Loading...
HomeMy WebLinkAboutConstruction Schedule - - Merrimack College PRELIMINARY Two Story Lecture Hall-Design Construction Schedule 12-02-24- 02-Dec-24 16:01 Activity ID Activity Name Original Start Finish Predecessor Details Successor Details I Qtr 1,2025 Qtr 2,2025 Qtr 3,2025 Qtr 4,2025 112 Duration Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec IT • • i • • f ! a • • is Preconstruction � 123 22-Jut-4 15-Jan-25 15 Jan-25,Preconstnaction Architecture&Design gn Municipal Approvals 72 21-Aug-24 03-Dec-24 F 03-Dec-24,MunicipalApprovals rd ARCH1420 Submit to TRC 1 21-Aug-24* 21-Aug-24 -------------- -- ------- ----- --'--- ------------------- --- ---------- ------ ---- --. ARCH1430 TRC Meeting 1 28-Aug-24* 28-Aug-24 03-Dec-24,Planning Board ARCH1270 Submit to North Andover Planning Board#1 1 12Sep-24* 12-Sep-24 nnng Board#1 ARCH1290 North Andover Planning Board Hearing#1 1 15-Oct-24* 15-Oct-24 tanning Board Hearing#1 ARCH1330 North Andover Planning Board Hearing#2 1 12-Nov-24* 12-Nov-24 ARCH1340:FS, Andover Planning Board Hearing#2 ARCH1410:FS 3 - ----------- l ------ ---- --, ARCH1410 Submit For Foundation Permit 10 18-Nov-24 03-Dec-24 ARCH1330:FS 3 FNDS3920:FS Submit For Foundation Permit ARCH1340 Planning Board Hearing#3 1 26-Nov-24* 26-Nov-24 ARCH1330:FS lanning Board Hearing#3 -. �- F 03-Dec-24,Conservation ARCH1280 Submit to Andover Conservation Commission#1 1 17Sep-24* 17-Sep-24 rvation Commission#1 ARCH1350 Andover Conservation Commission Meeting#1 1 01-Oct-24* 01-Oct-24 in Commission Meeting#1 g * g ----------------------------------- ---- ------ ---- ----- ARCH1370 Andover Conservation Commission Meetin #2 1 15-Oct-24 15-Oct-24 rvation Commission Meetin #2 * g Meeting#3 ARCH1390 Andover Conservation Commission Meeting#3 1 03-Dec24 03-Dec-24 ARCH1400:SS AndoveF Conservation Commission ARCH1400 Appeal Period Following Conservation Commission Hearing#3 1 03-Dec-24 03-Dec-24 ARCH1390:SS FNDS3920:FS Appeal Period Following Conservation Commission Hearing#3 r.Design Development 46 22-Jul-24 24-Sep-24 felI ARCH1060 Design Development 46 22-Jul-24* 24-Sep-24 ARCH1080:SS, ARCH1090:SS, ARCH1100:SS 35, ARCH1110:FF ---------- ------------------------------------ ARCH1080 Interior Design 25 22-Jul-24 23-Aug-24 ARCH1060:SS ARCH1090 Preliminary MEP/FP 25 22-Jul-24 23-Aug-24 ARCH1060:SS ARCH1100 DD QA/QC Review 5 10-Sep-24 16-Sep-24 ARCH1060:SS 35 ARCH1110:FS 5 ARCH1110 DD Drawing Submission(Rev) 1 24-Sep-24 24-Sep-24 ARCH1100:FS 5, ARCH1120:FS, (Rev) ARCH1060:FF ARCH1150:FS, ARCH1140:FS 7 Design Development Budgeting Update 15 25Sep-24 15-Oct-24 gn Development Budgeting Update -------------- -- ------- --------------------------- ARCH1120 DD Estimate 15 25Sep-24 15-Oct-24 ARCH1110:FS ARCH1140 Owner Signs LOI to Hire MEP/FP Subs for DB Engineering&Award Structural Steel 1 04-Oct-24 04-Oct-24 ARCH1110:FS 7 ARCH1250:FS, Hire MEP/FP Subs for DB Engineering&Award Structural Steel ARCH1170:FS, ARCH1180:FS, PR000190:FS, PR000160:FS Construction Documents 51 25Sep-24 06-Dec-24 T 06-0ec-24,Construction Documents ARCH1150 Construction Documents Start After DD Drawin Submission 40 25-Se-24 19-Nov-24 ARCH1110:FS ARCH1170:SS 10, nstruction Documents Start After Drawing Submission) ( g ) p ( ter DD Dravv� ARCH1180:SS 10, ARCH1210:SS 30, ARCH1220:FS, ARCH1160:SS 30 ARCH1170 Interior Design(Starts With CD) 20 09-Oct-24 05-Nov-24 ARCH1150:SS 10,, sign(Starts With CD) --------------------------------------------------- ARCH1180 MEP/FP Design(Starts With CD) 20 09-Oct-24 05-Nov-24 ARCH1150:SS 10,, Design(Starts With:CD) ARCH1210 CD QA/QC Review 5 06-Nov-24 12-Nov-24 ARCH1150:SS 30 ARCH1220:FS 5 QC Review -- -- -g P 9 o _ g Drawings ARCH1220 CDs Issued For Construction-Including Stamped MEP Drawings 11 20-Nov-24 06-Dec24 ARCH1210:FS 5, CDs Issued For Construction Including Stamped MEP' ARCH1150:FS GMP Estimate&LOI 46 06-Nov-24 14-Jan-25 14-Jan-25,GMP Estimate&LOI ARCH1160 GMP Estimate(Starts 3/4 of the Way Through CDs) 20 06-Nov-24 05-Dec-24 ARCH1150:SS 30 ARCH1240:FS 5 1 GMP Estimate(Starts 3/4 of,the Way Through CDs) 9 ( Y ) g J J------------- -------------------- --- p (5 Days After Completion of GMP Estimate) ARCH1240 Owner Signs LOI/Contract 5 Da sAfter Completion of GMP Estimate 1 13-Dec-24 13-Dec24 ARCH1160:FS 5 PROC1000:FS, Owner Signs LOVContract PR000150:FS, PR00O210:FS, ARCH1440:FS ARCH1440 Issuance of