HomeMy WebLinkAbout2024/05/02 - Construction Mannagement Plan Set - - NOR TH ANDO VER DEPAR TMENT OF PUBLIC WORKS tl%l Nitsch EVn eeung CONS TR UCTION MANA GEMENT PLAN ww~.n ,erM.com 2 Center Plaza,Suite 430 FORBoston,MA 02108 T:(617)338-0063 CORNER DE VEL OPMENT PR OJECT A T MERRIMA CK COLLEGE F:(617)338-6472 ►Civil Engineering NOR TH ANDO VER, MA ►Land Surveying ►Transportation Engineering ►Structural Engineering ►Green Infrastructure Planning INDEX ►GIS DWG NO. SHEET NO. PLAN TITLE CMP-1 1 COVER CMP-2 2 GENERAL NOTES AND SCHEDULE CMP-3 3 TEMPORARY TRAFFIC CONTROL DEVICES CMP-4 4 EXISTING CONDITIONS CMP-5 5 CMP PHASE 1:MOBILIZATION AND SETUP ~ CMP-6 6 CMP PHASE 2:BUILDING 1 EXCAVATION �p < Ok w'w CMP-7 7 CMP PHASE 3:EXCAVATION AND CONCRETE �'O 9 o z CMP-8 8 CMP PHASE 4:CONCRETE AND FRAMING GTFJGF o THIS PLAN DEPICTS IN SCHEMATIC FORM,THE o CMP-9 9 CMP PHASE 5:FRAMING AND SITE UTILITY INSTALLATIONS Q ELEMENTS OF AN APPROACH TO THE LAYOUT w Q O AND PLANNING OF THE WORK DURING THE w 2 m CMP-10 10 CMP PHASE 6:MEDINA DRIVE CONSTRUCTION PROGRESS OF THE CONSTRUCTION OPERATIONS. J CMP-11 11 CMP PHASE 7:FRAMING AND FINISHES PROJECT SITE THIS PLAN CONTAINS NO EXPRESS OR IMPLIED OU > o Q 0 REPRESENTATIONS AS TO THE CONSTRUCTABILITY LJJ Y O C4 w CMP-12 12 CMP PHASE 8:FACADE AND FINISHES OF ANY ASPECT OF THE WORK.THE Q CONSTRUCTION CONTRACTOR REMAINS ~ Q CMP-13 13 CMP PHASE 9:FINISHES AND HARDSCAPE C� EXCLUSIVELY RESPONSIBLE FOR THE PLANNING, _ CMP-14 14 TRUCK ROUTING PLAN �O� MEANS,METHODS,SEQUENCES,PROCEDURES w 'A AND EXECUTION OF THE WORK,AND FOR THE Lu O m CMP-15 15 TRUCK TURNING PLAN �� PROPER AND TIMELY IMPLEMENTATION OF ALL CMP-16 16 CONSTRUCTION SIGN SUMMARY 00 R5O TG INCIDENTAL AND/OR REQUIRED SAFETY �P �tiA PRECAUTIONS AND PROGRAMS. CE /�F LU NOTHING IN THIS PLAN SHALL RELIEVE,OR o `rTQ OTHERWISE DIMINISH THE RESPONSIBILITY OF THE � FF j CONTRACTOR FOR THIS EXCLUSIVE r A MFO�Nq ��OG RESPONSIBILITY. O,Q�� TF`6" THE PREPARER OF THIS PLAN HAS NO ROLE IN >> THE OVERSIGHT OR OTHERWISE IN THE �- A9 IMPLEMENTATION OF THIS PLAN. 4'O �2 SJ ALL WORK SHALL CONFORM TO THESE PLANS,THE 2024 LOCUS PLAN MASSDOT HIGHWAY DIVISION STANDARD SPECIFICATIONS FOR SCALE: 1"=250'(APPROXIMATE) HIGHWAYS AND BRIDGES;THE OCTOBER 2017 CONSTRUCTION STANDARDS;THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS(MUTCD)WITH LATEST REVISIONS;THE 1990 STANDARD DRAWINGS FOR SIGNS REV.I COMMENTS I DATE AND SUPPORTS;THE 1968 STANDARD DRAWINGS FOR TRAFFIC REVISIONS SIGNALS AND HIGHWAY LIGHTING;AND THE AMERICAN STANDARD FOR NURSERY STOCK CURRENT EDITION(ANSI Z-60.1—2004). NITSCH PROJECT# I5884 WHERE CONFLICTS EXIST,THE MASSDOT STANDARDS SHALL FILE: 15884 covER.DwG GOVERN. SCALE: AS SHOWN DATE: 05/02/2024 PROJECT MANAGER:B.ZIMOLKA SURVEYOR: --- DRAFTED BY: P.CALVES CHECKED BY: B.ZIMOLKA SHEET:I CMP OF 16 i 1. THESE PLANS ARE NOT INTENDED TO LIMIT THE CONTRACTORS RIGHT TO BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S SCHEDULE THE WORK BUT TO OUTLINE ONE WAY OF PROGRESSING. THE EXPENSE. CONTRACTOR IS EXPECTED TO USE KNOWLEDGE AND EXPERIENCE TO PERFORM THE WORK IN THE MOST SAFE AND EFFICIENT MANNER IN 20.THE CONTRACTOR IS HEREBY NOTIFIED THAT ADDITIONAL WORK WITHIN THE COMPLIANCE WITH THE DRAWINGS AND SPECIFICATIONS AND MEETING THE PROJECT LIMITS MAY BE PERFORMED BY OTHERS. REQUIREMENTS OF THE TOWN OF NORTH ANDOVER AND MERRIMACK COLLEGE. NitKh E Oneeemg 21.THE CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND DIMENSIONS PRIOR 2. CONTRACTOR SHALL SUBMIT FOR APPROVAL BY THE TOWN AND THE TO CONSTRUCTION. www.nrlscheng.com COLLEGE,CONSTRUCTION MANAGEMENT PLANS FOR ANY WORK OUTSIDE OF THE WORK ZONES INDICATED IN THESE DRAWINGS. 