HomeMy WebLinkAbout2023/09/18 - Jon Strauss Comment - - 9/27/23,9:14 AM Town of North Andover Mail-Sept. 19,2023 Planning Board Agenda
kO
1D
No- "I"
� . Al OW
z
Rk
� sshu
�,
Jean Enright<jen rig ht@northandoverma.gov>
VOW
Sept. 19, 2023 Planning Board Agenda
Jon Strauss <jstrauss75@gmail.com> Mon, Sep 18, 2023 at 8:18 AM
To: Jean Enright<jen rig ht@northandoverma.gov>
Jean,
Relative to the Site Plans for the Corner Development Project at Merrimack College, Sheet C4.0 (Grading and Drainage Plan)shows a proposed 24"drain pipe
leading from an on-site subsurface infiltration system across Andover Street into an existing drain manhole on the western side of Andover Street.
My questions relative to this are the following:
1) Does the Town typically allow private site drainage to tie into a public drainage system?
2) If so, has a downstream drainage capacity analysis been performed?
3)Are there any existing drainage easements in place for the portion of the existing drainage system on Andover Street that encroaches on the Merrimack property
shown as Map 24, Lot 29?
1 know the stormwater report peer review touched on the outlet to this system, but I think it's important that these questions be answered early in the planning
phase.
Thanks.
-Jon Strauss
On Thu, Sep 14, 2023 at 3:52 PM Jean Enright<jen rig t v r . v>wrote:
[Quoted text hidden]
Visit online r . v i
Share i tt : / r . t r -
receivedYou isubscribed i .
To unsubscribe from thisr iing emails from i , send an email to pbagendas+unsubscribe@northandoverma.gov.
To view thisdiscussion visit t : r . rt y r i 1 / r - i -
/ i t j j / / i . i . .
https://mail.google.com/mail/u/O/?ik=7c2eff6265&view=pt&search=all&permmsgid=msg-f:l 777377523607663187&simpl=msg-f:1777377523607663187 1/1