Full Building Permit 20 16-Dec-24 14-Jan-25 ARCH1240:FS STRSTEEL1290:FS Issuance of Full Building Permit Procurement 0 07-Oct-24 07-Oct-24 r ient g y g ( g> i g ( I for MEP/FP Design),07-Oct-24 ARCH1250 Begin Earl Procurement of Lon Lead Items Start After LOI for MEP/FP Design) 0 07-Oct-24 ARCH1140:FS e ent of Lop Lead:.Items Start After LO College Vacation Schedule 22 13-Dec-24 15-Jan-25 7 15-Jan-25,College Vacation Schedule eg -- ----J------- -- ----- -- ------ ---- HOL1030 Christmas Break-2024/25 22 13-Dec-24 15-Jan-25 SITE1020:SS Christmas Break-2024/25 Actual Level of Effort 0 Remaining Work ♦ ♦MilestoneCON TASK filter:Completed Work. Actual Work Critical Remaining Work ��summary ©Oracle Corporation Merrimack College PRELIMINARY Two Story Lecture Hall-Design Construction Schedule 12-02-24- 02-Dec-24 16:01 Activity ID Activity Name Original Start Finish Predecessor Details Successor Details Qtr 1,2025 Qtr 2,2025 Qtr 3,2025 Qtr 4,2025 112 Duration Dec Jan Feb I Mar Apr May Jun Jul Aug Sep Oct Nov Dec an HOL1040 Spring Break 2025-TBD?? 22 13-Dec-24* 15-Jan-25 0 Spring Break 2025-TBD?? HOL1050 2025 Recess&Falb Semester-TBD?? e 22 13-Dec24* 15-Jan-25 2025 Recess',&Fall Semester-TBD?? HOL1060 Christmas Break-2025/26-TBD?? 22 13-Dec-24* 15-Jan-25 0 Christmas Break-2025/26-TBD?? Procurement 308 07-Od 4 23-Deo-25 V 23- - ------- ---- - Siteworic 40 07-Oct-24 03-Dec-24 03-Dec-245 Sitew-rk 1 A1020 Order Sitework Drainage System 40 07-Oct-24* 03-Dee-24 Order S teMric Drainage System Elevator 116 16-Dec-24 29-May-25 29-May-25,Elevator PROC1000 Contract Award For Elevator 5 16-Dec-24 20-Deo-24 ARCH1240:FS PROC1010:FS Con}ractAward For Ele,vator PROC1010 Elevator Shop Drawings 20 23-Dec-24 21-Jan-25 PROC1000:FS PROC1020:FS Elevator Shop Drawings -- --------------------------------- ---,--- -------------------- --- ---------,------ ---- PROC1020 Review&App rove Elevator Shop Drawings 10 22-1an-25 04-Feb-25 PROC1010:FS PROC1030:FS Review&App rove EfevatorShop Drawings -- -- e R -- ; Material Fabrication Assumes 16 Week Lead Time PROC1030 Material Fabrication(Assumes 16 Week Lead Time) 80 05 Feb 25 28 May 25 PROC1020.FS PROC1040.FS ( ) PROC1040 Material Available to Site 1 29-May-25 29-May-25 PROC1030:FS ELEV1530:FS Material Available to Site Switchgear 260 16-Dec-24 23-Dec-25 3- PR000150 Order Switch9 ear Assumes 52 week Lead Time 260 16-Dec-24* 23-Dec-25 ARCH1240:FS Ord q HVAC Equipment 76 07-Oct-24 24-1an-25 24-Jan-25;HVAC Equipment , PR000160 Contract Award For HVAC 5 07-Oct-24 11-Oct-24 ARCH1140:FS PROC1050:FS b,HVAC PROC1050 HVAC Shop Drawings 10 14-Oct-24 25-Oct-24 PR000160:FS PROC1060:FSDrawings' PROC1060 Review&Approve HVAC Shop Drawings 10 28-Oct-24 08-Nov-24 PROC1050:FS PROC1070:FS Approve WVAC Shop Drawings PROC1070 Material Fabrication(Assumes 10 Week Lead Time) 50 11-Nov-24 23-Jan-25 PROC1060:FS PROC1080:FS Material Fabrication(Assumes 10 Week Lead Time) ----- ---,--- --------------------- --- PROC1080 Material Available to Site 1 24-Jan-25 24-Jan-25 PROC1070:FS MEP4060:FS Material Available to Site ------------- ' Strucbjral Steel 68 07-Oct-24 14-Jan-25 14,1an-25,Structural Steel ; PR000190 ContractAward For Structural Steel 2 07-Oct-24 08-Oct-24 ARCH1140:FS PR00O200:FS Structural&el PR00O200 Structural Steel Shop Drawings 15 09-Oct-24 29-Oct-24 PR000190:FS PROC1090:FS eel Shop Drawings; -- PP op 9 -- hop Drawings PROC1090 Review&A rove Structural Steel Shop Drawings 10 30-Oct-24 12-Nov-24 PR00O200:FS PROC1100:FS &Approve Structural Steel S ;, - -------- T---------,- --- --------------------- -- -- e R -- e ek Lea Time) PROC1100 Material Fabrication(Assumes 8 Week Lead Time) 40 13-Nov-24 13-Jan-25 PROC1090:FS PROC1110:FS Material Fabrication(Assam s 8 We' PROC1110 Material Available to Site 1 14-Jan-25 14-Jan-25 PROC1100:FS STRSTEEL1290:FS � Material Available to Site , Glazing 150 16-Dec-24 17-Jul-25V 1T lul-25,Glazing ' PR00O210 Contract Award For Glazing 5 16-Dec-24* 20-Dec24 ARCH1240:FS PR00O220:FS Con(ractAward For Glazing PR000220 Glazing Shop Drawings 20 23-Dec-24 21-Jan-25 PR00O210:FS PR00O230:FS Glazing Shop Drawings --- ----, ----- --- - pp g p gs eview-&A'prgve Glazing Sh p Drawings PR00O230 Review rove Glazing Sho Drawin 20 22-Jan-25 18-Feb-25 PR00O220:FS PR00O240:FS R p PR000240 Material Fabrication(Assumes 20 Week Lead Time) 100 19 Feb 25 10 Jul 25 PR00O230:FS PR00O250:FS Matenal