HomeMy WebLinkAbout2024/05/02 - Construction Mannagement Plan Set - - NOR TH ANDO VER DEPAR TMENT OF PUBLIC WORKS tl%l
Nitsch EVn eeung
CONS TR UCTION MANA GEMENT PLAN ww~.n ,erM.com
2 Center Plaza,Suite 430
FORBoston,MA 02108
T:(617)338-0063
CORNER DE VEL OPMENT PR OJECT A T MERRIMA CK COLLEGE F:(617)338-6472
►Civil Engineering
NOR TH ANDO VER, MA ►Land Surveying
►Transportation Engineering
►Structural Engineering
►Green Infrastructure
Planning
INDEX ►GIS
DWG NO. SHEET NO. PLAN TITLE
CMP-1 1 COVER
CMP-2 2 GENERAL NOTES AND SCHEDULE
CMP-3 3 TEMPORARY TRAFFIC CONTROL DEVICES
CMP-4 4 EXISTING CONDITIONS
CMP-5 5 CMP PHASE 1:MOBILIZATION AND SETUP ~
CMP-6 6 CMP PHASE 2:BUILDING 1 EXCAVATION �p <
Ok w'w
CMP-7 7 CMP PHASE 3:EXCAVATION AND CONCRETE �'O 9 o z
CMP-8 8 CMP PHASE 4:CONCRETE AND FRAMING GTFJGF o THIS PLAN DEPICTS IN SCHEMATIC FORM,THE o
CMP-9 9 CMP PHASE 5:FRAMING AND SITE UTILITY INSTALLATIONS Q ELEMENTS OF AN APPROACH TO THE LAYOUT w Q O
AND PLANNING OF THE WORK DURING THE w 2 m
CMP-10 10 CMP PHASE 6:MEDINA DRIVE CONSTRUCTION PROGRESS OF THE CONSTRUCTION OPERATIONS. J
CMP-11 11 CMP PHASE 7:FRAMING AND FINISHES PROJECT SITE THIS PLAN CONTAINS NO EXPRESS OR IMPLIED OU > o Q 0
REPRESENTATIONS AS TO THE CONSTRUCTABILITY LJJ Y O C4 w
CMP-12 12 CMP PHASE 8:FACADE AND FINISHES OF ANY ASPECT OF THE WORK.THE Q
CONSTRUCTION CONTRACTOR REMAINS ~
Q
CMP-13 13 CMP PHASE 9:FINISHES AND HARDSCAPE C�
EXCLUSIVELY RESPONSIBLE FOR THE PLANNING, _
CMP-14 14 TRUCK ROUTING PLAN �O� MEANS,METHODS,SEQUENCES,PROCEDURES w
'A AND EXECUTION OF THE WORK,AND FOR THE Lu O m
CMP-15 15 TRUCK TURNING PLAN �� PROPER AND TIMELY IMPLEMENTATION OF ALL
CMP-16 16 CONSTRUCTION SIGN SUMMARY 00 R5O TG INCIDENTAL AND/OR REQUIRED SAFETY
�P �tiA PRECAUTIONS AND PROGRAMS.
CE
/�F LU
NOTHING IN THIS PLAN SHALL RELIEVE,OR o
`rTQ OTHERWISE DIMINISH THE RESPONSIBILITY OF THE �
FF j CONTRACTOR FOR THIS EXCLUSIVE r
A MFO�Nq ��OG RESPONSIBILITY.
O,Q�� TF`6" THE PREPARER OF THIS PLAN HAS NO ROLE IN
>> THE OVERSIGHT OR OTHERWISE IN THE
�-
A9 IMPLEMENTATION OF THIS PLAN.
4'O
�2
SJ
ALL WORK SHALL CONFORM TO THESE PLANS,THE 2024 LOCUS PLAN
MASSDOT HIGHWAY DIVISION STANDARD SPECIFICATIONS FOR SCALE: 1"=250'(APPROXIMATE)
HIGHWAYS AND BRIDGES;THE OCTOBER 2017 CONSTRUCTION
STANDARDS;THE CURRENT MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES FOR STREETS AND HIGHWAYS(MUTCD)WITH
LATEST REVISIONS;THE 1990 STANDARD DRAWINGS FOR SIGNS REV.I COMMENTS I DATE
AND SUPPORTS;THE 1968 STANDARD DRAWINGS FOR TRAFFIC REVISIONS
SIGNALS AND HIGHWAY LIGHTING;AND THE AMERICAN STANDARD
FOR NURSERY STOCK CURRENT EDITION(ANSI Z-60.1—2004). NITSCH PROJECT# I5884
WHERE CONFLICTS EXIST,THE MASSDOT STANDARDS SHALL FILE: 15884 covER.DwG
GOVERN.
SCALE: AS SHOWN
DATE: 05/02/2024
PROJECT MANAGER:B.ZIMOLKA
SURVEYOR: ---
DRAFTED BY: P.CALVES
CHECKED BY: B.ZIMOLKA
SHEET:I
CMP
OF 16
i
1. THESE PLANS ARE NOT INTENDED TO LIMIT THE CONTRACTORS RIGHT TO BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S
SCHEDULE THE WORK BUT TO OUTLINE ONE WAY OF PROGRESSING. THE EXPENSE.
CONTRACTOR IS EXPECTED TO USE KNOWLEDGE AND EXPERIENCE TO
PERFORM THE WORK IN THE MOST SAFE AND EFFICIENT MANNER IN 20.THE CONTRACTOR IS HEREBY NOTIFIED THAT ADDITIONAL WORK WITHIN THE
COMPLIANCE WITH THE DRAWINGS AND SPECIFICATIONS AND MEETING THE PROJECT LIMITS MAY BE PERFORMED BY OTHERS.
REQUIREMENTS OF THE TOWN OF NORTH ANDOVER AND MERRIMACK COLLEGE. NitKh E Oneeemg
21.THE CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND DIMENSIONS PRIOR
2. CONTRACTOR SHALL SUBMIT FOR APPROVAL BY THE TOWN AND THE TO CONSTRUCTION. www.nrlscheng.com
COLLEGE,CONSTRUCTION MANAGEMENT PLANS FOR ANY WORK OUTSIDE OF
THE WORK ZONES INDICATED IN THESE DRAWINGS. 22.THE CONTRACTOR SHALL VERIFY PROPERTY LIMITS PRIOR TO CONSTRUCTION 2 Center Plaza,Suite 430