22.THE CONTRACTOR SHALL VERIFY PROPERTY LIMITS PRIOR TO CONSTRUCTION 2 Center Plaza,Suite 430 AND PLACE ANY TEMPORARY OR NEW EQUIPMENT WITHIN THE PROJECT Boston,MA 02108 3. ALTERNATIVE PHASING OR MODIFICATIONS TO ANY ASPECT OF THE LIMITS OR MERRIMACK COLLEGE PROPERTY. CONSTRUCTION MANAGEMENT PLANS AND THE CONSTRUCTION STAGING PLANS T:(617)338-0063 WILL BE SUBJECT TO REVIEW FOR ACCEPTANCE BY THE TOWN PRIOR TO 23.PRIOR TO THE START OF CONSTRUCTION,THE CONTRACTOR SHALL SUBMIT F:(617)338-6472 COMMENCEMENT OF WORK. THE CONTRACTOR SHALL BEAR ALL COSTS FOR REVIEW A DETAILED SCHEDULE OF OPERATIONS IN ADDITION TO OTHER ASSOCIATED WITH THE SUBMISSION AND REVIEW OF ALTERNATIVE CONTRACT REQUIREMENTS TO THE NORTH ANDOVER ENGINEERING DIVISION CONSTRUCTION MANAGEMENT PLANS AND CONSTRUCTION STAGING PLANS, AND PUBLIC WORKS DEPARTMENT AS WELL AS THE MERRIMACK COLLEGE ►Civil Engineering INCLUDING PRESENTATION TO THE TOWN AND THE COLLEGE IF NEEDED, FACILITIES DEPARTMENT. ►Land Surveying VEHICULAR AND PEDESTRIAN TRAFFIC MODELING,LEVEL OF SERVICE(LOS) ►Transportation Engineering ANALYSES,AND OTHER ASSOCIATED EFFORTS.ALTERNATIVE CONSTRUCTION 24.NO EXISTING PUBLIC UTILITY STRUCTURES SHALL BE ABANDONED AND/OR ►Structural Engineering MANAGEMENT AND CONSTRUCTION STAGING PLANS SHALL NOT CAUSE AN DISMANTLED WITHOUT AUTHORIZATION FROM THE TOWN. 9 g INTERFERENCE WITH ADJACENT CONTRACTS OR DELAY THE SCHEDULE OR ►Green Infrastructure INCREASE THE COST OF THIS OR ANY ADJACENT CONTRACTS. LEVEL OF 25.THE CONTRACTOR SHALL DISPOSE OF ALL WASTE MATERIAL IN ACCORDANCE ►Planning SERVICE ANALYSIS SHALL BE DEFINED BY THE"HIGHWAY CAPACITY MANUAL." WITH ALL FEDERAL,STATE AND LOCAL REGULATIONS AT HIS OWN EXPENSE. ►GIS 5. CONTRACTOR SHALL SECURE WORK AREAS TO ENSURE PUBLIC SAFETY AND 26.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ADEQUATE CONVENIENCE.THIS SHALL INCLUDE ENSURING THAT ALL EXCAVATIONS ARE STREET LIGHTING ADJACENT TO THE PROJECT,FOR THE DURATION OF THE PROTECTED AT ALL TIMES. PROJECT,AS APPROVED BY THE TOWN AND THE COLLEGE. CONTRACTOR SHALL ENSURE THAT STREET LIGHTING SERVICE WILL NOT BE INTERRUPTED 6. ALL CONSTRUCTION SIGNING,DRUMS,BARRICADES AND OTHER DEVICES AND THAT STREET LIGHTING WILL BE OPERATIONAL AT THE END OF EACH SHALL CONFORM WITH THE CURRENT EDITION OF THE MANUAL ON UNIFORM WORKDAY. TRAFFIC CONTROL DEVICES(MUTCD)AS AMENDED AND TOWN OF NORTH ANDOVER SPECIFICATIONS. 27.THE CONTRACTOR SHALL ERADICATE EXISTING PAVEMENT MARKINGS THAT CONFLICT WITH PROPOSED PAVEMENT MARKINGS. 7. ALL TRAFFIC CONTROL DEVICES SHALL BE INSTALLED ALONG THE ROADWAY IN ORDER WITH THE FLOW OF TRAFFIC.SIMILARLY,ALL DEVICES SHALL BE 28.CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ANY WEIGHT RESTRICTIONS REMOVED IN ORDER AGAINST THE FLOW OF TRAFFIC. ON AREA BRIDGES AND TO INSURE THAT TRAFFIC DOES NOT EXCEED WEIGHT RESTRICTIONS IF BRIDGES ARE USED. LJJ Q 8. CONTRACTOR SHALL COORDINATE WITH THE TOWN AND THE COLLEGE TO J ACCOMMODATE ACCESS NEEDS OF ABUTTING PROPERTIES NOT SPECIFIED IN 29.UPON COMPLETION OF CONSTRUCTION,ALL FEATURES WITHIN THE PUBLIC THE PLANS. RIGHT—OF—WAY INCLUDING PAVEMENT CONDITION,PAVEMENT MARKINGS, G z SIGNAGE,PARKING METERS,UTILITY POLES,AND TRAFFIC SIGNAL EQUIPMENT = 00 9. CONTRACTOR SHALL MAINTAIN EMERGENCY PASSAGE AT ALL TIMES TO SHALL BE RESTORED TO EXISTING CONDITION OR FINAL CONDITION AS BUILDINGS WITHIN THE PROJECT LIMITS.CONTRACTOR SHALL MAINTAIN APPROVED BY THE NORTH ANDOVER DEPARTMENT OF PUBLIC WORKS AND y w m 24—HOUR EMERGENCY VEHICLE ACCESS TO AND THROUGH CONSTRUCTION THE MERRIMACK COLLEGE FACILITIES DEPARTMENT. J AREAS. p w Q Oro 30.MEDINA DRIVE ADJACENT TO THE PROJECT SITE IS TO REMAIN ACTIVE AND Z U > o co 10.CONTRACTOR SHALL PROVIDE POLICE DETAIL OFFICERS DURING WORK HOURS OPEN TO TRAFFIC AT ALL TIMES DURING CONSTRUCTION UNLESS OTHERWISE Q Y O o y w FOR TRAFFIC CONTROL. NOTED. c) L— W Q Q a] W � m 11.SAFETY SIGNS PROPOSED FOR LOCATIONS OTHER THAN ERECTED ONCD _ -- = TEMPORARY BARRICADES MAY BE ERECTED ON EXISTING LIGHTPOLES,SIGN Z a= [ w POSTS,AND OTHER EXISTING FEATURES AS APPROVED BY THE TOWN AND w THE COLLEGE. J :E O BAR SCHEDULE Q `� 12.LOCATIONS OF SIGNS SHOWN ARE APPROXIMATE.EXACT LOCATIONS SHALL BELU Q DETERMINED BY THE CONTRACTOR IN THE FIELD. THE CONTRACTOR SHALL 2024 2025 2026 Z w ENSURE THAT SIGNS ARE PLACED SO MAXIMUM VISIBILITY IS OBTAINED. LJJLU CD p 13.THE NORTH ANDOVER POLICE,FIRE,AND ENGINEERING DIVISIONS,AS WELL FEB'MAR'APR:MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB'MAR'APR MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB:MAR:APR MAY JUNE: ILL AS THE MERRIMACK COLLEGE FACILITIES DEPARTMENT SHALL BE ADVISED OF r THE SCHEDULE OF CONSTRUCTION AS WELL AS OF ANY DETOURS OR ALTERNATE ROUTES. PHASE 1:MOBILIZATION AND SETUP 14.WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK,THE LOCATION,ELEVATION,AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR AND THE PHASE 2:BUILDING 1 EXCAVATION INFORMATION FURNISHED TO THE ENGINEER,THE COLLEGE AND THE TOWN FOR RESOLUTION OF THE CONFLICT. 