Fabrication(Assumes 20 Week Lead Time) PR00O250 Material Available to Site 5 11-Jul-25 17-Jul-25 PR00O240:FS EXT2150:FS Material Available to Site' Preconstnrction Site Prep 5 18-Nov-24 22-Nov-24 - R P Nov-24, r construction Site Pre A1000 Excavate&Abate Existing Steam Pipe 5 18-Nov-24* 22-Nov-24 cavate&At?ate Existing Steam Pipe ; ---------,--I- ---------------- ------ A1010 Excavate&Relocate Existing CAN Conduit 5 18-Nov-24* 22-Nov-24 cavate&;Ralocate Existing CATV Conduit ; Building Construction 278 04--De 4 08-Jan-6 rA Mobilization&Foundations 29 04-Dec-24 15-Jan-25 15-Jan-25,Mobilization&Fpundations FNDS3920 Mobilization 2 04-Dec24 05-Dec 24 ARCH1400:FS, FNDS3930:FS, Mobilizatipn ARCH1410:FS FNDS3300:FS,SITE1000: SS,FNDS3280:FF FNDS3280 Install Construction Fence 1 05-Dec 24 05-Dec24 FNDS3920:FF stall Coristructiori Fence '-------------------------- ------- ------ ------------------------------------------------------------------ FNDS3300 Layout 2 06-Dec-24 09-Dec-24 FNDS3920:FS FNDS3350:FS Layout FNDS3930 Setup of Erosion Control 2 06-Dec-24 09-Dec-24 FNDS3920:FS FNDS4170:FF Setup of Erosion Control FNDS4170 Planning Board Review of Erosion Control Measures 1 09-Dec-24 09-Dec-24 FNDS3930:FF lanning Board Review of Erosion Control Measures FNDS3350 E&B For Footings 7 10-Dec-24 18-Dec-24 FNDS3300:FS FNDS3370:SS 5 E&B;For Footings FNDS3370 Footings 8 17-Dec-24 27-Deo-24 FNDS3350:SS 5 FNDS3380:SS 3, Footings MASON1450:SS 5 ---- Foundation WIts FNDS3380 Foundation Walls 15 20-Dec-24 13-Jan-25 FNDS3370:SS 3 FNDS4160:SS 12 n a FNDS4160 Backfill Foundations 5 09-Jan-25 15-Jan-25 FNDS3380:SS 12 STRSTEEL1290:FS Backfill Foundations f Interior Masonry 10 24-Dec-24 08-Jan-25 08-lart-25,Interior Masonry MASON1450 CMU Elevator Shaft 10 24-Dec-24 08-Jan-25 FNDS3370:SS 5 ELEV1530:FS, CMU Elevator Shaft STRSTEEL1290:FS •--------- r------------- -- Steel 108 16-titan-25 17-Jun-25 ----J, 17-Ju-25,Steel ----------- ; 1st Flo ----------- --- STRSTEEL1290 1 st Floor Steel&2nd Floor Metal Deck 15 16-Jan-25 05-Feb-25 FNDS4160:FS, STRSTE EL21 00:FS or Steel&'2nU Floor Metal Deck' PROC1110:FS, MASON1450:FS, ARCH1440:FS Actual Level of Effort 0 Remaining Work ♦ ♦MilestoneCON TASK filter:Completed Work. Actual Work Critical Remaining Work ��summary ©Oracle Corporation Merrimack College PRELIMINARY Two Story Lecture Hall-Design Construction Schedule 12-02-24- 02-Dec-24 16:01 Activity ID Activity Name Original Start Finish Predecessor Details Successor Details Qtr 1,2025 Qtr 2,2025 Qtr 3,2025 Qtr 4,2025 112 Duration Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ian STRSTEEL2100 Detail 1st Floor Steel 3 06-Feb-25 10-Feb-25 STRSTEEL1290:FS STRSTEEL1300:FS Detail 1st Floor;Stoel -- --STRSTEEL1300 2nd Floor Steel&Roof Deck 10 11-Feb-25 24-Feb-25 STRSTEEL2100:FS SLA61340:FS,EXT2130: 2nd Floor Steel&Roof Deck FS,SLAB1330:FS, STRSTEEL3940:SS 8, STRSTEEL3970:FS, STRSTEEL3950:FS STRSTEEL3940 Roof Drains 5 21-Feb-25 27-Feb-25 STRSTEEL1300:S; STRSTEEL3960:FS Roof Drains; STRSTEEL3950 Roof Screen Boots 5 25-Feb-25 03-Mar-25 STRSTEEL1300:FS Roof Screen Boots STRSTEEL3970 RTU Curbs 10 25-Feb-25 10-Mar-25 STRSTEEL1300:FS STRSTEEL3980:FS RTU Cutts — STRSTEEL3960 Roofing 10 28-Feb-25 13-Mar-25 STRSTEEL3940:FS EXT3220:FS 14� Roofing STRSTEEL3980 Roof Screen Install 70 11-Mar-25 17-Jun-25 STRSTEEL3970:FS Roof Screen Install ra Underground Utilities&Slabs 21 25-Feb-25 25-Mar-25 �I 25 Unde round Utilities& labs Mar-25; SLAB1330 Install Underground Utilities 10 25-Feb-25 10-Mar-25 STRSTEEL1300:FS SLAB1350:FS Instal(Ubderground Utili ies' ---------.-------------- - -----, ------,----------:----------:----------------- --- ---------,------ SLAB1340 Prep&Place 2nd Fir SOD 5 25-Feb-25 03-Mar-25 STRSTEEL1300:FS Prep&Place 2nd Fir SOD SLAB1350 Underground Utilities Inspection 2 11-Mar-25 12-Mar-25 SLAB1330:FS SLAB1380:FS Underground Utilities In 3pection SLAB1380 Install Rigid Insulation 4 13-Mar-25 18-Mar-25 SLAB1350:FS SLAB1370:FS Install Rigid Ihsulatio i FS SLA61370 Prep&Place SOG Ground Floor 5 19-Mar-25 25-Mar-25 SLA61380:FS STAIR1550:FS,MEP1650: Prep&Place SO Ground Floor, S Exterior 171 25-Feb-25 24-Oct-25 24-Oct-25,'Exterior --- -------------------- -. r! s 03-Oct-25,Elevation#1-Main E EXT2130 Exterior Wall Framing/Sheathing./AVB 10 25-Feb-25 10-Mar-25 STRSTEEL1300:FS EXT2250:FS,EXT2140: I:xter rWall Framing/S eething./AVB FS EXT2140 Masonry