 of the Construction General Permit or CGP). In the absence of information demonstrating otherwise, the water is considered uncontaminated if there is no groundwater contamination within 1,000 feet of the groundwater dewatering location. Information on groundwater contamination can be generated over the Internet via the NHDES web site http:// des.nh.gov/ by using the One Stop Data Mapper. For a toxic substance included in the New Hampshire surface water quality standards, see Env-Wq 1703.21 (see https://www.des.nh.gov/sites/g/fi 1 es/ehbemt 341/files/documents/2020-01/Env-Wg Page 49 2022 Construction General Permit (CGP) 1700.pdf). If it is determined that the groundwater to be dewatered is near a remediation or other waste site, you must apply for the Remediation General Permit (see https://www3.epa.gov/region 1/npdes/rgp.html) d. As a minimum, you must treat any uncontaminated excavation "dewatering" discharges and "stormwater" discharges, as those terms are defined in Appendix A of the CGP, as necessary, to remove suspended solids and turbidity so that the surface waters receiving the construction discharges95 meet New Hampshire surface water quality standards for turbidity (Env-Wq 1703.11 and Env-Wq 1703.03(c)(1)c), benthic deposits (Env-Wq 1703.03(c)(1)a), and Env-Wq 1703.08) and foam, debris, scum or other visible substances (i.e., plumes or visual turbidity)96 (Env-Wq 1703.03(c)(1)b). L For all Construction Activities covered under this CGP, the following shall apply to ensure compliance with the aforementioned regulations for turbidity, benthic deposits and visible substances: Unless otherwise specified, site inspection requirements shall comply with Part 4 of the CGP. As a minimum site inspection frequency shall be in accordance with Part 4.2.2 of the CGP (and Part 4.3.2 of the CGP for sites discharging dewatering water). Site inspection frequency may be reduced in accordance with Part 4.4 of the CGP (Reductions in Inspection Frequency). Monitoring of the receiving water for visible turbidity and benthic sediment deposits shall be conducted each site inspection and results reported in the Inspection Report required in Part 4.7 of the CGP. Should visible turbidity or benthic sediment deposits attributable or partly attributable to your construction activities be present in the receiving water, the"Corrective Actions"specified in Part 5 shall be immediately implemented to correct the water quality standard violations. In addition, daily monitoring (including photographs) of the receiving water shall be conducted until there is no visible turbidity or benthic deposits. Inspection Reports required in Part 4.7 of the CGP shall include, but not be limited to, the distance downstream and the percent of the river width97 where visible turbidity was observed, and the period of time that the visible turbidity persisted. A copy of the Inspection Report(s) shall be made available to NHDES within 24 hours of receiving a written request from NHDES. ii. For Construction Activities, disturbing 5 acres or more of land at any one time (excluding areas that have been completely stabilized in accordance with the final stabilization criteria specified in Part 2.2.14.c of the CGP), the following shall 95 Construction Discharges include uncontaminated"dewatering"and"stormwater"discharges as those terms are defined in Appendix A of the CGP.Controlled construction discharges are construction discharges where the rate of flow can be regulated such as from a construction settling basin or NHDES approved flocculation system. 96 For the definition of visual turbidity,see the definition for"Non-Turbid"in Appendix A of the CGP,which states the following:""Non-Turbid"-a discharge that is free from visual turbidity.For the purposes of this permit,visual turbidity refers to a sediment plume or other cloudiness in the water caused by sediment that can be identified by an observer."[EPA interprets the text of this footnote as intending to reference the Appendix A definitions of"visual turbidity"and"non- turbid"in the final permit.] 97 The distance downstream and the percent of river width where visible turbidity(i.e.,plume) is observed is required to determine the extent of the river affected and to determine if there was a"zone of passage" (i.e.,a portion of the receiving water where there was no visible turbidity where mobile organisms could pass without being adversely impacted).The percent of river width affected is equal 100 multiplied by the width of the plume (in feet) divided by the width of the receiving water(in feet). Page 50 2022 Construction General Permit (CGP) apply to ensure compliance with the aforementioned regulations for turbidity, benthic deposits and visible substances. Item 9.1.1.d.i) above shall apply to all construction discharges and the minimum site inspection frequency shall comply with Part 4.3.1 of the CGP (and Part 4.3.2 of the CGP for sites discharging dewatering water). Site inspection frequency may be reduced in accordance with Part 4.4 of the CGP (Reductions in Inspection Frequency). With regards to controlled construction discharges, if there is no visible turbidity (i.e., plumes) or benthic deposits, and, in the absence of information demonstrating otherwise, turbidity measurements of less than or equal to 50 nephelometric turbidity units (NTU) in the controlled construction discharges at the outlet prior to mixing with the receiving surface waters, shall be presumed to meet New Hampshire surface water quality standards for the parameters listed above. As a minimum, the controlled construction discharges must be sampled at each site inspection. If any controlled construction discharge exceeds 50 NTU, or if visible turbidity or benthic sediment deposits attributable or partly attributable to any construction discharge are observed in the receiving water, then the "Corrective Actions"specified in Part 5 of the CGP shall be immediately implemented. In addition, should such violation occur, and, in order to determine compliance with surface water quality standards for turbidity (Env-Wq 1703.11 and Env-Wq 1703.03(c)(1)c), benthic deposits (Env-Wq 1703.03(c)(1)a), and Env-Wq 1703.08) and foam, debris, scum or other visible substances (Env-Wq 1703.03(c)(1)b)), turbidity monitoring shall be immediately implemented as specified below: Turbidity samples of the receiving water shall be immediately taken in the receiving water upstream and beyond the influence of the construction activity, and, unless a mixing zone98 is approved by NHDES, no more than 75 feet downstream of each controlled construction discharge that exceeded 50 NTU and no more than 75 feet downstream of each construction discharge that caused visible turbidity. Downstream samples shall be taken at locations in the receiving water that are most likely influenced by the discharge (e.g., if visible turbidity (i.e., a plume) is present, the sample shall be taken in the plume). Samples shall be collected a minimum of 2 times per day during the daylight hours at times when construction activities are most likely to cause turbidity in the receiving water and shall continue until the turbidity water quality standards are met in the receiving water (i.e., the difference between the upstream and downstream turbidity level is no greater than 10 NTU). 98 Permittees may request a distance greater than 75 feet downstream of a construction discharge for determining compliance with turbidity standards in Class B surface waters, by submitting a mixing zone request to NHDES that complies with Env-Wq 1707.02.If a mixing zone is approved,NHDES is required to include conditions to ensure that the criteria on which the approval is based are met(Env-Wq 1707.03). Page 51 2022 Construction General Permit (CGP) If water quality standards are not met during daylight hours on any day, sampling shall resume the next day and continue no fewer than 2 times per day until water quality standards are met. The date, time, location and results of turbidity measurements, as well as a summary identifying the cause of the violations, corrective actions that were implemented, the period of time that the receiving water exceeded turbidity standards and the distance downstream and the percent of the river width where visible turbidity was observed, and the period of time that the visible turbidity persisted, shall be recorded and included in the Inspection Report required in Part 4.7 of the CGP. Turbidity measurements shall be conducted via a field meter in accordance with the requirements for turbidity specified in Table 1 B in 40 CFR 136.3 (see 40 CFR §136.3 Identification of test procedures - Code of Federal Regulations ecfr.io). Field meters shall be calibrated every day sampling is conducted and prior to the first sample. e. Construction site owners and operators are encouraged to consider opportunities for post- construction groundwater recharge using infiltration best management practices (BMPs) during site design and preparation of the SWPPP in order to assure compliance with Env-Wq 1703.03 and Env-Wq 1703.11. If your construction site is in a town that is required to obtain coverage under the NPDES General Permit for discharges from Municipal Separate Storm Sewer Systems (MS4) you may be required to use such practices. The SWPPP must include a description of any on-site infiltration that will be installed as a post-construction stormwater management measure or reasons for not employing such measures such as 1) The facility is located in a wellhead protection area as defined in RSA 485- C:2; or 2) The facility is located in an area where groundwater has been reclassified to GAA, GA1 or GA2 pursuant to RSA 485-C and Env-DW 901; or3) Any areas that would be exempt from the groundwater recharge requirements contained in Env-Wq 1507.04, including all land uses or activities considered to be a "High-load Area" (see Env-Wq 1502.30). For design considerations for infiltration measures see Env-Wq 1508.06. Note that there may be additional local requirements that fall under the NH MS4 permittee's Authorization to Discharge Permit for those regulated areas. f. Appendix F of the CGP contains information regarding Tier 2, or high quality waters in the various states. [EPA notes that this information has now been moved to h. ., tr ti r i r i -r r -tools ]. pji t Although there is no official list of tier 2 waters for New Hampshire, it can be assumed that all New Hampshire surface waters are tier 2 for turbidity unless 1) the surface water that you are proposing to discharge into is listed as impaired for turbidity in the states listing of impaired waters (see https://nhdes-surface-water- quality-assessment-site-nhdes.hub.arcgis.com/) or 2) sampling upstream of the proposed discharge location shows turbidity values greater than 10 NTU (Env-Wq 1703.11). A single grab sample collected during dry weather (no precipitation within 48 hours) is acceptable. g. To ensure compliance with RSA 485-C, RSA 485-A, RSA 485-A:131 1(a), Env-Wq 1700 and Env-Wq 302, the following information may be requested by NHDES. This information must be kept on site unless you receive a written request from NHDES that it be sent to the address shown below in 9.1.1.h. Page 52 2022 Construction General Permit (CGP) i. A list of all non-stormwater discharges that occur at the facility, including their source locations and the control measures being used (see Part 1.2.2 of the CGP). ii. Records of sampling and analysis required for construction dewatering and stormwater discharges (see 9.1.1.d above). h. All required or requested documents must be sent to: NH Department of Environmental Services, Watershed Management Bureau, P.O. Box 95 Concord, NH 03302-0095. 9.1.2 MAR100000 Commonwealth of Massachusetts (except Indian country) a. All discharges covered by the Construction General Permit shall comply with the provisions pursuant to 314 CMR 3.00, 314 CMR 4.00, 314 CMR 9.00, including applicable construction stormwater standards and 310 CMR 10.00. b. Pursuant to 314 CMR 3.11 (2)(a)6., and in accordance with MassDEP's obligation under 314 CMR 4.05(5)(e) to maintain surface waters free from pollutants in concentrations or combinations that are toxic to humans, aquatic life, or wildlife, permittees are prohibited from discharging dewatering water under the CGP from sites that are designated as Superfund/CERCLA or RCRA, and must make accommodations to dispose of the dewatering discharges appropriately, such as coverage under the Remediation General Permit (RGP). c. Pursuant to 314 CMR 3.11 (2)(a), and in accordance with MassDEP's obligation to protect Outstanding Resource Waters under 314 CMR 4.04(3), applicants seeking coverage under the 2022 CGP that propose to carry out construction activities near Outstanding Resource Waters as identified in 314 CMR 4.06, shall submit to MassDEP for review: i. a copy of the Stormwater Pollution Prevention Plan (SWPPP), ii. a copy of the EPA NOI, and iii. MassDEP's Stormwater BMP Checklist. For purposes of this review, the permittee shall submit these documents to MassDEP at the same time they are submitted to EPA. Instructions on how to submit these documents to MassDEP and where to find the MassDEP Stormwater BMP Checklist and obtain authorization to discharge can be found here: https://www.mass.gov/how-to/wm-15-npdes-general-permit- notice-of- intent. d. Pursuant to 314 CMR 3.11 (2)(a)6., and in accordance with MassDEP's obligation under 314 CMR 4.05(5)(e) to maintain surface waters free from pollutants in concentrations or combinations that are toxic to humans, aquatic life, or wildlife, applicants that propose to dewater under the 2022 CGP and plan to discharge to certain waters as described below, shall determine that any dewatering discharges are not contaminated by testing the proposed discharge as described below as part of the application for WM15 authorization. Unless otherwise specified, testing described in this section should be conducted using the methods in 40 CFR 136. i. Applicants for sites that plan to discharge to Outstanding Resource Waters as identified in 314 CMR 4.06 shall test one sample of the proposed dewatering discharge water for pH, E. Coli (for discharges to freshwater), fecal coliform (for Page 53 2022 Construction General Permit (CGP) discharges to salt water), Enterococci (for discharges to salt water), total suspended solids, oil and grease, total nitrogen, total phosphorus, and all parameters with numeric criteria listed in the Massachusetts Surface Water Quality Standards at 314 CMR 4.05(e). Results shall be reported to MassDEP as part of the WM 15 application. To determine if the dewatering discharge could be covered under the 2022 CGP, the effluent at zero dilution must meet numeric water quality criteria. If the effluent does not meet numeric water quality criteria, the applicant shall contact EPA Region 1 to discuss coverage under the Remediation General Permit. ii. Applicants for sites that propose to discharge to Public Water Supplies (314 CMR 4.06(1)(d)1) shall also test one sample of the proposed dewatering discharge water for per- and polyfluoroalkyl substances (PFAS), as outlined in the table below. Results shall be reported to MassDEP as part of the WM15 application. If any PFAS compounds are detected, the applicant shall apply for coverage under the NPDES Remediation General Permit for Massachusetts if required. PEAS Testing Parameters for Discharges to Public Drinking Water Supplies99 Perfluorohexanesulfonic acid (PFHxS),grab Report ng/L Perfluoroheptanoic acid (PFHpA), grab Report ng/L Perfluorononanoic acid (PFINIA), grab Report ng/L Perfluorooctanesulfonic acid (PFOS),grab Report ng/L Perfluorooctanoic acid (PFOA), grab Report ng/L Perfluorodecanoic acid (PFDA), grab Report ng/L iii. Applicants for sites that propose to discharge to an impaired water as identified in the most recent final Massachusetts Integrated List of Waters,shall test one sample of the proposed dewatering discharge water for the parameter(s) for which the waterbody is impaired. To determine if the dewatering discharge could be covered under the 2022 CGP, the effluent at zero dilution must meet numeric water quality criteria. If the effluent does not meet numeric water quality criteria, the applicant shall contact EPA Region 1 to discuss coverage under the Remediation GeneralPermit and shall apply for RGP coverage if required. iv. For dewatering discharges to all other waters, if any pollutants are knownor believed present in the proposed dewatering discharge water, the applicant shall apply for coverage under the NPDES Remediation General Permit for Massachusetts if required. For the purposes of this condition, a pollutant is "known present" if measured above the analytical detection limit using a sufficiently sensitive test method in an environmental sample, and "believed present" if a pollutant has not been measured in an environmental sample but will be added or generated prior to discharge, such as through a treatment process. Consequently, a pollutant is "known absent" if measured as non-detect relative to the analytical detection limit using a sufficiently sensitive test method in an environmental sample, and "believed absent" if a pollutant has not been measured in an environmentalsample but will not be added or generated prior to discharge and is not a parameter that applies to the applicable activity category for a site. If any pollutants are known or believed present in the 99 PFAS testing shall follow established EPA methods 537 or 537.1 for drinking water until EPA Method 3512 for non- potable water becomes available. Page 54 2022 Construction General Permit (CGP) proposed dewatering discharge water, the applicant shall test one sample of the proposed dewatering discharge water for the pollutants known or believed to be present. To determine if the dewatering discharge could be covered under the 2022 CGP, the effluent at zero dilution must meet numeric water quality criteria. If the effluent does not meet numeric water quality criteria, the applicant shall contact EPA Region 1 to discuss coverage under the Remediation General Permit. e. Pursuant to 314 CMR 3.11 (2)(a), and in accordance with MassDEP's obligation to protect Outstanding Resource Waters under 314 CMR 4.04(3), applicants that propose to dewater under the 2022 CGP and discharge to Outstanding Resource Waters as identified in 314 CMR 4.06, shall submit the SWPPP and associated documents to MassDEP to review. MassDEP shall complete review within 30 daysof receipt. f. Pursuant to 314 CMR 3.11 (2)(a)6., and in accordance with MassDEP's obligation under 314 CMR 4.05 to maintain surface waters free from color and turbidity in concentrations or combinations that are aesthetically objectionable or would impair any use assigned to the waterbody, permittees that have been authorized to dewater under the 2022 CGP and that discharge to Outstanding Resource Waters as identified in 314 CMR 4.06 shall carry out daily benchmark monitoring for turbidity'oo for the duration of dewatering. Permittees shall compare the weekly average of the turbidity monitoring results with the established benchmark turbidity value of 25 Nephelometric Turbidity Units (NTU). If a permittee's weekly average turbidity results exceed the benchmark, the operator shall conduct follow-up corrective action to determine the source of the problem and to make any necessary repairs or upgrades to the dewatering controls to lower the turbidity levels. The permittee shall document any corrective action taken in its corrective action log. Furthermore, permittees at these sites shall carry out inspections at higher frequency, specifically, daily inspections of the dewatering discharge treatment for the duration of the discharge. The permittee shall inspect the site for sediment plume or whether a hydrocarbon sheen is visible at the point of discharge, estimate the flow rate at the point of discharge, and inspect the site downstream to assess whether sedimentation is attributable to the dewatering discharges. g. Pursuant to 314 CMR 3.11 (2)(a)6., and in accordance with MassDEP's obligation under 314 CMR 4.05 to maintain surface waters free from color and turbidity in concentrations or combinations that are aesthetically objectionable or would impair any use assigned to the waterbody, permittees shall store materials outside the Base Flood Elevation 101 when feasible to prevent displacing runoff and erosion. h. Pursuant to 314 CMR 3.11 (2)(a), and in accordance with MassDEP's obligation to maintain surface waters free from nutrients in concentrations that would cause or contribute to impairment of existing or designated uses under 314 CMR 4.05(5)(c), all applicants who apply for coverage under the 2022 CGP shall follow guidelines on fertilizer application, including use of fertilizer containing no phosphorus, in accordance with 330 CMR 31.00 Plant Nutrient Application Requirements for too Applicants shall follow EPA Method 180.1 to monitor for turbidity 101 Base Flood Elevation (BFE) is the elevation of surface water resulting from a flood that has a 1%chance of equaling or exceeding that level in any given year.The BFE is shown on the Flood Insurance Rate Map (FIRM) for zones AE,AH,A 1-A30,AR,AR/A,AR/AE,AR/Al-A30,AR/AH, AR/AO, V 1-V30 and V E. (Source: https://www.fema.gov/node/404233). Page 55 2022 Construction General Permit (CGP) Agricultural Land and Non-Agricultural Turf and Lawns. Further, fertilizer shall never be applied to a site when a rain event greater than 0.5 inches is forecast in the next 48 hours. L Pursuant to 314 CMR 3.11 (2)(a), all applicants who apply for coverage under the 2022 CGP and elect to carry out site inspections every 14 days shall also inspect sites within 24 hours of 0.25 inches of precipitation events or greater over 24 hours,or within 24 hours of a discharge that occurred due to snowmelt from 3.25 inches or greater of snow accumulation.102During the high flow periods in spring (i.e., months of April to June), inspection frequency shall be increased to once per week for all sites. L To determine whether 3.25 inches or greater of snow accumulation has occurred at a site, snowfall measurements can be taken at the site,103 or theoperator can rely on similar information from a local weather forecast. j. Implementing structural improvements, enhanced/resilient pollution prevention measures, and other mitigation measures can help to minimize impacts from stormwater discharges from major storm events such as hurricanes, storm surge, extreme/heavy precipitation,104and flood events. Pursuant to 314 CMR 3.11 (2)(a), if such stormwater control measures are already in place due to existing requirements mandated by other state, local or federal agencies, the SWPPP shall include a brief description of the controls and a reference to the existing requirement(s). If the site may be exposed to or has previously experienced such major storm events 105, additional stormwater control measures that may be considered, and implemented as necessary, include, but are not limited to: L Reinforce materials storage structures to withstand flooding and additional exertion of force; ii. Prevent floating of semi-stationary structures by elevating to the Base Flood Elevation (BFE) level or securing with non-corrosive device; HE, When a delivery of exposed materials is expected, and a storm is anticipated within 48 hours, delay delivery until after the storm or storematerials as appropriate (refer to emergency procedures); 102 This is the amount of snow that is equivalent to 0.25 inches of rain, based on information from the National Oceanic and Atmospheric Administration (NOAA) indicating that 13 inches of snow is, on average, equivalent to l inch of rain.See https://www.nssl.noaa.gov/education/svrwxl 01/winter/faq/. 103 NOAA's National Weather Service has guidelines on snowfall measurements at https://www.weather.gov/jkl/snow-measurement.These guidelines recommend use of a "snowboard" (a piece of wood about 16 inches by 16 inches) that is placed in an unobstructed part of the site on a hard surface. 104 Heavy precipitation refers to instances during which the amount of rain or snow experienced in a location substantially exceeds what is normal. What constitutes a period of heavy precipitation varies according to location and season. Heavy precipitation does not necessarily mean the total amount of precipitation at a location has increased—just that precipitation is occurring in more intense or more frequent events. 105 To determine if your facility is susceptible to an increased frequency of major storm events that could impact the discharge of pollutants in stormwater,you may reference FEMA, NOAA, or USGS flood map products at https://www.usgs.gov/faqs/where-can-i-find-flood-maps?qt- news_science_products=0#gtnews_science_products. Page 56 2022 Construction General Permit (CGP) iv. Temporarily store materials and waste above the Base Flood Elevation [EPA notes that it has deleted a footnote reference to the term "Base Flood Elevation"since the same footnote is already included in Part 9.1.2.g, above.] level; v. Temporarily reduce or eliminate outdoor storage; A Temporarily relocate any mobile vehicles and equipment to higher ground; AL Develop scenario-based emergency procedures for major storms that are complementary to regular stormwater pollution prevention planning andidentify emergency contacts for staff and contractors; and viii. Conduct staff training for implementing your emergency procedures atregular intervals. k. Pursuant to 314 CMR 3.11 (2)(a)6., and in accordance with MassDEP's obligation under 314 CMR 4.05(5)(e) to maintain surface waters free from pollutants in concentrations or combinations that are toxic to humans, aquatic life, or wildlife, permittees who seek coverage under the 2022 CGP and anticipate to carry out dust control shall limit their dust control methodology to using water only and specifically avoid using other techniques, such as solutions containing calcium chloride. I. If MassDEP requests a copy of the Stormwater Pollution Prevention Plan (SWPPP) for any construction site at any time, the permittee shall submit the SWPPP to MassDEP within 14 days of such a request. MassDEP may conduct an inspection of any site covered by this permit to ensure compliance with state lawrequirements, including state water quality standards. 9.1.3 MTR10F000 Areas in the State of Vermont located at a federal facility a. Earth disturbance at any one time is limited to five acres. b. All areas of earth disturbance must have temporary or final stabilization within 14 days of the initial disturbance. After this time, disturbed areas must be temporarily or permanently stabilized in advance of any runoff producing event. A runoff producing event is an event that produces runoff from the construction site. Temporary stabilization is not required if precipitation is not forecast and work is to continue in the next 24-hours or if the work is occurring in a self-contained excavation (i.e. no outlet) with a depth of two feet or greater (e.g. house foundation excavation, utility trenches). Areas of a construction site that drain to sediment basins are not considered eligible for this exemption, and the exemption applies only to the excavated area itself. c. Site inspections on active construction sites shall be conducted daily during the period from October 15 through April 15. d. The use of chemical treatments (e.g. polymers, flocculants, and coagulants) for the settling and/or removal of sediment from stormwater runoff associated with construction and construction-related activities requires prior written approval and an approved site and project-specific plan, from the Vermont Agency of Natural Resources. In addition, the use of cationic polymers is prohibited unless approved by the Vermont Agency of Natural Resources under a site and project-specific plan. e. Any applicant under EPA's CGP shall allow authorized Vermont Agency of Natural Resources representatives, at reasonable times and upon presentation of credentials, to enter upon the project site for purposes of inspecting the project and determining Page 57 2022 Construction General Permit (CGP) compliance with this Certification. f. The Vermont Agency of Natural Resources may reopen and alter or amend the conditions of this Certification over the life of the EPA 2022 Construction General Permit when such action is necessary to assure compliance with the VWQS. 9.2 EPA REGION 2 9.2.1 NYR101000 Indian country within the State of New York a. Saint Regis Mohawk Tribe i. Any Responsible-Person/Decision-Maker required under the CGP to submit a Notice of Intent (NOI) to EPA for coverage under the CGP, must concurrently submit an electronic copy of the NOI to the SRMT Environmental Division, Water Resource Program Manager. Additionally, an electronic copy of the Notice of Termination (NOT) must be provided within three business days after electronic confirmation is received from EPA that the NOT has been accepted. The NOI and NOT must be electronically provided to the following addresses: Mr. Tieman W. Smith Water Resources Program Manager Saint Regis Mohawk Tribe 449 Frogtown Road Akwesasne, NY 13655 Tiernan.Smith@srmt-nsn.gov 518.358.2272 ext. 5073 ii. Any Responsible-Person/Decision-Maker that is required as part of the CGP to prepare a Discharge Management Plan (OMP) or Storm Water Management Plan (SWMP) and/or Storm Water Pollution Prevention Plan (SWPPP) must submit an electronic copy of the DMP, SWMP and/or SWPPP to the SRMT Environment Division, Water Resources Program Manager 10 business days prior to the start of construction of any work to be conducted under the CGP. The applicable documents must be provided to the electronic address listed above. iii. Any Responsible-Person/Decision-Maker that is required under the CGP to submit an annual report to EPA must submit an electronic copy of the annual report concurrently to the SRMT Water Resource Program. Additionally, any correspondences between the applicant and EPA related to analytical data, written reports, corrective action, enforcement, monitoring, or an adverse incident must likewise be routed to the SRMT Water Resources Program at the above electronic address. iv. An "Authorization to Proceed Letter"with site-specific mitigation requirements may be sent out to the permittee when a review of the NOI and OMP, SWMP and /or SWPPP on a case-by-case basis, is completed by the SRMT Environment Division, Water Resource Program. This approval will allow the application to proceed if all mitigation requirements are met. b. Seneca Nation i. Under Part 1.1.5 of the CGP, the Seneca Nation requests that an applicant must demonstrate that they meet the eligibility criteria listed in Appendix D (certify in your Notice of Intent (NOI) that you meet one of the eligibility criteria [Criterion A- F]) as well as species and critical habitats that are listed under the Seneca Nation's "Fishing and Conservation Laws"and the"Seneca Nation of Indians Comprehensive Conservation Law". Page 58 2022 Construction General Permit (CGP) ii. The Tribal Historic Preservation Office (THPO) was established in 2000 after the Seneca Nation received a recognition letter from the National Park Service (NPS); therefore under Part 1.1.6 of the CGP (Appendix E) and prior to submitting a Notice of Intent (NOI) operators must complete the Nation's TPHO, Project Review Form (https://sni.org/media/246603/sni-thpo-project-review-form.pdf) and submit the completed form with associated information to the Tribal Historic Preservation Officer at 90 Ohi:yo' Way, Salamanca, NY 14779. Federal agencies engaging in construction activities must provide for construction review by a certified construction reviewer in accordance with 7 Del. C. §§4010 &4013 and 7 DE Admin. Code 5101, subsection 6.1.6. HE, Under Part 1.2 of the CGP, discharges must also follow the Section 13 of the Guide for Construction (Seneca Nation of Indians Source Water Code) and respectively, Council Resolution, dated April 13, 2013 (CN: R-04-13-13-1 1) to ensure that the health, safety and welfare of the citizens of the Seneca Nation, and all other within the Lands and Territories of the Seneca Nation of Indians, and to facilitate the adequate provisions of water through the elimination or prevention of ground water contamination in the vicinity of wells that supply drinking water for the Nation. The area is known as the Source Water Protection Area (SWPA) and specified activities are regulated within this SWPA, as cited in Section 13 of the Guide for Construction and Section VI, of CN: R-04-13-13-1 1. iv. Under Part 1.4, any operator who seeks coverage of the CGP, and is required to submit a notice of intent NOI and Notice of Termination (NOT) (as necessary) to the EPA for coverage, under Part 1.4.2 must also submit a copy of the NOI to the Seneca Nation's Environmental Protection Department (EPD) within three business days of submittal to the EPA, (address shown below). Respectively, a copy of the NOT (as described under Part 8.3 of the CGP), which certifies that you have met the requirements of Part 8, must be provided within three business days after electronic confirmation is received from the EPA that the NOT has been accepted. In addition to a NOI and NOT, the Seneca Nation (Environmental Protection Department [EPD]) would require an Environmental Impact Assessment (EA) (Long Form), as shown in Section 2 of the Seneca Nation of Indians Laws, Ordinances & Policies (Guide for Construction), to be completed and submitted to the EPD prior to any project to determine whether the impacts from a project would create significant and detrimental effects to the Nation's lands, water (violate WQS), and environment. The NOI, NOT, and EA must be submitted electronically to epd@sni.org and provided to the following address: Seneca Nation Environmental Protection Department (EPD) Attn: Director of EPD 12837 Route 438 Irving, NY 14081 v. Under Part 3.0 of the CGP, discharges must be controlled as necessary to meet applicable WQS.The Seneca Nation is working actively towards finalizing and implementing the; therefore, the EPD would require an applicant to submit or grant access to the permit to obtain information on the impact of effluents on receiving waters, including the capability of receiving waters to support future designated uses and achieve the WQS of the Nation; and to advise prospective dischargers of discharge requirements, and coordinate with the appropriate Page 59 2022 Construction General Permit (CGP) permitting agencies. As stated in the Decision Document, under Section 303(c) of the CWA, 33 U.S.C. § 1313(c), states develop, review, and revise (as appropriate) water quality standards for surface waters of the United States. At a minimum, such standards are to include designated water uses, water quality criteria to protect such uses, and an antidegradation policy. 40 C.F.R. § 131.6. In addition, under Section 401 of the CWA states may grant, condition, or deny"certification" for federally permitted or licensed activities that may result in a discharge to the waters of the United States 33 U.S.C. § 1341. A Under Part 7.2.8(a)(b)(c) and for Part 9 of the CGP, the following Sections of the Seneca Nation's Guide for Construction shall be considered, in conjunction with the CGP: (a) Section 1. Executive Order-To Establish a Policy for Governing Access to Nation Territories and Facilities by Officials of Foreign Government, dated March 31, 2011 (b) Section 3. Natural Resources Committee, Sand and Gravel Law (CN: R-06-24- 05-08) (c) Section 4. Fishing and Conservation Laws- Part 1.1.5 of the CGP (d) Section 5. Seneca Nation of Indians Comprehensive Conservation Law, adopted January 14, 2012 (e) Section 9. Food is Our Medicine (FIOM) Program/Native Planting Policy (CN: R- 03- 08-14-14) (f) Section 10. Forestry Management Plan (CN: R-08-14-10-23) (g) Section 11. Timber Ordinance #41 1-092, dated May 8, 1982 (h) Section 14. Flood Damage Prevention Local Law, dated September 27, 1988 (i) Section 16. Utilities Ordinance No. 87-100 (j) Authorizing Emergency Action and Contingency Plan to Restrain Pollution of Nations Waters, (Council Resolution: R-03-01-18-10), dated March 10, 2018 Seneca Nation of Indians Permit Application for Construction within Waterways Permit, Form NR98-01.00 9.3 EPA REGION 3 9.3.1 DCR100000 District of Columbia a. Discharges authorized by this permit shall comply with the District of Columbia Water Pollution Control Act of 1984, as amended (DC Official Code § 8-103.01 and § 8- 103.06, et seq.) to ensure that District of Columbia waters, waters in adjacent and downstream states, and the beneficial uses of these waters will not be harmed or degraded by the discharges. b. Discharges authorized by this permit must comply with §§ 1104.1 and 1104.8 of Chapter 1 1 and the provisions of Chapter 19 of Title 21 of District of Columbia Municipal Regulations in order to attain and maintain designated uses of the District of Columbia waters. Page 60 2022 Construction General Permit (CGP) c. The permittee shall comply with the District of Columbia Stormwater Management and Soil Erosion and Sediment Control regulations in Chapter 5 of Title 21 of the District of Columbia Municipal Regulations. d. The permittee shall comply with the District of Columbia Flood Management Control regulations in Chapter 31 of Title 20 of the District of Columbia Municipal Regulations. e. The permittee shall submit a copy of the Stormwater Pollution Prevention Plan (SWPPP) to the Regulatory Review Division, Department of Energy & Environment, Government of the District of Columbia, 1200 First Street, NE, 5th Floor, Washington, DC 20002, during the review and approval of the permittee's DOEE Erosion and Sediment Control Plan in accordance with the provisions of Chapter 542 of Title 21 of the District of Columbia Municipal Regulations. f. Upon request, the permittee shall submit all inspection and monitoring reports as required by this permit and 40 CFR § 122.41 to the Associate Director, Inspection and Enforcement Division, Department of Energy & Environment, Government of the District of Columbia, 1200 First Street, NE, 5th Floor, Washington, DC 20002; telephone (202) 535-2226, or by email at Joshua.Rodriguez@dc.gov. g. In the event the permittee intends to discharge dewatering water, groundwater, or groundwater comingled with stormwater from a known contaminated site, the permittee shall contact the Regulatory Review Division, Department of Energy & Environment, Government of the District of Columbia, 1200 First Street, NE, 5th Floor, Washington, DC 20002; telephone (202) 535-2600, or by email at MS4DischargeAuthorization@dc.gov to request authorization to discharge dewatering water, groundwater, or groundwater comingled with stormwater to the District's Municipal Separate Storm Sewer System (MS4) or to a surface water body pursuant to §§ 8-103.02, 8-103.06, and 8-103.07 of the District of Columbia Water Pollution Control Act of 1984, as amended. 9.3.2 DER1011`000 Areas in the State of Delaware located at a federal facility (as defined in Appendix A) a. Federal agencies must submit a sediment and stormwater management plan (SSMP) and receive Department approval prior to undertaking any land clearing, soil movement or construction activity unless conducting an exempt activity. b. Federal construction activities are required to have a third-party Certified Construction Reviewer (CCR) perform weekly reviews to ensure the adequacy of construction activities pursuant to the approved SSMP and regulations. Implementation of approved SSMPs requires the daily oversight of construction activity by certified responsible personnel. c. Implementation of approved SSMPs requires the daily oversight of construction activity by certified responsible personnel. d. A current copy of the SSMP must be maintained at the construction site. e. Unless authorized by the Department, not more than 20 acres may be disturbed at any one time. 9.4 EPA REGION 4 No additional conditions Page 61 2022 Construction General Permit (CGP) 9.5 EPA REGION 5 9.5.1 MIR101000 Indian country within the State of Minnesota a. Fond du Lac Reservation i. New dischargers wishing to discharge to an Outstanding Reservation Resource Water (ORRW)106must obtain an individual permit from EPA for storm water discharges from large and small construction activities. ii. A copy of the Storm Water Pollution Prevention Plan (SWPPP) must be submitted to the Office of Water Protection at least fifteen (15) days in advance of sending the Notice of Intent to EPA. The SWPPP can be submitted electronically to richardgitar@FDLREZ.com or by hardcopy sent to: Fond du Lac Reservation Office of Water Protection 1720 Big Lake Road Cloquet, MN 55720 HE, Copies of the Notice of Intent (NOI) and the Notice of Termination (NOT) must be sent to the Fond du Lac Office of Water Protection at the same time they are submitted to EPA. [The condition helps the Office of Water Protection keep track of when a project is about to start and when it has ended. FDL Water Quality Certification Ordinance, Section 204 (a) (2)). iv. If the project will entail a discharge to any watercourse or open water body, the turbidity limit shall NOT exceed 1 Oho of natural background within the receiving water(s) as determined by Office of Water Protection staff. For such discharges, turbidity sampling must take place within 24 hours of a 1/2-inch or greater rainfall event. The results of the sampling must be reported to the Office of Water Protection within 7 days of the sample collection. All sample reporting must include the date and time, location (GPS: UTM/Zone 15), and NTU. CGP applicants are encouraged to work with the Office of Water Protection in determining the most appropriate location(s) for sampling. [This condition helps both the Office of Water Protection and the project proponent in knowing whether or not their erosion control efforts are effective. FDL Water Quality Certification, Section 204 (b) (1)). v. Receiving waters with open water must be sampled for turbidity prior to any authorized discharge as determined by Office of Water Protection staff. This requirement only applies to receiving waters which no ambient turbidity data exists. [This condition allows the Office of Water Protection to obtain a baseline turbidity sample in which to compare to other samples. FDL Water Quality Certification Ordinance, Section 204 (b) (2)]. A All work shall be carried out in such a manner as will prevent violations of water quality criteria as stated in the Water Quality Standards of the Fond du Lac Reservation, Ordinance #12/98, as amended. This includes, but is not limited to, the prevention of any discharge that causes a condition in which visible solids, bottom deposits, or turbidity impairs the usefulness of water of the Fond du Lac 106 Although additional waters may be designated in the future, currently Perch Lake, Rice Portage Lake, Miller Lake, Deadfish Lake,and Jaskari Lake are designated as ORRWs. Page 62 2022 Construction General Permit (CGP) Reservation for any of the uses designated in the Water Quality Standards of the Fond du Lac Reservation. These uses include wildlife, aquatic life, warm water fisheries, cold water fisheries, subsistence fishing (netting), primary contact recreation, secondary contact recreation, cultural, wild rice areas, aesthetic waters, agriculture, navigation, commercial and wetlands. It also includes the designated uses of wetlands including, but not limited to, baseflow discharge, cultural opportunities, flood flow attenuation, groundwater recharge, indigenous floral and fauna) diversity and abundance, nutrient cycling, organic carbon export/cycling, protection of downstream water quality, recreation, resilience against climactic effects, sediment/shoreline stabilization, surface water storage, wild rice, and water dependent wildlife. [In addition to listing the designated uses of waters of the Fond du Lac Reservation, this condition also limits the project proponent to discharges that will not violate our Water Quality Standards. FDL Water Quality Certification Ordinance, Section 204 (a) (7)). VIL Appropriate steps shall be taken to ensure that petroleum products or other chemical pollutants are prevented from entering waters of the Fond du Lac Reservation. All spills must be reported to the appropriate emergency management Agency (National Response Center AND the State Duty Officer), and measures shall be taken immediately to prevent the pollution of waters of the Fond du Lac Reservation, including groundwater. The Fond du Lac Office of Water Protection must also be notified immediately of any spill regardless of size. [This condition helps protect water quality and also reminds project proponents of their responsibility in reporting spill events. FDL Water Quality Certification Ordinance, Section 204 (b) (3)). viii.All seed mixes, whether used for temporary stabilization or permanent seeding, shall NOT contain any annual ryegrass (Lolium species). Wild rye (Elymus species) or Oats (Avena species) may be used as a replacement in seed mixes. [This condition prevents the use of annual ryegrass on the Reservation. Annual ryegrass is allelopathic,which means it produces biochemical in its roots that inhibit the growth of native plants. If used in seed mixes, annual ryegrass could contribute to erosion, especially on slopes. However, the condition also specifies substitute grasses that germinate almost as fast as annual ryegrass for use as a cover crop to help prevent erosion. FDL Water Quality Certification Ordinance, Section 204 (t) (1))- ix. To prevent the introduction of invasive species, ALL contractors and subcontractors MUST disclose information stating prior equipment location(s) and ALL known invasive species potentially being transported from said location(s). All equipment MUST undergo a high pressure wash (including any equipment mats) BEFORE ENTERING the Fond du Lac Reservation. Personal equipment such as work boots, gloves, vest, etc. MUST be clean of debris, dirt and plant and animal material BEFORE ENTERING the Fond du Lac Reservation. Equipment being transported from known infested areas MUST undergo a high pressure wash as soon as possible after leaving the infested site and again BEFORE ENTERING the Fond du Lac Reservation, to avoid transport of invasive species into areas surrounding the Reservation. Written certification of equipment cleaning MUST be provided to the Fond du Lac Office of Water Protection. Upon arrival, ALL contractor and subcontractor equipment will be inspected by appointed Fond du Lac staff. If equipment is deemed unsatisfactory, the equipment MUST Page 63 2022 Construction General Permit (CGP) undergo a high pressure washing until the equipment is cleared by the inspector, until such time, minimal travel will be allowed through the Reservation. The contractor shall be held responsible for the control of any invasive species introduced as a result of their project. [This condition requires the project proponent to prevent the inadvertent introduction of invasive species by taking an active role in cleaning all vehicles, equipment, and equipment mats before entering the Reservation. This condition has been placed in certifications since 2012, due to the introduction of Wild Parsnip in 2011 from a pipeline contractor. It is much easier to prevent the introduction of an invasive species than it is to eradicate it once it has been introduced. Many invasive plant species form monocultures, preventing native plants from growing. This situation often leads to cases of erosion, which in turn effects water quality. FOL Water Quality Certification Ordinance, Section 204 (g) (1)]. x. A copy of this certification MUST be kept by the contractor on-site at all times and be available for viewing by all personnel, including inspectors. [This condition ensures that the information contained in the certification, especially the conditions, is readily available onsite for reference. FOL Water Quality Certification Ordinance, Section 204 (a) (9)]. b. The Grand Portage Band of Lake Superior Chippewa i. The CGP authorization is for construction activities that may occur within the exterior boundaries of the Grand Portage Reservation in accordance to the Grand Portage Land Use Ordinance.The CGP regulates stormwater discharges associated with construction sites of one acre or more in size. Only those activities specifically authorized by the CGP are authorized by this certification (the "Certification"). ii. All construction stormwater discharges authorized by the CGP must comply with the Water Quality Standards and Water Resources Ordinance, as well as Applicable Federal Standards (as defined in the Water Resources Ordinance). iii. All appropriate steps must be taken to ensure that petroleum products or other chemical pollutants are prevented from entering the Waters of the Reservation. All spills must be reported to the appropriate emergency-management agency, and measures must be taken to prevent the pollution of the Waters of the Reservation, including groundwater. iv. The 2022 CGP requires inspections and monitoring reports of the construction site stormwater discharges by a qualified person. Monitoring and inspection reports must comply with the minimum requirements contained in the 2022 CGP. The monitoring plan must be prepared and incorporated into the Storm Water Pollution Prevention Plan (the "SWPP"). A copy of the SWPP must be submitted to the Board at least 30 days in advance of sending the requisite Notice of Intent to EPA. The SWPP should be sent to: Grand Portage Environmental Resources Board P.O. Box 428 Grand Portage, MN 55605 Copies of the Notice of Intent and Notice of Termination required under the General Permit must be submitted to the Board at the address above at the same time they are submitted to the EPA. Page 64 2022 Construction General Permit (CGP) v. If requested by the Grand Portage Environmental Department, the permittee must provide additional information necessary for a case-by-case eligibility determination to assure compliance with the Water Quality Standards and any Applicable Federal Standards.The burden is on the applicant to demonstrate compliance with the Water Quality Standards, the Water Resources Ordinance, and Applicable Federal Standards whether or not the application is ultimately eligible for the CGP. A CGP discharges must not cause nuisance conditions as defined in Grand Portage Water Quality Standards. vii. The Board retains full authority to ensure compliance with and to enforce the provisions of the Water Resource Ordinance and Water Quality Standards, Applicable Federal Standards, and these Certification conditions. Nothing herein affects the scope or applicability of other controlling tribal or federal requirements, including but not limited to impacts to cultural, historical, or archeological features or sites, or properties that may be eligible for listing on the National Register of Historic Places under the National Historic Preservation Act, 54 U.S.C. §§ 300101 et seq. Al.Appeals related to Board actions taken in accordance with any of the preceding conditions may be heard by the Grand Portage Tribal Court. c. Leech Lake Band of Ojibwe L The water quality standards that apply to the construction site are the standards at the time the operator submits its Notice of Intent (NOI) to EPA and the LLBO WRP (see conditions # 2 and # 3). ii. A copy of the Stormwater Pollution Prevention Plan (SWPPP) must be submitted to the LLBO WRP at least 30 days in advance of sending the NOI for the project to EPA. See attached LLBO 401 Water Quality Certification Ordinance. Section 304(a)(1). The SWPPP should be submitted electronically to ................:.....:.......®.. ................rr, it ii .n aj and by hardcopy sent to: Leech Lake Band of Ojibwe ATTN: Water Resources Program -401 Cert Division of Resource Management 190 Sailstar Drive NW Cass Lake, Minnesota 56633 HL Copies of the NOI and the Notice of Termination (NOT) must be submitted to the LLBO WRP at the same time they are submitted to EPA. See attached LLBO 401 Water Quality Certification Ordinance, Section 304(a)(2).The NOI and NOT should be submitted electronically to ...............:...m... ................ir, it i gy .n [and sent by hardcopy to the address cited in condition # 2. iv. Any and all other conditions listed in Section 304 of the attached LLBO 401 Water Quality Certification Ordinance shall be observed unless the LLBO WRP deems that certain conditions therein are not applicable to the project in need of a permit under this certification. v. A copy of this certification MUST be kept by the contractor on-site at all times and be available for viewing by all personnel, including inspectors. Page 65 2022 Construction General Permit (CGP) A Upon consideration of the NOI, if the LLBO WRP finds that the discharge will not be controlled as necessary to meet applicable water quality standards, the LLBO WRP may insist, consistent with Part 3.1 of the CGP, that additional controls are installed to meet applicable water quality standards, or recommend to EPA that the operator obtain coverage under an individual permit. 