15.THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS FOR THE ALTERATION PHASE&EXCAVATION AND CONCRETE AND ADJUSTMENT OF ELECTRIC,TELEPHONE,AND ANY OTHER PRIVATE UTILITIES BY THE UTILITY COMPANIES AT NO ADDITIONAL COST TO THE TOWN > L OR COLLEGE.IF THE CONTRACTOR ADJUSTS UTILITY COVERS IT SHALL BE PHASE 4:CONCRETE AND FRAMING DEEMED PART OF THE WORK AND THERE WILL BE NO ADDITIONAL COMPENSATION. + PHASE 5:'FRAMING AND SITE UTILITY INSTALLATIONS 16.ALL UTILITY COMPANIES,PUBLIC AND PRIVATE,MUST BE NOTIFIED,INCLUDING . THOSE IN CONTROL OF UTILITIES NOT SHOWN ON THIS PLAN,(SEE CHAPTER REV. COMMENTS DATE 370,ACTS OF 1963,MASSACHUSETTS)PRIOR TO EXCAVATING,BLASTING, PHASE IS:MEDINA DRIVE',CONSTRUCTION REVISIONS INSTALLING,BACKFILLING GRADING,PAVEMENT RESTORATION,OR REPAVING. PHASE 7:.FRAMING AND FINISHES NITSCH PROJECT# 15aa4 17.THE ACCURACY AND COMPLETENESS OF UNDERGROUND UTILITIES ARE NOT �:Z =:Z GUARANTEED.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE �:O 0:0 FILE: 5884 scHEouLE. G THE EXACT LOCATION,SIZE,TYPE,ETC.OF ALL UNDERGROUND UTILITIES Q PHASE 8:FACADE AND FINISHES' Z SCALE: N/A THAT MAY BE AFFECTED BY THE WORK. AT LEAST 72 HOURS BEFORE j U U DATE: 05io2i2024 DIGGING BEGINS,THE CONTRACTOR IS REQUIRED TO CALL DIG SAFE AT PHASE 9:FINISHES AND HARDSCAPE PROJECT MANAGER:B.zIMOLKA (888)344-7233. ALL TOWN OWNED UTILITY STRUCTURES WITHIN AREAS SURVEYOR: AFFECTED BY THE WORK SHALL BE ADJUSTED TO NEW LINE AND GRADE AS (n DRAFTED BY: P.cALVEs DIRECTED BY THE ENGINEER. ANY UTILITY POLES AND/OR GUY POLES Z Z CHECKED BY B.zIMOLKA WITHIN AREAS AFFECTED BY THE WORK SHALL BE REMOVED AND RESET BY O O THE RESPECTIVE UTILITY COMPANY.ALTERATIONS TO UTILITIES NOT OWNED BY U U SHEET:2 THE TOWN SHALL BE MADE BY THE RESPECTIVE UTILITY OWNERS. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 18.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR CONSTRUCTION MANAGEMENT EFFORTS OUTSIDE OF THE SITE CONSTRUCTION MONTH PLANS AND TO COMPLY WITH CONDITIONS OUTLINED WITHIN THE PLANS ANDCMP-2 SPECIFICATIONS USING APPROVED METHODS. 19.AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS,INCLUDING STAGING AREAS,SHALL BE RESTORED OF 16 Njtxh EVn eemg 10'-0" 2'MIN www,nKscheng,com ROAD 2 Center Plaza,Suite 430 WORK 1 g Boston,MA 02108 AHEAD 11-1/2"GAUGE WHITE REFLECTORIZED BANDS o T:(617)338-0063 GALVANIZED FENCE FABRIC F:(617)338-6472 WITH 2-1/4"MESH. 2 FABRIC ONLY ON \ \ _ WORKZONE SIDE. _ ►Civil Engineering z ORANGE REFLECTORIZED BANDS -Land Surveying uu�u � u u u u u ►Transportation Engineering X\X U ALUMINUM TIE WIRES 6" -Structural CURB WALKWAY ►Green Infrastructure lng u_ u 23" ►Planning ✓ \ PROFILE GIS 0 x REFLECTORIZED DRUM SIGN MOUNTING DETAIL PROFILE FRONT (WITH CURB) CHAIN LINK FENCE y W C.1) 5 Q W 0 Z J O0 CD w Q O SIZED TO FIT BARRIER SLEEVE SPACING(8'—10'TYR) O w m CE CD o � LL LLJ � Q LJJ W ALUMINUM TIE WIRES w Lu O w 0 Q 4'-0" 11-1/2 GAUGE GALVANIZED FENCE FABRIC LU LU \ /M U WITH UST C MESH.MOUNT MESH FABRIC w / FOR DUST CONTROL ON WORKZONE SIDE. ILL X& LU �/Z\ � � � PRE—CORED SLEEVE TO ACCEPT FENCE POST PRECAST OR AI WATER—FILLED BARRIER REV.I COMMENTS I DATE REVISIONS NITSCH PROJECT# 15884 NOTE: FILE: 15884 DETAIL.DWC USE ON PORTION OF SITE ADJACENT TO MEDINA SCALE: N/A DRIVE DATE: 05/02/2023 PROJECT MANAGER:B,ZIMOLKA CHAIN LINK FENCE ON TRAFFIC BARRIER SURVEYOR: DRAFTED BY: P.CALVES NOT TO SCALE CHECKED BY: B.ZIMOLKA SHEET:3 MP C -3 OF 16 i EX GUIDE SIGN EX OBJECT MARKER TURNPIKE STREET(ROUTES &114 —------ Nitsch EVmeeung www.nFtSCh6n9 COM EX YIELD SIGN SIGNS Lj X GUIDE SIGN 2 Center Plaza,Suite 430 ————— Boston,MA 02108 \� T:(617)338-0063 TmT,MTMTTT -F(617)338-6472 -Civil Engineering EX LEFT LANE -Land Surveying MUST TURN FT SIGN -Transportation Engineering It <> C -Structural Engineering 0-Green Infrastructure -Planning EX STATE -GIS ROUTE SIGNS LILL--j J ---------- f LET COI LEGE dEIMIACK MIA 121 LOT 2� EX PED CROSSING AHEAD SIGN III tjj BOOK13717,I-GF8 ��Ea � Ill,zz r y 0 Cf) < -I F-2,5 5I, LLJJ pC LL CD 0 > CIO C EX TOWN LINE SIGN CD C4 LU -2112 < a: LU < Cm CD C) ILL, N/F PLACE COI LEGE ?!P 2,LOT 50 x -79 Uj LIlGF 8 < EX STOP SIGN T 7- CE LU I Z' LLJ ILL A ----------- V IT f s NIATTHFW R&MARIA WLSOL EX S — f- - ;.