Veneer 20 11-Mar-25 07-Apr-25 EXT2130:FS EXT2260:FS,EXT2150: Masonry Vender FS ------------------------------ EXT2150 Glazing Systems 10 18 Jul-25 31-Jul-25 EXT2140:FS, EXT2270:FS,EXT2160: Glazing Systems PR00O250:FS FS EXT2160 Metal Panels 10 01-Aug-25 14-Aug-25 EXT2150:FS EXT2280:FS,EXT2170: Metal Panels FS ---------------------- ---- g_ p_ ------ ---- EXT2170 Storefront 30 15-Au 25 26-Se 25 EXT2160:FS EXT2180:FS Storefront EXT2180 Joint Sealants 5 29Sep-25 03-Oct-25 EXT2170:FS EXT2300:FS Joint Sealants ® �• e or Wall Elevation#2-Wes EXT2250 Exterior Wall Framin/Sheathin /AVB 6 11-Mar-25 18-Mar-25 EXT2130:FS EXT2190:FS,EXT2260: E rramin/Sheathing./AVB 10-Oct-25, 9 9� _ rl FS -- EXT2260 Masonry Veneer 20 08-Apr-25 05-May-25 EXT2140:FS, EXT2200:FS,EXT2270: Masonry Veneer ; EXT2250:FS FS --- ----------- -- ------ ---- --, EXT2270 Glazing Systems 15 01-Aug-25 21-Aug-25 EXT2150:FS, EXT2210:FS,EXT2280: Glazing S tems EXT2260:FS FS EXT2280 Metal Panels 10 22-Aug-25 05-Sep-25 EXT2160:FS, EXT2220:FS,EXT2300: Metal I?anels EXT2270:FS FS ------ EXT2300 Joint Sealants 5 06-Oct-25 10-Oct-25 EXT2180:FS, EXT2240:FS Joint Sealants EXT2280:FS ® m 11111TOct-25,Elevation#3 T N EXT2190 Exterior Wall Framing/Sheathing./AVB 10 19-Mar-25 01-Apr-25 EXT2250:FS EXT2310:FS,EXT2200: �Aerioi Wall Fr ming/Sheathing./AVB FS --- ----- ---------------------- EXT2200 Masonry Veneer 30 06-May-25 17-Jun-25 EXT2260:FS, EXT2320:FS,EXT2210: Masonry Veneer -------------- EXT2190:FS FS EXT2210 Glazing Systems 10 22-Aug-25 05-Sep-25 EXT2270:FS, EXT2330:FS,EXT2220: Glazing Systems EXT2200:FS FS EXT2220 Metal Panels 10 08-Sep-25 19-Sep-25 EXT2280:FS, EXT2340:FS,EXT2240: Me al Panels EXT2210:FS FS,SITE1010:FS ---- EXT2240 Joint Sealants 5 13-Oct-25 17-Oct-25 EXT2300:FS, EXT2350:FS Joint Sealant EXT2220:FS �7 • 24-Oct-25,Elevation#4 --- ----- ----- ---------- ---9--- - ----- ---- ----- EXT2310 Exterior Wall Framing/Sheathing./AVB 6 02-Apr-25 09-Apr-25 EXT2190:FS EXT2320:FS,EXT3220: Exterior Wall rami /Sheathin./AVB ; FF ---------- EXT3220 BUILDING WATERTIGHT(Roof&Sheathing/AVB) 1 09-Apr-25 09-Apr-25 EXT2310:FF, MEP2430:FS,ELEV1530: UILpING W TERT GHT(Roof&Sheaithing/AVB ; STRSTEEL3960:FS FS EXT2320 Masonry Veneer 20 18-Jun-25 16-Jul-25 EXT2200:FS, EXT2330:FS ; Masonry Ven r ; EXT2310:FS -------------- Actual Level of Effort 0 Remaining Work ♦ ♦MilestoneCON TASK filter:Completed Work. Actual Work Critical Remaining Work ��summary ©Oracle Corporation Merrimack College PRELIMINARY Two Story Lecture Hall-Design Construction Schedule 12-02-24- 02-Dec-24 16:01 Activity ID Activity Name Original Start Finish Predecessor Details Successor Details Qtr 1,2025 Qtr 2,2025 Qtr 3,2025 Qtr 4,2025 112 Duration Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ian EXT2330 Glazing Sterns 15 08Sep-25 26-Sep-2 5 EXT2210:FS, EXT2340:FSGla ng Systems EXT20:FS EXT2340 Metal Panels 10 29-Sep-25 10-Oct-25 EXT2220:FS, EXT2350:FS,LAND3440: Metal Panels EXT2330:FS FS ------- --- ---- - EXT2350 Joint Sealants 5 20-Oct-25 24-Oct-25 EXT2240:FS, ; Joint Sealants EXT2340:FS Elevator 65 30-May-25 29-Aug-25 ; 29 ug-25 Elevator' ELEV1530 Install 60 30-May-25 22-Aug-25 MASON1450:FS, ELEV1540:FS Install PROC1040:FS, ; EXT3220:FS ELEV1540-- Final Test u 5 25-Aug-25 29-Aug-25 EL EV1530:FS Fin I Test, Stair 1 35 26-Mar-25 13-May-25 13-May-25,Stair 1 STAIR1550 Steel Stairs&Pans 10 26-Mar-25 08-Apr-25 SLAB1370:FS STAIR1560:FS, Steel Stairs&Pans STAIR1600:FS STAIR1560 Place Concrete 2 09-Apr-25 10-Apr-25 STAIR1550:FS STAIR1570:FS Place Concrete STAIR1570 Frame 8 11-Apr-25 22-Apr-25 STAIR1560:FS STAIR1580:FS Frame STAIR1580 Electrical Rough 5 23-Apr-25 29-Apr-25 STAIR1570:FS STAIR1590:FS Electrical;Rough STAIR1590 Hang&Tape Drywall 10 30-Apr-25 13-May-25 STAIR1580:FS Hang&Tape drywall ----------------------- ------- ----- Stair 2 35 09-Apr-25 28-May-25 v 28-May-25,Stair 2 STAIR1600 Steel Stairs&Pans 10 09-Apr-25 22-Apr-25 STAIR1550:FS STAIR1610:FS Steel Stairs&Pans STAIR1610 Place Concrete 2 23-Apr-25 24-Apr-25 STAIR1600:FS STAIR1620:FS Place Concrete STAIR1620 Frame 8 25-Apr-25 06-May-25 STAIR1610:FS STAIR1630:FS Frame STAIR1630 Electrical Rough 5 07-May-25 13-May-25 STAIR1620:FS STAIR1640:FS ± Electrical Rough ---------------- ---- -- - --- ----- --- STAIR1640 Hang&Tape Drywall 10 14-May-25 28-May-25 STAIR1630:FS Hang&Tape Drywall Interior 192 26-Mar-25 26-Dec-25 i 26 .. - 06-May-25,1st