Loading...
HomeMy WebLinkAbout2024/02/20 - Minor Modifications Memorandum - - 000 0 11b(J .. III iii iu IIII a iii III III : IIII 114 iii Memorandum ............1 iii"l III"i �llli!IIIII�� P° 120 I111,,11111111 a iii iii i S b I������I�����,�����; III ��:�°�u ��� �:����:�� ������11 6,12 53,11II1!!��°����� 0 r h d11111ll"l' IIIii"lW m111„Tllhi ll 1II A � ..„� �� ��..�' "�. II� �IIII��III�.�iii,..i,.°iu�..iii�.�:114 iii .�� �.�.. III II�����iii�iii�iii�..i,III����III��. .� IIII IIII e i�: iii LeIII: IIII iii..°iu IIII�.I °°Illll,ll°iii e IIII° a iiriii.:II iii°Illlllllll'II II On behalf of the applicants, Merrimack College (owner) and Greystar Development East, LLC (developer), VHB has prepared this memorandum to summarize proposed modifications to the plans titled Corner Development Project at Merrimack College and issued August 17, 2023 and last revised for decisions on November 16, 2023 as approved by the North Andover Planning Board on December 5, 2023. In the December 5, 2023 decision, one findings of fact was that the Town, Owner, and MassDOT were to continue "discussions regarding the MassDOT Rt. 114 Roadway Improvement Project, including the potential for construction of an additional travel lane on Andover/Elm Street and such continued discussions/evaluations/advocacy between the Town, Owner, and MassDOT will be a benefit to the Town as a whole." Merrimack College,VHB, MassDOT and GPI have spent significant time collaborating together on this analysis, studying concepts of further modifying the proposed Route 114 corridor improvements project along Andover Street, the result of which is included in Exhibit Al: MassDOT Andover Street Right Turn Lane Concept. This concept includes widening of the road by utilizing a permanent highway access easement to include an approximately 200-foot long right turn lane and extended shared- use path along the Merrimack College side of Andover Street. After evaluation, it is our understanding that the MassDOT Corridor Improvements team will be proposing to incorporate these modifications into their Project. Foremost, the study confirmed that the proposed Corner Development Project as approved on December 5, 2023 does not inhibit the physical ability to construct a widening of Andover Street.This turn lane was designed to satisfy the 95th percentile queue and will further improve operations and reduce intersection delay at Andover Street and Turnpike Street/Route 114.The proposed shared-use path along Route 114 will wrap around the corner and continue south towards Flaherty Way providing additional continuity and multi-modal accessibility in coordination with both Projects. The pedestrian connection of the proposed Corner Development Project at the intersection of Andover/Elm Street and Route 114 has been reconfigured as a result of this study to still tie into both existing conditions and the proposed multiuse path in the future. The previously approved plans included the proposed buildings with associated site amenities, landscaping, and utilities.After the coordination with MassDOT on the right turn lane and pedestrian connection to the site, the applicants are submitting a request to