AND PLACE ANY TEMPORARY OR NEW EQUIPMENT WITHIN THE PROJECT Boston,MA 02108
3. ALTERNATIVE PHASING OR MODIFICATIONS TO ANY ASPECT OF THE LIMITS OR MERRIMACK COLLEGE PROPERTY.
CONSTRUCTION MANAGEMENT PLANS AND THE CONSTRUCTION STAGING PLANS T:(617)338-0063
WILL BE SUBJECT TO REVIEW FOR ACCEPTANCE BY THE TOWN PRIOR TO 23.PRIOR TO THE START OF CONSTRUCTION,THE CONTRACTOR SHALL SUBMIT F:(617)338-6472
COMMENCEMENT OF WORK. THE CONTRACTOR SHALL BEAR ALL COSTS FOR REVIEW A DETAILED SCHEDULE OF OPERATIONS IN ADDITION TO OTHER
ASSOCIATED WITH THE SUBMISSION AND REVIEW OF ALTERNATIVE CONTRACT REQUIREMENTS TO THE NORTH ANDOVER ENGINEERING DIVISION
CONSTRUCTION MANAGEMENT PLANS AND CONSTRUCTION STAGING PLANS, AND PUBLIC WORKS DEPARTMENT AS WELL AS THE MERRIMACK COLLEGE ►Civil Engineering
INCLUDING PRESENTATION TO THE TOWN AND THE COLLEGE IF NEEDED, FACILITIES DEPARTMENT. ►Land Surveying
VEHICULAR AND PEDESTRIAN TRAFFIC MODELING,LEVEL OF SERVICE(LOS) ►Transportation Engineering
ANALYSES,AND OTHER ASSOCIATED EFFORTS.ALTERNATIVE CONSTRUCTION 24.NO EXISTING PUBLIC UTILITY STRUCTURES SHALL BE ABANDONED AND/OR ►Structural Engineering
MANAGEMENT AND CONSTRUCTION STAGING PLANS SHALL NOT CAUSE AN DISMANTLED WITHOUT AUTHORIZATION FROM THE TOWN. 9 g
INTERFERENCE WITH ADJACENT CONTRACTS OR DELAY THE SCHEDULE OR ►Green Infrastructure
INCREASE THE COST OF THIS OR ANY ADJACENT CONTRACTS. LEVEL OF 25.THE CONTRACTOR SHALL DISPOSE OF ALL WASTE MATERIAL IN ACCORDANCE ►Planning
SERVICE ANALYSIS SHALL BE DEFINED BY THE"HIGHWAY CAPACITY MANUAL." WITH ALL FEDERAL,STATE AND LOCAL REGULATIONS AT HIS OWN EXPENSE. ►GIS
5. CONTRACTOR SHALL SECURE WORK AREAS TO ENSURE PUBLIC SAFETY AND 26.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ADEQUATE
CONVENIENCE.THIS SHALL INCLUDE ENSURING THAT ALL EXCAVATIONS ARE STREET LIGHTING ADJACENT TO THE PROJECT,FOR THE DURATION OF THE
PROTECTED AT ALL TIMES. PROJECT,AS APPROVED BY THE TOWN AND THE COLLEGE. CONTRACTOR
SHALL ENSURE THAT STREET LIGHTING SERVICE WILL NOT BE INTERRUPTED
6. ALL CONSTRUCTION SIGNING,DRUMS,BARRICADES AND OTHER DEVICES AND THAT STREET LIGHTING WILL BE OPERATIONAL AT THE END OF EACH
SHALL CONFORM WITH THE CURRENT EDITION OF THE MANUAL ON UNIFORM WORKDAY.
TRAFFIC CONTROL DEVICES(MUTCD)AS AMENDED AND TOWN OF NORTH
ANDOVER SPECIFICATIONS. 27.THE CONTRACTOR SHALL ERADICATE EXISTING PAVEMENT MARKINGS THAT
CONFLICT WITH PROPOSED PAVEMENT MARKINGS.
7. ALL TRAFFIC CONTROL DEVICES SHALL BE INSTALLED ALONG THE ROADWAY IN
ORDER WITH THE FLOW OF TRAFFIC.SIMILARLY,ALL DEVICES SHALL BE 28.CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ANY WEIGHT RESTRICTIONS
REMOVED IN ORDER AGAINST THE FLOW OF TRAFFIC. ON AREA BRIDGES AND TO INSURE THAT TRAFFIC DOES NOT EXCEED WEIGHT
RESTRICTIONS IF BRIDGES ARE USED. LJJ Q
8. CONTRACTOR SHALL COORDINATE WITH THE TOWN AND THE COLLEGE TO J
ACCOMMODATE ACCESS NEEDS OF ABUTTING PROPERTIES NOT SPECIFIED IN 29.UPON COMPLETION OF CONSTRUCTION,ALL FEATURES WITHIN THE PUBLIC
THE PLANS. RIGHT—OF—WAY INCLUDING PAVEMENT CONDITION,PAVEMENT MARKINGS, G z
SIGNAGE,PARKING METERS,UTILITY POLES,AND TRAFFIC SIGNAL EQUIPMENT = 00
9. CONTRACTOR SHALL MAINTAIN EMERGENCY PASSAGE AT ALL TIMES TO SHALL BE RESTORED TO EXISTING CONDITION OR FINAL CONDITION AS
BUILDINGS WITHIN THE PROJECT LIMITS.CONTRACTOR SHALL MAINTAIN APPROVED BY THE NORTH ANDOVER DEPARTMENT OF PUBLIC WORKS AND y w m
24—HOUR EMERGENCY VEHICLE ACCESS TO AND THROUGH CONSTRUCTION THE MERRIMACK COLLEGE FACILITIES DEPARTMENT. J
AREAS. p w Q Oro
30.MEDINA DRIVE ADJACENT TO THE PROJECT SITE IS TO REMAIN ACTIVE AND Z U > o co
10.CONTRACTOR SHALL PROVIDE POLICE DETAIL OFFICERS DURING WORK HOURS OPEN TO TRAFFIC AT ALL TIMES DURING CONSTRUCTION UNLESS OTHERWISE Q Y O o y w
FOR TRAFFIC CONTROL. NOTED. c) L—
W Q Q a] W
� m
11.SAFETY SIGNS PROPOSED FOR LOCATIONS OTHER THAN ERECTED ONCD _ -- =
TEMPORARY BARRICADES MAY BE ERECTED ON EXISTING LIGHTPOLES,SIGN Z a= [ w
POSTS,AND OTHER EXISTING FEATURES AS APPROVED BY THE TOWN AND w
THE COLLEGE. J :E O
BAR SCHEDULE Q `�
12.LOCATIONS OF SIGNS SHOWN ARE APPROXIMATE.EXACT LOCATIONS SHALL BELU Q
DETERMINED BY THE CONTRACTOR IN THE FIELD. THE CONTRACTOR SHALL 2024 2025 2026 Z w
ENSURE THAT SIGNS ARE PLACED SO MAXIMUM VISIBILITY IS OBTAINED. LJJLU
CD
p
13.THE NORTH ANDOVER POLICE,FIRE,AND ENGINEERING DIVISIONS,AS WELL FEB'MAR'APR:MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB'MAR'APR MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB:MAR:APR MAY JUNE: ILL
AS THE MERRIMACK COLLEGE FACILITIES DEPARTMENT SHALL BE ADVISED OF r
THE SCHEDULE OF CONSTRUCTION AS WELL AS OF ANY DETOURS OR
ALTERNATE ROUTES.
PHASE 1:MOBILIZATION AND SETUP
14.WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED
WORK,THE LOCATION,ELEVATION,AND SIZE OF THE UTILITY SHALL BE
ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR AND THE PHASE 2:BUILDING 1 EXCAVATION
INFORMATION FURNISHED TO THE ENGINEER,THE COLLEGE AND THE TOWN
FOR RESOLUTION OF THE CONFLICT.
15.THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS FOR THE ALTERATION PHASE&EXCAVATION AND CONCRETE
AND ADJUSTMENT OF ELECTRIC,TELEPHONE,AND ANY OTHER PRIVATE
UTILITIES BY THE UTILITY COMPANIES AT NO ADDITIONAL COST TO THE TOWN > L
OR COLLEGE.IF THE CONTRACTOR ADJUSTS UTILITY COVERS IT SHALL BE PHASE 4:CONCRETE AND FRAMING
DEEMED PART OF THE WORK AND THERE WILL BE NO ADDITIONAL
COMPENSATION. +
PHASE 5:'FRAMING AND SITE UTILITY INSTALLATIONS
16.ALL UTILITY COMPANIES,PUBLIC AND PRIVATE,MUST BE NOTIFIED,INCLUDING .