9.5.2 WIR101000 Indian country within the State of Wisconsin a. Bad River Band of Lake Superior Tribe of Chippewa Indians i. Only those activities specifically authorized by the CGP are authorized by this Certification. This Certification does not authorize impacts to cultural properties, orhistorical sites, or properties that may be eligible for listing as such. ii. All projects which are eligible for coverage under the CGP and are located within the exterior boundaries of the Bad River Reservation shall be implemented in such a manner that is consistent with the Tribe's Water Quality Standards (WQS). The Tribe's WQS can be viewed at: http://www.badriver-nsn.gov/wp- content/uploads/2020/01/NRD_WaterQualityStandards_201 l.pdf iii. Operators are not eligible to obtain authorization under the CGP for all new discharges to an Outstanding Tribal Resource Water (OTRW or Tier 3 water). OTRWs, or Tier 3 waters, include the following: Kakagon Slough and the lower wetland reaches of its tributaries that support wild rice, Kakagon River, Bad River Slough, Honest John Lake, Bog Lake, a portion of Bad River, from where it enters the Reservation through the confluence with the White River, and Potato River. OTRWs can be viewed at: https://www.arcgis.com/apps/View/index.html?appid=6f44c371217e4ee8b5f1 c2 c705c 7c7c5 iv. An operator proposing to discharge to an Outstanding Resource Water (ORW or Tier 2.5 water) under the CGP must comply with the antidegradation provisions of the Tribe's WQS. ORWs, or Tier 2.5 waters, include the following: a portion of Bad River, from downstream the confluence with the White River to Lake Superior, White River, Marengo River, Graveyard Creek, Bear Trap Creek, Wood Creek, Brunsweiler River, Tyler Forks, Bell Creek, and Vaughn Creek. ORWs can be viewed at: https://www.arcgis.com/apps/View/index.html?appid=6f44c371217e4ee8b5f1 c2 c705c 7c7c5. The antidegradation demonstration materials described in provision EA.iii., and included on the antidegradation demonstration template found at: https://www.badriver-nsn.gov/natural-resources/projectreviews/, must be submitted to the following address: Bad River Tribe's Natural Resources Department Attn: Water Regulatory Specialist P.O. Box 39 Odanah, WI 54861 WaterReg@badriver-nsn.gov v. An operator proposing to discharge to an Exceptional Resource Water (ERW or Tier 2 water) under the CGP must comply with the antidegradation provisions of the Tribe's WQS. ERWs, or Tier 2 waters, include the following: any surface water within the exterior boundaries of the Reservation that is not specifically classified as an Outstanding Resource Water (Tier 2.5 water) or an Outstanding Tribal Resource Water (Tier 3 water). ERWs can be viewed at: Page 66 2022 Construction General Permit (CGP) https://v✓ww.arcgis.com/apps/View/index.html?appid=6f44c371217e4ee8b5fI c2 c705c 7c7c5. The antidegradation demonstration materials described in provision EA.ii., and included on the antidegradation demonstration template found at: https://v✓ww.badriver-nsn.gov/natural-resources/projectreviews/, must be submitted to the following address: Bad River Tribe's Natural Resources Department Attn: Water Regulatory Specialist P.O. Box 39 Odanah, WI 54861 WaterReg@badriver-nsn.gov A Projects utilizing cationic treatment chemicals within the Bad River Reservation boundaries are not eligible for coverage under the CGP. A* A discharge to a surface water within the Bad River Reservation boundaries shall not cause or contribute to an exceedance of the turbidity criterion included in the Tribe's WQS, which states:Turbidity shall not exceed 5 NTU over natural background turbidity when the background turbidity is 50 NTU or less, or turbidity shall not increase more than 10%when the background turbidity is more than 50 NTU. viii.All projects which are eligible for coverage under the CGP within the exterior boundaries of the Bad River Reservation must comply with the Bad River Reservation Wetland and Watercourse Protection Ordinance, or Chapter 323 of the Bad River Tribal Ordinances, including the erosion and sedimentation control, natural buffer, and stabilization requirements. Questions regarding Chapter 323 and requests for permit applications can be directed to the Wetlands Specialist in the Tribe's Natural Resources Department at (715) 682-7123 or wetlands@badriver-nsn.gov. ix. An operator of a project, which is eligible for coverage under the CGP, that would result in an allowable discharge under the CGP occurring within the exterior boundaries of the Bad River Reservation must notify the Tribe prior to the commencing earth-disturbing activities.The operator must submit a copy of the Notice of Intent (NOI) to the following addresses at the same time it is submitted to the U.S. EPA: Bad River Tribe's Natural Resources Department Attn: Water Regulatory Specialist P.O. Box 39 Odanah, WI 54861 WaterReg@badriver-nsn.gov Bad River Tribe's Natural Resources Department Attn: Tribal Historic Preservation Officer (THPO) P.O. Box 39 Odanah, WI 54861 oy ..�..�N... ...................................... ..............................itii..........................Ir::::.:.ir�,. i ...m.. The operator must also submit a copy of the Notice of Termination (NOT) to the above addresses at the same time it is submitted to the U.S. EPA. Photographs showing the current site conditions must be included as part of the NOT to document the stabilization requirements have been met. x. The THPO must be provided 30 days to comment on the project. Page 67 2022 Construction General Permit (CGP) xi. The operator must obtain THPO concurrence in writing. This written concurrence will outline measures to be taken to prevent or mitigate effects to historic properties. For more information regarding the specifics of the cultural resources process, see 36 CFR Part 800. A best practice for an operator is to consult with the THPO during the planning stages of an undertaking. A. An operator of a project, which is eligible for coverage under the CGP, that would result in an allowable discharge under the CGP occurring within the exterior boundaries of the Bad River Reservation must submit a copy of the Stormwater Pollution Prevention Plan (SWPPP) to the following address at the same time as submitting the NOI: Bad River Tribe's Natural Resources Department Attn: Water Regulatory Specialist P.O. Box 39 Odanah,WI 54861 WaterReg@badriver-nsn.gov Ail.Any corrective action reports that are required under the CGP must be submitted to the following address within one (1) working day of the report completion: Bad River Tribe's Natural Resources Department P.O. Box 39 Odanah, WI 54861 WaterReg@badriver-nsn.gov xiv.An operator of a project, which is eligible for coverage under the CGP, that would result in an allowable discharge under the CGP occurring within the exterior boundaries of the Bad River Reservation must submit a copies of the inspection reports (including photographs) to the following address within 24 hours of completing any site inspection required: Bad River Tribe's Natural Resources Department Attn: Water Regulatory Specialist P.O. Box 39 Odanah, WI 54861 WaterReg@badriver-nsn.gov xv. An operator shall be responsible for meeting any additional permit requirements imposed by the U.S. EPA necessary to comply with the Tribe's antidegradation policies if the discharge point is located upstream of waters designated by the Tribe. 9.6 EPA REGION 6 9.6.1 NMR100000 State of New Mexico, except Indian country a. In Outstanding National Resource Waters (ONRWs) in New Mexico, no degradation is permitted except in limited, specifically defined instances. Therefore, Operators are not eligible to obtain authorization under this general permit for stormwater discharges to waters classified as ONRWs listed in Paragraph D of 20.6.4.9 New Mexico Administrative Code (NMAC), also referred to as "Tier 3 waters" as defined in Appendix A of this permit. Exception: When construction activities are in response to a public emergency (e.g., wildfire, extreme flooding, etc.) and the related work requires immediate authorization to avoid a threat to public health or safety. i. Operators who conduct construction activities in response to a public emergency to mitigate an immediate threat to public health or safety shall Page 68 2022 Construction General Permit (CGP) adhere to the requirements in 20.6.4.8(A)(3)(c) NMAC, including notifying the New Mexico Environment Department (NMED) within seven days of initiation of the emergency action and providing NMED with a summary of the action taken within 30 days of initiation of the emergency action. H. For all other scenarios, Operators with proposed discharges to ONRWs in New Mexico shall obtain coverage from EPA under an NPDES Individual Permit and will comply with the additional standards and regulations related to discharges to ONRWs in 20.6.4.8(A) NMAC. Additional information is available from: New Mexico Environment Department Surface Water Quality Bureau P.O. Box 5469 Santa Fe, NM 87502-5469 Telephone: 505-827-0187 ,.[,.I s: n .n m® s u irf a c ,,,,. ir,,,,, u i�� s ,.L.1. s: is. .e In .1n m. i im ,.........,s b. If construction dewatering activities are anticipated at a construction site and non- stormwater discharges of groundwater, subsurface water, spring water, and/or other dewatering water are anticipated, the Opera tors/Perm ittees must complete the following steps: 1. Review the state's Ground Water Quality Bureau Mapper (https://gis.web.env.nm.gov/GWQB/) and Petroleum Storage Tank Bureau Mapper (https://gis.web.env.nm.gov/GWQB/). Check if the following sources are located within the noted distance from the anticipated construction dewatering activity. At a minimum, a list of the following potential sources of contaminants and pollutants at the noted distance is to be kept in the SWPPP. Page 69 2022 Construction General Permit (CGP) Source of Potential Constituents likely to be Contamination or Pollutants* required for testing* Within 0.5 mile of an open Leaking BTEX (Benzene, Toluene, Underground Storage Tank (LUST) site Ethylbenzene, and Xylene) plus additional parameters depending on site conditions** Within 0.5 mile of an open All applicable parameters Voluntary Remediation site or pollutants listed in 20.6.4.131 20.6.4.521 Within 0.5 mile of an open RCRA 20.6.4.54, p Corrective Action Site 20.6.4.97 thru 20.6.4.99, 20.6.4.101 through 20.6.4.899, and Within 0.5 mile of an open Abatement Site 20.6.4.900 NMAC Within 0.5 mile of an open Brownfield Site (or an alternate listapproved by the NMED- Within 1.0 mile or more of a Sup erfund SWQB)* site or National Priorities List (NPL) site with associated groundwater contamination. Construction activity contaminants Additional parameters and/or natural water pollutants depending on site activities and conditions (Contact NMED- SWQB for an alternate list)* *For further assistance determining whether dewatering may encounter contaminated sources, please contact the NMED Ground Water Quality Bureau at 505-827-2965 or NMED Surface Water Quality Bureau (SWAB) at 505-827-0187. **EPA approved sufficiently sensitive methods must be used.For known PCB sources and analysis,EPA Method 1668C must be used (see https://www.epa.gov/cwa-methods). 2. If dewatering activities are anticipated, information on the flow rate and potential to encounter contaminated groundwater, subsurface water, spring water, or dewatering water must be provided directly to NMED at the following address: NMED Surface Water Quality Bureau Program Manager, Point Source Regulation Section PO Box 5469, Santa Fe, NM 87502 Please call the SWQB to obtain the appropriate email address (505-827-0187). 3. In addition, the Operator/Permittee must characterize the quality of the groundwater and subsurface water, spring water, or dewatering water being considered for discharge according to the table above and including dissolved hardness and pH. Considering the contaminant sources listed in the table above, water quality data may already be available. For further assistance, contactthe Page 70 2022 Construction General Permit (CGP) NMED Surface Water Quality Bureau (505-827-0187), Ground Water Quality Bureau (505-827- 2965), Petroleum Storage Tank Bureau (505-476-4397), or Hazardous Waste Bureau (505-476- 6000). i. The Opera tor/Perm ittee must submit recent analytical test results (i.e., within the past 5 years) according to the table above, and including dissolved hardness and pH, to the EPA Region 6 Stormwater Permit Contact and the NMED Surface Water Quality Bureau (see contact information in #2 above). If the test data exceed applicable water quality standards, then the groundwater, subsurface water, spring water, or dewatering water cannot be discharged into surface waters under this general permit. Operators/Permittees may submit an NPDES Individual Permit application to treat and discharge to waters of the U.S. or find alternative disposal measures. No discharges to surface waters are allowed until authorized. ii. If the discharge has the potential to affect groundwater (e.g., land application), the Operator/Permittee must submit an NOI to the NMED Ground Water Quality Bureau (see 20.6.2.1201 NMAC- Notice of Intent to Discharge). 4. The Operator/Perm ittee must document any findings and all correspondence with NMED and EPA in the SWPPP. c. Operators who intend to obtain authorization under this permit for new and existing storm water dischargesfrom construction sites must satisfy the following condition: L The SWPPP must include site-specific interim and permanent stabilization, managerial, and structural solids, erosion and sediment control best management practices (BMPs) and/or other controls that are designed to prevent to the maximum extent practicable an increase in the sediment yield and flow velocity from pre-construction, pre-development conditions to assure thatapplicable standards in 20.6.4 NMAC, including the antidegradation policy, and TMDL waste load allocations (WLAs) are met. This requirement applies to discharges both during construction and after construction operations have been completed. The SWPPP must identify and document the rationale for selecting these BMPs and/or other controls. The SWPPP must also describe design specifications, construction specifications, maintenance schedules (including a long-term maintenance plan),criteria for inspections,and expected performance and longevity of these BMPs.For sites greater than 5 acres in size, BMP selection must be made based on the use of appropriatesoil loss prediction models (i.e. SEDCAD, RUSLE,SEDIMOT, MULTISED, etc.) OR equivalent genera IIyaccepted (by professional erosion control specialists) soil loss prediction tools. ii. For all sites, the Operator(s) must demonstrate, and include documentation in the SWPPP, that implementation of the site-specific practices will ensure that the applicable standards and TMDL WLAs are met, and will result in sediment yields and flow velocities that, to the maximum extent practicable,will not be greater than the sediment yield levels and flow velocities from preconstruction, pre- development conditions. HL All SWPPPs must be prepared in accordance with good engineering practices by qualified (e.g., CPESC certified, engineers with appropriate training) erosion control specialists familiar with the use of soil loss prediction models and design of erosion and sediment control systems based on these models (or equivalent soil Page 71 2022 Construction General Permit (CGP) loss prediction tools). Qualifications of the preparer (e.g., professional certifications, description of appropriate training) must be documented in the SWPPP.The Operator(s) must design, implement,and maintain BMPs in the manner specified in the SWPPP. NMED supports the use of EPA's small residential lot template if a site qualifies to use it as explained inthe permit, as long as it is consistent with the above requirements. NMED's requirement does not preclude small residential sites from using the template, but it may require an additional short paragraphto justify the selection of specific BMPs for the site. d. Operators must notify NMED when discharges of toxic or hazardous substances or oil from a spill or other release occurs - see Emergency Spill Notification Requirements, Part 2.3.6 of the permit. For emergencies, Operators can call 505-827-9329 at any time. For non-emergencies, Operators can call 866-428-6535 (voice mail 24-hours per day) or 505-476-6000 during business hours from 8am-5pm, Monday through Friday. Operators can also call the NMED Surface Water Quality Bureau directly at 505-827- 0187. e. Operators of small construction activities (i.e., 1-5 acres) are not eligible to qualify for a waiver in lieu of needing to obtain coverage under this general permit based on Item C.3 of Appendix C (Equivalent Analysis Waiver) in the State of New Mexico. 9.6.2 NMR101000 Indian country within the State of New Mexico.. except Navajo Reservation Lands that are covered under Arizona permit AZR100001 and Ute Mountain Reservation Lands that are covered under Colorado permit CORI00001. a. Nambe Pueblo i. The operator must provide a copy of the Notice of Intent (NOI) and Notice of Termination (NOT) to the Nambe Pueblo Governor's Office at the same time it is provided to the US Environmental Protection Agency. The NOI and NOT should be provided to the following address: Office of the Governor Nambe Pueblo !SA NP102 WEST Nambe Pueblo, New Mexico 87506 ii. The operator must provide a copy of the Storm Water Pollution Prevention Plan (SWPPP) to Nambe Pueblo at the same time it is submitted to the EPA, either by email to governor@nambepueblo.org or mailed to the above address. HE, The operator must provide copies of inspection reports, a copy of the corrective action log, and modifications made to the SWPPP as a result of inspection findings, upon request by the Nambe Pueblo Department of Environmental and Natural Resources or Nam be Governor. b. Ohkay Owingeh Tribe i. All operators obtaining permit coverage under the EPA CGP, must submit a copy of the certified (signed) Notice of Intent (NOI) to the Ohkay Owingeh Office of Environmental Affairs, a copy of NOI modifications and the Notice of Termination (NOT), must be provided within three business days after EPA provides electronic confirmation that the submission has been received. The NOI and NOT must be provided to the following address: Page 72 2022 Construction General Permit (CGP) Naomi L. Archuleta - Environmental Programs Manager Ohkay Owingeh Office of Environmental Affairs P.O. Box 717 Ohkay Owingeh, NM 87566 ii ii Y ii n a iiN c i e I a�� 1��. Noah Kaniatobe - Environmental Specialist Ohkay Owingeh, Office of Environmental Affairs P.O. Box 717 Ohkay Owingeh, NM 87566 . ......................................................................................................................................................................a'. ,o�r H. All operators obtaining permit coverage under the EPA CGP, must submit an electronic copy of the Storm Water Pollution Prevention Plan (SWPPP) to Ohkay Owingeh Office of Environmental Affairsat the same time that the NOI is submitted to the tribe (see contact information listed above). HE, Following each incident where the operator takes a corrective action the operator must provide thecorrective action log to the Ohkay Owingeh Office of Environmental Affairs. iv. The operator must notify Ohkay Owingeh Office of Environmental Affairs within 24 hours, in the event of an emergency spill in addition to the notification requirements at Part 2.3.6 of the CGP. Please contact: Ohkay Owingeh Tribal Police Department at 505.852.2757. Please contact: Ohkay Owingeh Tribal Police Department 505.852.2757 c. Pueblo of Isleta i. All operators obtaining permit coverage under the EPA CGP must submit a copy of the certified Notice oflntent (NOI) to the Pueblo of Isleta at the same time it is submitted to EPA for projects occurring within the exterior boundaries of the Pueblo of Isleta. Additionally, a copy of NOI modifications and the Notice of Termination (NOT), must be provided within three business days after EPA provides electronic confirmation that the submission has been received. The Notices must be provided to the following address: Water Quality Control OfficerPueblo of Isleta Environment DepartmentPO Box 1270 Isleta NM 87022 505-869-7565 is et pu .c m H. The operator must notify the Pueblo of Isleta's Dispatch at 505-869-3030 as soon as possible and thePueblo of Isleta Water Quality Control Officer within 10 hours, in the event of a spill of hazardous ortoxic substances or if health or the Page 73 2022 Construction General Permit (CGP) environment become endangered in addition to the notification requirements at Part 2.3.6 and at 1.12.6.1 of the CGP. iii. All operators obtaining permit coverage under the EPA CGP must submit an electronic copy of the Stormwater Pollution Prevention Plan (SWPPP) to the Pueblo of Isleta Water Quality Control Officer atthe above address, 30 days prior to submitting the certified NOI to EPA. If the electronic file is too largeto send through e-mail, a zip file or flash drive may be submitted. iv. All operators obtaining permit coverage under the EPA CGP must give 2 days advance notice to the Pueblo of Isleta Water Quality Control Officer of any planned changes in the permitted activity whichmay result in noncompliance with permit requirements. v. All operators obtaining permit coverage under the EPA CGP must post a sign or other notice of permit coverage at a safe, publicly accessible location in close proximity to the construction site.The notice mustbe located so that it is visible from the public road or tribal road that is nearest to the active part of the construction site. The sign must be maintained on-site from the time construction activities begin until final stabilization is met. vi. Erosion and sediment controls shall be designed to retain sediment on-site and project-generatedwaste materials that have the potential to discharge pollutants shall not be placed on open soil oron a surface that is not stabilized. Volumes of sediment over five (5) cubic yards must be removed from the active construction site; additionally, if sediment is placed for disposal withinthe exterior boundaries of the Pueblo of Isleta, disposal must be within a tribally approved sediment disposal site. d. Pueblo of Laguna i. All operators obtaining permit coverage under the EPA CGP must submit an electronic copy of the certified (signed) Notice of Intent (NOI) to the Pueblo of Laguna's Environmental & Natural Resources Department (ENRD) within three business days of submittal to the EPA. Additionally, a copy of NOI modifications and the Notice of Termination (NOT), must be provided within three business days after the EPA provides electronic confirmation that the submission has been received. The NOI and NOT must be electronically submitted to info.environmental@pol-nsn.gov. ii. All operators obtaining permit coverage under the EPA CGP must submit an electronic copy of the Stormwater Pollution Prevention Plan (SWPPP) to the Pueblo of Laguna's ENRD 14 days prior to the submittal of the NOI (see contact information listed above). iii. The operator must provide copies of corrective actions logs and modifications made to the SWPPP as a result of inspection findings to the Pueblo of Laguna ENRD (see contact information above). iv. In addition to the notification requirements of Part 2.3.6 of the CPG [EPA interprets this intending to refer to the CGP], the operator must notify the Pueblo of Laguna ENRD at 505-552-7512 in the event of an emergency spill as soon as possible. e. Pueblo of Sandia. The following conditions apply only to discharges on the Pueblo of Sandia Reservation: Page 74 2022 Construction General Permit (CGP) i. All operators obtaining permit coverage under the EPA CGP, must submit a copy of the certified (signed) Notice of Intent (NOI) to the Pueblo of Sandia Environment Department concurrently with submittal to the EPA. Additionally, a copy of NOI modifications and the Notice of Termination (NOT), must be provided concurrently with submittal to the EPA.The NOI and NOT must be provided electronically to the following addresses: Electronic Addresses: Amy Rosebrough (Water Quality Manager):it .. ......... .ir.............. ... �I� sanii a u .nsn.us Greg Kaufman (Environment Director):gkaufman@sandiapueblo.nsn.us ii. All operators obtaining permit coverage under the EPA CGP, must submit an electronic copy of the Stormwater Pollution Prevention Plan (SWPPP) to the Pueblo of Sandia Environment. Department at least 14 days prior to submittal of the NOI to the Pueblo (see contact information listed above). iii. If requested by the Pueblo of Sandia Environment Department, the permittee must provide additional information necessary on a case-by-case basis to assure compliance with the Pueblo of Sandia Water Quality Standards and/or applicable Federal Standards. iv. An "Authorization to Proceed Letter"with site specific mitigation requirements may be sent out to the permittee when a review of the NOI and SWPPP, on a case-by-case basis, is completed by the Pueblo of Sandia Environment Department.This approval will allow the application to proceed if all mitigation requirements are met. v. The Pueblo of Sandia will not allow Small Construction Waivers (Appendix C) to be granted for any small construction activities. A The operator must provide copies of inspection reports, a copy of the corrective action log, and modifications made to the SWPPP as a result of inspection findings to the Pueblo of Sandia Environment Department upon request. An inspection report and corrective action log must be submitted to the Pueblo within 3 days of any inspection that results in corrective action (see contact information listed above). vii. The operator must notify the Pueblo of Sandia within 24 hours in the event of an emergency spill, in addition to the notification requirements at Part 2.3.6 of the COP (see contact information listed above). viii. Before submitting a Notice of Termination (NOT) to the EPA, permittees must clearly demonstrate to the Pueblo of Sandia Environment Department through a site visit or documentation that requirements for site stabilization have been met and any temporary erosion control structures have been removed. A short letter stating that the NOT is acceptable and all requirements have been met will be sent to the permittee to add to the permittee's NOT submission to the EPA. f. Pueblo of Santa Ana. The following conditions apply only to discharges on the Pueblo of Santa Ana Reservation: i. All operators obtaining permit coverage under the EPA CGP, must submit a copy of the certified (signed) Notice of Intent (NOI) to the Pueblo's Department of Natural Resources within three business days of submittal to EPA. Additionally, a copy of NOI modifications and the Notice of Termination (NOT), must be Page 75 2022 Construction General Permit (CGP) provided within three business days after EPA provides electronic confirmation that the submission has been received. The NOI and NOT must be provided to the following address: Regular U.S. Delivery Mail: Pueblo of Santa Ana Department of Natural Resources Water Resources Division Attn: Andrew Sweetman 02 Dove Rd Santa Ana Pueblo, NM 87004 Electronically: Andrew Sweetman Water Resources Division Manager Andrew.Sweetman@santaana-nsn.gov Tammy Montoya Hydrologist Tammy.Montoya@santaana-nsn.gov ii. All operators obtaining permit coverage under the EPA CGP, must submit an electronic copyof the Stormwater Pollution Prevention Plan (SWPPP) to the to the Pueblo's Department of Natural Resources at the same time that the NO! is submitted to the tribe (see contact information listed above). HE, The operator must provide copies of inspection reports, a copy of the corrective action log, and modifications made to the SWPPP as a result of inspection findings, upon request by the Pueblo's Department of Natural Resources. iv. The operator must notify the Pueblo's Department of Natural Resources within 24 hours in the event of an emergency spill, in addition to the notification requirements at Part 2.3.6 of the CGP. g. Pueblo of Taos L All operators obtaining permit coverage under the EPA CGP, must submit a copy of the certified (signed) Notice of Intent (NOi) to the Taos Pueblo Environmental Office and Taos Pueblo Governor's Office within three business days of submittal to EPA. Additionally, a copy of NOi modifications and the Notice of Termination (NOT), must be provided within three business days after EPA provides electronic confirmation that the submission has been received. The NOi and NOTmust be provided to the following addresses: Honorable Governor of Taos Pueblo PO Box 1846 Taos, New Mexico 87571 Taos Pueblo Environmental Office PO Box 1846 Taos, New Mexico 87571 ii. All operators obtaining permit coverage under the EPA CGP, must submit an electronic copy of theStormwater Pollution Prevention Plan (SWPPP) to the Taos Pueblo Environmental Office when the NOI is submitted to the tribe. Electronic copy of SWPPP downloaded on flash drive may be sent to the above address for the Taos Pueblo Environmental Office. iii. The operator must provide a copy of the corrective action log following each corrective action undertaken and modifications made to the SWPPP as a result of Page 76 2022 Construction General Permit (CGP) a corrective action to the Taos Pueblo Environmental Office at address listed above. h. Pueblo of Tesuque. i. All operators obtaining permit coverage under the EPA CGP, must submit a copy of the certified (signed) Notice of Intent (NOI) to the Pueblo of Tesuque Department of Environment and Natural Resources (DENR) and the Pueblo Is Governor within three business days of submittal to EPA. Additionally, a copy of any NOi modifications and the Notice of Termination (NOT), must be provided within three business days after EPA provides electronic confirmation that the submission has been received.The NOI and NOT must be provided to the following address: Governor Mark Mitchell Pueblo of Tesuque 20 TP 828 Santa Fe, NM 87506 governor@pueblooftesuque.org Sage Mountain.flower Pueblo of Tesuque Department of Environment and Natural Resources Director 20 TP 828 ii. All operators obtaining permit coverage under the EPA CGP, must submit an electronic copyof the Stormwater Pollution Prevention Plan (SWPPP) to Pueblo of Tesuque DENR and the u lo's Governor at the same time that the NO! is submitted to the EPA (see contact information listed above). iii. The operator must provide a copy of the corrective action log, and any modifications made tothe SWPPP as a result of inspection findings, or upon request by the Pueblo of Tesuque DENR. iv. The operator must notify the Pueblo of Tesuque DENR within 24 hours in the event of an emergency spill, in addition to the notification requirements at Part 2. .6 of the CGP (seecontact information listed above). i. Santa Clara Indian Pueblo. i. All operators obtaining permit coverage under the EPA CGP, must submit a copy of the certified (signed) Notice of Intent (NOI) to the Santa Clara Pueblo Office of Environmental Affairs at the same time the NOI is submitted to the U.S. EPA. Additionally, a copy of the NOI modifications and the Notice of Termination (NOT), must be provided at the same time after electronic confirmation is received from EPA that the NOT has been accepted. The NOI and NOT shall be provided to the following address in electronic format: Dino Chavarria, Santa Clara Pueblo Office of Environmental Affairs dinoc@santaclarapueblo.org ii. All operators obtaining permit coverage under the EPA CGP, must submit an electronic copy of the Stormwater Pollution Prevention Plan to the Santa Clara Pueblo Office of Environmental Affairs at the same time the NOI is submitted to the U.S. EPA (see contact information listed above). Page 77 2022 Construction General Permit (CGP) iii. The operator must notify the Santa Clara Pueblo Office of Environmental Affairs at the address above within 24 hours, in the event of an emergency spill, in addition to the notification requirements at Part 2.3.6 of the CGP 9.6.3 OKR101000 Indian country within the State of Oklahoma, except areas of Indian country covered by an extension of state program authority pursuant to Section 10211 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act(SAFETEA). a. Pawnee Nation. The following conditions apply only to discharges within Pawnee Indian country: i. Copies of the Notice of Intent (NOI) and Notice of Termination (NOT) must be provided to the Pawnee Nation at the same time it is submitted to the Environmental Protection Agency to the following address: Pawnee Nation Department of Environmental Conservation and Safety P.O. Box 470 Pawnee, OK 74058 Or email to dnrs@pawneenation.orq ii. An electronic copy of the Storm Water Pollution Prevention Plan (SWPPP) must be submitted to the Pawnee Nation Department of Environmental Conservation and Safety at the same time the NOI is submitted. HE, The operator must provide access to the site for inspections and for copies of inspection reports, copy of the corrective action log and modifications, made to the SWPPP because of inspection findings, upon request by the Pawnee Nation DECS. iv. The Pawnee Nation Department of Environmental Conservation and Safety must be notified at 918.762.3655 immediately upon discovery of any noncompliance with any provision of the permit conditions. 9.6.4 OKR10F000 Discharges in the State of Oklahoma that are not under the authority of the Oklahoma Department of Environmental Quality, or the Oklahoma Department of Agriculture and Forestry including activities associated with oil and gas exploration, drilling, operations, and pipelines (includes SIC Groups 13 and 46, and SIC codes 492 and 5171), and point source discharges associated with agricultural production, services, and silviculture (includes SIC Groups 01, 02, 07, 08, 09). a. For activities located within the watershed of any Oklahoma Scenic River, including the Illinois River, Flint Creek, Barren Fork Creek, Upper Mountain Fork, Little Lee Creek, and Lee Creek or any water or watershed designated "ORW" in Oklahoma's Water Quality Standards, this permit may only be used to authorize discharges from temporary construction activities. Certification is denied for any on-going activities such as sand and gravel mining or any other mineral mining. b. For activities located within the watershed of any Oklahoma Scenic River, including the Illinois River, Flint Creek, Barren Fork Creek, Upper Mountain Fork, Little Lee Creek, and Lee Creek or any water or watershed designated "ORW" in Oklahoma's Water Quality Standards, certification is denied for any discharges originating from support activities, including, but not limited to, concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, or borrow areas. Page 78 2022 Construction General Permit (CGP) c. Dewatering discharges into sediment or nutrient-impaired waters, and waters identified as Tier 2, Tier 2.5, or Tier 3 (OAC 785:46-13) shall be controlled to meet water quality standards for turbidity in those waters as follows: i. Cool Water Aquatic Community/Trout Fisheries: 10 NTUs (OAC 785: 45-5- 12(f)(7)(A)(i) ii. Lakes: 25 NTUs (OAC 785: 45-5-12(f)(7)(A)(ii) Hi. In waters where background turbidity exceeds these values, turbidity from dewatering discharges should be restricted to not exceed ambient levels (OAC 785: 45-5-12(f)(7)(B) 9.7 EPA REGION 7 No additional conditions. 9.8 EPA REGION 8 9.8.1 MTR101000 Indian country within the State of Montana a. Blackfeet Nation. i. The Applicant and applicants for projects authorized under the NWPs should obtain all other permits, licenses, and certifications that may be required by federal, state, or tribal authority. Primary relevant tribal permit will be ALPO (Ordinance 1 17). Others may apply. It is the applicant's responsibility to know the tribal and local ordinances and complete all necessary permissions before they can commence work. ii. If a project is unable to meet the enclosed conditions, or if certification is denied for an applicable NWP, the Applicant may request an individual certification from Blackfeet. An individual certification request must follow the requirements outlined in 40 CFR 121.5 of EPA's CWA § 401 Certification Rule, effective September 11, 2020. HE, Copies of this certification should be kept on the job site and readily available for reference. iv. If the project is constructed and/or operated in a manner not consistent with the applicable NWP, general conditions, or regional conditions, the permittee may be in violation of this certification. v. Blackfeet and EPA representatives may inspect the authorized activity and any mitigation areas to determine compliance with the terms and conditions of the NWP. A This NWP Reissuance does not reduce Tribal authority under any other rule. vii. The project, including any stream relocations and restoration, must be built as shown and as otherwise described in the application, the construction plans, cross sections, mitigation plans and other supporting documents submitted to this office. Impacts to aquatic systems and restoration efforts will be monitored by an appropriate aquatic resource professional to ensure that disturbed areas are restored to at least their original condition. viii.All existing water uses will be fully maintained during and after the completion of the project. (If applicable) Page 79 2022 Construction General Permit (CGP) ix. Where practicable, perform all in-channel and wetland work during periods of low flow or drawn down or when dry x. Equipment staging areas must be located out of all delineated wetlands xi. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during and immediately after construction, and all exposed soil and other fills, as well as any work below the ordinary high-water mark or in a wetland, must be permanently stabilized as soon as possible A. Materials such as piling, culverts, sandbags, fabric, mats, timbers used for temporary facilities in wetlands or below the high-water mark of Waters of the US must be free from oil, gas, excess dirt, loose paint and other pollutants. Al. Equipment staging areas in wetlands or in stream or river channels must be placed on mats, or other measures must be taken to minimize soil disturbance and compaction. Av.Clearing of riparian or wetland vegetation for the sole purpose of constructing work bridges, detours, staging areas or other temporary facilities must be limited to the absolute minimum necessary. When temporary impacts to native riparian or wetland vegetation are unavoidable, it must be mowed or cut above ground with the topsoil and root mass left intact. xv. Remove all temporary fills and structures in the entirety when they are no longer needed. Restore affected areas to the appropriate original and planned contours where possible. Re-vegetate disturbed areas with appropriate native species when native species are impacted. xvi.Construction methods and best management practices (BMPs) must minimize aquatic resource impacts to the maximum extent possible. Any BMPs described in the Joint Application must be followed. BMPs should include installation and maintenance of sediment control measures; separation, storage and reuse of any topsoil; and recovery of all disturbed areas where possible. All best management practices must in place prior to the onset of construction or as soon as practicable during the construction process. xvii. Best available technology and/or best management practices must be utilized to protect existing water uses and maintain turbidity and sedimentation at the lowest practical level. xviii. Applicant/contractor should manage disturbed streambank topsoil in a manner that optimizes plant establishment for the site. xix.When operating equipment or otherwise undertaking construction in wetlands and water bodies the following conditions apply: (a) Work should be done in dry conditions if possible. (b) All equipment is to be inspected for oil, gas, diesel, anti-freeze, hydraulic fluid or other petroleum leaks. All such leaks will be properly repaired and equipment cleaned prior to being allowed on the project site. Leaks that occur after the equipment is moved to the project site will be fixed the same day or the next day or removed from the project area. The equipment is not allowed to continue operation once a leak is discovered. Page 80 2022 Construction General Permit (CGP) (c) All equipment is to be inspected and cleaned before and after use to minimize the spread or introduction of invasive or undesirable species. (d) Construction equipment shall not operate below the existing water surface except as follows: - Impacts from construction should be minimized through the use of best management practices submitted in the permit application. - Essential work below the waterline shall be done in a manner to minimize impacts to aquatic system and water quality. (e) Containment booms and/or absorbent material must be available onsite. Any spills of petroleum products must be reported to the Army Corps, Blackfeet Nation BEO Office and the US EPA within 24 hours. xx. Upland, riparian and in-stream vegetation should be protected except where its removal is necessary for completion of work. Revegetation should be completed as soon as possible. Applicant/contractor should revegetate disturbed soil in a manner that optimizes plant establishment for the site. Revegetation must include topsoil replacement, planting, seeding, fertilization, liming and weed-free mulching as necessary. Applicant must use native plant material and soils where appropriate and feasible.This certification does not allow for the introduction of non-native flora and fauna. All disturbed surface areas must be restored to pre- construction contours and elevation. xxi.Spoils piles should not be placed or stored within the delineated wetlands or streams unless protected by a temporary structure designed to divert and handle high flows that can be anticipated during permit activity.Spoils piles should be placed on landscaping fabric or some other material to separate spoils material and allow retrieval of spoils material with minimal impact. xxii. Impacts to wetlands shall not exceed 4.92 acres. xxiii. Any unexpected and additional impacts to waters of the US should be reported to the xxiv. Army Corps, Blackfeet Environmental Office Water Quality Coordinator and the US EPA. xxv. All instream and stream channel reconstruction work must be completed before the stream is diverted into the new channel. xxvi. Any temporary crossings, bridge supports, cofferdams, or other structures that are necessary during permit activity should be designed to handle high flows that can be anticipated during permit activity. All temporary structures should be completely removed from the water body at the conclusion of the permitted activity and the area restored to a natural function and appearance. xxvii. The certification does not authorize any unconfined discharge of liquid cement into the waters of the United States. Grouting riprap must occur under dry conditions with no exposure of wet concrete to the water body. 0.0 xxviii. BMPs shall include application of certified weed-free straw or hay across all disturbed wetland areas that are temporarily impacted; installation and maintenance of sediment control measures during construction and if necessary, after construction is completed; use of heavy mud mats if necessary; separation, Page 81 2022 Construction General Permit (CGP) storage and reuse of all streambank topsoil and wetland topsoil, as appropriate; and recovery of all disturbed wetland and streambank areas where possible. All conditions set by the Blackfeet Tribe and US Army Corps must be followed. xxix. All applicants, including federal agencies, must notify EPA and the Blackfeet Environmental Office of the use of all NWPs for which certification has been granted prior to commencing work on the project. Notifications must include: (a) project location (lat. Long., exact point on map); (b) NWP that will be used and the specific activity that will be authorized under the NWP; (c) amount of permanent and temporary fills; (d) a short summary of the proposed activity, and all other federal, state, tribal or local permits or licenses required for the project; (e) complete contact information of both the applicant and contractor (name, name of the company or property if applicable, telephone, mobile, and email); and, (f) Summary of best management practices that will be used. (g) A summary of communications with the affected Tribe's water quality staff regarding the project, including any concerns or issues. (h) Notify Blackfeet and EPA at least 7 days before the completion of construction and operations begin. xxx. Point source discharges may not occur: (1) in fens, bogs or other peatlands; (2) within 100 feet of the point of discharge of a known natural spring source; or (3) hanging gardens. xxxi. Except as specified in the application, no debris, silt, sand, cement, concrete, oil or petroleum, organic material, or other construction related materials or wastes shall be allowed to enter into or be stored where it may enter into waters of the U.S. xxxii. Silt fences, straw wattles, and other techniques shall be employed as appropriate to protect waters of the U.S. from sedimentation and other pollutants. xxxiii. Water used in dust suppression shall not contain contaminants that could violate water quality standards. xxxiv. Erosion control matting that is either biodegradable blankets or loose- weave mesh must be used to the maximum extent practicable. xxxv. All equipment used in waters of the U.S. must be inspected for fluid leaks and invasive species prior to use on a project. All fluid leaks shall be repaired and cleaned prior to use or when discovered, or if the fluid leak can't be repaired, the equipment shall not be used on site. Equipment used in waters with the possibility of aquatic nuisance species infestation must be thoroughly cleaned and effectively decontaminated before they are used on the project. Page 82 2022 Construction General Permit (CGP) xxxvi. Vegetation should be protected except where its removal is necessary for completion of the work. Locations disturbed by construction activities should be revegetated with appropriate native vegetation in a manner that optimizes plant establishment for the specific site. xxxvii. Revegetation may include topsoil replacement, planting, seeding, fertilization, liming, and weed-free mulching, as necessary. Where practical, stockpile weed-seed-free topsoil and replace it on disturbed areas. All revegetation materials, including plants and plant seed shall be on site or scheduled for delivery prior to or upon completion of the earth moving activities. xxxviii. Activities may not result in any unconfined discharge of liquid cement into waters of the U.S. Grouting riprap must occur under dry conditions with no exposure of wet concrete to the waterbody. xxxix. Activities that may result in a point source discharge shall occur during seasonal low flow or no flow periods to the extent practicable. A The placement of material (discharge) for the construction of new dams is not certified, except for stream restoration projects. A. Any decision-maker that is required under 7.0 of the CGP to prepare a Stormwater Pollution Prevention Plan (SWPPP), must submit an electronic copy of the SWPPP to the Blackfeet Environmental Office at least 30 days before construction starts for review and approval. Any modifications to the SWPPP should be submitted to the Blackfeet Environmental Office. Ail.Any Decision-maker required under Part 1.4 of the CGP to submit a Notice of Intent (NOI) to EPA for coverage under the CGP, must submit a copy of the NOI to the Blackfeet Environmental Office within three business days of submittal to EPA. Additionally, a copy of the Notice of Termination (NOT) must be provided within three business days after electronic confirmation is received from EPA that the NOT has been accepted.The NOI and NOT must be provided to the following address Gerald Wagner, Blackfeet Environmental Office Director. 62 Hospital Drive, Browning, MT 59417 . ..............................d ii,ir..............c..::�..............!r....................._ b. Fort Peck Tribes. i. Any Decision-maker required under Part 1.4 of the CGP to submit a Notice of Intent (NOI) to EPA for coverage under the CGP, must submit a copy of the NOI to the Fort Peck Tribes Office of Environmental Protection within three business days of submittal to EPA. Additionally, a copy of the Notice of Termination (NOT) must be provided within three business days after electronic confirmation is received from EPA that the NOT has been accepted. The NOI and NOT must be provided to the following address: Martina Wilson, Office of Environmental Protection Director 501 Medicine Bear Rd Poplar, MT 59255 martinawilson@fortpecktribes.net ii. Any Decision-maker that is required under Part 7.0 of the CGP to prepare a Stormwater Pollution Prevention Plan (SWPPP), must submit an electronic copy of the SWPPP to the Fort Peck Tribes Office of Environmental Protection at least 30 days before construction starts for review and approval. Any modifications to the Page 83 2022 Construction General Permit (CGP) SWPPP should be submitted to the Fort Peck Tribes Office of Environmental Protection. iii. Any Decision-maker that is required under Part 8.0 of the CGP to submit a weekly, bi-weekly, and/or annual report to EPA, must submit an electronic copy of the annual report to the Fort Peck Tribes Office of Environmental Protection within three business days after submittal to EPA. 9.9 EPA REGION 9 9.9.1 CAR101000 Indian country within the State of California a. Morongo Band of Mission Indians i. A copy of the Stormwater Pollution Prevention Plan (SWPPP) must be submitted (either mailed or electronically) to the MEPD no less than thirty (30) days before commencing construction activities: Morongo Band of Mission Indians Environmental Protection Department 12700 Pumarra Road Banning, CA 92220 Email: epd@morongo-nsn.gov ii. Copies of the Notice of Intent (NOI) and the Notice of Termination (NOT) must be sent to the MEPD at the same time they are submitted to EPA. iii. Operators of an 'emergency-related project" must submit notice to the MEPD within twenty- four (24) hours after commencing construction activities. iv. Spills, leaks, or unpermitted discharges must be reported to the MEPD within twenty-four (24) hours of the incident, in addition to the reporting requirements of the CGP. v. Projects utilizing cationic treatment chemicals (as defined in Appendix A of the CGP) within the Morongo Reservation are not eligible for coverage under this certification of the CGP. A. Facilities covered under the CGP will be subject to compliance inspections by MEPD staff, including compliance with final site stabilization criteria prior to submitting an NOI [EPA assumes this intended to refer to an NOT]. 