include minor modifications to the Site Plans as shown on the attached Corner Development Project at Merrimack College plans revised for Minor Modifications on February 20, 2024, design overlays, and summarized below. The following elements have not changed: Proposed zoning conformance as approved by NAPB and ZBA including frontage, setbacks, and building height Building footprints and locations Parking counts Emergency vehicle access Peak stormwater rates at or below existing peak rates '101 WaIll irwt Sti'leet, P0 i:'3OX 9151,Watertown, IMassacht.isetts 4-71 III r"17.924.17 IIIF 6�.. w . a 2 Ism Il w iiri III IIII III m III III 9����: 00 III����ef "i"162 53 MINI �" IIII"'� III ��� Memorandum III a g e The proposed minor modifications include the following: MassDOT widening of Andover/Elm Street to accommodate right turn lane (scope to be incorporated as part of the Route 114 Corridor Improvements Project) Revised pedestrian connection at corner to accommodate future Route 114 shared-use path Relocated building entries and associated grading, walkways, and landscaping adjustments Revised stormwater management design to align with layout and grading updates to further reduce peak runoff rates from previously permitted proposed conditions (Table 2) Consolidated utility equipment and service yards Table 1 Summary of Proposed Modifications Description Required Proposed as Proposed Delta Previously Modifications Permitted Front Yard Setback 30 Feet >30 Feet >30 Feet 0 Feet Side Yard Setback (At Corner Lot) 30 Feet >30 Feet >30 Feet 0 Feet Rear Yard Setback 30 Feet >30 Feet >30 Feet 0 Feet Building Height* 35 ft <48 ft <48 ft 0 Feet Gross Square Footage N/A 139,600 SF 139,600 SF 0 SF Drainage Area Impervious Area N/A 4.2 Acres 4.2 Acres 0 Acres Net Parking Change N/A -43 Spaces -43 Spaces 0 Spaces *No change in request from ZBA The Project continues to fully comply with the Massachusetts DEP Stormwater Management Standards and the North Andover Chapter 250 Stormwater Management and Erosion Control Regulations including peak rate attenuation, stormwater recharge, and water quality standards.As shown in Table 2,the previously permitted peak discharge rates were all below the existing conditions peak rate per Standard 2.With the minor modifications, the peak discharge rates remain at or below the previously permitted rates.A complete, updated version of the Stormwater Management Report documenting this full compliance has been prepared for additional reference and supporting information based on the minor modifications. Table 2 Stormwater Management - Peak Di1scharge Rates (cfs) Design Point 2-year 10-year 25-year 100-year Storm Storm Storm Storm DP-1 Existing 14.7 30.0 39.9 55.3 Permitted (12/05/2023) 11.2 25.4 36.1 53.4 Proposed (02/20/2024) 10.8 25.4 35.1 52.8 00 ea g"iI �. "16� �! �� 111, lib, 2(D� � Memorandum III �� APPENDICES e III III II 'II II„ 0 le,iar IIII IIIIIIIII00 III e "1 "6 2 5 4 IIII L,l 11, III '''' Memorandum NORTH ANDOVER,LAWRENCE,&ANDOVER ROUTE 114 :# / ---------------- N/F ATEFED.AID PROJ.NO. SHEET TOTAL MERRIMACK COLLEGE 0. SHEETS MASSDOT ROUTE 114 CORRIDOR IMPROVEMENTS PROJECT L.C.C.NO.18975-R 'A 225 459 C/�N (LOT 100) IM PROJECT FILE NO. 608095 CERT.NO.3281 DOC.NO.9351 0 315 TURNPIKE STREET TRAFFIC SIGN&PAVEMENT 025.0-0013 .2 MARKING PLANS Z ph w/T t cl o APPROXIMATE AREA OF PERMANENT LHIGHWAY EASEMENT FOR SHARED USE PATH PATH ON MC PROPERTY(3,500-4,000 SF) AND RAIL FENCE INEXISTING PGST % —--—-- ROUTE 114 CORRIDOR IMPROVEMENT PROJECT u� LIMIT OF WORK ui E3 Ell iiii 13 --13 m E [3 3 00 T 2S 23 24 2 PROP.CONST.IL&PGL 0 S27'13'23"W '—R 1289�32'- w F- 260.42 S20 4�- .