\ _`-� \ Z l I. LOT 49 SO&Q09,12,,PAGE 169 Z - - -I x R, EX RRFB WITH RED CROSSING SIGNS n EX RRF.WITH RED 11-T CROSSING SON S --G kl�- 0 C:I o FFL-21304 LL REV. COMMENTS DATE REVISIONS EX ADVANCED RED LLI INT CROSSING SIGN NITSCH PROJECT# 15884 / \ „a 1 11 J r j �, FILE: 15884 EXISTING D G N/F SCALE: -40' MERRIN ACK COLLEGEINC lAP)-OT4,P, /Vc� DATE: 05/02/2024 DOOk 90R PAGE 18 PROJECT MANAGER:B.ZIMOLKA SURVEYOR: WAY SIG Y EX ONE N DRAFTED BY P.CALVES CHECKED BY: B.ZIMOLKA SHEET:4 EX STREET NAME EX STOP SIGN 0 AND SPEED LIMIT -7�-77 SIGNS -.d ocK'0 pop, 0 25 50 100 200 G FEET CMP-4 ENGINEERING SCALE OF16 b^ TURNPIKE STREET(ROUTES 914&125 T _ - TREE TO BE `\ — Nitsch E11i'I E PROTECTED(TYR) \ 1 � LEGEND: \ EXISTING LIGHT POLE wwvrr'n�tscheng'com \ 2 Center Plaza,Suite 430 V _ \ EXISTING FIRE HYDRANT o Boston,MA 02108 —x— 72"CONSTRUCTION C.L.F.W/DUST CONTROL \\ T:(617)338-0063 �- swlNc coNsrRucTloN GATE F.(617)338-6472 \ ►Civil Engineering TYPE III BARRICADE ►Land Surveying a _w slcNs ►Transportation Engineering ' \ 2 PROP R11 DIRECTION OF TRAFFIC ►Structural Engineering SIGN ►Green Infrastructure s 2 ACKUP PROP M4-�-_ ® TEMP.JERSEY BARRIER ► Vt \ SIGN Planning ✓ _ --�— — ® TEMP.WATER FILLED BARRIER ►GIS i MATERIALS POLICE DETAIL DELIVERY TRUCK f DIRECTION OF PEDESTRIAN TRAFFIC PROP R7-1 SIGN(TYR) TRUCK ENTERING 30`MAIN % GATE "` - = ✓ — — TRUCK EXITING CL I ,f T 7 N WORK TO BE COMPLETED: W - —• w, 1. ESTABLISH PERIMETER FENCING 2. ESTABLISH E+S CONTROLS 1 � MAINTAIN u %�\\� ' s - f \ THIS TREE TO EXISTING c` \ + T 3. ESTABLISH TEMPORARY CONSTRUCTION Z w Q O 1 \ i j BE SAVED PEDESTRIAN %_ } FACILITIES en w m z ACCESS / t PROP R11-2 - j A \ 4. INSTALL WATER MAIN INTO MEDINA Q O w Q co SIGN - 1 =' DRIVE,STUB INTO FENCE LINECD r 0 \ PROP - F - _ / J O v W21 7 I ~ a SIGN - � NOTE m W v7 s� PROP DETOUR Ol u O Q = ^= j _- F ' ~►�+_` MEDINA DROVE_ J ti C ��. —1 ►may. 1�_ - _' 1. G CC W TOLBEN COVERED I DURING THEUDURATI A w OF ITS 0 U A TWO-WAY TRUCK �y ACCESS ROUTE. (n - t PROPM4-9VSIGN LLI \ n ALL WAY TO EAC COGNAGE VERED FOR HCE THE a DURATION OF ITS USE AS A TWO-WAY w DETOUR ROUTE LLJ CL _ L ' 3. MEDINA DRIVE CLOSURE AND DETOUR �` v� J �} •,_�„�j_ � \�°' ,` � `-�:—�c�� SETUP TO ONLY BE IN PLACE DURING / a \ WATER MAIN INSTALL. V " ............. TRUCKS $ I - ---------- DURATION' ENmuNc AND LEAVING �. -�-"—.� ✓ /-- °� - DADWAY -- - ULY 2024(2 MONTHS) --__ s t % � O - -- — 7 � \` r -- " 7Z.b a Y 3 4J '�� "�%\\� �` � • J�O _ '�-�-,.✓ lam. ��\��-� — / COVER EXISTING ONE t No WAY SIGN REV. COMMENTS DATE < \ _ �Z1�1111 REVISIONS l � 4 - 411 CK NITSCH PROJECT# 15884 tr+TRANCE �. FILE: 15884 PHASE LDW -z DAAEE 05/02/2024 SP 1 ,- i 3 ' - � SURVEYOR:OJECT A B.ZIMOLKA �i �� \�� DRAFTED BY: P.CALVES' CHECKED BY B.ZIMOLKA TRUCK ENTRANCE SHEET:5 ✓ SWING GATE TO REMAIN \ fZ Ip // OPEN DURING(j 0 25 50 100 200 �. - fZ0 FEETCMP-5 TRUCKS z / AND 7ER'EN NG � ENGINEERING SCALE SP_, OF 16 -i / Nitsch EVm eeung \\ = LEGEND: ,,, . ` ;r000 r�Nce .�° 1M00D°� �I EXISTING LIGHT POLE www.nitscheng com EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430 ` Boston,MA 02108 3 —x— 72"CONSTRUCTION C.L.F.W/DUST CONTROL z 4 a T:(617)338-0063 p - SWING CONSTRUCTION GATE F:(617)338-6472 CONC CCNC F TYPE III BARRICADE -Civil Engineering ►Land Surveying TURNPIKE STREET(ROUTES 114&125 s SIGNS ►Transportation Engineering DIRECTION OF TRAFFIC -Structural Engineering _ F ►Green Infrastructure ..,.�..,, _ _ __ __ _ ® TEMP.JERSEY BARRIER ►Planning -.� GIS - - W 3 \ ® TEMP.WATER FILLED BARRIER A POLICE DETAIL a , , TREE TO BE5) EXCAVATOR PROTECTED(TYP) \ DIRECTION OF PEDESTRIAN TRAFFIC a" �\ TRUCK ENTERING 4 ��*, `� — — TRUCK EXITING � 4 __ o H a Q � § r BULLDOZER r El Z f �k O \ _ W - 6 Cf) LLJ < 1� (3 Q CD w \ 1 _ GE AC Z > o KUP WORK TO BE COMPLETED: _ CO CD LLJ IINNNNN 1. BUILDING 1 STRIP TOPSOIL () Q LLI Q > 1 - ` 2. BUILDING 1 FOUNDATION STONE _ r _ t n i j \ 1 / 3. STALL WITHIN SITE � ti q- TEMP STOCK PILE ;' FOOTPRINT cc w HYDRANT IN p � AREA � z 3 a . W 3 R W - - PROP R7-1 SIGN(TYP) Q w 2 e a jILL CL 30'MAIN x W s GATE A V MWATERING TANK a DUMPSTER(TYP _ =� TYP) �—r.