9.9.2 GUR100000 Island of Guam a. For purposes of this Order, the term "Project Proponent"shall mean U.S. Environmental Protection Agency, and its agents, assignees, and contractors. b. For purposes of this Order, the permit"Operator" shall mean any party associated with a construction project that meets either of the following two criteria: i. The party has operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications (e.g. in most cases this is the owner of the site); or ii. The party has day-to-day operational control of those activities at a project that are necessary to ensure compliance with the permit conditions (e.g., they are authorized to direct workers at a site to carry out activities required by the permit; in most cases this is the general contractor of the project). Page 84 2022 Construction General Permit (CGP) Subcontractors generally are not considered operators for the purposes of this permit. c. The Project Proponent shall enforce the proposed 2022 CGP and ensure that the Operator complies with the conditions of the permit at all times.107 (40 CFR §121.11 (c)) d. All submittals required by this Order shall be sent to the Guam Environmental Protection Agency Attn: 401 Federal Permit Manager, Non-Point Source Program, EMAS Division, 3304 Mariner Avenue, Bldg. 17-3304, Barrigada, Guam 96913, AND via email to jesse.cruz@epa.guam.gov. The submittals shall be identified with WQC Order #2021- 04 and include the COP Permit Number, certifying representative's name, title, mailing address and phone number. (§51060)(4) 2017 GWQS) e. A copy of the Operator's signed Stormwater Pollution Prevention Plan (SWPPP) and signed Notice of Intent (NOI) and Notice of Termination (NOT) submitted to EPA for review and approval, shall concurrently be submitted to Guam EPA, consistent with condition A4. Coordination with Guam EPA is encouraged when the receiving water(s) for the proposed discharge is/are being identified. (§10105.B.5.d.) GSESCR; (§51060)(4) 2017 GWQS) f. The Operator must comply with the conditions and requirements set forth in 22 GAR 10, Guam Soil Erosion and Sediment Control Regulations (GSESCR). g. Before submitting the NOT to EPA, Operators shall comply with GSESC regulations at §10105.B10. (Stabilization of Affected Areas) and §10107.B. {Final Inspection and Approval) h. All operators/owners shall comply with the general design criteria for best management practices (BMPs) acceptable for meeting the Construction and Post- construction stormwater criteria in the 2006 CNMI and Guam Stormwater Management Manual. (E.O. 2012-02) L Operating reports and monitoring and analytical data (e.g. Discharge Monitoring Reports (DMRs), follow-up monitoring reports, Exceedance Reports for Numerical Effluent Limits, etc.) submitted to EPA shall be concurrently submitted to Guam EPA, consistent with condition A4. §51060)(4) 2017 GWQS j. The Operators who install a sediment basin or similar impoundment shall maintain the storage capacity of five thousand cubic feet {5,000 cu. ft.) per acre of project area tributary to the basin. (§10105.B.5.i.) GSESCR k. (1) This Order does not authorize EPA to qualify Rainfall Erosivity Waivers to stormwater discharges associated with small construction activities (i.e. 1-5 acres). Operators are required to apply for an NOI for those projects eligible for coverage under the proposed 2022 CGP. An Erosion and Sediment Control Plan is required for every site that would be covered by the proposed 2022 CGP. (22 GAR §10104) The average annual rainfall for Guam and the CNMI exceeds 100 inches per year in many locations.These climatic conditions combined with the region's unique limestone, volcanic geologic formations, sensitive water resources and significant land 107 By incorporating this condition into the permit, EPA acknowledges receipt of Guam's certification conditions. Page 85 2022 Construction General Permit (CGP) development forces make stormwater discharges a very significant environmental and economic issue. (2006 CNMJ/Guam Stormwater Management Manual) E.O. 2012-02 (2) This Order does not authorize EPA to approve a Sediment TMDL Waiver for the Ugum River. Operators of construction activities eligible for a TMDL Waiver in lieu of coverage under the proposed 2022 CGP, shall submit a complete and accurate waiver certification as described in C.2., Appendix C - (Small Construction Waivers) to Guam EPA per condition A4., prior to notifying EPA of its intention to obtain a waiver. §51060)(4) 2017 GWQS 1. The Project Proponent shall submit to Guam EPA a signed Statement of Understanding of Water Quality Certification Conditions.108 (see Attachment A for an example) per condition A4. §51060)(4) 2017 GWQS m. The Operator shall comply with applicable provisions of the Guam Pesticides Act of2007 (10 GCA Chapter 50) and implementing regulations at Title 22 GAR Chapter 15 for any use and application of pesticides. n. Point source discharge(s) to waterbodies under the jurisdiction of Guam EPA must be consistent with the antidegradation policy in 22 GAR §5101(b). o. The operator shall carry out construction activities in such a manner that will not violate Guam Water Quality Standards (GWQS). Proposed 2022 CGP discharges are prohibited as follows: i. In Marine Waters, Category M-1 Excellent 22 GAR Chapter 5 §5102(b)(1); and ii. In Surface Waters, Category S-1 High 22 GAR Chapter 5 §5102(c)(1) p. In addition to complying with construction dewatering requirements in Part 2.4 and site inspection requirements for all areas where construction dewatering is taking place in Part 4 of the proposed 2022 CGP, Operators shall comply with all dewatering conditions and requirements set forth in 22 GAR 7, Water Resources Development and Operating Regulations, to include securing Guam EPA permits prior to any dewatering activities. q. The Operator shall develop and implement a Spill Prevention and Containment Plan. r. The Operator shall have adequate and appropriate spill response materials on hand to respond to emergency release of oil, petroleum or any other material into waters of the territory. s. Any unpermitted discharge into territorial waters or onto land with a potential for entry into territorial waters, is prohibited. If this occurs, the Operator shall immediately take the following actions: L Cease operations at the location of the violation or spill. ii. Assess the cause of the water quality problem and take appropriate measures to correct the problem and/or prevent further environmental damage. iii. Notify Guam EPA of the failure to comply. All petroleum spills shall be reported immediately to: 108 By incorporating this condition into the permit, EPA acknowledges receipt of Guam's certification conditions. Page 86 2022 Construction General Permit (CGP) (a) Guam's Emergency 911 system (b) Guam EPA's 24-Hour Spill Response Team at (671) 888-6488 or during working hours (671) 300-4751 (c) US Coast Guard Sector Guam (671) 355-4824 (d) National Response Center 1-800-424-8802 iv. Submit a detailed written report to Guam EPA within five days of noncompliance that describes the nature of the event corrective action taken and/or planned, steps to be taken to prevent a recurrence, results of any samples taken, and any other pertinent information. t. Compliance with this condition does not relieve the Operator from responsibility to maintain continuous compliance with the terms and conditions of this Order or the resulting liability from failure to comply. u. Submittal or reporting of any of this information does not provide relief from any subsequent enforcement actions for unpermitted discharges to waters of the United States. v. This Order is valid for five (5) Years from Date of Certification, unless otherwise approved by the Guam EPA Administrator. w. The Operator shall be required to adhere to the current Guam Coral Spawning Moratorium dates for both hard and soft corals where in-water activities and/or construction activity in close proximity with marine waters may impair water quality. These dates can be obtained from the Guam Department of Agriculture, Division of Aquatic and Wildlife Resources, or the NOAA NMFS Pacific Islands Regional Office Habitat Conservation Division. . The Operator shall provide notice to Guam EPA consistent with Condition A4: (a) Immediately upon discovery of noncompliance with the provisions of this Order. y. A Notice of Violation/Work Stop Order will be issued if certification conditions are not adhered to or when significant or sustained water quality degradation occurs. Work or discharge shall be suspended or halted until the Operator addresses environmental problems/concerns to Guam EPA's satisfaction. Guam EPA may also levy penalties and fines (10 GCA §471 1 1). Invalidity or enforceability of one or more provisions of this certification shall not affect any other provision of this certification. 9.10 EPA REGION 10 9.10.1 IDR101000 Indian country within the State of Idaho, except Duck Valley Reservation lands (see Region 9) a. Shoshone-Bannock Tribes i. Copies of the following information must be sent to the SBT-WRD: (a) Notice of Intents (NOI) The Notice of Intent shall be forwarded to the SBT-WRD within thirty (30) days of receipt of submitting NOI to the USEPA. Page 87 2022 Construction General Permit (CGP) Shoshone-Bannock Tribes Water Resources Department PO Box 306 Pima Drive Fort Hall, ID 83203 Phone: (208) 239-4582 Fax: (208) 239-4592 Or Email ctanaka@sbtribes.com b. If requested by the SBT-WRD, the permittee must submit a copy of the SWPPP to SBT- WRD within fourteen (14) days of the request. 9.10.2 ORR101000 Indian country within the State of Oregon, except Fort McDermitt Reservation lands (see Region 9) a. Confederated Tribes of Coos, Lower Umpqua, and Siuslaw i. No activities allowed under the CGP shall result in the degradation of any Tribal waters or affect resident aquatic communities or resident or migratory wildlife species at any life stage. ii. The operator shall be responsible for achieving compliance with CTCLUSI Water Quality Standards and all other tribal codes, regulations, and laws as they exist at the time that the permit is submitted. HE, The operator shall submit a copy of the Notice of Intent (NOI) to be covered by the general permit to the CTCLUSI Water Quality Program before, or at the same time as, it is submitted to EPA. iv. The operator shall be responsible for submitting all Stormwater Pollution Prevention Plans (SWPPP) required under this general permit to the CTCLUSI Water Quality Program for review and determination that the SWPPP is sufficient to meet Tribal Water Quality Standards, prior to the beginning of any discharge activities taking place. v. The operator shall be responsible for reporting an exceedance to Tribal Water Quality Standards to the CTCLUSI Water Quality Program at the same time it is reported to EPA. vi. The THPO will be provided 30 days to comment on the APE as defined in the permit application. vii. If the project is an undertaking, a cultural resource assessment must occur. All fieldwork must be permitted by the THPO (as appropriate), conducted by qualified personnel (as outlined by the Secretary of Interior's Standards and Guidelines; http://www.nps.gov/history/local-law/arch_stnds_O.htm) and documented according to Oregon Reporting Standards (Reporting_Guidelines.pdf) (oregon.gov).The resulting report must be submitted to the THPO and the THPO must concur with the finding of effect and recommendations before any ground disturbing work can occur.The THPO requires 30 days to review all reports. viii.The operator must obtain THPO concurrence in writing. If historic properties are present, this written concurrence will outline measures to be taken to prevent or mitigate adverse effects to historic properties. b. Confederated Tribes of the Umatilla Indian Reservation i. The operator shall be responsible for achieving compliance with the Page 88 2022 Construction General Permit (CGP) Confederated Tribes of the Umatilla Indian Reservation's (CTUIR) Water Quality Standards. ii. The operator shall submit a copy of the Notice of Intent (NOI) to be covered by the general permit to the CTUIR Water Resources Program at the address below, at the same time it is submitted to EPA. iii. The operator shall be responsible for submitting all Stormwater Pollution Prevention Plans (SWPPP) required under this general permit to the CTUIR Water Resources Program for review and determination that the SWPPP is sufficient to meet Tribal Water Quality Standards, prior to the beginning of any discharge activities taking place. iv. The operator shall be responsible for reporting an exceedance to Tribal Water QualityStandards to the CTUIR Water Resources Program at the same time it is reported to EPA. Confederated Tribes of the Umatilla Indian Reservation Water Resources Program 46411 Timine Way Pendleton, OR 97801 (541) 429-7200 v. The THPO will be provided 30 days to comment on the APE as defined in the permit application. A If the project is an undertaking, a cultural resource assessment must occur. All fieldwork must be permitted by the Tribal Historic Preservation Office (as appropriate), conducted by qualified personnel (as outlined by the Secretary of Interior's Standards and Guidelines; http://www.nps.gov/history/local- law/arch_stnds_O.htm) and documented according to Oregon Reporting Standards (Reporting_Guidelines.pdf (oregon.gov). The resulting report must be submitted to the THPO and the THPO must concur with the finding of effect and recommendations before any ground disturbing work can occur.The THPO requires 30 days to review all reports. vii. The operator must obtain THPO concurrence in writing. If historic properties are present, this written concurrence will outline measures to be taken to prevent or mitigate adverse effects to historic properties. 9.10.3 WAR10F000 Areas in the State of Washington, except those located on Indian country, subject to construction activity by a Federal Operator a. For purposes of this Order, the term "Project Proponent" shall mean those that are seeking coverage under this permit, and its agents, assignees and contractors. b. The Federal Agency shall mean the US Environmental Protection Agency. The Federal Agency shall enforce the permit and ensure that the Project Proponent complies with the conditions of the permits at all times. c. Failure of any person or entity to comply with this Certification may result in the issuance of civil penalties or other actions, whether administrative or judicial, to enforce the terms of this Certification. d. The Certification conditions within this Order must be incorporated into EPA's final NPDES permit. Per 40 CFR 121.10(a), all certification conditions herein that satisfy the Page 89 2022 Construction General Permit (CGP) requirements of 40 CFR 121.7(d) must be incorporated into the permit. Per 40 CFR 121.10(b), the permit must clearly identify all certification conditions. e. This Certification does not authorize exceedances of water quality standards established in chapter 173-201 A WAC. L Discharges from construction activity must not cause or contribute to violations of the Water Quality Standards for Surface Water of the State of Washington (chapter 173- 201 A WAC), Ground Water Quality Standards (chapter 173- 200 WAC), Sediment Management Standards (chapter 173-204 WAC), and standards in the EPA's Revision of certain Federal water quality criteria applicable to Washington (40 CFR 131.45). Discharges that do not comply with these standards are prohibited. g. Prior to discharge of stormwater and non-stormwater to waters of the State, the Permittee must apply all known, available, and reasonable methods of prevention, control, and treatment (AKART). This includes the preparation and implementation of an adequate Stormwater Pollution Prevention Plan (SWPPP),with all appropriate Best Management Practices (BMPs) installed and maintained in accordance with the SWPPP and the terms and conditions of the permit. L BMPs must be consistent with: (a) The Stormwater Management Manual for Western Washington (most current approved edition at the time this permit was issued), for sites west of the crest of the Cascade Mountains; or (b) The Stormwater Management Manual for Eastern Washington (most current approved edition at the time this permit was issued), for sites east of the crest of the Cascade Mountains; or (c) Revisions to either manual, or other stormwater management guidance documents or manuals which provide equivalent level of pollution prevention, that are approved by Ecology and incorporated into this permit in accordance with the permit modification requirements of WAC 173-226-230. (For purposes of this section, the stormwater manuals listed in Appendix 10 of the Phase I Municipal Stormwater Permit are approved by Ecology); or (d) Documentation in the SWPPP that the BMPs selected provided an equivalent level of pollution prevention, compared to the applicable stormwater management manuals, including: The technical basis for the selection of all stormwater BMPs (scientific, technical studies, and/or modeling) that support the performance claims for the BMPs being selected. An assessment of how the selected BMP will satisfy AKART requirements and the applicable federal technology-based treatment requirements under 40 CFR part 125.3. The Stormwater Management Manuals for Eastern and Western Washington can be found at: https://ecology.wa.gov/Regulations-Permits/Guidance- technical-assistance/Stormwa ter-perm ittee-guidance-resources/Stormwater- manuals. H. An adequate SWPPP must include a narrative and drawings. All BMPs must be clearly referenced in the narrative and marked on the drawings. The SWPPP Page 90 2022 Construction General Permit (CGP) narrative must include documentation to explain and justify the pollution prevention decisions made for the project. Documentation must include: (a) Information about existing site conditions (topography, drainage, soils, vegetation, etc.). (b) Potential erosion problem areas. (c) The 13 elements of a SWPPP, including BMPs used to address each element. Unless site conditions render the element unnecessary and the exemption is clearly justified in the SWPPP, the 13 elements are as follows: - Preserve Vegetation/Mark Clearing Limits - Establish Construction Access - Control Flow Rates - Install Sediment Controls - Stabilize Soils - Protect Slopes - Protect Drain Inlets - Stabilize Channels and Outlets - Control Pollutants - Control Dewatering - Maintain BMPs - Manage the Project - Protect Low Impact Development (LID) BMPs h. Discharges of stormwater and authorized non-stormwater must be monitored for turbidity (or transparency) and, in the event of significant concrete work or engineered soils, pH must also be monitored. As applicable based on project specifics, monitoring, benchmarks, and reporting requirements contained in Condition SA. (pp.10-16) of the Washington State Construction Stormwater General Permit, effective January 1, 2021, shall apply. i. Discharges to segments of waterbodies listed as impaired by the State of Washington under Section 303(d) of the Clean Water Act for turbidity, fine sediment, phosphorus, or pH must comply with the following numeric effluent limits: Parameter Parameter Unit Analytical Numeric Effluent Limit identified in Sampled Method 303(d) listing • Turbidity Turbidity NTU SM2130 25 NTUs at the point where • Fine the stormwater is Sediment discharged from the site. • Phosphorus High pH pH su pH meter In the range of 6.5-8.5 All references and requirements associated with Section 303(d) of the Clean Water Act mean the most current EPA-approved listing of impaired waters that exists on the Page 91 2022 Construction General Permit (CGP) effective date of the permit, or the date when the operator's complete permit application is received by EPA,whichever is later. The EPA approved WQ Assessment can be found at: https://ecology.wa.gov/Water- Shorelines/Water-quality/Water-improvement/Assessment-of-state-waters-303d j. Discharges to a waterbody that is subject to a Total Maximum Daily Load (TMDL) for turbidity, fine sediment, high pH, or phosphorus must be consistent with the TMDL. L Where an applicable TMDL sets specific waste load allocations or requirements for discharges covered by this permit, discharges shall be consistent with any specific waste load allocations or requirements established by the applicable TMDL. H. Where an applicable TMDL has established a general waste load allocation for construction stormwater discharges, but no specific requirements have been identified, compliance with this permit will be assumed to be consistent with the approved TMDL. Hie Where an applicable TMDL has not specified a waste load allocation for construction stormwater discharges, but has not excluded these discharges, compliance with this permit will be assumed to be consistent with the approved TMDL. iv. Where an applicable TMDL specifically precludes or prohibits discharges from construction activity, the operator is not eligible for coverage under this permit. Applicable TMDL means a TMDL for turbidity, fine sediment, high pH, or phosphorus which has been completed and approved by EPA as of the effective date of the permit, or prior to the date of the operator's complete application for permit coverage is received by EPA, whichever is later. k. Discharges to waters of the state from the following activities are prohibited: L Concrete wastewater. H. Wastewater from washout and clean-up of stucco, paint, form release oils, curing compounds and other construction materials. HE, Process wastewater as defined by 40 Code of Federal Regulations (CFR) 122.2. iv. Slurry materials and waste from shaft drilling, including process wastewater from shaft drilling for construction of building, road, and bridge foundations unless managed to prevent discharge to surface water. v. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance. A. Soaps or solvents used in vehicle and equipment washing. v`Ii. Wheel wash wastewater, unless managed to prevent discharge to surface water. viii. Discharges from dewatering activities, including discharges from dewatering of trenches and excavations, unless managed according to appropriate controls described within the permit. I. This Certification is valid until the expiration date including any administrative extension or termination date of the NPDES 2022 Construction General Permit. (40 CFR § 122.46) Page 92 2022 Construction General Permit (CGP) m. The Federal Agency shall enforce and the Project Proponent must comply with all the reporting and notification conditions of the NPDES 2022 Construction General Permit in order to comply with this Order and the certification conditions herein (40 CFR § 121.11). n. You have a right to appeal this Order to the Pollution Control Hearing Board (PCHB) within 30 days of the date of receipt of this Order. The appeal process is governed by chapter 43.21 B RCW and chapter 371-08 WAC. "Date of receipt" is defined in RCW 43.21 B.001 (2). To appeal you must do all of the following within 30 days of the date of receipt of this Order: • File your appeal and a copy of this Order with the PCHB (see addresses below). Filing means actual receipt by the PCHB during regular business hours. • Serve a copy of your appeal and this Order on Ecology in paper form - by mail or in person (see addresses below). E-mail is not accepted. You must also comply with other applicable requirements in chapter 43.21 B RCW and chapter 371-08 WAC. ADDRESS AND LOCATION INFORMATION Street Addresses Mailing Addresses Department of Department of Ecology Ecology Attn: Appeals Attn: Appeals Processing Processing Desk Desk 300 Desmond Drive PO Box 47608 SE Olympia, WA 98504-7608 Lacey, WA 98503 Pollution Control Pollution Control Hearings Hearings Board Board 1 1 1 1 Israel RD SW PO Box 40903 STE 301 Olympia, WA 98504-0903 Tumwater, WA 98501 CONTACT INFORMATION Please direct all questions about this Order to: Noel Tam Boer Department of Ecology P.O. Box 47600 Olympia, WA 98503-7600 (360) 701-6171 noel.ta m boer@ecy.wa.gov 9.10.4 WAR101000 Indian country within the State of Washington a. Lummi Nation Page 93 2022 Construction General Permit (CGP) i. This certification does not exempt and is provisional upon compliance with other applicable statutes and codes administered by federal and Lummi tribal agencies. Pursuant to Lummi Code of Laws (LCL) 17.05.020(a), the operator must also obtaina land use permit from the Lummi Planning Department as provided in Title 15 of theLummi Code of Laws and regulations adopted thereunder. ii. Pursuant to LCL 17.05.020(a), each operator shall develop and submit a Storm WaterPollution Prevention Plan to the Lummi Water Resources Division for review and approval by the Water Resources Manager prior to beginning any discharge activities. iii. Pursuant to LCL Title 17, each operator shall be responsible for achieving compliance with the Water Quality Standards for Surface Waters of the Lummi iv. Indian Reservation (Lummi Administrative Regulations [LAR] 17 LAR 07.010 through 17 LAR 07.210 together with supplements and amendments thereto). v. Each operator shall submit a signed copy of the Notice of Intent (NOI) to the Lummi Water Resources Division at the same time it is submitted electronically to the Environmental Protection Agency (EPA) and shall provide the Lummi Water Resources Division the acknowledgement of receipt of the NOI from the EPA and the associated NPDES tracking number provided by the EPA within 7 calendar days of receipt from the EPA. A. Each operator shall submit a signed copy of the Notice of Termination (NOT) to the Lummi Water Resources Division at the same time it is submitted electronically to the EPA and shall provide the Lummi Water Resources Division the EPA acknowledgement of receipt of the NOT. vii. Storm Water Pollution Prevention Plans, Notice of Intent, Notice of Termination and associated correspondence with the EPA shall be submitted to: Lummi Natural Resources Department ATTN: Water Resources Manager 2665 Kwina Road Bellingham, WA 98226-9298 b. Port Gamble S'Klallam Tribe i. No discharge from the project site shall cause exceedances of Port Gamble S'KlallamSurface Water Quality Standards narrative or numeric criteria in Tribal waters. This includes activities outside of Tribal lands that occur upstream of Tribal waters. (a) If any exceedance of these water quality standards occurred, the Natural Resources Department shall be notified immediately. • The Department shall additionally be provided a complete draft of the proposed corrective action within a reasonable timeframe and its approval will be required before any corrective action may be taken. . Operators performing activities under the CGP that may affect Tribal waters will requirea permit and shall submit their plans to the Port Gamble S'Klallam Natural Resources Department for review. • The Department has the right to require conditions outside of this Water QualityCertification prior to permit approval. Page 94 2022 Construction General Permit (CGP) iii. No activities allowed under the CGP shall result in the degradation of any Tribal watersor change in designated uses. iv. No activities allowed under the CGP shall affect resident aquatic communities or resident/migratory wildlife species at any life stage. • Biological assessment methods used to determine the effect of an activity allowedunder the CGP shall be approved by the PGST Natural Resources Department. v. No activities allowed under the CGP shall be conducted within wetland and stream bufferzones, nor shall said activities affect in any way wetland or stream buffers, as defined by PGST Law and Order Code 24.08.01(c). A. Concentrations for substances listed within the table in Water Quality Standards for Surface Waters sec. 7(7) shall not be exceeded by activities allowed under the CGP. c. Spokane Tribe of Indians i. Pursuant to Tribal Law and Order Code (TLOC) Chapter 30 each operator shall be responsible for achieving compliance with the Surface Water Quality Standards of the Spokane Tribe. The operator shall notify the Spokane Tribe, Water Control Board (WCB) of any spills of hazardous material and; ii. Each operator shall submit a signed hard copy of the Notice of Intent (NOI) to the WCB at the same time it is submitted to EPA. HE, The permittee shall allow the Tribal Water Control Board or its designee to inspect and sample at the construction site as needed. iv. Each operator shall submit a signed copy of the Notice of Termination (NOT) to the WCB at the same time it is submitted to EPA The correspondence address for the Spokane Tribe Water Control Board is: Water Control Board c/o Brian Crossley PO Box480 Wellpinit WA 99040 (509)626-4409 crossley@spokanetribe.com d. Swinomish Tribe i. Owners and operators seeking coverage under this permit must submit a copy of the Notice of Intent (NOI) to the DEP at the same time the NOI is submitted to EPA. ii. Owners and operators must also submit to the DEP changes in NOI and/or Notices of Termination at the same time they are submitted to EPA. iii. Owners and operators seeking coverage under this permit must also submit a Stormwater Pollution Prevention Plan to the DEP for review and approval by DEP prior to beginning any discharge activities. e. Tulalip Tribes i. Submission of NOI: Copies of the Notice of Intent (NOI),) Certification shall be submitted to the Tribe's Natural Resources Department to notify the Tribes of the Page 95 2022 Construction General Permit (CGP) pending project and in order for the Tribes to review the projects potential impacts to endangered or threatened species. ii. Submission of SWPPP: A copy of the Stormwater Pollution Plans (SWPPPs) shall be submitted to the Tribe's Natural Resources Department along with the NOI during the 30 day waiting period. iii. Submission of Monitoring Data and Reports: The results of any monitoring required by this permit and reports must be sent to the Tribe's Natural Resources Department, iv. The Tulalip Tribes are federally recognized successors in the interest to the Snohomish, Snoqualmie, Skykomish, and other allied tribes and bands signatory to the Treaty of Point Elliott. v, including a description of the corrective actions required and undertaken to meet effluent limits or benchmarks (as applicable). A Authorization to Inspect: The Tribe's Natural Resources Department may conduct an inspection of any facility covered by this permit to ensure compliance with tribal water quality standards.The Department may enforce its certification conditions. A. Submission of Inspection Reports: Inspection reports must be sent to the Tribe's Natural Resources Department, including a description of the corrective actions required and undertaken to meet effluent limits or benchmarks (as applicable). viii. Permits on-site: A copy of the permit shall be kept on the job site and readily available for reference by the construction supervisor, construction managers and foreman, and Tribal inspectors. ix. Project Management: The applicant shall ensure that project managers, construction managers and foreman, and other responsible parties have read and understand conditions of the permit, this certification, and other relevant documents, to avoid violations or noncompliance with this certification. x. Emergency Spill Notification Requirements: In the event of a spill or the contractor shall immediately take action to stop the violation and correct the problem, and immediately repot t spill to the Tulalip Tribes Police Department (425) 508-1565. Compliance with this condition does not relieve the applicant from responsibility to maintain continuous compliance with the tem IS and conditions of this certification or the resulting liability from failure to comply. xi. Discharges to CERCLA Sites:This permit does not authol ize direct stormwater discharges to certain sites undergoing remedial cleanup actions pursuant to the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) unless first approved by the appropriate EPA Regional office. In the case of the Tulalip Landfill site (WAD980639256), the Tulalip Tribes also requests notification by the facility and consultation with EPA prior to discharge. Contaminants at this site may include but are not limited to: dioxins, furans, arsenic, copper, lead, zinc, 4- methyl-phenol, Hex-CB, HPAHs, PCBs, PCE, cadmium, mercury, and LPAHs. A. Discharge-related Activities that have Potential to Cause an Adverse Effect on Historic Properties: Installation of stormwater controls that involve subsurface disturbances may potentially have an adverse impact on historic properties. Page 96 2022 Construction General Permit (CGP) Ail. Procedures detailed in the permit shall be completed. Richard Young, of the Tulalip Tribe's Cultural Resources Department shall be contacted prior to initiating discharge- related activities that may have an impact on historic properties. His contact information is (360) 716-2652, ryoung@tulaliptribes-nsn.gov. xiv.Invalidation: This certification will cease to be valid if the project is constructed and/or operated in a manner not consistent with the project description contained in xv. the permit. This certification will also cease to be valid and the applicant must reapply with an updated application if info mation contained in the permit is voided by subsequent submittals. xvi.Modification: Nothing in this certification waives the Tulalip Tribes of Washington's authority to issue modifications to this cel iification if additional impacts due to operational changes are identified, or if additional conditions are necessary to protect water quality or further protect the Tribal Communities interest. 00 xvii. incorporation by reference:TI 1 is certification does not exempt the applicant from compliance with other statues and codes administered by the Tribes, county, state and federal agencies. xviii. Compliance with Tribe's 1996 Water Quality Standards: Each permittee shall be responsible for controlling discharges and achieving compliance with the T1 ibe's Water Quality Standards. Ax.Compliant with Tulalip Tribes Tidelands Management Policy: Permittee shall be responsible for achieving compliance with applicable sections of the Tulalip Tribe's Tidelands Management Policy. (Tulalip Tribal Code Title 8 Chapter 8.30). xx. Compliant with Tulalip Tribes Environmental Infractions: Permittee shall be responsible for achieving compliance with applicable sections of the Tulalip Tribe's Environmental Infractions. (Tulalip Tribal Code Title 8 Chapter 8.20). xxi.Where to Submit information and for further Coordination: All requested documents should be sent to the: Tulalip Tribes Natural Resources Environmental Department c/o Kurt Nelson and Valerie Streeter, 6704 Marine Drive, Tulalip, Washington 98271. For further 40 1 Certification coordination with the Tulalip Tribes Natural Resources Department, please contact Mr. Kurt Nelson (360) 716-4617 knelson@tu 1 aliptribes- nsn.gov. 6406 Marine Dr., Tulalip WA 98271. L Makah Tribe L The permittee shall be responsible for meeting any additional permit requirements imposed by EPA necessary to comply with the Makah Tribe's Water Quality Standards if the discharge point is located within the Makah's U&A treaty reserved areas. ii. Each permittee shall submit a copy of the Notice of Intent (NOI) to be covered by the general permit to Makah Fisheries Management, Water Quality Department at the address listed below at the same time it is submitted to the EPA. Makah Water Quality Makah Fisheries Management (MFM) ray.colby@makah.com Page 97 2022 Construction General Permit (CGP) PO Box 115 Neah bay, WA 98357 iii. All supporting documentation and certifications in the NOI related to coverage under the general permit for Endangered Species Act purposes shall be submitted to the Tribe's Habitat programs for their review. iv. If EPA requires coverage under an individual or alternative permit, the permittee shall submit a copy of the permit to Assistant Fisheries Director, ray.colby@makah.com. v. The permittee shall submit all Stormwater Pollution Prevention plan (SWPP) to MFM for review and approval prior to beginning any activities resulting in a discharge to Makah tribal waters. A. The permittee shall notify Ray Colby, ray.colby@makah.com (360) 645-3150 prior to conducting inspections at construction sites generating stormwater discharges to tribal waters. vii. The operator shall treat dewatering discharges with controls necessary to minimize discharges of pollutants to surface waters, or ground waters, and from stormwater runoff onsite from excavations, trenches, foundations, or storage areas. To the extent feasible, at all points where dewatering is discharged, comply with the velocity dissipation using check dams, sediment traps, and grouted outlets. g. Puyallup Tribe of Indians L The permittee shall be responsible for meeting any additional permit requirements imposed by EPA necessary to comply with the Puyallup Tribe's antidegradation procedures. ii. Each permittee shall submit a copy of the Notice of Intent (NOI) to be covered by the general permit to Char Naylor, Tribal Water Quality Manager at the following e-mail address: ( .. ................!rirk..........................................ir. ., u u Iirii nsn® ) at the same time it is submitted to EPA. HE, All supporting documentation and certifications in the NOI related to coverage under the general permit for Endangered Species Act purposes shall be submitted to Char Naylor, Tribal Water Quality Manager/Assistant Fisheries Director ( . ., ira.ir.g. ir@ u a u -[rib ......nsn. ) for review. iv. If EPA requires coverage under an individual or alternative permit, the permittee shall submit a copy of the permit to Char Naylor at the email address listed above. v. The permittee shall submit all stormwater pollution prevention plans to Char Naylor for review and approval prior to beginning any activities resulting in a discharge to Puyallup tribal waters. A The permittee shall contact Brandon Reynon („ ,ir.............. ...........................i.n i.r..e n il Dili u tribe nsn.goy ,..... ), Tribe's Historic Preservation Officer or Jennifer Keating . . . ................! ..!�..!i.................!r..�... ...............................::li..!0 u u -1--rii ,.....nsn. , Tribe's Assistant Historic Preservation Officer regarding historic properties and cultural resources. vii. To minimize the discharge of pollutants to groundwater or surface waters from stormwater that is removed from excavations, trenches, foundations, vaults, or Page 98 2022 Construction General Permit (CGP) other storage areas, treat dewatering discharges with controls necessary to minimize discharges of pollutants. Examples of appropriate controls include sediment basins or sediment traps, sediment socks, dewatering tanks, tube settlers, weir tanks, and filtration systems (e.g., bag or sand filters) that are designed to remove sediment. To the extent feasible, utilize vegetated, upland areas of the site to infiltrate dewatering water before discharge. At all points where dewatering water is discharged, utilize velocity dissipation controls. Examples of velocity dissipation devices include check dams, sediment traps, riprap, and grouted riprap at outlets. viii.The permittee shall provide and maintain natural buffers to the maximum extent possible (and/or equivalent erosion and sediment controls) when tribal waters are located within 100 feet of the boundaries. If infeasible to provide and maintain an undisturbed 100 foot natural buffer, erosion and sediment controls to achieve the sediment load reduction equivalent to a 100-foot undisturbed natural buffer shall be required. Page 99 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix C: EPA NOls and EPA NOTs C-1 Appendix C:EPA NOIs and EPA NOTs 2022 Construction General Permit (CGP) NPDES Form 6100-067 OMB No. 2040-0305, Exp. Date 01/31/25 Appendix D - Eligibility Worksheet Relating to Threatened and Endangered Species Protection D.1 Introduction This appendix provides a printable worksheet that can be helpful in selecting and documenting your eligibility criteria with respect to the protection of Federally listed threatened or endangered species and Federally designated "critical habitat" under the Endangered Species Act (ESA) [hereinafter "ESA-listed species and designated critical habitat(s)"] from discharges and discharge-related activities authorized under this permit. This is important because Section 9 of the ESA prohibits all persons and agencies from "taking" threatened and endangered species (16 U.S.C. § 1532(19)). While coordination between you and the U.S. Fish and Wildlife Service (USFWS) and/or the National Marine Fisheries Service (NMFS) (together, referred to as the "Services") may not be required in all cases, EPA encourages you to coordinate with the Services, to document that coordination, and to do so early in the planning process prior to submitting your NOI. D.2 Certifying ESA Eligibility Criterion for the CGP To be eligible for coverage under the CGP, you must certify that you meet one of the criteria listed in this worksheet (Section D.5), which is then submitted with your NOI for coverage under this permit. If you do not meet one of the ESA eligibility criteria outlined in the worksheet below, you are not eligible for coverage under this permit. These criteria ensure that coverage is available only for discharges and discharge-related activities that (1) avoid or eliminate any short- or long-term adverse effects to ESA-listed species and designated critical habitat(s), or (2) may result in any short- or long-term adverse effects that result in incidental take addressed under the incidental take statement of a biological opinion or permit for take issued under Section 10 of the ESA. As part of your determination of eligibility, EPA has developed a worksheet that assists operators in arriving at the correct criterion. The following requirements apply to the completion of the worksheet depending on how you are submitting your NOI for permit coverage: 1 . If the EPA Regional Office grants you a waiver from electronic reporting, in accordance with Part 1.1.5 of the CGP, you must complete the worksheet in section DA of this appendix to provide all information as required on your NOI that supports the eligibility criterion you qualify under per Part 1.1.5 of the permit. You must submit the worksheet with your NOI. If you do not submit the worksheet with your NOI, your NOI will be considered incomplete. 2. If you do not have a waiver from electronic reporting, you must complete your eligibility criteria selection outlined in the Endangered Species Protection section of the NOI in the NPDES eReporting Tool (NeT-CGP) and provide all information as required on your NOI that supports the eligibility criterion you qualify under per Part 1 .1.5 of the permit. The printable worksheet in this appendix may be helpful to you in preparing to submit your NOI, but you do not have to use it. D.3 What to Expect Once you Submit your NOI After you submit your NOI and before your NOI is authorized, EPA may notify you if any additional controls are necessary to ensure your discharges are not likely to result in any short- or long-term adverse effects on ESA-listed species and critical habitat. Page D-1 of 18 2022 Construction General Permit (CGP) The Services have the opportunity, within 14 days of submission of the NOI, to advise EPA whether either agency believes the planned discharges meet the selected eligibility criterion; whether the eligibility criterion could be met with additional conditions; or whether the eligibility criterion is not met. With respect to ESA issues, EPA recognizes the Services' expertise and will carefully consider their conclusion(s) in identifying eligibility for authorization, either with or without additional conditions. In the event EPA has placed a hold on your NOI based on NMFS or USFWS' recommendation, EPA will notify you as to whether your discharges are authorized or whether an individual permit will be required. If you do not hear from EPA within 14 days, you may assume that your discharge is authorized without further conditions. D.4 Worksheet Instructions Follow the instructions within the worksheet below to determine which criterion you are eligible for coverage under this permit. Check only 1 criterion, answer the required questions, and include the required information. Please keep the following in mind as you complete the worksheet: • The worksheet requires that you answer questions in a sequential order so that you can select the correct eligibility criterion. The worksheet does not go through each criterion alphabetically, but rather is organized in a way that allows you to eliminate those criteria that do not apply to your site. For instance, Step 1 of the worksheet requires you to determine whether criterion B, E, or F applies first, in that order, before proceeding to determining whether criterion A applies in Step 2. • You must consider ESA-listed species and/or designated critical habitat(s) under the jurisdiction of both the U.S. Fish and Wildlife Service (USFWS) and National Marine Fisheries Service (NMFS) and select the criterion that best applies to your site. You must comply with any applicable terms, conditions, or other requirements developed in theprocess of meeting one of the eligibility criteria in this section to remain eligible for coverage under this permit. • When evaluating the potential effects of your activities, you must consider effects to listed species or critical habitats within the "action area" of your construction activity, as identified by the USFWS IPaC and/or the NOAA website resources on page D-10 through D- 1 1 of this appendix. Please Note: NMFS'jurisdiction includes ESA-listed marine and estuarine species that spawn in inland rivers. The definition of "action area," which is contained in Appendix A, is repeated below forconvenience. "Action Area"—all areas to be affected directly or indirectly by the federal action and not merely theimmediate area involved in the action.See 50 CFR part 402.For the purposes of this permit and for application of the Endangered Species Act requirements,the following areas are included in the definition of action area: • The areas on the construction site where stormwater discharges originate and flow toward the point of discharge into the receiving waters.This includes: • areas on the construction site where excavation,site development,or other ground disturbance activities occur, and • areas where stormwater controls will be constructed and operated,including any areas where stormwater flows to and from the stormwater controls. • The areas in the vicinity of the construction site where stormwater discharges flow from the construction site to one or more points of discharge into receiving waters.(Example:Where stormwater flows into an off-site ditch,swale,or gully that leads to receiving waters.) • The extent of the receiving water potentially affected by stormwater discharges from your construction site through alteration of water chemistry,turbidity,temperature,or bank structure(i.e.,erosive flow),regardless of whether the construction site is adjacent to the receiving water. Page D-2 of 18 2022 Construction General Permit (CGP) D.5 Worksheet Instructions ➢ First determine whether you are eligible under Criterion B by reviewing the eligibility requirements below. ➢ If you determine that your facility does not meet Criterion B (e.g., due to difference in action area described, lack of analysis of appropriate effects, new listings or designation of critical habitat), proceed to check if you meet the requirements for Criterion E or F. Criterion B Eligibility Requirements If your discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility under the current 2022 CGP that included your action area (e.g., a general contractor or developer may have completed and filed an NOI for the entire action area with the necessary ESA certifications (Criterion A, C, D, E, or F)), you may be eligible under Criterion B. In order to be eligible for coverage, you must confirm that all three of the following are true (check all that apply): ❑ I have confirmed that the other operator's certification of eligibility accounted for my action area and that the eligibility certification was valid. ❑ There has been no lapse of NPDES permit coverage in the other operator's certification. ❑ I will comply with all measures that formed the basis of the other operator's valid certification of eligibility. Instructions ➢ If all three of the above are true, you may check Criterion B below and answer questions B1-65, and if applicable, 1136-67. ➢ If any of the above are not true (for example, if there are any listed species in your action area that were not addressed in the other operator's certification, you are not eligible under Criterion B), you may not select Criterion B and must proceed to check if you meet the requirements for Criterion E or F. B Eligibility requirements met by another operator under the 2022 CGP. The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your "action area" under eligibility Criterion A, C, D, E, or F of the 2022 CGP and you have confirmed that no additional ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS not considered in the Page D-3 of 18 2022 Construction General Permit (CGP) that certification may be present or located in the "action area." To certify your eligibility under this criterion, there must be no lapse of NPDES permit coverage in the other CGP operator's certification. By certifying eligibility under this criterion, you agree to comply with any conditions upon which the other CGP operator's certification was based. You must include below the NPDES ID from the other 2022 CGP operator's notification of authorization under this permit and list any measures that you must comply with). If your certification is based on another 2022 CGP operator's certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C. B1. Provide the NPDES ID from the other CGP operator's NOI authorized under this permit: B2. Identify the eligibility criterion of the other CGP operator's NOI? (check only one) �A � C �'F]' D �[:]` E F B3. Provide the authorization date of the other CGP operator's NOI (MM/DD/YYYY): By certifying eligibility under Criterion B, you must comply with any terms and conditions imposed under the eligibility requirements of the criterion for which the other operator has established eligibility (either Criterion A, C, D, E, or F) to ensure that your discharges and discharge-related activities are protective of listed species and/or critical habitat. Note: If you are unable to meet these eligibility requirements, then you may either establish eligibility under one of the other criteria, or you may consider applying to EPA for an individual permit. B4. List any measures that formed the basis of the other operator's valid certification of eligibility that you will comply with (or enter "N/A" if none exist): B5. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion B, including any of the terms and conditions, as well as the other operator's basis for establishing eligibility. Yes F-1 If your certification is based on another operator's certification under Criterion C, you must provide the following: Page D-4 of 18 2022 Construction General Permit (CGP) B6. What Federally listed species and/or designated habitat are located in your "action area"? (attached separate sheet if necessary) B7. What is the distance between your site and the listed species or designated critical habitat (in miles)-? Instructions If you selected Criterion B above and answered questions B1-B5, and if applicable, 1136-1137, you are done with this worksheet. If you are not filing electronically, you must submit this ON" ) worksheet with your NOI. If you are not eligible under Criterion B proceed to check if you meet the requirements for ;F Criterion E or F. Criterion E Eligibility Requirements If consultation under ESA section 7 has concluded, you may be eligible for coverage under Criterion E. In order to be eligible for coverage under Criterion E, you must confirm that both of the following are true (check all that apply): F-1 A consultation between a Federal agency and USFWS and/or the NMFS under section 7 of the ESA has concluded. Consultations can be either formal or informal, and would have occurred only as a result of a separate Federal action (e.g.,, during application for an individual wastewater discharge permit or the issuance of a wetlands dredge and fill permit), and the consultation must have addressed the effects of your construction activity's discharges and discharge-related activities on all ESA-listed threatened or endangered species and all designated critical habitat under the jurisdiction of each Service, as appropriate, in your action area. The result of this consultation must be either: i. A biological opinion currently in effect that determined that the action in question (taking into account the effects of your facility's discharges and discharge-related activities) is likely to adversely affect, but is not likely to jeopardize the continued existence of listed species or result in the destruction or adverse modification of critical habitat. The biological opinion must have included the effects of your facility's discharges' and discharge-related activities on all the listed species and designated Effects of discharge include, but are not limited to,the analysis of the hydrological, chemical, and biological effects of the discharge on listed species,their prey,and their habitat, as well as critical habitat,where designated. For example, the Page D-5 of 18 2022 Construction General Permit (CGP) critical habitat in your action area under the jurisdiction of each Service, as appropriate. To be eligible under (i), any reasonable and prudent measures specified in the incidental take statement must be implemented; ii. Written concurrence (e.g., letter of concurrence) from the applicable Service(s) with a determination that your facility's discharges and discharge-related activities are not likely to adversely affect ESA-listed species and/or designated critical habitat. The concurrence letter must have included the effects of your facility's discharges and discharge-related activities on all the ESA-listed species and/or designated critical habitat on your species list(s) acquired from USFWS and/or NMFS as part of this worksheet. F-1 The consultation does not warrant reinitiation under 50 CFR §402.16; or, if reinitiation of consultation is required (e.g., due to a new species listing, critical habitat designation, or new information), the Federal action agency has reinitiated the consultation and the result of the consultation is consistent with the statements above. Include any reinitiation documentation from the Services or consulting Federal agency with your NOI. Instructions ➢ If both of the above are true, you may cheek Criterion E below and answer questions E1-E6. • For more information on section 7 consultation, see 50 CFR part 402. If you receive a "jeopardy opinion," you may continue to work With USFWS and/or NMFS and your permitting authority to modify your project so that it will not jeopardize listed species or designated critical habitat. • Note that most consultations are accomplished through informal consultation. When conducting informal ESA section 7 consultation as a non-Federal representative, you must follow the procedure found in 50 CFR Part 402'of the ESA regulations. You must notify the Services of your intention and agreement to conduct consultation as a non-Federal representative. • Consultation may also occur in the context of another Federal ;action at the construction site (e.g., where ESA section 7 consultation was performed for issuance of a wetlands dredge and fill permit for the project or where a NEPA review is performed for the project that incorporates a section 7 consultation) • Any terms and conditions developed through consultations to protect listed,species and critical habitat must be incorporated into the SWPPP. As noted above, a Federal operator may, if they wish, initiate consultation with the Services at Step Four. Non-Federal operators may seek technical assistance from the Services at Step 5. • Whether ESA section 7 consultation must be performed with either USFWS, NMFS, or both Services depends on the listed species that may be affected by the operator's stormwater discharge. In general, NMFS has jurisdiction over marine, estuarine, and anadromous species. Operators should also be aware that while formal section 7 consultation 'provides protection from incidental takings liability, ;informal consultation does not. ➢ If not, proceed to check if you meet the requirements for Criterion F. effects analysis would have evaluated whether the various pollutants in the discharge (e.g.,TSS, metals) would adversely affect listed species through exposure to the pollutants,or to their prey or habitat. Effects that look only at short-term effects unrelated to the stormwater discharge effects to listed species are not sufficient for these purposes. Page D-6 of 18 2022 Construction General Permit (CGP) ❑ E ESA Section 7 consultation has successfully concluded. Consultation between a Federal Agency and the USFWS and/or NMFS under section 7 of the ESA has concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS. To certify eligibility under this criterion, Indicate the result of the consultation: ❑ Biological opinion and/or conference opinion and incidental take statement currently in effect currently in effect from USFWS and/or NMFS that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of ESA-listed species, nor the destruction or adverse modification of critical habitat; Or ❑ Written concurrence from USFWS and/or NMFS with a finding that the site's discharges and discharge-related activities are not likely to adversely affect ESA-listed species and/or designated critical habitat. E1. Identify the federal action agency or agencies involved: E2. Identify the Service(s) field or regional offices providing the consultation: E3. Identify any tracking numbers associated with the consultation (e.g., IPaC number, ECO number): E4. What is the date the consultation was completed? (MM/DD/YYYY) E5. Check to confirm that correspondence with USFWS and/or NMFS documenting the Biological Opinion, conference opinion (IPaC or ECO tracking number) or concurrence is attached. Yes E6. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion E, including copies of the correspondence between yourself and the Services. Yes Page D-7 of 18 2022 Construction General Permit (CGP) Instructions If you selected Criterion E above and answered questions E1-Eb,you are done with this worksheet. If you are not filing electronically,you must submit this worksheet with your NOI. If you are not eligible under Criterion E, proceed to check if you;meet the requirements for Criterion F. Criterion F Eligibility Requirements If your construction activities are the subject of a permit under ESA section 10, and this authorization addresses the effects of your site's discharges and discharge-related activities on ESA-listed species and designated critical habitat in your action area, you may be eligible for coverage under Criterion F. In order to be eligible or coverage under Criterion F, you must confirm that the following is true: FIA permit or permits issued under section 10 of the ESA specifically address the effects of your facility's discharges and discharge-related activities (if applicable) on all federally-listed species and designated critical habitat in your action area. Note: You must follow USFWS and/or NMFS procedures when applying for an ESA section 10 permit (see 50 CFR §17.22(b)(1) for USFWS and §222.22 for NMFS). Application instructions for section 10 permits can be obtained from http://www.fws.gov and http://www.nmfs.noaa or by contacting the appropriate Service office. Instructions y If the above is true,you may check Criterion F below and answer questions F146. Is �. If you are not eligible under criterion F, proceed to Step 2. F-1 F Issuance of section 10 permit. Potential take is authorized through the issuance of a permit under section 10 of the ESA by the USFWS and/or NMFS, and this authorization addresses the effects of the site's discharges and discharge-related activities on ESA-listed species and designated critical habitat. You must include copies of the correspondence between yourself and the participating agencies in your SWPPP and your NOI. F1. Which Service provided the section 10 permit? (check all that apply) USFWS F-1 NMFS F-1 F2. Identify the field or regional offices providing the permit(s): 2022 Construction General Permit (CGP) F3. Identify any tracking numbers associated with the consultation (e.g., IPaC number, ECO number): F4. What is the date the permit(s) was granted? (MM/DD/YYY) (2nd permit date, if applicable: F5. Check to confirm that correspondence with USFWS and/or NMFS and a copy of the section 10 permit or relevant tracking number(s) (IPaC and/or ECO number) is attached. Yes ❑ F6. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion F, including a copy of the section 10 permit and copies of the correspondence between yourself and the Services. Yes ❑ Instructions y If you selected Criterion F above and answered questions F1-F6, you are done with this worksheet. If you are not filing electronically, you must submit this worksheet with your NOI. �= If you are not eligible under Criterion F, proceed to Step 2. IN Instructions ➢ First, determine the extent of your action area. You must determine whether species listed as either threatened or endangered, or their critical habitat(s) are located in your site's action area (i.e., all areas to be affected directly or indirectly by the Federal action and not merely the immediate area involved in the action, including areas beyond the footprint of the site that are likely to be affected by stormwater discharges, discharge-related activities, and authorized non-stormwater discharges). You must consider the following in determining the action area for your site, and confirm that all the following are true: Fm_1 In determining my "action area", I have considered that discharges of pollutants from the project site can expand the action area well beyond the footprint of my site and the discharge point(s). I have taken into account the controls I will be implementing to minimize pollutants and the receiving waterbody characteristics (e.g., perennial, intermittent, ephemeral) in determining the extent of physical, chemical, and/or biotic effects of the Page D-9 of 18 2022 Construction General Permit (CGP) discharges. I confirm that all receiving waterbodies that could receive pollutants from my site are included in my action area. Fm-1 In determining my "action area", I have considered that discharge-related activities must also be accounted for in determining my action area. I understand that discharge-related activities are any activities that cause, contribute to, or result in stormwater and authorized non-stormwater point source discharges, and measures such as the siting, construction, timing,2 and operation of stormwater controls to control, reduce, or prevent pollutants from being discharged. I understand that any new or modified stormwater controls that will have noise or other similar effects, and any disturbances associated with construction of controls, are part of my action area. If you have any questions about determining the extent of your action area, you may contact EPA or the Services for assistance. https://www.epa.gov/npdes/contact-us- stormwater#regional Instructions ➢ Next, you must identify,to the best of your ability, any species listed as either threatened or endangered, or their critical habitat(s), that are located in your site's action area (see definitions of these terms in Appendix A). You must follow the instructions on the htti2s://www.ei2a.c o� v/npdes/construction-general-permit-threatened-and-endangered-species to obtain lists of any ESA-protected species and/or critical habitat that are expected to exist in your county, township, or the receiving water for your discharge. ➢ If ESA-protected resources occur within your action area, keep a copy of the species and critical habitat list(s) from the Service(s) with your SWPPP and use the lists) to complete your NOI. For USFWS species, attach to this worksheet the full printout from your IPaC query/Official Species List. You can include the map from your IPaC query.For NMFS species, attach to this worksheet the full printout of the report from your query of the mapping resource you used (either the National or Greater Atlantic Region Mapper). The printed report from NMFS mappers will include a map of your query. 2 Timing considerations could be related to,for example, a time of the year where a migratory bird species is present in the action area and the operator might want to consider that in terms of their construction sequencing; there are other times of the year where this consideration might not be relevant. Page D-10 of 18 2022 Construction General Permit (CGP) Instructions After completing Step 2 above, if there are no listed species and no critical habitat areas in your action area, you may be eligible for criterion A. Criterion A Eligibility Requirements In order to be eligible for coverage under criterion A, you must confirm that all the following are true (check all that apply): F-1 I confirm that I have used the species location resources of BOTH NMFS and USFWS to identify any ESA-listed species within my action area. F-1 I have confirmed there to be no ESA-listed species and no critical habitat in my action area. Instructions ➢ If all of the above are true,you may check criterion A below and answer questions Al-AS. ➢ If any of the above is not true, you may not select criterion A and must proceed to Step 3 to determine if you can become eligible under criterion C. Note: For existing dischargers that have previously obtained coverage under criterion A, you must verify whether ESA-protected species and/or critical habitat are expected to exist in your action area, as described above. Please note that if you now find that your action area overlaps with ESA-protected species or critical habitat, you must proceed to Step 3. F-1 A No ESA-listed species and/or designated critical habitat present in action area. You certify that ESA-listed species and designated critical habitat(s) under the jurisdiction of the USFWS or NMFS are not likely to occur in your site's "action area" as defined in Appendix A of this permit.. Please Note: NMFS'jurisdiction includes ESA-listed marine and estuarine species that spawn in inland rivers. Al. USFWS information sources used (reliance on State resources is not acceptable): Note: If your Official Species List from USFWS indicated no species or critical habitat were present in your action area, include the full consultation tracking code at the top of your Official Species List in your NOI in the basis statement for Criterion A. If an Official Species List was not available on IPaC, list the contact date and name of the Service staff with whom you corresponded to verify no USFWS species or critical habitat were present in your action area. Page D-11 of 18 2022 Construction General Permit (CGP) A2. NMFS information sources used (reliance on State resources is not acceptable): A3. I confirm that aerial image(s) of the site is attached. Yes ❑ A4. I confirm that a printout of the species' list(s) showing no ESA-listed species or critical habitat in my action area is attached. Yes ❑ AS. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion A. For USFWS species, include the full printout from your IPaC query/Official Species List. You can include the map from your IPaC query. For NMFS species, include the full printout from the appropriate NMFS website resources on page X with the correct Region selected. Yes ❑ Instructions If you selected Criterion A above and answered questions Al-A5, you are done with this a worksheet. If you are not filing electronically,you must submit this worksheet with your NQI, y If listed species and/or critical habitat may exist in your action area, you must do one or more of the following: Conduct visual inspections. This method may be particularly suitable for construction sites that are smaller in size or located in non-natural settings such as highly urbanized areas or industrial parks where there is little or no natural habitat, or for construction activities that discharge directly into municipal stormwater collection systems. • Conduct a formal biological survey. In some cases, particularly for larger construction sites with extensive stormwater discharges, biological surveys may be an appropriate way to assess whether species are located in the action area and whether there are likely to be short- or long-term adverse effects to such species. Biological surveys are frequently performed by environmental consulting firms. • If required, conduct an environmental assessment under the National Environmental,Policy Act (NEPA). Some construction activities might require review under NEPA for specific reasons, such as Federal funding or other Federal involvement in the project. Note: Coverage under the CGP!does not trigger such a review for individual projects/sites. EPA has complied with NEPA in the issuance of the CGP. and • Follow the instructions in Steps 3—5 below, as applicable. Note that many but not all measures imposed to protect listed species under these steps will also protect critical habitat. Thus, meeting the eligibility requirements of this CGP may require measures to protect critical habitat that are''separate from those to protect listed species. Page D-12 of 18 2022 Construction General Permit (CGP) 04 Instructions ➢ If in Step 2 you identified that listed species and/or designated critical habitat could exist in your action area,you must next assess whether your discharges or discharge-related activities are likely to result in short- or long-term adverse effects to ESA-listed threatened or endangered species or designated critical habitat. Potential short- or long-term adverse effects from discharges and discharge-related activities include: • Hydrological. Stormwater discharges may cause siltation, sedimentation, or induce other changes in receiving waters such as temperature, salinity, or pH. These effects will vary with the amount of stormwater discharged and the volume and condition of the receiving water. Where a stormwater discharge constitutes a minute portion of the total volume of the receiving water, adverse hydrological effects are less likely. Construction activity itself may also alter drainage patterns on a site where construction occurs that can impact listed species or critical habitat. • Habitat. Excavation, site development, grading, and other surface disturbance activities from construction activities, including the installation or placement of stormwater controls, may result in adverse effects to listed species or their habitat. Stormwater may drain or inundate listed species habitat. • Toxicity. In some cases, pollutants in construction stormwater may have toxic effects on listed species. For example: Stormwater discharges from construction on or adjacent to agricultural property may contain pesticides. Stormwater discharges from projects involving pavement and roofing could include tar and asphalt. The scope of effects to consider will vary with each site. If you are having difficulty determining whether your project is likely to result in short- or long-term adverse effects to listed species or critical habitat, or one of the Services has already raised concerns to you, you should contact the appropriate Services office for assistance. Instructions v If any short- or long-term adverse effects to listed threatened or endangered species or their critical habitat are not likely,then you may check Criterion C below and answer questions � C1-C8. If any short- or long-term adverse effects to listed threatened or endangered species or their critical habitat are likely, you must follow Step 4 below. You may still be eligible for Criterion C if you are able to install and implement appropriate measures to avoid the likelihood of adverse effects. Page D-13 of 18 2022 Construction General Permit (CGP) Criterion C Eligibility Requirements FE-1C Discharges not likely to result in any short- or long-term adverse effects to ESA-listed species and/or designated critical habitat. ESA-listed species and/or designated critical habitat(s) under the jurisdiction of the USFWS and/or NMFS are likely to occur in or near your site's "action area," and you certify to EPA that your site's discharges and discharge-related activities are not likely to result in any short- or long-term adverse effects to ESA-listed threatened or endangered species and/or designated critical habitat. This certification may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to result in any short- or long-term adverse effects to ESA-listed species and/or designated critical habitat. To certify your eligibility under this criterion, you must indicate belowl) the ESA-listed species and/or designated habitat located in your "action area" using the process outlined in this Appendix; 2) the distance between the site and the listed species and/or designated critical habitat in the action area (in miles); and 3) a rationale describing specifically how short- or long-term adverse effects to ESA-listed species will be avoided from the discharges and discharge-related activities. You must also include a copy of your site map from your SWPPP showing the upland and in-water extent of your "action area" with your NOI. C1. I confirm that both ESA-listed species and designated critical habitat under the jurisdiction of the USFWS and/or NMFS were considered in my evaluation. Yes Fm_1 C2. Provide the USFWS information resources and expertise used to arrive at this criterion selection: Official species list from USFWS Information for Planning and Consultation (IPaC) website and consistency letter from USFWS. C3. Provide the NMFS information resources and expertise used to arrive at this criterion selection: Drawn Action Area & Overlapping Section 7 Consultation Areas provided by the NOAA ESA Section 7 Mapper Page D-14 of 18 2022 Construction General Permit (CGP) C4. What ESA-listed species and/or designated critical habitat are located in your "action area?" (or attach a printout of the species' list(s)) Northern Long-eared Bat (Endangered) - See attached species' list C5. What is the distance between your site and the ESA-listed species and/or designated critical habitat within the action area (in miles, state "on site" if the ESA-listed species and/or designated critical habitat is within the area to be disturbed)? -9 miles C6. Provide the rationale describing specifically how any short- or long-term adverse effects to ESA-listed species will be avoided from the discharge and discharge-related activities. Based on the N H ESP Map of Northern Long Ear Bat locations, the project is approximately 9 miles from the nearest critical habitat and construction activities are not likely to adversely affect the animals. C7. I confirm that a site map from my SWPPP showing the upland and in-water extent of my "action area" is attached. Yes FE] C8. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion C. Yes FE-1 Instructions y If you selected Criterion C above and answered questions C1-C8,you are done with this worksheet. If you are not filing electronically,you must submit this worksheet with your Nol. y If not, please proceed to step 4. r Page D-15 of 18 2022 Construction General Permit (CGP) Instructions If you make a preliminary decision in Step 3 that short- or long-term adverse effects from your construction activity's discharges or disc h arge-rel ated activities are likely to occur, you can still receive coverage under eligibility Criterion C of the CGP if appropriate measures are undertaken to avoid or eliminate the likelihood of short- or long-term adverse effects prior to applying for CGP coverage. These measures may involve relatively simple changes to construction activities such as re-routing a stormwater discharge to bypass an area where species are located, relocating stormwater controls, or by modifying the "footprint" of the construction activity. If you are unable to ascertain which measures to implement to avoid the likelihood of short- or long-term adverse effects, you must coordinate with USFWS and/or NMFS, in which case you would not be eligible for coverage under eligibility Criterion C, but may instead be eligible for coverage under eligibility criterion D (described in more detail in Step 5). y If you are able to install and implement appropriate measures to avoid the likelihood of short- or long-term adverse effects,then you may,ao back and check eligibility Criterion C above and answer questions C1-C8 above, and C9-CI0 below. The measures you adopt to avoid or 10 eliminate short- or long-term adverse effects must be implemented for the duration of the construction project and your coverage under the CGP. v If you cannot ascertain which measures to_implement to avoid the likelihood of adverse effects, you must follow the procedures in Step 5. � C9. I confirm that I have or will install and implement appropriate measures to avoid the likelihood of any short- or long-term adverse effects to ESA-listed threatened or endangered species or their critical habitat. Yes F-1 C10. Provide a description of the measures installed/to be installed and implemented to avoid likelihood of any short- or long-term adverse effects. Instructions If you selected Criterion C above and answered questions CI-CIO,you are done with this worksheet. If you are not filing you NOI electronically,you must submit this worksheet with U your NOI. If you are not eligible for Criterion C, please proceed to step 5. Page D-16 of 18 2022 Construction General Permit (CGP) 111104 Instructions If in Step 4 you cannot ascertain which measures to implement to avoid the likelihood of short- or long- term adverse effects, you must contact USFWS and/or NMFS. You may still be eligible for CGP coverage if likely adverse effects can be addressed through meeting criterion D. If you meet the requirements of criterion D, then you may check criterion D below and answer questions D1-D5. Criterion D Eligibility Requirements D Coordination with USFWS and/or NMFS has successfully concluded. Coordination between you and the USFWS and/or NMFS has concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS, and resulted in a written confirmation from USFWS and/or NMFS that the effects of your site's discharges and discharge-related activities are not likely to result in short- or long-term adverse effects for ESA-listed species and/or designated critical habitat in your action area. By certifying eligibility under this criterion, you agree to comply with any conditions you must meet for your site's discharges and discharge-related activities to not likely result in any short- or long- term adverse effects. You must include copies of the correspondence with the participating agencies in your SWPPP and your NOI. D1. Which Service participated in coordination? (check all that apply) USFWS ❑ NMFS ❑ D2. Identify the field and/or regional office(s) that provided the coordination? D3. What is the date the coordination concluded? (MM/DD/YYY) __/__/ D4. Check to confirm that correspondence with USFWS and/or NMFS documenting concurrence is attached. Yes F-1 D5. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion D, including copies of the correspondence between yourself and the Services. Yes F-1 Page D-17 of 18 2022 Construction General Permit (CGP) Instructions If you selected Criterion D above and answered questions DI-D5,you are done with this worksheet. If you are not filing electronically,you must submit this worksheet with your NOI. Paperwork Reduction Act Notice This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2040-0305). Responses to this collection of information are mandatory (40 CFR 122.26). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The public reporting and recordkeeping burden for this collection of information is estimated to be 3.3 hours per response. Send comments on the Agency's need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821 T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address. Page D-18 of 18 Appendix H - Notice of Intent (NOI) Form and Instructions Part 1.4.1 requires you to use the NPDES eReporting Tool, or "NeT" system, to prepare and submit your NOI electronically. However, if the EPA Regional Office grants you a waiver to use a paper NOI form, and you elect to use it, you must complete and submit the following form. U.S.Environmental Protection Agency OMB No. Form NPDES Washington,DC 20460 2040-0305 vvEPA 3510-9 Exp.Date Notice of Intent for the 2022 NPDES Construction General Permit 01/31/2025 Submission of this Notice of Intent(NOI)constitutes notice that the operator identified in Section III of this form requests authorization to discharge pursuant to the NPDES Construction General Permit(CGP)permit number identified in Section II of this form.Submission of this NOI also constitutes notice that the operator identified in Section III of this form meets the eligibility requirements of Part 1.1 CGP for the project identified in Section IV of this form. Permit coverage is required prior to commencement of construction activity until you are eligible to terminate coverage as detailed in Part 8 of the CGP. To obtain authorization,you must submit a complete and accurate NOI form.Discharges are not authorized if your NOI is incomplete or inaccurate or if you were never eligible for permit coverage.Refer to the instructions at the end of this form. SECTION •• TO USE PAPER NOI •• E OPERATORS PLEASE NOTE:NOI MUST BE SUBMITTED THROUGH E-FILING AS PER SWPPP INSTRUCTIONS. PDF O FORM FILLED OUT FOR INFORMATIVE PURPOSES ONLY. THE ONLINE NOI TO BE Z FILLED OUT MAY BE FORMATTED DIFFERENTLY AND REQUIRE MORE DETAILS THAN PROVIDED ON THIS FORM. SHOULD ANY ADDITIONAL INFORMATION BE N a NEEDED, SECTION PLEASE CONTACT VHB. •' • NPDES ID(EPA Use Only) Master Permit Number(see Appendix B of the CGP for the list of eligible permit numbers) E SECTIONOPERATOR INFORMATION Operator Name Are you requesting coverage under this NOI as a"Federal Operator"or for a"Federal Facility"as defined in ❑Yes ❑No Appendix A? Mailing Address Street O } City State ZIP Code O E O County or Similar Government Division L O AL, W C Operator Point of Contact Information: First Name Middle Initial Last Name Title Phone Number Email Address EPA Form 3510-9 Page 1 Complete if NOI was prepared by someone other than the certifier: First Name Middle Initial Last Name N a Organization O Z Phone number Email address SECTION •R•JECT/SITE INFORMATION Proiect/Site Name LECTURE HALL AT MERRIMACK COLLEGE Street/Location 315 TURNPIKE STREET Citv State ZIP Code NORTH ANDOVER MA 01845 N i QCounty or Similar Government Division: ESSEX COUNTY in u For the project/site you are seeking permit coverage,provide the following information: N O Latitude in decimal degrees to four decimal laces Longitude in decimal degrees to four decimal laces L (� g places): g (� g places): a 42.6706 °N 71.1238 °W Latitude/Longitude Data Source: ❑Map ❑GPS 0 Other(Specify): GOOGLE MAPS Horizontal Reference Datum: ❑NAD 27 ❑NAD 83 0 WGS 84 = Is your site located in Indian country lands,or on a property of religious or cultural significance to an Indian Tribe? ❑Yes 0 No O a If yes,provide the name of the Indian Tribe associated with the area of Indian country(including name of Indian reservation,if applicable),or if o not in Indian country,provide the name of the Indian Tribe associated with the property: WOO O in Estimated Project Start Date(MM/DD/YYYY) Estimated Project Completion Date(MM/DD/YYYY) Estimated Area to be Disturbed(to the nearest quarter acre): 1.25 O ❑Single-Family Residential ❑Multi-Family Residential ❑Commercial a E Type of Construction Site (check all that apply): ❑Industrial 0 Institutional El Highway or Road v ❑Utility ❑Other(Specify): O O a Was the pre-development land use used for agriculture(see Appendix A for definition of"agricultural land")? ❑Yes 0 No Have earth-disturbing activities commenced on your project/site? ❑Yes ❑No If yes,is your project an"emergency-related project" (see Appendix A)? El Yes 0 No EPA Form 3510-9 Page 2 Have stormwater discharges from your project/site been covered previously under an NPDES permit? ❑Yes 0 No If yes,provide the NPDES ID(if you had coverage under EPA's 2017 CGP)or the NPDES permit number(if you had coverage under an EPA individual permit): c a Are there other operators that are covered under this permit for the same project site? ❑Yes 0 No E L o If yes,provide the NPDES ID number for all other operators at the site who have coverage under this permit: 0 Will there be demolition of any structure built or renovated before January 1, 1980?OF 0 No L If yes,do any of the structures being demolished have at least 10,000 square feet of floor space? ❑Yes ❑No Will you be discharging dewatering water from your site? ❑Yes 0 No If yes,will you be discharging dewatering water from a current or former Federal or State remediation site? ❑Yes 0 No SECTION •R • By indicating"Yes,"I confirm that I understand that the CGP only authorizes the allowable stormwater discharges in Part 1.2.1 and 0 the allowable non-stormwater discharges listed in Part 1.2.2.Any discharges not expressly authorized in this permit cannot become authorized or shielded from liability under CWA section 402(k)by disclosure to EPA,State,or local authorities after issuance of this ❑Yes permit via any means,including the Notice of Intent(NOI)to be covered by the permit,the Stormwater Pollution Prevention Plan L (SWPPP),during an inspection,etc.If any discharges requiring NPDES permit coverage other than the allowable stormwater and 0 non-stormwater discharges listed in Parts 1.2.1 and 1.2.2 will be discharged,they must be covered under another NPDES permit. v O OF Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System(MS4)? 0 Yes ❑No L CL Are there any waters of the U.S.within 50 feet of your project's earth disturbances? ❑Yes 0 No For each point of discharge,provide the following receiving water information.(Attach a separate list if necessary) Point of Discharge ID Provide the name of the first water of If the receiving water is impaired If a TMDL been completed for this the U.S.that receives stormwater (on the CWA 303(d)list),list the receiving waterbody,providing the directly from the point of discharge pollutants that are causing the following information: and/or from the MS4 that the point of impairment: discharge discharges to: _ TMDL Name and ID: 0 aBenthicBACTERIA TMDL FOR THE SHAWSHEEN Macroinvertebrates RIVER BASIN(REPORT MA33®01®2002®24) 0 Curly-LeafSHAWSHEEN RIVER Pollutant(s)for which there is a TMDL: EscherichiaI1 0 Fecal i Fish Passage a Barrier .? TMDL Name and ID: O N Pollutant(s)for which there is a TMDL: EPA Form 3510-9 Page 3 For each point of discharge,provide the following receiving water information.(Attach a separate list if necessary) Point of Discharge ID Provide the name of the first water of If the receiving water is impaired If a TMDL been completed for this the U.S.that receives stormwater (on the CWA 303(d)list),list the receiving waterbody,providing the directly from the point of discharge pollutants that are causing the following information: and/or from the MS4 that the point of impairment: discharge discharges to: TMDL Name and ID: Pollutant(s)for which there is a TMDL: TMDL Name and ID: Pollutant(s)for which there is a TMDL: TMDL Name and ID: c O a E O Pollutant(s)for which there is a TMDL: C N i TMDL Name and ID: V Pollutant(s)for which there is a TMDL: TMDL Name and ID: Pollutant(s)for which there is a TMDL: Are any of the waters of the U.S.to which you discharge designated by the State or Tribal authority under its antidegradation policy as a Tier 2(or Tier 2.5)water(water quality exceeds levels necessary to support propagation of fish,shellfish,and wildlife and recreation in and on the water)or as a Tier 3 water(Outstanding 0 Yes ❑No National Resource Water)? (See Appendix F). If yes,names)of receiving water(s)and its designation(Tier 2,Tier 2.5 or Tier 3): UNNAMED TRIBUTARY - TIER 2 EPA Form 3510-9 Page 4 SECTION •' • Will you use polymers,flocculants,or other treatment chemicals at your construction site? ❑Yes ❑No If yes,will you use cationic treatment chemicals at your construction site*? ❑Yes ❑No If yes,have you been authorized to use cationic treatment chemicals by your applicable EPA ❑Yes ❑No Regional Office in advance of filing your NOI*? c O If you have been authorized to use cationic treatment chemicals by your applicable EPA Regional Office,attach a copy of your authorization letter and include documentation of the appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards. a Please indicate the treatment chemicals that you will use: U .E N s U *Note:You are ineligible for coverage under this permit unless you notify your applicable EPA Regional Office in advance and the EPA office authorizes coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards. SECTION Vil.STORMWATER POLLUTION PREVENTION PLAN(SWPPP)AND PERSONNEL TRAINING INFORMATION a Has the SWPPP been prepared in advance of filing this NOI,as required? 0 Yes ❑No By indicating"Yes,"I confirm that all required personnel,including those conducting inspections at your site,will meet the N training requirements in Part 6 of this permit. ❑Yes First Name Middle Initial Last Name U a O } Professional Title O a U E CL CL O CL c � — Phone number Email address H SECTION DA '• • In accordance with Part 1.1.5,if the EPA Regional Office grants you a waiver from electronic reporting,you must complete the worksheet in o Appendix D to select your eligibility criteria with respect to the protection of Federally listed threatened or endangered species and Federally U designated"critical habitat"under the Endangered Species Act(ESA) [hereinafter"ESA-listed species and designated critical habitats)"]from O discharges and discharge-related activities authorized under this permit. O a N 'v You must submit the ESA worksheet and all required supporting documentation with this NOI.If you do not submit the worksheet and the O required supporting documentation with your NOI,your NOI will be considered incomplete.After you submit your NOI and before your NOI is y authorized,EPA may notify you if any additional controls are necessary to ensure your discharges are not likely to result in any short-or long- O term adverse effects on ESA-listed species and critical habitat. AL, W V By indicating"Yes,"I confirm that you have included the completed ESA worksheet from Appendix D and all required ❑Yes W supporting information for your criterion selection with the submission of this NOI. EPA Form 3510-9 Page 5 SECTION •' PRESERVATION Are you installing any stormwater controls as described in Appendix E that require subsurface earth p Yes ❑No disturbance? (Appendix E,Step 1) If yes,have prior surveys or evaluations conducted on the site have already determined historic properties do not exist,or that prior disturbances have precluded the existence of historic properties? ❑Yes 0 No (Appendix E,Step 2) If no,have you determined that your installation of subsurface earth-disturbing stormwater ❑Yes 0 No 0 controls will have no effect on historic properties? (Appendix E,Step 3) a L If no,did the SHPO,THPO,or other Tribal representative(whichever applies)respond to H you within the 15 calendar days to indicate whether the subsurface earth disturbances p Yes ❑No caused by the installation of stormwater controls affect historic properties? (Appendix E, v Step 4) 'i 0 v If yes,describe the nature of their response: ❑ Written indication that no historic properties will be affected by the installation of stormwater controls. ❑ Written indication that adverse effects to historic properties from the installation of stormwater controls can be mitigated by agreed upon actions. ❑ No agreement has been reached regarding measures to mitigate effects to historic properties from the installation of stormwater cnntrnk Project Notification Form( )was provided to Massachusetts HistoricalCommission( ) 0 Other(Specify): on 1/28/2020.A response was received,indicating that it has been determined that this project i unlikely to affect significant historic or archaeological resources. SECTION •N INFORMATION certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I have no personal knowledge that the information submitted is other than true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. a E 0 First Name Middle Initial Last Name c c O } Title a V U Signature Date(MM/DD/YYYY) Email Address EPA Form 3510-9 Page 6 Instructions for Completing EPA Form 3510-9 Notice of Intent for the 2022 NPDES Construction General Permit NPDES Form Date(02/22) This Form Replaces Form 3510-9(02/17) Form Approved OMB No.2040-0305 General Instructions described in this NOI. Refer to Appendix A of the permit for the definition of"operator'. Who Must File an NOI Form? Indicate whether you are seeking coverage under this permit Under the provisions of the Clean Water Act,as amended(33 as a "Federal Operator" or "Federal Facility" as defined in U.S.C.1251 et.seq.;the Act),Federal law prohibits stormwater Appendix A. discharges from certain construction activities to waters of the U.S. unless that discharge is covered under a National Also provide a point of contact, the operator's mailing Pollutant Discharge Elimination System (NPDES) permit. address, county,telephone number,and e-mail address (to Operators of construction sites where one or more acres are be notified via e-mail of NOI approval when available). disturbed,smaller sites that are part of a larger common plan Correspondence for the NOI will be sent to this address. of development or sale where there is a cumulative disturbance of at least one acre,or any other site specifically If the NOI was prepared by someone other than the certifier designated by the Director,must obtain coverage under an (for example, if the NOI was prepared by the facility SWPPP NPDES general permit. For coverage under the 2022 CGP, contact or a consultant for the certifier's signature), include each person, firm, public organization, or any other entity the full name, organization, phone number, and email that meets either of the following criteria must file a Notice of address of the NOI preparer. Intent form: (1) they have operational control over Section IV.Project/Site Information construction plans and specifications,including the ability to make modifications to those plans and specifications; or (2) Enter the official or legal name and complete street address, they have day-to-day operational control of those activities including city, State, ZIP code, and county or similar at the project necessary to ensure compliance with the government subdivision of the project or site.If the project or permit conditions. If you have questions about whether you site lacks a street address, indicate the general location of need a NPDES stormwater permit,or if you need information the site (e.g., Intersection of State Highways 61 and 34). to determine whether EPA or your State agency is the Complete site information must be provided for permit permitting authority,contact your EPA Regional Office. coverage to be granted. Provide the latitude and longitude of your facility in decimal Completing the Form degrees format. The latitude and longitude of your facility Obtain and read a copy of the 2022 CGP, viewable at can be determined in several different ways, including https://www.epa.gov/npdes/stormwater-discharges- through the use of global positioning system (GPS) receivers, construction-activities#cap. To complete this form, type or U.S.Geological Survey(U.S.G.S.) topographic or quadrangle print uppercase letters,in the appropriate areas only. Please maps, and web-based siting tools, among others. For place each character between the marks (abbreviate if consistency, EPA requests that measurements be taken from necessary to stay within the number of characters allowed the approximate center of the construction site. For linear for each item).Use one space for breaks between words,but construction sites, the measurement should be taken not for punctuation marks unless they are needed to clarify midpoint of the site. If known, enter the horizontal reference your response. If you have any questions on this form, datum for your latitude and longitude. The horizontal telephone EPA's NOI Processing Center at (866) 352-7755. reference datum is shown on the bottom left corner of USGS Please submit the original document with signature in ink-do topographic maps;it is also available for GPS receivers. not send a photocopied signature. Indicate whether the project is in Indian country lands or located on a property of religious or cultural significance to Section I.Approval to Use Paper NOI Form an Indian Tribe,and if so,provide the name of the Indian Tribe You must indicate whether you have been granted a waiver associated with the area of Indian country (including name from electronic reporting from the EPA Regional Office.Note of Indian reservation,if applicable),or if not in Indian country, that you are not authorized to use this paper NOI form unless provide the name of the Indian Tribe associated with the the EPA Regional Office has approved its use. Where you property. have obtained approval to use this form,indicate the waiver Enter the estimated construction start and completion dates that you have been granted, the name of the EPA staff using four digits for the year(i.e., 10/06/2012).Indicate to the person who granted the waiver,and the date that approval nearest quarter acre the estimated area to be disturbed. was provided. Indicate the type of construction site. See https://www.epa.gov/npdes/contact-us- Indicate whether the pre-development land use of the site stormwater#regional for a list of EPA Regional Office was used for agriculture Appendix A defines "agricultural contacts. land"as cropland,grassland,rangeland, pasture,and other agricultural land, on which agricultural and forest-related Section II.Permit Information products or livestock are produced and resource concerns Provide the master permit number of the permit under which may be addressed. Agricultural lands include cropped you are applying for coverage (see Appendix B of the woodland, marshes, incidental areas included in the general permit for the list of eligible master permit numbers) agricultural operation, and other types of agricultural land used for the production of livestock. Section III.Operator Information Indicate whether earth-disturbing activities have already Provide the legal name of the person, firm, public commenced on your project/site.If earth-disturbing activities organization, or any other entity that operates the project have commenced on your site because stormwater discharges from the site have been previously covered under a NPDES permit,you must provide the 2017 CGP NPDES ID or EPA Form 3510-9 Page 7 the NPDES permit number if coverage was under an 3 water. A list of Tier 2, 2.5, and 3 waters is provided at individual permit. https://www.epa.gov/npdes/construction-general-permit- Indicate if demolition is occurring, and if so, if the structure resources-tools-and-templates. If the answer is "yes", name has at least 10,000 square feet of floor space. all waters designated as Tier 2,Tier 2.5, or Tier 3 to which the Indicate if there are other operators covered under this site will discharge. permit for the same project site. If there are multiple Section VI.Chemical Treatment Information operators, provide the NPDES ID number for the other operators at the site who have coverage under this permit. Indicate whether the site will use polymers, flocculants, or other treatment chemicals. Indicate whether the site will Indicate whether you will be discharging dewatering water, employ cationic treatment chemicals. If the answer is "yes" as defined in Appendix A,during the course of the project.If to either question, indicate which chemical(s) you will use. you will be discharging dewatering water, indicate whether Note that you are not eligible for coverage under this permit the site from which you will be dewatering is located on a to use cationic treatment chemicals unless you notify your current or former Federal or State remediation site. Federal applicable EPA Regional Office in advance and the EPA remediation sites include cleanups covered by Superfund office authorizes coverage under this permit after you have (both National Priorities List (NPL) sites and non-NPL sites), included appropriate controls and implementation Resource Conservation and Recovery Act(RCRA)corrective procedures designed to ensure that your use of cationic actions sites, cleanups at Federal Facilities, and Federal, treatment chemicals will not lead to a violation of water State,or Tribal brownfields sites.State remediation sites could quality standards. If you have been authorized to use include,for instance,brownfield site cleanups funded by the cationic treatment chemicals by your applicable EPA State,State superfund sites,and petroleum tank release sites. Regional Office, attach a copy of your authorization letter Operators may use online mapping resources,such as EPA's and include documentation of the appropriate controls and Cleanups in My Community Map, to help determine if they implementation procedures designed to ensure that your use are located on a remediation site. The Cleanups in My of cationic treatment chemicals will not lead to a violation of Community Map is viewable at: water quality standards. Examples of cationic treatment httl2s://ordsl2ub.el2a.gov/ords/cimc/f?p=cimc:mal2::::71 chemicals include, but are not limited to, cationic polyacrylamide (C-PAM), PolyDADMAC (POLY DIALLYL Section V.Discharge Information DIMETHYL AMMONIUM CHLORIDE),and chitosan. You must confirm that you understand that the CGP only authorizes the allowable stormwater discharges listed in Part Section VII.stormwater Pollution Prevention Plan(SWPPP) 1.2.1 and the allowable non-stormwater discharges listed in and Personnel Training Information Part 1.2.2.Any discharges not expressly authorized under the All sites eligible for coverage under this permit are required to CGP are not covered by the CGP or the permit shield prepare a SWPPP in advance of filing the NOI,in accordance provision of the CWA Section 402(k) and they cannot with Part 7. Indicate whether the SWPPP has been prepared become authorized or shielded by disclosure to EPA, State, in advance of filing the NOI. or local authorities via the NOI to be covered by the permit Confirm that all required personnel, including those or by any other means (e.g., in the SWPPP or during an conducting inspections at your site, will meet the training inspection). If any discharges requiring NPDES permit requirements in Part 6 of this permit. coverage other than the allowable stormwater and non- Indicate the street,city,State,and ZIP code where the SWPPP stormwater discharges listed in Parts 1.2.1 and 1.2.2 will be discharged,they must either be eliminated or covered under can be found. Indicate the contact information (name, another NPDES permit. organization, phone, and email) for the person who developed the SWPPP for this project. Indicate whether discharges from the site will enter into a municipal separate storm sewer system (MS4), as defined in Section Vill.Endangered Species Information Appendix A. Confirm that you have included the completed ESA Also,indicate whether any waters of the U.S.exist within 50 feet worksheet from Appendix D and all required supporting from your site. Note that if"yes",you are required to comply information for your criterion selection with the submission of with the requirement in Part 2.2.1 of the permit to provide this NOI. natural buffers or equivalent erosion and sediment controls. Section IX.Historic Preservation For each unique point of discharge you list, you must specify Use the instructions in Appendix E to complete the questions the name of the first water of the U.S.that receives stormwater on the NOI form regarding historic preservation. directly from the point of discharge and/or from the MS4 that the point of discharge discharges to.You must specify whether Section X.Certification Information any waters of the U.S. that you discharge to are listed as The NOI must be signed as follows: "impaired" as defined in Appendix A, and the pollutants for which the water is impaired. You must identify any Total For a corporation: By a responsible corporate officer.For the Maximum Daily Loads (TMDL) that have been completed for purpose of this Section,a responsible corporate officer any of the waters of the U.S.that you discharge to.Operators means: may find it useful to use EPA's Discharge Mapping Tool to determine whether the water of the U.S. is impaired, the (i) a president, secretary, treasurer, or vice-president of the pollutant causing the impairment,and whether a TMDL exists corporation in charge of a principal business function,or any for the water body.The Discharge Mapping Tool is viewable at other person who performs similar policy-or decision-making https://www.epa.gov/npdes/epas-stormwater-discharge- functions for the corporation, or (ii) the manager of one or mapping-tools. more manufacturing, production, or operating facilities, provided,the manager is authorized to make management Indicate whether discharges from the site will enter into a decisions which govern the operation of the regulated water of the U.S.that is designated as a Tier 2,Tier 2.5,or Tier facility including having the explicit or implicit duty of making EPA Form 3510-9 Page 8 major capital investment recommendations, and initiating Submitting Your Form and directing other comprehensive measures to assure long- term environmental compliance with environmental laws Submit your NOI form by mail to one of the following and regulations;the manager can ensure that the necessary addresses: systems are established or actions taken to gather complete For Regular U.S.Mail Delivery: and accurate information for permit application Stormwater Notice Processing Center requirements; and where authority to sign documents has Mail Code 4203M,ATTN:2022 CGP been assigned or delegated to the manager in accordance U.S.EPA with corporate procedures. 1200 Pennsylvania Avenue,NW For a partnership or sole proprietorship: By a general partner Washington, DC 20460 or the proprietor,respectively;or For Overnight/Express Mail Delivery: Stormwater Notice Processing Center For a municipality, State, Federal, or other public agency: By William Jefferson Clinton East Building-Room 7420 either a principal executive officer or ranking elected official. ATTN:2022 CGP For purposes of this Part, a principal executive officer of a U.S.EPA Federal agency includes (i) the chief executive officer of the 1201 Constitution Avenue, NW agency,or(ii) a senior executive officer having responsibility Washington, DC 20004 for the overall operations of a principal geographic unit of the agency(e.g.,Regional Administrator of EPA).Include the Visit this website for instructions on how to submit name and title of the person signing the form and the date electronically: of signing. An unsigned or undated NOI form will not be considered eligible for permit coverage. https://v��ww.epa.aov/npdes/stormwater-discharges- construction-activities#ereportina Modifying Your NOI If you have been granted a waiver from your Regional Office from electronic reporting,and if after submitting your NOI you need to correct or update any fields on this NOI form,you may do so by indicating changes on this same form. Paperwork Reduction Act Notice This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2040-0305). Responses to this collection of information are mandatory (40 CFR 122.26). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.The public reporting and recordkeeping burden for this collection of information is estimated to be 3.3 hours per response. Send comments on the Agency's need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821 T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address. Page 9 EPA Form 3510-9 Appendix I - Notice of Termination (NOT) Form and Instructions Part 8.3 requires you to use the NPDES eReporting Tool, or "NeV system, to prepare and submit your NOT electronically. However, if the EPA Regional Office grants you a waiver to use a paper NOT form, and you elect to use it, you must complete and submit the following form. U.S.Environmental Protection Agency OMB No. Form NPDES �� Washington,DC 20460 2040-0305 3510-13PA Exp.Date Notice of Termination for the 2022 NPDES Construction General Permit 01/31/2025 Submission of this Notice of Termination constitutes notice that the operator identified in Section III of this form is no longer authorized discharge pursuant to the NPDES Construction General Permit(CGP)from the site identified in Section IV of this form.All necessary information must be included on this form. Refer to the instructions at the end of this form. SECTION '• TO USE PAPER NOI •• E NOT MUST BE SUBMITTED THROUGH E-FILING AS PER SWPPP INSTRUCTIONS. OPERATORS PLEASE NOTE: O PDF FORM FILLED OUT FOR INFORMATIVE PURPOSES ONLY. THE ONLINE NOI TO THAN PROVIDED ON THIS FORM. SHOULD ANY ADDITIONAL INFORMATION BE BE FILLED OUT MAY BE FORMATTED DIFFERENTLY AND REQUIRE MORE DETAILS NEEDED, PLEASE CONTACT VHB. Q a SECTION •' • NPDES ID You have completed all construction activities at your site,and you have met all other requirements in Part 8.2.1. Check this box to confirm that you have attached photographs as required by Part 8.2.1.a that document your compliance with the permit's final stabilization requirements. Include the date each photograph was taken,and a brief description of the area of the site captured by the photograph(e.g.,photo shows application of seed and erosion control mats to ❑ remaining exposed surfaces on northeast corner of site). Reason for Termination (Check only one): If any portion of your site is covered by one of the Part 2.2.14c.iii exceptions to the final stabilization criteria,indicate which exception applies and include a supplementary explanation with your photographs that provides the necessary context for why this portion of the site is in compliance even though it appears to be unstabilized. El Another operator has assumed control over all areas of the site and that operator has submitted an NOI and obtained coverage under the CGP. El You have obtained coverage under an individual permit or another general NPDES permit addressing stormwater discharges from the construction site. SECTIONOPERATOR INFORMATION Operator Name Mailing Address o Street a E 0 c City State ZIP Code 0 a 0 County or Similar Government Division CL O Phone Number Email Address EPA Form 3510-13 Page 1 SECTION •JECT/SITE INFORMATIO Proiect/Site Name LECTURE HALL AT MERRIMACK COLLEGE N Street/Location Q315 TURNPIKE STREET City State ZIP Code u NORTH ANDOVER MA 01845 W 0 CL County or Similar Government Division: ESSEX COUNTY SECTION V.CERTIFICATION •• • certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false p information,including the possibility of fine and imprisonment for knowing violations. a E First Name Middle Initial Last Name O C O Title a U USignature Date(MM/DD/YYYY) Email Address EPA Form 3510-13 Page 2 Instructions for Completing EPA Form 3510-13 Notice of Termination for the 2022 NPDES Construction General Permit NPDES Form Date(02/22) This Form Replaces Form 3510-13(02/17) Form Approved OMB No.2040-0305 General Instructions photographs that describes why this portion of the site is in compliance even though it may appear to be unstabilized. Who May File an NOT Form? Permittees who are presently covered under the EPA-issued Section III.Operator Information 2022 Construction General Permit (CGP) for Stormwater Provide the legal name of the person, firm, public Discharges Associated with Construction Activity may submit organization, or any other entity that operates the project an NOT form when: (1) earth-disturbing activities at the site described in this NOT and is covered by the NPDES ID are completed and the conditions in Parts 8.2.1.a through identified in Section II. Enter the complete mailing address, 8.2.1.b are met;or(2) the permittee has transferred all areas telephone number,and email address of the operator. under its control to another operator,and that operator has submitted and obtained coverage under this permit; or (3) Section IV.Project/Site Information the permittee has obtained coverage under a different Enter the official or legal name and complete street address, NPDES permit for the same discharges. including city, State, ZIP code, and county or similar government subdivision of the project or site.If the project or Completing the Form site lacks a street address, indicate the general location of Type or print, using uppercase letters, in the appropriate the site (e.g., Intersection of State Highways 61 and 34). areas only.Please place each character between the marks. Complete site information must be provided for termination Abbreviate if necessary to stay within the number of of permit coverage to be valid. characters allowed for each item. Use only one space for breaks between words, but not for punctuation marks unless Section V.Certification Information they are needed to clarify your response. If you have any The NOT,must be signed as follows: questions about this form, refer to httl2s://www.epa.gov/npdes/stormwater-discharges- For a corporation: By a responsible corporate officer. For the purpose of this Part, a responsible corporate officer means: construction-activities#cap or telephone EPAs NOI Processing Center at (866) 352-7755. Please submit original (i) a president, secretary, treasurer, or vice-president of the document with signature in ink- do not send a photocopied corporation in charge of a principal business function,or any signature. other person who performs similar policy-or decision-making functions for the corporation, or (ii) the manager of one or Section I.Approval to Use Paper NOI Form more manufacturing, production, or operating facilities, provided,the manager is authorized to make management You must indicate whether you have been granted a waiver decisions which govern the operation of the regulated from electronic reporting from the EPA Regional Office.Note facility including having the explicit or implicit duty of making that you are not authorized to use this paper NOT form unless major capital investment recommendations, and initiating the EPA Regional Office has approved its use. Where you and directing other comprehensive measures to assure long- have obtained approval to use this form,indicate the waiver term environmental compliance with environmental laws that you have been granted, the name of the EPA staff and regulations;the manager can ensure that the necessary person who granted the waiver,and the date that approval systems are established or actions taken to gather complete was provided. and accurate information for permit application See https://www.epa.gov/npdes/contact-us- requirements; and where authority to sign documents has stormwater#regional for a list of EPA Regional Office been assigned or delegated to the manager in accordance contacts. with corporate procedures. Section II.Permit Information For a partnership or sole proprietorship: By a general partner or the proprietor,respectively;or Enter the existing NPDES ID assigned to the project.If you do not know the NPDES ID number, or contact EPA's NOI For a municipality, State, Federal, or other public agency: By Processing Center at (866) 352-7755. either a principal executive officer or ranking elected official. For purposes of this Part, a principal executive officer of a Indicate your reason for submitting this Notice of Termination Federal agency includes(i) the chief executive officer of the by checking the appropriate box. Check only one. If you agency,or(ii) a senior executive officer having responsibility selected the first box, confirm that you have attached for the overall operations of a principal geographic unit of photographs as required by Part 8.2.1.a. All submitted the agency(e.g., Regional Administrator of EPA). photographs must: (1) be taken both before and after the site has met the final stabilization criteria in Part 2.2.14.c; (2) Include the name, title, and email address of the person be clear and in focus, and in the original format and signing the form and the date of signing. An unsigned or resolution; and (3) include the date each photograph was undated NOT form will not be considered valid termination of taken,and a brief description of the area of the site captured permit coverage. by the photograph (e.g., photo shows application of seed and erosion control mats to remaining exposed surfaces on Paperwork Reduction Act Notice northeast corner of site). This collection of information is approved by OMB under the If any portion of your site is covered by one of the Part Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMBControl No. 2040-0305). Responses to this collection of 2.2.14c.iii final stabilization exceptions, indicate which information are mandatory (40 CFR 122.26).An agency may exception applies and provide an explanation with your not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a EPA Form 3510-13 Page 3 currently valid OMB control number.The public reporting and recordkeeping burden for this collection of information is estimated to be 1.2 hours per response.Send comments on the Agency's need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821 T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address. Submitting Your Form Submit your NOT form by mail to one of the following addresses: For Regular U.S.Mail Delivery: Stormwater Notice Processing Center Mail Code 4203M,ATTN:2022 CGP U.S. EPA 1200 Pennsylvania Avenue, NW Washington,DC 20460 For Overnight/Express Mail Delivery: Stormwater Notice Processing Center William Jefferson Clinton East Building-Room 7420 ATTN:2022 C G P U.S. EPA 1201 Constitution Avenue, NW Washington,DC 20004 Visit this website for instructions on how to submit electronically: httl2s://www.el2a.gov/npdes/stormwater-discharges- construction-activities#ereporting EPA Form 3510-13 Page 4 iiriirn t iir III::1 III III u t iii in III:°'luaus iir)t ii in III:::.,III in( III:°:1 III:°)III:°)) Maink III ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix D: Site Inspection Form an Dewatering Inspection Form applicable) D-1 Appendix D:Site Inspection Form and Dewatering Inspection Form EPA Site Inspection Form: 2022 Construction General Permit Site Inspection Report Project Name: [enter] ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ NPDES ID Number: [enter] .................................................................................................................................................................................................................................................................................................................................................... SECTION A—SITE INSPECTION REPORT FORM (CGP PART 4.6.3) (If necessary,complete additional inspection reports for each separate inspection location.) Inspector Information Inspector Name: [enter] Title: [enter] Company Name: [enter] Email: [enter] Address: [enter] Phone: [enter] Inspection Details Inspection Date: [enter] Inspection Location: [enter] Inspection Start Time: [enter] Inspection End Time: [enter] Current Phase on Weather Conditions Construction: [enter] during Inspection: [enter] .................................................................................................................................................................................................................................................................... Did you determine that any portion of your site was unsafe for inspection per CGP Part 4.5? Yes ❑ No ❑ If"Yes," provide the following information: [enter] ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Location of unsafe conditions: [enter] ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... The conditions that prevented you inspection this location: [enter] ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Indicate the required inspection frequency: (Check all that apply.You may be subject to different inspection frequencies in different areas of the site.) Standard Frequency(CGP Part 4.2): ❑ At least once every 7 calendar days;OR ❑ Once every 14 calendar days and within 24 hours of the occurrence of either: A storm event that produces 0.25 inch or more of rain within a 24-hour period, or A snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period Increased Frequency(CGP Part 4.3.1) (If site discharges to sediment or nutrient-impaired waters or to waters designated as Tier 2,Tier 2.5,or Tier 3): o Once every 7 calendar days and within 24 hours of the occurrence of either: A storm event that produces 0.25 inches or more of rain within a 24-hour period, or A snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period Reduced Frequency(CGP Part 4.4): ❑ For stabilized areas:Twice during first month, no more than 14 calendar days apart;then once per month after first month until permit coverage is terminated ❑ For stabilized areas on "linear construction sites":Twice during first month, no more than 14 calendar days apart; then once more within 24 hours of the occurrence of either: A storm event that produces 0.25 inches or more of rain within a 24-hour period, or A snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period ❑ For arid, semi-arid, or drought-stricken areas during seasonally dry periods or during drought:Once per month and within 24 hours of the occurrence of either: A storm event that produces 0.25 inches or more of rain within a 24-hour period, or A snowmelt discharge from a storm event that produces 3.25 inches or more of snow within a 24-hour period ❑ For frozen conditions where construction activities are being conducted:Once per month Was this inspection triggered by a storm event producing 0.25 inches or more of rain within a Yes ❑ 24-hour period? No ❑ If"Yes," how did you determine whether the storm produced 0.25 ❑ On-site rain gauge inches or more of rain? ❑ Weather station representative of site. Weather station location: [enter] ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Total rainfall amount that triggered the inspection (inches): ................................................................................. Was this inspection triggered by a snowmelt discharge from a storm event producing-3.25 inches or Yes ❑ more of snow within a 24-hour period? No ❑ If"Yes," how did you determine whether the storm produced 3.25 ❑ On-site rain gauge inches or more of snow? ❑ Weather station representative of site. Weather station location: [enter] ........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Total snowfall amount that triggered the inspection (inches): [enter] ................................................................................. EPA DewateringInspection Form Project Name: [enter] ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ NPDES ID Number: [enter] ........................................................................................................................................................................................................................................................................................................................................... Section A — Dewatering Discharges Inspection Form (CGP Part 4.6.3) Complete this section within 24 hours of completing the inspection. (If necessary, complete additional inspection reports for each separate inspection location.) Inspector Information Inspector Name: [enter] Title: [enter] Company Name: [enter] Email: [enter] Address: [enter] Phone: [enter] Inspection Details Inspection Date: [enter] Inspection Location: [enter] Discharge Start Time: [enter] Discharge End Time: [enter] Rate of Discharge(gallons per day) [enter] Corrective Action Required?' Yes ❑ No ❑ ................................................................................................................................................................... Describe Indicators of Pollutant Discharge at Point of Dewatering Discharge:' [enter] ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Attach photographs of: 1. Dewatering water prior to treatment by a dewatering control(s) and the final discharge after treatment; and 2. Dewatering control(s); and 3. Point of discharge to any receiving waters flowing through or immediately adjacent to the site and/or to constructed or natural site drainage features, storm drain inlets, and other conveyances to receiving waters. 1 If you observe any of the following indicators of pollutant discharge,you are required to take corrective action under Part 5.1.5.b: a sediment plume,suspended solids,unusual color,presence of odor,decreased clarity,or presence of foam;or a visible sheen on the water surface or visible oily deposits on the bottom or shoreline of the receiving water. Section B — Signature and Certification (CGP Part 4.7.2) "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information contained is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." MANDATORY: Signature of Operator or"Duly Authorized Representative:" Signature: [enter] .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Printed Name: [enter] .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... OPTIONAL: Signature of Contractor or Subcontractor Signature: [enter] .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Printed Name: [enter] .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... General Tips for UsingThis Template This Dewatering Inspection Report Template is provided to assist you in preparing dewatering inspection reports for EPA's 2022 Construction General Permit (CGP). If you are covered under the 2022 CGP, you can use this template to create a dewatering inspection report form that complies with the minimum reporting requirements of Part 4.6.3 of the permit. Note that the use of this form is optional; you may use your own inspection report form provided it includes the minimum information required in Part 4.6.3 of the CGP. This template is for dewatering inspections only.A separate site inspection report template that does not include dewatering inspections and complies with the minimum reporting requirements of Part 4.7 of the permit is available at h,.�,. s: a v in s c instiruc,.i in n it I irirnit,.....ir sources,.....t Is,..... n m I tes. If you are covered under a State CGP, this template may be helpful in developing a report that can be used for that permit; however, it will need to be modified to meet the specific requirements of that permit. If your permitting authority requires you to use a specific inspection report form, you should not use this form. The following tips for using this template will help you ensure that the minimum permit requirements are met. > Review the inspection requirements. Before you start developing your inspection report form, read the CGP's Part 4 inspection requirements.This will ensure that you have a working understanding of the permit's underlying inspection requirements. > Complete all required blank fields. Fill out all blank fields. Only by filling out all fields will the template be compliant with the requirements of the permit. (Note: Where you do not need the number of rows provided in the template form for your inspection, you may delete these as you see fit. Or, if you need more space to document your findings,you may insert additional rows in the electronic version of this form or use the bottom of the page in the field version of this form.) > Use your site map to document inspection findings. In several places in the template, you are directed to specify the location of certain features of your site, including where stormwater controls are installed and where you will be stabilizing exposed soil.You are also asked to fill in location information for unsafe conditions and the locations of any discharges occurring during your inspections.Where you are asked for location information, EPA encourages you to reference the point on your SWPPP site map that corresponds to the requested location on the inspection form. Using the site map as a tool in this way will help you conduct efficient inspections, will assist you in evaluating problems found, and will ensure proper documentation. > Include the inspection form with your SWPPP. Once your form is complete, make sure to include a copy of the inspection form in your SWPPP in accordance with Part 7.2.7.e of the CGP. > Retain copies of all inspection reports with your records.You must also retain copies of all inspection reports in your records in accordance with the requirements in Part 4.7.3 of the CGP.These reports must be retained for at least 3 years from the date your permit coverage expires or is terminated in accordance with the requirements in Part 4.7.4 of the CGP. Instructions for Section A Inspector Name Enter the name of the person that conducted the inspection. Include the person's [enter] contact information (title,affiliated company name,address, email,and phone number). Inspection Date Enter the date you performed the inspection. [enter] Inspection Location If your project has multiple locations where you conduct separate dewatering [enter] inspections,specify the location where this inspection is being conducted.Otherwise, you can enter"dewatering operation." Discharge Start and End Times Enter the approximate time the dewatering discharge started and ended on the day of [enter] the inspection Rate of Discharge Enter the rate of discharge in gallons per day on the day of inspection. [enter] To estimate the approximate discharge rate on the day of dewatering inspection,one approach is to use the manufacturer's design pump rating for the pump model in use. For example,a pump rated at 164 gpm (gallons per minute) by the manufacturer can be assumed to be discharging at 164 gpm in most cases.To convert to gallons per day, multiply the rate in gpm by the ratio of minutes in one-day(1,440 minutes per day), resulting in a discharge rate of 236,160 gallons per day. In cases where the dewatering discharge is being pumped over long distances or a substantial distance uphill,which will result in a reduced pump rate relative to manufacturer's specification,the operator may improve the accuracy of the estimate by estimating the time required to fill a container of a known volume. For example, if it takes 60 seconds to fill an empty 55-gallon barrel,the estimated discharge rate is 55 gpm, or 79,200 gallons per day. Indicators of Pollutant Discharge For the point of discharge, describe any observed sediment plume, [enter] suspended solids, unusual color, presence of odor, decreased clarity, presence of foam;and or a visible sheen on the water surface or visible oily deposits on the bottom or shoreline of the receiving water. Corrective Action Required? Answer"Yes"if during your inspection you found any of the conditions listed above in the instructions for Yes ❑ the Indicators of Pollutant Discharge section. If you answer"Yes,"you must take corrective action and No ❑ complete a corrective action log,found at ht .I s: .e aw ov n des construction eneiraIl eir�irnit,.... resources. . .tools and t........ir ��llates.Answer"No" if you did not observe any of the listed pollutant indicators. Photographs As required in CGP Part 8.2.1.a, attach photos of: (1) dewatering water prior to treatment by a dewatering control(s) and the final discharge after treatment; (2)the dewatering control(s);and (3)the point of discharge to any receiving waters flowing through or immediately adjacent to the site and/or to constructed or natural site drainage features, storm drain inlets,and other conveyances to receiving waters.__ Instructions for Section B Each inspection report must be signed and certified to be considered complete (CGP Part 4.7.2). Operator or "Duly Authorized Representative" — MANDATORY (CGP Appendix G Part G.11.2 and CGP Appendix H Section X) At a minimum, the dewatering inspection report must be signed by either (1) the person who signed the NOI, or (2) a duly authorized representative of that person. The following requirements apply: If the signatory will be the person who signed the NOI for permit coverage, as a reminder, that person must be one of the following types of individuals: For a corporation: By a responsible corporate officer. For the purpose of this subsection, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. For a partnership or sole proprietorship: By a general partner or the proprietor, respectively. For a municipality, State, Federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this subsection, a principal executive officer of a Federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). If the signatory will be a duly authorized representative, the following requirements must be met: The authorization is made in writing by the person who signed the NOI (see above); The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and The signed and dated written authorization is included in the SWPPP.A copy must be submitted to EPA, if requested. Sign, date and print your name and affiliation. Contractor or Subcontractor - OPTIONAL Where you rely on a contractor or subcontractor to complete the dewatering inspection report,you should consider requiring the individual(s) to sign and certify each report. Note that this does not relieve you, the permitted operator, of the requirement to sign and certify the dewatering inspection report as well. If applicable, sign, date, and print your name and affiliation. Note While EPA has made every effort to ensure the accuracy of all instructions contained in this template, it is the permit, not this template, that determines the actual obligations of regulated construction stormwater discharges. In the event of a conflict between this template and any corresponding provision of the CGP, you must abide by the requirements in the permit. EPA welcomes comments on this Dewatering Inspection Report Template at any time and will consider those comments in any future revision. You may contact EPA for CGP- related inquiries at cap@epa.gov ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix E: Corrective Action Log E-1 Appendix E:Corrective Action Log Appendix E - Copy of Corrective Action Log INSERT COPY OF CORRECTIVE ACTION LOG YOU WILL USE (Note: EPA has developed a sample corrective action log that CGP operators can use. The form is available at https://www.epa.gov/npdes/stormwater-discharges-construction-activities#resources) or see below: 2022 CGP Corrective Action Log Project Name: [enter] ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... NPDES ID Number: [enter] ............................................................................................................................................................................................................................................................................................................... Section A — Individual Completing this Log Name: [enter] Title: [enter] Company Name: [enter] Email: [enter] Address: [enter] Phone Number: [enter] Section B — Details of the Problem (CGP Part 5.4.1.a) Complete this section within 24 hours of discovering the condition that triggered corrective action. Date problem was first identified; [enter] Time problem was first identified: [enter] What site conditions triggered this corrective action? (Check the box that applies. See instructions for a description of each triggering condition (1 through 6). ❑ 1 ❑ 2 ❑ 3 ❑ 4 ❑ 5a ❑ 5b ❑ 6 Specific location where problem identified: ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Provide a description of the specific condition that triggered the need for corrective action and the cause (if identifiable) [enter] .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Section C — Corrective Action Completion (CGP Part 5.4.1.b) Complete this section within 24 hours after completing the corrective action. For site condition#1, 2, 3,4,or 6 (those not related to a dewatering discharge)confirm that you met the following deadlines(CGP Part 5.2.1): ❑ Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events.AND ❑ Completed corrective action by the close of the next business day, unless a new or replacement control,or significant repair,was required.OR ❑ Completed corrective action within seven (7) calendar days from the time of discovery because a new or replacement control,or significant repair,was necessary to complete the installation of the new or modified control or complete the repair.OR ❑ It was infeasible to complete the installation or repair within 7 calendar days from the time of discovery. Provide the following additional information: Explain why 7 calendar days was infeasible to complete the installation or repair: [enter] .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Provide your schedule for installing the stormwater control and making it operational as soon as feasible after the 7 calendar days: [enter] .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... For site condition#5a, 5b,or 6(those related to a dewatering discharge),confirm that you met the following deadlines: ❑ Immediately took all reasonable steps to minimize or prevent the discharge of pollutants until a solution could be implemented, including shutting off the dewatering discharge as soon as possible depending on the severity of the condition taking safety considerations into account. ❑ Determined whether the dewatering controls were operating effectively and whether they were causing the conditions. ❑ Made any necessary adjustments, repairs, or replacements to the dewatering controls to lower the turbidity levels below the benchmark or remove the visible plume or sheen. Describe any modification(s)made as part of Date of SWPPP If yes,date SWPPP was updated: corrective action:(Insert additional rows below if completion: update applicable) necessary? 1. ❑ Yes ❑ No 2. ❑ Yes ❑ No Section D - Signature and Certification (CGP Part 5.4.2) "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information contained therein. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information contained is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." MANDATORY: Signature of Operator or"Duly Authorized Representative:" Signature: Date: Printed Name: Affiliation: OPTIONAL: Signature of Contractor or Subcontractor Signature: Date: Printed Name: Affiliation: General Instructions This Corrective Action Log Template is provided to assist you creating a corrective action log that complies with the minimum reporting requirements of Part 5.4 of the EPA's Construction General Permit (CGP). For each triggering condition on your site,you will need to fill out a separate corrective action log. The entire form must be completed to be compliant with the requirements of the permit. (Note: In Section C, if you do not need the number of rows provided in the corrective action log, you may delete these or cross them off.Alternatively, if you need more space to describe any modifications, you may insert additional rows in the electronic version of this form or use the bottom of the page in the field version of this form.) If you are covered under a State CGP, this template may be helpful in developing a log that can be used for that permit; however, you will likely need to modify this form to meet the specific requirements of any State- issued permit. If your permitting authority requires you to use a specific corrective action log, you should not use this template. Instructions for Section A Individual completing this form Enter the name of the person completing this log. Include the person's contact information (title, affiliated company name, address, email, and phone number). Instructions for Section B You must complete Section B within 24 hours of discovering the condition that triggered corrective action. (CGP Part 5.4) When was the problem first discovered?Specify the date and time when the triggering condition was first discovered. ❑ AM Date: Time: El PM ............................................................................................................................................................... What site conditions triggered this corrective action? (CGP Parts 5.1 and 5.3) [enter] .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Check the box corresponding to the numbered triggering condition below that applies to your site. ❑ 1. A stormwater control needs a significant repair or a new or replacement control is needed, or, in accordance with Part 2.1.4c,you find it necessary to repeatedly(i.e., 3 or more times) conduct the same routine maintenance fix to the same control at the same location (unless you document in your inspection report under Part 4.7.1 c that the specific reoccurrence of this same problem should still be addressed as a routine maintenance fix under Part 2.1.4); ❑ 2. A stormwater control necessary to comply with the requirements of this permit was never installed, or was installed incorrectly; ❑ 3. Your discharges are not meeting applicable water quality standards; ❑ 4. A prohibited discharge has occurred (see Part 1.3); ❑ 5. During discharge from site dewatering activities: a. The weekly average of your turbidity monitoring results exceeds the 50 NTU benchmark(or alternate benchmark if approved by EPA pursuant to Part 3.3.2b); or b. You observe or you are informed by EPA, State, or local authorities of the presence of any of the following at the point of discharge to a receiving water flowing through or immediately adjacent to your site and/or to constructed or natural site drainage features or storm drain inlets: • sediment plume • suspended solids • unusual color • presence of odor • decreased clarity • presence of foam • visible sheen on the water surface or visible oily deposits on the bottom or shoreline of the receiving water ❑ 6. EPA requires corrective action as a result of permit violations found during an inspection carried out under Part 4.8. Provide a description of the problem (CGP Part 5.4.1.a) Provide a summary description of the condition you found that triggered corrective action,the cause of the problem (if identifiable),and the specific location where it was found. Be as specific as possible about the location; it is recommended that you refer to a precise point on your site map. [enter] ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Instructions for Section C You must complete Section C within 24 hours after completing the correction action. (CGP Part 5.4) Deadlines for completing corrective action for condition#1, 2, 3,4, or 6 (if not relating to a dewatering discharge) (CGP Part 5.2.1) ❑ Check the box to confirm that you met the deadlines that apply to each triggering condition.You are always required to check the first box(i.e., Immediately took all reasonable steps to address the condition, including cleaning up any contaminated surfaces so the material will not discharge in subsequent storm events.).Only one of the next three boxes should be checked depending on the situation that applies to this corrective action. ❑ Check the second box if the corrective action for this particular triggering condition does not require a new or replacement control, or a significant repair.These actions must be completed by the close of the next business day from the time of discovery of the condition. ❑ Check the third box if the corrective action for this particular triggering condition requires a new or replacement control,or a significant repair.These actions must be completed by no later than seven calendar days from the time of discover of the condition. ❑ Check the fourth box if the corrective action for this particular triggering condition requires a new or replacement control, or a significant repair,and if it is infeasible to complete the work within seven calendar days.Additionally,you will need to fill out the table below the checkbox that requires: 1. An explanation as to why it was infeasible to complete the installation or repair within seven calendar days of discovering the condition. 2. Provide the schedule you will adhere to for installing the stormwater control and making it operational as soon as feasible after the seventh day following discovery. Note:Per Part 5.2.1.c,where these actions result in changes to any of the stormwater controls or procedures documented in your SWPPP,you must modify your SWPPP accordingly within seven calendar days of completing this work. Deadlines for completing corrective action for condition#5a, 5b,or 6 related to a dewatering discharge(CGP Part 5.2.2) These deadlines apply to conditions relating to construction dewatering activities. Check the box to confirm that you met the deadlines that apply to each triggering condition.You are required to check all of the boxes in this section to indicate your compliance with the corrective action deadlines. List of modification(s)to correct problem Provide a list of modifications you completed to correct the problem. Date of completion Enter the date you completed the modification.The work must be completed by the deadline you indicated above. SWPPP update necessary? Check"Yes"or"No"to indicate if a SWPPP update is necessary consistent with Part 7.4.1.a in order to reflect changes implemented at your site. If"Yes,"then enter the date you updated your SWPPP.The SWPPP updates must be made within seven calendar days of completing a corrective action. (CGP Part 5.2.1.c) Instructions for Section D Each corrective action log entry must be signed and certified following completion of Section D to be considered complete. (CGP Part 5.4.2) Operator or"Duly Authorized Representative"— MANDATORY(CGP Appendix G Part G.11.2 and CGP Appendix H Section X) At a minimum, the corrective action log must be signed by either (1) the person who signed the NOI, or (2) a duly authorized representative of that person.The following requirements apply: If the signatory will be the person who signed the NOI for permit coverage, as a reminder, that person must be one of the following types of individuals: For a corporation: By a responsible corporate officer. For the purpose of this subsection, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. For a partnership or sole proprietorship: By a general partner or the proprietor, respectively. For a municipality, State, Federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this subsection, a principal executive officer of a Federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). If the signatory will be a duly authorized representative,the following requirements must be met: The authorization is made in writing by the person who signed the NOI (see above); The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and The signed and dated written authorization is included in the SWPPP.A copy must be submitted to EPA, if requested. Sign, date and print your name and affiliation. Signature: Date: Printed Name: Affiliation: Contractor or Subcontractor- OPTIONAL Where you rely on a contractor or subcontractor to complete this log and the associated corrective action, you should consider requiring the individual(s) to sign and certify each log entry. Note that this does not relieve you, the permitted operator, of the requirement to sign and certify the log as well. If applicable, sign, date, and print your name and affiliation. Signature: Date: Printed Name: Affiliation: Recordkeeping Logs must be retained for at least 3 years from the date your permit coverage expires or is terminated. (CGP Part 5.4.4) Keep copies of your signed corrective action log entries at the site or at an easily accessible location so that it can be made immediately available at the time of an on-site inspection or upon request by EPA.(CGP Part 5.4.3) Include a copy of the corrective action log in your SWPPP. (CGP Part 7.2.7.e) Note While EPA has made every effort to ensure the accuracy of all instructions contained in this template, it is the permit, not this template, that determines the actual obligations of regulated construction stormwater discharges. In the event of a conflict between this template and any corresponding provision of the CGP,you must abide by the requirements in the permit. EPA welcomes comments on this Corrective Action Log Template at any time and will consider those comments in any future revision. You may contact EPA for CGP- related inquiries at. . P e a. v. iiriirn t iir III::1 III III u t iii iin III:°I luaus iir)t iii iin III:::.,III in( III:°:l III:°)III:°)) Maink III ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix F: SWPPP Amen ment Log F-2 Appendix F:SWPPP Amendment Log Instructions (see CGP Part 7.4): — Create a log here of changes and updates to the SWPPP.You may use the table below to track these modifications. — SWPPP modifications are required pursuant to CGP Part 7.4.1 in the following circumstances: ✓ Whenever new operators become active in construction activities on your site, or you make changes to your construction plans, stormwater controls, or other activities at your site that are no longer accurately reflected in your SWPPP (this includes changes made in response to corrective actions triggered under CGP Part 5); ✓ To reflect areas on your site map where operational control has been transferred (and the date of transfer) since initiating permit coverage; ✓ If inspections or investigations determine that SWPPP modifications are necessary for compliance with this permit; ✓ Where EPA determines it is necessary to install and/or implement additional controls at your site in order to meet requirements of the permit; ✓ To reflect any revisions to applicable Federal, State, Tribal, or local requirements that affect the stormwater control measures implemented at the site; and ✓ If applicable, if a change in chemical treatment systems or chemically-enhanced stormwater control is made, including use of a different treatment chemical, different dosage rate, or different area of application. Date of Amendment Prepared by Description of the Amendment Amendment [Name(s) and Title] INSERT DATE INSERT DATE INSERT DATE INSERT DATE INSERT DATE INSERT DATE INSERT DATE INSERT DATE ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix G: Su contractor Certi ications Agreements G-1 Appendix G:Subcontractor Certifications/Agreements Appendix G - Subcontractor Certifications/Agreements SUBCONTRACTOR CERTIFICATION STORMWATER POLLUTION PREVENTION PLAN Project Number: Project Title: Lecture Hall Project at Merrimack College Operator(s): As a subcontractor,you are required to comply with the Stormwater Pollution Prevention Plan (SWPPP) for any work that you perform on-site.Any person or group who violates any condition of the SWPPP may be subject to substantial penalties or loss of contract.You are encouraged to advise each of your employees working on this project of the requirements of the SWPPP.A copy of the SWPPP is available for your review at the office trailer. Each subcontractor engaged in activities at the construction site that could impact stormwater must be identified and sign the following certification statement: I certify under the penalty of law that I have read and understand the terms and conditions of the SWPPP for the above designated project and agree to follow the practices described in the SWPPP. This certification is hereby signed in reference to the above named project: Company: Address: Telephone Number: Type of construction service to be provided: Signature: Title: Date: iirim t iir III::1 III III u t iii in III:°'luaus iir)t iii in III:::.,III in( III:°:I III:°)III:°)) Maink III ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix H• Grading a Log H-1 Appendix H:Grading and Stabilization Log Sample Gradingand Stabilization Activities Log Date Grading Activity Ceased Date When Date Grading Description of (Indicate Stabilization Activity Description of Stabilization Measure Temporary or Measures Initiated Grading Activity and Location Permanent) Initiated INSERT DATE INSERT DATE INSERT DATE ❑Temporary ❑ Permanent INSERT DATE INSERT DATE INSERT DATE ❑Temporary ❑ Permanent INSERT DATE INSERT DATE INSERT DATE ❑Temporary ❑ Permanent INSERT DATE INSERT DATE INSERT DATE ❑Temporary ❑ Permanent INSERT DATE INSERT DATE INSERT DATE ❑Temporary ❑ Permanent INSERT DATE INSERT DATE INSERT DATE ❑Temporary ❑ Permanent INSERT DATE INSERT DATE INSERT DATE ❑Temporary 0 Permanent INSERT DATE INSERT DATE INSERT DATE ❑Temporary ❑ Permanent ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix I: TrainingDocumentation 1-1 Appendix I:Training Documentation Owner/Contractor/Consultant to insert Training Documentation here. Storrnwater III::1 III III u t iii in III:°I luaus iir)t iii in III:::.,III in( III:°:I III:°)III:°)) Maink III ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix J• Delegation f Authority J-1 Appendix J:Delegation of Authority Sample Delegation of AuthorityForm Delegation of Authority I, [enter] , hereby designate the person or specifically described position below to be a ..................................................................................................................................................................................................................................................... duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the EPA's Construction General Permit (CGP), at the [enter] ................................................................................................................................................................................................................................................................................................................................................................................................................................................ construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. [enter] (name of person or position) ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... [enter] (company) ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... [enter] (address) ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... [enter] (city, state, zip) ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... [enter] (phone) ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in Appendix G of EPA's CGP, and that the designee above meets the definition of a "duly authorized representative" as set forth in Appendix G. certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: [enter] Company: [enter] Title [enter] Signature: [enter] Date: [enter] t iiriirn t iir III::1 III III u t iii in III:°I luaus iir)t iii in III:::.,III in( III:°:l III:°)III:°)) Maink III ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix K: EndangeredSpecies Documentation K-1 Appendix K:Endangered Species Documentation 2022 Construction General Permit (CGP) NPDES Farm 1 7 OMB No., 24 3 5, Exp. Date 1. 3 2 Appendix D - Eligibility Worksheet Relating to Threatened and Endangered Species Protection D.1 Introduction This appendix provides a printable worksheet that can be helpful in selecting and documenting your eligibility criteria with respect to the protection of Federally listed threatened or endangered species and Federally designated "critical habitat" under the Endangered Species Act (ESA) [hereinafter "ESA-listed species and designated critical habitat(s)"] from discharges and discharge-related activities authorized under this permit. This is important because Section 9 of the ESA prohibits all persons and agencies from "taking" threatened and endangered species (16 U.S.C. § 1532(19)). While coordination between you and the U.S. Fish and Wildlife Service (USFWS) and/or the National Marine Fisheries Service (NMFS) (together, referred to as the "Services") may not be required in all cases, EPA encourages you to coordinate with the Services, to document that coordination, and to do so early in the planning process prior to submitting your NOI. D.2 Certifying ESA Eligibility Criterion for the CGP To be eligible for coverage under the CGP, you must certify that you meet one of the criteria listed in this worksheet (Section D.5), which is then submitted with your NOI for coverage under this permit. If you do not meet one of the ESA eligibility criteria outlined in the worksheet below, you are not eligible for coverage under this permit. These criteria ensure that coverage is available only for discharges and discharge-related activities that (1) avoid or eliminate any short- or long-term adverse effects to ESA-listed species and designated critical habitat(s), or (2) may result in any short- or long-term adverse effects that result in incidental take addressed under the incidental take statement of a biological opinion or permit for take issued under Section 10 of the ESA. As part of your determination of eligibility, EPA has developed a worksheet that assists operators in arriving at the correct criterion. The following requirements apply to the completion of the worksheet depending on how you are submitting your NOI for permit coverage: 1 . If the EPA Regional Office grants you a waiver from electronic reporting, in accordance with Part 1.1.5 of the CGP, you must complete the worksheet in section DA of this appendix to provide all information as required on your NOI that supports the eligibility criterion you qualify under per Part 1.1.5 of the permit. You must submit the worksheet with your NOI. If you do not submit the worksheet with your NOI, your NOI will be considered incomplete. 2. If you do not have a waiver from electronic reporting, you must complete your eligibility criteria selection outlined in the Endangered Species Protection section of the NOI in the NPDES eReporting Tool (NeT-CGP) and provide all information as required on your NOI that supports the eligibility criterion you qualify under per Part 1 .1.5 of the permit. The printable worksheet in this appendix may be helpful to you in preparing to submit your NOI, but you do not have to use it. D.3 What to Expect Once you Submit your NOI After you submit your NOI and before your NOI is authorized, EPA may notify you if any additional controls are necessary to ensure your discharges are not likely to result in any short- or long-term adverse effects on ESA-listed species and critical habitat. Page D-1 of 18 2022 Construction General Permit (CGP) The Services have the opportunity, within 14 days of submission of the NOI, to advise EPA whether either agency believes the planned discharges meet the selected eligibility criterion; whether the eligibility criterion could be met with additional conditions; or whether the eligibility criterion is not met. With respect to ESA issues, EPA recognizes the Services' expertise and will carefully consider their conclusion(s) in identifying eligibility for authorization, either with or without additional conditions. In the event EPA has placed a hold on your NOI based on NMFS or USFWS' recommendation, EPA will notify you as to whether your discharges are authorized or whether an individual permit will be required. If you do not hear from EPA within 14 days, you may assume that your discharge is authorized without further conditions. D.4 Worksheet Instructions Follow the instructions within the worksheet below to determine which criterion you are eligible for coverage under this permit. Check only 1 criterion, answer the required questions, and include the required information. Please keep the following in mind as you complete the worksheet: • The worksheet requires that you answer questions in a sequential order so that you can select the correct eligibility criterion. The worksheet does not go through each criterion alphabetically, but rather is organized in a way that allows you to eliminate those criteria that do not apply to your site. For instance, Step 1 of the worksheet requires you to determine whether criterion B, E, or F applies first, in that order, before proceeding to determining whether criterion A applies in Step 2. • You must consider ESA-listed species and/or designated critical habitat(s) under the jurisdiction of both the U.S. Fish and Wildlife Service (USFWS) and National Marine Fisheries Service (NMFS) and select the criterion that best applies to your site. You must comply with any applicable terms, conditions, or other requirements developed in theprocess of meeting one of the eligibility criteria in this section to remain eligible for coverage under this permit. • When evaluating the potential effects of your activities, you must consider effects to listed species or critical habitats within the "action area" of your construction activity, as identified by the USFWS IPaC and/or the NOAA website resources on page D-10 through D- 1 1 of this appendix. Please Note: NMFS'jurisdiction includes ESA-listed marine and estuarine species that spawn in inland rivers. The definition of "action area," which is contained in Appendix A, is repeated below forconvenience. "Action Area"—all areas to be affected directly or indirectly by the federal action and not merely theimmediate area involved in the action.See 50 CFR part 402.For the purposes of this permit and for application of the Endangered Species Act requirements,the following areas are included in the definition of action area: • The areas on the construction site where stormwater discharges originate and flow toward the point of discharge into the receiving waters.This includes: • areas on the construction site where excavation,site development,or other ground disturbance activities occur, and • areas where stormwater controls will be constructed and operated,including any areas where stormwater flows to and from the stormwater controls. • The areas in the vicinity of the construction site where stormwater discharges flow from the construction site to one or more points of discharge into receiving waters.