THOSE IN CONTROL OF UTILITIES NOT SHOWN ON THIS PLAN,(SEE CHAPTER REV. COMMENTS DATE
370,ACTS OF 1963,MASSACHUSETTS)PRIOR TO EXCAVATING,BLASTING, PHASE IS:MEDINA DRIVE',CONSTRUCTION REVISIONS
INSTALLING,BACKFILLING GRADING,PAVEMENT RESTORATION,OR REPAVING.
PHASE 7:.FRAMING AND FINISHES NITSCH PROJECT# 15aa4
17.THE ACCURACY AND COMPLETENESS OF UNDERGROUND UTILITIES ARE NOT �:Z =:Z
GUARANTEED.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE �:O 0:0 FILE: 5884 scHEouLE. G
THE EXACT LOCATION,SIZE,TYPE,ETC.OF ALL UNDERGROUND UTILITIES Q PHASE 8:FACADE AND FINISHES' Z SCALE: N/A
THAT MAY BE AFFECTED BY THE WORK. AT LEAST 72 HOURS BEFORE j U U DATE: 05io2i2024
DIGGING BEGINS,THE CONTRACTOR IS REQUIRED TO CALL DIG SAFE AT PHASE 9:FINISHES AND HARDSCAPE PROJECT MANAGER:B.zIMOLKA
(888)344-7233. ALL TOWN OWNED UTILITY STRUCTURES WITHIN AREAS SURVEYOR:
AFFECTED BY THE WORK SHALL BE ADJUSTED TO NEW LINE AND GRADE AS (n DRAFTED BY: P.cALVEs
DIRECTED BY THE ENGINEER. ANY UTILITY POLES AND/OR GUY POLES Z Z CHECKED BY B.zIMOLKA
WITHIN AREAS AFFECTED BY THE WORK SHALL BE REMOVED AND RESET BY O O
THE RESPECTIVE UTILITY COMPANY.ALTERATIONS TO UTILITIES NOT OWNED BY U U SHEET:2
THE TOWN SHALL BE MADE BY THE RESPECTIVE UTILITY OWNERS. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
18.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE SHOP
DRAWINGS FOR CONSTRUCTION MANAGEMENT EFFORTS OUTSIDE OF THE SITE CONSTRUCTION MONTH
PLANS AND TO COMPLY WITH CONDITIONS OUTLINED WITHIN THE PLANS ANDCMP-2
SPECIFICATIONS USING APPROVED METHODS.
19.AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE
CONTRACTOR'S OPERATIONS,INCLUDING STAGING AREAS,SHALL BE RESTORED OF 16
Njtxh EVn eemg
10'-0"
2'MIN www,nKscheng,com
ROAD 2 Center Plaza,Suite 430
WORK 1 g Boston,MA 02108
AHEAD
11-1/2"GAUGE WHITE REFLECTORIZED BANDS o T:(617)338-0063
GALVANIZED FENCE FABRIC F:(617)338-6472
WITH 2-1/4"MESH. 2
FABRIC ONLY ON
\ \ _ WORKZONE SIDE. _ ►Civil Engineering
z ORANGE REFLECTORIZED BANDS -Land Surveying
uu�u � u u u u u ►Transportation Engineering
X\X U ALUMINUM TIE WIRES 6" -Structural CURB WALKWAY ►Green Infrastructure lng
u_ u 23" ►Planning
✓ \ PROFILE GIS
0
x REFLECTORIZED DRUM
SIGN MOUNTING DETAIL
PROFILE FRONT (WITH CURB)
CHAIN LINK FENCE y
W
C.1)
5 Q
W
0 Z
J O0
CD w Q O
SIZED TO FIT BARRIER SLEEVE SPACING(8'—10'TYR) O w m
CE
CD o �
LL LLJ
� Q LJJ W
ALUMINUM TIE WIRES w
Lu O w
0
Q
4'-0" 11-1/2 GAUGE GALVANIZED FENCE FABRIC LU
LU
\ /M U WITH UST C MESH.MOUNT MESH FABRIC w
/ FOR DUST CONTROL ON WORKZONE SIDE. ILL
X& LU
�/Z\
�
� �
PRE—CORED SLEEVE
TO ACCEPT FENCE
POST PRECAST OR AI
WATER—FILLED
BARRIER
REV.I COMMENTS I DATE
REVISIONS
NITSCH PROJECT# 15884
NOTE: FILE: 15884 DETAIL.DWC
USE ON PORTION OF SITE ADJACENT TO MEDINA SCALE: N/A
DRIVE
DATE: 05/02/2023
PROJECT MANAGER:B,ZIMOLKA
CHAIN LINK FENCE ON TRAFFIC BARRIER SURVEYOR:
DRAFTED BY: P.CALVES
NOT TO SCALE
CHECKED BY: B.ZIMOLKA
SHEET:3
MP
C -3
OF 16
i
EX GUIDE SIGN
EX OBJECT MARKER
TURNPIKE STREET(ROUTES &114
—------ Nitsch EVmeeung
www.nFtSCh6n9 COM
EX YIELD SIGN SIGNS
Lj
X GUIDE SIGN 2 Center Plaza,Suite 430
————— Boston,MA 02108
\�
T:(617)338-0063
TmT,MTMTTT
-F(617)338-6472
-Civil Engineering
EX LEFT LANE -Land Surveying
MUST TURN
FT SIGN -Transportation Engineering
It <> C -Structural Engineering
0-Green Infrastructure
-Planning
EX STATE -GIS
ROUTE SIGNS
LILL--j
J
----------
f
LET
COI LEGE dEIMIACK
MIA 121 LOT 2� EX PED CROSSING
AHEAD SIGN III tjj
BOOK13717,I-GF8
��Ea � Ill,zz r y
0
Cf)
<
-I F-2,5 5I,
LLJJ
pC
LL
CD
0
> CIO
C
EX TOWN LINE SIGN CD C4 LU
-2112
< a: LU
<
Cm
CD
C)
ILL,
N/F
PLACE COI LEGE
?!P 2,LOT 50 x
-79 Uj LIlGF 8 <
EX STOP SIGN
T 7- CE
LU
I Z'
LLJ
ILL
A
-----------
V
IT
f
s
NIATTHFW R&MARIA WLSOL EX S — f- - ;.\ _`-� \
Z l
I.