`: — � �g 1 �s Q �� r DURATION i N-z - - ULY 2024 OCTOBER 20 MONTHS) \- J 24 M H ,- _ \ i f THIS BE SAVED _ S TREE TO \✓ REV. COMMENTS DATE ' 3 REVISIONS E 9 NITSCH PROJECT# 15884 ` --- FILE: 15884 PHASE 2.D SCALE: I"-40' r M y \^ � DATE: 05/02/2024 ` i z i e - __ •• • PROJECT MANAGER:B.ZIMOLKA ,n�-- � :_� �_, _� �� __��f•� _ _ SURVEYOR: I / i � • • DRAFTED BY: P.CALVES u J • V .� ~`. �_ _ `� ���_ CHECKED BY: B.ZIMOLKA �. �: ;✓ �, �,'` „„gam _ �✓--- _ - SHEET 6 - 0 20 40 80 160 FEET CMP-6 ENGINEERING SCALE OF 16 i Nitsch EVmeeung ---__ LEGEND: wood puce ��_ � =C� EXISTING LIGHT POLE �W'fl���8fl�'�� cww.EDGE r G� G � EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430 j ry� - ` - wv Boston,MA 02108 a 5 G 7 - -x- 72"CONSTRUCTION C.L.F.W/DUST CONTROL DO — o — o T:(617)338-0063 \ � a s,CONC SWING CONSTRUCTION GATE F:(617)338-6472 V R EnGE ` COW, \" .,., --. -- -- -- -- -- --. --. ---_ c .--fact <. -- ----. ----. -- ----. -- ---.. -.--- ►Civil Engineering TYPE III BARRICADE TURNPIKE STREET(ROUTES 1 14&125) ►Land Surveying \ a u _ ------------------------------- 7W SIGNS ►Transportation Engineering ►Structural Engineering DIRECTION OF TRAFFIC ►Green Infrastructure _ -'- __ r -_ -_- _ _ ® TEMP.JERSEY BARRIER ► ......_<. ...... ._ 9 C \ ® TEMP.WATER FILLED BARRIER \' El Ed TREE TO BE POLICE DETAIL PROTECTED(TYP) � DIRECTION OF PEDESTRIAN TRAFFIC CON RETE V BOOM CPUMP TRUCK ENTERING Xx Vk - - TRUCK EXITING W W v - v fcaa Q O z CONCRETE El O / ` AGITATOR a ~ w ' 4 Q BULLDOZER WORK TO BE COMPLETED: SOILS AND DEBRISCE 2c1$ACKLJ _ ` CD REMOVAL TRUCK GAfE O w Q 00 - 1. BUILDING 1 PLACE CAST IN PLACE U > o T O o C4 LU LU ��•. - s 2. BUILDING 2 STRIP TOPSOIL Q U LLI ✓� '` - Q j 3. BUILDING 2 FOUNDATION STONE V L7 C3 w W / PROP R7-1 SIGN(TYP) M - ' St- // W Q r e \` C/� CC c y y g LU LU CL ILL CL 30 MAIN - l11 GATE :. /ii; _ C-) VRL 3 { a DUMPSTER `. i _ • EXCAVATOR' (TYP) _ DURATION DEWATEROG _ TANK NK OCTOBER 2024-JANUARY 2025 :- v (4 MONTHS) THIS EVEDE ;� TO t \ RSA = 1 �✓ T � e - REV. COMMENTS DATE REVISIONS CH FILE 5884 PHASE 3.D < 2 - ''� �v SCALE: I"-40' DATE: 05/02/2024 / '• ''l - r_ • PROJECT MANAGER:B.ZIMOLKA SURVEYOR: - , - �, E _;_ - � ��' ` __=`•, �- DRAFTED BY: P.CALVES V HE - - ^ r � _ •r�� _ � SHEET:7 ` v ZZ - - i s o � � F 0 20 40 80 160 FEET CMP-7 ENGINEERING SCALE OF 16 i t Njtxh EVmeemg LEGEND: L °00D f °❑ ❑ EXISTING LIGHT POLE wwW'flrts com — f ��— = GRAN.mGE_ — 4 EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430 -_ GRAN.EDGE_ Boston,MA 02108 —x— 72"CONSTRUCTION C.L.F.W/DUST CONTROL T:(617)338-0063 ` a 5 s z a ---- swlNc coNsrRucTloN GATE F.(617)338-6472 u \ cnr - CONC \�� d GRAN EDGE ff` � CDNC � - DHAN.EWE C=> ►Civil Engineering TYPE III BARRICADE ►Land Surve In TURNPIKE STREET(ROUTES 114&125) Y g „u m7WSIGNS ►Transportation Engineering qoURB WN EDGE GRAN.EDGE DIRECTION OF TRAFFIC ►Structural Engineering x — ►Green Infrastructure n _— _ —— -- _— _ = TEMP.JERSEY BARRIER ► Planning =. ❑ ® TEMP.WATER FILLED BARRIER ►GIS g tr TREE TO BE - - - w POLICE DETAIL 9 PROTECTED(TYP) DIRECTION OF PEDESTRIAN TRAFFIC lk TRUCK ENTERING TRUCK EXITING MOBILE CRANE(TYP) It- �. a < 4 r a o r G ro - EJ MATERIALS DELIVERY w ~ Z Q O V TRUCK ❑ CONCRETE AGITATOR Q w m _ 2,"ACKUP LJJ cc CD G E > o r Y - LJJ O _ = OR TO BE COMPLETED: o � �WORK o Q �� 1. BUILDING 1 UTILITY INSTALLATION Z Q � W � - ❑ \.�\, //// 2. BUILDING 1 FRAMINGLLJ VCm Lu _ ❑ !✓// 3. BUILDING 2 PLACE CAST IN PLACE �Z L L1 cn /✓i j/ r\ N, 4. BUILDING 2 BUILDING ELEMENTS a Q i 4 PRO R7-1 SIGN(TYP) w / 3 3 / LU ILL = 3 3 3 > 3� 30'MAIN _ r i GATE ill iiii � t DUMPSTER(TYP) DEWATERING,'; TANK(TYPE 3n p= - DURATION i a . = - - JA PRIL 2025 i.� 33 THIS _ - D ( MONTHS) BE T S TREE TO 4 3 SAVE Y - 3 � REV. COMMENTS DATE x REVISIONS ❑` T �a f- / ( 4 —— NITSCH PROJECT# 15884 v ✓� �� n i FILE: 15884 PHASE 4.D SCALE: I"-40' DATE: 05/02/2024 � _� z .