Floor-MEPS MEP1650 Interior CFMF 15 26-Mar-25 15-Apr-25 SLAB1370:FS MEP2450:FS,MEP2390: Interior CFMF FS,MEP4060:FS, MEP2410:FS MEP2390 Install Plumbing Rough In 10 16-Apr-25 29-Apr-25 MEP1650:FS MEP4080:FS Install Plumbing Rough In ---- -- -;---- --------------- --- - ---- MEP2410 Install Sprinkler Main&Branches 10 16-Apr-25 29-Apr-25 MEP1650:FS MEP4080:FS Install Sprinkler Main&Branch MEP4060 Install HVAC Rough In 10 16-Apr-25 29-Apr-25 MEP1650:FS,PRO MEP4080:FS Install HVAC Rough In MEP4080 MEP Inspections 5 30-Apr-25 06-May-25 MEP2390:FS MEP Inspections MEP4060:FS, MEP2410:FS .. - 15-May- 25,1st Floor-Electrical Rough MEP2430 Electrical Rough 10 10-Apr-25 23-Apr-25 EXT3220:FS MEP2440:FF,MEP2520: Electrical Rough FS,LOB1000:FS --- --------------- ---- --- -----------,--'--- ----------- '------ r - MEP2440 Electrical Inspection 1 23-Apr-25 23-Apr-25 MEP2430:FF MEP2630:FS lectrical Inspection MEP2630 Fire Caulking 5 24-Apr-25 30-Apr-25 MEP2440:FS MEP2640:FS Fire Caulking MEP2640 Insulation 10 01-May-25 14-May-25 MEP2630:FS MEP2650:FS Insulation MEP2650 Insulation Inspection 1 15-May-25 15-May-25 MEP2640:FS FIN2720:FS ;Insulation Inspection 04-Nov�25,1st Floor ------------ ---- ---- FIN2720 Hang&Tape Drywall 20 16-May-25 13-Jun-25 MEP2650:FS FIN2810:FS,FIN2740:FE Haag&Tape drywall FIN2740 Prime Paint 5 16 Jun-25 20-Jun-25 FIN2720:FS FIN2760:FS Prim e Paint FIN2760 ACT Ceilings 10 23 Jun-25 07-Jul-25 FIN2740:FS FIN3060:FS,FIN2770:F11: " ACT Ceilings FIN2770 MEP Finishes 8 08-Jul-25 17-Jul-25 FIN2760:FS FIN2780:FS MEP Finishes FIN2780 Final Paint 10 18-1u1-25 31-Jul-25 FIN2770:FS FIN2855:FS FinalPaint-- I- g g d' FIN2855 Stadium Blocks&Deck-East 10 01-Au-25 14-Au-25 FIN2780:FS FIN2750:FS Stadium ium Blocks Deck-East FIN2750 Flooring-East 10 15-Aug-25 28-Aug-25 FIN2855:FS FIN3120:FS Flooring-East FIN3120 Install Seating-East 7 29-Aug-25 09-Sep-25 FIN2750:FS FIN3160:FS Install eating-Fast FIN3160 Stadium Blocks&Deck-West 10 10Sep p-25 23-Se-25 FIN3120:FS FIN3190:FS S dium Blocks&Deck-West FIN3190 Flooring-West 10 24Sep-25 07-Oct-25 FIN3160:FS FIN3130:FS Floorin9- st ------- --- ------ ------ - --------------- ------ ------ ------ ------ FIN3130 Install Seating-West 7 08-Oct-25 16-Oct-25 FIN3190:FS FIN3180:FS Install Seating-West p ouch Up FIN3180 Touch U 4 17-Oct-25 22-Oct-25 FIN3130:FS FIN2790:FS T FIN2790 Clean&Punch 5 23-Oct-25 29-Oct-25 FIN3180:FS FIN2800:FS (Dean&Punch 04-Nov..r25,1st Floor , FIN3060 Floor Tile 8 08-Jul-25 17-Jul-25 FIN2760:FS FIN3070:FS Floor Tile Actual Level of Effort 0 Remaining Work ♦ ♦MilestoneCON TASK filter:Completed Work. Actual Work Critical Remaining Work ��summary ©Oracle Corporation Merrimack College PRELIMINARY Two Story Lecture Hall-Design Construction Schedule 12-02-24- 02-Dec-24 16:01 Activity ID Activity Name Original Start Finish Predecessor Details Successor Details Qtr 1,2025 Qtr 2,2025 Qtr 3,2025 Qtr 4,2025 112 Duration Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ian FIN3070 Wall Tile 8 18-Jul-25 29-Jul-25 FIN3060:FS FIN3080:FS Wall Tile FIN3080 Millwork&Counters 4 30-Jul-25 04-Aug-25 FIN3070:FS FIN3090:FS Millwork& unte' -- -- -g- g-5 k F ure FIN3090 Set Bathroom Fixtures 8 05-Au 25 14-Au 25 FIN3080:FS FIN3100:FS 4 Set Bathroom .. . FIN3100 Install Partitions&Finish Plumbing Accessories 4 15-Aug-25 20-Aug-25 FIN3090:FS FIN2800:FS 4 Install artitio s&Fi ish Plumbing Accessories QJ FIN2800 Final Inspections 4 30-Oct-25 04-Nov-25 FIN2790:FS, STARTUP4170:FS --- ------- ----- Final Inspections FIN3100:FS ------, 4 ' ---------------- --- ---------------t------------4----------.------_-----------_--------_-------------- ... LOB1000 Lobby Electrical Rough In(Follows 1st Floor Electrical Rough In) 10 24-Apr-25 07-May-25 MEP2430:FS LOB1010:FS Lobby Electrical Dough In(Follows 1st Floor lectn I Rough In)am Lott � 4 ; LOB1010 Lobby Electrical Inspection 1 08-May-25 08-May-25 LOB1000:FS LOB1020:FS Lobby Electrical Inspection Y 9 P y Y Y 9 S&nspeat L061020 Lobby Frame Ceilings,Install MEPS&Ins Inspect 10 09-Ma-25 22-Ma-25 L061010:FS L061030:FS Lobby Frame Ceilings,Install MEP i LOB1030 Lobby Hang Ceiling Drywall 5 23-May-25 30-May-25 LOB1020:FS LOB1040:FS Lobby Hong Ceiling;Drywall LOB1040 Lobby Insulate Walls 5 02-Jun-25 06-Jun-25 LOB1030:FS LOB1050:FS Lobby Insulate Walls LOB1050 Lobby Insulation Inspection 1 09-Jun-25 09-Jun-25 LOB1040:FS LOB1060:FS Lobb