-33�63 L-=149.83' �--PT+27.57 77 11' PC�177.7�4 &0. cli ............ SHLC No.2217 ELM STREET LIMITOFWCRK STA.27+05 ANDOVER STREET MEET EXISTING N/ MERRIMACKF COLLEGE BK/PG 13727/8 485 ANDOVER,STREET / I D24.D-DO29 PLAN 1164D N/F MERRIMACK COLLEGE BK/PG 700/56 (Li aj 175 HAVERHILL STREET STATE DRAIN EASEMENT STJ_DRAIN MENT aj 1-5 N/F N/F (UNDEFINED GEOMETRY) UND�FINEDGEOMETRY)BK/PG 504/314 BK/PG 5 2/52 PLAN 1762 471 ANDOVER STREET,LLC MERRIMACK COLLEGE BK/PG 14463/6 BK/PG 17112/195 PB/PG 504/600 PLO-567 PLA 600 471 ANDOVER STREET 477 ANDOVER STREET N/F MATTHEW R,WILSON AND 024.0-0031 024-0-0030 MARIA WILSON o BK/PG 10912/169 200 ELM STREET 2-49 TI 20'WIDE COMMON aj DRIVEWAY AND N/F PARKING EASEMENT MERRIMACK COLLEGE BK/PG 8341/122 BK/PG 137217/8 0 ELM STIR 2-50 PLAN 11640 0 20 50 100 aj SCALE:1 20' 0 le,iar IIII IIIIIIIII00 III e "1 "6 2 5 4 IIII LI III '''' 0 2,1111!�'' ...... Memorandum III 'g.. ( \\Vhb\gbl\proj\Wat-LD\11625.34 Greystar P3 Deve1opment\cad\Id\P1anset\1162534 LM dwg \\ OVERLAY s PERMITTED �3 PROPOSED MODIFICATIONS 01 , wLL Y Q ar Turnpike Street/Route 174- -- - - o 101 Walnut Street PO Box 9151 Watertown,MA 02471 617.924.1770 a DRILL HOLE / -- -- — -- -- -- -- -- -- -- -- -- — — Legend: (FOUND) r r_ cC PROPOSEDBITUM: - CONCRETE BUILDING 1 � 1 .,J J® STANDINOUS ARD DUTY CONCRETE PAVEMENT 77,600 TOTAL GSF -- BITUMINOUS CONCRETE PAVEMENT F 4 LEVELS 366 BEDS F HEAVY DUTY I a EJ ME i 1 CRUSHED STONE BUILDINGS L ————————— --._.___---- —— EN E 0- 0 LANDSCAPE AREA a _ \ r y APPROX.PROJECT LIMITS , L a . ' Program Summary a , g ,: i Description Building 1 Building 2 r r. RESIDENTIAL GSF 72,300 56,500 E .. • '{ = .'--,__ F R' -" """'O'- ACADEMIC/CLASSROOM GSF 5,300 5,5C0 k N �T �N E ` TOTAL GSF 77,600 62,000 •�_ � pry _F o 1 � na g a= HVD �.-s a� _� _ Parkin Summary M 1 a a -- _ -- E _-•' ����� EXISTINGPR E T T TOTAL-42 SPACES j ' i .I _ _ i - F J PROPOSED PROJECT TOTAL=0 SPACES y y PROPOSED CHURCH TOTAL=-1 SPACES /�. -°�. Il F� •<£'' - / NET CHANGE_-43 ✓i 1 -- _ � a ,a . a / 100, Sign ummary Specification Desc. e 0 30 60 Feet Width Height 15 PROPOSED NumberD BUILDING N/F \` 2,OtT0 TOTAL GSA 1 I R1-1 30" so" 6 MERRIMACK COLLEGE 4 LMEtJ 174 BEDS Corner Development MAP 24,LOT 29 o BOOK 13727,PAGE 8 v11-2 30 30 Project at Merrimack ,M �v ,. ' 4� m H�o � �•.