(Example:Where stormwater flows into an off-site ditch,swale,or gully that leads to receiving waters.) • The extent of the receiving water potentially affected by stormwater discharges from your construction site through alteration of water chemistry,turbidity,temperature,or bank structure(i.e.,erosive flow),regardless of whether the construction site is adjacent to the receiving water. Page D-2 of 18 2022 Construction General Permit (CGP) D.5 Worksheet Instructions ➢ First determine whether you are eligible under Criterion B by reviewing the eligibility requirements below. ➢ If you determine that your facility does not meet Criterion B (e.g., due to difference in action area described, lack of analysis of appropriate effects, new listings or designation of critical habitat), proceed to check if you meet the requirements for Criterion E or F. Criterion B Eligibility Requirements If your discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility under the current 2022 CGP that included your action area (e.g., a general contractor or developer may have completed and filed an NOI for the entire action area with the necessary ESA certifications (Criterion A, C, D, E, or F)), you may be eligible under Criterion B. In order to be eligible for coverage, you must confirm that all three of the following are true (check all that apply): ❑ I have confirmed that the other operator's certification of eligibility accounted for my action area and that the eligibility certification was valid. ❑ There has been no lapse of NPDES permit coverage in the other operator's certification. ❑ I will comply with all measures that formed the basis of the other operator's valid certification of eligibility. Instructions ➢ If all three of the above are true, you may check Criterion B below and answer questions B1-65, and if applicable, 1136-67. Is, ➢ If any of the above are not true (for example, if there are any listed species in your action area that were not addressed in the other operator's certification, you are not eligible under Criterion ION B), you may not select Criterion B and must proceed to check if you meet the requirements for Criterion E or F. B Eligibility requirements met by another operator under the 2022 CGP. The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your "action area" under eligibility Criterion A, C, D, E, or F of the 2022 CGP and you have confirmed that no additional ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS not considered in the Page D-3 of 18 2022 Construction General Permit (CGP) that certification may be present or located in the "action area." To certify your eligibility under this criterion, there must be no lapse of NPDES permit coverage in the other CGP operator's certification. By certifying eligibility under this criterion, you agree to comply with any conditions upon which the other CGP operator's certification was based. You must include below the NPDES ID from the other 2022 CGP operator's notification of authorization under this permit and list any measures that you must comply with). If your certification is based on another 2022 CGP operator's certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C. B1. Provide the NPDES ID from the other CGP operator's NOI authorized under this permit: B2. Identify the eligibility criterion of the other CGP operator's NOI? (check only one) �A � C �'F]' D �[:]` E F B3. Provide the authorization date of the other CGP operator's NOI (MM/DD/YYYY): By certifying eligibility under Criterion B, you must comply with any terms and conditions imposed under the eligibility requirements of the criterion for which the other operator has established eligibility (either Criterion A, C, D, E, or F) to ensure that your discharges and discharge-related activities are protective of listed species and/or critical habitat. Note: If you are unable to meet these eligibility requirements, then you may either establish eligibility under one of the other criteria, or you may consider applying to EPA for an individual permit. B4. List any measures that formed the basis of the other operator's valid certification of eligibility that you will comply with (or enter "N/A" if none exist): B5. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion B, including any of the terms and conditions, as well as the other operator's basis for establishing eligibility. Yes F-1 If your certification is based on another operator's certification under Criterion C, you must provide the following: Page D-4 of 18 2022 Construction General Permit (CGP) B6. What Federally listed species and/or designated habitat are located in your "action area"? (attached separate sheet if necessary) B7. What is the distance between your site and the listed species or designated critical habitat (in miles)-? Instructions r If you selected Criterion B above and answered questions B1-BS;, and if applicable, 1136-1137 1'+ you are done with this worksheet. If you are not filing electronically, you must submit this worksheet with your NOI. If you are not eligible under Criterion B proceed to check if you meet the requirements for Criterion E or F. Criterion E Eligibility Requirements If consultation under ESA section 7 has concluded, you may be eligible for coverage under Criterion E. In order to be eligible for coverage under Criterion E. you must confirm that both of the following are true (check all that apply): F-1 A consultation between a Federal agency and USFWS and/or the NMFS under section 7 of the ESA has concluded. Consultations can be either formal or informal, and would have occurred only as a result of a separate Federal action (e.g.,, during application for an individual wastewater discharge permit or the issuance of a wetlands dredge and fill permit), and the consultation must have addressed the effects of your construction activity's discharges and discharge-related activities on all ESA-listed threatened or endangered species and all designated critical habitat under the jurisdiction of each Service, as appropriate, in your action area. The result of this consultation must be either: i. A biological opinion currently in effect that determined that the action in question (taking into account the effects of your facility's discharges and discharge-related activities) is likely to adversely affect, but is not likely to jeopardize the continued existence of listed species or result in the destruction or adverse modification of critical habitat. The biological opinion must have included the effects of your facility's discharges' and discharge-related activities on all the listed species and designated Effects of discharge include, but are not limited to,the analysis of the hydrological, chemical, and biological effects of the discharge on listed species,their prey,and their habitat, as well as critical habitat,where designated. For example, the Page D-5 of 18 2022 Construction General Permit (CGP) critical habitat in your action area under the jurisdiction of each Service, as appropriate. To be eligible under (i), any reasonable and prudent measures specified in the incidental take statement must be implemented; ii. Written concurrence (e.g., letter of concurrence) from the applicable Service(s) with a determination that your facility's discharges and discharge-related activities are not likely to adversely affect ESA-listed species and/or designated critical habitat. The concurrence letter must have included the effects of your facility's discharges and discharge-related activities on all the ESA-listed species and/or designated critical habitat on your species list(s) acquired from USFWS and/or NMFS as part of this worksheet. F-1 The consultation does not warrant reinitiation under 50 CFR §402.16; or, if reinitiation of consultation is required (e.g., due to a new species listing, critical habitat designation, or new information), the Federal action agency has reinitiated the consultation and the result of the consultation is consistent with the statements above. Include any reinitiation documentation from the Services or consulting Federal agency with your NOI. Instructions ➢ If both of the above are true, you may cheek Criterion E below and answer questions Is E1-E6. • For more information on section 7 consultation, see 50 CFR part 402. If you receive a "jeopardy opinion," you may continue to work with USFWS and/or NMFS and your permitting authority to modify your project so that it will not jeopardize listed species or designated critical habitat. • Note that most consultations are accomplished through informal consultation. When conducting informal ESA section 7 consultation as a non-Federal representative, you must follow the procedure found in 50 CFR Part 402 of the ESA regulations. You must notify the Services of your intention and agreement to conduct consultation as a non-Federal representative. • Consultation may also occur in the context of another Federal action at the construction site (e.g., where ESA section 7 consultation was performed for issuance of a wetlands dredge and fill permit for the project or where a NEPA review is performed for the project that incorporates a section 7 consultation) • Any terms and conditions developed through consultations to protect listed species and critical habitat must be incorporated into the SWPPP.As noted above, a Federal operator may, if they wish, initiate consultation with the Services at Step Four. Non-Federal operators may seek technical assistance from the Services at Step 5. • Whether ESA section 7 consultation must be performed with either USFWS, NMFS, or both Services depends on the listed species that may be affected by the operator's stormwater discharge. In general NMFS has jurisdiction over marine, estuarine, and anadromous species. Operators should also be aware that while formal section 7 consultation provides protection from incidental takings liability, ;informal consultation does not. ➢ If not, proceed to check if you meet the requirements for Criterion F. effects analysis would have evaluated whether the various pollutants in the discharge (e.g.,TSS, metals) would adversely affect listed species through exposure to the pollutants,or to their prey or habitat. Effects that look only at short-term effects unrelated to the stormwater discharge effects to listed species are not sufficient for these purposes. Page D-6 of 18 2022 Construction General Permit (CGP) ❑ E ESA Section 7 consultation has successfully concluded. Consultation between a Federal Agency and the USFWS and/or NMFS under section 7 of the ESA has concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS. To certify eligibility under this criterion, Indicate the result of the consultation: ❑ Biological opinion and/or conference opinion and incidental take statement currently in effect currently in effect from USFWS and/or NMFS that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of ESA-listed species, nor the destruction or adverse modification of critical habitat; Or ❑ Written concurrence from USFWS and/or NMFS with a finding that the site's discharges and discharge-related activities are not likely to adversely affect ESA-listed species and/or designated critical habitat. E1. Identify the federal action agency or agencies involved: E2. Identify the Service(s) field or regional offices providing the consultation: E3. Identify any tracking numbers associated with the consultation (e.g., IPaC number, ECO number): E4. What is the date the consultation was completed? (MM/DD/YYYY) E5. Check to confirm that correspondence with USFWS and/or NMFS documenting the Biological Opinion, conference opinion (IPaC or ECO tracking number) or concurrence is attached. Yes E6. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion E, including copies of the correspondence between yourself and the Services. Yes Page D-7 of 18 2022 Construction General Permit (CGP) Instructions If you selected Criterion E above and answered questions E1-Eb,you are done with this worksheet. If you are not filing electronically,you must submit this worksheet with your NO . If you are not eligible under Criterion E, proceed to check if you;meet the requirements for Criterion F. Criterion F Eligibility Requirements If your construction activities are the subject of a permit under ESA section 10, and this authorization addresses the effects of your site's discharges and discharge-related activities on ESA-listed species and designated critical habitat in your action area, you may be eligible for coverage under Criterion F. In order to be eligible or coverage under Criterion F, you must confirm that the following is true: FIA permit or permits issued under section 10 of the ESA specifically address the effects of your facility's discharges and discharge-related activities (if applicable) on all federally-listed species and designated critical habitat in your action area. Note: You must follow USFWS and/or NMFS procedures when applying for an ESA section 10 permit (see 50 CFR §17.22(b)(1) for USFWS and §222.22 for NMFS). Application instructions for section 10 permits can be obtained from http://www.fws.gov and http://www.nmfs.noaa or by contacting the appropriate Service office. Instructions y If the above is true,you may check Criterion F below and answer questions F146. �. If you are not eligible under criterion F, proceed to Step 2. F-1 F Issuance of section 10 permit. Potential take is authorized through the issuance of a permit under section 10 of the ESA by the USFWS and/or NMFS, and this authorization addresses the effects of the site's discharges and discharge-related activities on ESA-listed species and designated critical habitat. You must include copies of the correspondence between yourself and the participating agencies in your SWPPP and your NOI. F1. Which Service provided the section 10 permit? (check all that apply) USFWS F-1 NMFS F-1 F2. Identify the field or regional offices providing the permit(s): 2022 Construction General Permit (CGP) F3. Identify any tracking numbers associated with the consultation (e.g., IPaC number, ECO number): F4. What is the date the permit(s) was granted? (MM/DD/YYY) (2nd permit date, if applicable: F5. Check to confirm that correspondence with USFWS and/or NMFS and a copy of the section 10 permit or relevant tracking number(s) (IPaC and/or ECO number) is attached. Yes ❑ F6. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion F, including a copy of the section 10 permit and copies of the correspondence between yourself and the Services. Yes ❑ Instructions y If you selected Criterion F above and answered questions F1-F6, you are done with this worksheet. If you are not filing electronically, you must submit this worksheet with your NOI. �= If you are not eligible under Criterion F, proceed to Step 2. Instructions ➢ First, determine the extent of your action area. You must determine whether species listed as either threatened or endangered, or their critical habitat(s) are located in your site's action area (i.e., all areas to be affected directly or indirectly by the Federal action and not merely the immediate area involved in the action, including areas beyond the footprint of the site that are likely to be affected by stormwater discharges, discharge-related activities, and authorized non-stormwater discharges). You must consider the following in determining the action area for your site, and confirm that all the following are true: ❑ In determining my "action area", I have considered that discharges of pollutants from the project site can expand the action area well beyond the footprint of my site and the discharge point(s). I have taken into account the controls I will be implementing to minimize pollutants and the receiving waterbody characteristics (e.g., perennial, intermittent, ephemeral) in determining the extent of physical, chemical, and/or biotic effects of the Page D-9 of 18 2022 Construction General Permit (CGP) discharges. I confirm that all receiving waterbodies that could receive pollutants from my site are included in my action area. F-1 In determining my "action area", I have considered that discharge-related activities must also be accounted for in determining my action area. I understand that discharge-related activities are any activities that cause, contribute to, or result in stormwater and authorized non-stormwater point source discharges, and measures such as the siting, construction, timing,2 and operation of stormwater controls to control, reduce, or prevent pollutants from being discharged. I understand that any new or modified stormwater controls that will have noise or other similar effects, and any disturbances associated with construction of controls, are part of my action area. If you have any questions about determining the extent of your action area, you may contact EPA or the Services for assistance. https://www.epa.gov/npdes/contact-us- stormwater#regional Instructions ➢ Next, you must identify,to the best of your ability, any species listed as either threatened or endangered, or their critical habitat(s), that are located in your site's action area (see definitions of these terms in Appendix A). You must follow the instructions on the https://www.epa.c o� v/npdes/construction-general-permit-threatened-and-endangered-species to obtain lists of any ESA-protected species and/or critical habitat that are expected to exist in your county, township, or the receiving water for your discharge. ➢ If ESA-protected resources occur within your action area, keep a copy of the species and critical habitat list(s) from the Service(s) with your SWPPP and use the list(s) to complete your NOI. For USFWS species, attach to this worksheet the full printout from your IPaC query/Official Species List. You can include the map from your IPaC query.For NMFS species, attach to this worksheet the full printout of the report from your query of the mapping resource you used (either the National or Greater Atlantic Region Mapper). The printed report from NMFS mappers will include a map of your query. 2 Timing considerations could be related to,for example, a time of the year where a migratory bird species is present in the action area and the operator might want to consider that in terms of their construction sequencing; there are other times of the year where this consideration might not be relevant. Page D-10 of 18 2022 Construction General Permit (CGP) Instructions After completing Step 2 above, if there are no listed species and no critical habitat areas in your action area, you may be eligible for criterion A. Criterion A Eligibility Requirements In order to be eligible for coverage under criterion A, you must confirm that all the following are true (check all that apply): F-1 I confirm that I have used the species location resources of BOTH NMFS and USFWS to identify any ESA-listed species within my action area. F-1 I have confirmed there to be no ESA-listed species and no critical habitat in my action area. Instructions ➢ If all of the above are true,you may check criterion A below and answer questions Al-AS. is" ➢ If any of the above is not true, you may not select criterion A and must proceed to Step 3 to determine if you can become eligible under criterion C. Note: For existing dischargers that have previously obtained coverage under criterion A, you must verify whether ESA-protected species and/or critical habitat are expected to exist in your action area, as described above. Please note that if you now find that your action area overlaps with ESA-protected species or critical habitat, you must proceed to Step 3. F-1 A No ESA-listed species and/or designated critical habitat present in action area. You certify that ESA-listed species and designated critical habitat(s) under the jurisdiction of the USFWS or NMFS are not likely to occur in your site's "action area" as defined in Appendix A of this permit.. Please Note: NMFS'jurisdiction includes ESA-listed marine and estuarine species that spawn in inland rivers. Al. USFWS information sources used (reliance on State resources is not acceptable): Note: If your Official Species List from USFWS indicated no species or critical habitat were present in your action area, include the full consultation tracking code at the top of your Official Species List in your NOI in the basis statement for Criterion A. If an Official Species List was not available on IPaC, list the contact date and name of the Service staff with whom you corresponded to verify no USFWS species or critical habitat were present in your action area. Page D-11 of 18 2022 Construction General Permit (CGP) A2. NMFS information sources used (reliance on State resources is not acceptable): A3. I confirm that aerial image(s) of the site is attached. Yes ❑ A4. I confirm that a printout of the species' list(s) showing no ESA-listed species or critical habitat in my action area is attached. Yes ❑ AS. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion A. For USFWS species, include the full printout from your IPaC query/Official Species List. You can include the map from your IPaC query. For NMFS species, include the full printout from the appropriate NMFS website resources on page X with the correct Region selected. Yes ❑ Instructions If you selected Criterion A above and answered questions Al-A5,you are done with this works'heet. If you are not filing electronically,you must submit this workshee't with your NQI, y If listed species and/or critical habitat may exist in your action area, you must do one or more of the following Conduct visual inspections. This method may be particularly suitable for construction sites that are smaller in size or located in non-natural settings such as highly urbanized areas or industrial parks where there is little or no natural habitat,or for construction activities that discharge directly into municipal stormwater collection systems. • Conduct a formal biological survey. In some cases, particularly for larger construction sites with extensive stormwater discharges, biological surveys may be an appropriate way to assess whether species are located in the action area and whether there are likely to be short- or long-term adverse effects to such species. Biological surveys are frequently performed by environmental consulting firms. • If required, conduct an environmental assessment under the National Environmental Policy Act (NEPA). Some construction activities might require review under NEPA for specific reasons, such as Federal funding or other Federal involvement in the project. Note: Coverage under the CGP!does not;trigger such a review for individual projects/sites. EPA has complied with NEPA in the issuance of the CGP. and • Follow the instructions in Steps 3-5 below, as applicable. Note that many but not all measures imposed to protect listed species under these steps will also protect critical habitat. Thus, meeting the eligibility requirements of this CGP may require measures to protect critical habitat that are''separate from those to protect listed species. Page D-12 of 18 2022 Construction General Permit (CGP) MID WIN 5 MO Instructions ➢ If in Step 2 you identified that listed species and/or designated critical habitat could exist in your action area,you must next assess whether your discharges or discharge-related activities are likely to result in short- or long-term adverse effects to ESA-listed threatened or endangered species or designated critical habitat. Potential short- or long-term adverse effects from discharges and discharge-related activities include: • Hydrological. Stormwater discharges may cause siltation, sedimentation, or induce other changes in receiving waters such as temperature, salinity, or pH. These effects will vary with the amount of stormwater discharged and the volume and condition of the receiving water. Where a stormwater discharge constitutes a minute portion of the total volume of the receiving water, adverse hydrological effects are less likely. Construction activity itself may also alter drainage patterns on a site where construction occurs that can impact listed species or critical habitat. • Habitat. Excavation, site development, grading, and other surface disturbance activities from construction activities, including the installation or placement of stormwater controls, may result in adverse effects to listed species or their habitat. Stormwater may drain or inundate listed species habitat. • Toxicity. In some cases, pollutants in construction stormwater may have toxic effects on listed species. For example: Stormwater discharges from construction on or adjacent to agricultural property may contain pesticides. Stormwater discharges from projects involving pavement and roofing could include tar and asphalt. The scope of effects to consider will vary with each site. If you are having difficulty determining whether your project is likely to result in short- or long-term adverse effects to listed species or critical habitat, or one of the Services has already raised concerns to you, you should contact the appropriate Services office for assistance. Instructions v If any short- or long-term adverse effects to listed threatened or endangered species or their critical habitat are not likely,then you may check Criterion C below and answer questions C1-C8. If any short- or long-term adverse effects to listed threatened or endangered species or their critical habitat are likely, you must follow Step 4 below. You may still be eligible for Criterion C if you are able to install and implement appropriate measures to avoid the likelihood of adverse effects. Page D-13 of 18 2022 Construction General Permit (CGP) Criterion C Eligibility Requirements ❑ C Discharges not likely to result in any short- or long-term adverse effects to ESA-listed species and/or designated critical habitat. ESA-listed species and/or designated critical habitat(s) under the jurisdiction of the USFWS and/or NMFS are likely to occur in or near your site's "action area," and you certify to EPA that your site's discharges and discharge-related activities are not likely to result in any short- or long-term adverse effects to ESA-listed threatened or endangered species and/or designated critical habitat. This certification may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to result in any short- or long-term adverse effects to ESA-listed species and/or designated critical habitat. To certify your eligibility under this criterion, you must indicate belowl) the ESA-listed species and/or designated habitat located in your "action area" using the process outlined in this Appendix; 2) the distance between the site and the listed species and/or designated critical habitat in the action area (in miles); and 3) a rationale describing specifically how short- or long-term adverse effects to ESA-listed species will be avoided from the discharges and discharge-related activities. You must also include a copy of your site map from your SWPPP showing the upland and in-water extent of your "action area" with your NOI. C1. I confirm that both ESA-listed species and designated critical habitat under the jurisdiction of the USFWS and/or NMFS were considered in my evaluation. Yes ❑ C2. Provide the USFWS information resources and expertise used to arrive at this criterion selection: C3. Provide the NMFS information resources and expertise used to arrive at this criterion selection: Page D-14 of 18 2022 Construction General Permit (CGP) C4. What ESA-listed species and/or designated critical habitat are located in your "action area?" (or attach a printout of the species' list(s)) C5. What is the distance between your site and the ESA-listed species and/or designated critical habitat within the action area (in miles, state "on site" if the ESA-listed species and/or designated critical habitat is within the area to be disturbed)? C6. Provide the rationale describing specifically how any short- or long-term adverse effects to ESA-listed species will be avoided from the discharge and discharge-related activities. C7. I confirm that a site map from my SWPPP showing the upland and in-water extent of my "action area" is attached. Yes ❑ C8. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion C. Yes ❑ Instructions y If you selected Criterion C above and answered questions C1-C8,you are done with this worksheet. If you are not filing electronically,you must submit this worksheet with your NUI. v If not, please proceed to step 4. Page D-15 of 18 2022 Construction General Permit (CGP) oil fill Instructions If you make a preliminary decision in Step 3 that short- or long-term adverse effects from your construction activity's discharges or disc h arge-rel ated activities are likely to occur, you can still receive coverage under eligibility Criterion C of the CGP if appropriate measures are undertaken to avoid or eliminate the likelihood of short- or long-term adverse effects prior to applying for CGP coverage. These measures may involve relatively simple changes to construction activities such as re-routing a stormwater discharge to bypass an area where species are located, relocating stormwater controls, or by modifying the "footprint" of the construction activity. If you are unable to ascertain which measures to implement to avoid the likelihood of short- or long-term adverse effects, you must coordinate with USFWS and/or NMFS, in which case you would not be eligible for coverage under eligibility Criterion C, but may instead be eligible for coverage under eligibility criterion D (described in more detail in Step 5). y If you are able to install and implement appropriate measures to avoid the likelihood of short- or long-term adverse effects,then you may,ao back and check eligibility Criterion C above 10 and answer questions C1-C8 above, and C9-CI0 below. The measures you adopt to avoid or eliminate short-or long-term adverse effects must be implemented for the duration of the construction project and your coverage under the CGP. v If you cannot ascertain which measures to implement to avoid the likelihood of adverse effects, you must follow the procedures in Step 5. C9. I confirm that I have or will install and implement appropriate measures to avoid the likelihood of any short- or long-term adverse effects to ESA-listed threatened or endangered species or their critical habitat. Yes F-1 C10. Provide a description of the measures installed/to be installed and implemented to avoid likelihood of any short- or long-term adverse effects. Instructions If you selected Criterion C above and answered questions CI-CIO,you are done with this worksheet. If you are not filing you NOI electronically,you must submit this worksheet with your NOI. If you are not eligible for Criterion C, please proceed to step 5. Page D-16 of 18 2022 Construction General Permit (CGP) 111104 Instructions If in Step 4 you cannot ascertain which measures to implement to avoid the likelihood of short- or long- term adverse effects, you must contact USFWS and/or NMFS. You may still be eligible for CGP coverage if likely adverse effects can be addressed through meeting criterion D. If you meet the requirements of criterion D, then you may check criterion D below and answer questions D1-D5. Criterion D Eligibility Requirements D Coordination with USFWS and/or NMFS has successfully concluded. Coordination between you and the USFWS and/or NMFS has concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS, and resulted in a written confirmation from USFWS and/or NMFS that the effects of your site's discharges and discharge-related activities are not likely to result in short- or long-term adverse effects for ESA-listed species and/or designated critical habitat in your action area. By certifying eligibility under this criterion, you agree to comply with any conditions you must meet for your site's discharges and discharge-related activities to not likely result in any short- or long- term adverse effects. You must include copies of the correspondence with the participating agencies in your SWPPP and your NOI. D1. Which Service participated in coordination? (check all that apply) USFWS ❑ NMFS ❑ D2. Identify the field and/or regional office(s) that provided the coordination? D3. What is the date the coordination concluded? (MM/DD/YYY) __/__/ D4. Check to confirm that correspondence with USFWS and/or NMFS documenting concurrence is attached. Yes F I D5. Check to confirm you have provided documentation in your SWPPP supporting your eligibility under Criterion D, including copies of the correspondence between yourself and the Services. Yes F I Page D-17 of 18 2022 Construction General Permit (CGP) Instructions If you selected Criterion D above and answered questions DI-D5,you are done with this worksheet. If you are not filing electronically,you must submit this worksheet with your NOI. Paperwork Reduction Act Notice This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2 40 3 5). Responses to this collection of information are mandatory (40 CFR 122.26). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The public reporting and recordkeeping burden for this collection of information is estimated to be 3.3 hours per response. Send comments on the Agency's need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821 T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address. Page D-18 of 18 Drawn Action Area & OverlappingS7 Consultation Areas Area of Interest (A01) Information Area : 1.1 acres Oct 2 2024 12:52:34 Eastern Daylight Time ,I hll, i �I u� Yiv III N" Ali a u�r"" i i i P r i lffj ,r �! f/ % f, 0 C"m'sn"' E S,',. FrGil j°rj,,"Yj Summary Name Count Area(acres) Length(mi) Atlantic Sturgeon 0 0 N/A Shortnose Sturgeon 0 0 N/A Atlantic Salmon 0 0 N/A Sea Turtles 0 0 N/A Atlantic Large Whales 0 0 N/A In or Near Critical Habitat 0 0 N/A Jell Al➢e ' � IlPouu uu"�. mamrnnonnmmnmmmnnmm �b�mm United States Department of the Interior U FISH AND WILDLIFE SERVICE t OiMN Vii buff New England Ecological Services Field Office 70 Commercial Street, Suite 300 Concord,NH 03301-5094 Phone: (603)223-2541 Fax: (603)223-0104 In Reply Refer To: 10/02/2024 16:48:03 UTC Project Code: 2025-0000918 Project Name: Merrimack College Lecture Hall Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: Please review this letter each time you request an Official Species List, we will continue to update it with additional information and links to websites may change. About Official Species Lists The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Federal and non-Federal project proponents have responsibilities under the Act to consider effects on listed species. The enclosed species list identifies threatened, endangered, proposed, and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. The Service recommends that verification be completed by visiting the IPaC website at regular intervals during project planning and implementation for updates to species lists and information.An updated list may be requested by returning to an existing project's page in IPaC. Endangered Species Act Project Review Please visit the "New England Field Office Endangered Species Project Review and Consultation"website for step-by-step instructions on how to consider effects on listed species and prepare and submit a project review package if necessary: https://www.fws.gov/office/new-england-ecological-services/endangered-species-proj ect-review *NOTE* Please do not use the Consultation Package Builder tool in IPaC except in specific situations following coordination with our office. Please follow the project review guidance on our website instead and reference your Project Code in all correspondence. Northern Long-eared Bat - (Updated i.' ° "" ) The Service published a final rule to reclassify the northern long-eared bat (NLEB) as endangered on November 30, 2022. The final rule went into effect on March 31, 2023. You may utilize the Northern Long-eared Bat Rangewide Determination Key available in IPaC. More information about this Determination Key and the Interim Consultation Framework are available on the northern long-eared bat species page: https://www.fws. ov/species/northern-long-eared-bat-myotis-septentrionalis For projects that previously utilized the 4(d) Determination Key, the change in the species' status may trigger the need to re-initiate consultation for any actions that are not completed and for which the Federal action agency retains discretion once the new listing determination becomes effective. If your project was not completed by March 31, 2023, and may result in incidental take of NLEB, please reach out to our office at newengland@fws.gov to see if reinitiation is necessary. Additional Info About Section 7 of the Act Under section 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to determine whether projects may affect threatened and endangered species and/or designated critical habitat. If a Federal agency, or its non-Federal representative, determines that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Federal agency also may need to consider proposed species and proposed critical habitat in the consultation. 50 CFR 402.14(c)(1) specifies the information required for consultation under the Act regardless of the format of the evaluation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: https://www.fws.gov/service/section-7-consultations In addition to consultation requirements under Section 7(a)(2) of the ESA, please note that under sections 7(a)(1) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species. Please contact NEFO if you would like more information. Candidate species that appear on the enclosed species list have no current protections under the ESA. The species' occurrence on an official species list does not convey a requirement to 2 of... consider impacts to this species as you would a proposed, threatened, or endangered species. The ESA does not provide for interagency consultations on candidate species under section 7, however, the Service recommends that all project proponents incorporate measures into projects to benefit candidate species and their habitats wherever possible. Migratory Birds In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project-related impacts.Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts see: https://www.fws.gov/program/migratory-bird-permit -bird-permit https://www.fws.gov/library/collections/bald-and-golden-eagle-management Please feel free to contact us at newengland@fws.gov with your Project Code in the subject line if you need more information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Attachment(s): Official Species List Attachment(s): ■ Official Species List OFFICIAL SPECIES LIST This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: New England Ecological Services Field Office 70 Commercial Street, Suite 300 Concord, NH 03301-5094 (603) 223-2541 3 of... IIII ject cod 3I II PROJECT SUMMARY Project Code: 2025-0000918 Project Name: Merrimack College Lecture Hall Project Type: Commercial Development Project Description: The Project proposes to construct a 19,205 gross square foot building (Lecture Hall) situated along Aherne Road, oriented in-line with Sullivan Hall on the Merrimack College campus, located at 315 Turnpike Street in North Andover, Massachusetts. Project Location: The approximate location of the project can be viewed in Google Maps: htt s:// www.google.com/maps/@42.670563951-71.12377217574674,14z q« �NNII J 10 It,111�4 W w° iu!U1udw,, :p u III ml Wf m �15 r W y �kj�4 Counties: Essex County, Massachusetts 4 of... IIII ject cod 3I II ENDANGERED SPECIES ACT SPECIES There is a total of 2 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries1, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Z ... MAMMALS NAME STATUS Tricolored Bat Perimyotis subflavus Proposed No critical habitat has been designated for this species. Endangered Species profile:https:Hecos.fws.gov/ecp/species/10515 INSECTS NAME STATUS Monarch Butterfly Danaus plexippus Candidate No critical habitat has been designated for this species. Species profile:https:Hecos.fws.gov/ecp/species/9743 CRITICAL HABITATS THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S)MAY HAVE EFFECTS ON ALL ABOVE LISTED SPECIES. 6 of... Project code: 2025-0000918 10/02/2024 16:48:03 UTC IPAC USER CONTACT INFORMATION Agency: Private Entity Name: Bridget Hilgendorff Address: 260 Arsenal Place #2 Address Line 2: PO Box 9151 City: Watertown State: MA Zip: 02471 Email bhilgendorff@vhb.com Phone: 6176072709 LEAD AGENCY CONTACT INFORMATION Lead Agency: Environmental Protection Agency 7 of 7 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix L Historic Preservation Documentation L-1 Appendix L:Historic Preservation Document RECEIVED JAN 2 8 2020 950 CM .: OFFICE OF THE SECRETARY OF THE COMMISSION NIASS. HIST COMM APPENDIX A 5 C'a .. MASSACHUSETTS HISTOWCAL COMMISSION Massachusetts Archives Building 220 Morrissey Boulevard. Boston, MA 021.25 61 -727- 470, Fax.- 1 -72r7-5128 PROJECT NOTIFICATION FORM files ects After review Of MHC Project Naine Yarious Devel,,ol2ment Pr9j. has • �� W � � YOU submitted, Itdeterm"Location/Address Merrimack. of Camp � . C CA, .................. Ined thCA City/Town North Andover Un,1,(e y to affect sig n ificant W 11VTWI fv S ' Project Proponent , Name Merrimack, o l l c,)"c Address 3 15 Tu rn P ik Street Jonathan K at • , City/Tryon North Andover,MA. l Planner 1VlaSS U86M3, l Telephone# 97 - 37-5459 is, ion r' Agency license or funding for the project(list all licenses,permits,approvals, grants or other entitlements being sought from state and federal agencies). Type of License or Fund s eci ..........m y) assDeelopment Bond funding Project Description(narrative): The projects are described as follows,and as identified on the attached Figure 2—Merrimack.College Proposed Campus Development Projects: L A new academic facility within the North Andover portion of the campus,adjacent to Route 114,in between Austin and Sullivan Hall.The facility is proposed as a three-story building with approximately 40,000 square feet of academic and student space consisting of various learning environments,faculty offices,maker spaces and innovation spaces to aid in the development of new majors to attract and serve grooving enrollments. Contemplated in space are expanded academic areas in the Liberal Arts, Science and Engineering and Education/Social Policy.(See photos 41-4) 2/3/4. Expansion of two existing facilities,the Rogers Center for the Arts(1999)and Palmisano Hall (199 1)is proposed to create additional academic and student maker spaces that are part of an expanded and enhanced STEAM (Science,Technology,Engineering,Arts and Math)model at the College. Envisioned in the space are learning environments for majors such as graphic design, science and engineering, as well as student spaces such as dance studios.The projects are situated on the North Andover portion of the carnpus.The expansion of the Rogers Center for the Arts will e on the north side of the building of up to approximately 20,000 square feet on two stories.The addition on Palm isano Hall will be on the southern end of the facility and contemplated to be / / (Effective / 950 CMR-276 F ro i yN ` 7 s approximately 10,000 square feet on two stories.As part of the Palmisano 1 lall expansion,a renovation of lab spaces of approximately 16,000 square feet is also contemplated.(See photo # - 12 5W As part of a partnership with the non-profit Squashbusters,an approximately 20,000 SF facility is being advanced on the North Andover portion of the campus.The facility will include squash courts, offices and meeting spaces for Squashbusters,for which they are funding the construction. The college will be constructing classrooms for general academic use as part of the project.(See photos#1 -16) 6. As part of a larger renovation of the Collegiate Church(1956),the College is renovating the garden level floor to a student activity space, and Athletics facility that will include 6 lanes for bowling,E- Sports space;as well as general hangout space for students(tv's,pool tables).Additionally,as part of the project,the college is adding to the facility a small enclosed staircase and elevator to provide access to both floors.These portions are part of an overall project that includes the renovating of the Church space to be more of an all purpose space on the campus. (See photos#17-20) Renovating and developing new athletic facilities as part of the College's transition into Division l is a component of proposed projects. 7/8. The College will be relocating and expanding locker rooms,renovating athletic office spaces and. reconfiguring academic spaces in the existing Merrimack.Athletics Complex(1972, located in North Andover).The college will also either expand its current Hammel Court,or repurpose the space for a turf field. The approximate size of the project is 20,000 square feet. (See photos#21- 25) 9,M. Additionally,the College is contemplating a new athletic facility located in the existing parking lot , located in North Andover directly behind the Duane Stadium. The facility will either be a basketball facility or a turf field pavilion.The approximate size of the project is 20,000 square feet. (See photos#2+6-30) 10. The College will be expanding campus parking adjacent to Lot C and Austin Hall. Such a project is likely to include approximately 350 spaces and will be entirely in North Andover..(See photos # 1-34) Does the project include demolition? If so,specify nature of demolition and describe the building(s)which are proposed for demolition. The Rogers Center for the Arts Expansion, Palmisano Hall Renovations,Collegiate Church Renovation, Hammel Court Expansion,and Merrimack.Athletics Complex Renovations described above will include demolition of interior spaces. Roes the project include rehabilitation of any existing building? If so,specify nature of rehabilitation and describe the building(s)which are proposed for rehabilitation. The:Palmisano Hall Renovations, Collegiate Church Renovation,Hammel Court Expansion, and.Merrimack Athletics Complex Renovations will include rehabilitation of existing spaces as described above. Does the project include new construction? If so,describe(attach plans and elevations if necessary). All projects other than the Palmisano Hall Renovations,Hammel Court Expansion,and Merrimack Athletics Complex Renovations will include new construction as described above. The Squashbusters Facility,New Academic Facility, and Palmisano Hall Expansion will be new buildings on campus. The Rogers Center for the Arts Expansion and Collegiate Church Renovation will include new building expansions from the existing,structures.The New Athletic 5/31/96(Ef:f:ective 7/l/93)corrected 950 CMR-276 +r Facility and Parking Expansion Projects will include new exterior site improvements.Attached are photo logs of the corresponding potential project sites. To the best of your knowledge,are any historic or archaeological properties known to exist within the project's area of potential impact? If so,specify. There are no inventoried or listed historic or archaeological properties within the projects' area of impact.Only one inventoried object(NAD.922—Christ the Teacher statue)is located on the campus and is beyond the projects' area of impact. What is the total acreage of the project area? Woodland n/a acres Productive Resources: Wetland n/a acres Agriculture n/a acres Floodplain n/a acres Forestry n/a acres Open space 3.0 acres Mining/Extraction n/a acres Developed 9.5 acres Total Project Acreage 12.5 acres(Total for all . projects) What is the acreage of the proposed new construction? New Academic Facility 1.0-AC Palmisano Hall Expansion—1.0-AC Palmisano Hall Renovations—N/A Squashbusters Facility 2.0-AC Rogers Center for the Arts Expansion—1.5-AC Collegiate Church Renovation— 1.0-AC Hammel Court Expansion—NIA Merrimack Athletics Complex Renovations—NIA New Athletic Facility 4.0-AC Parking Expansion 2.0-AC What is the present land use of the project area? The Project Area is a College campus thus the present program use is Academic use. Please attach a copy of the section of the USGS quadrangle map which clearly marks the project location. See Figure 1 for Project Location on the USGS quadrangle map,and Figure 2 for individual development project locations within the Campus. This Project Notification Form has been submitted to the MHC in compliance with 950 CNM 71.00. Signature of Person submitin this fom �� ���"" �������� Date: g g Name: Jeff Koetteritz,Project Manager,VHB Address: 101 '''walnut Street City/Town: Watertown,MA 02472 Telephone: d 17-607-29+67 REGULATORY AUTHORITY 950 CMR 71.00: M.G.L. c. 9, §§ 26-27C as amended by St.1988, c.254. 5/31/96(Effective 7/l/93)corrected 950 C R-276 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix M: GaugeRecording M-1 Appendix M:Rainfall Gauge Recording Rainfall Gauge Recording Use the table below to record the rainfall gauge readings at the beginning and end of each work day.An example table follows. Month/Year Month/Year Month/Year Day Start time End time Day Start time End time Day Start time End time 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 6 6 6 7 7 7 8 8 8 9 9 9 10 10 10 11 11 11 12 12 12 13 13 13 14 14 14 15 15 15 16 16 16 17 17 17 18 18 18 19 19 19 20 20 20 21 21 21 22 22 22 23 23 23 24 24 24 25 25 25 26 26 26 27 27 27 28 28 28 29 29 29 30 30 30 31 31 31 Example Rainfall Gauge Recording April 2022 May 2022 June 2022 Day 7:00 am 4:400 pm Day 7:00 am 4:00 pm Day 7:00 am 4:00 pm 1 -- -- 1 0.2 0 1 0 0.4 2 -- -- 2 0 0 2 0 0 3 0 0 3 0.1 0.3 3 -- -- 4 0 0.3 4 0 0 4 -- -- 5 0 0 5 0 0 5 0 0 In this example (for only partial months), 0.25-inch rainfall inspections would have been conducted on April 4 and June 1. ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix N: TurbidityMeterManualandManufacturer' s Instructions N-1 Appendix N:Turbidity Meter Manual and Manufacturer's Instructions Appendix K-Turbidity Monitoring Report Form and Instructions Part 3.3 requires you to use the EPA NPDES eReporting Tool, or "NeT" system, to prepare and submit your report electronically. However, if the EPA Regional Office grants you a waiver to use a paper form, and you elect to use it, you must complete and submit the following form. U.S.Environmental Protection Agency NPDES Washington,DC 20460 OMB No. Form 2040-0305 6100- vvEPATurbidity Monitoring Report Form for Dewatering Discharges to Sensitive Waters Under Exp.Date 065 the 2022 NPDES Construction General Permit 01/31/2025 SECTION .• TO USE PAPER FORM Have you been granted a waiver from electronic reporting from the Regional Office*? ❑Yes ❑No If yes,check which waiver you have been granted,and provide the name of the EPA Regional Office staff person who granted the waiver,and the date of approval: E ❑The owner/operator's headquarters is physically located in a geographic area(i.e.,ZIP code or census tract)that is o identified as under-served for broadband Internet access in the most recent report from the Federal Communications i Waiver granted: Commission. ❑The owner/operator has issues regarding available computer access or computer capability. Name of EPA staff person that granted the waiver Date approval obtained (MM/DD/YYYY) *Note:You are required to obtain approval from the applicable Regional Office prior to using this paper form.If you have not obtained a waiver, you must file this form electronically using the NPDES eReporting Tool(NeT). SECTION •R • NPDES ID Does this report fulfill turbidity monitoring report obligations of other operators that are covered under this permit ❑Yes7 No L for the same project site? N If yes,provide the NPDES ID number(s)for all other such operators at the same project site: SECTIONOPERATOR INFORMATION Operator Name Mailing Address 0 Street a E L 0 City State ZIP Code L 0 L 0 County or Similar Government Division: O Phone Number Email Address Complete if form was prepared by someone other than the certifier: First Name Middle Initial Last Name L 0 L a Organization CL 0 L a Phone Number Email Address SECTION •- • Site Name N N L a a� EPA Form 6100-065 Page 1 Street/Location City State ZIP Code N N N County or Similar Government Division: Q SECTION • • QUARTER 0) IS Quarter 1 (January 1 -March 31) M Quarter 3(July 1 -September 30) L 'L Identify monitoring quarter o a •_ (select only one): 0 C1 El Quarter 2(April 1-June 30) El Quarter 4(October 1 -December 31) SECTION • •R DATA Discharge Point Description/Name: Was dewatering water discharged during the monitoring quarter? iE:Yes(Enter the data below) El No(Skip to Section VII) Specific Week within e(NTU)2 Benchmark Threshold Alternate Benchmark Average exceeds Benchmark?4 Monitoring Quarter' Weekly Average (NTU) Threshold (NTU)3 Week 1 50 El Yes El No Week 2 50 El Yes El No Week 3 50 El Yes El No Week 4 50 El Yes El No O Week 5 50 El Yes El No a Week 6 50 IE Yes El No •i O Week 7 50 El Yes No a O Week 8 50 IM Yes No D Week 9 50 El Yes No Week 10 50 El Yes No Week 11 50 El Yes No Week 12 50 El Yes El No Week 13 50 IE Yes El No Week 14 50 El Yes El No 'Refer to Table K-1 to determine the specific monitoring week number for which you are reporting turbidity data for this quarter. 2 Report to the nearest whole number.Enter"N/A"if no dewatering discharge occurred during any particular week. 3 Prior approval from the EPA Regional Office is required pursuant to Part 3.3.2.b.Unless and until EPA approves your request to use an alternate benchmark,you are required to use the standard benchmark of 50 NTU and take any required corrective actions if an exceedance occurs. Enter"N/A"if you have not received approval for an alternate benchmark threshold. 4If"Yes,"the operator must conduct follow-up corrective action pursuant to Part 5.2.2 and document any corrective action taken in the corrective action log in accordance with Part 5.4. EPA Form 6100-065 Page 2 VII.CERTIFICATION INFORMATION certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false p information,including the possibility of fine and imprisonment for knowing violations. a E First Name Middle Initial Last Name p Title a U L Signature Date(MM/DD/YYYY) U Phone Number Email Address EPA Form 6100-065 Page 3 Instructions for Completing EPA Form 6100-065 Turbidity Monitoring Report for Dewatering Discharges to Sensitive Waters Under the 2022 NPDES Construction General Permit NPDES Form Date(02/22) Form Approved OMB No.2040-0305 General Instructions definition of "operator." Provide the operator's mailing address, phone number, and e-mail. The operator Who Must Submit A Turbidity Monitoring Report to EPA? information in this Section should match the operator Sites covered under the Construction General Permit (CGP information provided on your NOI form. or permit) that are required to monitor pursuant to Part 3.3 If this form was prepared by someone other than the certifier, of the permit must submit Turbidity Monitoring Reports include the name, organization, phone number, and email consistent with the reporting requirements specified in Part address of the person who prepared this form. 3.3.4 of the permit. Section IV.Site Information When Must I Submit A Turbidity Monitoring Report to EPA? Enter the official or legal name and complete street address, You must submit your report to EPA no later than 30 days including city, State, ZIP code, and county or similar following the end of each monitoring quarter.Submit a form government subdivision of the site. If the site lacks a street for every quarter the site is active. address, indicate the general location (e.g., Intersection of State Highways 61 and 34).The site information in this Section Monitoring Reporting should match the site information provided on your NOI form. Quarter# Months Deadline Section V.Monitoring Quarter 1 January 1 -March 31 April 30 Indicate the appropriate monitoring quarter(Quarter 1,2,3, 2 April 1 -June 30 July 30 or 4).The monitoring quarters are specified in the table in the section titled "When Must I Submit A Turbidity Monitoring 3 July 1 -September 30 October 30 Report to EPA."Select only one quarter. 