LOT 49
SO&Q09,12,,PAGE 169
Z
- - -I x
R,
EX RRFB WITH RED
CROSSING SIGNS
n
EX RRF.WITH RED
11-T
CROSSING SON S --G kl�-
0
C:I
o
FFL-21304
LL REV. COMMENTS DATE
REVISIONS
EX ADVANCED RED LLI
INT
CROSSING SIGN
NITSCH PROJECT# 15884
/ \ „a 1 11 J r j �, FILE: 15884 EXISTING D G
N/F SCALE: -40'
MERRIN ACK COLLEGEINC
lAP)-OT4,P, /Vc� DATE: 05/02/2024
DOOk 90R PAGE 18 PROJECT MANAGER:B.ZIMOLKA
SURVEYOR:
WAY SIG Y
EX ONE N DRAFTED BY P.CALVES
CHECKED BY: B.ZIMOLKA
SHEET:4
EX STREET NAME EX STOP SIGN 0
AND SPEED LIMIT
-7�-77
SIGNS -.d
ocK'0 pop, 0 25 50 100 200
G
FEET
CMP-4
ENGINEERING SCALE
OF16
b^ TURNPIKE STREET(ROUTES 914&125 T
_ -
TREE TO BE `\ — Nitsch E11i'I
E PROTECTED(TYR) \ 1 � LEGEND:
\ EXISTING LIGHT POLE wwvrr'n�tscheng'com
\ 2 Center Plaza,Suite 430
V _
\ EXISTING FIRE HYDRANT
o
Boston,MA 02108
—x— 72"CONSTRUCTION C.L.F.W/DUST CONTROL
\\ T:(617)338-0063
�- swlNc coNsrRucTloN GATE F.(617)338-6472
\ ►Civil Engineering
TYPE III BARRICADE ►Land Surveying
a
_w slcNs ►Transportation Engineering
' \ 2
PROP R11 DIRECTION OF TRAFFIC ►Structural Engineering
SIGN ►Green Infrastructure
s 2 ACKUP
PROP M4-�-_ ® TEMP.JERSEY BARRIER ►
Vt \ SIGN Planning
✓ _ --�— — ® TEMP.WATER FILLED BARRIER ►GIS
i
MATERIALS POLICE DETAIL
DELIVERY TRUCK
f DIRECTION OF PEDESTRIAN TRAFFIC
PROP R7-1 SIGN(TYR)
TRUCK ENTERING
30`MAIN %
GATE "` - = ✓ — — TRUCK EXITING
CL
I
,f
T
7 N WORK TO BE COMPLETED: W
- —•
w,
1. ESTABLISH PERIMETER FENCING
2. ESTABLISH E+S CONTROLS
1 �
MAINTAIN u %�\\� '
s
- f
\ THIS TREE TO EXISTING c` \ + T 3. ESTABLISH TEMPORARY CONSTRUCTION Z w Q O
1
\ i j BE SAVED PEDESTRIAN %_ } FACILITIES en
w m
z ACCESS /
t PROP R11-2 - j A \ 4. INSTALL WATER MAIN INTO MEDINA Q O w Q co
SIGN - 1 =' DRIVE,STUB INTO FENCE LINECD
r
0
\ PROP - F - _ / J O
v W21 7 I
~
a
SIGN
- � NOTE m W
v7
s� PROP DETOUR Ol u O Q
=
^= j _- F ' ~►�+_` MEDINA DROVE_ J ti C
��.
—1 ►may. 1�_ - _' 1. G CC W
TOLBEN COVERED I DURING THEUDURATI A w
OF ITS 0
U A TWO-WAY TRUCK
�y ACCESS ROUTE. (n
- t PROPM4-9VSIGN
LLI
\ n
ALL WAY TO EAC COGNAGE VERED FOR HCE
THE a
DURATION OF ITS USE AS A TWO-WAY w
DETOUR ROUTE LLJ
CL
_ L ' 3. MEDINA DRIVE CLOSURE AND DETOUR
�` v� J �} •,_�„�j_ � \�°' ,` � `-�:—�c�� SETUP TO ONLY BE IN PLACE DURING
/ a \ WATER MAIN INSTALL. V
" .............
TRUCKS $ I - ----------
DURATION'
ENmuNc
AND LEAVING �. -�-"—.� ✓
/-- °� -
DADWAY -- - ULY 2024(2 MONTHS)
--__
s
t %
� O - -- — 7 � \`
r
--
"
7Z.b
a Y 3 4J
'�� "�%\\� �` � • J�O _ '�-�-,.✓ lam. ��\��-� —
/ COVER EXISTING ONE t
No WAY SIGN REV. COMMENTS DATE
< \ _ �Z1�1111 REVISIONS
l �
4 - 411 CK NITSCH PROJECT# 15884
tr+TRANCE �.
FILE: 15884 PHASE LDW
-z DAAEE 05/02/2024
SP
1
,-
i 3 ' - � SURVEYOR:OJECT A B.ZIMOLKA
�i
�� \�� DRAFTED BY: P.CALVES' CHECKED BY B.ZIMOLKA
TRUCK
ENTRANCE
SHEET:5
✓ SWING GATE TO REMAIN \
fZ
Ip // OPEN DURING(j
0 25 50 100 200
�. - fZ0 FEETCMP-5
TRUCKS
z / AND 7ER'EN NG
� ENGINEERING SCALE
SP_,
OF 16
-i / Nitsch EVm eeung
\\ = LEGEND:
,,, .
` ;r000 r�Nce .�° 1M00D°� �I EXISTING LIGHT POLE www.nitscheng com
EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430
` Boston,MA 02108
3
—x— 72"CONSTRUCTION C.L.F.W/DUST CONTROL
z
4 a T:(617)338-0063
p
- SWING CONSTRUCTION GATE F:(617)338-6472
CONC CCNC
F TYPE III BARRICADE -Civil Engineering
►Land Surveying
TURNPIKE STREET(ROUTES 114&125 s SIGNS ►Transportation Engineering
DIRECTION OF TRAFFIC -Structural Engineering
_ F ►Green Infrastructure
..,.�..,, _ _ __ __ _ ® TEMP.JERSEY BARRIER ►Planning
-.�
GIS
- - W 3 \ ® TEMP.WATER FILLED BARRIER
A
POLICE DETAIL
a , ,
TREE TO BE5) EXCAVATOR
PROTECTED(TYP)
\ DIRECTION OF PEDESTRIAN TRAFFIC
a" �\ TRUCK ENTERING
4
��*, `� — — TRUCK EXITING
� 4
__ o
H
a Q
� § r
BULLDOZER
r
El
Z
f �k O
\ _ W
- 6
Cf)
LLJ <
1�
(3 Q CD w
\ 1 _ GE AC Z > o
KUP WORK TO BE COMPLETED: _ CO
CD LLJ
IINNNNN
1. BUILDING 1 STRIP TOPSOIL ()
Q LLI
Q >
1 - ` 2. BUILDING 1 FOUNDATION STONE _
r
_ t
n i
j
\ 1
/ 3. STALL WITHIN SITE �
ti q- TEMP STOCK PILE
;' FOOTPRINT
cc
w
HYDRANT IN p �
AREA � z
3 a
. W
3 R W
- - PROP R7-1 SIGN(TYP) Q w
2
e
a
jILL
CL
30'MAIN x
W s GATE
A V
MWATERING TANK
a DUMPSTER(TYP _
=� TYP)
�—r.`: —
� �g
1 �s
Q �� r
DURATION
i N-z
-
- ULY 2024 OCTOBER 20 MONTHS)
\-
J 24 M H
,- _
\ i f THIS BE SAVED _
S TREE TO
\✓
REV. COMMENTS DATE
' 3 REVISIONS
E 9
NITSCH PROJECT# 15884
` --- FILE: 15884 PHASE 2.D
SCALE: I"-40'
r
M
y
\^ � DATE: 05/02/2024
` i z
i
e - __ •• •
PROJECT MANAGER:B.ZIMOLKA
,n�-- � :_� �_, _� �� __��f•� _ _ SURVEYOR:
I / i � • • DRAFTED BY: P.CALVES
u
J •
V .� ~`. �_ _ `� ���_ CHECKED BY: B.ZIMOLKA
�. �: ;✓ �, �,'` „„gam _ �✓---
_ - SHEET 6
-
0 20 40 80 160
FEET
CMP-6
ENGINEERING SCALE
OF 16
i
Nitsch EVmeeung
---__ LEGEND:
wood puce ��_ � =C� EXISTING LIGHT POLE �W'fl���8fl�'��
cww.EDGE r G� G � EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430
j ry� - ` - wv Boston,MA 02108
a 5 G 7 - -x- 72"CONSTRUCTION C.L.F.W/DUST CONTROL
DO — o — o T:(617)338-0063
\ � a
s,CONC SWING CONSTRUCTION GATE F:(617)338-6472
V R EnGE ` COW,
\" .,., --. -- -- -- -- -- --. --. ---_ c .--fact <. -- ----. ----. -- ----. -- ---.. -.--- ►Civil Engineering
TYPE III BARRICADE
TURNPIKE STREET(ROUTES 1 14&125) ►Land Surveying
\ a u _ ------------------------------- 7W SIGNS ►Transportation Engineering
►Structural Engineering
DIRECTION OF TRAFFIC ►Green Infrastructure
_ -'-
__
r -_ -_- _ _ ® TEMP.JERSEY BARRIER ►
......_<. ...... ._ 9
C \ ® TEMP.WATER FILLED BARRIER
\'
El Ed
TREE TO BE POLICE DETAIL
PROTECTED(TYP)
� DIRECTION OF PEDESTRIAN TRAFFIC
CON
RETE
V
BOOM CPUMP TRUCK ENTERING
Xx
Vk
- - TRUCK EXITING W
W
v - v
fcaa
Q
O z
CONCRETE
El
O
/ ` AGITATOR
a ~
w
' 4 Q
BULLDOZER
WORK TO BE COMPLETED:
SOILS AND DEBRISCE
2c1$ACKLJ _
` CD
REMOVAL TRUCK GAfE O w Q 00
- 1. BUILDING 1 PLACE CAST IN PLACE U > o T
O o C4 LU
LU
��•. - s 2. BUILDING 2 STRIP TOPSOIL Q U
LLI
✓� '`
- Q
j 3. BUILDING 2 FOUNDATION STONE V
L7
C3 w
W
/ PROP R7-1 SIGN(TYP) M
- ' St- // W Q
r e
\` C/� CC
c
y
y
g
LU
LU
CL ILL
CL
30 MAIN -
l11 GATE
:. /ii;
_ C-)
VRL
3
{
a DUMPSTER
`.
i _ • EXCAVATOR' (TYP) _ DURATION
DEWATEROG
_ TANK NK OCTOBER 2024-JANUARY 2025
:-
v
(4 MONTHS)
THIS EVEDE
;� TO
t \ RSA = 1 �✓
T �
e - REV. COMMENTS DATE
REVISIONS
CH
FILE 5884 PHASE 3.D
< 2 -
''� �v SCALE: I"-40'
DATE: 05/02/2024
/ '• ''l - r_ • PROJECT MANAGER:B.ZIMOLKA
SURVEYOR:
- , - �, E _;_ - � ��' ` __=`•, �- DRAFTED BY: P.CALVES
V HE
-
-
^ r � _ •r�� _ � SHEET:7
` v ZZ
- - i
s
o �
� F
0 20 40 80 160
FEET
CMP-7
ENGINEERING SCALE
OF 16
i
t Njtxh EVmeemg
LEGEND:
L °00D f °❑ ❑ EXISTING LIGHT POLE wwW'flrts com
— f
��— = GRAN.mGE_ — 4 EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430
-_ GRAN.EDGE_
Boston,MA 02108
—x— 72"CONSTRUCTION C.L.F.W/DUST CONTROL
T:(617)338-0063
` a 5 s
z a ----
swlNc coNsrRucTloN GATE F.(617)338-6472
u
\ cnr - CONC
\�� d GRAN EDGE ff` � CDNC �
- DHAN.EWE C=> ►Civil Engineering
TYPE III BARRICADE ►Land Surve In
TURNPIKE STREET(ROUTES 114&125) Y g
„u m7WSIGNS ►Transportation Engineering
qoURB WN
EDGE GRAN.EDGE
DIRECTION OF TRAFFIC ►Structural Engineering
x — ►Green Infrastructure
n
_—
_ —— -- _— _ = TEMP.JERSEY BARRIER ►
Planning
=. ❑ ® TEMP.WATER FILLED BARRIER ►GIS
g tr
TREE TO BE - - - w POLICE DETAIL
9
PROTECTED(TYP)
DIRECTION OF PEDESTRIAN TRAFFIC
lk
TRUCK ENTERING
TRUCK EXITING
MOBILE CRANE(TYP)
It- �. a <
4
r
a o
r G
ro - EJ
MATERIALS DELIVERY w ~
Z Q O
V TRUCK
❑ CONCRETE AGITATOR Q w m
_ 2,"ACKUP LJJ cc CD
G E > o r
Y - LJJ O
_ = OR TO BE COMPLETED: o � �WORK o
Q
�� 1. BUILDING 1 UTILITY INSTALLATION Z Q � W �
- ❑ \.�\,
//// 2. BUILDING 1 FRAMINGLLJ
VCm
Lu
_ ❑ !✓// 3. BUILDING 2 PLACE CAST IN PLACE �Z
L L1 cn
/✓i j/ r\ N, 4. BUILDING 2 BUILDING ELEMENTS a Q
i 4 PRO R7-1 SIGN(TYP) w
/ 3
3 / LU
ILL
= 3
3
3 >
3� 30'MAIN _ r
i GATE
ill iiii
� t
DUMPSTER(TYP)
DEWATERING,';
TANK(TYPE
3n p= - DURATION
i
a .
= - - JA PRIL 2025
i.�
33 THIS
_
- D ( MONTHS)
BE
T S TREE TO
4
3 SAVE
Y -
3
�
REV. COMMENTS DATE
x
REVISIONS
❑` T �a f- / ( 4 ——
NITSCH PROJECT# 15884
v
✓� �� n i FILE: 15884 PHASE 4.D
SCALE: I"-40'
DATE: 05/02/2024
� _� z .^�.,\ � � '� � __'�• _�' � PROJECT MANAGER:B.ZIMOLKA
T � t,_•�� SURVEYOR:
DRAFTED BY: P.CALVES
T ,
i s e - �-T e
CHECKED BY: B.ZIMOLKA
.ter SHEET:8
. -
3
tf —77
_
FEET
CMP-8
ENGINEERING SCALE
OF 16
i
Nitsch EVn eeung
LEGEND:
eng.com
\ I I I I =' EXISTING LIGHT POLE vvww°nitsch
---- \ w000 rw� ./ c v j EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430
ti
--- -x- 72"CONSTRUCTION C.L.F.W/DUST CONTROL
Boston MA 21
EDGE Gam.GG T:(617)338-0063
GRAN.EDGE I�r
swlNc coNsrRucrloN GATE F:(617)338-6472
\ � 2 ♦ 5 6 ] B
a ►Civil Engineering
\r cRAN D ------------- cone
F CONC. TYPE III BARRICADE ►Land Surveying
SIGNS ►Transportation Engineering
TURNPIKE STREET(ROUTES 114&125) DIRECTION OF TRAFFIC ►Structural Engineering
- ►Green Infrastructure
EDGE GRAN.EDGE ® TEMP.JERSEY BARRIER ►Planning
A _ �
® TEMP.WATER FILLED BARRIER GIS
f • _ - - - - - - - f: - - - - - - - POLICE DETAIL
z a DIRECTION OF PEDESTRIAN TRAFFIC
',« - - - Z
TREE TO BE
PROTECTED(TYP) TRUCK ENTERING
Q
- � - - TRUCK EXITING J
Y
a
f MOBILE CRANE
H
r �
A �
Z �
J -
WORK TO BE COMPLETED: O
_
Lij
r* 1. BUILDING 1 CONTINUE UTILITY H Q m
r INSTALLATION AND FRAMING
LU 2. BUILDING 1 MEP INSTALLATION J LU Q co
TRASH CHUTE
O
\ \
ACKUP 3. BUILDING 1 FACADE INSTALLATION y 0
/ G —
MATERIALS Y / _ Z Q Q W
DELIVERY TRUCK /, 4. BUILDING 2 FRAMING
e W
Lu O
Z
////////
j ✓/ / //
� z
/� % a
r 4 J
a 3 l
,4
\ 3� PRO R-1 SIGN(TYP)
CE
LU
LS7
LLJ
ILL
LU
3
- % �
3
3 X "= ;` 30'MAIN
3CL
U�£ GATE
DUMPSTER
3� -4k.