Insulation Inspection' LOB1060 Lobby Hang Drywall 7 10-1un-25 18-Jun-25 LOB1050:FS LOB1070:FS Lobby Hang Drywall LOB1070 Lobby Tape&Finish Drywall 7 19-Jun-25 27-Jun-25 LOB1060:FS LOB0180:FS ;Lobby Tape&Finish'D II ; low LOB0180 Lobby Prime Paint&Level 5 5 30-Jun-25 07-Jul-25 LOB1070:FS LOB0190:FS Lobby Prime Paint& evel 5 ----------------------- --- ------ ---- LOB0190 Lobby Storefront 7 08-Jul-25 16-Jul-25 LOB0180:FS LOB0200:FS NLobby Storefront g y Floor n LOB0200 Lobby Wall Covering 7 17-Jul-25 25-Jul-25 LOB0190:FS LOB1080:FS Lobby Wall Co ring LOB1080 LobbyFlooring7 28-Jul-25 05-Au 25 LOB0200:FS LOB1090:FS Lobby g P g g by Special Wishes L061090 LobbySpecial Finishes 7 06-Au-25 14-Au-25 L061080:FS L061100:FS Lob, i LOB1100 Lobby MEP Finishes 7 15-Aug-25 25-Aug-25 LOB1090:FS LOB1110:FS, Lob y MEP Finishes STARTUP4160:FS, 4 ------------ - t STARTUP4180:FS _______ ------- 4-------- __ --- ------ ---1- 1 , LOB1110 Lobby Final Inspections 3 26-Aug-25 28-Aug-25 LOB1100:FS ; 4 Loby Fina Inspections i .. - 28-May-2v,2nd Floor-MEPS ' MEP2450 Interior CFMF 15 16-Apr-25 06-May-25 MEP1650:FS MEP2480:FS,MEP4090: Int4dor CFMF 4 FS,MEP2500:FS 4 MEP2480 Install Plumbing Rough In 10 07-May-25 20-May-25 MEP2450:FS MEP4100:FS Install Plumbing Rough'In MEP2500 Install Sprinkler Main&Branches 10 07-May-25 20-May-25 MEP2450:FS MEP4100:FS Install Sprint er Main&Branches ------- .----- - --- - - - ---------i---------.------- ---- ------- "i -- -'--- MEP4090 HVAC Rough In 10 07-May-25 20-May-25 MEP2450:FS MEP4100:FS HVAC Rough In ; MEP4100 MEP Inspections 5 21-May-25 28-May-25 MEP4090:FS, MEP2520:FS MEP Inspections MEP2480:FS, MEP2500:FS 1 .. ® W 07-Jul725,2nd Floor- lectri I Rough MEP2520 Electrical Rough In 10 29-May-25 11-Jun-25 MEP2430:FS, MEP2530:FS,LOB1120: Electrical Rough In MEP4100:FS FS MEP2530 Electrical Inspection 1 12-Jun-25 12-Jun-25 MEP2520:FS MEP2660:FS Electrical Inspection ---------------- ---- -- ------- ------ ---'--------------- --- - ---- -- MEP2660 Fire Caulking 5 13-Jun-25 19-Jun-25 MEP2530:FS MEP2670:FS Fie Caulking ; MEP2670 Insulation 10 20-Jun-25 03-Jul-25 MEP2660:FS MEP2680:FS Insulation MEP2680 Insulation Inspection 1 07 Jul-25 07-Jul-25 MEP2670:FS FIN2810:FS Insulation Inspection .rr- 26 FIN2810 Hang&Tape Drywall 20 08-Jul-25 04-Aug-25 MEP2680:FS, FIN2830:FS Hang&Tap II FIN2720:FS - ---- ' FIN2830 Prime Paint 5 05-Aug-25 11-Aug-25 FIN2810:FS FIN2850:FS Prime Pai t FIN2850 ACT Ceilings 10 12-Aug-25 25-Aug-25 FIN2830:FS FIN2860:FS,FIN3000:F1 ACT ding FIN2860 MEP Finishes 8 26-Aug-25 05-Sep-25 FIN2850:FS FIN2870:FS EP F ishes FIN2870 Final Paint 10 08-Sep-25 19-Sep-25 FIN2860:FS STAIR1650:SS,FIN3200: Fih I Paint FS - p- ----- ---- -- - Ceck- ast FIN3200 Stadium Blocks&Deck-East 10 22Se 25 03-Oct-25 FIN2870:FS FIN2840:FS Stadium Blocks& FIN2840 Flooring-East 10 06-Oct-25 17-Oct-25 FIN3200:FS FIN3140:FS Fioonng-East, , FIN3140 Install Seating-East 7 20-Oct-25 28-Oct-25 FIN2840:FS FIN3170:FS Install Sea'jing-�ast FIN3170 Stadium Blocks&Deck-West 10 29-Oct-25 11-Nov-25 FIN3140:FS FIN3110:FS Stad,i6m Blocks;& FIN3110 Flooring-West 10 12-Nov-25 25-Nov-25 FIN3170:FS FIN3150:FS Flooring-We FIN3150 Install Seating-West 7 26-Nov-25 08-Dec-25 FIN3110:FS FIN3210:FS Install;Se ----- ----- ----- --------------'---- FIN3210 Touch Up 4 09-Dec-25 12-Dee-25 FIN3150:FS FIN2880:FS Touch FIN2880 Clean&Punch 5 15-Dec-25 19-Dec-25 FIN3210:FS FIN2890:FS Gea ... :€:.. ;26 Actual Level of Effort 0 Remaining Work ♦ ♦MilestoneCON TASK filter:Completed Work. Actual Work Critical Remaining Work ��summary ©Oracle Corporation Merrimack College PRELIMINARY Two Story Lecture Hall-Design Construction Schedule 12-02-24- 02-Dec-24 16:01 Activity ID Activity Name Original Start Finish Predecessor Details Successor Details I Qtr 1,2025 Qtr 2,2025 Qtr 3,2025 Qtr 4,2025 215 Duration Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ian FIN3000 Floor Tile 8 26-Aug-25 05-Sep-25 FIN2850:FS FIN3010:FS loor I FIN3010 Wall Tile 8 08-Sep-25 17-Sep-25 FIN3000:FS FIN3020:FS Wal Tile ------------- FIN3020 Millwork&Counters 4 18Sep-25 23-Sep-25 FIN3010:FS FIN3030:FS M llwork&Counters ; -P Bathroom Fixtures FIN3030 Set Bathroom Fixtures 8 24-Se-25 03-Oct-25 FIN3020:FS FIN3040:FS Set FIN3040 Install Partitions&Finish Plumbing Accessories 4 06-Oct-25 09-Oct-25 FIN3030:FS FIN2890:FS qInstall'Partitions Fi sH Plum ----- --------1 FIN2890 Final Inspections 