^�.,\ � � '� � __'�• _�' � PROJECT MANAGER:B.ZIMOLKA T � t,_•�� SURVEYOR: DRAFTED BY: P.CALVES T , i s e - �-T e CHECKED BY: B.ZIMOLKA .ter SHEET:8 . - 3 tf —77 _ FEET CMP-8 ENGINEERING SCALE OF 16 i Nitsch EVn eeung LEGEND: eng.com \ I I I I =' EXISTING LIGHT POLE vvww°nitsch ---- \ w000 rw� ./ c v j EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430 ti --- -x- 72"CONSTRUCTION C.L.F.W/DUST CONTROL Boston MA 21 EDGE Gam.GG T:(617)338-0063 GRAN.EDGE I�r swlNc coNsrRucrloN GATE F:(617)338-6472 \ � 2 ♦ 5 6 ] B a ►Civil Engineering \r cRAN D ------------- cone F CONC. TYPE III BARRICADE ►Land Surveying SIGNS ►Transportation Engineering TURNPIKE STREET(ROUTES 114&125) DIRECTION OF TRAFFIC ►Structural Engineering - ►Green Infrastructure EDGE GRAN.EDGE ® TEMP.JERSEY BARRIER ►Planning A _ � ® TEMP.WATER FILLED BARRIER GIS f • _ - - - - - - - f: - - - - - - - POLICE DETAIL z a DIRECTION OF PEDESTRIAN TRAFFIC ',« - - - Z TREE TO BE PROTECTED(TYP) TRUCK ENTERING Q - � - - TRUCK EXITING J Y a f MOBILE CRANE H r � A � Z � J - WORK TO BE COMPLETED: O _ Lij r* 1. BUILDING 1 CONTINUE UTILITY H Q m r INSTALLATION AND FRAMING LU 2. BUILDING 1 MEP INSTALLATION J LU Q co TRASH CHUTE O \ \ ACKUP 3. BUILDING 1 FACADE INSTALLATION y 0 / G — MATERIALS Y / _ Z Q Q W DELIVERY TRUCK /, 4. BUILDING 2 FRAMING e W Lu O Z //////// j ✓/ / // � z /� % a r 4 J a 3 l ,4 \ 3� PRO R-1 SIGN(TYP) CE LU LS7 LLJ ILL LU 3 - % � 3 3 X "= ;` 30'MAIN 3CL U�£ GATE DUMPSTER 3� -4k. (TYP) 3 3 E DURATION � APRIL 2025-MAY 2025(1 MONTH) T DEWATERING % 33>' TANK _ G u a t THIS TREE TO BE SAVED 4 REVISIONS DATE 4 REV. COMMENTS NITSCH PROJECT# 15884 A FILE: 15884 PHASE S.D - SCALE: I" ti DATE: 05/02/2024 _ PROJECT MANAGER:B.ZIMOLKA ' SURVEYOR: 5 DRAFTED BY: P.CALVES `- ✓ a 1 • CHECKED BY: B.ZIMOLKA 10 z = G - _ - g _ 4 T s ` SHEET 9 c - Y _< / v• 0 20 40 80 160 FEET CMP-9 ENGINEERING SCALE OF I6 i Nitsch EVmefung LEGEND: - i T EXISTING LIGHT POLE wwv�r'n�ts+cheng'com - - ----- _ - _ ff G.ED E � '`d ti� EXISTING FIRE HYDRANT enter Plaza,Suite 430 2 a� GRAN. GE GRAN.EDGE =— Boston,MA 02108 o T o T o o -x- 72"CONSTRUCTION C.L.F.W/DUST CONTROL T:(617)338-0063 - FYI SWING CONSTRUCTION GATE F:(617)338-6472 GRPN mGE-- CDNC � CONC ----. ----. ----. ----. ----. GRAN.EDGE www, TUrn*e S*e#/_ROUte 114 ] TYPE III BARRICADE ►Civil Engineering Land Surveying TURNPIKE STREET(ROUTES 114&925) 4 Y g GRPN. - - -- - ---- ---- ---- �' ---- ---- S SIGNS ►Transportation Engineering � C= Yi. ---- ----.CWW.EDGE J DIRECTION OF TRAFFIC ►Structural Engineering ►Green Infrastructure ® TEMP.JERSEY BARRIER ►Panning ® TEMP.WATER FILLED BARRIER ►GIS El TREE TO BE PROTECTED(TYP) POLICE DETAIL - DIRECTION OF PEDESTRIAN TRAFFIC TRUCK ENTERING - - TRUCK EXITING Z --- ALTERNATE VEHICLE PATHS OF TRAVEL 4 x F F � edlna aV�' PROP R11-2 L=U cw PARKING IG J� CE-9VPROP M4 O m_co �� SIGN WORK TO BE COMPLETED: U > T G (D 20'BACKUP — Y 0 . V4 w 1 GATE 1. S AND Q C) Z INSTALL UTILITY CONNECTION Z Q Q � W CONSTRUCT MEDINA DRIVE. i iiiii 2. PERIODIC,SCHEDULED SHUTDOWNS TO w S -_� W EL // \ 3 V r OCCUR AND COORDINATED WITH Z Lu O 227 j / MERRIMACK COLLEGE. z - � � o \ \' Q w COLLEGIATE 2 LL _ = NOTE: a �6FOR 30'MAINWAY TO BE C_ ECIAFECHURCHOF 1 ALL ONE WAY SIGNAGE ON FLA ERTY Awx � H r r I rt I VERED DURATION OF OITS USE AS AH GATE CHRIST THE TEACHER TWO—WAY � _� �� _� � r DETOUR ROUTE. t 1 ti I i= DURATION �z mw s - MAINTAIN - - s le I� EXISTING THIS TREE TO =3 E PEDESTRIAN I (4 MONTHS) i BE SAVED ACCESS,,-,v = - --- P _ / l J 1 R11-2 '_ % \ h e , a F S GN —__ /� 4 — E COMMENTS DATE PROP —W21 7 REVISIONS f yy �~ 3 1£ _� PROP DETOUR OF l SIGN � .—mil/ �►� �—��� P ;{�/ g �� MEDINA DRIVE = NITSCH PROJECT# 15884 Y 7 5884:FILE / 41 SCALE: "-40,PH PHASE - � b� 0/02/2024 = / PROJECT MANAGER:B5 ZIMOOKA T. PROP M4-9V r ,�\ ` = = SIGN ems___ ���� ate^ - _Z_! y� �F�� DRAFTED BY: P.CALVES CHECKED BY: B.ZIMOLKA SHEET 10 a f -_ ✓ 0 20 40 80 160 FEET CmP_1 0 ENGINEERING SCALE OF 16 i Njtxh EVn eemg LEGEND: EXISTING LIGHT POLE wwW'flFtschong com \ ;=� �' � `� EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430 —— � Boston,MA 02108 CRAN.ENE r —x— 72"CONSTRUCTION C.L.F.W/DUST CONTROL T:Boston, 3A 021 3 --.,_"—ram ---- ---- ----. - Ga e❑ce o a a 5 0 7 SWING CONSTRUCTION GATE F-.(617)338-6472 ti ►Civil Engineering CONC c❑Nc TYPE III BARRICADE 1 GRAN❑ -?