4 October 1 -December 31 January 30 Section VI.Turbidity Monitoring Data Completing the Form Provide the discharge point description/name if you are discharging dewatering water from more than one point at Obtain and read a copy of the 2022 CGP, viewable at the site.If you are discharging from only one point at the site, https://www.epa.gov/npdes/stormwater-discharges- leave the spaces blank. construction-activities#cgp. To complete this form, type or print, using uppercase letters, in the appropriate areas only. Submit Section VI data for each dewatering discharge point. Please submit the original document with signature in ink-do For example, if you are discharging dewatering water from not send a photocopied signature. Photocopy your form for two points at the site, then submit two Section Vls (one for your records before you send the completed original form to each discharge point). the appropriate address. Indicate whether dewatering occurred during the monitoring Section I.Approval to Use Paper Form quarter. If"Yes"enter the data in the data table.If"No"skip to Section VII. You must indicate whether you have been granted a waiver from electronic reporting from the EPA Regional Office.Note For averaging purposes, a monitoring week starts with a that you are not authorized to use this paper form unless the Monday and ends on Sunday.A numerical value is assigned EPA Regional Office has approved its use. Where you have for each week,which is called a Week Number (e.g., 1,2,3 obtained approval to use this form,indicate the waiver that etc.).The form includes a Week Number for each week of the you have been granted, the name of the EPA staff person year. Refer to Table K-1 for the dates that correspond with who granted the waiver, and the date that approval was each Week Number. provided. See https://www.epa.gov/npdes/contact-us- stormwater for a list of EPA Regional Office contacts. Next, calculate the weekly average turbidity value for the corresponding monitoring week. The weekly average is Section II.Permit Information calculated by adding all of the individual turbidity results for that monitoring week and dividing by the total number of Provide the NPDES ID (i.e., NOI tracking number) assigned to samples. The calculation for the weekly average includes the site for which this form is being submitted.Submit the form only those days when dewatering discharge occurred. Days only for sites discharging dewatering water to a sediment- when no dewatering discharge occurred, and therefore do impaired water or a water designated as a Tier 2,Tier 2.5,or not have turbidity data associated with them, are not Tier 3 water. included in the calculation of the weekly average. For example,if turbidity samples from your dewatering discharge Indicate whether this report fulfills turbidity monitoring report in week 1 result in values of 30 NTU on Tuesday, 40 NTU on obligations of other operators that are covered under this Wednesday, and 45 NTU on Thursday, your weekly average permit for the same project site. If the answer is yes, provide turbidity value would be 38 NTU ((30+40+45) =3= 38 NTU). If all relevant NPDES ID numbers. in week 2,your turbidity samples resulted in values of 45 NTU Section III.Operator Information on Monday,30 NTU on Tuesday,25 NTU on Wednesday,and 15 NTU on Thursday,you would calculate a new average for Provide the legal name of the person, firm, public that week,which would yield an average turbidity value of organization, or any other entity that is considered the 29 NTU ((45+30+25+15) =4 = 29 NTU). By comparison, if your operator of the site. See Part 1.1.1 and Appendix A for samples on consecutive days from Friday to Monday were 60 the Page 4 EPA Form 6100-065 NTU,45 NTU,40 NTU,and 43 NTU,respectively, and there are For a municipality, State, Federal, or other public agency: By no other dewatering discharges for the remainder of the either a principal executive officer or ranking elected official. week, you would calculate one weekly average for the For purposes of this Part, a principal executive officer of a Friday to Sunday to be 48 NTU ((60+45+40)=3=48 NTU),and Federal agency includes(i) the chief executive officer of the a separate weekly average for the one Monday to be 43 NTU agency,or(ii) a senior executive officer having responsibility (43 . 1 = 43 NTU). for the overall operations of a principal geographic unit of the agency(e.g.,Regional Administrator of EPA).Include the If you collect and analyze more than one turbidity sample name and title of the person signing the form and the date per day from your dewatering discharge, you must include of signing. any additional results in the calculation of your weekly average. For example, if during a monitoring week you take A person is a duly authorized representative only if: two turbidity samples on Tuesday with a value of 30 NTU and 35 NTU,three samples on Wednesday with a value of 40 NTU, l. The authorization is made in writing by a person 45 NTU,and 48 NTU,and one sample on Thursday with a value described above; of 45 NTU, your weekly average turbidity value for this week 2. The authorization specifies either an individual or a would be 41 NTU ((30+35+40+45+48+45)+6=41 NTU). position having responsibility for the overall operation of the Enter the weekly average turbidity values for the regulated facility or activity such as the position of plant corresponding week into the table.Enter"N/A"into the table manager, operator of a well or a well field, superintendent, for the turbidity weekly average if no dewatering discharge position of equivalent responsibility, or an individual or occurred during the week. position having overall responsibility for environmental matters for the company, (A duly authorized representative The benchmark threshold for turbidity for this permit is 50 NTUs may thus be either a named individual or any individual unless EPA has authorized the use of an alternate benchmark occupying a named position.) and in accordance with Part 3.3.2.b.If you are using an alternate 3. The written authorization is submitted to the Director. benchmark threshold,enter the number into the table for the corresponding week. Unless and until EPA approves your An unsigned or undated form will be considered incomplete. request to use an alternate benchmark,you are required to use the standard benchmark of 50 NTU and take any Submitting Your Form required corrective actions if an exceedance occurs. Enter If you have been granted a waiver from your Regional Office "N/A" if you have not received approval for an alternate to submit a paper form, you must send your form by mail to benchmark threshold. one of the following addresses: For each week with a value for the weekly average, select For Regular U.S.Mail Delivery: "Yes" or "No" in the table to indicate whether the weekly average value exceeds the 50 NTU benchmark or the Stormwater Notice Processing Center alternate turbidity benchmark (whichever is applicable). If Mail Code 4203M,ATTN:2022 CGP Reports "Yes",the operator must conduct follow-up corrective action U.S.EPA pursuant to Part 5.2.2 and document any corrective action 1200 Pennsylvania Avenue,NW taken in the corrective action log in accordance with Part Washington, DC 20460 5.4. For Overnight/Express Mail Delivery: Section VII.Certification Information Stormwater Notice Processing Center Forms must be signed by a person described below,or by a William Jefferson Clinton East Building-Room 7420 duly authorized representative of that person. ATTN:2022 CGP Reports U.S.EPA For a corporation: By a responsible corporate officer. For the 1201 Constitution Avenue,NW purpose of this Section, a responsible corporate officer Washington, DC 20004 means: Visit this website for instructions on how to submit (i) a president, secretary, treasurer, or vice-president of the electronically: corporation in charge of a principal business function,or any other person who performs similar policy-or decision-making https://epanet.zendesk.com/hc/en- functions for the corporation, or (ii) the manager of one or us/sections/115000949868-CGP-Training-Material more manufacturing, production, or operating facilities, Revisions to a Submitted Form provided,the manager is authorized to make management decisions which govern the operation of the regulated If you have previously submitted a form with an error,submit facility including having the explicit or implicit duty of making a revised form with the correct information.After discovering major capital investment recommendations, and initiating the error,submit the revised form as soon as possible.Make a and directing other comprehensive measures to assure long- notation on the revised form where the correction was made. term environmental compliance with environmental laws Paperwork Reduction Act Notice and regulations;the manager can ensure that the necessary systems are established or actions taken to gather complete This collection of information is approved by OMB under the and accurate information for permit application Paperwork Reduction Act, 44 U.S.C. 3501 et seq. requirements; and where authority to sign documents has (OMB Control No. 2040-0305). Responses to this been assigned or delegated to the manager in accordance collection of information are mandatory (40 CFR 122.26). with corporate procedures. An agency may not conduct or sponsor, and a person is For a partnership or sole proprietorship: By a general partner not required to respond to, a collection of information or the proprietor,respectively;or unless it displays a currently valid OMB control number.The public reporting and recordkeeping burden for this collection of information is EPA Form 6100-065 Page 5 estimated to be 0.2 hours per response.Send comments on the Agency's need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821 T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address. EPA Form 6100-065 Page 6 Table K-1:2022 CGP-Dates Corresponding to Monitoring Weeks for Each Monitoring Quarter 2022 2023 2024 2025 2026 2027 Monday Sunday Monday Sunday Monday Sunday Monday Sunday Monday Sunday Monday Sunday Monitoring Quarter Week# Start Date End Date Monitoring Quarter Week# Start Date End Date Monitoring Quarter Week# Start Date End Date Monitoring Quarter Week# Start Date End Date Monitoring Quarter Week# Start Date End Date Monitoring Quarter Week# Start Date End Date 1 1/2/23 1/8/23 1 1/1/24 1/7/24 1 1/6/25 1/12/25 1 1/5/26 1/11/26 1 1/4/27 1/10/27 2 1/9/23 1/15/23 2 1/8/24 1/14/24 2 1/13/25 1/19/25 2 1/12/26 1/18/26 2 1/11/27 1/17/27 3 1/16/23 1/22/23 3 1/15/24 1/21/24 3 1/20/25 1/26/25 3 1/19/26 1/25/26 3 1/18/27 1/24/27 4 1/23/23 1/29/23 4 1/22/24 1/28/24 4 1/27/25 2/2/25 4 1/26/26 2/1/26 4 1/25/27 1/31/27 5 1/30/23 2/5/23 5 1/29/24 2/4/24 5 2/3/25 2/9/25 5 2/2/26 2/8/26 5 2/1/27 2/7/27 6 2/6/23 2/12/23 6 2/5/24 2/11/24 6 2/10/25 2/16/25 6 2/9/26 2/15/26 6 2/8/27 2/14/27 1 7 2/14/22 2/20/22 1 7 2/13/23 2/19/23 1 7 2/12/24 2/18/24 1 7 2/17/25 2/23/25 1 7 2/16/26 2/22/26 1 7 2/15/27 2/21/27 8 2/21/22 2/27/22 8 2/20/23 2/26/23 8 2/19/24 2/25/24 8 2/24/25 3/2/25 8 2/23/26 3/1/26 9 2/28/22 3/6/22 9 2/27/23 3/5/23 9 2/26/24 3/3/24 9 3/3/25 3/9/25 9 3/2/26 3/8/26 10 3/7/22 3/13/22 10 3/6/23 3/12/23 10 3/4/24 3/10/24 10 3/10/25 3/16/25 10 3/9/26 3/15/26 11 3/14/22 3/20/22 11 3/13/23 3/19/23 11 3/11/24 3/17/24 11 3/17/25 3/23/25 11 3/16/26 3/22/26 12 3/21/22 3/27/22 12 3/20/23 3/26/23 12 3/18/24 3/24/24 12 3/24/25 3/30/25 12 3/23/26 3/29/26 13 3/28/22 4/3/22 13 3/27/23 4/2/231 13 1 3/25/24 3/31/24 13 1 3/31/25 4/6/251 13 1 3/30/26 4/5/26 1 4/4/22 4/10/22 1 4/3/23 4/9/23 1 4/1/24 4/7/24 1 4/7/25 4/13/25 1 4/6/26 4/12/26 2 4/11/22 4/17/22 2 4/10/23 4/16/23 2 4/8/24 4/14/24 2 4/14/25 4/20/25 2 4/13/26 4/19/26 3 4/18/22 4/24/22 3 4/17/23 4/23/23 3 4/15/24 4/21/24 3 4/21/25 4/27/25 3 4/20/26 4/26/26 4 4/25/22 5/1/22 4 4/24/23 4/30/23 4 4/22/24 4/28/24 4 4/28/25 5/4/25 4 4/27/26 5/3/26 5 5/2/22 5/8/22 5 5/1/23 5/7/23 5 4/29/24 5/5/24 5 5/5/25 5/11/25 5 5/4/26 5/10/26 6 5/9/22 5/15/22 6 5/8/23 5/14/23 6 5/6/24 5/12/24 6 5/12/25 5/18/25 6 5/11/26 5/17/26 2 7 5/16/22 5/22/22 2 7 5/15/23 5/21/23 2 7 5/13/24 5/19/24 2 7 5/19/25 5/25/25 2 7 5/18/26 5/24/26 8 5/23/22 5/29/22 8 5/22/23 5/28/23 8 5/20/24 5/26/24 8 5/26/25 6/1/25 8 5/25/26 5/31/26 9 5/30/22 6/5/22 9 5/29/23 6/4/23 9 5/27/24 6/2/24 9 6/2/25 6/8/25 9 6/1/26 6/7/26 10 6/6/22 6/12/22 10 6/5/23 6/11/23 10 6/3/24 6/9/24 10 6/9/25 6/15/25 10 6/8/26 6/14/26 11 6/13/22 6/19/22 11 6/12/23 6/18/23 11 6/10/24 6/16/24 11 6/16/25 6/22/25 11 6/15/26 6/21/26 12 6/20/22 6/26/22 12 6/19/23 6/25/23 12 6/17/24 6/23/24 12 6/23/25 6/29/25 12 6/22/26 6/28/26 13 6/27/22 7/3/22 13 6/26/23 7/2/23 13 6/24/24 6/30/24 13 6/30/25 7/6/25 13 6/29/26 7/5/26 1 7/4/22 7/10/22 1 7/3/23 7/9/23 1 7/1/24 7/7/24 1 7/7/25 7/13/25 1 7/6/26 7/12/26 2 7/11/22 7/17/22 2 7/10/23 7/16/23 2 7/8/24 7/14/24 2 7/14/25 7/20/25 2 7/13/26 7/19/26 3 7/18/22 7/24/22 3 7/17/23 7/23/23 3 7/15/24 7/21/24 3 7/21/25 7/27/25 3 7/20/26 7/26/26 4 7/25/22 7/31/22 4 7/24/23 7/30/23 4 7/22/24 7/28/24 4 7/28/25 8/3/25 4 7/27/26 8/2/26 5 8/1/22 8/7/22 5 7/31/23 8/6/23 5 7/29/24 8/4/24 5 8/4/25 8/10/25 5 8/3/26 8/9/26 6 8/8/22 8/14/22 6 8/7/23 8/13/23 6 8/5/24 8/11/24 6 8/11/25 8/17/25 6 8/10/26 8/16/26 3 7 8/15/22 8/21/22 3 7 8/14/23 8/20/23 3 7 8/12/24 8/18/24 3 7 8/18/25 8/24/25 3 7 8/17/26 8/23/26 8 8/22/22 8/28/22 8 8/21/23 8/27/23 8 8/19/24 8/25/24 8 8/25/25 8/31/25 8 8/24/26 8/30/26 9 8/29/22 9/4/22 9 8/28/23 9/3/23 9 8/26/24 9/1/24 9 9/1/25 9/7/25 9 8/31/26 9/6/26 10 9/5/22 9/11/22 10 9/4/23 9/10/23 10 9/2/24 9/8/24 10 9/8/25 9/14/25 10 9/7/26 9/13/26 11 9/12/22 9/18/22 11 9/11/23 9/17/23 11 9/9/24 9/15/24 11 9/15/25 9/21/25 11 9/14/26 9/20/26 12 9/19/22 9/25/22 12 9/18/23 9/24/23 12 9/16/24 9/22/24 12 9/22/25 9/28/25 12 9/21/26 9/27/26 13 9/26/22 10/2/22 13 9/25/23 10/1/23 13 9/23/24 9/29/24 13 9/29/25 10/5/25 13 9/28/26 10/4/26 1 10/3/22 10/9/22 1 10/2/23 10/8/23 14 9/30/24 10/6/24 1 10/6/25 10/12/25 1 10/5/26 10/11/26 2 10/10/22 10/16/22 2 10/9/23 10/15/23 1 10/7/24 10/13/24 2 10/13/25 10/19/25 2 10/12/26 10/18/26 3 10/17/22 10/23/22 3 10/16/23 10/22/23 2 10/14/24 10/20/24 3 10/20/25 10/26/25 3 10/19/26 10/25/26 4 10/24/22 10/30/22 4 10/23/23 10/29/23 3 10/21/24 10/27/24 4 10/27/25 11/2/25 4 10/26/26 11/1/26 5 10/31/22 11/6/22 5 10/30/23 11/5/23 4 10/28/24 11/3/24 5 11/3/25 11/9/25 5 11/2/26 11/8/26 6 11/7/22 11/13/22 6 11/6/23 11/12/23 5 11/4/24 11/10/24 6 11/10/25 11/16/25 6 11/9/26 11/15/26 4 7 11/14/22 11/20/22 4 7 11/13/23 11/19/23 6 11/11/24 11/17/24 4 7 11/17/25 11/23/25 4 7 11/16/26 11/22/26 8 11/21/22 11/27/22 8 11/20/23 11/26/23 4 7 11/18/24 11/24/24 8 11/24/25 11/30/25 8 11/23/26 11/29/26 9 11/28/22 12/4/22 9 11/27/23 12/3/23 8 11/25/24 12/1/24 9 12/1/25 12/7/25 9 11/30/26 12/6/26 10 12/5/22 12/11/22 10 12/4/23 12/10/23 9 12/2/24 12/8/24 10 12/8/25 12/14/25 10 12/7/26 12/13/26 11 12/12/22 12/18/22 11 12/11/23 12/17/23 10 12/9/24 12/15/24 11 12/15/25 12/21/25 11 12/14/26 12/20/26 12 12/19/22 12/25/22 12 12/18/23 12/24/23 11 12/16/24 12/22/24 12 12/22/25 12/28/25 12 12/21/26 12/27/26 13 12/26/22 1/1/23 13 12/25/23 12/31/23 12 12/23/24 12/29/24 13 12/29/25 1/4/26 13 12/28/26 1/3/27 13 12/30/24 1/5/25 t iiriirn t iir III::1 III III u t iii in III:°I luaus iir)t iii in III:::.,III in( III:°:l III:°)III:°)) Maink III ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix BufferDocumentation O•. 0-2 Appendix O:Buffer Documentation \\0b.com\gbl\proj\Wat-LD\11625.37 Merrimack Lecture Hall\cad\Id\Planset\Local Approvals\l 162537-PREP.dwg E O TURNPIKE STREET/ROUTE 174 TURNPIKE STREET/ROUTE 114vhb " �r 260 Arsenal PI#2 PO Box 9151 Watertown,MA 02471 - 617.924.1770 PROVIDE SILTSOCK AT BACK --v OF CURB OPENINGS -- - --- - - --- - -- -- ---- - 1 -- - - FIELD VERIFY EXISTING LIGHTING CONDUIT,. - RELOCATE AS REQUIRED AROUND NEW AHERNE ROAD EQUIPMENT tIGHTPOLE TO REMAIN717 a STABILIZED CONSTRUCTION EXIT :a..-..........:::: a. �......... ................... ............. ,.» ... X 40 x X r �X X t 11 � 1 ————RESET — RESET BENMARK 36"EXISTING TREE TO BE REMOVED L ' . ...,�, k I AS NEEDED . 28"EXISTING TREE TO BE REMOVED X X• I CONFIRM EXISTING STEAM IS 26"EXISTING TREE TO BE REMOVED I 0 X ABANDONED AND REMOVE WITHIN I 10'OF BUILDING FOOTPRINT = kP I. X'AX X 22"EXISTING TREE TO BE REMOVEDX.... ���CCC �' XX xxXXXXXXXXXX XXXXXXXXXXXXXX o. 0 X xXXX XXXXXXXXXXXXxxxxxxxxxxxxxxx IX III{I XxXXXXXX RELOCATE EXISTING TELECOM xXX X� X L -- �X 'MAINTAIN ACCESS FOR IXX UTILITY MAINTENANCE SILTSOCK/SI LT FENCE L J y PROTECT EXISTING TRANSFORMER r BARRIER(TYP X ;. ... — X � \ k REMOVE EXISTING WATER XQ1- -- .� I 0 10 20 40 Feet IN J REMOVE DRAIN Merrimack College SILTSACK SEDIMENT ' TRAP(TYP) REMOVE EXISTING PAtMENT " Lecture Hall N 315 Turnpike Street 1 North Andover,MA No. Re=,o, oar App d. 1 Response to Comments 10/3024 DT r ® 0 s rr d M O 1 x x------ ------ x =x �• - x -- Q - x x •�__ o I Issued for D- TREE PROTECTION FFNCE�TYP) Local Approvals September 12,2024 'm I a Not Approved for Construction Site Preparation and --- EXISTING TREE INVENTORY o - -- 81 Control PROTECTED/ CODE CALIPER SIZE NAME REMOVED Notes V b 26" Norway Spruce Removed D Genera < - .'y --- Q2 22" Norway Spruce Removed 1 ELEVATIONS SHOWN ARE BASED ON NAVD OF 1988. 0 24" Maple Protected oawm9 N—u,, ' --- ---- ® 48" Silver Maple Protected 2. CATCH BASINS WITHIN AND IMMEDIATELY DOWNSTREAM OF THE LIMIT OF WORK SHALL BE FITTED WITH SEDIMENT TRAPS UNTIL THE SITE IS PERMANENTLY STABILIZED. c •O o QS 30" Silver Maple Protected 3. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO CONSTRUCTION. �H OF k4C2 00 © 30" Silver Maple Protected �p� SS,q sa -- - 0 24" Silver Maple Protected 4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING �= OIANE yj; o � -- CONSTRUCTION EXITS AT ALL CONSTRUCTION VEHICLE ACCESS POINTS ONTO y' ® 48" Silver Maple Protected DISTURBED AREAS OF THE SITE.CONSTRUCTION EXISTS SHALL BE MAINTAINED UNTIL o TRAIN O -- - " No.54369 " Sh- or >; - DISTURBED PORTIONS OF THE SITE ARE STABILIZED AS DETERMINED BY THE ENGINEER. - Q9 20" Linden Protected Z 8 20" Linden Protected 5. PRIOR TO ANY LAND DISTURBANCE ACTIVITIES COMMENCING ON THE SITE,THE NALENG a 36" Oak Removed CONTRACTOR AND/OR DEVELOPER SHALL PHYSICALLY MARK LIMITS OF NO LAND 1 DISTURBANCE WITH TAPE,SIGNS,OR ORANGE CONSTRUCTION FENCE,SO THAT ( © WORKERS CAN SEE THE AREAS TO BE PROTECTED.THE PHYSICAL MARKERS SHALL BE Lti a,� lea N�mbe, - - 28" London Plane Removed Tree 11625.37 N INSPECTED DAILY. ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix P� Spill LogTemplate Forms P-1 Appendix P:Spill Log and Template Forms Operationsi I Lecture Hall at Merrimack , MA Hazardous Waste & Oil Spill Report Date: Time: AM/PM Exact location (Transformer#): Type of equipment: Make: Size: S/N: Weather Conditions: On or near water? ❑ Yes If es, name of body of water: ❑ No y y Type of chemical/oil spilled: Amount of chemical/oil spilled: Cause of spill: Measures taken to contain or clean up spill:ill: Amount of chemical/oil recovered: Method: Material collected as a result of cleanup: drums containing drums containing drums containing Location and method of debris disposal: Name and address of any person, firm, or corporation suffering charges:P 9 9 Procedures, method,and precautions instituted to prevent a similar occurrence from recurring: Spill reported by General Office by: Time: AM/ PM Spill reported to DEP/National Response Center b P P P Y DEP Date: Time: AM/ PM InsP ector: N RC Date: Ti me: AM/ PM I nsP ector: Additional comments: 6-3 Spill Prevention Operations i I Lecture Halli o Andover, MA ��33 Asses °°° .°°°°°°°°- ��hniltiI4 iinmen't The supervisor or manager will assess the incident and initiate containment control measures with the appropriate spill containment equipment included in the spill kit kept on-site.A list of recommended spill equipment to be kept on site is included on the following page. Fire/ Police Department: 911 North Andover Health Department (978) 688-9540 North Andover Conservation (978) 688-9530 Commission: Emergency Response Equipment The following equipment and materials shall be maintained at all times and stored in a secure area for long-term emergency response need. Supplies Quantity Recommended Suppliers Sorbent Pillows/"Pigs" 2 ,Iht-tpj .ne i xor Item#KIT276 —mobile container with two pigs Sorbent Boom/Sock 25 feet forestir su Iliers.cor�n .III.. a Sorbent Pads 50 Lite-Dri® Absorbent 5 pounds Shovel 1 Item#33934—Shovel (or equivalent) Pry Bar 1 Item#43210—Manhole cover pick(or equivalent) Goggles 1 pair Item#23334—Goggles(or equivalent) Gloves—Heavy 1 pair Item#90926—Gloves(or equivalent) B-4 Spill Prevention ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix Q: Chemical Information Q-1 Appendix Q:Chemical Information Appendix J - Suggested Format for Request for Chemical Treatment If you plan to add "cationic treatment chemicals" (as defined in Appendix A) to stormwater and/or authorized non-stormwater prior to discharge, Part 1.1.9 requires you to notify your applicable EPA Regional Office in advance of submitting your NOI. The EPA Regional Office will authorize coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will result in discharges that meet applicable water quality standards. To notify your EPA Regional Office, you may use following form. U.S.Environmental Protection Agency NPDES Washington,DC 20460 OMB No. Form 2040-0305 6100-066 vvEPA Suggested Form for Notifying EPA about Proposed Use of Cationic Treatment Exp.Date Chemicals under the 2022 NPDES Construction General Permit 01/31/2025 Under Part 1.1.9 of the 2022 CGP,if you plan to add"cationic treatment chemicals" (as defined in Appendix A)to stormwater and/or authorized non- stormwater prior to discharge,you may not submit your Notice of Intent(NOI)until you notify your applicable EPA Regional Office in advance and the EPA Regional Office authorizes coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will result in discharges that meet applicable water quality standards.You may use this suggested form to notify your EPA Regional Office about your proposed use of cationic treatment chemicals. SECTIONOPERATOR INFORMATION Operator Name Mailing Address O Street v E L O r- City State ZIP Code L O a L O County or Similar Government Division O Phone Number Email Address SECTION •••JECT/SITE INFORMATION Project/Site Name Project/Site Address Street/Location City State ZIP Code c O a County or Similar Government Division L O O Site Contact Information(if different from operator) h First Name Middle Initial Last Name N O L a Phone Number Receiving Waterbodies Name(s)of Receiving Waterbodies: SECTION Attach a map that illustrates the entire site including all of the below items.Include this map in your Stormwater Pollution Prevention Plan (SWPPP). -All receiving waterbodies -All proposed location(s)of chemical treatment system(s) -All proposed point(s)of discharge to receiving waterbodies -All soil types within areas to be disturbed a -All areas of earth disturbance -Sufficient indication of topography to indicate where stormwater flows Attach a schematic drawing of the proposed treatment system(s).Include all components of the treatment train,sample points,and pipe configurations.In addition to sufficient holding capacity upstream of treatment,the system must have the capacity to hold water for testing and to re-treat water that does not meet water quality standards. EPA Form 6100-066 Page 1 SECTION • PERSONNEL Treatment System Operator or Company Name(if subcontracted out): Street/Location City State ZIP Code Responsible Personnel = List personnel who will be responsible for Cite the training that the personnel have received in operation and maintenance of the H operating the chemical treatment systems treatment system(s)and use of the specific chemical(s)proposed. and application of the chemicals. N 0 Q SECTION • • ❑ Chitosan enhanced sand filtration with discharge to infiltration(ground water). ❑ Chitosan enhanced sand filtration with discharge to temporary holding ponds(batch). Check proposed ❑ Chitosan enhanced sand filtration with discharge to surface waters(flow-through). treatment system to be used: ❑ Other(describe below and submit documentation that the proposed system and chemical(s)demonstrate the ability to remove turbidity and produce non-toxic effluent/discharge): ❑ FlocClearTM(2%chitosan acetate solution). E El Storml(lear.0- T"'LiquiFlocT"'(1%chitosan acetate solution). ~ Check proposed cationic chemical(s)to ❑ ChitoVanTM(1%chitosan acetate solution). p be used: CL a ❑ StormKlearTm LiquiFlocTM(3%chitosan acetate solution). ❑ Other(Specify): Estimated Treatment Period Start Date(MM/DD/YYYY) Estimated Treatment Period End Date(MM/DD/YYYY) Describe sampling and recordkeeping schedule.Attach additional sheets as needed: EPA Form 6100-066 Page 2 Explain why you have selected this proposed treatment system and chemicals.Include an explanation of why the use of cationic treatment chemicals is necessary at the site.Reference how the soil types on your site influenced your choices.Describe or provide an illustration of how the site of the discharge will be stabilized and why the discharge location will not cause erosion of the discharge water's bank or bed(please note that a permit from the Corps and State agencies may be necessary to place rock in the water body for this stabilization).Attach as many additional sheets as needed for a full explanation.If you have a report from a chemical treatment contractor describing their recommended } approach you may attach that. E a L N O Q O SECTION VI.CERTIFICATION INFORMATION have documented and hereby certify that the following information is correct and has been documented in the SWPPP for this project: • The SWPPP includes a complete site-specific description of the chemical treatment system herein proposed for use,including specifications,design,and Material Safety Data Sheets for all chemicals to be used. • The controls to be used on the site are compatible with the safe and effective use of cationic chemical treatment. • I verified through jar tests that the site soil is conducive to chemical treatment. • I verified that the chemical treatment system operators for this project received training. • I read,understand,and will follow all conditions and design criteria in the applicable use designation(s). • If the discharge is to Tribal waters,I notified the appropriate Tribal government of the intent to use chemical treatment on a site located within that jurisdiction. • I will keep the use level designation,operation and maintenance manual,and training certificate on site prior to and during use of chemical treatment. • A licensed engineer designed the system for this project including system sizing,pond sizing,and flow requirements. O • 1 verify that the discharge will not adversely affect downstream conveyance systems or stream channels(e.g.,cause erosion). a E I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a ,O system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. U } Authorized Official L U First Name Middle Initial Last Name Title Signature Date(MM/DD/YYYY) Email Address EPA Form 6100-066 Page 3 Instructions for Submitting EPA Form 6100-066 Suggested Form for Notifying EPA about Proposed Use of Cationic Treatment Chemicals under the 2022 NPDES Construction General Permit NPDES Form Date(02/22) Form Approved OMB No.2040-0305 Section I.Operator Information and initiating and directing other comprehensive measures to assure long-term environmental compliance with Provide the legal name of the person,firm,public environmental laws and regulations;the manager can organization,or any other entity that operates the project. ensure that the necessary systems are established or actions Refer to Appendix A of the permit for the definition of taken to gather complete and accurate information for "operator." Provide the operator's mailing address,county, permit application requirements;and where authority to telephone number,and e-mail address. sign documents has been assigned or delegated to the manager in accordance with corporate procedures. Section II.Project/Site Information For a partnership or sole proprietorship:By a general partner Enter the official or legal name and complete street or the proprietor,respectively;or address,including city,State,ZIP code,and county or similar government subdivision of the project or site.If the project For a municipality,State,Federal,or other public agency:By or site lacks a street address,indicate the general location either a principal executive officer or ranking elected of the site (e.g.,Intersection of State Highways 61 and 34). official.For purposes of this Part,a principal executive officer of a Federal agency includes (i) the chief executive officer Provide site contact information,if different from the of the agency,or(ii) a senior executive officer having operator. responsibility for the overall operations of a principal geographic unit of the agency(e.g., Regional Administrator Provide the name of the receiving waterbodies to which of EPA).Include the name and title of the person signing the your site/project will discharge. form and the date of signing. Section III.Map Submitting Your Form Attach a map of the entire site that includes the identified Submit this form to your applicable EPA Regional Office. items.Attach a schematic of the proposed treatment Contact information can be found at: system(s) that includes the identified items. https://v✓ww.epa.gov/npdes/contact-us- Section IV. Responsible Personnel stormwater#regional Provide the legal name of the treatment system operator or company and complete street address,including city, State,including city,State,and ZIP code. List personnel who will be responsible for operating the chemical treatment systems and application of the chemicals. For each personnel listed,cite the training that the personnel have received in operation and maintenance of the treatment system(s) and use of the specific chemical(s) proposed. Section V. Proposed Treatment Indicate the proposed treatment system and proposed cationic chemicals to be used.Indicate the estimated treatment start and end dates.Describe the sampling and recordkeeping schedule. Explain why you have selected the proposed treatment system and chemicals. Section VI.Certification Information The form must be signed as follows: For a corporation: By a responsible corporate officer. For the purpose of this Section,a responsible corporate officer means: (i) a president,secretary,treasurer,or vice-president of the corporation in charge of a principal business function,or any other person who performs similar policy-or decision- making functions for the corporation,or(ii) the manager of one or more manufacturing, production,or operating facilities,provided,the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, EPA Form 6100-066 Page 4 iirim t iir III::1 III III u t iii iin III:°I luaus iir)t iii iin III:::.,III in( III:°:I III:°)III:°)) Maink III ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix R• UIC Well Correspondence R-1 Appendix R:UIC Well Correspondence Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials Introduction Massachusetts Department of Environmental Protection (MassDEP) Permit and Registration Applications, as well as these Instructions & Supporting Materials, also are available for download from the MassDEP Web site at II -[-tjL.-//www.lir mass. ee ii lii iir ass e ii liic tiro s in two file formats: Microsoft Word TM and Adobe Acrobat PDFTM. Either format allows documents to be printed. Instructions & Supporting Materials files in Microsoft Word TM format contain a series of documents that provide guidance on how to prepare a permit application. Permit Applications in Microsoft Word format must be downloaded separately. Users with Microsoft Word TM 97 or later may complete these forms electronically. Permitting packages in Adobe Acrobat PDF format combine Permit Applications and Instructions & Supporting Materials in a single document. Adobe Acrobat PDFTM files may only be viewed and printed without alteration. Permit Applications in this format may not be completed electronically, but must be printed and completed using a typewriter or by hand. Permit Name Registration Stormwater Discharge Well Permit Code BRP WS06 (includes BRP WS06 categories as cited in the permit and fees regulations 310 CMR 4.00) („ „ „ iirn a v e ii c tiff e iir s e e ii nice iir t ii ii 1 ii it 14,IOG tlii ii tlii ii ,sc u Ia iir !, e tiro liis lii ii s t�irr ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,p...,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,........................,...... Purpose of Regulating the injection of fluids to the ground to prevent contamination of Registration groundwater used as a source of drinking water. For Assistance Contact MassDEP Bureau of Resource Protection, Underground Injection Control with this (UIC) Program: application For all UIC types: 7 -5859. For email questions: III ._I „....................................................... .. to ii ,,,,,,,,,, u Stormins.doc rev.08/13 Page 1 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials Who must Any party who has discharged, is discharging, or proposes to discharge to a Class V apply Stormwater Discharge Well as defined in 310 CMR 27.00 must apply unless exempted by 310 CMR 27.07 II ,,t�p, iirn s v/ a/ oc e /� iir lii /iir,,, a tlii iins/3 ii it d . Also any party that has a registered Class V stormwater discharge well with the UIC Program for which ownership, contents or type of discharge, physical location, number of wells, or construction details have or will change. Also any Class V water purification discharge well that was not previously registered and which is now being registered for Pre-Closure. The only types of Class V stormwater UIC wells not requiring UIC Registration are those associated with properties that are only used for single unit (family) residential use OR for which a permit has been obtained from the MassDEP Ground Water Discharge Program (314 CMR 5.00 ,, iirn e / eii cliff s/iirn ss e eit/lire u 'iii iir / 1 ��,cii iir 15 IOO it uii ,,,,,� it iii c iir e, eiiriirn'iiits tiff ). Typically the only types of Class V UIC wells that require a Ground Water Discharge Permit are those that are adding chemicals to the discharge to the UIC well. If you are attempting to register a different type of UIC Class V well then see the UIC Program's main web page im a s s.qo o eiiciii ii s c g..iird iiriii ii iii ii u co iiiir tii „)to obtain the applicable UIC Registration application form for your well type. Also see the "Class V Injection Well Category and Well Type Descriptions" link under the "Guidance" Section of this web page for descriptions of the various UIC Class V well types. May I submit No. A separate BRP WS 06 UIC Registration application form must be submitted for one application each facility address. Multiple wells may only be registered under one application if for multiple all wells are on the same property. Also, all wells must be in the same municipality properties? (with some limited exceptions). What land use This application form applies to all types of land uses. types must use this application Fees Depending upon the specific details concerning your application, your registration fee is $0, $110, $2203 $290, $400, $585 or$695. See the discussion below under Section A, Registration Fee to determine the applicable registration fee. Review timeline If MassDEP fails to issue a determination for the registration of the UIC Class V well on an adequately prepared BRP WS-06 application within 48 days of receipt of the application and payment of the application fee, the Department will refund the entire fee and will continue with the review. The same applies if MassDEP fails to issue a determination for the application for pre-closure of a UIC Class V well within 30 days of receipt of the application and payment of the application fee. Stormins.doc rev.08/13 Page 2 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials What Regulations that apply primarily include, but are not limited to: regulations Un derground Injection ControlProgram, 7 .- �/ i ass /eco i /iieraiiioii s/ 1 cii iir � apply? a These nd 1/. other MassDEP Regulations are available online at: ,, / ii /e / ii cliff /limn s /s,,,ii liic /tirogj ato ii / Or, they may be purchased at State Bookstore State Bookstore West Massachusetts State House 436 Dwight Street, Room 102 Room 116 g Boston, MA 02133 Springfield, MA 01103 617-727-2834 413-784-1376 The installation and operation of Class V Water Purification discharge wells shall What other comply with the MassDEP Standard Design Requirements for Shallow Injection requirements Wells. must be considered? You may only register one UIC Class V"well category" and "well type" combination with each BRP WS06 application. If your residence or facility includes multiple combinations of"well category" and "well type"then you must submit a separate BRP WS06 application with applicable payment transmittal form and fee for each unique combination. The requirement for separate applications applies whether for multiple single use wells or a single well that is used for more than one type of UIC Class V wastewater discharge. If your application is for the conversion of a well that was not previously registered then you must submit two (2) separate BRP WS06 applications (with 2 separate payment transmittal forms) and pay the fees associated with each registration application. One application must be submitted for the proposed converted new use and one for the closure or partial closure of the unregistered well use. In addition to the above UIC registration requirements, applicants should consider the need to obtain the following permits or sanctions that may apply: • Wetlands requirements should be checked through the local Conservation Commission; 0 Ground Water Discharge Permit Program (314 CMR 5.00 b,, limn .. v / ii cliff e /limn e iir/lire u tlii iir / 1 limn iir 15�-00 it u in iir Id iisc iir e�� iirii iiistii ; • A MassDEP Title 5 Permit (310 CMR 15.00 / limn s o e,,,,,,,�„/ in lii,,,,,,,s/limns e t iir/iire u tliioii 1 ,cirn iir,15 100 ,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, • Local Board of Health requirements may also apply; and, • Local Plumbing Inspector requirements. Note: The additional requirements listed above are examples intended to serve as a guide to the applicant. They do not necessarily include all possible additional requirements. How long is the UIC registrations for Class V wells currently do not have expiration dates provided Registration that the Owner/Operator submits a UIC Modification Application when pertinent valid? inventory information changes. Future changes in Massachusetts regulations may establish expiration/renewal dates for any and all UIC Class V well types. Stormins.doc rev.08/13 Page 3 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials How to Apply To submit an application to MassDEP, follow the steps described below: Step Action 1. Complete a MassDEP Transmittal Form for Permit Application and Payment. The transmittal form and required transmittal number can be obtained at a tirain jinn iitt al ,,,,,,,,,,,,,,,,iirir ,,,,,,,,,„o„iir„°,,,,, ,,,,,,,,,,, Submit payment and original signed transmittal form to the MassDEP address shown on the transmittal form. Please note that if you are sending in payment for multiple application forms you must submit a separate transmittal form (each with a unique transmittal number) for each form that is submitted. 2. Complete the appropriate Application Form - BRP WS 06 UIC Registration Stormwater Discharge Well(s). Include all specified information. Use additional sheets if necessary. 3. Submit a complete application package including a BRP WS-06 form, a copy of the Transmittal Form for Permit Application and Payment, and all specified attachments to: MassDEP, BRP UIC Program One Winter Street, 5th Floor Boston, MA 02108 Please note that if that the PO box shown on the Transmittal Form for Permit Application and Payment is for the bank that MassDEP uses to deposit permit and registration fees. If you send the entire application package to the PO box rather than the One Winter Street address, the bank will discard everything other than the Payment Transmittal Form and check and you will be required to resubmit your application package to MassDEP. 4. Retain a copy of the complete application package for your files. Instructions to assist with completing the application form: A. Registration Category and Fee Registration Category Identifying the type of registration activity you are conducting Registration Category: Expanded Description 1.a. Select this category for the first time registration of a proposed Registration of a Proposed or injection well(s) or an existing injection well unless the well is being Existing Unregistered UIC registered for the purpose of closing, partially closing, or converting it Wells to a new use. Stormins.doc rev.08/13 Page 4 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials Select this category for the first time registration of an existing injection well(s)for the purpose of closing or partially closing it unless also converting it to a new use. Also select this category for the 1.b. purpose of obtaining Pre-Closure approval for a well(s)that has Pre-Closure of an Unregistered already received a MassDEP UIC registration number where you also or Registered UIC Well(s) must modify any of the information that was submitted with the original UIC registration application for that well. If none of the original information must be changed then you should use the shorter BRP WS06d Pre-Closure application form for your convenience. Select this category for the first time registration of an existing injection well(s)for the purpose of closing the initial use and converting it to a new use. You must complete a separate BRP WS 06 application form for the use that the well is being converted to 1.c. (if applicable). Also select this category for the purpose of obtaining Pre-Closure of an Unregistered Pre-Closure approval for a well(s)that is being converted to a new or Registered UIC Well(s)and use and that has already received a MassDEP UIC registration Conversion to New Well Type number where you also must modify any of the information that was submitted with the original UIC registration application for that well If none of the original information must be changed then you should use the shorter BRP WS06d Pre-Closure application form for your convenience. 1.d. Select this category if you must make modifications or corrections to a Modification of a U I C g rY Registration Application that is previously submitted BRP WS06 application form that is still pending g MassDEP review and approval. Still Under Review at MassDEP 1.e. Modification of an Existing UIC Select this category for modification to an existingMassDEP Registration that Does Not g y Include Increasing the Number of approved UIC registration that does not include increasing the g number of registered wells. Registered Wells (Minor Modification) 1.f. Modification of an Existing UIC Select this category for modification to an existing MassDEP Registration that Includes g y g Increasing the Number of approved UIC registration that includes increasing the number of g registered wells. Registered Wells (Major Modification For the above Pre-Closure categories (items 1.b. and 1.c.), if you are submitting for an UIC well(s)that has received a MassDEP issued UIC registration number complete Sections A, B, L, and M of this application form and for all other Sections only complete the data/information fields where you are entering new or revised information. For any of the above Modification categories (items 1.d., 1.e., and 1.f.) complete Sections A, B, and M of this application and for all other Sections only complete the data/information fields where you are entering new or revised information. For Modifications, Pre-Closures, or Pre-Closures and Conversions of a UIC Registered Well(s)you must enter the UIC registration number that was previously issued by MassDEP. If you can't locate your UIC registration number then call the number or send an email to the address listed on page one of this form for assistance. Basic Well Information 1. Descriptions of the well category and well type can be found on the UIC Class V Well Category and Well Type Descriptions web page .!.j in a iir i iir a u lii c a s,v, et, ii iir iir e e s ciir'iii 'iii ii i,iirn ). Stormins.doc rev.08/13 Page 5 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials 2. The fee structure and classification of an application is impacted by whether a well is being installed at a residential or non-residential site. In order to be classified as, fee exempt, residential well(s) must service 4 or fewer residential units AND only be used for residential purposes. 3. Some wells can be used for more than one purpose. For instance, a dry well may be used for both stormwater or water purification discharge and system bleed from an open-loop ground source heat pump well. If applicable, indicate the other well category and well type. Registration Fee For Registration of More than One Type of Discharge—This form may only be used to apply for UIC registration of stormwater discharge to one type of Stormwater Discharge Well(s) (from the selection in Basic Well Information Question #2). A separate BRP WS06 registration application, payment transmittal form (transmittal form not required if you answered "yes"to Basic Well Information question #3), and applicable fee shall be submitted for each additional type of discharge even if one discharge well(s) is used for more than one well category and well type combination. For Conversion of Unregistered Wells - If your application is for the conversion of a well(s)that was not previously registered, you shall submit one application form, payment transmittal form, and applicable fee for the registration and closure or partial closure of each of the unregistered well uses. You shall also submit a separate registration application form, payment transmittal form, and applicable fee for each type of new UIC Class V discharge well. For Conversion of Registered Wells- If your application is for the conversion of a Registered UIC well(s), you shall submit a separate registration application form, payment transmittal form, and applicable fee for each type of new UIC Class V discharge. In addition one BRP WS06d Pre-Closure application must be submitted for the closure of the previous well use. Fee Table Instructions Determine which fee applies to your well using the provided fee table in conjunction with the answers you provided for Questions 1 (registration category), 2 (well type), and 3 (residential status). Step 1: Find the Registration Category in the first row (this will limit the number of columns you have to choose from to either 1 or 2). Step 2: In the second row find the one column that matches your response to Question 3. Step 3: Follow this column downward to the row that matches your well category(selected in Question 2). Your Registration Category Selection 1.a. or 1.f. 1.b. or 1.c. 1.d. or 1.e. from Section A, question 1 above Your Answer to Question 3 Yes No Yes No Yes or No No land uses with higher potential pollutant loads per MassDEP $0 $110 $0 $220 Your Well Type Stormwater Handbook yp One or more land uses with higher (from question 2 potential pollutant loads per $585 $585 $695 $695 $0 above) p p MassDEP Stormwater Handbook Agricultural $290 1 $290 1 $400 $400 Karst $0 I $0 I $0 $110 Exceptions: If the well(s) is owned by a local or regional government the fee is $0. If the well(s) is owned by the state then the entire fee indicated above applies. Stormins.doc rev.08/13 Page 6 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials B. Facility/Residential Information Facility/Residential Property Name: Enter the common name of this facility if it is different than the legal name and the facilities (or residence's)street address and the town that the facility is located in. You may enter"private residence" under the "Facility/Residential Property Name" category if applicable. Additional information (for facilities only): The remainder of the information discussed below under Section B does not apply to a property that is only used as a private residence. If the property is only used as a private residence then you may proceed to Section C. Company Name: Enter the legal /corporate name (i.e., Acme Products, Inc.) or the name of the legal representative of the company if the company operates under an assumed business name (i.e., John Smith, dba Acme Products). The name must be a legal, active name registered with the state of Massachusetts, unless otherwise exempted by the Department of Commerce regulations. Facility PWS ID number: If the facility is a Public Water System (PWS) or there is a PWS on the same site list the PWS ID number assigned by the MassDEP Drinking Water Program. NAICS or SIC Code: Enter the Standard Industrial Classification (SIC)four-digit code or North American Industry Classification System five or six-digit code (NAICS)for the facility. These codes are used to describe the primary activity at the facility that generates the most money and may be found on fire marshal reports, insurance papers, or tax forms. The NAICS codes replaced the SIC system in 1997; however, it is usually easy to convert between the two systems so either code is acceptable. SIC or NAICS information is also available from the U.S. Census Bureau at 1-888-756-2427 or at Ihtt.p H iin lii corn/search Ihtr . Include a seconds code if applicable. EPA Hazardous Waste Generator ID Number: If you store Hazardous Waste on site enter the appropriate EPA ID number(s). If you store Hazardous Waste on site and do not have an ID number contact your Regional MassDEP office and ask for the Hazardous Waste section to obtain an appropriate ID number. Find your region: Tenant Name and Tenant's EPA Hazardous Waste Generator ID Number: If the well will receive waste from a tenant or from an area occupied by a tenant on the property then list the name of the tenant and, if applicable, the EPA Hazardous Waste Generator ID Number that has been assigned to the tenant. C. Current Status of Activity(ies) Being Registered Designed but not yet constructed/modified/closed/converted: Construction/modification/closure/partial closure/conversion of the system has not started. Proposed activity partially completed or completed but not active: Construction of the new well(s)or modification or conversion of a registered well(s) or conversion of an unregistered well(s) has begun or has been completed but the well(s) has not been placed into operation. Discharge discontinued but closure activities not completed: All entry points to well(s)temporarily plugged or discharge discontinued but well closure activities are not yet completed. Proposed activity completed and active or closure completed: Construction/modification/conversion/closure/partial closure has been completed and the system has either been placed into operation and/or the closure activities have been completed and the well has been partially or permanently closed. Enter the date that the well(s)was placed in service or the date that the closure activities were completed. Stormins.doc rev.08/13 Page 7 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials Is the applicant requesting a waiver of the 30-day review period for closure applications? If you answer "yes"you must include in a cover letter with your application the reason you are requesting a waiver of the 30-day review period. D. Owner/Operator Information Name and Address of Owner: Enter the legal/corporate name (i.e., Acme Products, Inc.)and address of the owner of the company if different than the facility name in Section A. The name must be a legal, active name registered with the state of Massachusetts, unless otherwise exempted by the Department of Commerce regulations. If this information is the same as the "Facility/Residential Property Name" or the "Company Name" from Section B you may enter in the "Name of Owner" space "same as facility name" or"same as company name". Legal Contact: Give the name and phone numbers to whom you want all correspondence directed. The correspondence will otherwise be sent to the Operator's and Owner's addresses. Name and address of the operator: (if not the same as the owner): In the case where the property is owned by one or more entities but the facility is operated by another company and the facility owner's name and address are different than in Section A, enter the legal /corporate name (i.e., Acme Products, Inc.)and address of the owner of the facility. The name must be a legal, active name registered with the state of Massachusetts, unless otherwise exempted by the Department of Commerce regulations. If applicable, under"Name of Operator"you may enter"same as owner" or"same as facility name" or"same as company name". Ownership Type: Select the applicable category. E. Designer Enter the name and phone number of the person who has designed the proposed/existing UIC system and the company for which he/she works or the person who is overseeing the well closure activities. If designed by a Massachusetts licensed engineer, enter Massachusetts license number. An internet based Massachusetts Engineer lookup tool can be found here: III........ „ lii e ii e iir ii a a III lii liic u s u e ii ii in o iir,,,,,,,,,,,,iir IIlo ii III;II If designed by a Licensed Site Professional (LSP) enter the Massachusetts LSP license number. (An internet based LSP lookup tool can be found here: , , // a liic ep_ataLe.im a.u e iirc Viirn) F. Installer Enter the name and phone number of the person who will install or has installed the proposed/existing UIC system or who will conduct the well closure activities and the company for which he/she works. G. Preparer Information Enter the name, address, and phone number of the person who has completed the BRP WS06 registration application form and the company for which he/she works. If applicable, enter Massachusetts license number or the Massachusetts LSP license number. (An internet based LSP lookup tool can be found here: „�L....�„ / u lii c e..... �t �l.......... ii u s/1.........S F..)/Ispse.airch.htirn) Stormins.doc rev.08/13 Page 8 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials H. Registered Well Driller If the UIC well installation involves the installation of a drilled well or the decommissioning of a drilled well, enter the driller's name, the name of the company that he/she works for, the driller's MassDEP Well Driller certification number, and a phone number where the driller can be reached. Per 310 CMR 46.00 : ii /c / e in clii o /iirn e to iir/lire u t'iiloiins/310i iciinnri1461 100 131 icertificatioiir-ii,o, iwelli idrillersi iiandi ii,,,, i iwelli,cgi letioini,iir„ iir s ttirn ) drilled wells may only be installed or decommissioned by a MassDEP Certified Well Driller. A list of certified well drillers can be found here: II ,[, , / ii / e / .�iin lii,,, /iir / iir/ iirlii iin Ill lii in / iirlii it�, iir iir iirn Ih��im ................... I. Site Information Water Supply: Indicate whether the facility is supplied water from a Public Water System (PWS)or a private well. Note that in addition to large municipal water systems, most private water companies that have 15 or more service connections are considered a PWS. Sewer: Indicate whether the facility is connected to a public sewer system or whether the property is serviced by an on-site sanitary wastewater disposal system (Title 5 or Groundwater Discharge Permit). Other Discharges: List and locate on the site map all other discharges on the site, whether or not they are registered or permitted with MassDEP. Provide the information requested on the application form. Sites with Activity and Use Limitations (AULs): The following web link provides a searchable database where one may look up properties in Massachusetts where an "Activity and Use Limitation" (AUL) has been recorded or registered: II ,,................................ ,/ U liic iirn s/ iirclli II limes e iir III s An AUL provides notice to users of property of the presence of oil or hazardous material (OHM) contamination remaining at the location after a cleanup has been conducted pursuant to M.G.L. Chapter 21 E and the Massachusetts Contingency Plan MCP). The AUL is a legal document that identifies activities and uses of the property that may and may not occur, as well as the property owner's obligation and maintenance conditions that must be followed to ensure the safe use of the property. Location of Well(s): Enter the UIC Well latitude and longitude coordinates for each UIC well included in this application in decimal degrees to a minimum of five decimal places and fill out the information requested on how you obtained this data. Only enter the location of wells for the Well Category and Well Type that you are registering with this application. In the far left column of the table provided in the form the applicant shall provide a unique name identifier for each well being registered. The identifier can be a combination of characters, symbols and numbers (i.e. storm-1, storm-2, etc.). The middle two columns are for entering latitude and longitude. Place a check mark or the letter "X" in the far right column for any well that is being either physically closed or for which all entry points for the well category and well type associated with this application are being closed or discontinued such that the well will no longer be receiving stormwater associated with this UIC well category and well type. If you are only closing some, but not all of the entry points associated with this UIC well category and well type you should leave this column blank(i.e. the well will continue to receive wastewater of this well category and well type after the proposed closure activities). Where indicated, identify the method used for locating the latitude/longitude coordinates for the UIC Class V well(s)and the accuracy of the measurement. If you would like to test whether your Latitude and Longitude data are correct, simply go to www.maps.google.com and type in the numbers in the following format and select the search icon (blue box with Stormins.doc rev.08/13 Page 9 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials magnifying glass). A green arrow should appear on the location of the coordinates provided. [Format example: 42.37635-71.06075] If you do not have access to a GPS unit you may use Internet tools including the following: 1. Go to Jhtt , ii o e oii .............................. 2. Select Maps Labs from the lower left corner of the web page. 3. A separate window will open up with various map tools available for use. 4. Scroll down and select Enable next to the "LatLng Marker"tool. 5. Select Save Changes (note: you may have to drag the window up in order to access the "save changes button). 6. Using Google Maps, navigate and zoom in to the well site. 7. Right click on the point closest to the well being located and select"Drop LatLng Marker." 8. Select and copy or note the lat/long provided in the marker tab. Attachments: All Plans and Maps Submitted Must Have a Title, North Arrow and a Bar Scale of Distance. UIC Class V Well Stormwater Non-Exposure Form: The UIC Stormwater Non-Exposure Form is required for all original UIC Registration applications for stormwater wells and for any Modification UIC Registration applications where one or more proposed stormwater well is being added to the existing UIC Registration. The only exceptions are for registration applications for which all stormwater wells associated with this application or are being registered for Pre-Closure or if you answered "yes" to Question #3 in Section A(i.e. the land use is only for one to four residential units). The form and instructions can be found here: ,L" im a s.rn ass iii t to ii us/'iii lit a e ii s iiie alit „it . ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,p,,,,,,,,,,,,,,,,,.............................., Topo or Orthophoto map of the facility: Provide a topographic map or maps of the area extending at least to 1/2 mile beyond the property boundaries of the facility, which clearly show the following: 1)The site location; 2)All hazardous waste management and storage facilities; 3)All springs and surface water bodies in the area, plus all Public Water System (PWS)drinking water wells within �/2 mile of the facility and the nearest private drinking water wells within �/4 mile of the facility that are identified in the public record or otherwise known to you. 4)All public source water protection areas including: Zone II's, Zone C's or Interim Wellhead Protection Area's (IWPA). (Water supply protection maps are available at ,,, ,,„ ,,,,,,, a Scaled site plan of the facility with the following: 1) Location of buildings, property boundary lines, and abutting streets; 2) Plat and lot number(from local tax assessor record maps); 3) Location where groundwater table elevation, ledge test, percolation data, and soil profile data were collected (if applicable); 4) Location of all UIC Class V Wells associated with this application or UIC Registration Number; 5) Location of all other shallow or deep injection well(s)and all drains, drain lines, treatment devices, drywells, cesspools, septic systems and other on-site surface or subsurface discharges at the facility; 6) Location of drinking water well(s) and other types of water supply wells on the property, and any on abutting properties or public water supplies within 500 feet of the shallow injection well; 7) Boundary of any known oil or hazardous material contaminant soils or groundwater plume and any Activity Use Limitation areas that exist on the property; and, 8) Location of monitoring wells (if applicable). Stormins.doc rev.08/13 Page 10 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials Description of the shallow injection well system and its major components: The description must contain diagrams (design sheets) including the plan view and cross sectional diagram of the shallow injection well system, indicating piping,junction boxes, tanks, treatment devices, wells and drainfields. Dimensions of all major components and design calculations must be included. Narrative Statement: Provide a narrative statement that indicates that this proposed well(s)and UIC Class V discharge will conform to the MassDEP Standard Design Requirements for Shallow Injection Wells iirn ,.e a e iir c'iii e ii a ,,,,,,,iir iir'iii iir 'iii ii in a iir e iii ii ,iir u'iii lire ii e ii t it , u'iii c,class, ��������������������������������������������������������������������������������������������������������������m .....���������������������������nn shallow, and provide explanations for any deviation(s)from these requirements. Material Safety Data Sheets (MSDS) (if applicable) -for all chemical products stored or used at the facility which may discharge to the shallow injection well and or are known to be added to the effluent to the well. Analytical Testing Data: Laboratory analytical results from soil samples may be required for an existing stormwater discharge well that has one or more land uses with higher potential pollutant loads in order to establish base-line conditions prior to the MassDEP issuance of the UIC registration approval. Typically water quality testing is not required to be submitted with the UIC application package but may be a condition of MassDEP's issuance of an approval to install or operate the well depending upon site specific concerns for water quality. Equipment Specification Sheets-for all treatment equipment that will add chemicals to the proposed wastewater that is or will be discharged to the UIC Class V well. Specification sheets are not required for filtration equipment that will not add chemicals to the wastewater that is discharged to the UIC Class V well. Please note that chemical additives are not commonly used for Class V Stormwater wells. You should discuss the proposed use of any chemical additives with the MassDEP UIC Program prior to submitting your application form and payment. Other Information: If the responsibility for operating and maintaining one or more of your stormwater wells will be transferred to another entity (e.g. municipality) after completion of your project, you shall attach a letter from the local municipality or other responsible party agreeing to committing to the long term maintenance of the UIC system, as described in the Certification statement that is signed by the Operator of the UIC well(s) in Section M of this application form. See the instructions for Section K for additional information that may be required as attachments to this application. J. Injection Well Information Number of wells, maximum well depth and month/year of installation: Indicate the number of wells being registered. Include a breakdown of the number of wells being proposed (not yet constructed) and the number of existing wells, the proposed well depth (enter maximum well depth if registering multiple wells), and the month and year installed (for existing wells). Only include the number of wells that are being included with this registration (i.e. only include the wells for the unique combination of"well category" and "well type" associated with this application). Well construction: Check applicable well type(s). Enter type of well seal and the grout material used to create the well seal (if applicable). Well seals and grout are typically associated with drilled wells and not with shallow injections wells. Will the Discharge Include any Well Additive(s)? If yes, submit Proposal for Chemical Use (additive) in a UIC Class V well supplemental form. Source of Injection Fluid and Potential Contaminants: Describe the types of fluids being discharged to the UIC well (e.g., backwash from water softening unit, reject water from reverse osmosis unit, stormwater run-off Stormins.doc rev.08/13 Page 11 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials from parking lot or roof, non-contact cooling water, ground source heat pump or plate and frame heat exchanger, etc.). Identify all sources of injection fluid and for each, detail the potential contaminants that may be present in the injection fluid. List Any Current or Proposed Treatment Devices: If applicable, list all treatment devices proposed or installed prior to the infiltration structure in order to prevent the contamination of underground sources of drinking water. The sampling point for the system must be after all treatment devices. Specifications and a detail sheet must be provided for all treatment devices. A statement from the device manufacturer or from the UIC system designer must be included stating that the devise(s) are rated to meet the standards of the UIC program. Rate of Injection: Maximum total rate of injection (gallons per minute): Enter the maximum discharge rate that the well(s) is/are designed to accept in gallons per minute (for all wells combined). Maximum total rate of injection (gallons per day): Provide the maximum daily discharge rate in gallons per day that all wells combined are designed to accept. MonthNear ceased using well(s)for previous use(s): Enter this information for unregistered wells that are being registered for closure/partial closure or conversion (if applicable). Number of entry points to the system: The number of entry points to a stormwater UIC Class V discharge well is the number of catch basins (including leaching catch basins which are considered both an entry point and a Class V UIC well), surface drainage structures (trench, grate, channel &certain Low Impact Development(LID) Best Management Practices (BMPs)) and roof drain downspouts that contribute stormwater discharge to the stormwater UIC well(s).. Enter the existing number of entry points and the proposed number of entry points. If the facility has multiple existing UIC registrations or if multiple UIC registrations are being applied for, only enter the number of entry points for the unique "well category"and "well type" associated with this application. Well Setback Distances and Depth: Distance to nearest wetland or water body(within 200 feet of the UIC well): Water bodies include lakes, ponds, reservoirs, ocean, rivers, and streams. Note: If you are within 200 feet of a waterbody or wetland you must notify the local conservation commission. Distance to nearest septic system (within 200 feet of the UIC well): If not known check with local Board of Health. All on-site septic systems must be shown on the site plan. Distance to nearest building foundation (within 25 feet of the UIC well): If multiple wells, list the shortest distance between the wells and the building foundation. Distance to nearest property line (within 25 feet of the UIC well): If multiple wells, list the shortest distance between the wells and the property boundary. Depth to Water Table and Depth to Bedrock: If the UIC discharge is an existing system and the depths are not known provide the best information available. However, systems installed after 9/13/02 must provide these data. If water table and depth to bedrock are not available at the time of UIC registration application submittal, it will be a condition of MassDEP's issuance of an approval to install the well. Stormins.doc rev.08/13 Page 12 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials Depth to bedrock is only required to the depth of the bottom of the deepest proposed UIC Class V injection well or depth to water table, whichever is deeper. If no bedrock is encountered to that depth then the applicant should enter"greater than [insert depth] feet". Soil Type: Use terms such as fill, sandy till, gravel, sand, etc. Distance to Nearest Private Drinking Water Well (within 1,250 feet of the UIC well): If not known check with local Board of Health. All on-site wells must be shown on the site plan. Distance to Nearest Public Water Supply Source (e.g.well or reservoir) (within 2,500 feet): If not known check at- ht °° g1 s ii is state ii a liiii / „i1 lii it Iliturn. All on-site wells must ,,,,,,,,,,,,,,,,,,,,,p,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,p,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.............................. ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,........................,� p,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,............................I be shown on the site plan. If you need assistance, check with the Customer Service Center at the Regional MassDEP office. K. Additional Well-Type-Specific Information Sto rmwate r Well Does the overflow from the UIC well(s) discharge to groundwater onto a different property or to a stormwater system that is owned/operated by another entity? Check the "yes" box if the overflow is connected to a groundwater discharge well or to a stormwater system that is not owned by the same entity that owns the property for which the UIC stormwater discharge registration is being sought. If you checked the "yes" box for this question then you must attach a copy of the approval letter, permit, or Order of Conditions from the entity that owns the property that is receiving the overflow water or from the entity that controls the municipal stormwater system or from the local conservation commission (whichever is applicable). Does the overflow from the UIC well(s) discharge to surface water or within a wetland or surface water buffer on-site or off-site? Check the applicable "yes" or"no" box. If you checked the "yes" box for this question then you must attach the Order of Conditions from the local conservation commission. L. Injection Well(s) or Activity(ies) Being Closed Is the closure being required by a federal, state, or local entity? Check the "yes" box if the proposed closure is the result of a written notification by a federal, state, or local authority indicating that the well(s) must be closed. If you check off the "yes" box fill out the information requested to identify the issuing authority and any contact information that was provided to you for that authority. Number of Wells Being Closed with this Application: Enter the number of stormwater discharge wells that will be completely closed that are associated with this UIC registration application or with the existing UIC registration number that was previously assigned by MassDEP. Completely closed means that all entry points associated with the stormwater discharge will no longer discharge to the well(s) after the proposed closure activities have been completed. If you are only closing some but not all of the stormwater entry points for a particular UIC well then you are only closing some of the entry points and not the well itself. Do not include in your answer any wells for which one or more stormwater entry points will continue to discharge to the well following the completion of the proposed closure activities. Closure of a UIC well does not necessarily mean that the well itself will be physically decommissioned. Under many circumstances a well that is closed as a UIC well for one "well category" and "well type" may continue to be Stormins.doc rev.08/13 Page 13 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials used for other types of UIC and/or non-UIC type uses. However, if the well will not be used for any other water supply or water discharge purposes it is considered an abandoned well per 310 CMR 46.00 ii................................................................................ s.................... ee cs e s iir l ce/lire....... a lii iir 1 cii iir4 . An abandoned well shall be h sical decommissioned before it falls into a state of disrepair. A drilled well shall be decommissioned by a MassDEP Certified Well Driller before it falls into a state of disrepair. Please note that an abandoned well that falls into a state of disrepair may be considered a potential hazard to public health or safety and become reclassified as an unauthorized UIC Class V well that will require subsequent UIC registration for the purposes of properly closing the well. Will this proposed closure activity result in the complete closure of all wells associated with this registration application or with the existing UIC registration number? Only answer"yes"to this question if all of the stormwater discharges associated with the UIC well(s) included in this UIC registration application or with the existing UIC registration number that was previously assigned by MassDEP will discontinue upon completion of the proposed well closure activities. It is important that this question be answered correctly because MassDEP will determine whether or not the UIC registration for stormwater discharge will be completely closed out upon the completion of the proposed closure activities. The consequences of answering "yes"will be that any further stormwater discharges associated with this UIC registration number will be unauthorized. If you check off the "no" box for this question, enter the number of wells associated with this UIC registration number that will continue to receive stormwater discharges of this well type. Number of entry points to the system: There are three questions associated with the number of entry points. The number of entry points to a UIC stormwater well is the number of catch basins, and roof drain downspouts that are discharging to the well(s). Enter the number of entry points before closure, the number of entry points proposed for closure, and the number of entry points that will remain after the proposed closure activities have been completed. Only enter the number of entry points for the stormwater discharges associated with this UIC registration number. Proposed or previously completed well closure activities (check all that apply): Closure activities shall adhere to the Mass DEP Guidance Document#: BRP/DWM/DW/G04-3, Massachusetts Closure Requirements for Underground Injection Control(UICs) Wells (including shallow injection wells) iirnass.gov/e ea/docs/de, / ateiir lii Ithiru Iz/0c e ). The discussion of required laboratory analytical testing parameters in that document is focused on motor vehicle—waste disposal wells. For other types of"well category" and "well type" combinations the sampling parameters chosen will depend upon the types of contaminants that were either known to have been discharged to the well or that had the potential to have been discharged into the well. If properly maintained and operated, many UIC Class V stormwater discharge wells will not require sampling of fluids/sediments in the bottom of the well or in the area surrounding the well. If uncertain as to what sampling and laboratory analyses should be completed, you are encouraged to contact the MassDEP UIC Program at ASK U I C @ state iima us prior to submitting your Pre-Closure application. Check all boxes that describe the types of well closure activities associated with this UIC Pre-Closure application. You shall include both proposed closure activities and activities that will have already been completed at the time this application is submitted. The selection options include the following: • Clean out well(s); • Sample fluids/sediments in the bottom of the injection well; • Remove well(s) and any contaminated soil—the selection of this option indicates that the well(s)will be physically removed (excavated)from the ground; • Appropriate disposal of remaining fluids/sediments; • Conversion to other well type; Stormins.doc rev.08/13 Page 14 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials • Note: Only select this option if the well is being converted to another UIC Class V well type. If you are converting to a non-UIC Class V well type (i.e. converting to an irrigation well, etc.)then you should not select this option and you should not select the following "well and all entry points physically decommissioned" option. If you select this option you will be asked to select the well category and type for the new purpose of the well. Note: a separate UIC registration application (BRP WS06) must be submitted for any conversion to a new well type). If you are converting to a non-UIC Class V well type (i.e. irrigation well)then you should indicate your intent in an attached narrative to your Pre-Closure application from; • Well(s) and entry points abandoned (physically decommissioned). The selection of this option indicates that the well, or one or more of the UIC wells, associated with this UIC Registration Number will be physically removed/filled-in/destroyed and that all entry points to the well will either be removed and/or the piping to the UIC well will be permanently sealed so that no fluid may continue to be directed toward the closed well.; • Partial Closure- Some of the current or past discharges will be discontinued. Other discharges of the well category and well type associated with this UIC Registration Number to the well(s)will continue; • Sample fluids/sediments from the area surrounding the injection well (as applicable); or, • Other(Describe). Proposed Laboratory Analytical Parameters for Soil Sampling Activities: The selection of soil or groundwater analytes shall be based upon the potential oil and/or hazardous materials that are known to have discharged to the UIC well or had the potential to be discharged to the UIC well. Laboratory analytical results from soil samples are often required for a stormwater discharge well that has one or more land uses with higher potential pollutant loads In many instances laboratory analyses are not required for the closure of the other types of UIC Class V stormwater discharge wells. Go to tI................................ iir ass iir iii sh n o to ir/ iiriii ii iii ii e,,,rtiiifii e � o iirat iriii tii for M ass D E P's online searchable database of MassDEP Certified Laboratories. Proposed Laboratory Analytical Parameters for Groundwater Sampling Activities: See discussion above for proposed soil sampling activities. M. Certifications for UIC Well(s) that is/are Being Registered for Continued Use or Proposed Future Use as a Stormwater Well The certification statements in Section M shall be signed if one or more of the existing or proposed wells included in this application are being registered for continued or future use. If all of the wells included in this application are being registered for closure then the certification statements in Section M should be left blank and you shall complete the certification statements in Section N of this document. Section M has two certification statements. One is for the operator of the existing or proposed UIC well(s)and one is for the owner of the property on which the existing or proposed UIC well(s) is, or will be, located. All applications are required to have the Operator certification statement signed by the operator. If the operator is not also the owner of the property then the property owner shall sign the Owner certification statement. The following are the only eligible persons who may sign for the operator or owner. Any person who signs for the operator or owner must have authority to legally bind the business to perform the activities described in the applicable certification statement. That person must be one of the following: • In a sole proprietorship, the company's sole proprietor. Stormins.doc rev.08/13 Page 15 of 16 Massachusetts Department of Environmental Protection Bureau of Resource Protection — Drinking Water Program BRP WS 06 UIC Registration Stormwater Discharge Well Instructions and Supporting Materials • In a partnership, a general partner with authority to bind the partnership. • In a corporation or a non-profit corporation, a corporate official with authority to bind the corporation, e.g., president, secretary, treasurer, or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision making functions of the corporation. • In a municipality or other public agency, a principal executive officer or ranking elected official who is empowered to enter into contracts on behalf of the municipality or public agency. N. Certifications for UIC Well(s) that is/are Being Registered for Complete Closure of all Future Use as a Stormwater Well The certification statements in Section N shall be signed if all of the wells included in this application are being registered for closure. See the instructions above for Section M for the descriptions for the persons who are eligible to sign for the operator or owner. Stormins.doc rev.08/13 Page 16 of 16 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well Note: this application form only applies to Stormwater Discharge Wells. Refer to the Instructions and Supporting Materials document that corresponds to this UIC Registration form for detailed instructions regarding the completion of this form and the required attachments. Transmittal#(not required for 1-to 4-unit residential applications) A. Registration Category and Fee Registration Category Important:When filling out forms 1. Identify the type of registration activity you are conducting (check one): on the computer, use only the tab a. Registration of a Proposed or Existing Unregistered UIC Well(s) ❑ key to move your cursor-do not use the return b. Pre-Closure of an Unregistered or Registered UIC Well(s) ❑ key. c. Pre-Closure of an Unregistered or Registered UIC Well(s)and Conversion to New Well Type* ❑ � W * Note: Conversion also requires submittal of a separate registration application for the new well type. d. Modification of a UIC Registration Application that is Still Under Review at MassDEP ❑ e. Modification of an Existing UIC Registration that Does Not Include Increasing the Number of Registered Wells ❑ f. Modification of an Existing UIC Registration that Includes Increasing the Number of Registered Wells ❑ Note: For the above Pre-Closure categories (items b and c), if you are submitting for a UIC well(s)that has received a MassDEP issued UIC registration number complete Sections A, B, L, and M of this application and for all other Sections only complete the data/information fields where you are entering new or revised information. For any of the above Modification categories (items d, e, and f) complete Sections A, B, and M of this application and for all other Sections only complete the data/information fields where you are entering new or revised information. For Modifications, Pre-Closures, or Pre-Closures and Conversions of a UIC Registered Well: Enter UIC Registration Number(required): UIC Registration Number issued by MassDEP Basic Well Information 2. Well Category, Well Type and registration fee Well Category: Stormwater Well Type (select one): ❑ No Land Uses with Higher Potential Pollutant Loads per MassDEP Stormwater Handbook ❑ One or more Land Uses with Higher Potential Pollutant Loads per MassDEP Stormwater Handbook ❑ Agricultural ❑ Karst uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 1 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well A. Registration Category and Fee (cont.) 3. Is the facility serviced by the well(s) both: a. For four(4) residential units or fewer; and, b. Only used for residential purposes? ❑ Yes ❑ No 4. Are any of the wells included in this registration application also being used for another type of UIC Class V discharge? ❑ Yes ❑ No 5. If you answered "yes"to the above question 4, enter the well category and well type for the other type of discharge (refer to the Class V Injection Well Category, Well Type, and Fee Table (see instructions document for web link)): Well Category Well Type UIC Registration Fee Notes: For Registration of More than One Type of Discharge—This form may only be used to apply for UIC registration of discharge from one type of stormwater discharge well(s). A separate BRP WS06 registration application, payment transmittal form, and applicable fee shall be submitted for each additional type of discharge even if one discharge well is used for more than one well category and well type combination. For Conversion of Unregistered Wells- If your application is for the conversion of a well(s)that was not previously registered, you shall submit one application form, payment transmittal form, and applicable fee for the registration and closure or partial closure of each of the unregistered well uses. You shall also submit a separate registration application form, payment transmittal form, and applicable fee for each type of new UIC Class V discharge well. For Conversion of Registered Wells- If your application is for the conversion of a Registered UIC well(s), you shall submit a separate registration application form, payment transmittal form, and applicable fee for each type of new UIC Class V discharge. In addition one BRP WS06d Pre-Closure application must be submitted for the closure of the previous well use. Fee Table Instructions: Determine which fee applies to your well using the following fee table in conjunction with the answers you provided for questions 1 (registration category), 2 (well type), and 3 (residential status). Step 1: Find the Registration Category in the first row(this will limit the number of columns you have to choose from to either 1 or 2). Step 2: In the second row find the one column that matches your response to Question 3. Step 3: Follow this column downward to the row that matches your well category(selected in Question 2). uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 2 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well A. Registration Category and Fee (cont.) Your Registration Category Selection 1.a. or 1.f. 1.b. or 1.c. 1.d. or 1.e. (from question 1 above) Your Answer to Question 3 Yes No Yes No Yes or No No land uses with higher potential pollutant loads per MassDEP Stormwater Handbook $0 p $110 $0 $220 One or more land uses with higher potential pollutant loads per MassDEP Stormwater $585 $585 $695 $695 Handbook $0 Agricultural $290 $290 $400 $400 Karst $0 $0 $0 $110 Exceptions: If the well(s) is owned by a local or regional government the fee is $0. If the well(s) is owned by the Commonwealth of Massachusetts, the standard fees indicated above apply. If the fee would have exceeded $100 then the entire fee indicated above applies. Enter fee here: $ Annual Compliance Fee: There is no annual compliance fee associated with this Registration. B. Residential/Facility Information Facility/Residential Property Name Facility/Residential Street Address City/Town State Zip Code Additional information (for facilities only): Company Name (MassDEP use only)Facility# Facility Public Water Supplier(PWS)ID#(if applicable) NAICS or SIC Code#(if applicable) Facility Telephone# Facility Mailing Address(if different from street address) City/Town State Zip Code EPA Hazardous Waste Generator ID#(if applicable) EPA Hazardous Waste Generator ID#(if applicable) Tenant Name(if applicable) Tenant's EPA Haz.Waste Generator ID#(if applicable) uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 3 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well C. Current Status of Activity(ies) Being Registered (check one) ❑ Designed, but not yet ❑ Proposed activity partially completed or constructed/modified/closed/converted completed but not active F-1 Discharge discontinued but closure activities not completed ❑ Proposed activity completed and active or closure completed Date placed in service(or date closure completed) Is the applicant requesting a waiver of the 30-day waiting period for closure applications? ❑ Yes ❑ No If you answered "yes"to this question, indicate your reasons for requesting the waiver in a cover letter attached to this application. D. Owner/Operator Information Name of Owner Address of Owner(enter"same"if same as facility) City/Town State Zip Code Owner Email Address Owner's Legal Contact Legal Contact Phone# Legal Contact Fax# Legal Contact Email Address Name of Operator(if different from owner) Address of Operator(enter"same"if same as facility) City/Town State Zip Code Operator's Legal Contact Legal Contact Phone# Legal Contact Fax# Legal Contact Email Address Ownership Type (choose one): Private: ❑ Industrial ❑ Commercial ❑ Non-profit ❑ Residential Public: ❑ Local El Regional ❑ State ❑ Federal E. Designer Name of Designer Name of Company Massachusetts Engineer License#(if applicable) Designer Phone# Email LSP#(if applicable) National 3rd party or manufacturer approval&ID#(if applicable) uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 4 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well F. Installer Name of Installer Name of Company National 3rd party or manufacturer approval&ID#(if applicable) Installer Phone# Email G. Preparer Name of Preparer Preparer Address City/Town State Zip Code Preparer Phone# Email address Massachusetts Engineer License#(if applicable) LSP#(if applicable) H. Registered Well Driller (if applicable) MassDEP Well Driller Registration# Name of Well Driller Phone# Name of Company Email address I. Site Information Water Supply: El Public ❑ Private Sewer: ❑ Public ❑ Private Other Discharges: Are there other current or proposed discharges on site? ❑ Yes ❑ No If yes, are they permitted with MassDEP? If es, permit#: ❑ Yes ❑ N O y Permit# If no, are they registered with MassDEP as UIC If es, registration #: Class V wells? ❑ Yes ❑ N o yRegistration# Please list the type or types of other discharges: Check any of the following that apply to this site: a. ❑ Bureau Of Waste Site Cleanup Priority Site If yes,file number b. ❑ Bureau of Waste Site Cleanup Waiver Site If yes,file number c. ❑ Superfund site If yes, Federal ID# uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 5 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well I. Site Information (cont.) If the site is currently being regulated by the Bureau of Waste Site Cleanup, check any of the following that apply: ❑ Incident Response ❑ Short Term Measure ❑ Activity and Use Limitations: Confirm that the applicant has checked that the site does not have any activity restrictions with respect to limiting discharges on the site. ❑ No restrictions ❑ Restrictions (please explain; attach additional sheets if necessary): Location of Wells: Only enter the location of wells for the one well type you are including in this registration. Note: Latitude & Longitude are required data. Well ID# is assigned by you and each well should have a unique ID#. Please check the closure box for any well(s) being completely closed to the well category and well type associated with this registration application. If you need additional well locations, please provide all information on a separate sheet. If you do not have access to a GPS unit, see instructions to this form for Internet tools that may be used to select well locations. Check here if well is either being physically closed or Well ID Latitude in Decimal Longitude in Decimal if all entry points (name and/or number) Degrees Degrees (discharges)associated (e.g.,42.355767) (e.g., -71.060996) with this well category and well type will be discontinued. uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 6 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well I. Site Information (cont.) Identify the method used for locating the latitude/longitude coordinates for the UIC Class V well(s) (check one): Location Type: ❑ Approximate location of well ❑ Approximate center of area where discharge is located (i.e. center of drainfield or trench) Accuracy— Estimated horizontal accuracy is less than (check one): ❑ +/-100 feet ❑ +/- 500 feet ❑ +/- 1000 feet Provide a narrative description of the site and the feature to be permitted. As an example: "The site is on the west side of Main Street, the third building north of High Street. The disposal field lies 100 feet off the southwest corner of the building." Attachments: All of the following shall be attached to this application (unless submitted with a previous application and the information contained in the original submittal has not changed): ❑ UIC Class V Stormwater Non Exposure Form and Certification Statement(required for all registrations unless filing for Pre-Closure of all stormwater wells associated with this UIC registration application or you answered "yes" to Question#3 in Section A). ❑ Topographic or Orthophoto Map ❑ Design Sheets ❑ MSDS Sheets (if applicable) ❑ Site Plan (include bar scale, stormwater collection system, and delineation of drainage area contributing to the stormwater wells). ❑ Equipment Specification Sheets (if applicable) ❑ Narrative Statement ❑ Cross Sectional Diagram Depicting All Underground Components of the UIC System ❑ Analytical Testing Data ❑ Other information J. Injection Well Information Number of proposed new wells Maximum well depth Number of existing wells Month/year of UIC wells construction(for existing wells) uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 7 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well J. Injection Well Information (cont.) Total Number of Existing Plus Proposed Wells (do not include wells that are in a different UIC well category and well type (those must be registered under a separate UIC registration number)): Well Construction (check all that apply): El Drywell El Drilled Well ❑ Manufactured System El Dug Well ❑ Improved Sinkhole ❑ Drainfield/Leachfield ❑ Trench Drain ❑ Other(describe): Well Additives: Are any well additives being used or proposed for use? El Yes ❑ No If you answered yes, attach a completed Proposal for Chemical Use (additive) in a UIC Class V Well supplemental form. Please note that chemical additives are not typically allowed for UIC registered stormwater wells. Source of Injection Fluid and Potential Contaminants Source of injection fluid#1 Potential contaminants for Source#1 Source of injection fluid#2 Potential contaminants for Source#2 Source of injection fluid#3 Potential contaminants for Source#3 Source of injection fluid#4 Potential contaminants for Source#4 Treatment Devices If applicable, list any treatment devices prior to the injection point that will serve to remove contaminants from the water that is discharged into the stormwater well(s) (attach specification sheets & include on site plan and cross section): Rate of Injection Maximum total rate of injection and (of all wells combined): Gallons per minute Gallons per day Month/Year ceased using well(s)for previous use(s) (only applies to wells being closed or converted if applicable): uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 8 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well J. Injection Well Information (cont.) Number of Entry Points Note: The number of entry points equals the number of collection points to the stormwater system that are or will be discharging to the stormwater well(s). This includes catch basins (including leaching catch basins which are considered both an entry point and a Class V UIC well), surface drainage structures (trench, grate, channel &certain Low Impact Development(LID) Best Management Proctices (BMPs)) and roof drain downspouts. #of entry points to existing system Total#of entry points for proposed system(existing plus proposed) Well setback distances and depths (all distances shall be provided in feet): Distance to nearest wetland or water body(enter"NA" if distance is greater than 200 feet) Distance to nearest septic system (enter"NA" if distance is greater than 200 feet) Distance to nearest building foundation (existing or proposed) (enter"NA" if distance is greater than 25 feet) Distance to nearest property line (enter"NA" if distance is greater than 25 feet) Depth to water table (feet) (indicate "unknown" if unknown) Depth to bedrock (feet) (indicate "unknown" if unknown) Soil type(s)at site-e.g.,fill,sandy till,gravel,sand Distance to nearest private drinking water well (existing or proposed) (enter "NA" if distance is greater than 1,250 feet) Distance to nearest Public Water Supply source (e.g., well or reservoir) (enter"NA" if distance is greater than 2,500 feet) K. Additional Well-Type-Specific Information In addition to completing the questions in this section, all registration applications for a new stormwater well(s)and for an existing stormwater well(s)that was not previously registered with the MassDEP U IC program must attach a completed UIC Stormwater Non Exposure Form (unless you answered "yes"to Question #3 in Section A). The non-exposure form is required for a Pre-Closure of unregistered wells unless all of the wells being registered with this application are also being closed. The non-exposure form is also required if filing a Modification of an existing UIC registration for the purpose of adding an additional stormwater well(s) or for all other modifications where any of the information previously submitted on the non exposure form has changed or needs to be corrected. Does overflow from the UIC well(s) discharge to groundwater or surface water on a different property or to a stormwater system that is owned/operated by another entity? ❑ Yes ❑ No If yes, the applicant must attach a copy of the approval letter/permit/Order of Conditions from the entity owning the property that is receiving the overflow water or from the entity that controls the municipal stormwater system or from the local conservation commission. uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 9 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well K. Additional Well-Type-Specific Information (cont.) Does the overflow from the UIC well(s) discharge to surface water or within a wetland or surface water buffer on-site? ❑ Yes ❑ No If yes, the applicant must attach a copy of the Order of Conditions from the local conservation commission allowing the discharge. L. Injection Well(s) or Activity(ies) Being Closed Note: Section L should only be filled in if you are closing a well(s). Is the closure being required by a federal, state, or local entity? ❑ Yes ❑ No If yes, which regulatory entity? Name Contact name for regulatory entity Contact Phone# Number of Wells Being Closed with this Application Will this proposed closure activity result in the complete closure of all wells associated with this registration application or with the existing UIC registration number? ❑ Yes ❑ No If you answered "no" to the above question, how many wells of this well category and well type will remain after the proposed closure activities have been completed? The following three (3) data entry fields are only associated with the well type being registered with this application. Do not include the numbers of entry points associated with any converted new well type (if applicable). Number of entry points to system before closure Number of entry points proposed for closure Number of entry points to system after closure Proposed or previously completed well closure activities (check all that apply): El Clean out well(s) ❑ Sample fluids/sediments in the bottom of the injection well(s) Remove wells and an contaminated soil ❑ Appropriate disposal of remaining fluids El ( ) y /sediments ❑ Conversion to other Well Category/Type / Well Category/Well Type Note: a separate UIC registration application (BRP WS06) must be submitted for any conversion to a new well type. ❑ Well(s)and all entry points physically decommissioned ❑ Partial Closure (some but not all entry points eliminated or well(s)still in use for other types of discharge) uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 10 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program T,m", ■ ■ i r i n e s a o Stormwater Discharge Well L. Injection Well(s) or Activity(ies) Being Closed (cont.) ❑ Sample fluids/sediments from the area surrounding the injection well(s) (as applicable) ❑ Other(specify): Proposed Laboratory Analytical Parameters for Soil Sampling Activities: Soil Sampling Parameter#1 Soil Sampling Parameter#2 Proposed Laboratory Analytical Parameters for Groundwater Sampling Activities: Groundwater Sampling Parameter#1 Groundwater Sampling Parameter#2 uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 11 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well M. Certifications for UIC Well(s) that is/are Being Registered for Continued Use or Proposed Future Use for the Stormwater Well Type Activity Selected for this Application (Applicant i in thisinformation) Operator: The injection well(s)described above is used for placement or injection of fluids into the ground. understand that this well(s) is subject to inventory requirements and compliance with the regulations under the Underground Injection Control Program established pursuant to the Safe Drinking Water Act, P.L. 93-523 and amendments, and UIC guidelines, and I hereby serve notice that the well(s) is proposed or in service. agree: 1. That the well(s) described herein will not be used for discharges other than those described above (unless I have applied for and received the required Massachusetts and local government approvals); 2. That I will notify the MassDEP Drinking Water Program/UIC Program (on forms provided by the UIC program) if any of the information (including ownership, location or type of discharge, and installation of additional wells,)for the above well(s) changes, but before the change occurs (30- day minimum notice on ownership/operator and 60-day notice on all other changes) (ownership changes not required after a UIC registration number has been completely closed (i.e. all wells associated with the approved registration application have been closed and closure has been approved by MassDEP)); 3. That I will notify the MassDEP Drinking Water Program/UIC Program (on forms provided by the UIC program) if the well(s) becomes inactive; 4. That I will notify the MassDEP Drinking Water Program/UIC Program (on forms provided by the UIC program)when the above well(s) is no longer in use, but before physically decommissioning the well(s)and that I will file a Post-Closure Notification Form within seven days of completing the closure with the UIC program; 5. That I will maintain financial responsibility for the well(s)described above; and 6. That I will provide a sampling tap (approved by MassDEP) and allow sampling at the point of injection (not required for a closed well). certify under pains and penalties of law that I have personally examined and am familiar with the information submitted in this document and all attachments and based on my personal knowledge or inquiry of those agents immediately responsible for obtaining the information on my behalf, I believe the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including possible fines and imprisonment. Signature of Operator Date Name of Operator Position/Title uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 12 of 13 y Massachusetts Department of Environmental Protection Bureau of Resource Protection — drinking water program TV m", ■ ■ i r i n e s a o Stormwater Discharge Well M. Certifications for UIC Well(s) that is/are Being Registered for Continued Use or Proposed Future Use for the Stormwater Well Type Activity Selected for this Application (cont.) (Applicant i this Owner(must be completed if owner has not signed above as operator) certify that I have personally examined and am familiar with the information submitted in this document and agree to the installation, conversion, or closure of the discharge well(s) described in this application. I also agree that I will assume the responsibilities of the operator in the event that the operator leaves the property and a replacement operator has not been established and reported to MassDEP (on forms provided by the UIC program). Signature of Owner Date Printed Name Position/Title N. Certifications for UIC Well(s) that is/are Being Registered for Complete Closure of all Future Stormwater Activities Associated with the Well Type Selected for this Application: (Applicant to fillin thisinformation) Operator certify under pains and penalties of law that I have personally examined and am familiar with the information submitted in this document and all attachments and based on my personal knowledge or inquiry of those agents immediately responsible for obtaining the information on my behalf, I believe the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including possible fines and imprisonment. Signature of Operator Date Name of Operator Position/Title Owner(must be completed if owner has not signed above as operator) certify that I have personally examined and am familiar with the information submitted in this document and agree to the conversion or closure of the discharge well(s) described in this application. Signature of Owner Date Printed Name Position/Title Submit a signed and complete application package to: Send duplicate copies of this form to: MassDEP Local Board of Health Bureau of Resource Protection UIC Program One Winter Street, 5th Floor Boston, MA 02108 uicstorm•08/2013 UIC Registration—Stormwater Discharge Well-Page 13 of 13 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Appendix : Local O o S-1 Appendix S:Local Orders of Condition Stermwater Pollution Prevention Plan(5`NPl'V)Manual Appendix T: Design Calculations for Stormwater Erosion Control