4 22-Dec 25 26-Dec25 FIN2880:FS, STARTUP4170:FS J Fin FIN3040:FS 16-Oct-25,2nd Floor Main LOB1120 Lobby Electrical Rough In Follows 1st Floor Electrical Rough In 10 12-Jun-25 25-Jun-25 MEP2520:FS LOB1130:FS Lobby Electrical Rougn In(Follows 1st Floor Electrical Rbugh I) LOB1130 Lobby Electrical Inspection 1 26-Jun-25 26-Jun-25 LOB1120:FS LOB1140:FS Lobby Electrical Insp ctio LOB1140 Lobby Frame Ceilings,Install MEPS&Inspect 10 27-Jun-25 11-Jul-25 LOB1130:FS LOB1150:FS Lobby Frame dings,Instal MEPS&Inspect LOB1150 Lobby Hang Ceiling Drywall 5 14-Jul-25 18-Jul-25 LOB1140:FS LOB1160:FS Lobby Hang ilin g D II LOB1160 Lobby Insulate Walls 5 21-Jul-25 25-Jul-25 LOB1150:FS LOB1170:FS Lobby Insulate Valls ------------- -- ------- ----- ---,--- --- ------------------------------------ LOB1170 Lobby Insulation Inspection 1 28-Jul-25 28-Jul-25 LOB1160:FS LOB1180:FS Lobby Ins lati n Inspection ; L061180 Lobby Hang Drywall 7 29 Jul-25 06-Aug-25 L061170:FS L061190:FS N, Lobby:Han(jDrywa l LOB1190 Lobby Tape&Finish Drywall 7 07-Aug-25 15-Aug-25 LOB1180:FS LOB1200:FS Lot 'by Tipe&inish Drywall LOB1200 Lobby Prime Paint&Level 5 5 18-Aug-25 22-Aug-25 LOB1190:FS LOB1210:FS L Llobb Prime Paint&Level 5 LOB1210 Lobby Storefront 7 25-Aug-25 03-Sep-25 LOB1200:FS LOB1220:FS Lobby St refront ------------- -- ------- Y 9 P P- - - b Wall Covering ; LOB1220 Lobby Wall Covering 7 04Se-25 12-Se 25 LOB1210:FS LOB1230:FS Lob LOB1230 Lobby Flooring 7 15-Sep-25 23-Sep-25 LOB1220:FS LOB1240:FS i bby Flooring Qij LOB1240 Lobby Special Finishes 7 24S Special Finnep-25 02-Oct-25 LOB1230:FS LOB1250:FS Lobby Sp hl es s LOB1250 Lobby MEP Finishes 7 03-Oct-25 13-Oct-25 LOB1240:FS LOB1260:FS, MEP Fini shes ashes STARTUP4160:FS 40, STARTUP4180:FS 40 LOB1260 Lobby Final Inspections 3 14-Oct-25 16-Oct-25 LOB1250:FS STARTUP4170:FS LobbY Final In,Pecti s ------------------------ ----------- f -------- --- -- ihes 9-Sep-25 Starr#1 ■ r. - • 1. � 1 i - -5, talc In STAIR1650 Final Paint 3 08-Sep-25 10-Sep-25 FIN2870:SS STAIR1660:FS, FinalT aint STAIR1700:FS STAIR1660 Stair Railings 3 11-Sep-25 15-Sep-25 STAIR1650:FS STAIR1670:FS Stair Railings -P p -- a r MEP Finishes STAIR1670 Stair MEP Finishes 3 16Se-25 18-Se-25 STAIR1660:FS STAIR1680:FS St STAIR1680 Starr Flooring 5 19-Sep-25 25-Sep-25 STAIR1670:FS STAIR1690:FS E tair Flooring STAIR1690 Stair Inspections 2 26-Sep-25 29-Sep-25 STAIR1680:FS STARTUP4170:FS Stair Inspections '-------- ------- ---- 2-. 02-Oct-5,Starr#2 STAIR1700 Final Paint 3 11-Sep-25 15-Sep-25 STAIR1650:FS STAIR1710:FS Final Paint STAIR1710 Stair Railings 3 16-Sep-25 18-Sep-25 STAIR1700:FS STAIR1720:FS Stp r Railings, --------------- - STAIR1720 Stair MEP Finishes 3 19-Sep-25 23-Sep-25 STAIR1710:FS STAIR1730:FS it MEP Finishes STAIR1730 Stair Flooring i 5 24Sep-Sep 30-Sep-25 STAIR1720:FS STAIR1740:FS Starr Flooring STAIR1740 Stair Inspections 2 01-Oct-25 02-Oct-25 STAIR1730:FS STARTUP4170:FS Starr Inspections ----- Sitework 213 04-Dec-24 03-Oct-25 03-Oct-25,Sitewo SITE1000 Clear&Grub 3 04-Dec-24 06-Dec-24 FNDS3920:SS Gear&Grub --------------- --------------- --- SITE1010 E&B For Gas Service 5 22-Sep-25 26-Sep-25 EXT2220:FS SITE1040:FS EAB For Gas Service' SITE1040 E&B&Install Storm Drainage Systems 5 29Sep-Sep 03-Oct-25 SITE1010:FS E&B&Install Sto Drain ge;Sy - rt �13-,tan-25,Utility Work Between Lecture&Sullivan ' SITE1020 E&B For Electric Service 20 13-Dec-24 13-Jan-25 HOL1030:SS SITE1030:SS E&B For Electric Service SITE1030 E&B For Water Service 20 13-Dec-24 13-Jan-25 SITE1020:SS E&B For Water Service SITE1050 Drainage Line As Required 20 13-Dec-24 13-Jan-25 I Drainage Line As Required Landscape/Hardscape 40 13-Oct-25 09-Deo-25OV 0-Dec-2 �►17 ov-2,Etev - • • LAND3440 Start Prep for Hardscape/Landscape 2 13-Oct-25 14-Oct-25 EXT2340:FS LAND3560:FS, Start Prep for ids e/La LAND3460:FS LAND3460 Install Granite Curb 4 15-Oct-25 20-Oct-25 LAND3440:FS LAND3470:FS, Install Granit'Curb LAND3580:FS ----- ---- --- ------- LAND3470 Backfill Sidewalk 2 21-Oct-25 22-Oct-25 LAND3460:FS LAND3490:FS Backfill Side IIc LAND3490 Install Lightpole Bases 1 23-Oct-25 23-Oct-25 LAND3470:FS LAND3500:FS Install Light' le B s; r9 roun Elect LAND3500 Install Underground Electric 1 24-Oct-25 24-Oct-25 LAND3490:FS LAND3510:FS Install Linde - -P p LAND3510 Pre For Patio Install 5 27-Oct-25 31-Oct-25 LAND3500:FS LAND3520:FS Pre For atio I stall Actual Level