- ►Land Surveying ,. sRAN.F❑se �� Turn e Sf12 _OUte 1�4 TURNPIKE STREET ROUTES 1 94&925 s SIGNS ►Transportation Engineering \ ( ) DIRECTION OF TRAFFIC Green Infrastructure strEnguct re — ring "` Green Infrastructure -- GRAN.EDGE �i� -- -- AQ\ " ® TEMP.JERSEY BARRIER ►Planning F` a TEMP.WATER FILLED BARRIER GIS [r'/ POLICE DETAIL qt r � Li � �� TREE TO BE — \ DIRECTION OF PEDESTRIAN TRAFFIC PROTECTED(TYP) TRUCK ENTERING TRUCK EXITING MOBILE CRANE y LU f ,Sy a V x6v Z 4� TRASH LL �O N CHUTE —71 ` s _ Z w < � J lna v - e tAed - oe o LU LU a � U \\� O PARKI BACKUP T o N I�% � CC o � t G - G 0 2b'B ATE Q Q GATE= _ LLI o LL MATERIALS WORK TO BE COMPLETED: w DELIVE = — _ LU O RY / TRUCKS 1. BUILDING 1 MEP INSTALLATION LL1 2. BUILDING 1 FINISHES Q Q CE 227 4 / 3 BUILDING 2 FACADE CONSTRUCTION s w t ILL _ ! I - 4. BUILDING 2 FRAMING CONTINUES r 30'MAIN — I COLLEGIATE CHURCH O r CHRIST THE TEACHER GATE ❑,._ _ � s - - _ DURATION z Q a o,o a TREE TO - THIS r = _ _ SE TEMBER 2025-OCTOBER 2025 BE SAVED - - \ ---- - - (3 MONTHS) ;- REV. COMMENTS DATE REVISIONS NITSCH PROJECT# 15884 FILE: 15884 PHASE 7.D 3 SCA : 3 G _ 3 _ - 4 \ \ / Qh P DATE: 05/02/2024 \ c � �/W(� \,- PROJECT MANAGER:B.ZIMOLKA > _ - Y' � _ ��' ���--— k \ s SURVEYOR j f - _ __ �`; �• DRAFTED BY: P.CALVES _ ` ✓ v�` g � :-� � ��,�`� � —�•�♦♦ ♦J `-\ CHECKED BY B Z IMOLKA Jk 3 \ a- \ ♦ - - _ SHEET:II l� ♦ 0 20 40 100 160 FEET m P ENGINEERING SCALE OF 16 i Nitsch EVn eemg � X LEGEND: _'� EXISTING LIGHT POLE www.nFtscheng'com wood f • I _ In f ` •�° i - ti EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430 _ - - - - �' - �-- - Boston,MA 02108 7' ` -x- 72"CONSTRUCTION C.L.F.W/DUST CONTROL `�" `"" � T:(617)338-0063 a 5 6 � $ SWING CONSTRUCTION GATE F:(617)338-6472 a a CONC. ►Civil Engineering � TYPE III BARRICADE ►Land Surveying _ o �F _ _ Turnpike�ee OUte 114 TURNPIKE STREET(ROUTES 114&125) SIGNS ►Transportation Engineering DIRECTION OF TRAFFIC ►Structural Engineering t •u m ►Green Infrastructure = ® TEMP.JERSEY BARRIER ►Planning 2 'L _ — — - GIS ' ........ TEMP.WATER FILLED BARRIER r TREE TO BE \ POLICE DETAIL i PROTECTED(TYP)� \ �4 DIRECTION OF PEDESTRIAN TRAFFIC - \ TRUCK ENTERING TRUCK EXITING xx \ W y n z._ i\ Z O m �. LL z F s _ .\\ a 10 w ¢ o_ s � diva pr�� - ¢ w \e �) J w 00 � � e \ ° O PARK I Y O o y LU v� /���� , _N-,�"Nfi o MATERIALS CUT _ Q LU MOBILE DELIVERY j oQP TYP) AT f __ _ c \ LU -- G E / CRANE TRUCKS WORK TO BE COMPLETED: 1. SITE UTILITY INSTALLATION pp o CD w w O \ 2. BUILDING 1 FINISHES y � 4 F ; y 2z� 3. BUILDING 2 FACADE CONSTRUCTION = < F t. i - r 4 LU - ILL J TRASH v CHUTE,� COLLEGIATE CHURCH OF 30'MAIN ( CHRIST THE TEACHER GATES A \� aEWATERING DUMPSTERS TANK Y e � � _ v _ b _ / ON Z - .z � = � ���� - OC OBDURAT�ER 2025-JANUARY 2026 �y THIS3 TREE TO ! BE SAVED __ ` 4 MONTHS J / REV. COMMENTS DATE IV 3 REVISIONS 3 NITSCH PROJECT# 15884 FILE: 15884 PHASE 8.DVW / - SCALE: "-40' „= Y ahem _ - a , ,4 PROJECT MANAGER:B.ZIM00LKA Y a SURVEYOR: --- -- _ �_.// � ✓1�s',�3��gym" ..,'=i � (1� '` � �'��• �«' �- - DRAFTED BY: P.CALVES _ F 1. J e`,v J\ -`a s �` - SHEET:D12 Y Ax B.ZI 0 20 40 80 160 FEET CMP-1 2 ENGINEERING SCALE OF 16 i Njtxh EVn eemg LEGEND: EXISTING LIGHT POLE www. tscheng'com EXISTING FIRE HYDRANT 2 Center Plaza,Suite 430 -x`- 72"CONSTRUCTION C.L.F.W/DUST CONTROL Boston,MA 02108 T:(617)338-0063 SWING CONSTRUCTION GATE F:(617)338-6472 wm CE ►Civil Engineering TYPE III BARRICADE - -- - - - -_ -- ----- - ►Land Surveying -- i SIGNS ►Transportation Engineering z a ALE- - ►Structural Engineering o o o- o � DIRECTION OF TRAFFIC ►Green Infrastructure = a .- ® TEMP.JERSEY BARRIER ►Planning � � CONC CCNCLI ►LIIJ _ ® TEMP.WATER FILLED BARRIER T SIDEWALK CONNECTION Turnpike�e"oute 114 T BE INSTALLED b TURNPIKE STREET ROUTES 914&125 P POLICE DETAIL DIRECTION OF PEDESTRIAN TRAFFIC �"`�_ �\� _ _ _<.....--:t.....�........—ti—:.-.......—.................................... _ — ————_——————— TRUCK ENTERING ❑ ❑ — — TRUCK EXITING LU g "l TREE TO BE \ CL �\ a PROTECTED(TYP) Q CODit o c s: CD g Si ,� ,,,,• ,'•Ri••. W 00 -. s a . LU CD ♦ I .£ T •t o t S.r,., i ii WORK TO BE COMPLETED: -COD Q W L7 CD LLJ 1 SITE FINISHES EL LLJ Lu a P. ..i. :• .. NO PARKING _ �:; , ,..,,,., .'. �,; �, �'•:;t' 2. BUILDING 1 FINISHES LU CE "r _ 3. BUILDING 2 MEP INSTALLATION V/ LU 20'BACKUP 0 GATE _ 4. BUILDING 2 FINISHES = TRASH CHUTE ILL 227 jr - - / E 1 4 { � 3 COLLEGIATE CHURCH OF 30'MAIN GATE CHRIST THE TEACHER 1w, DUMPSTER ! t- DURATION TYP)( < - JANUARY 2026-JUNE 2026(6 MONTHS) r MOBILE l O CRANE m_ j <=_ / REV. COMMENTS DATE REVISIONS g� _ -- 1 z " THIS TREE TO _ v _ - NITSCH PROJECT# 15884 w j BE SAVED 3 _ - — \ f FILE: 15884 PHASE 9.D Y j SCALE: "_40' DATE: 05/02/2024 PROJECT MANAGER:B.ZIMOLKA \ _ _ SURVEYOR: v y = -------------- DRAFTED BY: P.CALVES CHECKED BY: B.ZIMOLKA g ! SHEET:13 �l Flp hert 0 20 40 80 160 FEET CMP-1 3 ENGINEERING SCALE OF 16 i SITE ACCESS TO/FROM INTERSTATE 495 VIA ROUTE TRUCK ENTERING Nitsch 1�g - - TRUCK EXITIN "a �0 � 114 N F WWWWmitschengcom x�� , PROJECT SITE \ 2 Center Plaza,Suite 430 Boston,MA 02108 T:(617)338-0063 F:(617)338-6472 r — ►Civil Engineering 4 off, _ ►Land Surveying -\ v / ,\ ` ►Transportation Engineering o '` �! ►Structural Engineering \�/i_ �� °� ✓ ►Green Infrastructure � ►Planning �, �.