(TYP) 3
3
E
DURATION
� APRIL 2025-MAY 2025(1 MONTH)
T DEWATERING %
33>' TANK _ G
u
a
t THIS TREE TO
BE SAVED
4 REVISIONS
DATE
4
REV. COMMENTS
NITSCH PROJECT# 15884
A FILE: 15884 PHASE S.D
-
SCALE: I"
ti DATE: 05/02/2024
_ PROJECT MANAGER:B.ZIMOLKA
' SURVEYOR:
5
DRAFTED BY: P.CALVES
`- ✓ a 1 • CHECKED BY: B.ZIMOLKA
10
z = G -
_ -
g
_ 4 T s
` SHEET 9
c
-
Y _<
/
v•
0 20 40 80 160
FEET
CMP-9
ENGINEERING SCALE
OF I6
i
Nitsch EVmefung
LEGEND:
-
i T
EXISTING LIGHT POLE wwv�r'n�ts+cheng'com
- - ----- _
- _
ff G.ED E � '`d ti� EXISTING FIRE HYDRANT enter Plaza,Suite 430
2
a� GRAN. GE GRAN.EDGE =— Boston,MA 02108
o T o T o o -x- 72"CONSTRUCTION C.L.F.W/DUST CONTROL T:(617)338-0063
- FYI SWING CONSTRUCTION GATE F:(617)338-6472
GRPN mGE-- CDNC
� CONC
----. ----. ----. ----. ----. GRAN.EDGE www,
TUrn*e S*e#/_ROUte 114 ] TYPE III BARRICADE ►Civil Engineering
Land Surveying TURNPIKE STREET(ROUTES 114&925) 4 Y g
GRPN. - - -- - ---- ---- ---- �' ---- ---- S SIGNS ►Transportation Engineering
� C= Yi. ---- ----.CWW.EDGE
J DIRECTION OF TRAFFIC ►Structural Engineering
►Green Infrastructure
® TEMP.JERSEY BARRIER ►Panning
® TEMP.WATER FILLED BARRIER ►GIS
El
TREE TO BE
PROTECTED(TYP) POLICE DETAIL
- DIRECTION OF PEDESTRIAN TRAFFIC
TRUCK ENTERING
- - TRUCK EXITING Z
--- ALTERNATE VEHICLE PATHS OF TRAVEL
4
x
F
F �
edlna
aV�' PROP R11-2 L=U cw
PARKING IG J� CE-9VPROP M4 O
m_co
�� SIGN WORK TO BE COMPLETED: U >
T
G (D 20'BACKUP — Y 0 . V4 w
1
GATE 1. S AND
Q C) Z
INSTALL UTILITY CONNECTION Z Q Q � W
CONSTRUCT MEDINA DRIVE.
i iiiii 2. PERIODIC,SCHEDULED SHUTDOWNS TO w
S
-_� W EL
// \ 3 V r OCCUR AND COORDINATED WITH Z Lu O
227 j / MERRIMACK COLLEGE. z
- � � o
\ \' Q w
COLLEGIATE 2 LL
_
= NOTE:
a
�6FOR
30'MAINWAY TO BE C_ ECIAFECHURCHOF
1 ALL ONE WAY SIGNAGE ON FLA ERTY Awx
� H r
r I rt I VERED DURATION OF OITS USE AS AH
GATE CHRIST THE TEACHER TWO—WAY
� _� �� _� � r
DETOUR ROUTE.
t 1 ti
I
i= DURATION
�z
mw
s
-
MAINTAIN -
- s le I� EXISTING
THIS TREE TO
=3 E PEDESTRIAN I (4 MONTHS)
i BE SAVED ACCESS,,-,v = - ---
P _ / l
J 1 R11-2 '_ % \ h
e
, a
F
S GN —__ /�
4 — E COMMENTS DATE
PROP —W21 7 REVISIONS
f yy
�~ 3 1£ _� PROP DETOUR OF l
SIGN
� .—mil/ �►� �—��� P ;{�/
g �� MEDINA DRIVE = NITSCH PROJECT# 15884
Y 7 5884:FILE
/ 41
SCALE: "-40,PH PHASE
- �
b�
0/02/2024
= / PROJECT MANAGER:B5 ZIMOOKA
T. PROP M4-9V r ,�\
` = = SIGN ems___ ����
ate^ - _Z_! y� �F�� DRAFTED BY: P.CALVES
CHECKED BY: B.ZIMOLKA
SHEET 10
a f -_ ✓
0 20 40 80 160
FEET
CmP_1 0
ENGINEERING SCALE
OF 16
i
Njtxh EVn eemg
LEGEND:
EXISTING LIGHT POLE wwW'flFtschong com
\
;=� �' � `� EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430
—— � Boston,MA 02108
CRAN.ENE r —x— 72"CONSTRUCTION C.L.F.W/DUST CONTROL T:Boston,
3A 021 3
--.,_"—ram ---- ---- ----. - Ga e❑ce
o a a 5 0 7 SWING CONSTRUCTION GATE F-.(617)338-6472
ti ►Civil Engineering
CONC c❑Nc TYPE III BARRICADE
1 GRAN❑ -?-
►Land Surveying
,. sRAN.F❑se �� Turn e Sf12 _OUte 1�4 TURNPIKE STREET ROUTES 1 94&925 s SIGNS ►Transportation Engineering
\ ( ) DIRECTION OF TRAFFIC Green Infrastructure
strEnguct re
— ring
"` Green Infrastructure
-- GRAN.EDGE
�i� -- --
AQ\ " ® TEMP.JERSEY BARRIER ►Planning
F` a
TEMP.WATER FILLED BARRIER
GIS
[r'/ POLICE DETAIL
qt
r � Li � ��
TREE TO BE — \ DIRECTION OF PEDESTRIAN TRAFFIC
PROTECTED(TYP) TRUCK ENTERING
TRUCK EXITING
MOBILE
CRANE
y LU
f ,Sy a V x6v Z
4�
TRASH LL �O
N CHUTE
—71
` s _
Z w <
�
J
lna
v - e tAed - oe
o LU
LU a �
U
\\�
O PARKI BACKUP T
o
N I�% � CC o �
t G - G 0
2b'B ATE Q Q
GATE= _
LLI
o LL
MATERIALS WORK TO BE COMPLETED: w