• College age / t i / e w 6-7P 24 2° � 315 Turnpike St o I = No rth Andover,MA 01845 t h S .. .. No- Re....on Dare Ap,d.00 . �PGK o w171 30 30 2 dart,caz,ons 11/162o2s �WK 3 Minor Modifications 0220/2024 JWK o TT N� PARKING ` :..' SP-1 12, 18" PASSENCEA 66 woo 0 zanE f ON PIPE �� -- _ M6-1(R) z1•' 15° a g Au* Issued for Dare (FOUND) August 17.2023 Local Approvals v : N <, N/F / Zoning Summary Chart MERRIMACK COLLEGE z� ONC.B UND o NIAP 2,LOT 50 CENTER F[phe Zoning District(5): Residence 3(R3) BOOK 13727,PAGE 8 (FOUND) y Wpy Overlay Distcict(S): None o A \ Parcel: Map 25-Lot 13 Zoning Regulation Requirements Required* Provided DawIn9N mbe ir MINIMUM LOT AREA 25,000 SF 2,480,742 SF \ - FRONTAGE 125.0 Feet 125 Feet hb Notes FRONT YARD SETBACK 30 Feet >30 Feet •O a�iJ SIDE YARD SETBACK(AT CORNER LOT) 30 Feet >30 Feet C3 REAR YARD SETBACK 30 Feet >30 Feet 1. ALL ACCESSIBLE PARKING,RAMPS,AND ACCESS SHALL CONFORM TO MAAB AND \ \ TN qN ADA REQUIREMENTS,WHICHEVER IS MORE RESTRICTIVE. MINIMUM LOT WIDTH 0 Feet 0 Feet sneer ar LL N/F \ N /�I\D'Vl R MAXIMUM BUILDING HEIGHT 35 Feet 48 Feet** 3 12 > h ,VQQ \ 2. ALL PAVEMENT MARKINGS AND SIGNS SHALL CONFORM TO MUTCD REQUIREMENTS. _1' N A y �� Zoning regulaton requ rements as specf'ed'n Tawn of North Andover MA D'vs onl Bylaxs,Part 11 m MATTHEM R.2,LOT 4 W LSON FR \ 3. SITE LIGHTING SHOWN FOR COORDINATION ONLY,REFER TO LIGHTING PLANS FOR smm�ar fDmens oral Re t /\ General Legislation Chapter 195 Zoning Code Article 7 Di nens oral Requ re netts§195 7 2 Table of MAP 2 LOT 49 �� q°Ye e° ✓✓�• \ PROPOSED SITE LIGHTING. "Wll requre relef froir heghtrequrement under MGL Ch.40A§3(the Dover Arrendnent').Proposed Project Number R�, BOOK 109t,.,,".PAGIF 169 / ar ` heghtbasedot--gegrade<alculaton. 11625.34 �� \\Vhb\gbl\proj\Wat-LD\11625.34 Greystar P3 Development\cad\Id\Planset\1162534 GD.dwg 1 OVERLAY V _ PERMITTED PROPOSED MODIFICATIONS _„�01 Turnpike Street/Route 114 101 Walnut Street - PO Box 9151 m Watertown,MA 02471 ` 617 924 1770 227, 22 N 22 2 ` 23 27 227 2 23 �. 41 ��o PROPOSED BUILDING 1 ) FFE=228.0 • 22p� NN EN EN HE=224.0/228.0 FFE 224.0 i P a } 2 N EN ME z i r 4 —r EG CIO .a a 7 � e �a �a y r �N k EN {` 2, m co F-• EN EN E } 22 23' �- - - pry n t v � edina � t tc " • �N� --e�/ • ` � .. z2a ,2n jt �r / 1 f r ti 100, FFE—224.0' '.- � 0 15 30 60 Feet PROPOSED Q1 BUILDING 2 N/F N FIFE 220.0/224.0 I MERRIMACK COLLEGE Corner Development y..� opm MAP 24,LOT 29 t C rn ever nt BOOK 13727,PAGE 8 z2S Project at Merrimack MF 224 College _ 22 North Andover,MA 01845 N Ni,. R......r Date Ap,d. 3 Minor Modifications 02/20/2024 JWK y - f I s B� i 2 m o \ Date Local ovals August 17,2023 N ms Approvals Grading and ti LL f Y MERRIMACK COLLEGE .�! Drainage Plan d � !AP 2,LOT-'A N 0 - ,. ... Flo BOOK 13727,PAGE 8 ? e y W �� �_ h Notes Daxing N mba m 1. ELEVATIONS SHOWN ARE BASED ON NAVD OF 1988. 2. CATCH BASINS WITHIN AND IMMEDIATELY DOWNSTREAM OF THE LIMIT OF WORKC4.0 hb SHALL BE FITTED WITH SEDIMENT TRAPS UNTIL THE SITE IS PERMANENTLY STABILIZED, 3 ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO CONSTRUCTION a A� \ 4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING snae� of �' Ary CONSTRUCTION EXITS AT ALL CONSTRUCTION VEHICLE ACCESS POINTS ONTO R N/F \ �p .,`DOVER - \ DISTURBED AREAS OF THE SITE.CONSTRUCTION EXITS SHALL BE MAINTAINED UNTIL 4 12 �� V m MATTHEW R.&.�.1ARA WLSON fi FR:, """ -- DISTURBED PORTIONS OF THE SITE ARE STABILIZED AS DETERMINED BY THE -� � �,. .....». \\�. ENGINEER. MAP 2,LOT 49 ' w m a,a ea N mbe, 5. SEE SHEET C7.0 UTILITY ADD ALTERNATE PLAN FOR UTILITY ADD ALTERNATES. BOOK 19912,PAGE 169 ?_ 11625.34