� \ ►GIS SITE ACCESS TO/FROM INTERSTATE 93 VIA ROUTE 125 �' ✓ �% / '' OLU CZ CD i \ J CM ELI W O J LLJ A \ / wi \i CA \ REV. DATE REVISIONS / L NITSCH PROJECT# 15884 RTH READING NO �x FILE: 15884 TRUCHROUTE.wG SCALE: NTS f \ / \ J` DATE: 05/02/2024 PROJECT MANAGER B.ZIMOLKA SURVEYOR: -- DRAFTED BY. P.CALVES CHECKED BY: B.ZIMOLKA SHEET:14 mp-1 4 OF 16 i > r�wol Nitsch FrtgIBeefll g www.nitscheng.com 2 Center Plaza,Suite 430 Boston,MA 02108 T:(617)338-0063 F:(617)338-6472 ►Civil Engineering ►Land Surveying t 7 _ ►Transportation Engineering El — ►Structural Engineering ►G Infrastructure 3 1 � ` Green Infra ix�s �'\ G \ \ mum w seem K UM K UM mum � TM e�UM IIS n �n 1--- ° ) a 1 1 t J °c i t ° FTJ ° f GATE f- i i i , t � � i t i t t � 7 p VL p __ S m S O - THIS TREE TO _ v s m, Q{$ `�_ �,' BE SAVED _ ( ' _ Q (n C w m i {t i t Ia t to v J 21� CD O LLJ 6ZQ oa <8> `i --_ �jY , -- i c e- _ •o EF - -i Z Y C4 w_, t 6 0-1 t t .� � tr CC W H � w o w W INGRESS EGRESS INGRESS EGRESS INGRESS EGRESS PHASES 1,7,8—SU40 PHASES 3,4—CONCRETE TRUCK PHASES 4,5/6a—WB40 FIRETRUCK CIRCULATION—1 INCH=60 FEET SCALE Cr w 0 w LL T �� •ax 46'Hariz r-�-' ax 10'Vert 25 2. SU-40—Single Unit Truck CONCRETE TRUCK WB-40—Intermediate Semi—Trailer FIRE TRUCK REV.1 COMMENTS DATE Overall Len th 39.500ft Overall Len th 27.000ft Overall Len th 45.499ft Overall Len th 46.250ft REVISIONS Overall Width 8.000ft Overall Width 8.000ft Overall Widty 8.000ft Overall Width 8.330ft Overall BodyHeight 13.500ft Overall BodyHeight 12.971ft Overall BodyHeight 13.500ft Overall BodyHeiqht 10.489ft Min Body Gound Clearance 1.367ft Min Body Gound Clearance 0.933ft Min Body Gound Clearance 1.334ft Min Body Gound Clearance 0.920ft NITSCH PROJECT# I5884 Track Width 8.000ft Track Width 8.000ft Track Width 8.000ft Track Width 8.330ft FILE: 15884 TRUCKTURN.DWG Lock—to—lock time 5.00s Lock—to—lock time 6.00s Lock—to—lock time 4.00s Lock—to—lock time 6.00s Max Steering Angle(Virtual) 31.80` Max Steering Angle(Virtual) 40.00` Max Steering Angle(Virtual) 20.30` Max Steering Angle(Virtual) 30.00` SCALE: AS SHOWN DATE: 05/02/2024 PROJECT MANAGER:B.ZIMOLKA SURVEYOR: --- DRAFTED BY: P.CALVES CHECKED BY: B.ZIMOLKA i SHEET: IS —15 CMP 0 50 100 200 400 FEET ENGINEERING SCALE OF 16 i Nitwh EVn eemg www.nitschang com 2 Center Plaza,Suite 430 Boston,MA 02108 T:(617)338-0063 F:(617)338-6472 ►Civil Engineering Land Surveying Transportation Engineering ►Structural Engineering ►Green Infrastructure Planning ►GIS IDENTIFI— SIZE OF SIGN(IN) DIMENSIONS(mm) NUMBER COLOR POST SIZE UNIT AREA IN CATION TEXT OF AND AREA IN SQUARE NUMBER LETTER VERTICAL SIGNS BACK— NUMBER SQUARE FEET WIDTH HEIGHT HEIGHT SPACING ARROW REQUIRED GROUND LEGEND BORDER REQUIRED FEET TRUCKS ORANGE P 5 ENTERING 9.00 18.00 < SP-1 36 36 AND LEAVING NG 5C 3 N/A 2 (RETRO- BLACK ROADWAY REFLECTIVE) 2 C�C O ORANGE G � SP-2 36 36 ENTRANCE 7D 5 N/A 2 (RETRO- BLACK BLACK PS 9.00 18.00 Coo w 2 m REFLECTIVE) CD 2 Z � CC C'3 O LU Q co T No SEE SEE SEE VARIED y Y o y � R7-1 12 18 PARKING MUTCD MUTCD MUTCD 4 WHITE RED RED 1.50 6.00 Z Q z � LL TME STANDARD STANDARD STANDARDLOCATIONS _ v M w LIJ ROAD SEE SEE SEE MTD ON oC v R11-2 48 30 MUTCD MUTCD MUTCD 3 WHITE BLACK BLACK 10.00 30.00 CLOSED BARRICADE COD Q STANDARD STANDARD STANDARDIr Z Lu O o LU SEE SEE SEE L` W21-7 36 36p MUTCD MUTCD MUTCD 2 (RETRO—ORANGE BLACK BLACK PS 9.00 18.00 r REFLECTIVE) 2 STANDARD STANDARD STANDAR DETPURI SEE SEE SEE ORANGE P5 M4-9V 30 24 MUTCD MUTCD MUTCD 2 (RETRO— BLACK BLACK 5.00 10.00 STANDARD STANDARD STANDAR REFLECTIVE) 2 REV. COMMENTS DATE REVISIONS NITSCH PROJECT# 15884 FILE: 15884 SIGNSUMMA Y.DWG SCALE: N/A DATE: 05/02/2024 PROJECT MANAGER:B.ZIMOLKA SURVEYOR: --- DRAFTED BY: P.CALVES CHECKED BY: B.ZIMOLKA i SHEET:16 MP C -16 OF I6 i