DELIVE = — _ LU
O
RY
/ TRUCKS
1. BUILDING 1 MEP INSTALLATION LL1
2. BUILDING 1 FINISHES Q Q
CE
227
4 / 3 BUILDING 2 FACADE CONSTRUCTION s w
t
ILL
_ ! I - 4. BUILDING 2 FRAMING CONTINUES r
30'MAIN — I COLLEGIATE CHURCH O
r CHRIST THE TEACHER GATE
❑,._ _
� s
- -
_ DURATION
z
Q
a
o,o
a
TREE TO -
THIS r
= _ _ SE TEMBER 2025-OCTOBER 2025
BE SAVED - - \
----
- - (3 MONTHS)
;-
REV. COMMENTS DATE
REVISIONS
NITSCH PROJECT# 15884
FILE: 15884 PHASE 7.D
3
SCA :
3
G _ 3
_ -
4 \ \ / Qh
P DATE: 05/02/2024
\ c � �/W(� \,- PROJECT MANAGER:B.ZIMOLKA
> _ - Y'
� _ ��' ���--— k \ s SURVEYOR
j f - _ __
�`; �• DRAFTED BY: P.CALVES
_ ` ✓ v�` g � :-� � ��,�`� � —�•�♦♦ ♦J `-\ CHECKED BY B Z
IMOLKA
Jk
3
\ a- \ ♦ - - _ SHEET:II
l�
♦
0 20 40 100 160
FEET m P
ENGINEERING SCALE
OF 16
i
Nitsch EVn eemg
� X
LEGEND:
_'� EXISTING LIGHT POLE www.nFtscheng'com
wood
f
• I
_ In f ` •�° i - ti EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430
_
- - - - �' - �-- - Boston,MA 02108
7' ` -x- 72"CONSTRUCTION C.L.F.W/DUST CONTROL
`�" `"" � T:(617)338-0063
a 5 6 � $ SWING CONSTRUCTION GATE F:(617)338-6472
a
a
CONC. ►Civil Engineering
� TYPE III BARRICADE
►Land Surveying
_ o �F _ _
Turnpike�ee OUte 114 TURNPIKE STREET(ROUTES 114&125) SIGNS ►Transportation Engineering
DIRECTION OF TRAFFIC ►Structural Engineering
t •u m
►Green Infrastructure
= ® TEMP.JERSEY BARRIER ►Planning
2 'L
_ — —
- GIS
' ........ TEMP.WATER FILLED BARRIER
r TREE TO BE \
POLICE DETAIL
i PROTECTED(TYP)� \
�4
DIRECTION OF PEDESTRIAN TRAFFIC
- \ TRUCK ENTERING
TRUCK EXITING
xx
\ W y
n
z._
i\ Z O
m
�. LL
z F
s
_ .\\ a 10 w ¢ o_ s � diva pr�� - ¢ w
\e
�) J w 00
� � e
\ ° O PARK I Y O o y LU
v� /���� ,
_N-,�"Nfi
o
MATERIALS CUT _ Q LU
MOBILE DELIVERY j oQP TYP) AT f __ _
c \ LU
-- G E
/ CRANE TRUCKS
WORK TO BE COMPLETED:
1. SITE UTILITY INSTALLATION pp o CD w
w O
\ 2. BUILDING 1 FINISHES y
� 4
F ;
y
2z� 3. BUILDING 2 FACADE CONSTRUCTION = <
F t.
i - r
4
LU
-
ILL
J TRASH
v
CHUTE,� COLLEGIATE CHURCH OF
30'MAIN ( CHRIST THE TEACHER
GATES
A \� aEWATERING DUMPSTERS
TANK Y
e � �
_ v _
b _
/ ON
Z -
.z
� = � ���� - OC OBDURAT�ER 2025-JANUARY 2026
�y THIS3
TREE TO
! BE SAVED __ `
4 MONTHS
J /
REV. COMMENTS DATE
IV
3 REVISIONS
3
NITSCH PROJECT# 15884
FILE: 15884 PHASE 8.DVW
/ - SCALE: "-40'
„= Y ahem _
- a ,
,4 PROJECT MANAGER:B.ZIM00LKA
Y
a
SURVEYOR: ---
-- _
�_.// � ✓1�s',�3��gym" ..,'=i � (1� '` � �'��• �«' �- - DRAFTED BY: P.CALVES
_ F
1.
J e`,v J\ -`a s �` - SHEET:D12 Y
Ax
B.ZI
0 20 40 80 160
FEET
CMP-1 2
ENGINEERING SCALE
OF 16
i
Njtxh EVn eemg
LEGEND:
EXISTING LIGHT POLE www. tscheng'com
EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430
-x`- 72"CONSTRUCTION C.L.F.W/DUST CONTROL Boston,MA 02108
T:(617)338-0063
SWING CONSTRUCTION GATE F:(617)338-6472
wm CE ►Civil Engineering
TYPE III BARRICADE
- -- - - - -_ -- ----- - ►Land Surveying
--
i SIGNS ►Transportation Engineering
z a ALE- - ►Structural Engineering
o o o- o � DIRECTION OF TRAFFIC ►Green Infrastructure
= a
.- ® TEMP.JERSEY BARRIER ►Planning
� � CONC CCNCLI ►LIIJ
_ ® TEMP.WATER FILLED BARRIER
T SIDEWALK CONNECTION Turnpike�e"oute 114 T BE INSTALLED b TURNPIKE STREET ROUTES 914&125
P POLICE DETAIL
DIRECTION OF PEDESTRIAN TRAFFIC
�"`�_ �\� _ _ _<.....--:t.....�........—ti—:.-.......—.................................... _ — ————_——————— TRUCK ENTERING
❑ ❑ — — TRUCK EXITING
LU
g "l TREE TO BE \ CL
�\ a PROTECTED(TYP) Q
CODit
o
c s:
CD
g
Si
,� ,,,,• ,'•Ri••. W
00
-.
s a . LU CD
♦ I .£ T
•t
o
t S.r,.,
i
ii
WORK TO BE COMPLETED:
-COD
Q W
L7
CD LLJ
1 SITE FINISHES EL LLJ
Lu
a P. ..i. :• ..