of Effort 0 Remaining Work ♦ ♦MilestoneCON TASK filter:Completed Work. Actual Work Critical Remaining Work ��summary ©Oracle Corporation Merrimack College PRELIMINARY Two Story Lecture Hall-Design Construction Schedule 12-02-24- 02-Dec-24 16:01 Activity ID Activity Name Original Start Finish Predecessor Details Successor Details Qtr 1,2025 Qtr 2,2025 Qtr 3,2025 Qtr 4,2025 126 Duration Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ian LAND3520 Place Patio Area 7 03 Nov-25 11-Nov-25 LAND3510:FS LAND3530:FS Pla Patio re a LAND3640:FS ---------------------- -- ------- LAND3530 Install Light Poles 2 12-Nov-25 13-Nov-25 LAND3520:FS LAND3540:FS Insta I Lighl Poles LAND3540 Punch 2 14-Nov-25 17-Nov-25 LAND3530:FS Pu ch •N 5-No 25,Ell LAND3560 Start Prep for Hardscape/Landscape 2 15-Oct-25 16-Oct-25 LAND3440:FS LAND3680:FS, Star Prep fore, rd pe/La LAND3580:FS LAND3580 Install Granite Curb 4 21-Oct-25 24-Oct-25 LAND3560:FS, LAND3590:FS, Ir stall Grani e Cu LAND3460:FS LAND3700:FS ---------------------- J LAND3590 Backfill Sidewalk 2 27-Oct-25 28-Oct-25 LAND3580:FS LAND3610:FS 3ackfill Sic ewalk LAND3610 Install Lightpole Bases 1 29-Oct-25 29-Oct-25 LAND3590:FS LAND3620:FS Install Lig tpole ases LAND3620 Install Underground Electric 1 30-Oct-25 30-Oct-25 LAND3610:FS LAND3630:FS Install Uri ergro nd Ele LAND3630 Base Pave Sidewalk 3 31-Oct-25 04-Nov-25 LAND3620:FS LAND3640:FS Base Pave Si ewalk LAND3640 Install Brick Pavers 6 12-Nov-25 19-Nov-25 LAND3630:FS, LAND3650:FS, Incall Bri Pav LAND3520:FS LAND3760:FS ------ ---- -- LAND3650 Install Light Poles 2 20-Nov-25 21-Nov-25 LAND3640:FS LAND3660:FS Install Lii lht Pol LAND3660 Punch 2 24-Nov-25 25-Nov-25 LAND3650:FS Punch • � • � rr- 05 0-25 LAND3680 Start Prep for Hardscape/Landscape 2 17-Oct-25 20-Oct-25 LAND3560:FS LAND3800:FS, Start rep forHard pe/L LAND3700:FS LAND3700 Install Granite Curb 5 27-Oct-25 31-Oct-25 LAND3580:FS, LAND3710:FS, In 3tall Gr,inite rb; LAND3680:FS LAND3820:FS -------------- LAND3710 Back-fill Sidewalk 2 03-Nov-25 04-Nov-25 LAND3700:FS LAND3730:FS ackfill, ide Ik LAND3730 Install Lightpole Bases 1 05-Nov-25 05-Nov-25 LAND3710:FS LAND3740:FS Install L ghtpo BasE LAND3740 Install Underground Electric 1 06-Nov-25 06-Nov-25 LAND3730:FS LAND3750:FS Install L nderg and LAND3750 Base Pave Sidewalk 3 07-Nov-25 11-Nov-25 LAND3740:FS LAND3760:PS Base Pave idewa LAND3760 Install Brick Pavers 6 20-Nov-25 01-Dec-25 LAND3750:FS, LAND3770:FS, Inst I Brick LAND3640:FS LAND3880:FS -------------------'---- -- ------- ------------------------------------ --- -- ------- --- -- LAND3770 Install Light Poles 2 02-Dec-25 03-Dec-25 LAND3760:FS LAND3780:FS Inst II Ligh LAND3780 Punch 2 04-Dec-25 05-Dec-25 LAND3770:FS Pu ch • - 0 Deal LAND3800 Start Prep for Hardscape/Landscape 2 21-Oct-25 22-Oct-25 LAND3680:FS Start Pre f Hard pe/ LAND3820 Install Granite Curb 2 03-Nov-25 04-Nov-25 LAND3700:FS LAND3830:FS Insta I G Hite ri? ---- --- -------- ------ ------ ------------- ------ ---- ------ ------ --- LAND3830 Back-fill Sidewalk 2 05-Nov-25 06-Nov-25 LAND3820:FS LAND3850:FS Bac dill Side Ik LAND3850 Install Lightpole Bases 1 07-Nov-25 07-Nov-25 LAND3830:FS LAND3860:FS Install I.ightpc le Bas LAND3860 Install Underground Electric 1 10-Nov-25 10-Nov-25 LAND3850:FS LAND3870:FS In all Under round LAND3870 Base Pave Sidewalk 3 11-Nov-25 13-Nov-25 LAND3860:FS LAND3880:FS B 3sElPave Sida LAND3880 Install Brick Pavers 2 02-Dec25 03-Dec25 LAND3870:FS, LAND3890:FS ]st Buck LAND3760:FS ----- ---;--- --------------------- ---- ---------,------- - --LAND3890 Install Light Poles 2 04-Dec-25 05-Dec-25 LAND3880:FS LAND3900:FS II L'igLAND3900 Punch 2 08-Deo-25 09-Deo 25 LAND3890:FS ncl Building Smart Up&Certificate of Occupancy 19 11-Dec-25 08-1an-26 STARTUP4160 Final Fire Alarm Walk Through 4 11-Dec-25 16-Dec-25 LOB1250:FS 40, STARTUP4190:FS Final LOB1100:FS -, STARTUP4180 Startup&Commissioning of Equipment 3 11-Dec-25 15-Dec-25 LOB1250:FS 40, STARTUP4190:FS tartu LOB1100:FS --------- , gi STARTUP4170 Final Building p 9 Department WalkThrou h 5 29-Dec-25 05-Jan-26 FIN2890:FS STARTUP4190:FS LOB1260:FS, FIN2800:FS, STAIR1690:FS, STAIR1740:FS STARTUP4190 C of 0 3 06-Jan-26 08-Jan-26- STARTUP4160:FS, STARTUP4170:FS, STARTUP4180:FS Actual Level of Effort 0 Remaining Work ♦ ♦MilestoneCON TASK filter:Completed Work. Actual Work Critical Remaining Work ��summary ©Oracle Corporation