NO PARKING
_ �:; , ,..,,,., .'. �,; �, �'•:;t' 2. BUILDING 1 FINISHES
LU
CE
"r
_
3. BUILDING 2 MEP INSTALLATION
V/
LU
20'BACKUP
0
GATE _ 4. BUILDING 2 FINISHES =
TRASH CHUTE ILL
227
jr
- - /
E 1
4
{ � 3
COLLEGIATE CHURCH OF
30'MAIN
GATE CHRIST THE TEACHER
1w,
DUMPSTER ! t- DURATION
TYP)( <
- JANUARY 2026-JUNE 2026(6 MONTHS)
r MOBILE l
O CRANE m_ j
<=_ /
REV. COMMENTS DATE
REVISIONS
g�
_ --
1 z
" THIS TREE TO _
v _ -
NITSCH PROJECT# 15884
w j BE SAVED 3 _ - — \ f FILE: 15884 PHASE 9.D
Y j SCALE: "_40'
DATE: 05/02/2024
PROJECT MANAGER:B.ZIMOLKA
\ _ _ SURVEYOR:
v y = --------------
DRAFTED BY: P.CALVES
CHECKED BY: B.ZIMOLKA
g
! SHEET:13
�l
Flp
hert
0 20 40 80 160
FEET
CMP-1 3
ENGINEERING SCALE
OF 16
i
SITE ACCESS TO/FROM
INTERSTATE 495 VIA ROUTE
TRUCK ENTERING
Nitsch 1�g
- - TRUCK EXITIN "a
�0
� 114
N
F WWWWmitschengcom
x�� ,
PROJECT SITE
\ 2 Center Plaza,Suite 430
Boston,MA 02108
T:(617)338-0063
F:(617)338-6472
r
— ►Civil Engineering
4
off, _
►Land Surveying
-\ v / ,\ ` ►Transportation Engineering
o '` �! ►Structural Engineering
\�/i_ �� °� ✓ ►Green Infrastructure
� ►Planning
�, �.� \ ►GIS
SITE ACCESS TO/FROM
INTERSTATE 93 VIA ROUTE 125
�' ✓ �% / '' OLU
CZ CD
i \
J
CM ELI
W O J
LLJ
A
\ / wi
\i
CA \ REV. DATE
REVISIONS
/ L NITSCH PROJECT# 15884
RTH READING
NO �x FILE: 15884 TRUCHROUTE.wG
SCALE: NTS
f
\ / \
J` DATE: 05/02/2024
PROJECT MANAGER B.ZIMOLKA
SURVEYOR: --
DRAFTED BY. P.CALVES
CHECKED BY: B.ZIMOLKA
SHEET:14
mp-1 4
OF 16
i
> r�wol
Nitsch FrtgIBeefll g
www.nitscheng.com
2 Center Plaza,Suite 430
Boston,MA 02108
T:(617)338-0063
F:(617)338-6472
►Civil Engineering
►Land Surveying
t
7 _ ►Transportation Engineering
El — ►Structural Engineering
►G Infrastructure
3
1 � ` Green Infra
ix�s �'\ G
\ \
mum w seem K UM K UM mum � TM e�UM IIS n
�n
1---
° ) a
1 1
t
J °c i
t
°
FTJ
° f
GATE
f-
i
i
i
,
t � �
i t
i t
t � 7
p VL p __
S m S O
- THIS TREE TO _
v s m, Q{$ `�_ �,' BE SAVED _ ( ' _ Q (n
C w m
i {t i t Ia t to v J
21� CD
O LLJ
6ZQ oa
<8> `i --_ �jY , -- i c e- _ •o EF - -i Z Y C4 w_,
t
6 0-1
t
t
.�
� tr CC
W
H �
w
o w
W
INGRESS EGRESS INGRESS EGRESS INGRESS EGRESS
PHASES 1,7,8—SU40 PHASES 3,4—CONCRETE TRUCK PHASES 4,5/6a—WB40 FIRETRUCK CIRCULATION—1 INCH=60 FEET SCALE Cr
w
0
w
LL
T
�� •ax 46'Hariz
r-�-' ax 10'Vert
25
2.
SU-40—Single Unit Truck CONCRETE TRUCK WB-40—Intermediate Semi—Trailer FIRE TRUCK REV.1 COMMENTS DATE
Overall Len th 39.500ft Overall Len th 27.000ft Overall Len th 45.499ft Overall Len th 46.250ft REVISIONS
Overall Width 8.000ft Overall Width 8.000ft Overall Widty 8.000ft Overall Width 8.330ft
Overall BodyHeight 13.500ft Overall BodyHeight 12.971ft Overall BodyHeight 13.500ft Overall BodyHeiqht 10.489ft
Min Body Gound Clearance 1.367ft Min Body Gound Clearance 0.933ft Min Body Gound Clearance 1.334ft Min Body Gound Clearance 0.920ft NITSCH PROJECT# I5884
Track Width 8.000ft Track Width 8.000ft Track Width 8.000ft Track Width 8.330ft FILE: 15884 TRUCKTURN.DWG
Lock—to—lock time 5.00s Lock—to—lock time 6.00s Lock—to—lock time 4.00s Lock—to—lock time 6.00s
Max Steering Angle(Virtual) 31.80` Max Steering Angle(Virtual) 40.00` Max Steering Angle(Virtual) 20.30` Max Steering Angle(Virtual) 30.00` SCALE: AS SHOWN
DATE: 05/02/2024
PROJECT MANAGER:B.ZIMOLKA
SURVEYOR: ---
DRAFTED BY: P.CALVES
CHECKED BY: B.ZIMOLKA
i
SHEET: IS
—15
CMP
0 50 100 200 400
FEET
ENGINEERING SCALE
OF 16
i
Nitwh EVn eemg
www.nitschang com
2 Center Plaza,Suite 430
Boston,MA 02108
T:(617)338-0063
F:(617)338-6472
►Civil Engineering
Land Surveying
Transportation Engineering
►Structural Engineering
►Green Infrastructure
Planning
►GIS
IDENTIFI— SIZE OF SIGN(IN) DIMENSIONS(mm) NUMBER COLOR POST SIZE UNIT AREA IN
CATION TEXT OF AND AREA IN SQUARE
NUMBER LETTER VERTICAL SIGNS BACK— NUMBER SQUARE FEET
WIDTH HEIGHT HEIGHT SPACING ARROW REQUIRED GROUND LEGEND BORDER REQUIRED FEET
TRUCKS ORANGE P 5
ENTERING 9.00 18.00 <
SP-1 36 36 AND LEAVING NG 5C 3 N/A 2 (RETRO- BLACK
ROADWAY REFLECTIVE) 2
C�C O
ORANGE G �
SP-2 36 36 ENTRANCE 7D 5 N/A 2 (RETRO- BLACK BLACK PS 9.00 18.00 Coo w 2 m
REFLECTIVE) CD
2 Z � CC
C'3 O LU Q co
T
No SEE SEE SEE VARIED y Y o y �
R7-1 12 18 PARKING MUTCD MUTCD MUTCD 4 WHITE RED RED 1.50 6.00 Z Q z � LL
TME STANDARD STANDARD STANDARDLOCATIONS _
v M w LIJ
ROAD SEE SEE SEE MTD ON oC v
R11-2 48 30 MUTCD MUTCD MUTCD 3 WHITE BLACK BLACK 10.00 30.00
CLOSED BARRICADE COD Q
STANDARD STANDARD STANDARDIr
Z Lu
O o
LU
SEE SEE SEE L`
W21-7 36 36p MUTCD MUTCD MUTCD 2 (RETRO—ORANGE BLACK BLACK PS 9.00 18.00 r
REFLECTIVE) 2
STANDARD STANDARD STANDAR
DETPURI SEE SEE SEE ORANGE P5
M4-9V 30 24 MUTCD MUTCD MUTCD 2 (RETRO— BLACK BLACK 5.00 10.00
STANDARD STANDARD STANDAR REFLECTIVE) 2
REV. COMMENTS DATE
REVISIONS
NITSCH PROJECT# 15884
FILE: 15884 SIGNSUMMA Y.DWG
SCALE: N/A
DATE: 05/02/2024
PROJECT MANAGER:B.ZIMOLKA
SURVEYOR: ---
DRAFTED BY: P.CALVES
CHECKED BY: B.ZIMOLKA
i
SHEET:16
MP
C -16
OF I6
i